Memo-90'-94'Capital Improvement ProgramThank you CITY OF HOPKINS MEMORANDUM DATE: August 21, 1989 TO: Zoning and Planning Commission FROM: Shawn Drill, Community Development Intern SUBJECT: 1990 - 1994 Capital Improvement Program The 90 -94 CIP will be reviewed by the Zoning and Planning Commission at the August 29 meeting. Please bring your draft copy, along with your questions and comments about the CIP to the meeting. Attached is a CIP Schedule and the updated project summary pages which represent the most current plan. Please cross out the summary pages in your draft as they are obsolete. Note on the Schedule that the City Council has received a draft of the CIP and will review it at the Sept. 12 Work - session, with a Public Hearing and Council action set for Sept. 19. CIP discussion at the last meeting included comments regarding the following: o Excelsior Corridor name change o LRT $ amount for two stations is underestimated o Existing council policy for curb and gutter o Undergrounding of CBD utilities o Pedestrian ramp should be in CIP o Golf Course ranking in Park Board list of priorities o Purchase of Maetzold Field for $575,000 The Pedestrian Ramp has been added back into the CIP in the Proposed Projects Section, and the purchase of Maetzold field now appears in the Parks Section. • 5 YEAR CIP SCHEDULE April 12 - Distribute Info Packet to Dept. Heads June 6 - Dept. Heads return new and revised project pages June 21 - Initial review with Department Heads July 3 - Complete review of project pages by C.D. July 12 - Initial review with Manager July 17 - CIP Report distributed to Park Board for review July 24 - Revenue Tables compiled to show current available revenue and impact of projects July 25 - Planning Commission Review July 26 - Dept. Head final review August 8 - City Council Work Session to review CIP Document August 18 - Complete Revisions, Prepare Report August 29 Planning Commission Review Sept 12 - Detailed Review of CIP to City Council Sept 19 Public Hearing, Council Adoption of CIP o Instructions /Timetable o Project pages to be revised o Blank project pages o Table of Contents (preliminary) •OG PROJECT FUNDING CAT. NUMBER PROJECT TITLE SOURCE CAPITAL IMPROVEMENT PROJECTS FIVE YEAR EXPENDITURE SUMMARY 1990 1991 1992 1993 1994 Util WA -1 Refurbishing Well # 1 U.R. 150,000 Util WA -2 Emergency Power for Well #4 R.B. 150,000 Util WA -3 Well #4 Water Tower R.B. 25,000 600,000 Util SA -1 Replace B16 Meadowbrook Lift Station U.R. 5,000 100,000 Util SA -2 Telemetering Controls U.R. 70,000 30,000 Trans ST -1 Rebuild /Redesign llth Avenue South M.S. 270,000 Trans ST -1 Rebuild /Redesign 11th Avenue South T.F. 180,000 Trans ST -2 Knollwood Addition: St. & Sewer S.A. 240,000 Trans ST -2 Knollwood Addition: St. & Sewer G.O. 160,000 Trans ST-2 Knollwood Addition: St. & Sewer I.R. 75,000 Trans ST -3 Central City: St. & Sewer S.A. 105,000 225,000 Trans ST-3 Central City: St. & Sewer G.O. 70,000 150,000 Trans ST -3 Central City: St. & Sewer I.R. 25,000 100,000 Trans