Memo - Capital Improvement PlanCITY OF HOPKINS
MEMORANDUM
Date: July 8, 2009
To: Mayor & City Council
From: Christine Harkess, Finance Director
Subject: Capital Improvement Plan (C.I.P.)
FINANCE DEPARTMENT
Attached is a revised CIP which has undergone a couple of staff revisions since the CIP
discussion at the June 9 th work session. At this work session we will again review the 2010 -2014
document and incorporate any changes from the work session discussion. This will be a
continuation of the CIP discussion that was done at the June 9 th work session.
The focus at this meeting will be on the street improvement program that was first discussed at
the June 9 th meeting. Questions raised at that meeting regarding the street improvement program
will be addressed by John Bradford and questions raised regarding the Activity Center HVAC
system upgrade will be addressed by Steve Stadler.
Included in this packet are the following —
1. Info related to the street improvement program — John Bradford
2. The cash flow statements by fund (pages C1 -8)
3. Projects summarized by funding source (pages F1-4)
4. Projects summarized by department (pages D1 -3)
5. Individual project sheets providing a description of the project, justification, and funding
source. (pages 1 -38)
6. LT project overview for the water, sewer and storm sewer funds (pages E1 -3)
Street CIP Fact Sheet
What is the difference between a reconstruction and reclamation project?
There is very little difference between the two types of project. The primary difference is
that a reclamation project reuses more of the existing material in the roadway than a
reconstruction project. Instead of hauling out subgrade material and hauling in new class
5 aggregate, reclamation involves injecting some asphalt oil into the existing base
material to give it the same strength as new class 5 aggregate.
The cost of a reclamation project is approximately 5 to 7% less than reconstruction and
both have the same expected life span.
How has the City dealt with curb and driveway aprons in past projects?
Our process for addressing curb and gutter is based on two factors. What condition is the
curb in and are there elevation changes needed in the roadway that necessitate the
removal of the curb.
Our process for addressing driveway aprons has been if we replace the curb at a driveway
apron, we replace the apron.
How have these processes been implemented in past years?
2009 -2010 Park Ridge Neighborhood
Curb entirely replaced because of utility work, narrowing of roadway, and grade
changes to street. All driveway aprons are thus being replaced as well.
2008 Minnetonka Mills Road
Curb installed because there was none in place. Aprons also replaced.
2007 19` Avenue and Drillane
Drillane had no curb so all new curb and driveway aprons.
19 had a combination of new curb and curb repair depending on grade changes.
Driveway aprons replaced at new curb locations.
2006 18 ", 19 & 20 Avenues
No curb and gutter so all new curb and driveway aprons were installed.
2005 North Presidential Avenues
Spot curb repair and curb replacement where grades were changed for drainage.
Driveway aprons only replaced where curb was replaced (e.g. Monroe Circle).
CABLE TV - WORKING CAPITAL PROJECTIONS 07/06/2009
e-
Actual
Actual
Projected
Projected Projected Projected
Projected
Projected
2014
2007
2008
2009
2010 2011 2012
2013
Working Capital Beginning Year
320,327
394,752
408,036
385,646 362,406 331,229
321,953
309,714
Revenues:
226,602
203,285
170,000
170,000 170,000 170,000
170,000
170,0
Franchise Fees
17,419
13,633
4,080
3,856 3,624 3,312
3,220
3,097
Interest
244,021
216,918
174,080
173,856 173,624 173,312
173,220
173,097
Total Revenues
Expenditures:
82,676
85,000
87,550
90,177 92,882 95,668
98,538
101,4
Expense
Transfer Out
86,920
86,920
86,920
86,920 86,920 86,920
86,920
86,920
Capital Outlay
-
31,714
22,000
20,000 25,000
197,097 204,802 182,588
185,458
188,414
196,470
169,596
203,634
Total Expenditures
Change in available funds
74,425
13,284
(22,390)
(23,240) - (31,178) (9,276)
(12,239)
(15,317)
Working Capital Ending Year
394,752
408,036
385,646
362,406 331,229 321,953
309,714
294,397
2009 Proiects
45,000
Council Chambers Video
a portion of this project was done in 2006
1,500
Council Chambers Lectern Monitors
46,500
2010 Proiects
20,000
Council Chambers Lighting
2011 Proiects
25,000
Automated Playback
digital recorder /players to control the channel
will be able to save council meetings on hard
drive
e-
PARK CAPITAL IMPROVEMENTS FUND (301) 07(0612009
C - �--
Actual
Actual
Actual
Projected
Projected Projected Projected
Projected
Projected
2006
2007
2008
2009
2010 2011 2012
2013
2014
Working Capital Beginning Year
96,397
70,780
434,115
357,936
242,416 221,340 153,054
73,084
(2,685)
Revenues:
Interest
Dedication fees
4,169
16,854
13,465
3,579
2,424 2,213 1,531
731
(27)
Joint Rec
0
385,475
0
10,000
10,000 10,000 10,000
10,000
10,000
refunds
5,755
7,174
Donations - general
Donations - benches
1,243
4,200
1,500
2,526
1,000 1,000 1,000
1,000
1,000
Total Revenues
700
5,413
412,284
22,139
16,805
13424 13,213 12,531
11,731
10,973
Expenditures:
C.I.P. Projects
Total Expenditures
31,030
31,030
48.949
98,318
132,325
34,500 81,500 92,500
87,500
45,000
48,949
98,318
132,325
34,500 81,500 92,500
87,500
45,000
Working Capital Year End
70,780
434,115
357,936
242,416
221,340 153,054 73,084
(2,685)
(36,712)
2009 Projects
30,000
Valley Park Basketball Court repairs
5,325
Resurface Burnes park tennis courts - Budget
was $10,000
40,000
Interlachen Picnic Shelter
50,000
Interlachen Play Equipment
7,000
Skate Park improvements
132,325
2010 Proiects
27,500
Shady Oak BeachPlay Area Renovation
(Total $110,000 paid over 4 years at
$27,500 each
year)
7,000
Skate Park improvements
34,500
2011 Proiects
27,500
Shady Oak BeachPlay Area Renovation
45,000
Hilltop Park Play Equipment
7,000
Skate Park improvements
79,500
2012 Projects
65,000
Valley Park Play Equipment
27,500
Shady Oak Beach Play Area Renovation
92,500
2013 Projects
27,500
Shady Oak BeachPlay Area Renovation
60,000
Oakes Park Play Equipment
87,500
2014 Projects
45,000
Park Valley Play Equipment
C - �--
Working Capital Beginning Year
Revenues:
Miscellaneous
Interest
Federal Stimulus Funds
Donations
Transfers In from General Fund
Tax Levy
Total Revenues
Expenditures:
Pavilion Projects
C.I.P. Projects
Transfer to General Fund
Total Expenditures
Working Capital Year End
CAPITAL IMPROVEMENTS FUND (305)
07/06/2009
Actual
Actual
Projected
Projected
Projected
Projected
Projected
Projected
2007
2008
2009
2010
2011
2012
2013
2014
196,976
194,214
248,537
238,022
159,402
208,296
257,879
(89,542)
276,790
6,767
7,080
2,485
2,380
1,594
2,083
2,579
(895)
65,000
10,000
49,083
72,082
100,000
0 h
100,000
125,000
125,000
125,000
332,640
79,162
102,485
67,380
111,594
127,083
127,579
124,105
66,121 0 38,000 38,000
269,281 24,839 25,000 146,000 24,700
50,00
335,402 24,839 113,000 146,000 62,700
194,214 248,537 238,022 159,402 208,296
levy eliminated for 2010 - put
in General Fund
15,000
62,500 475,000
77,500 475,000 0
257,879 (89,542) 34,563
2009 Proiects
25,000 City Hall - replace roof
38,000 Pavilion - Bleacher Heating Replacement
63,000 amended to Pavilion Chiller Plant Controls (same amt)
2010 Proiects
130,000 City Hall Boiler Replacement ($65,000 pd with Fed Stimulus funds)
16,000 Art Center - carpet replacement - various rooms & hallway
146,000 - original schedule on the carpet was 2007
2011 Proiects
8,700 Art Center - Redepenning Gallery carpet
16,000 Activity Center - Raspberry Room Carpet
38,000 Pavilion Bleacher Heating System Replacement ($10,000 donations ?)
62,700
2012 Proiects
50,000 Activity Center - HVAC Upgrade
12,500 Art Center - Office carpet
15,000 Pavilion - Ice Resurfacer Water Heating System Replacement
77,500
2013 Proiects
275,000 Activity Center - HVAC System
200,000 Parking Lot 200
475,000
2014 Proiects
none currently
e/ 3
(1) Includes current, delinquent and penalties
Total Projects Scheduled (CIP &SA) 846,792 950,000 1,238,000 1,668,000 1,791,000 1,640,000 2,248,700
Bonds must be sold not later than 18 months after the later of:
A - The date the original expenditure is paid OR
B - The date the project is placed in service
Next bond sale scheduled is for the 2008 and 2009 projects - bonds sold in 2009 or 2010
0 -�
P.I.R. FUND (501)
06/0412009
Actual
Actual
Projected
Projected
Projected
Projected
Projected
Projected
2007
2008
2009
2010
2011
2012
2013
2014
Working Capital Beginning Year
763,916
1,123,299
539,866
(154,058)
1,168,660
80,131
859,304
(126,927)
Revenues:
Special Assessment Revenues (1)
513,847
446,979
439.600
697.000
737,000
760,000
854,000
925,000
Refunds & Reimbursements
Interest
44,249
21,945
21,595
(6,162)
52,590
3,606
38,669
(5,712)
Transfers In
2,755
Miscellaneous
Bond Proceeds
1,942,447
2,000,000
2,000,000
2,000,000
Total Revenues
2,500,543
471,679
461,195
2.690,838
789,590
2,763,606
892,669
2,919,288
Expenditures:
Administrative Fees
3
3
Co Rd 3 - Phase II
140,000
C.I.P. Projects
929,944
846,792
700,000
259,000
911,600
913,000
910,000
1,200,000
C. 1. P. Projects - SpecialAssm
250,000
979,000
756,400
878,000
730,000
1,048,700
Transfer to MSA - Excelsior Blvd Project
880,000
Debt Service Transfers - curr debt
187,219
133,219
133,219
58,219
58,219
41,533
0
0
Debt Service Transfers -2007 debt
71,900
71,900
71,900
71,900
71,900
71,900
71,900
Debt Service Transfers - 2010 debt
80 000
80,000
80,000
80,000
Debt Service Transfers - 2012 debt
87,000
87,000
Debt Service Transfers - 2014 debt
Total Expenditures
2,141,160
1,055,112
1,155,119
1,368,119
1,878,119
1,984,433
1
2,487,600
Working Capital Year End
1,123,299
539,866
(154,058)
1,168,660
80.131
859,304
(126,927)
304,761
(1) Includes current, delinquent and penalties
Total Projects Scheduled (CIP &SA) 846,792 950,000 1,238,000 1,668,000 1,791,000 1,640,000 2,248,700
Bonds must be sold not later than 18 months after the later of:
A - The date the original expenditure is paid OR
B - The date the project is placed in service
Next bond sale scheduled is for the 2008 and 2009 projects - bonds sold in 2009 or 2010
0 -�
07/0912009
2000 - Co Rd 3, 5th Ave S, Traffic Signaljrade
2001 - Co Rd 3, rebuild /redesign 11th AVECSAH73 /5 Intersection
2002 - Co Rd 3, rebuild /redesign 11th AVECO 61, Hwy 7 17th Ave /CSAH 73 Intersection Imp,
CSAH 73/5 Intersection
2003 - Co Rd 3, 5th Ave, Co Rd 61, CSAV5 Intersection, CSAH 5 Corridor Imp
2004 - Co Rd 3, CSAH 73/5 Intersection, mH 5 Corridor Imp
2005 - Excelsior Blvd Streetscape Imp, C1 7315 Intersection, CSAH 5 Corridor Imp
2006 - Excelsior Blvd Streetscape Imp
2007 - Completion of Excelsior Blvd Stre®pe Imp
2008 - MSA road improvements
2009 - none
2010 - 5th St from 11 th Ave S to Corporatnits - reconstruction
2011 - none
2012 - none
2014 - Co Rd 3 from Blake Rd to Meadovtok Rd and Co Rd 61 Shady Oak Road
C /�
MUNICIPAL STATE AID FUND (302)
Actual
Actual
Projected
Projected
Projected
Projected
Projected
Projected
2007
2008
2009
2010
2011
2012
2013
2014
Working Capital Beginning Bal
220,189
57,078
235,317
920,716
931,923
1,266,243
1,603,905
1,944,944
Revenues:
State MSA Funds, projects
87,139
State MSA Funds, Co Rd 3 (3)
1,060,755
258,907
325,000
325,000
325,000
325,000
325,000
237,861
State MSA Funds, debt service (1)
Interest Earnings
25,854
11,997
2,353
9,207
9,319
12,662
16,039
19,449
Hennepin County
358,046 (2)
Transfer from PIR - Excelsior Blvd
880,000
Bond issue
Total Revenues
1,966,609
270,904
685,399
334,207
334,319
337,662
341,039
344,449
Expenditures:
Transfer Out for Projects
CIP State Aid Projects
2,129,720
92,665
323,000
4,437,849
Debt service expense
Total Expenditures
2,129,720
92,665
0
323,000
0
0
0
4,437,849
Working Capital Ending Balance
57,078
235,317
920,716
931,923
1,266,243
1,603,905
1,944,944
(2,148,456)
includes cash, interest rcvbl, & A/P
State MSA Cash Flow - Memo Only (1)
Balance Forward
787,148
1,122,025
61,270
61,270
61,270
61,270
61,270
61,270
Annual Allotment
334,877
320,177
325,000
325,000
325,000
325,000
325,000
325,000
Project Disbursements to city
(1,380,932)
(325,000)
(325,000)
(325,000)
(325,000)
(325,000)
(325,000)
Debt Service Disbursements
Total MSA Funds Available
1,122,025
61,270
61,270
61,270
61,270
61,270
61,270
61,270
MSA Balance Encumbered
61,270
61,270
(1) No more than 50% of annual allotmenh
be used for debt
service
(2) Excelsior Blvd Streetscape Improveme-
2006 CIP showed revenues of $420,000 Other
-- need to bill Hennepin County for their se which is approximately $358,000)
- WAITING FOR CO -OP AGREEMENT
(3) A/R of $1,862,861 is due from MnDO1d will be sent as funds become available.
