CR 2000-108 Authorize Final Payment 1999 Street Improvements Project 98-09• June 27, 2000 Proposed Action. Staff recommends adoption of the following motion: Move that Council adopt Resolution 2000- 42, Resolution Accepting Work and Ordering Final Payment, Street Improvement Project 98 -09. Overview. The contractor has completed street and utility improvements in 12 and 13 Avenues South, 1 Street South. Barbarossa and Sons has performed on punch list items to the engineer's satisfaction and the consultant recommends final payment. Through the course of the project several change orders were necessary and staff exercised its discretion in approving orders 1 -3. Approval of orders 4 -6 is presented here to Council because in total with the first orders the 5% limit without Council approval is exceeded. Approval is embodied within the resolution for final payment. Primary Issues to Consider. • Change order specifics • Accepting work and final payment • Resolution 2000 -42 • Staff recommendation Supporting Information. • Change Orders 4 -6 • Resolution 2000 -42 /L4-5L---- —d ttAAA James Gessele Engineering Superintendent G■TY OF H OPKINS Authorize Final Payment 1999 Street Improvements Project 98 -09 Council Report 2000 -108 Financial Impact: $ 36,973.91 Budgeted: Y/N Y Source: PIR and Utility Funds Related Documents (CIP, ERP, etc.): CIP and Project Contract Notes: • Analysis. • Change order specifics Change Order No. 4 calls for the use of fly ash material for sub grade stabilization in 1 Street South, installation of brick pavers at 1 Street South and 11 Avenue and paving mobilization on 2nd Street South. The change order cost is $5,312.85. Change Order No. 5 calls for replacement of broken pavement sections in 2nd Avenue South before construction of the new and final wear course. The change order cost is $523.14. Change Order No. 6 calls for removal and replacement of sidewalk and curb in 13 Avenue South at house number 125 to improve gutter line drainage. The change order cost is $1,160.47. Change Orders 1 -3 Change Orders 4 -6 Contract Work Total Authorized Actual $15,292.95 $34,980.45 6,996.46 6,996.46 704,343.50 654,970.40 $726,632.91 $696,947.31 • Accepting work and final payment The contractor has met all contract obligations. The work is done satisfactorily and the contractor has submitted a Consent of Surety form (in lieu of lien waivers) and forms IC -134. A signed certification of completion is forthcoming. • Resolution 2000 -42 Adoption of this resolution approves Change Orders 4 -6, formally acknowledges completion of the work, orders final payment, and initiates a one -year warranty on the contract work. • Staff recommendation Staff recommends adoption of Resolution 2000 -42 approving change orders and final payment. ITEM NO. ITEM NAME UNIT ESTIMATED QUANTITY UNIT PRICE AMOUNT 1 FLY ASH MATERIAL FOR SUBGRADE STABILIZATION TON 51.8 $34.804 $1,802.85 2 FURNISH AND INSTALL PAVERS SQ FT 240 $10.00 $2,400.00 3 PAVING MOBILIZATION (2ND STREET SOUTH) LUMP SUM 1 $1,000.00 $1,000.00 4 BITUMINOUS TACK COAT (2ND STREET SOUTH) GALLON 55 $2.00 $110.00 TOTAL DUE TO CHANGE ORDER NO¢,t� $5,312.85 CONTRACT AMOUNT PER CHANGE ORDER No % $719,636.45 FINAL CONTRACT AMOUNT, CHANGE ORDER NO $724,949.30 Contractor Barharossa & Sons, Inc Address 11000 93rd Av N , Osse 55369 Job Location Mn/DOT TP- 21840 -02 (5/83) IF S s 1 ... , - • 1 1 4 1 1 1 • 1 - H 1 In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions: WHEREAS, the City has elected to use fly ash material for subgrade stabilization purposes, AND WHEREAS, the City has elected to use brick pavers for pedestrian curb ramp construction at the corner of First Street South and l l th Avenue, AND WHEREAS, the Contractor has requested compensation for mobilizing a paving crew to Second Street South, AND WHEREAS, the Contractor has submitted bituminous tack coat quantity tickets for Second Street South and agrees to be compensated for at the original unit price bid for bituminous tack coat, AND THEREFORE BE IT MUTUALLY AGREED, that the following construction items be added to the Contract at the unit prices listed: CHANGE IN CONTRACTTIME Due to this change the Contract Time: a. is increased ( ) by decreased ( ) b. is not changed (X ). c. may be revised if the work affected the controlling operation ( ). Original