ST -4 Campbell Addition: St. & Sewer S.A. 210,000 Trans ST -4 Campbell Addition: St. & Sewer G.O. 140,000 Trans ST -4 Campbell Addition: St. & Sewer I.R. 50,000 Trans ST -5 Interlachen Addition: St. & Sewer S.A. 330,000 Trans ST -5 Interlachen Addition: St. & Sewer G.O. 220,000 Trans ST -5 Interlachen Addition: St. & Sewer I.R. 100,000 Trans ST -6 Concrete Alleys I.R. 10,000 10,000 10,000 10,000 10,000 Trans ST -7 Reconstruction of 17th Avenue M.S. 160,000 Trans ST -8 Reconstruct Mainstreet S.A. 150,000 210,000 Trans ST -8 Reconstruct Mainstreet G.O. 100,000 140,000 Trans ST -9 Reconstruction of Mall M.S. 300,000 Trans ST -9 Reconstruction of Mall S.A. 800,000 Trans ST - 9 Reconstruction of Mall T.F. 200,000 Trans ST -10 CBD Alley Improvement T.F. 450,000 1111/ ans ST -11 Light Rail Transit Stations (2) T.F. 150,000 ns ST -12 6th St. So. (11th to 12th Ave. So.) E.D. 100,000 ns ST - 12 6th St. So. (11th to 12th Ave. So.) M.S. 300,000 Trans ST -13 Excelsior Ave Beautification Project E.D. 25,000 1,000,000 Trans ST -13 Excelsior Ave Beautification Project T.F. 1,000,000 Trans ST -14 Jefferson Avenue Improvement M.S. 100,000 Trans ST-14 Jefferson Avenue Improvement S.A. 100,000 Trans ST -14 Jefferson Avenue Improvement T.F. 100,000 Trans ST -15 Undergrounding of Utilities - CBD T.F. 150,000 Trans SG -1 Replace Traffic Controllers M.S. 8,000 8,000 8,000 8,000 Trans SG-2 Signals - llth Ave. & 5th St. So. M.S. 50,000 Parks NF -1 Burnes Park Improvements G.O. 10,000 5,500 Parks NF -2 Oakes Park Improvements G.O. 3,000 6,000 21,500 Parks NF -3 Interlachen Park Improvements G.O. 4,000 Parks NF -4 Hilltop Park Improvements G.O. 15,000 1,000 Parks NF -5 Cottageville Park Improvements G.O. 16,500 1,000 Parks NF-6 Park Valley Playground Improvements G.O. 15,000 1,000 Parks NF -7 Elmo Park Improvements G.O. 3,500 1,000 Parks CF -1 Golf Course R.B. 200,000 1,800,000 Parks CF -2 Picnic Pavilion /Ice Arena G.O. 1,150,000 Parks CF -2 Picnic Pavilion /Ice Arena P.F. 600,000 Parks CF-3 Valley Park Improvements G.O. 25,000 44,500 55,500 Parks CF -4 Shady Oak Beach Improvements G.O. 9,000 34,000 Parks CF -5 Central Park Improvements G.O. 34,000 80,000 10,000 Parks CF-6 Maetzold Field G.O. 575,000 Bldgs MF - 1 Centennial Barn Remodel G.O. 150,000 Bldgs MF-2 Fuel Dispensing System C.R. 25,000 Bldgs MF -2 Fuel Dispensing System U.R. 50,000 Bldgs MF -3 Salt /Sand Storage Building G.O. 90,000 Bldgs MF -4 Sprinklers for City Buildings C.R. 40,000 45,000 Bldgs CC - 1 Comm. Ctr. Entrance /Office G.A. 25,000 Bldgs CC-1 Comm. Ctr. Entrance /Office G.R. 58,000 1111/ gs CC - Comm. Ctr. Game Room Renovation G.A. 127,000 gs CC -2 Comm. Ctr. Game Room Renovation G.O. 23,000 gs CC-3 Comm. Ctr Maint. Room Ren G.O. 8,500 TOTAL OF CAPITAL IMPROVEMENT PROJECTS 5,737,000 5,382,000 2,387,500 643,000 660,000 1 • Prop PP-1 2nd Ave. South (3rd to 5th St. So.) T.F. Prop PP -1 2nd Ave. South (3rd to 5th St. So.) M.S. Prop PP -1 2nd Ave. South (3rd to 5th St. So.) S.A. Prop PP-2 llth Avenue /2nd Avenue Connector T.F. Prop