Loading...
Electrical Permit Fee ScheduleTO 0 Mr. Craig INTER-OFFICE MEMO FROM Ray Kohnen SUBJECT Electrical Permit Fee Schedule C!TY OF QPICINS 1010 FIRST STREET SOUTH PHONE: 935- 474 HOPKINS, MINNESOTA 55343 DAT June 15 19 81 I would like Hopkins City Council action to adopt the State Electrical Permit Fee Schedule. The reason I want to adopt the State Fee Schedule is that about 95% of the local municipalities now use it. This would eliminate most problems the electrical contractors have with filling out Hopkins Electrical Permits. -Attached please find the present Hopkins Electrical Permit Fee Schedule and the State Electrical Fee Schedule I would like to adopt. Subd. No. Type of Permit Electrical .196 Inspection Fees for each separate inspection of installation, replacement, alteration or repair to any circuit from 0 to 30 AMP .197 Services, change or services, additions, alterations, or repairs on either primary or secondary services PERMITS .198 Circuits, installation of, additions, alterations, or repairs; each circuit or sub- feeder to be computed $eparate1y including circuits fed from sub feeders and in- cluding the equipment served, plus fees as set forth in items .199, .200 and .201 .199 All transformers and gen- erators for light, heat and power (Plus 1 to 100 KVA) 101 KVA and up .200 Transformers for signs and outline lighting 0 to 500 VA each additional 100 VA or fraction thereof .201 Remote control signal circuits and circuits of less than 500 volts (except in dwellings) .202 Other or requested special inspection or services (including conduits and mobile homes) Conditions Section 500 :00 Subd. 196 (1977) Fees minimum per inspection 5.00 0 to 60 AMP capacity 4.50 6o to 100 AMPS 6.00 101 to 200 AMPS 7.50 for each additional 100 AMPS or fraction thereof 3.00 0 to 30 AMPS 1.50 31 to 100 AMPS 3.00 for each additional 100 AMPS or fraction thereof 1.00 The fee for circuits of over 250 volts shall be double the abofe fee. per unit per KVA per KVA per unit per unit 1 to 10 openings each additional 10 openings or fraction thereof 3.00 .20 .10 6.00 .20 5.00 .5o per man hour 10.00 SUBD. NO. Electrical .196 Type of Permit PERMITS Inspection Fees for each separate inspection of installation, replacement, alteration or repair to any circuit from 0 to 30 AMP .197 Services, change of services, additions, alterations, or repair service of each .198 Not over 250 Volts: Circuits, installation of, additions, alterations, or repairs; of each circuit or sub- feeder to be computed separately .199 All transformers and gener- ators for light, heat or power; each unit (0 to 100 KVA) 101 KVA and up .200 Transformers for signs and outline lighting 0 to 500 VA each additional 100 VA or fraction thereof .201 Remote control signal circuits and circuits of less than 500 volts (except in dwellings) .202 Other or requested special inspection or services (including conduits and mobile homes) Section 500;00 Subd, 196 (1981) Conditions Fees Minimum per inspection 6.00 0 to 100 AMPS 7.00 101 to 200 AMPS 8.50 for each additional 100 AMPS or fraction thereof 3.50 0 to 30 AMPS 2.25 31 to 100 AMPS 3.50 for each additional 100 AMPS or fraction thereof 1.00 per unit per KVA per KVA per unit per unit 1 to 10 openings each additional 10 openings or fraction thereof per man hour State Surcharge 2.00 .10 .05 2.00 .20 2.00 .50 14.00 .50