Loading...
CR 11-006 Authorize Final Payment 2008 Street and Utiltiy Improvements Project 07-10G�TY OF • yOPKINS January 18, 2011 Authorize Final Payment 2008 Street and Utility Improvements City Proiect 07-10 Proposed Action Council Report 2011-006 Staff recommends approval of the following motion: adopt Resolution 2011-003, accepting work and ordering _f nal payment 2008 Street and Utility Improvements, City Project 07-10. Overview The contractor has completed all work detailed in the contract as well as any punch list items to the City's satisfaction. This action completes an assessable street project. Staff recommends approval of Resolution 2011-003 accepting work and ordering final payment in the amount of $55,689.90. Primary Issues To Consider • Accepting work and final payment • • Resolution 2004-003 Supporting Documents • Resolution 2011-003 • Engineer's recommendation for final payment • Final pay request R. Bradford, P.E. City Engineer Financial Impact: $986,942.54 Budgeted Y/N Y Source: Special Assessments, PIR Utility funds Related Documents (CIP, ERP, etc.): CIP Feasibility Study Notes: • \\Lisa\engineering\Council Reports\2011\CR2011-006 Authorize Final Payment 08 Street Recon.doc ----- -------------- ...... • BO L_TON 8,. M F—=, N K , i N C® Consulting Engineers & Surveyors �� 12224 Nicollet Avenue • Burnsville, MN 55337 Phone (952) 890-0509 • Fax (952) 890-8065 www.bolton-menk.com December 28, 2010 Mr. John Bradford, P.E. City of Hopkins 1010 18t Street South Hopkins, MN 55343 Re: Pay Estimate No. 8 and FINAL 2008 Street & Utility Improvements City of Hopkins, Minnesota SAP 132-350-001 BMI Project No. T16.022221 Dear Mr. Bradford: Enclosed, please find three (3) signed copies of Pay Estimate No. 8 and FINAL for the above referenced project. Also enclosed is a copy of Consent of Surety, IC -134 forms and lien waiver forms as required for project closeout. Please sign all copies of the pay estimate. Keep one copy for your file, return one signed copy to me for our files and return one signed copy to Valley Paving, Inc. along with final payment. When I receive our signed copy of the .final pay estimate I can prepare the final paperwork to complete project closeout with MnDOT State Aid. If you have any questions, please call (952) 890-0509. Sincerely, & MEIN Rippke, P.E. Project Engineer Cc: Marcus Thomas, P.E., Project Manager Mike Waltman, E.I.T., RPR Enclosures DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer. .. •.e.,a.er..«<r+-m,erceca-:a-rac...—. rrr �< ±.'�.r..___Wrr }� _��-___ __rr_.r- :-r_--..____ ��._. �:':.-:.•:.: r........:.d �.1:'. �:'.'rr: _-�.Irrir._�fi_rrrrrrrrrri_r ____:s �_....- s.. ...