Memo- Shady Oak Beach Project UpdatePublic Works Department Memorandum To: Honorable Mayor and Members of the City Council Copy: Rick Getschow, City Manager _ From: Steven J. Stadler, Public Works Director Date: January 21, 2010 Subject: Shady Oak Beach project update The Cities of Hopkins and Minnetonka have included in their Capital Improvement Plans (CIP) for the past two years, a project that would replace the existing water play area at Shady Oak Beach with a community play area. The water play area was initially developed as part of the facility's overall renovation in 1998, and is in need of replacement due to aging mechanical systems and changes in requirements for pool operations. As proposed, the two cities will share in the cost of improvements with Hopkins funding one -third and Minnetonka two - thirds of the cost. By providing the community play area, Shady Oak Beach would gain an amenity that, by design, would attract users that are not necessarily visiting Shady Oak Beach only for the swimming opportunity. In addition, the community play area would remain open for use well beyond the typical swim season of June — August. In November, 2009 the two cities applied for and received an $187,500 matching grant from the Hennepin County Youth Sports Grant Program. This grant will reduce the city's cost from $110,000 to $62,500. The total project cost is $375,000. The two cities hired Brauer & Associates, Inc. to develop the attached schematic plan of a new play area. The attached plan has been reviewed and approved by the Hopkins and Minnetonka Park Boards. The cities will next negotiate an agreement with Brauer for development of final plans /specifications. The Shady Oak Beach Community Play Area project is planned for construction beginning in August of 2010 and completed in time for the 2011 summer season. CAPITAL IMPROVEMENT PLAN 2010 rhru 2014 City of Hopkins, MN Project # 07- CIP -P219 Project Name Shady Oak Beach Community Play Area Future Department Public Works: Parks Contact Public Works Director Type Improvement Useful Life - -10 Category Parks/Fores/Pay.: Comm. Facil. Priority n/a Description Total Project Cost: $330,000 Replacement of the Shady Oak Beach water play area with a community play area designed to be a destination attraction for residents of Minnetonka and Hopkins. Justification The existing water play equipment at the site was installed when the beach was renovated in 1998 to encourage use of the site when weather conditions were not conducive to swimming. The system is in need of replacement due to health and safety requirements as well as aging equipment. Staff is recommending that the water play area be replaced with a community playground area designed to be a destination attraction for families with children 12 years of age and under. Use of this equipment on a seasonal basis would extend beyond the beach operating season and be available for use during the fall months as well. Expenditures 20 10 2011 2012 2013 2014 Total Construction /Maintenance 330,000 330,000 Total 330,000 330,000 Funding Sources 2010 2011 2012 2013 2014 Total GU - Other Governmental Unit 220,000 220,000 PDF- Park Dedication Fund 27,500 27,500 27,500 27,500 110,000 Total 247,500 27,500 27,500 27,500 330,000 Budget Impact/Other Operating expenses for the beach in 2008 were $200,200 with revenues of $230,700. ;tion of this project will enhance beach attendance during the nonnal beach operating season as well as post - use. It is anticipated that season pass sales will increase due to the addition of a high quality community paly imination of the existing water play area and underground confined space that houses the operational equipment will ,ult in reduced annual operating exuenditures of approxinamtely $5,000. 65 Tuesday, July 28, 2009 Shady Oak Beach Site Improvement Estimates City of Minnetonka & Hopkins, MN Project 09 -31 Date: 12 -21 -09 Schematic Design Phase One Estimate: 320,000.00 1) Earthwork, erosion control, & surveying .......... ............................... 11,500.00 2) Removals ........................................................... ............................... 13,500.00 3) Water modifications & drainage improvements .............................. 11,000.00 4) Tensile shade structures ..................................... ............................... 40,000.00 5) Upper Level Playground Equipment ................. ............................... 100,000.00 6) Additional Equipment (lower levels) ................. ............................... 69,000.00 7) Rubber, wood fiber and sand surfacing .............. ............................... 40,000.00 8) Concrete walks and play curbs ........................... ............................... 15,000.00 9) Site benches & tables ......................................... ............................... 12,000.00 10) Retaining wall modifications ............................. ............................... 3,000.00 11) Restoration & Landscaping Improvements ........ ............................... 5,000.00 Subtotal: 320,000.00 Estimated Design Fees 40,000.00 Construction Contingency 15,000.00 Total: $375,000.00 Phase One Alternates: 1) Wood fiber surfacing in lower container ............ ............................... 10,000.00 2) Rubber surfacing in lieu of wood fiber (preschool area) .................. 27,000.00 wV roveo ent'5 tind pXct%),c3ro i L 0& 13ectcb sbod'y 4s §7 \ � � ; 2 ; f ■ � ■ � E � a E | `}' ■ 0 § \ / § \ Shady OOl? Beach - PlaygroundImprovemen /D \/ \// ■ j \ {)� \ \ \LQ �. � - -x_ - -� ^� | § � \ § & / k E ID & &[ate 62]70 /@)� �7La \ } CD < � H H C V V A Z C O d 1 4 l0 O C 3 a M W d m N 3 0 v 7 Z, Shady Oal? Beach - Playground Improvements p D s 1 A C N n� j N M y, 2 �' O A ' S d 3 a O n A O N US n 0. N O N Q N 9l C m a CD s 3 O. n O S _M s O m O °-'• 3 m = CU O N In N K Ol M O m o m U _ M N N O_ "O N N iA (A C 0 3 3 ° La ID o� n 3 m D x N 2 0 m � o O_ el d 7 N = n — A gym n Q (� m 0-0 m sN (D - o F v A s 0 O M c M 3 M a 3 A N S d n . O H d T {A A 3 N O �Q O C 3 Q M e V 3 3 d 3 �o N / 1 'M 1,