Loading...
5 Year CIPDate: January 1984 • To: Zoning and Planning Commission From : - William P. Craig, City Manager SUBJECT: Five -year Capital Improvement Program Each year, it has been my practice to furnish you with an outline of a five -year capital improvement program, at the January meeting.. The plan gives "distant early warning" of necessary projects and expensive equipment replacement (vehicles are handled on a separate replacement schedule). The Capital Improvement Program also gives the advisory policy - making authority of the city an opportunity to plan and direct long -range improvements, beyond the narrow scope of the annual budget process. The program itself, however, has.no legal force - the final word belongs to the Council through normal budget and vote procedures. I. A1_ let's - It has been eity,practice to pay 20% of the cost of concrete alleys from general tax revenues. Seventy -eight concrete alleys have been installed since the program began in 1965; about two dozen asphalt alleys of varying condition remain, and a handful of unpaved alleys. 2. Seal Coat - The City tries to maintain a regular schedule for sealcoating paved streets with asphalt and crushed stone, since experience has shown.that the chief cause of pavement failure is water penetration of the asphalt surface. The City has been maintaining the six -year sealcoat interval, and must � average six miles of sealcoat per year to keep current. • 11th Avenue Viaduct - This project is.eontained on the approved five -year State Aid Funding Plan, and is posed in that plan to be fully funded by 1989. This CIP forsees the construction phase by 1985, thus a bond will be necessary that year. 4. Reconstruction of llth Avenue South and 7th Street South - This is another item from the five -year State Aid Plan. The reconstruction will be necessitated by the shifting of peat soils under the existing roadway. The reconstruction will be done in.the spots necessary, since the funding available cannot pay for redoing the street, and the vast majority of the streets named are in good condition. 5. Bike Trails - This program has been on the CIP for some years as seed money - funds,to be used to match grants, etc. Unfortunately, grants are at 'a low ebb. It is not in the 1984 budget. 6. Shady Oak Road - Since we suspect that the County intends.to improve Shady Oak Road some day, we need to note possible expense on the "distant horizon ". Perhaps when the crosstown is extended, the volume on Shady Oak will no longer merit a project. 7. Reconstruct 17th Avenue - This pertains to one small section of 17th which has subsided over the years, and can no longer be effectively patched with asphalt. The affected concrete sections should be removed and replaced. • Water Tank Renovation - The Moline tank was thoroughly recoated in 1977, and the Blake tank in 1978. Such work is usually scheduled for 8 -year intervals. 9. Loop Lines - Although most of the line "looping" to boost water pressure and volume has been completed, it appears that flow from the big treatment plant (behind Elmo Park) could be improved by installation of an additional main from there to highway 7. • 10. Storm Sewers - By policy, Council has devoted $65,000 annually from taxes to the storm sewer fund. 11. .5 Million Gallon Tank - This has long been a part of the overall water system improvement plan, increasing overhead storage by 50%. The year selected is somewhat arbitrary, and could be changed. The tank would be constructed at the Elmo Park treatment plant site. 12. Public Works Garage - It has been proposed to complete the garage complex by renovating the older structures in phases, through the years 1983 to 1 86. These expenses would be funded with the interest from the PIR fund principal, and from the Real Estate Sales Fund. 13. Tree Program - Our tree loss rate seems to have stabilized, but at a minimum we must continue to remove diseased trees as they are found, or the disease will overcome all the trees in a very short time. 14. Remodel Police Station - Butch LaBerge had some very specific ideas on remodeling the police station to give better service (including anew 24 hour entrance on the west side of the building). It was on the previous capital budget for 1984, but was moved back a year to allow Earl Johnson to review the needs from his point of view. 15. CBD Proiects The planning process for the Central Business District has included a section in the Comprehensive Plan and a special study by Barton - Aschman Associates. • The implementation, by the Housing and Redevelopment Authority, is proceeding through an HRA bonding and priority process. This explanation is necessarily brief; as usual I am available to answer.questions, and will make presentation at public meetings as necessary, Ideally the Commission will be.able to forward this to Council by late February, so that they may review, amend, etc. prior to 1985 budget preparation. • • v CAPITAL BUDGET WORKPLAN Threshold - $5,000 10 Source General Fund General Fund State Aid (Bond) State Aid General Fund State Aid State Aid Water Fund Water Fund General Fund Water Bond Real estate fund & PIR interest General Fund General Fund, Real Estate Fund PROJECTS 1985 1986 1987 1988 1989 STREETS & TRANSPORTATION Alleys $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 Seal Coat 55,000 58,000 61,000 64,000 67,000 11th Avenue Viaduct 1,400,000 - - - - Reconst. 11th & 7th South 70,000 - - - - Bike Trails 10,000 10,000 10,000 10,000 10,000 Shady Oak - - - - 200,000 Reconstruction 17th Avenue 30,000 - - - - WATER & SEWER Tank Renovation 80,000 40,000 - - - Loop Lines - 40,000 - - - Storm Sewers 65,000 65,000 65,000 65,000 65,000 .5 mg. Tank - - - 500,000 - • PUBLIC PROPERTY Public Works Garage 58,000 25,000 - - - Tree Program 73,500 77,000 81,000 85,000 89,000 Remodel Police Station 30,000 - - - - CBD Projects (Thru separate HRA bonding) 10 Source General Fund General Fund State Aid (Bond) State Aid General Fund State Aid State Aid Water Fund Water Fund General Fund Water Bond Real estate fund & PIR interest General Fund General Fund, Real Estate Fund