PP -2 llth Avenue /2nd Avenue Connector M.S. Prop PP -2 llth Avenue /2nd Avenue Connector S.A. Prop PP -3 7th Street Extention P.F. Prop PP -4 Pedestrian Ramp T.F. CAPITAL IMPROVEMENT PROJECTS PROPOSED EXPENDITURES FOR UNSCHEDULED PROJECTS D��G1ffQ PROG PROJECT FUNDING CAT. NUMBER PROJECT TITLE SOURCE 1990 1991 1992 1993 1994 300,000 400,000 300,000 300,000 400,000 300,000 300,000 20,000 350,000 0 0 300,000 20,000 2,350,000 20 YEAR CAPITAL EQUIPMENT REPLACEMENT PROGRAM FIVE YEAR EXPENDITURE SUMMARY FUNDING CAT. PROJECT TITLE SOURCE 1990 1991 1992 1993 1994 CE -1 City Manager's Vehicle E.R. 12,000 CE -2 Fire Chief's Vehicle E.R. 1,000 CE -3 Fire Marshal's Vehicle E.R. 500 17,000 CE - 4 Four Wheel Drive Truck FD E.R. 21,000 CE -5 Ambulance Van E.R. 30,400 CE -6 Heavy Rescue Vehicle P.F. 141,000 CE-7 Pumper Truck E.R. 227,100 CE -8 Parking Enforcement Vehicle E.R. 9,900 CE -9 Administration Vehicles E.R. 24,000 12,500 14,000 CE -10 Marked Police Vehicles E.R. 45,000 31,200 48,600 33,600 70,000 CE -11 Police 4 WD Vehicle E.R. 13,000 CE -12 Police Log Recorder E.R. 15,000 CE -13 Police Copy Machine E.R. 7,000 CE -14 Microcomputer Network Server E.R. 20,000 CE -15 Telephone System C.R. 40,000 CE -16 Compact Pickups (2) E.R. 9,400 9,800 CE -17 Portable Generator U.R. 9,500 CE -18 Three Quarter Ton Pickup E.R. 11,900 CE - 18 Three Quarter Ton Pickup U.R. 11,900 CE -19 Three Quarter Ton Utility Truck U.R. 15,800 CE -19 Three Quarter Ton Utility Truck E.R. 16,400 CE -20 Snow Blower E.R. 46,800 CE -21 One Ton Dump Truck E.R. 20,600 CE -22 Tandem Dump Trucks E.R. 60,500 65,400 CE -23 Log Truck w/ Clam E.R. 54,100 CE -24 Refuse Trucks U.R. 93,600 97,300 54,000 CE -25 Front End Loaders (2) E.R. 90,000 101,200 CE -26 Street Sweeper E.R. 83,200 011 27 Asphalt Paver E.R. 27,000 28 Three Wheel Truckster E.R. 10,200 29 Gang Mower E.R. 37,400 E -30 Riding Mower E.R. 9,200 CE -31 Brush Chipper E.R. 13,500 CE -32 Public Works Copy Machine U.R. 5,000 CE -33 City Hall Main Copy Machine E.R. 10,000 CE -34 Finance Computer E.R. 70,200 CE -35 Optical Scanner E.R. 10,000 CE -36 Mini Thermal Imaging Camera FD C.R. 10,000 CE-37 Inspections Computer C.R. 16,000 14,000 TOTAL CAPITAL EQUIPMENT REPLACEMENT PROGRAM 397,000 249,800 625,000 243,300 402,600 CURRENT REVENUES - GENERAL FUND • • Bldgs MF -2 Fuel Dispensing System C.R. 25,000 C.E. CE -15 Telephone System C.R. 40,000 C.E. CE -36 Mini Thermal Imaging Camera FD C.R. 10,000 C.E. CE -37 Inspections Computer C.R. 16,000 GENERAL FUND RESERVES Bldgs CC -1 Comm. Ctr. Entrance /Office CABLE TELEVISION FUND C.T. ECONOMIC DEVELOPMENT FUND Trans ST-12 6th St. So.