___ _.. CONTRACTOR RECAPITULATION 2008 STREET & UTILITY.IMPROVEMENTS CITY OF HOPKINS S.A.P. 132-360-001. CITY PROJECT NO. 07-10 BMI PROJECT NO. T16.022221 August. 3, 2010 TOTAL, COMPLETED WORK TO DATE $ 987,077.79 RETAINED PERCENTAGE 0% $ - TOTAL AMOUNT OF OTHER PAYMENTS OR (DEDUCTIONS) $ (135.25) (sprinkler repair due to sodding damage al 225 Campbell Dr.) NET AMOUNT DUE TO CONTRACTOR TO DATE $ 986,942.54 TOTAL AMOUNT PAID ON PREVIOUS ESTIMATES $ 931,252.64 PAY CONTRACTOR PER ESTIMATE NO. 8 & FINAL $ 55,689.90 CERTIFICATE FOR FINAL PAYMENT I hereby certify that, to the best of my knowledge and belief, all items, quanitities, and prices of work and material shown on the Estimate are correct and that all work has been performed in full accordance with the terms and conditions of the Contract for this project between the Owner and the undersigned Contractor, and as amended by any authorized changes, and that the foregoing is a true and correct statement of the contract amount for the Final Estimate, that the provisions of M.S. 290.92 have been compiled with and that all claims against me by reason of the Contract have been paid or satisfactorily. secured. CONTRACTOR: VALLEY PAVINqX4111C., 8800 Avenue East, Shakopee, MN 55379 BY: ,Pres. Nam chard . Carron Title DATE: 8/9/2010 APPROVED: Contractor's Surety CHECKED AND APPROVED AS TO QUANTITIES AND AMOUNT: BOLTON & MENK INC., 12224 Nicollet Avenue, Burnsville, MN 55337 BY: ,.PROJECT ENGINEER S rah E. ippke, P.E. DATE: APPROVED FOR YMENT: OWNER: CITY OF HOPKINS, 1010 1st Street South, Hopkins, MN 55343 BY: Name Title • CONTRACTOR'S PAY. ESTIMATE 2008 STREET & UTILITY IMPROVEMENTS . CITY OF HOPKINS, MN SDLP. 132350-001 CITY PROJECT NO. 07-10 BMI PROJECT NO. T16.022221 PAY ESTIMATE NO. 8 & FINAL WORK COMPLETED THROUGH FINAL Page 1 CONTRACTOR'S PAY ESTIMATE 2008 STREET & UTILITY IMPROVEMENTS CITY OF HOPKINS, MN S.A.P. 132-350-001 CITY PROJECT NO. 07-10 BMI PROJECT NO.716.022221 PAY ESTIMATE NO. 8 & FINAL WORK COMPLETED THROUGH FINAL LINE; - . - ITEM UNI PSE . .ESTIMATED BID QUANTITY � . UNIT., :.. BID AM.fN1NT�. -QUANTITY PREVIOUS .: .:Ei?RMATE AMOUNT PREVIOUS AtWRMAME. OUANM . COMPLETED TO DATE AMOUNT THIS ESTIMATE- 45 2503.803 CONSTRUCT 10" INSIDE DROP 41228.87 0 LIN FT 50.00 $ $ - 46 2503.803 8" PVC PIPE SEWER(SANITARY) 520.34 0 UN FT 41010 $ It - 47 2503.603 10"PVC PIPE SEWER(SANITARY) $44.75 0 LIN FT $0.00 S - $ 48 2503.603 C PVC SANITARY SERVICE PIPE $20.34 0. UN FT: $0.00 $ - - 49 2503.603 W DUCTILE IRON PIPE SEWER CL M "SAID 0 LIN FT $0.00 $ 50 2503.603 1 LINING SEWER PIPE r ITAR $33.06 0 LIN FT $0.00 - $ 51 2503.608 DUCTILE IRON FITTINGS $4.58 0 POUND 50.00 $ - - $ 52 2504AM CONNECT TO EXISTING WATERMAIN - $356.01 0 EACH $0.00 $ s- 53 2504.602 HYDRANT $2,797.281 0 EACH. 1 50.00 $ $ - 54 2504.602 ADJUST