10
Each year, during the winter season I have provided an outline of a five -year
capital improvement program. The plan gives "distant early warning" of neces-
sary projects and expensive equipment replacement (vehicles are handled on a
separate replacement schedule). The Capital Improvement Program also gives
the advisory policy - making arm of the city an opportunity to plan and direct
long -range improvements, beyond the narrow scope of the annual budget process.
The program itself, however, has no legal force - the final word belongs to
the City Council through normal budget procedures, year to year.
1. Alleys - It has been city practice to pay 20% of the cost of concrete alleys
from general tax revenues. Eighty concrete alleys have been installed since
the program began in 1965; two were done in 1984. Perhaps two dozen, most of
these being paved with deteriorated asphalt, remain.
2. Seal Coat - The City tries to maintain a regular schedule for seal coating
paved streets with asphalt and crushed stone. Experience has shown that
the chief cuase of pavement failure is water penetration of a deteriorated
surface. The City has been sealcoating at six year intervals, thus must
average six miles per year of seal coat to keep current.
3. 11th Avenue Viaduct - This project is in the approved five year State Aid
Funding Plan, for full funding by 1989. Since work is to begin in 1985 for
completion in 1986, a bond not later than 1986 will be advisable.
4. Reconstruction, 11th Avenue South & 7th Street Also from the five -year
State Aid Plan. This would fund spot reconstruction due to shifting peat
soils.
5. Bike Trails - This is a long -time item, intended to be seed money to match_
grants. Since grants are drying up, recommend 1986 to be the last year.
It is not in the 1985 actual budget.
6. Shady Oak Road - Since we suspect that the County intends to improve Shady
Oak Road some day, we need to note the possible expense on the "distant
horizon ". Perhaps when the Crosstown is extended, the volume on Shady Oak
will no longer merit a project.
•
7. Water Tank Renovation - The Moline tank was thoroughly recoated in 1977,
and the Blake tank in 1978.
9 -10 years is the maximum life of such work.
8. Loop Lines - Although all major water system loops have been completed,
the Engineer states that the flow from the big treatment plant (behind
Elmo Park) could be improved by the installation of an additional main
from there to Highway 7.
9. Storm Sewer - By policy, Council has devoted $65,000 annually from taxes
to the Storm Sewer Fund.
10. Half Million Gallon Tank - This he.s long been part of thE: overall water
system improvement plan, increasing overhead storage by 50 %. The tank
would be constructed at the Elmo Park treatment plant. Please note that
the major Water Utility bond will be paid off in 1988, thus making addi-
tional bonding capacity available for this needed improvement.
11. Public Works Garage - Completion of long -term project slated for 1986.
12. Tree Program - Losses were on the increase again in 1984.
13. Remodel Police Station - Chief Johnson is considering specific recommen-
dations for improvement.
14. CBD Projects - Handled through HRA bonding, based on specific T.I.F.
•
projects.
w�0
r
CAPITAL BUDGET
WORKPLAN
Threshold
- $5,000
PROJECTS
1986
1987
1988
1989
1990
Source
STREETS & TRANSPORTATION
Alleys
51000
5,000
5
5,000
5,000
General Fund
Seal Coat
58,000
61,000
64,000
67,000
70,000
General Fund
11th Avenue Viaduct
11100
-
-
-
-
State Aid (Bond)
Reconst. 11th & 7th South
70,000
-
-
-
-
State Aid
Bike Trails
10,000
-
-
-
-
General Fund
Shady Oak
-
-
-
-
200,000
State Aid
W ATER & SEWER
Tank Renovation
85,000
42,000
-
-
-
Water Fund
Loop Lines
-
40,000
-
-
-
Water Fund
Storm Sewers
65,000
65,000
65,000
65,000
65,000
General Fund
.5 mg. Tank
-
-
500,000
-
-
Water Bond
PUBLIC PROPERTY
Public Works Garage
25,000
-
-
-
-
Real estate fund &
Tree Program
77,000
81,00.0
85,000
_89,000
93,000
PIR interest
General Fund
Remodel Police Station
30,000
-
-
-
-
General Fund, Real
CBD Projects
(Thru separate HRA
bonding)
Estate Fund
I•
DATE: February 21, 1985
TO: Hopkins Zoning and Planning Commission
THROUGH: James Kerrigan, Community Development Director
FROM: Richard Wilson, Recreation and Parks Director
SUBJECT: FIVE YEAR CAPITAL BUDGET WORKPLAN
It has been brought to my attention that the Zoning and
Planning Commission will on February 26, 1985 consider a
City "Five Year Capital Budget Workplan" and submit a
recommendation to the City Council. I understand the
category of City park and recreation facilities was not
included in the draft Workplan that has been submitted to
the Commission. Therefore, please consider inclusion of
the following for your recommendation to the City Council.