(11th to 12th Ave. So.) E.D. 100,000 Trans ST-13 Excelsior Ave Beautification E.D. 25,000 1,000,000 GRANT -IN -AID GENERAL OBLIGATION BONDS PROPOSED PROJECTS BY FUNDING SOURCE TOTAL 41,000 10,000 40,000 0 G.R. 58,000 TOTAL 58,000 0 0 0 0 TOTAL TOTAL 25,000 1,100,000 Bldgs. CC-1 Comm. Ctr. Entrance /Office G.A. 25,000 Bldgs. CC -2 Comm. Ctr. Game Room Renovation G.A. 127,000 TOTAL 1990 1991 1992 1993 1994 0 0 0 0 152,000 0 0 Trans ST -2 Rnollwood Addition G.O. 160,000 Trans ST -3 Central City: St. & Sewer G.O. 70,000 150,000 Trans. ST -4 Campbell Addition: St. & Sewer G.O. 140,000 Trans. ST -5 Interlachen Addition: St. & Sewer G.O. 220,000 Trans. ST -8 Reconstruct Mainstreet G.O. 100,000 140,000 Parks NF -1 Burnes Park Improvements G.O. 10,000 5,500 Parks NF -2 Oakes Park Improvements G.O. 3,000 6,000 21,500 Parks NF -3 Interlachen Park Improvements G.O. 4,000 Parks NF -4 Hilltop Park Improvements G.O. 15,000 1,000 Parks NF-5 Cottageville Park Improvements G.O. 16,500 1,000 Parks NF-6 Park Valley Playground Impr. G.O. 15,000 1,000 Parks NF -7 Elmo Park Improvements G.O. 3,500 1,000 Parks CF -2 Picnic Pavilion /Ice Arena G.O. 1,150,000 Parks CF-3 Valley Park Improvements G.O. 25,000 44,500 55,500 Parks CF-4 Shady Oak Beach Improvements G.O. 9,000 34,000 Parks CF-5 Central Park Improvements G.O. 34,000 80,000 10,000 Parks CF -6 Maetzold Field G.O. 575,000 Bldgs MF -1 Centennial Barn Remodel G.O. 150,000 Bldgs MF -3 Salt /Sand Storage Building G.O. 90,000 Bldgs MF-4 Sprinklers for City Buildings G.O. 40,000 45,000 Bldgs CC-2 Comm. Ctr. Game Room Renovation G.O. 23,000 Bldgs CC -3 Comm. Ctr. Maint. Room Renovation G.O. 8,500 TOTAL 2,112,500 569,000 289,500 150,000 220,000 1990 1991 1992 1993 1994 INFRASTRUCTURE REPLACEMENT FUND Trans ST -2 Knollwood Addition: St. & Sewer I.R. 75,000 3 Trans ST -3 Central City: St. & Sewer I.R 25,000 100,000 Trans ST -4 Campbell Addition: St. & Sewer I.R. 50,000 Trans ST -5 Interlachen Addition: St. & Sewer I.R. Trans ST -6 Concrete Alleys I.R. 10,000 10,000 10,000 10,000 10,000 • MUNICIPAL STATE -AID STREETS Trans ST -1 Rebuild /Redesign llth Avenue South M.S. Trans ST-7 Reconstruction of 17th Avenue M.S. 160,000 Trans ST -9 Reconstruction of Mall M.S. 300,000 Trans ST -12 6th St. So.(11th to 12th Ave. So.) M.S. Trans ST - 14 Jefferson Avenue Improvement M.S. 100,000 Trans SG -1 Replace Traffic Controllers M.S. 8,000 Trans SG -2 Signals -llth Ave & 5th St. So. M.S. PRIVATE SECTOR FUNDING Parks CF -2 Picnic Pavilion /Ice Arena C.E. CE -6 Heavy Rescue Vehicle REVENUE BONDS Util WA -2 Emergency Power for Well #4 Util WA -3 Well #4 Water Tower Parks CF -1 Golf Course REAL ESTATE SALES FUND R.E. TAX INCREMENT FINANCING Trans ST -1 Trans ST -9 Trans ST -10 Trans ST -11 Trans ST Trans ST -14 Trans ST -15 TOTAL 85,000 60,000 35,000 110,000 110,000 TOTAL TOTAL TOTAL TOTAL P.F. P.F. Rebuild /Redesign llth Avenue South T.F. Reconstruction of Mall T.F. CBD Alley Improvement T.F. Light Rail Transit Stations (2) T.F. Excelsior Ave Beautification T.F. Jefferson Avenue Improvement T.F. Undergrounding of Utilities - CBD T.F. 568,000 628,000 8,000 8,000 0 600,000 141,000 200,000 100,000 150,000 270,000 300,000 SPECIAL ASSESSMENT Trans ST Xnollwood Addition: St. & Sewer S.A. 240,000 Trans ST - 3 Central City: St. & Sewer S.A. Trans ST - 4 Campbell Addition: St. & Sewer S.A. 210,000 Trans ST -5 Interlachen Addition: St. & Sewer S.A. Trans ST -8 Reconstruct