This is not shown on the schedule. Total 1s to be received total $3,243,793.
2000 - Co Rd 3, 5th Ave S, Traffic Signaljrade
2001 - Co Rd 3, rebuild /redesign 11th AVECSAH73 /5 Intersection
2002 - Co Rd 3, rebuild /redesign 11th AVECO 61, Hwy 7 17th Ave /CSAH 73 Intersection Imp,
CSAH 73/5 Intersection
2003 - Co Rd 3, 5th Ave, Co Rd 61, CSAV5 Intersection, CSAH 5 Corridor Imp
2004 - Co Rd 3, CSAH 73/5 Intersection, mH 5 Corridor Imp
2005 - Excelsior Blvd Streetscape Imp, C1 7315 Intersection, CSAH 5 Corridor Imp
2006 - Excelsior Blvd Streetscape Imp
2007 - Completion of Excelsior Blvd Stre®pe Imp
2008 - MSA road improvements
2009 - none
2010 - 5th St from 11 th Ave S to Corporatnits - reconstruction
2011 - none
2012 - none
2014 - Co Rd 3 from Blake Rd to Meadovtok Rd and Co Rd 61 Shady Oak Road
C /�
Working Capital Beginning Year
Revenues:
Operating Revenues
Other
Interest
Transfer In - Storm Sewer
Bond Issuance
Total Revenues
Expenditures:
Operation Expense
Other Exp - int on current bonds
Other Exp - int on 2009 bonds
Other Exp - int on 2011 bonds
Transfer Out - Storm Sewer Loan
Capital Outlay (per ERP)
Water System Maintenance
Capital Improvements
Capital Improvements - PW Bldg
Principal Bond payment
Principal Bond pymnt - 2009 debt
Principal Bond pymnt - 2011 debt
Capital Lease (PW Facility)
Total Expenditures
Change in available funds
Inventory change
Working Capital Ending Year
Rate History
1984 $0.85
1993 $1.05
1997 $1.10
2000 $1.20
2005 $1.40
Per Utility Master Plan (10/07)
2008 $1.65
2009 $1.86
2010 $1.90
2011 $1.94
2012 $1.98
2013 $2.02 projected rate
2014 $2.06 increases
2015 $2.11
2016 $2.16
2017 $2.21
these are the correct rates per the UMP
2009 - 2017 financial data was taken from the Utility Master Plan done by City Engineer
Notes -
Income - 2008 and forward used utility master plan rates (fixture /no surcharge option)
2009 - Residential Street Improvements - $ 273,000, Meter Replacement - $ 95,000
Emergency Generator - Lake Elmo Plant - $ 373,000
2010 - Residential Street Improvements - $ 227,000, Meter Replacement - $ 95,000,
MSA Road Improvements - $ 140,000
2011 - Residential street impry $75,000, Meter Replacement - $ 95,000, SLP Emergncy Connection - $ 211,000
2012 - Residential street improvements - $ 75,000, Meter Replacement - $ 95,000,
2013 - Residential street improvements - $ 80,000, Meter Replacement - $ 95,000;
Emergency Chlorine Shut Off Valves - $ 33,000
2014 - Residential street improvements - $ 80,000,
V -(P
WATER FUND - WORKING CAPITAL PROJECTION
07/09/2009
Actual
Actual
Projected
Projected
Projected
Projected
Projected
Projected
2007
2008
2009
2010
2011
2012
2013
2014
473,284
20,267
(314,013)
62,418
(173,417)
165,271
186,290
32,069
1,078,948
1,124, 931
1,357, 800
1,387,000
1,416,200
1,445,400
1,474,600
1,503,800
57,600
63,679
62,000
30,000
30,000
30,000
30,000
30,000
14,651
0
11,000
6,726
7,408
8,708
8,169
5,696
800.000
500.000
1,151,199
1,188.610
2
1,423,726
1,953,608
1,484,108
1,512,769
1,539,496
966,669
1,080,092
846,199
876,024
906,310
937,709
970,265
1,004,024
67,727
66,915
57,170
49,337
41,610
33,380
24,675
15,310
25,000
40,000
38,500
37.000
35,250
33,500
17,500
25,000
24,000
23,000
22,555
15,970
0
12,200
0
0
134,800
0
376,582
188,606
741,000
462,000
381,000
170,000
208,000
80,000
125,000
130,000
140, 000
145,000
155,000
160,000
170,000
180,000
30,000
30,000
35,000
35,000
40,000
20,000
20,000
25,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
45,000
1,603,533
1,526,583
1,854,369
1,659,561
1,614,920
1,463,089
1,666,990
1,445, 834
(452,334)
(337,973)
376,431
(235,835)
338,688
21,019
(154,221)
93,662
(683)
3,693
20,267
(314,013)
62,418
(173,417)
165,271
186,290
32,069
125,731
2009 - 2017 financial data was taken from the Utility Master Plan done by City Engineer
Notes -
Income - 2008 and forward used utility master plan rates (fixture /no surcharge option)
2009 - Residential Street Improvements - $ 273,000, Meter Replacement - $ 95,000
Emergency Generator - Lake Elmo Plant - $ 373,000
2010 - Residential Street Improvements - $ 227,000, Meter Replacement - $ 95,000,
MSA Road Improvements - $ 140,000
2011 - Residential street impry $75,000, Meter Replacement - $ 95,000, SLP Emergncy Connection - $ 211,000
2012 - Residential street improvements - $ 75,000, Meter Replacement - $ 95,000,
2013 - Residential street improvements - $ 80,000, Meter Replacement - $ 95,000;
Emergency Chlorine Shut Off Valves - $ 33,000
2014 - Residential street improvements - $ 80,000,
V -(P
Working Capital Beginning Year
Revenues:
Operating Revenues
Grants /Other Govt Funding
Other
Interest
Transfer In - Storm Sewer Fund
Bond Issuance
Total Revenues
Expenditures:
Operation Expense
MWCC Charges (3% inflation)
Interest Expense - 2009 Debt
Interest Expense - 2011 Debt
Transfer Out - Storm Sewer Fund
Capital Outlay (per ERP)
Met Council 1/1 Charge
Capital Improvements
Capital Improvements - PW Bldg
Principal Bond payment (2009)
Principal Bond payment (2011)
Capital Lease (PW Facility)
Total Expenditures
Change in available funds
Inventory change
Working Capital Ending Year
Rate History
1983 $1.50
1989 $1.75
1991 $2.00
1993 $2.50
1999 $2.25 Rate DECREASE
2006 $2.50 rate increase
Per Utility Master Plan (10/07)
2008$2.70
2009$3.10
2010$3.40
2011 $3.70
2012$4.00
2013$4.30 projected rate
2014 $4.60 increases
2015$4.90
2016$5.00
2017$5.25
these are the correct rates per the UMP
2009 - 2017 financial data was taken from the Utility Master Plan done by City Engineer
Notes -
Income - 2008 and forward used utility master plan rates (no fixture option)
2009 - Residential Street Improvements - $200,000; MSA Road Improvements - $50,000
2010 - Residential Street Improvements - $150,000; Lift Station #4 - $160,000; Upgrade Lift Station #1 - $220,000
Lift Station #4 - $60,000 and Lift Station #1 - $110,000 -- revenue from other governments
2011 -Residential Street Improvements - $100,000;
2012 - Residential Street Improvements - $100,000; Lift Station Maintenance4 - $15,000
2013 - Residential Street Improvements - $100,000;
2014 - Residential Street Improvements - $100,000;
C -1
SEWER FUND - WORKING CAPITAL PROJECTION
07/09/2009
Actual
Actual
Projected
Projected
Projected
Projected
Projected
Projected
2007
2008
2009
2010
2011
2012
2013
2014
414,387
(17,786)
(397,606)
99,762
(370,899)
270,438
118,025
141,855
1,409,057
1,453,029
1,767,000
1,938,000
2,109,000
2,280,000
2,451,000
2,622,000
190,000
18,618
21,445
24,000
23,000
23,000
23,000
20,000
20,000
11,207
0
6,000
5,007
23,967
22,270
27,596
33,415
800,000
800,000
1,438,882
1,474,474
2,597,000
2,156,007
2,955,967
2,325,270
2,498,596
2,675,415
584,770
541,276
676,057
671,926
693,479
715,749
738,762
762,545
1,024, 373
1,072,061
1,098,575
1,215,142
1,288,051
1,365,334
1,447,254
1,534,089
25,000
40,000
38,500
37,000
35,250
33,500
25,000
40,000
38,500
37,000
0
0
0
0
0
0
0
35,700
0
0
89,600
89,600
89,600
212,079
186,991
250,000
530,000
100,000
115,000
100,000
100,000
30,000
30,000
35,000
35,000
40,000
30,000
30,000
35,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
1,871,222
1,850,328
2,099,632
2,626,668
2,314,630
2,477,683
2,474,766
2,627,834
(432,340)
(375,854)
497,368
(470,661)
641,337
(152,413)
23,830
47,581
167
(3,966)
(17,786)
(397,606)
99,762
(370,899)
270,438
118,025
141,855
189,436
2009 - 2017 financial data was taken from the Utility Master Plan done by City Engineer
Notes -
Income - 2008 and forward used utility master plan rates (no fixture option)
2009 - Residential Street Improvements - $200,000; MSA Road Improvements - $50,000
2010 - Residential Street Improvements - $150,000; Lift Station #4 - $160,000; Upgrade Lift Station #1 - $220,000
Lift Station #4 - $60,000 and Lift Station #1 - $110,000 -- revenue from other governments