•
BURNES PARK
$ 35,000
Irrigation system. . . . . .
. $30,000
Improved rink lights . . . .
. 5,000
CENTRAL PARK
40,000
Play equipment . . . . .. . .
. 30,000
Expanded walk lights . . . .
. 10,000
HILLTOP PARK
170,000
Fourth Street improvement. .
. 20,000
Land and building purchase
150,000
HOPKINS ARENA
8,000
Attendant office . . . . . .
. 5,000
Water line . . . . . .
. 3,000
INTERLACHEN PARK
10,000
Play equipment . . . . . . .
. 10,000
SHADY OAK PARK
10,000
Expanded irrigation. . .
10,000
VALLEY PARK
20,000
Bridge . . . . . . . . .
. 10,000
-
Garden water line. . . . .
. 10,000'
RLW:ph
v
•
DATE: April 16 1985
TO: Zoning and Planning Commission
FROM: Richard Wilson, Recreation and Parks Director
SUBJECT: FIVE YEAR CAPITAL BUDGET WORKPLAN
On March 26 1985 the Hopkins Zoning and Planning Commission discussed
for the second time, the City's proposed five year capital budget work -
plan, including that portion for parks as recommended by staff and the Park
Board as of March 18, 1985 The Zoning and Planning Commission then
asked that the park portion be prioritized.
The attached submission should not be considered hard and fast. It lacks
the insight, for instance, that a city manager and .city finance director
should provide on such subjects as sources of funds, an amount to be
considered "available /affordable" on an annual basis, strategies to be
used in providing for contingencies or unexpected capital needs, etc.
However, this is a start towards a document that the City Council and
future City Manager will need to forecast capital needs.
• There are certain assumptions designed into this proposal. They are:
1. The City will make available $50,000 to $70,000 annually for
parks capital improvement.
2. That acquisition monies should be. set aside annually as a
contingency for future purchase.
(If #1 is accurate but #2 is not, some Year Two and Year Three
developments can be accomplished in Year One.)
At its regular meeting conducted April 15, 1985, the Park Board approved
a motion to-recommend the prioritized Hopkins Parks Five Year Capital
Budget Workplan.
r�
RLW:ph
I
U]
BURNES
Irrigation
Rink Lights
CENTRAL
Play Equipment
Expanded: With
Lights
HOPKINS PARKS
FIVE YEAR CAPITAL BUDGET WORKPLAN
1986 — 1990
Park Board Recommended
April 15, 1985
YEAR ONE YEAR TW YEAR T YEAR FOUR YEAR FIVE TOTAL
1986 1987( 1988` 1989 1990
$ 35,000
$30,000
$ 5,000
$30,000
$10,000
HILLTOP
Fourth Street
)Land 20,000
Land &.Building .30,000 30,000 30,000 30,000 $30,000
HOPKINS ARENA
Attendant Office
Water Line
INTERLACHEN
Play Equipment
SHADY OAK
Irrigation
VALLEY
Bridge
Garden Water Line
* TOTAL
10,000
10,000
40,000
170,000
s l
10,000
10 , 000
20,000
10,000
10,000
$60 $63,000 $70,000 $50,000 $50,000 $293,000
5,000
3,000
(1) Funding to be placed aside and reserved for a future purchase.