GATE VALVE BOX $162.38 0 EACH $0.00 $ - $ - 55 2504.502 1" CORPORATION STOP 41111.89 0 EACH $0.00 - - 56 2504.502 6" GATE VALVE AND BOX $935.81 0 EACH $0.00 $ - 57 2504.502 8" GATE VALVE AND BOX 51.220.83 0 EACH $0.00 - $ - 58 2504.602 1T GATE VALVE AND BOX 51 7.82 0 EACH $010 $ $ - 59 2504.602 1 -CURB STOP 8. BOX $187.84 0 EACH $0.00 $ $ - 60 2504.602 SALVAGE SPRINKLER HEAD $32.47 0 EACH 410.00 $ $ - 61 2504.802 INSTALL SPRINKLER HEAD 554.12 0 EACH $0.00 $ $ - 62 2504.603 1- TYPE K COPPER PIPE 4125.43 0 LIN FT $0.00 $ $ - 63 2504:603 W WATERMAIN DUCTILE IRON CL 52 $35.60 0 LIN FT $0.00- 84 2504.603 8" WATERMAIN DUCTILE IRON CL 57 $45.77 0 LIN FT 410.00 - $ - 55 2504.504 4" POLYSTYRENE INSULATION - 413.05 200 SO FT $610.00 S0 $ 152.50 50 $ 152.50 68 2506.502 CONST DRAINAGE STRUCTURE DES 48.4020 $1.04162 3 EACH S3127.85 .3W273 - 3 3 127.86 67 2505.502 CONST DRAINAGE STRUCTURE DES 46.4071 51 937.75 2 EACH S3 875.50 - 2 2 3 875.50 88 2508.502 CONST DRAINAGE STRUCTURE DES 60.4020 $2 639.82 1 EACH 639.62 1 169 2506.502 CONST DRAINAGE STRUCTURE DES 50.4022 $2 542.99 1 EACH S2 542.99 1 9 1 270 2506502 CONST DRAINAGE STRUCTURE DES 66-4022 $2 33954 1 EACH $2 339.54 14 1 2 339.54 71 2506502 CONST DRAINAGE STRUCTURE DESIGN SPECIAL DESIGN R-1 7(3' Sam 18 EACH 1112 358.98 - 188 18 12 358.98 72 2506.503 RECONSTRUCT DRAINAGE STRUCTU E 8966.34 6 EACH $5 798.04 1 4 1 $ 966.34 73 2508.576 CASTING ASSEMBLY R4W V STORM SEWER 555010 23 EACH 51 650.00 - 22 12 100.00 12 100.00 74 2506516 CASTING ASSEMBLY (R403 -JH STORM SEWER S1 .78 1 EACH S1 .78 $ $ - 75 2606515 CASTING ASSEMBLY -1733 STORM SEWER $525.00 19 EACH $11,07&00 18 11 250.00 18 $ 11 250.00 75 2506516 CASTING ASSEMBLY R-1733 SANITARY SEWER 5625.00 0 EACH 410.00 $ 77 2505572 ADJUST FRAME & RING CASTING $285.00 3 EACH $655.00 5 1,425.00 5 1,425.00 Ta 2506J602 INSTALL MANHOLE (SANITARY) $2 4155s 0 EACH $0.00 $ - 79 250SAM LINE DRAINAGE STRUCTURE SANITARY MANHOLE 115 899.73 0 EACH $0.00 $ - 80 2&ZAW RECONSTRUCT SANITARY MANHOLES $3.000.72 0 EACH $0.00 $ 81 2521501 4- CONCRETE WALK $325 13618 SO FT 344.38&16 17431 $ 56 825.08 17431 56 825.06 82 2531.501 CONCRETE CURB& GUTTER DESIGN 9518 $11.01 4427 LIN FT $4874127 4205 46 7.05 4205 46297.05 83 2531.501 CONCRETE CURB & GUTTER DESIGN 8815 tspar REPAIR $14A2 707 1 LIN FT $10.336.34 656 $ 9,590.72 658 $ 9,590. L2 590.72 84 2531507 6" CONCRETE DRIVEWAY PAVEMENT 1D 54924 394 BD YO 4119100.66 375 $ 1.8 465.00 375 18 465.00 85 2531.507 Y CONCRETE DRIVEWAY PAVEMENT(COMMERCIAL) $56.31 .82 SO YD $017.42 28 $ 1,576.68 28 $ 1,57&N 86 2531.802 PEDESTRIAN CURB RAMP $34.85 20 EACH 56 . $ 768.70 22 � 766.70 87 2583.801 TRAFFIC CONTROL. $5000.00 052 LUMP SUM $410&00 0.82 $ 4,100.00 0.82 4,100. Be 2564.802 TRAFFIC SIGN WITH POST 11.1 - 5183.08 1 EACH $183.06 1 $ 183.08 1 183.06 89 2564.802 ITRAFFIC 64H WITH POST CM 1-1 W'AW with W16-70 FLUORESCENT) smml 2 1 EACH I SM121 21.