2011 -Residential Street Improvements - $100,000;
2012 - Residential Street Improvements - $100,000; Lift Station Maintenance4 - $15,000
2013 - Residential Street Improvements - $100,000;
2014 - Residential Street Improvements - $100,000;
C -1
Working Capital Beginning Year
Revenues:
Operating Revenues
Other
Interest
Transfer In - Water Fund
Transfer In - Sanitary Sewer Fund
Bond Issuance
Total Revenues
Expenditures:
Operation Expense
Other Expense (interest on bonds)
Transfer Out - Water Fund
Transfer Out - Sanitary Sewer
Capital Outlay (per ERP)
Capital Improvements
Capital Improvements - PW Bldg
1999 Principal Bond payment
2001 Principal Bond payment
2003 Principal Bond payment
Capital Lease
Total Expenditures
Change in available funds
Working Capital Ending Year
Rate History (per month)
1989 $4.75 per quarter
1991 $6.00 per quarter
1992 $2.50
1993 $3.00
1998 $3.20
1999 $4.00
2006 $4.50
2009 $5.00
STORM SEWER FUND - WORKING CAPITAL PROJECTION 07109;`2009
Actual
Actual
Projected
Projected
Projected
Projected
Projected
Projected
2007
2008
2009
2010
2011
2012
2013
2014
923,842
598,454
351.098
377,165
283,504
543,258
807,427
1,059,762
716,710
716,957
802,140
802,140
802,140
802,140
802,140
802,140
8,069
8,072
8,000
5,000
5,000
5,000
5,000
5,000
40,171
10,209
30,000
24,775
5,324
13,670
20,500
26,486
764,950
735,238
840.140
831,915
812,464
820,810
827,640
833,626
126,914
133,548
141.392
174,257
179,637
185,187
190,912
194,730
106,320
93,956
86,681
77,319
66,073
58,454
50,393
41,803
0
0 0 0
0 0 0
0
482,104
365,090 196,000 264,000
117,000 118,000 129,000
330,000
95, 000
100,000 100,000 105,000
1 10, 000 115,000 120,000
130,000
205,000
215,000 215.000 225,000
50,000
50,000 50,000 55,000
55,000 55,000 60,000
60,000
25,000
25,000 25,000 25,000
25,000 25,000 25,000
25,000
1,090,338
982,594 814,073 925,576
552,710 556,641 575,305
781,533
(325,388)
(247,356) 26,067 (93,661)
259,754 264,169 252,335
52,093
598,454
351,098 377,165 283,504
543,258 807,427 1,059,762
1,111,855
2009 - 2017 financial data was taken from the
Utility Master Plan done by City Engineer
Notes -
2009 - Residential Street Imp - $180,000, Storm
Drainage System Maintenance - $16,000;
2010 - Residential Street Improvements - $70,000, Citywide Concrete Alley's - $11,000;
Storm Drainage System Maint - $16,000,
MSA Road Improvements - $167,000
2011 - Residential Street Improvements - $100,000, Storm Drainage Maint - $17,000
2012 - Residential Street Improvements - $100,000, Storm Drainage Maint - $18,000
2013 - Residential Street Improvements - $100,000; Storm Drainage Maint - $19,000
2014 - Residential Street Imp - $110,000; Storm
Drainage Maint - $20,000,
Storm Water Mgmt Projects - $200,000
C ,
City of Hopkins, MN
CAPITAL IMPROVEMENT PLAN
2010 thru 2014
FUNDING SOURCE SUMMARY
Source 2010 2011 2012
2013 2014 Total
Cable Television Fund
CI - Capital Improvement Fund
ED - Economic Development Fund
GU - Other Governmental Units
MS - Municipal State Aid Streets
PA - Pavilion Fund
PDF- Park Dedication Fund
PF - Private Sector Funds
PI - PIRIGeneral Obligation Bonds
SA - Special Assessment
SF - Sanitary Sewer Fund
SU - Storm Sewer Fund
TF - Tax Increment Financing
WF - Water Fund
GRAND TOTAL
20,000
25,000
45,000
81,000
24,700
62,500
475,000
643,200
1,300,000
1,300,000
475,000
2,010,000
2,485,000
323,000
4,437,849
4,760,849
38,000
15,000
53,000
34,500
79,500
92,500
87,500
45,000
339,000
90,000
90,000
259,000
911,600
913,000
910,000
1,200,000
4,193,600
979,000
756,400
878,000
730,000
1,048,700
4,392,100
340,000
100,000
115,000
100,000
100,000
755,000
264,000
117,000
118,000
129,000
330,000
958,000
14,500,000
2,000,000
16,500,000
462,000
381,000
170,000
208,000
80,000
1,301,000
19,037,500
4,523,200
2,364,000
2,639,500
9,251,549
37,815,749
Monday, July 06, 2009
/C�'l
City of Hopkins, MN
CAPITAL IMPROVEMENT PLAN
2010 thru 2014
PROJECTS BY FUNDING SOURCE
Source Project# Priority 2010 2011 2012 2013 2014 Total
! Cable Television Fund I
City Council Chambers Lighting 08- CIP -B051 n;a 20,00D 20,000
Automated Playback 08- CIP -B054 n'a 25,000 25,000
Cable Television Fund Total 20,000 25,000 45,000
CI - Capital Improvement Fund
i
n/a
4,437,849 4,437,849
Municipal State Aid Road Improvements
Parking Lots - Lot 200
06- CIP -S i 18
n/a
MS - Municipal State Aid Streets Totsil
200,000 200,000
Replace Carpet - Activity Center "Raspberry Roo --,''
08- CIP -A cc15
nla
16,000 16,000
Activity Center HVAC Upgrade
08- CIP -ACO20
n/a
n/a 38,000
50,000 275,000 325,000
Replace Office Carpet - HCA Stages Theatre
08- CIP- A,R006
n/a
15,000
12,500 12,500
Arts Center Carpet: Redepenning Gallery
08- CP -AR008
n/a
8,700 8,700
Art Center- Various Rooms and Hallway (Carpet)
09- CIP -AR028
n/a
16,000
16,000
City Hall Boiler Replacement
00- CP -CH033
n/a
65,000
65,000
CI - Capital Improvement Fund Total
81,000
24,700 62,500 475,000 643,200
ED - Economic Development Fund
0
Block 64 Redevelopment Project
06-DP-D404
n/a
1,300,000
1,300,000
ED - Economic Development Fund "hotal
1,300,000
1,300,000
L GU - Ot h e r G overnm ental U nit s
County Road 61 (Shady Oak Road)
01- CIP -S105
n!a
2,010,000 2,010,000
Upgrade of Sanitary Sewer Lift Station #1
04- CIP -0007
n/a
1 `� 0,000
110,000
Shady Oak Beach Community Play Area
07- CIP -P219
n/a
220,003
220,000
Lift Station # 4
08- CIP -0001
n/a
80,00
80,000
City Hall Boiler Replacement
09- CIP -CH033
n/a
65,000
65,000
GU - Other Governmental Units "I'otal
475,000
2,010,000 2,485,000
MS - Municipal State Aid Streets
County Road 61 (Shady Oak Road)
01- CIP -S105
n/a
4,437,849 4,437,849
Municipal State Aid Road Improvements
02- CIP -Si 16
n/a 323,000
323,000
MS - Municipal State Aid Streets Totsil
323,000
4,437,849 4,760,849
PA - Pavilion Fund
Pavilion Arena Bleacher Heating Replacement
08- GP -P008
n/a 38,000
38,090
Ice Resufacer Water Heating System Replacement
09- CIP -P316
n/a 15,000
15,000
1= l01?dmY, July 06, 2009
`/--
Source Project# Priority
2010
2011
20 12
2013
2014
Total
PA - Pavilion Fund Total
38,000
15,000
53,000
PDF- Park Dedication Fund
Shady Oak Beach Community Play Area
07- CIP -P219
n/a
27,500
27,500
27,500
27,500
110,000
Skate Park Improvements & Repair
08- CIP -P009
n/a
7,000
7,000
14,000
Play Equipment - Park Valley
08- CIP -P010
n/a
45,000
45,000
Play Equipment - Hilltop Park
08- CIP -P014
n/a
45,000
45,000
Play Equipment - Valley Park
08- CIP -P015
n/a
65,000
65,000
Play Equipment - Oakes Park
08- CIP -P016
n/a
60,000
60,000
PDF- Park Dedication Fund Total
34,500
79,500
92,500
87,500
45,000
339,000
IPF - Priva Sector Funds
Activity Center Cafe on 14th
09- CIP -ACO32
n/a
90,000
90,000
PF - Private Sector Funds Total
90,000
90,000
PI - PIR/Gene O bligation Bonds
Residential Street Improvements
01- CIP -S101
n/a
250,000
900,000
900,000
910,000
1,100,000
4,060,000
Citywide Concrete Alleys
01- CIP -S103
n/a
9,000
11,600
13,000
33,600
County Road 61 (Shady Oak Road)
01- CIP -S106
n/a
100,000
100,000
PI - P1R/General Obligation Bonds Total
259,000
911,600
913,000
910,000
1,200,000
4,193,600
SA - Spe cial Assessment - I
Residential Street Improvements
01- CIP -S101
n/a
244,000
710,000
830,000
730,000
1,000,000
3,514,000
Citywide Concrete Alleys
01- CIP -S103
n/a
35,000
46,400
48,000
129,400
County Road 61 (Shady Oak Road)
01- CIP -S106
n/a
48,700
48,700
Municipal State Aid Road Improvements
02- CIP -S116
n/a
700,000
700,000
SA - Special Assessment Total
979,000
756,400
878,000
730,000
1,048,700
4,392,100
, SF - Sanitary Sewer Fund
Residential Street Improvements - Utilities
01- CIP -S102
n/a
150,000
100,000
100,000
100,000
100,000
550,000
Upgrade of Sanitary Sewer Lift Station #1
04- CIP -0007
n/a
110,000
110,000
Lift Station # 4
08- CIP -0001
n/a
80,000
80,000
Sanitary Sewer Lift Station Maintenance
08- CIP -0009
n/a
15,000
15,000
