Work Specifications Koresh Athletic Buildingr WORK SPECIFICATIONS KOKESH ATHLETIC BUILDING Project Redo old Kokesh Athletic Building and three other buildings as per sketches provided by owner to contractor. This proposal includes only the exterior of these buildings. Specifications of this proposal can be changed, and price adjustments will be made. Where specifications are not listed, a construction budget will be included. 1. Remove all signage on buildings that will not be reused. General clean up of job site. 2. Clean all surfaces that are to be redone. This includes brick cleaning, removal of vines, removal of all excess hardware, removal of electrical mast, removal of old coping as needed. Block cuts and removal of brick will also be done at this time to prepare openings for new windows. Existing windows will be reused on building #4. Construction- CARPENTRY 1.Fir out rear wall on buidling #4 with 1" x 2 ". Install 6" redwood siding. 2. Retrim entire rear of building using the sketches provided. New wooden combination windows to be installed. 3. Building #3 should be sheathed with exterior grade plywood before cedar shakes are applied. 4. Build deck as shown on drawings, after the two new entry doors are installed, and third entry way has been added. Door allowance to not exceed $400 per door including hardware. 5. Install lattice work around door openings and deck area also around the air conditioners that have been moved. Build new steps. 6. Install 1" x 6" tongue and groove pine on building #5, and building. 7. New metal coping for building #5 after tile has been removed. Will require minimal carpentry. 8. Planter boxes with signage posts can be built after the initial concrete work has begun. These boxes will be built 30" tall and to scale using treated lumber or other suitable material. 9. Build trash enclosure out of cedar using treated posts. Supply hardware for gate system. Construction Installation of Glass and Doors 1. Glass will be 1" clear insulated glass in dark bronze 111 thermally broken framing. 2. Doors will be narrow style aluminum with standard hardware and closing mechanisms, 3. All installation of new glass will be done according to standard codes. Example tempered glass to be used where necessary. 4. Windows on building #3 will be reused. They will have new inserts and be made paint ready. 5. New wood panel doors to be installed on building #3 at this time. Electrical 1. Supply and install lighting on exterior of building as per sketches. 2. Lights will have switches or control devices as per City Codes and owner's needs. Timers are not included in this bid. $1,000 3. Additional 100 amp service to building #5 and two exterior stubs to kiosk or deck area are also included in this bid. Service to this building should be put underground in 2" plastic pipe. Service could then be increased if needed by new tenant. Concrete 1. Courtyard. Remove all topsoil and fill with 4" sand. Prepare area for proper drainage. Frame with 2" redwood. 2. Form walkways using the angles of the planters as reference, using exposed aggregate in walk area an smooth concrete for the rest of the courtyard. The exposed aggregate will be from the alley to each door. Final decisions are to incorporate the angles we already have sketched and incorporate them into our walkways. 41/ 3. On the finish, it will be washed, let set a couple of days, then washed with acid. Then sealed and covered, then sealed again in a week. In the spring, the concrete should be cleaned again and a sparkle seal should be applied. All concrete, block, or brick openings to be refurbished before, and made redy by the time the glass arrives. 11/ Stucco building #5 finish to be cosen by owners. • • Redash with Thorocoat all areas that are specified to be done. This includes second floor East wall and blocksurfaces, if paint cannot be used. Paint areas that are specified on the blue prints. A sealer will be applied to all new lumber on the rear of these buildings Awnings and awning design were taken into account with little changes being needed. These are to be provided by contractor. The budget for these and the installation cost to not exceed $2,500. This should bew more than adequate. Any credit will be handled by a credit memo. Planings for planter box are not included in this bid. All other exterior work that has been discussed between owners and contractor to be included. September 2i, 1c/B4 WORK SPELIFIL6IIONS- KOKESH r:;CHLEIlL BUlLIANLJ Ploject.