Cond. Use Permit-Convenience Store/Car Wash• PLANNING COMMISSION REPORT: CUP87 -4 Planning Commission Report , CONDITIONAL USE PERMIT CONVENIENCE STORE /CAR WASH PURPOSE: To review and recommend action on a convenience store /car wash. The applicant appeared before the Commission on March 30th with a request to build a convenience store and four bay car wash. The Commission approved this request with the condition that the northerly access point on 11th Avenue be redesigned to restrict it to an entry only drive, and should this not be accomplished to the satisfaction of the staff, this drive would be eliminated. The City Council was also concerned with the northerly ingress /egress on 11th Avenue South. Benshoof & Associates were hired as consultants to review this ingress /egress on 11th Avenue. They recommended that the northerly ingress /egress on 11th Avenue be eliminated. That also noted that it might be possible to have a right -in only at this point if the site were re- designed. The City Council agreed with the report and sent them back to the Zoning & Planning Commission for review. With the idea of keeping the northerly access point as a right -in only, the applicant has submitted a new site plan. The new plan has eliminated the four bay car wash on the west side MAY 21, 1987 BACKGROUND: Name of Applicant: Jack Welch Address of Property: Southwest corner of 11th Avenue and 7th Street South. Present Zoning: B -3 Reason for Request: To construct a convenience store and car wash. Nature of Request: Ordinance requires a Conditional Use Permit for construction over $75,000. No. CUP87 -4 Page 2 of the site and moved the store to the west. The car wash is a one bay automatic drive - through. The site has already received approval for an eleven bay car wash. This site plan would negate that Conditional Use Permit. ANALYSIS: The applicant will not be subdividing the site as previously requested. The front lot line will now be 11th Avenue South. The following is a listing of the proposed development and ordinance requirements: Lot Area Lot Width Front Yard Side Yard Rear Yard Bldg. Height Parking F.A.R. Car Wash stacking Proposed 3,000 sq.ft. 25 ft. 10 ft. 0 ft 15 ft 45 ft. 15 1.5 3 39,047 approx. 183 ft. 24 ft N 72 ft. S 10 ft. 20 ft. 16 ft. approx. 15 .14 approx. 6 There will be three ingress /egress accesses and one ingress only access to the site. The access points on 7th Street will be used for in /out' traffic. The northerly access point on 11th Avenue is a right -in only while the southerly access point is an in /out. Appropriate signage will be placed on the northerly ingress on 11th Avenue to restrict egress. Sidewalk will be constructed along both 7th street and 11th Avenue. The parking area for the convenience store will be located on the northerly part of the site. This parking location will allow customers not getting gas an opportunity to park without interfering with the gas customers and vis- versa. The landscape plan shows a variety of plantings. A row of trees will divide the subject site from the adjacent shopping center. A hedge will be located along 7th Street. The ordinance requires 15 plantings. The applicant will meet the requirements. The proposed plan shows 2 pump islands covered with a 60x60 canopy. The islands will be 50 feet long. The applicant at the time of the report did not know the 1 CUP87 -4 Page 3 number of gas pumps per island. Specific plans detailing the number of pumps will have to be presented. The applicant is required to have six stacking spaces per island. The applicant appears to have the required stacking. The site is surrounded by a small shopping center to the south, an empty lot to the west, Westbrooke condominiums to the east and an industrial district to the north. The site plan is showing two signs, one on the northeast corner of the site and the other along 11th Avenue. All signage will be reviewed when the applicant requests a sign permit and will be required to meet the sign ordinance. The delivery area for the store will be next to the car wash stacking. This area is separate from the other activities on the site. The Director of Engineering has reviewed the site plan and noted that the plan shows 6/12 curbing around the site, 6/18 curbing is required. The drainage will remain the same as the previous site plan. The exterior of the building will be brick. The Fire Marshal has reviewed the site plan and found it acceptable at this time. Benshoof & Associates have reviewed the new site plan . and has found that the new site plan will meet minimum requirements. The applicant has done everything to satisfy the concerns of the staff with the northerly ingress on 11th Avenue. Although the necessity of the northerly access on 11th is questionable, the applicant has revised the plans to a point where it is a safe access with minimum conflict points. No variances are required with this site plan. The applicant has indicated that the site would not meet their needs if the northerly access on 11th Avenue is not approved for ingress only, at a minimum. ALTERNATIVES: 1. Approve the Conditional Use Permit 2. Deny the Conditional Use Permit CUP87 -4 Page 4 3. Approve the Conditional Use Permit with the condition that the northerly ingress is closed. 4. Continue for further information RECOMMENDATION: I recommend Alternative 11. The following are Findings of Fact and Conditions should the Commission recommend approval: 1. The proposed plan meets the requirements for a motor fuel station. 2. The proposed plan meets the requirements for a car wash 3. That a motor fuel station and car wash are permitted uses in a B -3 district. Conditions: 1. That the northerly access point be an ingress only. Respectfully submitted, Nancy Communi °y Development Analyst