CR 06-106 Award Contract Sanitary Sewer Lift Station No 7 Emergency Power System Upgrade C\TY OF m HOPKINS September 14, 2006 Council Report 2006-106 Award Contract, Sanitary Sewer Lift Station No. 7 Emergency Power System Upgrade Prooosed Action. Staff recommends adoption of the following motion: Move that Council adoot resolution 2006-60. resolution for award of contract. Lift Station NO.7 Emeraencv Power System Uoarade. city oroiect 06-15. Overview. On May 2, 2006 City Council authorized preparation of final design documents for the upgrade of the emergency power system at lift station no. 7. Staff initially advertised the project for bids with a bid opening on July 26. We received just one bid in the amount of $218,000. This bid was rejected as being too high - the final construction cost estimate was $110,000. The project was re-advertised and a bid opening was held on Thursday, Sept 14. This time there were four bids received with the low bidder being Premier Electrical Corp. with a bid of $108,960. The second low bid was $131,450 and the high bid was $163,600. Premier Electrical is a reputable contractor having completed many lift station projects. Our consulting engineer, SEH, has worked with Premier on several projects and has recommended award. Staff recommends award to Premier Electrical Corporation. Primary Issues to Consider. Project scope: The project includes replacing the standby power engine-generator set, associated wiring and automatic switchgear. The project also includes providing an alternate standby power source in the event of power loss during construction. Project Schedule: It is anticipated that the contractor will begin work in November after receipt of the new equipment and complete the project by mid-December 2006. Suooortina information. Bid Tabulation and SEH letter ReSOlcoa-Oao Steve~. Stadler,tiC Works Director Financial Impact: $ 108.960 Budgeted: Y/N N Related Documents (CIP, ERP, etc.): Source: San Sewer Utilitv Fund B\O PR\CE ---- ~ ---- ~O ---- ~O ---- ~O p..CI<N.p..OOENOUtA #'\ I B\O BONO t50/o) B\OOER AOORESS s~.t\ 1'~60,-~1'\Ot& Of 6\05 ~on #1 Generator and service Replacement \,,\op\f.\OS, tAN SEt-I No.: p....t-\OPI<N0605.OO Bj.d oate: september 14, 2006 ~ 10:00 a.m. ~ I I 440'\ 85'ff1 {:>..'Je. N. Broo\<.I,/1I Pa~. Iv\N 55443 B\OOER - I I - premier Electrical corporatiOIl 500 af\f(\ha\\ (:>..ve. LOllq La\<.e. Iv\N 55356 I I 1480 CoUll\)' Road 90 Iv\aple Plaill,lv\N 55359 - R\dgeda\e E.\ectf\C, \nc. I 290 -:/0 St. NE. Pille Islalld. Iv\N 55963 - seaforth E.\ectf\C, \nc. Electrical IlIs\allatioll 8< Mj\ntenance CO. - - _ ~,,~'CE.7 ~DRl\'\^S ~D "'l1'~ESSED BY S1'EYE S1'pJ)LER. BIDS Ol'E~ED BY CLA.~" IV' - Circle DriVe. suite 200. I<\'nne\OO'" "''' 55343.930' s~ort EI\\ott tI.ndrlc~Son InC.. ,090' Red 22600 \ 600.134.6151 \ 952.912.260' ,a< . \ yNolW sehiOC.Com \ 952.9~ . SEtI is .n eOu.' opportuni\'j e",plOyer . SEH .,\lj"''''''''''' \060500\6-10'."""'''"''" o[bid \ A" c: Da\Te Halter, , ~ SEH September 14,2006 RE: Hopkins, MN Lift Station #7 Generator and Service Replacement SEH No. A-HOPKN0605.00 6.00 Steven J. Stadler, PE City of Hopkins Public Works 11100 Excelsior Blvd. Hopkins, MN 55343 Dear Mr. Stadler: On September 14, 2006 at 10:00 a.m. bids were received for the above-referenced project. Four bids were received. (Bid tabulation attached). All four bidders are good contractors. The low bidder, Premier Electric is the largest of the four. SEH has just completed a two-year $20,000,000 water filtration and general offices complex for the city of Eagan. Premier Electric was the electrical contractor on the project, and did an excellent job. This bid received was within the Engineer's estimate of $110,000. Therefore, we recommend that the City of Hopkins award the bid to Premier Electrical Corporation, Brooklyn Park, Minnesota. Thank you. Si~~, //~-,_. / ( Clarence Kad as, PE Project Manager Director / Power Engineering dka c: Dave Halter, SEH Attachment p:\fj\h\hopkn\060500\6-bidg\stadle rrecommedation for bid award ltr.doc Short Elliott Hendrickson Inc., 10901 Red Circle Drive, Suite 200, Minnetonka, MN 55343-9301 SEH is an equal opportunity employer I www.sehinc.com I 952.912.2600 I 800.734.6757 I 952.912.2601 fax CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO. 2006-060 RESOLUTION FOR A WARD OF CONTRACT SANITARY SEWER LIFT STATION NO.7 EMERGENCY POWER SYSTEM UPGRADE CITY PROJECT 06-15 BE IT RESOLVED, by the City Council of the City of Hopkins, Minnesota that the lowest bid of Premier Electrical Corp., in the amount of $108,960.00 is the lowest responsible bid for the Lift Station No.7 Emergency Power System Upgrade project, City project 06-15, and the Mayor and City Manager are hereby authorized and directed to enter into a contract with said bidder for and on behalf of the City. Adopted by the City Council of the City of Hopkins this 19th day of September 2006. Eugene J. Maxwell, Mayor ATTEST: Terry Obermaier, City Clerk