Loading...
Cond. Use Permit-PUD1 April 16, 1984 Case No: 84 -11 Applicant: A. R. Tempesta Location: Southwest corner of 9th Avenue & 7th Street South Request: Conditional Use Permit for a PUD STAFF FINDINGS & COMMENTS: Kerrigan 1. The applicants plan calls for the construction of 32 townhouses. 2. The applicant has already received Commission approval (11/30/82) and Council approval (12/7/82) for this proposal. There have been no changes to what was originally approved, however 427.26(5) of the Zoning Ordinance states the following: "Expiration of Conditional Use Permit: A Conditional Use Permit shall expire one year after it has been issued un- less the use for which the permit has been granted is in effect, except that, upon written application of the owner of the effected land for which the permit was granted prior • to the end of said year may request and the Council may grant an extension not to exceed one year." No extension was granted and thus a new Conditional Use Permit is required. • d ove mbe r Case No: 23, 1982 82 -44 Applicant: Anthony Tempesta Location: SW corner of 9th Avenue & 7th Street South Request: Conditional Use Permit for a PUD STAFF FINDINGS AND COMMENTS: Norris - Kerrigan 1. Applicant is requesting a Conditional Use Permit to construct a Planned Unit Develo:tnent of 32 attached townhouses. Proposed site is at the southwest corner of 9th Avenue & 7th Street South, in an R -2 District. 2. A substantial portion of the site is located in the Nine Mile Creek Flood Plain. All plans must be approved by the Nine Mile Creek Watershed District. 3. Applicant is proposing 14 units to front on 7th Street South, two buildings of 4 units and one building of 6 units, and 18 units, two buildings of 4 units and two buildings of 5 units facing 9th Avenue South. All units are to be two story, approximately 21' in height with two bedrooms, totalling 1008 square feet per unit. There will be 5 one -story (approximately 12 feet in height) storage • units, each to be 14'x38' and each containing 20 lockers. These units are to be located among the units. Units are located 35' from front and side lot lines in accordance with 427.31. 4. Parking is provided behind the units. Access to the parking is from 9th Avenue South and 7th Street South. There are 52 spaces provided. According to 427.45. (1) as it presently exists, 32 parking spaces would be provided. However., if the Zoning and Planning Commission and Council approves the amendments for residential parking requirements as recently considered, 64 parking spaces would be required. a 5. There are three 6'x10' garbage dumpster enclosures provided in the parking area. 6. A landscape plan was submitted which shows an assortment of trees and shrubs to be planted around the front and sides of the units and around the parking area in the back. There is also a play area proposed to be located to the rear of the units, beyond the parking areas. Applicant has proposed a wood chip trail on the creek easement. 7. The utility and drainage plans have been reviewed by the City Engineer. The Engineer noted that 9th Avenue South is not wide enough to accommodate on- street parking. 8. The Fire Marshal has reviewed the plans and noted that either all units must be sprinkled or fire walls must be constructed between every other dwelling unit. • 9. At the August 31, 1982 Zoning and Planning meeting, the Commission looked favorably. on applicants' Concept Review plan and recommneded that the applicant work with the neighborhood on the building design. The plans submitted with this request for this Conditional Use Permit are basically the same as those submitted for the Concept Review. The previous plan provided 66 _surface parking spaces and the present plan has 52 surface parking spaces and more green space.