Loading...
CR 2000-109 Award of Bid Thermotech Storm Sewer Project 99-09t • • June 28, 2000 GC" OF HOPKINS Award of Bid Thermotech Storm Sewer Project 99 -09 Proposed Action. Staff recommends adoption of the following motion: Move that Council adopt Resolution 2000- 43, Resolution for Award of Bid, Thermotech Storm Sewer Improvements, Project 99 -09. Overview. Council at its March 21 meeting approved plans and ordered bids for the installation of storm sewer pipe between the Thermotech building and Soo Line Railroad. Plans call for a new 36- inch pipe to provide an outlet to storm storage ponds west of the Thermotech site to Nine Mile Creek. A bid opening was held May 25 and Council needs to consider award of the contract for this project. Primary Issues to Consider. • Bid tabulation • Project budget and funding • Unique project scope • Project schedule • Recommendation Supporting Information. • Consultant's letter of recommendation • Bid abstract • Resolution 2000 -43 J ,a,.„L.,__. James Gessele Engineering Superintendent Council Report 2000 -109 Financial Impact: $ 97,975.00 Budgeted: Y/N Y Source: Storm Sewer Utility Related Documents (CIP, ERP, etc.): CIP and 2000 Budget Notes: $240,000 budgeted for construction • • • Analysis. • Bid tabulation Contractor Bid Amount Dave Perkins Contracting $88,670.00 Metro Utilities 97,975.00 F.F. Jedlicki 98,030.00 Meyer Contracting 103,565.00 Penn Contracting 119,917.00 G.L. Contracting 129,813.80 Northdale Construction 149,610.17 Municipal Contracting Services 162,500.00 Engineer's Estimate $132,400.00 • Project budget and funding The low bid of Dave Perkins Contracting was withdrawn by the contractor when it was discovered he had erroneously based his bid prices on installation of plastic storm sewer pipe. Staff approved of the withdrawal and then moved to the second low bid submitted by Metro Utilities. Metro Utilities bid is substantially under the engineer's estimate, explained in part by the consultant's very conservative estimating procedure. The bid is well within the City budget of $240,000 for construction. The funding source for this project is the storm sewer utility. • Unique project scope The bidding process became prolonged when Thermotech management raised concerns about pipe trenching operations near their building. Staff and its consultant worked closely with Thermotech and their engineer to address concerns and established additional construction procedures to protect the facility. The project scope now includes soil solidification between the pipe trench and Thennotech Building A, hand operated tamping devices for compaction, placement of excess trench materials along the south wall of Building A, and monitoring for structure movement at Building A during construction. • Project schedule The contractor anticipates soil solidification measures to be undertaken beginning July 24. Pipe installation should be completed the first two weeks of August. Substantial completion of the project should be by September 1 at the latest. • Recommendation Staff defers to the attached consultant's letter of recommendation for awarding the project to Metro Utilities, Inc. AMIF 10901 Red Circle Drive, Suite 200, Minnetonka, MN 55343 -9301 952.912.2600 952.912.2601 FAX architecture engineering environmental transportation June 27, 2000 Mr. Jim Gessele Engineering Supervisor City of Hopkins 1010 1st Street S. Hopkins, MN 55343 Dear Jim: RE: City of Hopkins City Project 99 -09 Thermotech Storm Sewer SEH No. A- HOPKN0003.00 14.00 In my letter recommending award of a contract to Metro Utilities, Inc. I indicated I had not checked their references based on my belief they had worked in Hopkins previously and that their work had been satisfactory. After discussing this with you and finding out you were not familiar with their work, I have checked references that are familiar with them. I checked four references as follows: 1. Joe Illetschko, Bonestroo Rosene Anderlik & Assoc. - Mohawk Dr. and Chippewa Dr. in Medina $200,000 contract to install 10" diameter sanitary sewer and 12" diameter water main. They did a "fine job - no complaints ". 2. Jim Rothstein, Donlar Construction Managers. - Installing the site utilities for a City Hall project in Maple Grove. They have not had any problems and have been responsive from a scheduling perspective. 