SF - Sanitary Sewer Fund Total
340,000
100,000
115,000
100,000
100,000
755,000
SU otS ot rrn SeNver Fund
Residential Street Improvements -- Utilities
01- CIP -S102
n/a
70,000
100,000
100,000
110,000
110,000
490,000
Citywide Concrete Alleys
01- CIP -S103
n/a
11,000
11,000
Storm Drainage System Maintenance - Alley Repairs
01- CIP -0002
n/a
16,000
17,000
18,000
19,000
20,000
90,000
Storm Water Management Projects
01- CIP -0003
n/a
200,000
200,000
Municipal State Aid Road Improvements
02- CIP -S116
n/a
167,000
167,000
SU - Storm Sewer Fund Total
264,000
117,000
118,000
129,000
330,000
958,000
iTF - Tax Increment Financing
4londay, Judy 06, 2009
Source Project; Priority 2010 2011 2012 2 01 3 2014 Total
Redevelopment, East Excelsior Boulevard
01- CIP -D401
n/a
2,000,000
2,000,000
Block 64 Redevelopment Project
06- CIP -D404
n/a
3,500,000
Marketplace and Main
07- CIP -D405
n1a
1,000,000
Blake Corridor Redevelopment
09- CIP -D406
n/a
5,000,000
8th Avenue Redevelopment
09- C1!P -D407
n/a
3,000,000
TF - Tax Increment Financing Total
14,500,000
2,000,000
#F - Water Fund
Residential Street Improvements — Utilities
01- CIP -S 102
n,!a
227,000
75,000 75,000 80,000 80,000
Municipal State Aid Road Improvements
02 -CIP -S i 16
n/a
140,000
Meter Replacement
08- CIP -U000
n/a
95,000
95,000 95,000 95,000
Emergency Chlorine Shut OH Valves
08 -C!P -0006
n/a
33,000
St. Louis Park Emergency Connection
OS- CIP -00'0
n/a
211,000
WF - Water Fund Total 462,000 381,000 170,000 208,000 80,000 1,301,000
GRAND TOTAL 19,037,500 4,523,200 2,364,000 2,639,500 9,251,549 37,815,749
4,000
3,500,000
1,000,000
5, 000, 000
3,000,
16, 500, 000
53 7, 000
140,000
380,000
33,000
211,000
r
9axlay, Julv 06, 2009
F /
City of Hopkins, MN
CAPITAL IMPROVEMENT PLAN
2010 thru 2014
DEPARTMENT SUMMARY
Department 2010 2011 2012 2013
2014 Total
Activity Center
Arts Center
Cable TV
City Hall Administration
Development
Pavilion
Public Works: Parks
Public Works: Streets/Traffic
Public Works: Utilities
R4017day, July 06, 2009
��
106,000
50,000
275,000
431,000
16,000
8,700
12,500
37,200
20,000
25,000
45,000
130,000
130,000
15,800,000
2,000,000
17,800,000
38,000
15,000
53,000
337,000
52,000
65,000
60,000
45,000
559,000
2,326,000
1,943,000
2,066,000
2,130,000
8,986,549
17,451,549
491,000
323,000
128,000
147,000
220,000
1,309,000
GRAND TOTAL 19,120,000
4,495,700
2,336,500
2,612,000
9,251,549
37,815,749
R4017day, July 06, 2009
��
City of Hopkins, MN
CAPITAL LA l PLAN
2010 ti, n 2014
PROJECTS BY DEPARTMENT
Department
Project#
Priority
2010
2011
2012 2013
2014 Total
Acti Ce
1,000,000
5,000,003
5;000,000
3,000,000
Replace Carpet - Activity Center "Raspberry Room"
08- CIP -AC015
n/a
17,800,000
16,000
38,000
38,000
Activity Center HVAC Upgrade
08- CIP -A CO20
n/a
38,000 15,000
50,000 275,000
16.000
325,000
Activity Center Cafe on 14th
09- CIP -A CO32
n.'a
90,000
90,000
Activity Center Tot
106,000
50,000 275,000
431,000
' , Arts Center
Replace Office Carpet - HCAStagesTheatre
08- C.p,�R006
n/a
12,500
Arts Center Carpet Redepenning Gallery
08- CIP -AR008
n!a
8,700
12.500
Art Center - Various Rooms and Hallway (Carpet)
09- CIP- A.R028
n/a
16,000
8,700
16,000
Alts Center Total
16,000
8,700
12,500
37,200
Cabl TV
City Council Chambers Lighting
08- CIP -3051
n/a
20,000
Automated Playback
08 -CIP -3054
n/a
25,000
20,000
25,000
Cable TV Total
20,000
25,000
45,000
City H all Admin
City Hall Boiler Replacement
City Hall Administration Total
Development
Redevelopment, East Excelsior Boulevard
Block 64 Redevelopment Project
Marketplace and Main
Blake Corridor Redevelopment
8th Avenue Redevelopment
Development Total
P avilion
Pavilion Arena Bleacher Heating Replacement
Ice Resufacer Water Heating System Replacement
Pavilion Total
Public Works: Parks A
Shady Oak Beach Community Play Area
Skate Park Improvements & Repair
09- CIP -CH033 n/a
0 1- CIP -D401
06- CIP -D404
07 -CIP -0405
09- CIP -D405
09- CIP -D407
n/a
n/a
n/a
n/a
n,'a
08- CIP -P008 n/a
09- CIP -P316 nla
13C,000 130,000
130,000 130,000
2,000,000
2,000,000
4,000,000
4, 800, 000
4,800,000
1,030,OOD
1,000,000
5,000,003
5;000,000
3,000,000
3,000,000
15,800,000
2,000,000
17,800,000
38,000
38,000
15,000
15,000
38,000 15,000
53,000
07- CIP -P219 n/a 330,000
08 - C1P - P009 n/a 7,000 7.000
330,000
14,000
Alondgv, July 06, 2009
' Department
Project#
Priority
2010
2011
2012
2013
2014
Total
Play Equipment - Park Valley
08- CIP -P010
n/a
45,000
45,000
Play Equipment- Hilltop Park
08- CIP -PO14
n/a
45,000
45,000
Play Equipment - Valley Park
08- CIP -P015
n/a
65,000
65,000
Play Equipment - Oakes Park
08- CIP -P016
n/a
60,000
60,000
Public NVorks: Parks Total
337,000
52,000
65,000
60,000
45,000
559,000
Public Works: Streets /Traffic
Residential Street Improvements
01- CIP -S101
n/a
494,000
1,610,000
1,730,000
1,640,000
2,100,000
7,574,000
Residential Street Improvements - Utilities
01- CIP -S102
n/a
447,000
275,000
275,000
290,000
290,000
1,577,000
Citywide Concrete Alleys
01- CIP -5103
n/a
55,000
58,000
61,000
174,000
County Road 61 (Shady Oak Road)
01- CIP -S106
n/a
6,596,549
6,596,549
Municipal State Aid Road Improvements
02- CIP -S116
n/a
1,330,000
1,330,000
Parking Lots - Lot 200
06- CIP -S118
n/a
200,000
200,000
Public Works: Streets /Tniffic Total
2,326,000
1,943,000
2,066,000
2,130,000
8,986,549
17,451,549
( Public Works: Utilities
Storm Drainage System Maintenance - Alley Repairs
01- CIP -0002
n/a
16,000
17,000
18,000
19,000
20,000
90,000
Storm Water Management Projects
01- CIP -U003
n/a
200,000
200,000
Upgrade of Sanitary Sewer Lift Station #1
04- CIP -0007
nla
220,000
220,000
Meter Replacement
08- CIP -0000
n/a
95,000
95,000
95,000
95,000
380,000
Lift Station # 4
08- CIP -0001
n/a
160,000
160,000
Emergency Chlorine Shut Off Valves
08- CIP -0008
n/a
33,000
33,000
Sanitary Sewer Lift Station Maintenance
08- CIP -0009
n/a
15,000
15,000
St. Louis Park Emergency Connection
08- CIP -U010
n/a
211,000
211,000
Public «orls: Utilities Total
491,000
323,000
128,000
147
220,000
1,309,000
GRAND TOTAL
19
4,495,700
2,336,500
2,612,000
9,251,549
37,815,749
Monday, July 06, 2009
P _33
\
V
Cl)
W
af
M
F
D
Z
u
Q W
F
Q W z
U)
LAW
Z IL U
zW3
u af
W 0Y I--
Y�n
O c
Q
LLJ
0
z
¢
F
D-
U
q
p
0 0
0 0
O
O
O
l i0
O
O
N
Ip
7
0 0
O O
O
' C',
Cl
ill
to
o
io
O
O
O
NI
O
O
O
V
�0
O
K
'K
64
ce '
jr
I , 0 0
0 0
III
�II
I
I lv ° 4
H
�
I
o o
l
° o
°o
N
C
O
O
47
N
cli
L--
d
0
N
o
0
o
0
I
0
o
p
co
(A
0
yr
C')
O
0
0
0
0
0
0
i0
O
0
O
0
O O
0 0
N
�0
CJ
O
M
C
O
C
O
O b
V, M
C-
O
0
00
0
o
cs
N
C
{
c.
o
jo
0
0
o
jo
,O
N
0
O
C,
0
O
N
ES-
0
O
LO
0
O
H
E4
0
CJ
co
Llr
0
q
£F
O
Cl
O
';O
O
N
N
Lf 1
N
r
r
I
i
I
i�
ICI
N�
C
p0
�
6S
iE-
IEr
q
O
o
O
O O
OO
OOIO
OHO
o
O O
O
IO
IO
O
O
O
O
N
C,
C]
c O
C
LJ O
r
IC O
SIN
I
q
C
N
N
C)
C
O
LO
N
C
Q
U
C
>
C
co
W
C O
c
o
o E @
m
o
U C
O C
E
m
N
W
F
of
m U
N
c o
U
C@
U
c QI'H
o
=I
co
Z
'.
ij:
LLJ
=lzlu
F �
c E
r
0
S N S F
ai
C7 ��—
3
ns�LOLmo�i�
m
F din
u W
m �
u
.E a
U E
e
�
ns m'v)
c m�
o
o
U
IF
IZ
Wj
Ki
ICI
O'
z�`
F
W'
0
U
a
> >
w o
U) w
c aF
E
N
W
?t
W
z
OiS'S
z,
W N
0 0
zz
a E
N 7
m
C 4.J
._
mm
O
N
W
N
N
'
y cnD
. CH
�m
N
>
W
J
OI C
x ! p
C V 0
>U)
U m
L ,
O F
Q p
C U)
p 0
p W
v w
Id;�
LLJ �,�I�
ma
E d
u
o n
J
F
u,u
C
EjaL
C . �
o'm
s,l
-it-
C C¢
m=
a
e
¢
F
a
�
Z'r
a;
U
F¢
F O
n
0
c
as
n
I¢i
W
'
Q
0-
¢
CU
N
V
N
W
F_
z
Z
u
CL
LIJ
U) w
0�F-
=mow
L
=emu
ri
H
LU
1
L H 5
Z0
N u1
Z
Q
F
CL
U
CL
�'M
L7 ' I —
uo
0
o
O
N
CD
i p . L7
e�7
0
o I
O
N
O
O
O
t!J
'tLJ
CD
0
r
00
O
0
O O
O
O
O O
N
O
O O
0 li
II I
C-4
tl� c
C')
H
H ES
"•' �. I ! '
I , I i i I
m
N
O
O
'
L i
C
O
O
O
I O. i I I—
O
O
V7
C
aC:
E
v7 �.
d
o
ml
z
`
r I W O u
rn o
P 3
`o x
w;z
v
LO d
m
c) 'z''
LU e
CO
FI �;?��
z
v�
o
_ p
� x
LY
'D u1
am�dQ
W'w
F
¢` - -LJ u
U)
W
C
I
Z
W
d
W w
t
oc�
[n wW
WFU
z Li
Z W �
� U W
Z Wz
o � a
CO �
W
Z
Q
Q
H
C
Q
U
j
to
f0
o
j
p
� e�
0
C
C
C
''
E-r
i
o
O
O
o.