--Redo old Kokesh thl Buildind and three other buildings al-,; p ti.Al< Lit es ppuvideLl bv (Jot I tie, L co' I r tor. 'his proposal includes only' Lhe exterior of these buildinds. ".3pecifications of- this proposal can be changed. prico adiustments will Pi! made. Where specifications are noL listed, a construction budget will be included. L . RL•naivt..• 1 1 tr1 cIIirc& tit , L I I t 4%1 i 1 .1 not be reused. t:tetter ts...I.eatt 1.1.1.! t." LieLtn ali 'races Litt are Lu be tedone. this includes 61 ick cleaning, removal Ut vines, emoval uf all excess hardware, t emL1'. ct 1 ot i1 t:t. L 1 Lir,i mast , removal of old coping as needed. Block cut.: and removal of brick will also be done at this Lime to pr epat e openi nos for new windows. Existing windows will be reused on building #4. 1. Fir out rear wall on building #1 with i" x ". Install 6" redwood siding. 2. Retrim entire rear of building using the sketches provided. New wooden combination windows Lu be installed. Buildind should be sheathed with exterior grade plywood before cedar shakes are applied. Build deck as shown on drawings, after Lhe two new entry doors are installed. and third entr way has been added. Door allowance Lo noL exceed +400 per door including hardware. install lattice work around door openings and deck area also cU outtii Lite c1 r tit I jtt -.1' ti that have been moved. Build now citeps. if I L 1 1 i tt c» L Ljntjutj t tJ i oo o p1 o ui buil dila #5, at id build the flower boxes 1- this. building. Hew met stl c obi lig I Lit Lu$ ldlh 4.j c3Lt$ tile has been 1 11 I ecrui r e ii$uj Ccr 1..1ttLY Planter bo.t.. wi Lit si tot_ie pLs JL. cat LL' af L&r Lhe ini Li tl c01'$11 L cAS L epuii . these boxes will be built L1 1 an L u scale usinCJ L e L tzq_i 1 Limb et- • or ot i c-ib i t I . lJU Id ti t, tttL L)1 C. L:Li ;At L$irip b uLed :".; 1.) Li 1 `,/ Iii I U.! t )r Cu/.aL of Glass and bqurs 1. Glass will be 1" clear insulated glass in dark bronze thermally broken F, affil ou. 2. boors will be narr ow styl e aluminum wzth standar d itardwc.ire and closing mechanisms. C9fq.:[eLe All installation of new plass will be done according to standard codes. Example Leo/pored glass to be used where oeeessarv. Windows uo building #J will be reused. }hev will have new inserts. and be made paint ready. New wood panel doors to be installed on building #J at this time. i. Supply and install lighLzog on exLeriu, of building as per skeLche. 2. Lights wi11 have switches or control devices as per City Codes and owner s needs. |imers ate not included in this bid' 3 `,ddiLiu/.a1 1oo amp service Lo building 45 and two exterior stubs Lo kiosk u/ deck area are also included in this, bid. Service to Lhis building should be put underground i/. 2" p1a-,Lic pipe. Service could then be i/.creased it needed by /.en tenant. 1. Lourtya,d' Remove all topsoil a//d fill with 4" sand. Prepare a' ea fur proper drainage. Frame with 2" redwood. |'u/x/ walkway u�1.110 the angles uf the planters as re+ereoce, using e:pused auq/e4ate in walk area and smooth concrete tor the rest of Lhe courtyard. The exposed aggregate will be hu"/ the aile: to each duur. Final decisions are to i/ /cu/ . pun* a e the angles we already have sketched aod / / �u,aLe U` em 1 11t our wa1kwa On i|.e finish, it will be washed, leL set a couple o/ days, Lhen washed with acid. then sealed and covered, then sealed u week. 1'. the Spring, U`e cu'`erete should be cleaned again and a -.,,pat Lie seal should be applied. ii 1 concreLe, block, or brick openings Lu be refurbished bet Chl id Made h ectli V by the time the glass cti t yes. Stucco buildind U3 finish Lu be chosen by owners. Reda.h with fhorocuaL all areas Lhal are specified Lo be done. rh1_ include. second floor East wall and block surfaces, if paint cantiot Litz. P.inL areas ihal are specified on Lira blue ptints. A sealet will .poi j d Lj tl 1 Fitv 1u(i,bti Lril iJi tth • ti tIt blAi d r.:Iwnings and awning desi Oh wet chanties beind needed. thee Hl e budget fus Lhese and the lhis should be more handled Lv t ctedit memo. e Laken into account with little aIt? to be provided by contractor. inslaliaLion cost to not exceed than adequate. Any credit will be Plantings .fot planter box are not included in this bid. H11 other exterior work that has been discussed between owners and contractor tu be included.