Loading...
CR 07-004 Site Plan Approval-Excelsior Crossings C\IY OF - December 27,2006 HOPKINS Council Report 07-4 SITE PLAN APPROVAL - EXCELSIOR CROSSINGS ProDosed Action Staff recommends the following motion: Move to adopt Resolution 07-2. approving a site plan for Buildings A and B (Phase 1 and 2) and Building C (Phase 3) for the Excelsior Crossings Development. At the Zoning and Planning meeting Ms. Aristy moved and Mr. Aamess seconded a motion to adopt Resolution RZ06-38, recommending site plan approval for Buildings A and B (Phase 1 and 2) and Building C (Phase 3) for the Excelsior Crossings Development. The motion was approved unanimously. Overview. Opus Northwest L.L.C. has purchased the former SUPERV ALU North Annex and is in the processing of razing the building. Opus is proposing to construct an office development. The development will be three office buildings from 5 to 7 stories. The proposed area is approximately 740,000 square feet, and construction is planned in three phases. The preliminary concept was approved earlier this year. There will also be a small retail area on the east side of the site. The site was rezoned to an overlay zoning of Planned Unit Development (PUD) with the approval of a master plan. The PUD zoning allows flexibility with the underlining zoning. With the rezoning to PUD there is an agreement with specific parameters on how the site will be developed. This agreement will be amended tonight with the new site plans. It is anticipated that the site will be developed in three phases. The applicant is requesting site plan approval for all three buildings. Primarv Issues to Consider. . What is the zoning of the property, and how has the Comprehensive Plan designated the subject site? . What are the specifics of the redevelopment? SUDDortin!! Documents. . Analysis of issues . Site Plans . Memo from Mark Koegler . Memo from Jim Benshoof . Resolution 07-2 Nancy Planner Financial Impact: $ N/ A Budgeted: Related Documents (CIP, ERP, etc.): Notes: Y/N Source: CR07 -4 Page 2 Primarv Issues to Consider. What is the zoning of the property, and how has the Comprehensive Plan designated the subject site? The zoning of the property is Business Park. The Comprehensive Plan has designated this site as Business Park. The proposed use complies with both documents. What are the specifics of the redevelopment? PUD Agreement A PUD agreement has been approved for the Excelsior Crossings proj ect. This agreement includes a master site plan for the project. The agreement addresses a variety of issues, including parking, building height, building materials, and site access. In approving this plan the City has acknowledged that their project will be determined acceptable if it meets the specifics of this agreement, subject to site plan approval. Buildings The development will be oriented to Excelsior Boulevard. There will be a large water feature surrounded by the three office buildings. The parking area for the buildings will be behind each building. The parking areas will be connected to each other. The proposed development will be constructed in phases. It is proposed Building B will start in the spring of 2007. The construction of Building A is proposed to begin in mid-2009 with completion in mid-2010. Building C is proposed to be constructed two years following the completion of Building A. There will be easements for the common areas, parking, access, etc. for the three buildings. Exterior The exterior of the buildings as proposed is a prefinished metal panel, ribbed metal panel and precast concrete. The glass used will be spandrel and vision glass. The exterior of the parking ramp will be precast concrete. Dock Doors Each building will have a dock area. The dock area will be located on the north side of Building A, east side of Building B, and north side of Building C. CR07 -4 Page 3 Trash The specifics of the trash/garbage have not been determined as of yet. The ordinance requires that the trash/garbage be screened. If the trash is not stored in the building, any accessory structure must be compatible with the building material of the principal structure. Representatives from Opus have said it will be screened and in the dock door area. Parking Office use requires one parking space for each 250 square feet. The applicant is proposing surface, decked and below-grade parking. At various points the parking structure will be two levels. The required number of total spaces for the office area is approximately 2960. The preliminary plan indicates 2851 parking spaces for the office buildings. Buildings B and C will have a below-grade garage for parking. The following is the parking breakdown for the buildings: Building A 209,000 square feet 820 parking spaces Building B 261,000 square feet 965 parking spaces Building C 270,000 square feet 1066 parking spaces The retail area that will be approved at a later date has 30 parking spaces. Traffic/Access The main access to the site will be from Excelsior Boulevard to J ackson Avenue. This intersection was improved several years ago with the idea of this site being redeveloped. A signal light will be added to the new Jackson intersection. There also is a secondary access point from Second Street. Internally there will be a loop road