Ip
o
O
-
t o
{
N
Cf
CD
O
O
O
C
O
O
Ip
O
K
O
N
IO
O
C:
O
r
O
O
iL-
O
r
64
4�-
r
0
N
O
O
C
O
r
r
E?
0 O
O O
0.0
c"
N O
E-r N
C-f
O
O
0
O
M
M
b4
O
64
M
O
O
O
O
O
O
N
O
I
O
r
p
I N
N
6
i N
0
N
O
0
O
O
0
p
c,
0
q
6
r
o
o
0
o
ss
N
o
to
0
0
0
C,
o O
0
o
0
o
0
in
N
0 0
?
H ES
{
Er
0
cD
I b4
0
N
0
O
0
CD
0
co
G
O
O
N
O
E4
O
y
C
o
C
O
y
U
r6
U
c
O
cD E
L7
w
F
U
rY
—
Q N
�!
7i
N
O
Z
a) o
E
w =
�
v m�
u c
Z
F''E
X
w
i F i'o
Z3, o co
U ca
r)
7 m U:
CL
X
w
Z
d
��
w
Z '
E
W o
lUiulu)
� o `
e�
E>
`�
J
FI
w,�
W
a
X',c4
IIL I
Fpm
w
W
LU
a Q
Q
j�
7
Q
F
N;
0
U.
Wi
F
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2010 thru 2014 Department Activity Center
Contact Facilities Director
Project # 08- CIP -AC015
Project Name Replace Carpet -Activity Center "Raspberry Room"
Type Improvement
Useful Life
Category Buildings: Activity Center
Future Priority n/a
Description Total Project Cost: $16,000
Replace Carpeting in Activity Center Raspberry Rooms.
Justificatio
-arpet is 15 years old, worn and requires replacement.
Expenditures 2010 2011 2012 2013 2014 Total
Construction /Maintenance 16,000 16,000
Total 16,000 16,000
Funding Sources 2010 2011 2012 2013 2014 Total
Cl - Capital Improvement Fund 16,000 16,000
Total 16,000 16,000
Budget Impact/Other
Wednesday, June 03, 2009
CAPITAL IMPROVEMENT PLAN 2010 thru 2014
City of Hopkins, MN
Project # 08- CIP -ACO20
Project Name Activity Center HVAC Upgrade
Future
Department Activity Center
Contact PW Director
Type Improvement
Useful Life
Category Buildings: Activity Center
Priority n/a
Description I Total Project Cost: S325,000
Replace existing gymnasium AC units with heat and air units. Replace existing low pressure steam boiler with hop
water boiler, install new hot water supply lines. Rework existing base board radiation units for hot water. Install new
VAV coils in existing fan units (7). Install new AC unit with heat fan unit in Historical Society room. Upgrade air
makeup unit for kitchen area. Install or integrate system controls with other city buildings.
2012: ENGINEERING
2013: CONSTRUCTION
I Justification I
Existing low pressure stem boiler is 25 years old. Supply piping for radiation units is 54 years old. Piping is located in
tunnel area around perimeter of building. Life of existing piping is a concern. Have had one failure in 2001. Cost of
replacing piping would be extremely high. Upgrading system will allow better control of the building and reduce
energy costs. Air exchange in winter months would be improved.
Expenditures
2010 2011 2012 2013 2014 Total
Construction /Maintenance 50,000 275,000 325,000
Total 50,000 275,000 325,000
Funding Sources 2010 2011 2012 2013 2014 Total
Cl - Capital Improvement Fund 50,000 275,000 325,000
Total 50,000 275,000 325,000
Budget Impact/Other
Risk of major failure of the 50 plus years old piping is a concern. Repairs would only be temporary as one failure
would be a sign of the entire distribution system surpassing its useful life. Existing equipment has surpassed its
expected life. No major disruption of use of this building.
Wednesday, Jerre 03, 2009
CAPITAL IMPROVEMENT PLAN 2010 rhru 2014
City of Hopkins, MN
Project # 09- CIP -ACO32
Project Name Activity Center Cafe on 14th
Future
Description
Department
Activity Center
Contact
PW Director
Type
Improvement
Useful Life
Category
Buildings: Activity Center
Priority
n/a
Total Project Cost: $90,000
General - The Activity Center Cafd on 14th project is a project aimed at a growing trend among senior centers to reach
out to younger audiences such as the baby boom generation. This project will tranform the Activity Center from a
traditional senior /community center into a restaurant, gathering place, learning center, and health club - that happens to
have customers who may range in age from 50 -90 (but still open to all ages). The original model of a Cafd community
facility was developed in Chicago and has been successfully implimented in other cities. The capital improvement
portion of this new project involves utilizing the existing kitchen in a cafd fashion that would serve food in the morning
until after lunch to people seated in what is currently the lounge area.
Detailed - The project involves opening up a portion of the wall between the kitchen and lounge area and building a wall
along what is now the serving line area of the kitchen. This new wall will close off the kitchen on the gym side and
create a hallway for entrance and exit from the gym's West doors. The kitchen needs to be redesigned from it's previous
school cafateria layout to a smaller "cafd" kitchen area with the appropriate equipment to serve breakfasts and
sandwich /salad /soup based lunches. The lounge area carpet will be replaced with tile, a computer & table will be added
internet access in the lounge.
ing Sources: Sources have yet to be identified but possible partners in the project could include: The Hopkins
rical Societv. Hopkins School District. a new non- arofit "Friends of the Activitv Center" omanization.
Justification
It is well documented that baby boomers are not utilizing traditional senior centers as readily as seniors have in the past.
People do not visit senior centers because it's for people of their age, they go there for the goods and services they need.
The goal of the Cafd is to attract the younger older adult - younger in outlook, attitude and years - those who would
benefit but seldom use "senior" sevices, to increase partnership, visibility and service reach, to improve the quality of
life for our older adults, and to increase satisfaction of services.
The cafd concept would satisfy several City strategic goals such as building on the small town feel of Hopkins through
developing new methods that are more responsive to citizens and customers. If partnering with the Historical Society
the nroiect will enhance the sense of place.
Expenditures 2010 2011 2012 2013 2014 Total
Construction /Maintenance 90,000 90,000
Total 90,000 90,000
Thursday, June 04, 2009
3
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
Fund ing S ources 2010 2011
2010 thru 2014
2012 2013
Department Activity Center
Contact PW Director
2014 Total
PF - Private Sector Funds 90,000 90,000
Total 90,000 90,000
The operational goal of the cafe would be to break even as a food service, but the Cafe would draw customers to the
Activity Center to participate in the activitites many programs and activities offered by the Center thus increasing
program and membership revenues.
Thursday, June 04, 2009
J—/
CAPITAL IMPROVEMENT PLAN 2010 rhru 2014
City of Hopkins, MN
Project # 08- CH' -AR006
Project Namc Replace Office Carpet- HCA Stages Theatre
Future
Department
Arts Center
Contact
Public Works Director
Type
Improvement
Useful Life
10 years
Category
Buildings: Arts Center
Priority
n/a
Description Total Project Cost: $29,500
Remove and replace carpet and carpet base in Stages Theatre offices, ticket office and Facility Manager's office, and
coat room.
260 sq yards x $48 /yard = $12,480
Justification
Carpet is 13 years old as of 2010. Carpet will have exceeded its useful life. Carpet has separated from backing which
has caused it to wrinkle and it can no longer be cleaned in these areas.
Expenditures
Construction /Maintenance
Total
2010 2011 2012 2013 2014
12,500
12,500
Total
Future
12,500
17,000
12,500
Total
Funding Sources 2010 2011 2012 2013 2014 Total Future
Cl - Capital Improvement Fund 12,500 12,500 F 17,000
Total 12,500 12,500 Total
Budget Impact/Other
Mote: Repeat project in 2021 at $17,000
Wednesday, June 03, 2009
CAPITAL IMPROVEMENT PLAN 2010 thru 2014
City of Hopkins, MN
'roject # 08- CIP -AR008
Project Name Arts Center Carpet: Redepenning Ga llery
Future
Department
Arts Center
Contact
Public Works Director
Type
Improvement
Useful Life
10 years
Category
Buildings: Arts Center
Priority
n/a
Description I I otal r uJcct k.usc OLU, I VV
Remove and replace carpet and carpet base in Redepenning Gallery, coat room and 2nd floor dressing room.
180 sq yards x $48 /yard = $8,610
ESTIMATED PROJECT SCHEDULE: Future- Repeat project in 2022 @ $12,000
Justification
Carpet is 13 years old as of 2009. Carpet will have exceeded its useful life.
Expenditures 2 2011 2012 2013 2014 Total Futurc
Construction /Maintenance 8,700 8,700 12,000
Total 8,700 8,700 Total
Funding Sources 2010
2011 2 2013
2014 Total
Future
CI - Capital Improvement Fund
8,700
8, 700
12,000
Total
8,700
8,700
Total
Budget Impact/Other
Wednesday, June 03, 2009
L�'
CAPITAL IMPROVEMENT PLAN 2010 thru 2014
City of Hopkins, MN
Project # 09- CIP -AR028
Project Name Art Center - Various Rooms and Hallway (Carpet)
Future
Department Arts Center
Contact Public Works Director
Type Improvement
Useful Life
Category Buildings: Arts Center
Priority n/a
Description I Total Project Cost: $37,500
Remove and relace carpet and carpet base in the Communcity Room, Green Room, West Main Floor Hallway,
Conference Room and Dance Studio Dressing Rooms of the Art Center.
330 Sq Yards x $48 /yard = $15,840.
ESTIMATED PROJECT SCHEDULE: Future - Repeat project in 2020 @ $21,500
Justification
Most of this project was approved for 2008, but scheduling constrints pushed the project to 2009.
The carpet to be replaced is the original carpet - 13 years old -= and there are "runs" down to the carpet backing in the
Community Room, Green Room and Hallway.
The Community Room carpet loos especially poor, which as a result reflect poorly on the room when shown to
perspective customers.
Expenditures 2010 2011 2012 2013 2014 Total Future
Construction /Maintenance 16,000 16,000 21,500
Total 16,000 16,000 Total
Funding Sources
2010 2011 2012 2013
2014 Total
Future
CI - Capital Improvement Fund
16,000
16,000
1 21,500
Total
16,000
16,000
'l'otal
Budget Impact/Other
Wednesday, June 03, 2009
CAPITAL IMPROVEMENT PLAN 2010 ihrit 2014
City of Hopkins, MN
Project # 08- CIP -BO51
Project Name City Council Chambers Lighting
Future
Department
Cable ]"v
Contact
Asst City Manager
Type
Improvement
Useful Life
Category
t3ldgs: Administrative Otlices
Priority
n/a
Description -- I
Replace the current incandescent lighting with fluorescent fixtures.
Justification
The current lighting system has been in place for years with small modifications made along the way. Lighting
technologies have changed with the push for more energy efficient devices leading the way. The broadcast cameras
require a specific light temperature for optimum picture duality. In order to achieve this light temperature very bright
and hot lights such as those now in place in the chamber were once required. Dimming the lights to an acceptable user
comfort level produces light temperature changes and the camera system does not produce images to its full capacity
resulting in a compromised image on television. With fluorescent lighting, a softer light is made with much less energy,
heat and glare. The net result is the correct lighting color temperature for the cameras with a much softer user- fi
light source for the council all while using less energy and less heat is generated further saving HVAC costs in the
summer.