3. Robert Stenger, Bor -Son Construction - Installing site utilities on a student housing project. They are about 80% complete. They are doing "okay" and their schedule progress has been good. 4. Dave Walock, Skarpol Construction Group - They have done a number of projects for Skarpol, generally site utilities. Mr. Walock spoke highly of them, indicating they used them on their last project when they were not the low bidder but because they were more responsive to the schedule. Based on these reference checks, I continue to recommend award of a contract to Metro Utilities, Inc. Sincerely, • %c David C Halter, P.E. Project Manager h:\ civil \proj ects\hopkins\ahopkn0003.00 \contractor references.doc Short Elliott Hendrickson Inc. Offices located throughout the Upper Midwest Equal Opportunity Employer We help you plan, design, and achieve. 8 aotld ls3 IeW1 J 00'0WSt 00 O0Z'Z$ 88 8888 p 888 00'000`Zt 00 00'000'Zl4 00'0£95 00'006$ bt §.§ y N 8 8 00'S9S'£OLS 00'000'6£1 00'008$ 61 ant oo 'Z$ Q i H 8 H O H H l H�V H fV �( H 00'09Z$ OS•OS a I 00'0ZL'Z$ 00'000'£$ 88888888888 a H H y � 511 f D pppp 8 N 0 H H 00'0£0'96$ 00'00S'L£S 00'009'14 F.F. Jed Unit Price 1 006$ x'000'£$ 00 $ J 00'59$ 0o'6Zt 1 00 888888 ENO} O HH H O N H H n g; H 4 H 00'0SZS 00'14 00' 1(4 aoud 1s3 1E1 '3U1 'Salad I ao'o9£' LS 00'DOS'£$_ 00'00£'ZS 00'009'6£5 00'SZS$ 00'00£$ $8888 O p p p § p p 0 N H p O n H H 188 H $750.00 $640.00 $39,750.00 $97,975.00 aoud gun Ilan on 00'Zt .00 '£S 00'00£'ZS 00'99$ 00'5£1 1 00'0£5 8 p 0 „„ p 0 0 p p 0 0 p 0 00'99Z$ 06'0$ 00'9$ ao!,d gun rnuo7 'TD I() al N 88 N §�§ N 17 00 00•009'I' 00'0LSt 00'05£5 88858888$ N W N H g Ya N °1N H H r 00 . 0L9•89t 00'OSZ'8£S 00'009t 00'00S' IS Unit Price I 00'014 00 00 00'L6t 00 00'5£$ 8 h H N H N 00'SSZS 05'05 00'0 LS h N H H 00'001'SS 00'OS6'g$ 00'000 oo'00o'gps o0'ost t o0'oszt 8888888 §�85� 11pp H HNH� H M H $1,800.00 $2,000.00 $52500.00 $132,400.00 Unit Price I O S'LS 00 oo 000'£$ 00'094 00'0£$ 00'SZS p$pp8 O O 1 N �10f1 c N�IA V 4 a N p88pE18.8 H N H H 00'OS£S SZ'LS 00'Z1t O r- fO 4 .-§ Mg R �- 009 SI 0 N N V 1-,- y- 0 OSL 1009' 1 I0S1 a!un dl Sl V3 dl Al dl 6 Iil W LLIW WU Al AS AC uuau Jotoenuoo Mobilization Remove Existing 12* Storm Sewer i 18" Storm Sewer Pipe 124" Storm Sewer Pipe 36" Storm Sewer Pipe Manhole, 6' Diameter _ Catch Basin; 4' Diameter Catch Basin; 6' Diameter Catch Basin Casting Manhole Casting Connect Existing 12" Storm Sewer to new Catch Basin Connect to Existing 36" RCP Topsoil Borrow (CV) - Seeding Chemical Grout Stabilized Wall Total Contract Amount 2 E rNC)ONIOnaom aom °rvv.g ° ;VV SI. P1 £l 8 888888888888888 a g H H H H 4 4 4 61 Munici I Co Unit Price 8 88888 8 8 8 8 $ $ 8 888 8S 8 88 888 O r N NO H O� N H F 44 a HH solid 1s3 Ieaol Zsuo° a 8Q� j 8 a y � 511 f D pppp 8 N 0 H v gl H 4 N S p p 1 08 y 8 O H p $8.t= O 8 H N g R N Northdal Unit Price 532 �7 HHHIO O N . {ON7is p� pp m H (p pp Y�In & < NV N N (P12$ ��ppyy81A lil H p 00 HH p pp ° H H p p p { $ p g H YY!! (9.N N H pp oo N p o p pp N H p o i N ff ao!,d gun rnuo7 'TD I() al N p pp a H pp M H N p 888,9-38 H NHHHyH 8888888888888888 R§RICIOWOUN g H N H N h N H H g r Penn Contr Unit Price 5 88 � 8 7 8888888 8 8888ii$ N O �H H H M �My M H O O 44 H H H Buena 1s3 r 0 � O r- fO N N R �- � � 8§ F. r I!un J J J J W 6 6 6 W U �� Contractor Item Mobilization Remove Existing 12" Storm Sewer 18" Storm Sewer Pipe 24" Storm Sewer Pipe 36" Storm Sewer Pipe Manhole, 6' Diameter ( Catch Basin; 4' Diameter Catch Basin; E Diameter Catch Basin Casting Manhole Casting Connect Existing 12" Storm Sewer to new Catch Basin Connect to Existing 36" RCP Topsoil Borrow (CV) Seeding Chemical Grout Stabilized Wall Total Contract Amount 'ON uWag rN..... aom °rvv.g 8 • • BE IT RESOLVED BY THE CITY COUNCIL OF HOPKINS, MINNESOTA, that the bid of Metro Utilities, Inc. in the amount of $97,975.00 is the lowest responsible bid for the installation of storm sewer pipe near the Thermotech site, City Project 99 -09, and the Mayor and the City Manager are hereby authorized and directed to enter into a contract with said bidder for and on behalf of the City. Adopted by the City Council of the City of Hopkins this 5th day of July, 2000. ATTEST: III Terry Obermaier, City Clerk CITY OF HOPKINS Hennepin County, Minnesota RESOLUTION NO. 2000 -43 RESOLUTION FOR AWARD OF BID THERMOTECH STORM SEWER IMPROVEMENTS CITY PROJECT 99 -09 Eugene J. Maxwell, Mayor