to Contractor Copy to Central Admin. Engr. Copy to Project Engineering Copy to Materials Office STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION CHANGE ORDER # 4 Working ( ) Calendar ( ) days. Sheet 1 of 1 PROJECT NO. 9 -0.9 FOLDER NO. _ 5" S.P. No N/A F.P. No N/A INITIALS Contract No TC9.80279 Issued by s- 1 4 / 41 :4 ' 4- 74 / 2 / Project E Approved by C Date Date Accepted by ' ✓c% '— / 4-e° iy Co actor'. Authorized Representative Date Reference Const. Manual 5- 591.200 &.367 3195 ITEM NO. ITEM NAME UNIT ESTIMATED QUANTITY UNIT PRICE AMOUNT 1 BITUMINOUS PAVEMENT PATCH LUMP SUM 1 $523.14 $523.14 TOTAL DUE TO CHANGE ORDER NO. 5 $523.14 CONTRACT AMOUNT PER CHANGE ORDER NO. 4 $724,949.30 FINAL CONTRACT AMOUNT, CHANGE ORDER NO. 5 $725,472.44 Mn/DOT TP- 21840 -02 (5/83) STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION CHANGE ORDER # 5 Contractor Rarbarossa & Sons, Inc S.P. No N/A Address 11000 93rd Ave N , Osseo, MN 55369 F.P. No N/A Job Location City of Hopkins 1999 Street and I Jtility Improvements Contract No. TC9 80279 In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions: WHEREAS, the City required the removal and replacement of broken inplace bituminous pavement along Second Avenue South before constructing the new wear course THEREFORE BE IT MUTUALLY AGREED, that the following construction item be added to the Contract at the unit price listed: CHANGE IN CONTRACT TIME Due to this change the Contract Time: a. is increased ( ) by decreased ( ) b. is not changed (X ). Working ( ) Issued by Calendar ( ) days. Approved by c. may be revised if the work affected the controlling Accepted by operation ( ). Original to Contractor Copy to Central Admin. Engr. Copy to Project Engineering Copy to Materials Office Projec Sheet 1 of City opkins W Cgrftractofs Authorized Representative v- 14 /o0 ate Date J6 Date Reference Const. Manual 5- 591.200 &.367 3/95 ITEM NO. ITEM NAME UNIT ESTIMATED QUANTITY UNIT PRICE AMOUNT 1 REMOVE & REPLACE WALK AND CURB @ 125 13T" AVENUE SOUTH LUMP SUM 1 $1,160.47 $1,160.47 TOTAL DUE TO CHANGE ORDER NO. 6 $1,160.47 CONTRACT AMOUNT PER CHANGE ORDER NO. 5 $725,472.44 FINAL CONTRACT AMOUNT, CHANGE ORDER NO. 6 $726,632.91 • Mn /DOT TP- 21840 -02 (5/83) Contractor Barbarossa & Sons, Inc. Address 11000 93rd Ave N., Osseo, MN 55369 Job Location City of Hopkins 1999 Street and Utility Improvements In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions: WHEREAS, the City required the removal and replacement of the new sidewalk and curb in fron t of 125 13 Avenue South. THEREFORE BE IT MUTUALLY AGREED, that the following construction item be added to the Contract at the unit price listed: ESTIMATED CHANGE IN COST CHANGE IN CONTRACT TIME Due to this change the Contract Time: a. is increased ( ) by Calendar ( ) days. decreased ( ) b. is not changed (X ). Original to Contractor Copy to Central Admin. Engr. Copy to Project Engineering Copy to Materials Office STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION CHANGE ORDER # 6 S.P. No. F.P. No. Contract No. TC9.80279 N/A N/A Working ( ) Issued by 1 r 460 4 TA - 67 lo® Project Engineer Date Approved by Sheet 1 of 1 Date 167‘ c. may be revised if the work affected the controlling Accepted by operation ( ). Co actor' Au orized Representative Date Reference Const. Manual 5- 591.200 &.367 3/95 • CITY OF HOPKINS HENNEPIN COUNTY, MINNESOTA RESOLUTION NO. 2000 -42 RESOLUTION ACCEPTING WORK AND ORDERING FINAL PAYMENT — STREET, ALLEY, UTILITY IMPROVEMENTS PROJECT 98 -09 WHEREAS, pursuant to a written contract signed with the City on June 16, 1999, Barbarossa and Sons, Inc. has satisfactorily completed street, alley, and utility improvements on 1 Street South and 12 /13 Avenues South, commonly known as City Project 98 -09 in accordance with such contract, NOW, THEREFORE, BE IT RESOLVED BY THE CITY OF HOPKINS, MINNESOTA: 1. The work completed under said contract is hereby declared accepted and approved. 2. Change Orders 1 -6 inclusive are approved. 3. Order for final payment on such contract is hereby ordered, taking the contractor's receipt in full. 4. A one -year warranty on contract work shall commence as of this resolution. Adoption by the City Council of Hopkins, Minnesota this 5 day of July, 2000. ATTEST: Terry Obermaier, City Clerk Eugene J. Maxwell, Mayor