$ 530,121 2 $ 539.12 Page 2 CONTRACTOR'S PAY ESTIMATE 2008 STREET & UTILITY IMPROVEMENTS CITY OF HOPKINS, MN S.A.P. 132360-001 CITY PROJECT NO. 07-10 BMI PROJECT NO. 716.022221 PAY ESTIMATE NO. 8 & FINAL INORKCOMPLEMTHROU.GH,. r FINAL Papa 3 CONTRACTOR'S PAY ESTIMATE 2008 STREET & UTILITY IMPROVEMENTS CITY OF HOPKINS, MN SAP.132-350-001 CITY PROJECT NO.0740 BMI PROJECT NO. T16.022221 FAY ESTIMATEAO:.. 8 & FINAL WORk COMPLETED THROUGH FINAL Pape 4 CONTRACTOR'S PAY ESTIMATE 2008 STREET & UTILITY IMPROVEMENTS CITY OF HOPKJNS, MN SA.P. 132350-001 CITY PROJECT NO ' 07-10 BMI PROJECT NO. T1 6.022221 PAY ESTIMATE NO. 8 & FINAL WORK COMPLETED THROUGH FINAL LINE .m. ITEM UNIT PRICE ESTIMATED SO) QUANTITY UNIT BID AMOUNT QUANTITY PREVIOUS ESTIMATE. AMOUNT PREVIOUS ESTIMATE QUANTITY COMPLETED TO -DATE AMOUNT THIS ESTIMATE 68 - 2505.502 CONST DRAINAGE STRUCTURE DES 604020 $2,839.62 0 EACH 50.00 $ - $ 69 2505.502 CONST DRAINAGE STRUCTURE DES 604022 $2,542.99 a EACH $0.00 $ . - $ 70 2506.502 CONST DRAINAGE STRUCTURE DES 66-4022 $2,339.54 a EACH $0.00 $ - $ 71 2505-502 CONST DRAINAGE STRUCTURE DESIGN SPECIAL (DESIGN R-1) (2'X3') 11686.61 0 EACH $0.00 $ - $ 72 2606-503 RECONSTRUCT DRAINAGE STRUCTURE $906.34 0 EACH $0.00$ - $ 73 1 2506.510 ICASTING ASSEMBLY (8-3067 V STORM SEWER) $550.001 1 EACH 1 $550.00 - $ - $ 74 2506-516 ICASTING ASSEMBLY (R -6563 -JH STORM SEWER) $1260.78 0 EACH 30.00 $ - $ 75 2506.518 CASTING ASSEMBLY (R-1733 STORM SEWER ) $625.00 0 EACH $0.00 $ - $ 76 2506.516 CASTING ASSEMBLY (R-1733 SANITARY SEWER) $625.00 is EACH $10,000.00 19 $ 11,875.00 19 $ 11,875.00 77 2508.522 ADJUST FRAME & RING CASTING $285.00 1 EACH 5285.00 1 $ 285.00 1 $ 285.00 73 2506.602 INSTALL MANHOLE rwrrARY) $2.415.84 4 EACH $9,683.36 5 $ 12,079.20 5 $ 12,079.20 79 2506A02 LINE DRAINAGE STRUCTURE (SANITARY MANHOLE) 55899.73 2 EACH $11,799.46 $ $ - so 250EL803 RECONSTRUCT SANITARY MANHOLES 53,000.72 I EACH $3.000.72 $ - 81 2521.501 O CONCRETE WALK $3.261 0 -- SO FT $0.00 1135 $ 3.700.10 1 1135 S 3,700.15" 82 1 2531501 CONCRETECURB & GUTTER DESIGN Balls $11.01 252 UN FT 1 $2 ,774.52 481 $ 5 295.81 , 481 $ 5,295.81 83 1 2531-501 lCONCRETE CURB & GUTTER DESIGN ESIS (SPOT REPAIR) 514.62 a LIN FT 50.00- $ - $ - 84 2531.507 IS" CONCRETE DRIVEWAY PAVEMENT (RESIDENTIAL) $49.24 0 SO YD 50.00_ $ $ 65 2531-507 Ir CONCRETE DRIVEWAY PAVEMENT (COMMERCIAL) 1156.31 0 SQYD $0.00 S $ 86 2531-502 PEDESTRIAN CURB RAMP 534.85 0 EACH $0.00 $ $ 87 2583.601 TRAFFIC CONTROL 55.000.00 0.18 LUMP sum $900.00 0.18 $ 900.00 0.18 900.00 as 2564.502 TRAFFIC SIGN WITH POST (m m. 3v)M 11183.08 0 EACH $0.00 $ - so 2564-802 TRAFFIC SIGN WITH POST (WI 1-1, 30')W with W167A FLUORESCENT) 5286.56 0 EACH $0.60 $ - $ go 2564-502 TRAFFIC SIGN WITH POST (R8,U 24- x 24-1 $127.15 0 EACH $0.00 $ - $ 91. 