connecting all of the buildings. The alley will remain to the west of the industrial uses along J ackson Avenue. A new access from the alley to Jackson will be constructed just south of the last building. This access with be platted as a public right-of-way. A traffic study was completed with the master plan and reviewed again with this proposal. Attached is a memo after from Jim Benshoof regarding the site plan. Height The proposed h~ight of Building A is 5 stories, Building B, 7 stories, and 7 stories for building C. The seven-story buildings will be approximately 105' in height and the five-story building will be 77' in height. The maximum height of buildings allowed in the Business Park zoning district is 80 feet. The PUD overlay zoning allows flexibility in the zoning requirements. The roof-top mechanical equipment will be screened. CR07 -4 Page 4 Setbacks The following are the required and proposed setbacks: Business Park ProDosed Front yard East side yard West side yard Rear yard Lot Coverage 20 feet 20 feet 20 feet 20 feet 85% maximum 100 feet 10 feet (parking structure) 25 feet (parking structure) 20 feet (parking structure) Building A - 200,000 sf (coverage: 45.16%) Building B - 260,000 sf (coverage: 56.65%) Building C - 270,000 sf (coverage: 69.36%) Engineering Issues The Public Works department has reviewed the plans. We recommend adopting our comments as conditions of approval for the site plan. The following are their comments: The radius of the intersection of the existing alley on the east side of the project with the north boundary of the future retail space needs to be increased to allow free movement of trucks. The medians at the first intersection west of the Jackson St. entrance need to be adjusted to accommodate south-bound left turns. The circle road should be crowned. The current plan shows a straight grade from curb to curb which can become icy during winter months as snow melts and flows across the street. The sanitary sewer connection to the 30" trunk line is very close to the Hwy 169 on ramp. Construction may require sheet piling to protect the ramp. An inside drop connection is not allowed. It may be more cost effective to connect at a location further away from the on ramp even if this means constructing a new manhole or additional pipe length. Relocation of the 12" main on the west side of the site will need approval of the Utility Division. A meeting with the developer's consulting engineer is pending. All storm sewer pipe located in the right-of-way shall be RCP. The outlet structure for the regional pond should have additional control for various flow events. The developer and city will need to meet and discuss. It appears that the current City of Hopkins standards are included in the detail section of the plans. All work will need to be accordance with our standard specifications. Landscaping There is landscaping throughout the site. In the center of the site is a two plus acre water feature with four fountains. This water feature is surrounded by walking paths. The site has landscaping along all the edges of the site. The ordinance requires that the landscaping value is CR07 -4 Page 5 one percent of the construction value. The proposed landscape plan meets this requirement. The plan also meets the minimum size for the proposed plantings. Along with the water feature on the site there are three other ponding areas for storm water detention. Fire Marshal The Fire Marshal has reviewed plans and found them acceptable. Bituminous Path/Sidewalk The regional trail will remain on the west side. Opus will provide access to the trail; the actual points have not been determined. There is an existing sidewalk on Second Street N .E. that will remain. The interior of the site has sidewalk around the water feature and around the loop road. There is sidewalk from the site to Second Street and Jackson. A new trail will be constructed around the regional storm pond on the north side of Second Street N.E. Watershed District The Watershed District will have to approve the proposed development. Any approval is contingent on the Watershed District approving the development. Surrounding Uses The site is surrounded by industrial uses to the east, industrial and residential to the north, Highway 169 to the west, and Excelsior Boulevard to the south. · What was the discussion at the Zoning and Planning meeting? Ms. Anderson reviewed the proposed development. David Menke, representing Opus Northwest, appeared before the Commission. Mr. Menke reviewed the site plan with the Commission. Gene Ernest, the landscape architect for Opus, appeared before the Commission. Mr. Ernest reviewed the landscaping with the Commission. Mr. Aamess was concerned with the pond on the south being near the trail. John Dietrich of RLK appeared before the Commission. Mr. Dietrich stated that there was approximately 10 feet of landscaping before the grade change for the pond. Jim Benshoof, the City's traffic consultant, appeared before the Commission. Mr. Benshoof clarified and reviewed his traffic comments with the Commission. At the public hearing Firmus Opitz of 315 Monroe Avenue appeared. Mr. Opitz was concerned with the traffic on Second Street. Alternatives. 