Mainstreet S.A. 150,000 210,000 Trans ST -9 Reconstruction of Mall S.A. 800,000 Trans ST -14 Jefferson Avenue Improvement S.A. 100,000 8,000 8,000 8,000 50,000 741,000 0 0 0 0 R.B. 150,000 R.B. 25,000 600,000 R.B. 200,000 1,800,000 TOTAL 25,000 800,000 1,950,000 180,000 450,000 1,000,000 105,000 225,000 TOTAL 1,290,000 420,000 105,000 225,000 330,000 150,000 450,000 1,630,000 0 150,000 IT) 100,000 0 330,000 a. • • UTILITY REVENUES Util WA-1 Refurbishing Well #f 1 U.R. 150,000 Util SA -1 Replace B16 Meadowbrook Lift ST. U.R. 5,000 100,000 Util SA -2 Telemetering Controls U.R. 70,000 30,000 Bldgs MF -2 Fuel Dispensing System U.R. 50,000 C.E. CE-17 Portable Generator U.R. 9,500 C.E. CE -18 Three Quarter Ton Pickup U.R. 11,900 C.E. CE - 19 Three Quater Ton Utility Pickup U.R. 15,800 C.E. CE -24 Refuse Trucks U.R 93,600 97,300 54,000 C.E. CE -32 Public Works Copy Machine U.R. 5,000 EQUIPMENT REPLACEMENT FUND TOTAL 1990 1991 1992 1993 289,500 223,600 109,200 69,800 1994 C.E. CE -1 City Manager's Vehicle E.R. 12,000 14,000 C.E. CE -2 Fire Chief's Vehicle E.R. 1,000 C.E. CE -3 Fire Marshal's Vehicle E.R. 500 17,000 C.E. CE -4 Four Wheel Drive Truck FD E.R. 21,000 C.E. CE -5 Ambulance Van E.R. 30,400 C.E. CE -7 Pumper Truck E.R. 227,100 C.E. CE -8 Parking Enforcement Vehicle E.R. 9,900 C.E. CE -9. Administration Vehicles E.R. 24,000 12,500 14,000 C.E. CE -10 Marked Police Vehicles E.R. 45,000 31,200 48,600 33,600 70,000 C.E. CE -11 Police 4 WD Vehicle B.R. 13,000 C.E. CE -12 Police Log Recorder E.R. 15,000 C.E. CE -13 Police Copy Machine E.R. 7,000 C.E. CE -14 Microcomputer Network Server E.R. 20,000 C.E. CE -16 Compact Pickups (2) E.R. 9,400 9,800 C.E. CE -18 Three Quarter Ton Pickup E.R. 11,900 C.E. CE -19 Three Quarter Ton Utility Truck E.R. 16,400 C.E. CE -20 Snow Blower E.R. 46,800 C.E. CE-21 One Ton Dump Truck E.R. 20,600 C.E. CE -22 Tandem Dump Trucks E.R. 60,500 65,400 C.E. CE -23 Log Truck W/ Clam E.R. 54,100 C.E. CE -25 Front End Loaders (2) E.R. 90,000 101,200 C.E. CE -26 Street Sweeper E.R. 83,200 C.E. CE -27 Asphalt Paver E.R. 27,000 C.E. CE -28 Three Wheel Truckster E.R. 10,200 C.E. CE -29 Gang Mower E.R. 37,400 C.E. CE -30 Riding Mower E.R. 9,200 C.E. CE -31 Brush Chipper E.R. 13,500 C.E. CE -33 City Hall Main Copy Machine E.R. 10,000 C.E. CE -34 Finance Computer E.R. 70,200 C.E. CE -35 Optical Scanner E.R. 10,000 TOTAL 225,500 146,200 475,800 173,500 402,600 4 • Total Expenditures By Funding Source 1990 CAPITAL IMPROVEMENT PROJECTS 1991 1992 1993 1994 C.R. 41,000 10,000 40,000 0 0 G.R. 58,000 0 0 0 0 C.T. 0 0 0 0 0 E.D. 25,000 1,100,000 0 0 0 G.A. 152,000 0 0 0 0 G.O. 2,112,500 569,000 289,500 150,000 220,000 I.R. 85,000 60,000 35,000 110,000 110,000 M.S. 568,000 628,000 8,000 8,000 0 P.F. 741,000 0 0 0 0 R.B. 25,000 800,000 1,950,000 0 0 R.E. 0 0 0 0 0 S.A. 1,290,000 420,000 105,000 225,000 330,000 T.F. 450,000 1,630,000 0 150,000 U.R. 289,500 223,600 109,200 69,800 E.R. 225,500 146,200 475,800 173,500 402,600 TOTAL 6,062,500 5,586,800 3,012,500 886,300 1,062,600 p