Electrical Permit Fee ScheduleTO
0
Mr. Craig
INTER-OFFICE MEMO
FROM Ray Kohnen
SUBJECT Electrical Permit Fee Schedule
C!TY OF QPICINS
1010 FIRST STREET SOUTH PHONE: 935- 474
HOPKINS, MINNESOTA 55343
DAT June 15 19 81
I would like Hopkins City Council action to adopt the State Electrical
Permit Fee Schedule.
The reason I want to adopt the State Fee Schedule is that about 95% of
the local municipalities now use it.
This would eliminate most problems the electrical contractors have with
filling out Hopkins Electrical Permits.
-Attached please find the present Hopkins Electrical Permit Fee Schedule
and the State Electrical Fee Schedule I would like to adopt.
Subd. No. Type of Permit
Electrical
.196 Inspection Fees for each
separate inspection of
installation, replacement,
alteration or repair to
any circuit from 0 to 30
AMP
.197 Services, change or services,
additions, alterations, or
repairs on either primary
or secondary services
PERMITS
.198 Circuits, installation of,
additions, alterations, or
repairs; each circuit or
sub- feeder to be computed
$eparate1y including circuits
fed from sub feeders and in-
cluding the equipment served,
plus fees as set forth in
items .199, .200 and .201
.199 All transformers and gen-
erators for light, heat
and power
(Plus 1 to 100 KVA)
101 KVA and up
.200 Transformers for signs and
outline lighting
0 to 500 VA
each additional 100 VA
or fraction thereof
.201 Remote control signal
circuits and circuits of
less than 500 volts
(except in dwellings)
.202 Other or requested special
inspection or services
(including conduits and
mobile homes)
Conditions
Section 500 :00
Subd. 196 (1977)
Fees
minimum per inspection 5.00
0 to 60 AMP capacity 4.50
6o to 100 AMPS 6.00
101 to 200 AMPS 7.50
for each additional 100
AMPS or fraction thereof 3.00
0 to 30 AMPS 1.50
31 to 100 AMPS 3.00
for each additional 100
AMPS or fraction thereof 1.00
The fee for circuits of
over 250 volts shall be
double the abofe fee.
per unit
per KVA
per KVA
per unit
per unit
1 to 10 openings
each additional 10
openings or fraction
thereof
3.00
.20
.10
6.00
.20
5.00
.5o
per man hour 10.00
SUBD. NO.
Electrical
.196
Type of Permit
PERMITS
Inspection Fees for each
separate inspection of
installation, replacement,
alteration or repair to
any circuit from 0 to 30
AMP
.197 Services, change of services,
additions, alterations, or
repair service of each
.198 Not over 250 Volts:
Circuits, installation of,
additions, alterations, or
repairs; of each circuit or
sub- feeder to be computed
separately
.199 All transformers and gener-
ators for light, heat or
power; each unit
(0 to 100 KVA)
101 KVA and up
.200 Transformers for signs and
outline lighting
0 to 500 VA
each additional 100 VA
or fraction thereof
.201 Remote control signal
circuits and circuits of
less than 500 volts
(except in dwellings)
.202 Other or requested special
inspection or services
(including conduits and
mobile homes)
Section 500;00
Subd, 196 (1981)
Conditions Fees
Minimum per inspection 6.00
0 to 100 AMPS 7.00
101 to 200 AMPS 8.50
for each additional 100
AMPS or fraction thereof 3.50
0 to 30 AMPS 2.25
31 to 100 AMPS 3.50
for each additional 100
AMPS or fraction thereof 1.00
per unit
per KVA
per KVA
per unit
per unit
1 to 10 openings
each additional 10
openings or fraction
thereof
per man hour
State Surcharge
2.00
.10
.05
2.00
.20
2.00
.50
14.00
.50