Expenditures 2010 2011 2012 2013 2014 Total
Construction /Maintenance 20,000 20,000
Total 20,000
Funding Sources 2010 2011 2012 2013 2014 Total
Cable Television Fund 20,000 20,000
Total 20,000
Budget Impact/Other
20,000
20,000
Wednesday, June 03, 2009
r
CAPITAL IMPROVEMENT PLAN 2010 rhru 2014
City of Hopkins, MN
Project # 08- CIP -BO54
Project Name Automated Playback
Future
Descripti
Purchase an automated playback system for the studio.
Department Cable TV
Contact Asst City Manager
Type Improvement
Useful Life
Category Qldgs: Administrative Offices
Priority n/a
Total Project Cost: 525,000
Justificati
Automated Playback of video programs such as the council meetings and other events of government /community
interests can be achieved by expanding on the bulletin board system to include DVD players, VCRs, and direct to hard
drives (MPG) storage record /playback systems. It provides absolute control of your programming thru an automated
system. The system is user friendly and can be attended to by non- technical people.
Expenditures 2010 2011 2012 2013 2014 Total
Construction /M aintenance 25,000 25,000
Total 25,000 25,000
Funding Sources 2010 2011 2012 2013 2014 Total
Cable Television Fund 25,000 25,000
Total
Budget Impact/Other
25,000
25,000
Wednesday, June 03, 2009
9
CAPITAL IMPROVEMENT PLAN 2010 that 2014
City of Hopkins, MN
Project # 09- CIP -CH033
Project Name City Hall Boiler Replacement
Future
Department
City Hall Administration
Contact
Public Works Director
'type
11111)1 "OVCI11cm
Useful Life
25 years
Category
Bldg: City Hall
Priority n/a
Description
Existing boilers are 45 years old, Engineering study completed in 2008 gave several scenarios for replament of one or
both.
Justification
Existing boilers were installed in 1964, replacing existing (Boiler) Boilers with smaller more fuel efficient Boilers will
significantly reduce our energy costs.
Expenditures 2010 2011 2 2013 2014 Total
Construction /Maintenance 130,000 130,000
Total 1 30,000 130,000
Funding Sources 2010 2011 2012 2013 2014 Total
CI - Capital Improvement Fund 65,000 65,000
GU - Other Governmental Unit 65,000 65,000
Total 130,000 130, 000
Budget Impact/Other
'ossible federal stimulus funds may be available for this project.
YVednesday, June 03, 2009
P
CAPITAL IMPROVEMENT PLAN 2010 thru 2014
City of Hopkins, MN
Project # 01- CIP -D401
ProjectNamc Redevelopment, East Excelsior Boulevard
Future
Department Development
Contact ED Director
Type Improvement
Useful Life Unassigned
Category Economic Development
Priority n/a
Description Total Project Cost: $4,000,000
north side of Excelsior Boulevard from Highway 169 to approximately Blake Road.
anent of older commercial area. Based on the adopted redevelopment plan, it would involve commercial, and
I uses. Identified in the East End Redevelopment Study.
Justification
Excelsior Boulevard was upgraded in this area, providing for additional property on the north side of the roadway. The
buildings in this area are older and no longer the highest and best use for this property. The funding amount is an
estimate and will vary depending on the scope and timing of the project.
E xpenditures 2010 2011 2012 2013 2014 Total
Construction /Maintenance 2,000,000 2,000,000 4,000,000
Total 2,000,000 2,000,000 4,000,000
Funding Sources 2010 2011 2012 2013 2014 Total
TF - Tax Inc rement Financing 2,000,000 2,000,000 4,000,000
Total 2,000,000 2,000,000 4,000,000
Budget Impact/Other
Wednesday, Ane 03, 2009
�1
CAPITAL IMPROVEMENT PLAN 2010 thru 2014
City of Hopkins, MN
Project # 06- CIP -D404
Project Name Block 64 Redevelopment Project
Future
Department
Development
Contact
ED Director
Type
Improvement
Useful Life
1,300,000
Category
Economic Development
Priority
n/a
D escription I I UtaI I I U, UL 3 I. J_,,_'„v,v vv
Redevelopment of block between 5th and 6th Avenues, north of Mainstreet, south of 1 st Street North. The current
schedule is for construction to start in late 2010.
Justification
Will redevelop older commercial and residential areas.
Prior Expenditures 2010 2011 20 2013 2014 Total
700,000 Construction /Maintenance 4,800,000 4,800,000
Total Total 4,800,000 4,800,000
Prior
Funding Sources
2010 2011
2012 2013 2014 Total
700,000
ED - Economic Development F
1,300,000
1,300,000
Total
TF -Tax Increment Financing
3,500,000
3,500,000
Total
4,800,000
4,800,000
Budget Impact/Other
Wednesday, June 03, /2009
CAPITAL IMPROVEMENT PLAN 2010 thru 2014
Department Development
City of Hopkins, MN Contact ED Director
Project # 07- CIP -D405
Type Improvement
Project Name Marketplace and Main Useful Life
Category Economic Development
FutnrC Prioritv n/a
Description Total Project Cost: 51,000,000
Redevelopment of property between 6th and 8th Avenues north of Mainstreet (former Luther Company property).
$900,000 of public assistance was provided in 2007. Construction is projected for 2009/2010.
I Justification
(Will redevelop older commercial area.
Budget Impact/Other
Wednesday, June 03, 2009
Expenditures
2010 2011
2012 2013 2014 Total
Construction /Maintenance
1,000,000
1,000,000
Total
Funding Sources
1,000,000
2010 2011
1,000,000
2012 2013 2014 Total
TF - Tax Increment Financing
1,000,000
1,000,000
Total
1,000,000
1,000,000
Budget Impact/Other
Wednesday, June 03, 2009
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2010 thru 2014
Department Development
Contact LI) Director
Project It 09- CIP -D406
Project Name Blake Corridor Redevelopment
Future
Type Improvement
Useful Life
Category Economic Development
Priority n/a
cc nnn nnn
Description I _.....
Redevelopment of properties along the Blake Road Corridor including the Cottageville Park area.
Justification
Removal of blighted and /or obsolete structures, improve access to transit and improve livability of the area.
Expenditures 2010 2011 2012 2013 2014 Total
Land Acquisition /Demolition 5,000,000 5,000,000
Total 5,000,000
Funding Sources 2010 2011 2012 20 13 2014 Total
TF - Tax Increment Financing 5,000,000 5,000,000
Total 5,000,000
Budget Impact/Other
5,000,000
5,000,000
1 June 03, 2009
CAPITAL IMPROVEMENT PLAN 2010 thru 2014
Department Development
City of Hopkins, MN Contact ED Director
Project # 09- CIP -D407 Type Improvement
Project Name Sth Avenue Redevelopment Useful Life
Category Economic Development
Future Priority n/a
Description Total Project Cost: $3,000,000
Redeveopment of 8th Avenue to support the LRT station and provide an improved lint: to downtown Hopkins.
Justification
The uses and densities along 8th Avenue, particularly on the west side, are not supportive of light rail transit and do not
serve to draw the pedestrian or bicyclist to Mainstreet. Redevelopment of the corridor will provide for an important
link between the LRT Station and the downtown assuming both are successful.
Expenditur 2010 2011 2012 2013 2 Total
Land Acquisition 3,000,000 3,000,000
Total 3,000,000
Funding Sourc 2010 2011 2012 2013 2014 Total
TF - Tax Increment Financing 3,000,000 3,000,000
Total 3,000,000 3,000,000
Budget Impact/Other
Wednesday, June 03, 20r')
/ 5'
3,000,000
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2010 thru 2014
Department Pavilion
Contact Public Works Director
Project # 08- CIP -P008
Project Name Pavilion Arena Bleacher Heating Replacement
Future
Type Improvement
Useful Life 15 years
Category Bicigs: Pavillion
Priority n/a
Description I
Replace the arena's current bleacher infrared heating system with a new efficient system.
Justification
The current system is 18 years old and no longer produces adequate heat due to deterioration of the major components.
Replacement is warranted rather than repair due to the age of the system and the type of repairs needed.
Expenditures 2010
2011 2012 2013
2014 Total
Construction /Maintenance
38,000
38,000
Total
Funding Sources 2010
38,000
2011 2012 2013
38,000
2014 Total
PA - Pavilion Fund
38,000
38,000
Total
3 8,000
38,000
Budget Impact/Other
Potential savings on utilities and greater satisfaction from user groups. Inadequate bleacher heat is the major complaint
amonsi Pavilion users.
11'ednesdrp June 03, 2009
/4
CAPITAL IMPROVEMENT PLAN 2010 rhru 2014
Department Pavilion
City of Hopkins, MN Contact Public Works Director
Project # 09- CIP -P316 Type Improvement
Useful Life 20 years
Project Name Ice Resufacer Water Heating System Replacement
Category Bldgs: Pavillion
Future Priority n/a
Description Total Project Cost: $15,000
Remove the three existing water heaters used to heat the ice resurfacing water and replace with new water heating
system.
Ju
One of three heaters used is unusable and the other two water heaters have corrosion and major scaling issues. All three
water heaters were part of the facility construction in 1990.
Expenditures 2010 2011 2012 2013 2014 Total
Construction /Mai ntenance 15,000 15,000
Total 15,000 15,000
Funding Sources 2010 2011 2012 2013 2014 Total
PA - Pavilion Fund 15,000 15,000
Total 15,000 15,000
Bu dget Impact/Other
Savings on utilities due to increase in efficiency of new system.
Wednesday, June 03, 2009
/1
CAPITAL IMPROVEMENT PLAN 2010 rhru 2014
City of Hopkins, MN
Project # 07- CIP -P219
Project Name Shady Oak Beach Community Play Area
Future
Department Public Works: Parks
Contact Public Works Director
Type Improvement
Useful Life
Category Parks /Fores /Pay.: Comm. Facil.
Priority n/a
Description
Replacement of the Shady Oak Beach water play area with a community play area designed to be a destination attraction
for residents of Minnetonka and I lopkins.
Justification
The existing water play equipment at the site was installed when the beach was renovated in 1998 to encourage use of
the site when weather conditions were not conducive to swimming. The system is in need of replacement due to health
and safety requirements as well as aging equipment. Staff is recommending that the water play area be replaced with a
community playground area designed to be a destination attraction for families with children 12 years of age and under.
Use of this equipment on a seasonal basis would extend beyond the beach operating season and be available for use
during the fall months as well,
Expenditur 2010 2011 2012 2013 2 To
Construction /Maintenance 330,000 330,000
Total 330,000 330,000
Funding Sources 2 010 2011 2012 2013 2014
Total
GU - Other Governmental Unit 220,000
220,000
PDF- Park Dedication Fund 27,500 27,500 27,500 2
110,000
Total 247,500 27,500 27,500 27,500
330,000
Budget Impact/Other
Operating expenses for the beach in 2008 were $200,200 with revenues of $230,700.
Completion of this project will enhance beach attendance during the normal beach operating season as well as post -
season use. It is anticipated that season pass sales will increase due to the addition of a high quality community paly
imination of the existing water play area and underground confined space that houses the operational equipment will
cult in reduced annual operating expenditures of approxinamtely $5,000.