1. Approve the site plan. By approving Buildings A and B (phases 1 and 2) and Building C (phase 3) of the site plan, the applicant will be able to construct the development as proposed. CR07 -4 Page 6 2. Deny the site plan. By denying Buildings A and B (phases 1 and 2) and Building C (phase 3) of the site plan, the applicant will not be able to construct the development. If the City Council considers this alternative, findings will have to be identified that support this alternative. 3. Continue for further information. If the City Council indicates that further information is needed, the item should be continued. MEMORANDUM Hoisington Koegler Group Inc. [;][3 ~n To: From: Subject: Date: Nancy Anderson Mark Koegler, ASLA Plan Review - Excelsior Crossings December 18, 2006 We have been asked to provide a general review of the site plan and landscaping plan for the Excelsior Crossings development proposed by Opus at the intersection of TH 169 and Excelsior Boulevard. Staff is preparing a separate review that will address specific compliance with the applicable provisions of the zoning ordinance and PUD/Developlnent Agreement. Site Plan The fmal site plan sublnitted by Opus (Sheets A1.0 and A1.1) is largely consistent with the preliminary plans that were previously submitted to the City. Orientation of the project continues to focus on Excelsior Boulevard with a central placement of the three office buildings oriented internally on a heavily landscaped pond and courtyard area. Parking in both surface lots and ramp structures radiates around the buildings on generally the west, north and east sides. An internal loop circulation drive connects all of the buildings and parking areas with access points at Jackson Avenue (2) and on the north side along Second Street NE. The access on Second Street NE is intended to be a secondary means of entering and exiting the site. Entrance points and general site circulation are again, consistent with earlier plans. An extensively landscaped pond area sits between the buildings. The area contains Ineandering walks and points of interest that should be a great amenity for the development and particularly, for workers in the surrounding office buildings. At a recent meeting, Opus indicated that the ponds would be designed to retain water. Four fountains will provide added visual interest in the pond areas. Landscaping Plan Landscaping improvements for the project are depicted on Sheets L1.0 - L 1.9. The PUD/Development Agreement has two stipulations regarding landscaping. The overall area dedicated to landscaping (lawn, boulevards, water features and related items exclusive of the 3 acre open space parcel) is not to be less than 15% of the total surface area of the project. Additionally, the cost of landscaping improvements is required to be either greater than or equal to 1 % of the project cost. Areas shown for landscaping easily exceed the 15% requirement. It would also appear that the value of the landscaping exceeds 1% of the total project cost; however, information should be supplied by the developer to verify this assumption. Overall, the placement of deciduous and coniferous plant materials should do a good job softening the edges of the parking ramps and surface lots that abut TH 169 and Second Street NE. Street trees along the edges of the inner drive will enhance the appearance of the internal portions of the site. The expansive courtyard/pond area is heavily landscaped with meandering walkways and perennial beds which will add seasonal color and interest. 123 North Third Street, Suite 100, Minneapolis, MN 55401-1659 Ph (612) 338-0800 Fx (612) 338-6838 www.hkgLcom Direct (612) 252-7120 Email mkoegler@hkgi.com Site Plan and Landscaping Plan Memo December 18, 2006 Page 2 Plans call for conifers to be eight feet in height and deciduous overstory trees to have a 3~ inch caliper. Ornamental trees are shown as having a 1 ~ inch caliper. The sizes shown for both the conifers and overstory trees exceed the City's minitnum standards. The added size of these plants will give the project a more established look upon initial installation. There are no materials noted on the landscaping plan for the sidewalk areas surrounding the pond. Presumably all of the sidewalks are concrete, possibly containing a color additive. The northeast corner of the courtyard area contains a loop pathway with ag-lime surfacing. The ring of Japanese Tree Lilacs in this area defines a small perennial garden. Seating areas exist adjacent to the sidewalk around the periphery of the pond area. In general, the landscaping plan for Excelsior Crossings is very well done. The quantity and size of the plant materials and the extensively landscaped center pond area will help define the project as a signature office location in the City of Hopkins. ..morandum 1800 Pioneer Creek Center, Maple Plain, MN 55359 Phone: 763-479-4200 Fax: 763-479-4242 To: Nancy Anderson, Cit~f Hopkins From: Jim Benshoof ~~ Date: December 20, 2006 Subject: Review of Site Plan Drawings for Excelsior Crossings Development Wenck File # 0428-05 As requested by City staff, we have reviewed traffic related aspects of site plan drawings submitted for the Excelsior Crossings Development. This review has been performed in the context of our participation,. on behalf of the City, throughout