2573502 SILT FENCE, TYPE PREASSEMBLED $2.39 a UN FT $0.6D 92 2573.530 STORM DRAIN INLET PROTECTION $97.42 a EACH $0.00 $ .93 2671-506 DECIDUOUS SHRUB 7 HT US I (BOXWOOD ) $23.39 0 SHRS wOD 2 $ 46.78 2 $ 46.78 94 1 2571= IDECIDUOUS SHRUB W HT US (LMAQ $7323 is SHRB S1,171.68 19 $ 1,391.37, 19 $ 1,391 -37 95 1 2571= 1 DECIDUOUS TREE r HT Sall (SUGAR MAPLE) 3198,35 0 TREE WOO 1 $ 198.35 1 $ 198.35 go 2571.502 DECIDUOUS TREE W MT IMIS (VVHlTE OAX) $239.04 0 TREE $0.00 9 S 2,151.36 9 $ 2,151.36 97 2511-1 TRANSPLANT TREE (SPADE SrZE S(n 3305,15 0 TREE $0.00 $ - $ - 98 2575'.505 SODDING TYPE LAwN $4.33 ISO soyb 11179.40 209 $ 904.97 287 $ 1,24271 so 2582.501 PAVT MSSG (LT ARRM EPDXY $147.48 0 EACH som $ 100 2582-501 PAVT MSSG (RT ARROW) EPDXY $147.49 0 EACH 1 $0.00 101 2582-501 PAVT MSSG,IL-THRU ARROW) EPDXY $228.87 0 EACH $0.00 $ 102 2582.501 PAVT MSSG NANDICAPPED SYMBOU EPDXY 5101.72 0 EACH $om 103 2582.501 PAVT mssG fBiKEm POLY PREF $1,724.14 0 EACH SO.001 $ I 104 1 2582.502 WSOLIOUNE WHIT&EPDXY 53.41 0 LIN Fr $0.00 $ 105 2582-509 e BROKEN LINE YELLOW-EPDXY sow 0 LIN Fr $0,00 105 ME.- Ir DOUBLE SOLID LINE YELLOW-EPDXY 1 Ili= a LIN Fr SO.00 i4 $ 107 -Too- CROSSWALK MARIONG-POLY PREFORM 1. 54 0 - SO Fr $'.' :$229, $ ------ 25MM CROSSWALK MARWJGZ-OXY I WWI 0 1 50 FT $0.00 $ 109 2531-804 Ir CONCRETE VALLEY GUTTER 1 $54.071 0 1 so Yo So SO.00 $ 48 $ 1486.63 SUBTOTALNON-PARTICIPATING 821020 $ 221,M.92 1 $ 224,296.14 ISUPPLEMENTAL AGREEMENT NO. I - PARTICIPATING pap s Z - I • CONTRACTOR'S PAY ESTIMATE 2008 STREET & UTILITY IMPROVEMENTS CITY OF HOPKINS, MN SAP. 132350-001 CITY PROJECT NO. 0740 BMI PROJECT NO. T16.022221 PAY ESTIMATE NO. WORK GOMRLETED THROUGH. 8 & FINAL FINAL . • Page 6 4 • CITY OF HOPKINS HENNEPIN COUNTY, MINNESOTA RESOLUTION 2011-003 RESOLUTION ACCEPTING WORK AND ORDERING FINAL PAYMENT 2008 STREET AND UTILITY IMPROVEMENTS PROJECT 07-10 WHEREAS, pursuant to a written contract signed with the City on June 18, 2008, Valley Paving Inc., has satisfactorily completed construction of the 2008 Street and Utility Improve- ments Project, commonly known as City Project 07-10, in accordance with such contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Hopkins, Minnesota, that: 1. The work completed under said contract is hereby declared accepted and approved. • 2. Order for final payment on such contract is hereby ordered, taking the contractor's receipt in full Adopted by the City Council of Hopkins, Minnesota, this 18r' day of January 2011. Eugene J. Maxwell, Mayor ATTEST: Terry Obermaier, City Clerk