14'ednesday, June 03, 2009
1,f�
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2010 thru 2014
Department Public Works: Parks
Contact Facilities Director
Project P 08 -CIP -11009
Project Name Skate Park Improvements & Repair
Type Improvement
Useful Life
Category Parks /Forestry
Future
Priority n/a
Description Total Project Cost: $21,000
Annual Improvements and repairs to park and park equipment.
Justification
Wooden structure equipment must be repaired before each season from weathering. Equipment must be upgraded and
changed each year to change the park experience and entice customers to pay their user fees.
Prior Expenditures 2010 2011 2012 2013 2014 Total
7,000 Construction /Maintenance 7,000 7,000 14,000
Total Total 7,000 7,000 14,000
P rior Funding Sources 20 2011 2012 2013 2014 Total
L 7,000 PDF- Park Dedication Fund 7,000
Total Total 7,000
7,000 14,000
7,000 14,000
Budget Impact/Other
Wednesday, June 03, 2009
/I
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2010 thru 2014
Department Public Worls: Parka
Contact PW Director
Project # 08- CIP -PO10
Project Name Play Equipment - Park Valley
Future
Type Improvement
Useful Life
Category Parks /Pores /Pay.: Comm. Facil.
Priority n/a
r nnn
Description
Replace park play equipment
2014 ----- - - - - -- 45,000.00
Justification
Upgrade of park play equipment after 20 - 25 years of use.
Expenditures 2010 2011 2 2013 2014 Total
Construction /Maintenance 45,000 45,000
Total 45,000 45,000
Funding Sources 2010 2011 2012 2013 2014 Total
PDF- Park Dedication Fund 45,000 45,000
Total 4 5,000 45,000
Budget Impact/Other
htedncsday, June 03, 20
6 "
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2010 thru 2014 Department Public Works: Parks
Contact Facilities Director
P r oject # 08-CIP-P0I4
Project Name Play Equipment - Hilltop Park
Ftifill-C
Description
Replace park play equipment.
Type Improvement
Useful Life
Category Parks/Forcs/Pay.: Comm. Facil.
Priority 11/a
Total Project Cost: 545,000
I Justification —1
(Upgrade of park play equipment after 20-25 years
Budget Impact/Other
Wed77esday, June 03, 2009
,0;1/
Expenditures 2010
2011 2012
2013 2014 Total
Construction/Maintenance
45,000
45,000
Total
Funding Sources 2010
45,000
2011 2012
45,000
2013 2014 Total
PDF- Park Dedication Fund
45,000
45,000
Total
45,000
45,000
Budget Impact/Other
Wed77esday, June 03, 2009
,0;1/
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2010 thrr+ 2014
Del) artwcn( Public Works: Parks
Contact Facilities Director
Project # 08-CIP -PO15
Project Name Play Equipment - Vallee Park
Future
Type Improvement
Usel'ul Lite
Catepr) Park /I ores /Pay.: Comet Facil.
Priorih nia
Description
Replace park play equipment.
. 11.11. . - -, ..,,.. 1111, 1
Justification
Upgrade of park play equipment after 20 -25 years of use.
Expenditure 2010 2011 2012 2013 2014 Total
Construction /Maintenance 65, 65,000
"total 65,000 65,000
Funding Sources 2010 2011 2012 2013 2014 'rota)
PDF- Park Dedication Fund 65,000 65,000
Total 65,000 65,000
Budget Impact/Other
Wednesday, June 03, 2009
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2010 thru 2014
Department Public Works: Parks
Contact Facilities Director
F ect # 08- CIP -P016
ect Name Play Equipment - Oakes Park
Future
Description
Replace park play equipment.
Type Improvement
Useful Life
Category Parks /Fores /Pay.: Comm. Facil.
Priority n/a
Total Project Cost: 560,000
Justification
Upgrade -of part: play equipment after 20 -25 years of use.
Budget Impact /Other
Wednesday, June 03, 2009
r�
Expenditures 2010 2011
2012 2013 2014
Total
Construction /Maintenance
60,000
60,000
Total
Funding Sources 2010 2011
60,000
2012 2013 2014
60,000
Total
PDF- Park Dedication Fund
60,000
60,000
Total
60,000
60,000
Budget Impact /Other
Wednesday, June 03, 2009
r�
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
Project is 01 -Cl P -5101
Project Name Residential Street Improvements
Future
r—t. zo :')n nna
im to improve streets needing repair or reconstruction as indicated by street condition survey, or as part of an area
improvement.
12010: Park Ridge Neighborhood Phase 2 Reconstruction.
2011: Central Hopkins Reclamation Project - 14th & 15th Avenue North between 2nd Street North and South Service
Drive; 16th Avenue North between 3rd Street North and South Service Drive; 3rd Street North between 15th and 17th
Avenues; 4th Street North between 12th and 17th Avenue, South Service Road between 12th and 16th Avenues.
2012: Central Hopkins Street Reclamation Project - 20th Avenue North between Mainsheet and 3rd Street; 19th
Avenue North between Mainstreet and I st Street North; 18th Avenue North between Mainstreet and 4th Street; 16th
Avenue North between Mainstreet and 1 st Street North; 14th Avenue North between Mainstreet and 2nd Street North.
2013: Central Hopkins Reclamation Project - Minnetonka Mills Road between 11th and 7th Avenue; 11th Avenue
North between l st Street and 3rd Street; 9th Avenue North between 2nd Street and Mainstreet; 3rd Street North between
8th and I 1 th Avenues; 4th Street North between 10th and 11th Avenue; 8th Ave North between 1st and 2nd Street.
2014: Park Valley and Peaceful Valley Reclamation Project - East and West Park Valley Road; 9th Avenue South
between Westbrooke Way and 7th Street South; 6th Street South between I Oth Avenue and 6th Ave South; 7th Street
South between 10th Avenue and East Park Valley Road; 5th Ave South between 5th Street South and 7th Street South
Justification
Ongoing street improvements determined through Pavement Management Program.
Prior Expenditures
1, 6 -- ,o o - 6 5 1 Construction /Maintenance
Total Total
494,000 1,610,000 1,730,000 1,640,000 2,100,000 7,574,000
Monday, AlY 06, 2009
2010 2011
494,000 1,610,000
2012 2013
1,730,000 1,640,000
'type
Improvement
Useful Lire
unassigned
Category
Trans: Streets
Priority
n/a
2014 Total
2,100,000 7,574,000
2010 thru 2014 Department Public works Streets /Traffic
Contact Public works Director
'm
CAPITAL IMPROVEMENT PLAN
2010 thru 2014
City of Hopkins, MN
Prior Funding Sources 2010 2011 2012 2013
1,946,000 PI - PIR /General Obligation Bo 250,000 900,000 900,000 910,000
Total SA - Special Assessment 244,000 710,000 830,000 730,000
Department
Public Works: Streets/Traffic
Contact
Public Works Director
2014
Total
1,100,000
4,060,000
1,000
3,514,000
Total 494,000 1,610,000 1,730,000 1,640,000 2,100,000 7,574,000
Budget Impact /Other
Public hearing - year prior to planned construction
Plans and specifications - year prior to planned construction
Bid and assessment - year of planned construction
istent with the City Council adopted Roadway Improvement Policy, street ratings, and Pavement Management
Monday, July 06, 2009
CAPITAL IMPROVEMENT PLAN 2010 thr u 2014
City of Hopkins, MN
Project a 01 -CIP -S 102
Project Name Residential Strect Improvements -- Utilities
Future
1)epartment
Public Works: Streets /Traffic
Contact
Public Works Director
'rype
Improvement
Useful Life
Unassigned
Category
Trans: Streets
Priorit�� n/a
Description
Locations to be determined as they are consistent with the street reconstruction program.
Program to reconstruct deteriorated water main and sanitary sewer and to provide storm sewer improvements in
conjunction with street improvement projects.
Public hearing: Year prior to planned construction
Plans and specifications: Year prior 10 planned construction
Bid: Year of planned construction
Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections.
Justification
In most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be
installed new. In some cases, water main and sanitary sewer need to be rehabilitated in conjunction with street
reconstruction. The numbers assume the city funding 100% of major storm sewer, water main, and sanitary sewer
re/construction. These costs are to be used in conjuncton with street reconstruction costs shown on 01- CIP -S101.
Prior Expenditures 2010 2011 2012 2013 2014 Total
1,453,000 Construction /Maintenance 447,000 275,000 275,000 290,000 290,000 1,577,000
Total Total 447,000 275,000 275,000 290,000 290,000 1,577,000
Prior Funding Sources 2010 2011 2012 2013 2014 Total
1,453,000 1 SF - Sanitary Sewer Fund 150,000 100,000 100,000 100,000 100,000 550,000
Total SU - Storm Sewer Fund 70,000 100,000 100,000 110,000 110,000 490,000
WF - Water Fund 227,000 75,000 75,000 80,000 80,000 537,000
Total 447,000 275,000 275,000 290,000 290,000 1,577,000
Budget Impact/Other
Public Hearing - year prior to planned construction
Plans and specifications - year prior to planned construction
Bid - year of planned construction
Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections.
Wednes&ry, June 03, 2009
� u
CAPITAL IMPROVEMENT PLAN 2010 thru 2014
�,r1�T Department Public Works: Streets /Tragic
1v1
City of Hopkins, 1V Contact Public Works Director
Project 01- CIP -S103
Project Name Citywide Concrete Alleys
Future
Type Improvement
Useful Life Unassi;ned
Category Trans: Streets
Priority n/a
Description l Total Project Cost: $1,139,000
?010: Lake Street NE alley (South side of Lake Street NE) (Murphy to Texas Avenue)
2011: Alley south of 6th street South and North of Nine Mile Creek, between 11th Avenue South and 10th Avenue
South.
12: Alley south of 3rd Street North and Nrth of 2nd Street North, between 6th Avenue North and 5th Avenue North.
to construct concrete alleys in at designated as poor on the Alley Condition Survey.
Public Hearing - year prior to project.
Plans, specifications, bid, construction - year of project.
Consistant with the Ctiy Council adopted Roadway Improvement Policy and Alley ratings.
Justification
The city has had a policy of constructing concrete alleys for a number of years. This policy has proved to be sound by
the concrete alleys' durability and low maintenance costs. Current policy has the city share at 20% of the cost in
residential areas. The city will experience cost savings due to lower maintenance costs.
Prior Expenditures 2010 2011 2012 2013 2014 Total
965,000 Construction /Maintenance 55,000 58,000 61,000 174,000
Total Total 55,000 58,000 61,000 174,000
Prior Funding Sources
2010
2011
2012 2013
2014 Total
965,000 PI - PIR /General Obligation Bo
9,000
11,600
13,000
33,600
Total SA - Special Assessment
35,000
46
48,000
129,400
SU - Storm Sewer Fund
11,000
11,000
Total
55,000
58,000
61,000
174,000
Budget Impact/Other
kpproximately 1250 feet per year for four years
?ublic Hearing - year prior to project
'tans, specifications, bid construction - year of project
istent with the City Council adopted Ro adway Improvement Policy and Alley rat
Wednesday, June 03, 2009
;0
CAPITAL IMPROVEMENT PLAN 2010 thru 2014
City of Hopkins, MN
Project# 01- CIP -S106
Project Name County Road 61 (Shad' Oak Road)
Future
DeparUuent Nublic Works: Streets /Traftic
Contact Nublic Works Director
Type Improvement
Userul Life Unassigned
Category Trans: Streets
Priority n/a
Description I
Shady Oak Road from County Road 3 to T.H. 7, Mainstreet fi 20th Avenue to Shady Oak Road.