the planning process for this proposed development. Prior to our review of the site plan drawings, we performed a comprehensive review of the traffic study report prepared by the RLK firm, as part of the Alternative Urban Areawide Review for this project. As the applicant began to prepare site plan drawings, we suggested to staff from the City and applicant that the following traffic related objectives be addressed: a) Provide convenient access between all parking areas and the main J ackson Avenue driveway. This objective is important to help ensure that the vast majority of development trips use the Jackson A venue access, with a much lesser portion using the access on 2nd Street N .E. b) Provide safe and efficient operation within the site at the Jackson Avenue driveway. This objective is important to ensure high quality operations at this access and to avoid any significant conflicts near this access location. c) Provide an understandable traffic system and effective accommodations for visitors, service vehicles, and emergency vehicles. d) Provide effective connections to nearby bicycle/pedestrian trails and to bus stops. e) Minimize vehicle/pedestrian conflicts within the site. As part of our site plan review, we reviewed the signal justification report prepared by the RLK fmn regarding potential traffic signal control at the Jackson A venue intersection with the main site access. From this review, we concur that traffic signal control at this intersection is needed and justified in conjunction with the initial phase of development (Le. buildings B and C). In this context, traffic signal control meets the provisions of the Minnesota Manual on Uniform Traffic Control Devices. We have provided suggestions to staff from the City and applicant regarding specific lane designations and signal timing parameters to ensure efficient operations and to avoid the possibility that northbound traffic on Jackson Avenue would back-up to Excelsior Boulevard. . Memorandum to Nancy Anderson, City of Hopkins Subject: Review of Site Plan Drawings for Excelsior Crossings Development Page 2 of2 December 20, 2006 On December 5, 2006, we met with staff from the City and applicant to discuss the site plan drawings and our preliminary traffic related comments. Based on our review and outcomes from the meeting on December 5, we are confident that the site plan drawings will effectively meet the traffic related objectives, provided that refinements are incorporated to account for the following comments we expressed at the meeting on December 5 and shortly thereafter: a) Provide return circulation or turn-around capabilities for two dead-end parking areas shown in the southeastern portion of the site - one just east of building C and the other on the south side of the future retail building. b) Refine the geometry for the intersection on the main entrance roadway at the southeast corner of building C to: 1) provide just one lane in each direction on the north-south roadway on the east side of building C and 2) adjust the ends of the islands on the main entrance roadway to adequately accommodate left turn maneuvers at this intersection. c) Refine the geometry for the intersection in the southwest corner of building A to provide a striped island on the north side of this intersection. This island is needed to separate through traffic from left turn movements. d) Refine the layout and circulation for parking under building C in accordance with the sketch and comments provided to staff from the City and applicant. e) Refine provisions for the drop off/pick up areas by the front doors for buildings A, B, and C, together with the one-way driveways at these locations that enter the respective parking structures. As shown in the plans we reviewed, we are concerned about the potential for wrong-way movements and awkward maneuvers. We believe several options are available to effectively resolve these needs. CITY OF HOPKINS Hennepin County, Minnesota Resolution No. 07-2 A RESOLUTION MAKING FINDINGS OF FACT AND SITE PLAN APPROVAL FOR BUILDINGS A AND B (pHASE 1 AND 2) AND BUILDING C (pHASE 3) OF THE EXCELSIOR CROSSINGS DEVELOPMENT WHEREAS, application has been made by Opus Northwest, LLC, (Applicant) for approval of the Site Plans for Buildings A and B (Phase 1 and 2) and Building C (Phase 3) of the Excelsior Crossings Development; WHEREAS, the procedural history of the application is as follows: A. The applicant submitted applications to the City of Hopkins for approval of the Site Plans for Buildings A and B (Phase 1 and 2) and Building C (Phase 3) of the Development on November 27, 2006. Thereafter, the Site Plans were reviewed by City staff, and commented upon by City staff, in writing. B. On December 26, 2006, the Zoning and Planning Commission reviewed the Site Plans and considered the comments of City staff. WHEREAS, the City Council of the City of Hopkins, Minnesota, makes the following findings of fact related to the applications for approval of Site Plans for Buildings A and B (Phase 1 and 2) and Building C (Phase 3) of the Development: A. That the proposed Site Plans for Buildings A and B (Phase 1 and 2) and Building C (Phase 3) of the Development meet the requirements of the Hopkins City Code related thereto, subject to Applicant's compliance with the comments and recommendations of City staff and the terms and conditions stated below. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Hopkins, Minnesota, recommends approval of the Site Plans for Buildings A and B (Phase 1 and 2) and Building C (Phase 3) of the Development, subject to and conditioned upon Applicant's compliance with the following conditions: 1. That the Hopkins City Council approves an amendment to the PUD Zoning for the Property described in Exhibit A hereto (the Property), allowing the dimensions and shape of the platted lots delineated in the preliminary Plat of Excelsior Crossings (Plat) as permitted uses within the PUD Zoning District established for the Property. 2. Execution and recording of an Amendment to the PUD/Development Agreement between the City and Applicant as approved by the Hopkins City Council, and Applicant's compliance with all terms and conditions stated in such Amendment and in the PUD/Development Agreement. 3. Applicant shall obtain all required Watershed District approvals for the development of the Property and satisfy all requirements and conditions of such approvals. 4. Applicant shall comply with and incorporate in the development of the Property all mitigative measures identified in the updated Alternative Urban Areawide Review Mitigation Plan dated April 6, 2006, as adopted by the Hopkins City Council May 16, 2006, and in the December 2006 Update to the May Updated AUAR for the Excelsior Crossings Development dated December 1,2006. 5. Applicant shall comply with all of the terms and conditions imposed upon approval of the preliminary/final plat. 6. All grading, drainage, utility, parking and traffic control plans, storm water pollution prevention plans, pond construction plans, landscaping plans and erosion control plans shall be subject to review and approval by the City's Public Works staff, and Applicant shall comply with or observe any modifications to such plans requested by the City's Public Works staff. Included are traffic comments by Jim Benshoof in a memo dated December 20, 2006. 7. Applicant shall obtain all necessary approvals from Hennepin County, the Minnesota Departments of Natural Resources, MPCA and other governmental agencies or authorities having jurisdiction over the development of the Property. 8. Applicant shall dedicate or grant to the City all drainage and utility easements and rights-of-way determined to be necessary by the City's Public Works staff. 9. Applicant shall obtain all required demolition permits or other permits for demolition of the pre-existing structures and improvements on the Property and shall otherwise comply with the terms and conditions stated in Applicant's Development Proposal dated May 9, 2006, related to such demolition. 10. Buildings and structures which cannot support the required level 800 radio coverage for police and fire shall be equipped with either a radiating cable system or an internal multiple antenna system with or without FCC type accepted bi-directional 800 MHz amplification as needed. All costs of testing, installation, and equipment shall be the responsibility of the Applicant. ADOPTED this 2nd day of January 2007. Eugene J. Maxwell, Mayor ATTEST: Terry Obermaier, City Clerk L -----1 ----- I I I I I I I I I I I I I I I I I I I 'II I ~ I III _ I ___ ____________J L-----r----- I I I jL-==--='-- - -- I ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ! I I I I I I I I I I I I I I 2005-170 121/24 f 2 1 " ... L. V I ~ ~ ~ :t ~ ~ ~ A.; : ~ : A.; f .... ~ ~ PRQF'FATY DFSCRIPTION' (Per Commercial Partners Title. LLC a. ogent for Lawyers Title Insurance CorporoUon Commitment for Title Inluranes ruo No. 25871 Third Supplomontol, dotod Auguat 31, 2005) Tract A: Lot I. Slac:k I, VALU ADDITION, according to the recarded pial thereof, Hennepin Count)'. Mtnn.soto. Torrens Propert)' T orrena Certlficot. No. BO I 994 Tract B: Porcol I: Trocta A, Band C, Roglat.r.d land SUI'WlY No. 1465, H.nn.pln County, Mlnn.aata, ...c.pt that partkln 01 Tracta A and B l)lng South.rty 01 the Northerly right-aI-way 11n. 01 County Road Number 3 aa ducrlb.d In Final Certlficat. Dacum.nt Number 1584165, and ..capllng lurther tho.. porta 01 aald Tracta A. B and C ahawn aa Parcel NaL 29A. 298, 29C, 290, 29E and 29r an City 01 Hapklna Right 01 Way Plat No. I, Hennapln County, Mlnn.lDta. Parcel 2: lata 3, 4, 5, 6, 7, B, 9 and 10, Blaell 13, WEST MINNEAPOliS CENTER, except that part 01 laid Loll 3, 4, 5, 6 and 7 Ihown aa Parcel 348 an City 01 Hopklna Right 01 Way Plot No. I, H.nn.pln County, Minn.aoto. TotnIlIl Property Torrenl Certificate No. 1110134 Tract C: Par'" I: Lata I and 2. lIIac1c 13, WEST MINNEAPOlIS CENTER, _t that part 01 IOId Loti Ihown 01 Porcel 34C an City of HopkIna ll''lIht of Way Plot Na. I: AI 01 -..tecI Narl/l _ Soul/l alley In aald Block 13 lyinV b.t..... tho Wnterly o.tonllon acroll It of th. North _ 01 _ Lot I _ the SouI/l_orIy .._ _ It 01 the Soul/leaotorty Ilno of IOld lot I: AI of the Noru.-t _ Soul/lwnt wx:atocl a110)' In Block 13 I,;-g b.tw"" tho Northerly ...t.nalon ocrOIl It 01 tho EDat lino 01 Lot 2. In aald BlacIc 13 ond 1/10 Wnt Ilno 01 lot 7 In IOId Bloell 13, .....pt that port ahawn oa Parcel J4C an CIty 01 Hopklna Right of Way Plat No. I. