Loading...
Item 84-216 LRT Instruction1010 FIRST STREET SOUTH • HOPKINS, MINNESOTA 55343 • 612/935-8474 To: Bakke - Kopp - Ballou & McFarlin Strgar- Roscoe BRW Re: Design, Construction Management, and Inspection Services for Replacement of Chicago, Milwaukee, St. Paul & Pacific Railroad Bridge Over Eleventh Avenue South. Gentlemen: The City Manager, Mr. William Craig, has reviewed the Statement of Qualifications submitted by twelve engineering consulting firms for the above advertised project. Your firm has been one of three selected for further consideration. In order to obtain further specifics, the City Manager requests you to submit by letter, the following information: (4) What part of the project would you expect the city to furnish and pay for separately, if any, such as site surveys, soil studies, etc? (5) What is your proposal as to services to be furnished by yourself as Engineers and the cost of these services? (6) What is your estimate of the time it would take to complete the project phases from the time the engineers received authorization to proceed? Please submit this information to Mr. Craig by August 1, 1984. If you have any questions in regard to the information being requested please contact me at 935 -8474. It is anticipated that after review of these submittals, interviews would be held by the City Council to select an engineering firm for the project. Thank you for your interest in this project. Sincerely, (1) Who will be the individual assigned to do the actual design work? (2) Who will be the individual assigned to the overall coordination of the design project including dealing with railroad, federal, state and local agencies and personnel and sub - contractors? (3) What phases of work would be involved in your approach to this project (i.e. study and report preliminary design, final design, bidding, con- struction, etc.)? John J. Strojan, P.E. City Engineer CITY OF HOPKINS • - 2 5. WHAT IS YOUR PROPOSAL AS TO SERVICES BY YOURSELF AS ENGINEER AND THE COST OF THESE SERVICES? Bakke - Kopp - Ballou & McFarlin Estimate 1985 Construction cost $ 770,000 Following fees given as "Not to Exceed" Phase A - $10,500 Collection of Data B - 5,200 Preliminary Studies C - 36,000 Final Design D - No Charge - Bidding E - Construction - $42,000 (Assumes resident inspection for one construction season - City could decrease scope or perform part or all of this service with own forces). Strgar- Roscoe Phase I thru ,IV as previously listed are described in detail on separate sheets - see actual proposal Actual fee to be negotiated after Scope of Services Developed - Hourly rates or lump sum could be used. Suggest - Phase I - Project Surveys and Bridge Concepts Hourly basis at 2.5 times salary cost expended plus out of pocket expenses - Estimate $15,000 Phase II Preliminary Design and Phase III - Final Design Fees based on percent of construction cost - ASCE Manual No. 45 Assuming 1,000,000 Project - 7.5% fee 25% to Phase II and 75% to Phase III Phase II 1,000,000 x .075 x 0.25 = 18,750 Phase III 1,000,000 x .075 x 0.75 = 56,250 Phase IV In- Construction Services - On hourly basis - Range from 4% to 7% of construction costs Open to alternate methods B RW Propose combination of hourly rates and lump sum methods. Phase I - Preliminary Studies and design - hourly rate Salary costs (labor plus labor additives) times 2.1 Phase II - Final Design Lump Sum Fee - Determined at conclusion of Phase I based on either a percentage of construction cost or negotiated amount A representative percentage of construction cost scale is shown on separate sheet. For Example - 800,000 construction cost 4.63% fee roadway and 4.63% fee bridge Phase III Construction Hourly rate - estimated maximum cost for these services will be determined following the completion of Design Phase Charges for work performed by Braun Engineering Testing will be involved at cost. Estimated Project Fee Range - Phase I - Preliminary $ 40,000 to $ 55,000 Phase II - Final Design 60,000 to 80,000 Phase III - Construction 120,000 to 140,000 TOTAL 220,000 to 275,000 MN /DOT & Braun Testing Services not included in above 411 6. WHAT IS YOUR ESTIMATE OF THE TIME IT WOULD TAKE TO COMPLETE THE PROJECT PHASES FROM THE TIME THE ENGINEERS RECEIVED AUTHORIZATION TO PROCEED? Bakke - Kopp - Ballou & McFarlin Phase Time Requirement Notice to Proceed A Collection of Data B Preliminary Studies Reviews of (B) C Final Design Reviews of (C) D Bidding Contract Execution Total to Start Construction E * Time periods not under control of consultant. Willing to commit to all others. Strgar- Roscoe Phase Description Time Required Project Total I Surveys & Concepts 1 month 1 month II Preliminary Design 4 months 5 months Review /Approvals 4 months 9 months III Final Design 3 months 12 months Review /Approvals IV In- Construction 12 months 30 months BRW Project schedule described as optimistic is furnished - Design Process 11 months Construction 9 months Absolute Minimum 20 months More likely 24 to 30 months from start of design to ribbon cutting. John J. Strojan P.E. 9/14/84 - 3 4 weeks 3 weeks 4 weeks* 12 weeks 2 weeks* 6 weeks 4 weeks 35 weeks 24 weeks*