Lighting, lanscaping, street, etc., improvements from County Road 3 to T.H. 7
Reconstruction and amenities on Mainstreet fi - om 20th Avenue to Shady Oak Road.
Reconstruction of West Park Road, 211d Street N., and 21 st Avenue N. (2nd Street -4th Street N.)
See also 01 -CIP U003 for the Storm Sewer Management associated with this project.
Justification
Deficiencies appear on Shady Oak Road in terms of roadway conditions, traffic /pedestrian movement, safety, and
aesthetics. Upgrade an undivided roadway, resolve safety issues with number of driveway access points and
intersection at Mainstreet. Lighting needs upgrading and provide beautification program.
tion of Mainstreet for 1 block section needs to be done to conclude the upgrading of all of Mainstreet
Expenditures 2010 2011 2012 2013 2014 Total Future
Construction /Maintenance 6,596,549 6,596,549 20,628,881
Total 6,596,549 6,596, 'hotal
Funding Sources 2010 2 2012 2013 2014 Total 1 , uture
GU - Other Governmental Unit 2,010,000 2,010,000 F - 20.628 8781
MS - Municipal State Aid Stree 4,437,849 4,437,849 I'otal
PI - PIR /General Obligation Bo 100,000 100,000
SA - Special Assessment 48,700 48,700
Total 6,596,549 6,596,549
Budget Impact/Other
2005/2009: Planning and acquisition
12/2015: Bidding and construction
sistent with Hennepin County CIP, city's desire to upgrade the roadway, and reconstruction program for all of
This project totals $27,225,430. Hopkins share is $5,036,549 of which we have $1.3 million budgeted. The remaining
$3.5 + million is right -of -way acquisitions for which we currently have no funding. The project is not feasible under the
current funding program.
Id %d)?esday, Jrme 03, 2009
AK
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2010 thru 2014
Department Public Works: Streets/Traffic
Contact Public Works Director
Project# 02- CIP -SI16 Type Improvement
Project Name Municipal State Aid Road Improvements Useful Lifc Unassigned
Category Trans: Streets
Future
Priority n/a
Description Total Project Cost: $1,330,000
5th Street S. from 1 lth Avenue S. to Corporate Limits, reconstruction
Feasibility Report: 2008
Construction: 2010
Justification
Pavement condition, substandard drainage and lack of curb and gutter warrant reconstruction of this Municipal State
Aid collector road.
Expenditures 2010 2011 201 2013 2014 Total
Construction /Maintenance 1,330,000 1,330,000
Total 1,330,000 1,330,000
Funding Sources 2010 2011 2012 2013 2014 Total
MS - Municipal State Aid Stree 323,000 323,000
SA - Special Assessment 700,000 700,000
SU - Storm Sewer Fund 167,000 167,000
WF - Water Fund 14 0,000 140,000
Total 1,330,000 1,330,000
Budget Impact/Other
61 June 03, 2009
�-q
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2010 lhru 2014 Department Public Works: Streets /Traffic
Contact Public Works Director
Project # 06- CIP -S118
Project Name parking Lots -Lot 200
Future
'type Improvement
Useful Life
Category Tans'. Parking Facilities
Priority n/a
Description
2010: Municipal Parking Lot 200, south of Mainstreet between 8th and 9th Avenues.
Rehabilitate parking lot pavement
Justification
Pavement has deteriorated to the point where cracksealing and sealcoating are not effective.
Expenditures 2010 2011 2012 2013 2014 Total
Construction /Maintena nce 200,000 200,000
Total 200,000 200,000
Funding Sourc 2010 2011 20 12 2013 2014 Total
Cl - Capital Improvement Fund 200,000 200,000
"Total
200,000
200,000
Wednesday, June 03, 2009
50,
CAPITAL IMPROVEMENT PLAN 2010 thru 2014
City of Hopkins, MN
Project # 01- CIP -UO02
Project Name Storm Drainage System Maintenance -Alley Repairs
Future
Description I
2009 -2013: Concrete alley repairs
Department
Public Works: Utilities
Contact
Public Works Director
Type
Improvement
Useful Life
Unassigned
Category
Utilities: Municipal Sanitary S
Priority n/a
Total Project Cost: $106,000
Justification
(Annual alley pavement concrete slab repairs are needed.
Prior Expenditures
16,000 Construction /Maintenance
Total Total 16,000 17,000 18,000 19,000 20,000 90,000
Prior Funding Sources 2010 2011 2012 2013 2014 Total
16,000 SU - Storm Sewer Fund 16,000 17,000 18,000 19,000 20,000 90,000
Total Total 16,000 17,000 18,000 19,000 20,000 90,000
Budg Impact/Oth
Consistent with the Storm Water Management Plan.
Friday, June 05, 2009 ,z
l'
2010 2011 2012 2013 2014 Total
16,000 17,000 18,000 19,000 20 ,000 90,000
CAPITAL IMPROVEMENT PLAN 2010 thru 2014
City of Hopkins, MN
Project # 01- CIP -UO03
Project Name Storm Watei Management Projects
Future
1'rioritI n/a
Department
Public Works: Utilities
Contact
Public Works Director
Type
ln,provement
Useful Lire
Unassigned
Category
Utilities: Storm Sewer
D escription I ....... ....... �..,.,.. ._....,......
2014: Provide outlet pipe to Shady Oak Pond into CSAH 61 storm drainage piping in conjunction with Shady Oak Road
reconstruction
Justification
Shady Oak Pond has no outlet and floods streets and residential property if not pumped.
Consistent with City Council approved action plan of October 21, 1997, the City's Storm Management Plan, and Shady
Oak Road reconstruction timetable.
Expenditures 2010 2011 2012 2013 2014 Total
Construction /Maintenance 200,000 200,000
Total 200,000 200,000
Funding Sources 2010 2011 2012 2013 2014 Total
SU - Storm Sewer Fund 200,000 200,000
Total 200,000 200,000
Budget Impact/Other
Consistent with City Council approved Action Plan of October 21, 1997, the City's Storm Management Plan, and Shady
Oak Road reconstruction timetable.
Wednesday, June 03, 2009
3 k
CAPITAL IMPROVEMENT PLAN 2010 thru 2014
Department Public Works: Utilities
City of Hopkins, MN Contact Public Works Director
Project # 04- CIP -UO07 Type Improvement
Project Name Upgrade of Sanitary Sewer Lift Station #1 Useful Life Unassigned
Category Utilities: Municipal Sanitary S
Future
Priority n/a
Description Total Project Cost: $220,000
Replace a confined space lift station that was installed in 1957 with a new submersible lift station and rerouting of the
discharge line, or climate lift station and install new gravity sanitary sewer pipe to Minnetonka trunk sewer pipe in
Shady Oak Road.
Justification
The station has given the city a long life and now needs to be replaced.
Budget Impact/Other
Friday, June 05, 2009
V
Expenditures
2010 2011 2012 2013
2014 Total
Construction /Maintenance
220,000
220,000
Total
Funding Sources
220,000
2010 2011 2012 2013
220,000
2014 Total
GU - Other Governmental Unit
SF - Sanitary Sewer Fund
110,000
110,000
110,000
110,000
Total
220,000
220,000
Budget Impact/Other
Friday, June 05, 2009
V
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2010 thrit 2014
Department Public Works: Utilities
Contact Public Works Director
Project # 08- CIP -U000
Project Name Meter Replacement
Future
Type Improvement
Useful Life
Category Utilities: Municipal Sanitary S
Priority n/a
Description
Meter Replacement
Justification
Items identified in 2007 comprehensive utility plan to provide safe and reliable water,
Prior Expenditures
95,0o0 construction /Maintenance
Total Total 95,000 95,000 95,000 95,000 380,000
Prior Funding Sources
95,000 WF - Water Fund
Total
Impact/Other
380,000
IVechiesdoy, Ane 03, 2009
2010 2011 2012 2013 2014 Total
95,000 95,000 9 5,000 95,000 380,000
2010 2011 2012 2013 2014 'rot a
95.000 95 ,000 95,000 95,000
380,000
Total 95,000 95,000 95,000 95,000
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2010 thru 2014
Department Public Works: Utilities
Contact Public Works Director
Project 9 08- CIP -U001
Project Name Lift Station # 4
Future
Description
Zehabilitate LS No. 4
Type Improvement
Useful Life
Category Utilities: Municipal Sanitary S
Priority n/a
Total Project Cost: $160,000
Justification
Lift station No. 4 was identified for rehab in the 2007 comprehensive utility plan
Regular major maintenance identified in the 2007 comprehensive utility plan.
Budget Impact/Other
Friday, June OS, 2009 y�
3✓
Expenditures
2010 2011 2012 2013
2014 Total
Construction /Maintenance
160,000
160,000
Total
Funding Sources
160,000
2010 2011 2012 2013
160,000
2014 Total
GU - Other Governmental Unit
SF - Sanitary Sewer Fund
80,000
80,000
80,000
80,000
Total
160,000
160,000
Budget Impact/Other
Friday, June OS, 2009 y�
3✓
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2010 thru 2014
Deparhnent Public Works: Utilities
Contact Facilities Director
Project # 08- CIP -UO08
Project Name Emergency Chlorine Shut Off Valves
Future
Type Improvement
Useful Life
Gttegory Utilities: Municipal Sanitary S
Priority nia
Description
Emergency Chlorine Shut Off Valves
Justification
Items identified in 2007 coniprchensive utility plan to provide safe and reliable water.
Y�ednesdny, June 03, 20009�/�
Expenditures 2010
2011 20 2013 2014
Total
Construction /Maintenance
33,
33,000
Total
Funding Sources 2010
33,000
2011 2012 2013 2014
33,000
Total
WF - Water Fund
33,000
33,000
Total
33,000
33,000
Y�ednesdny, June 03, 20009�/�
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2010 thru 2014
Project 9 08- CIP -UO09
Project Name Sanitary Sewer Lift Station Maintenance
Future
Description
Regular LS Major Maintenance
Priority n/a
Total Project Cost: $15,000
Department
Public Works: Utilities
Contact
Facilities Director
Type
Improvement
Useful Life
Category
Utilities: Municipal Sanitary S
Justification
Regular jajor maintenance identified in the 2007 comprehensive utiliyt plan.
Expenditures 2010 2011 2012 2013 2014 Total
Construction /Maintenance 15,000 15,000
Total
15,000
15,000
Funding Sources 2010 2011 2012 2013 2014 Total
SF - Sanitary Sewer Fund 15,000 15,000
Total 15,000 15,000
Budget Impact/Other
hVednesday, June 03, 2009
31
CAPITAL IMPROVEMENT PLAN
City of Hopkins, MN
2010 thru 2014
Depar tit ctit Public Worts: Utilities
Contact Facilities Director
Project # 08- CIP -UO10
Project Name St. Louis Park Emergency Connection
Future
Type Improvement
Useful Life
Category Utilities: Municipal Sanitary S
Priorih n/a
Description
St. Louis Park emergency connection.
Justification
Items identified in 2007 comprehensive utility plan to provide safe and reliable water.
Budget Impact/Other
1 June 03, 200
00
✓9
Expenditures 2010
2011 2012
2013 2014 Total
Construction /Maintenance
211,000
211,000
Total
Funding Sources 2010
211,000
2011 201
211,000
2013 2014 Total
WF - Water Fund
211,000
211,000
Total
211,000
211,000
Budget Impact/Other
1 June 03, 200
00
✓9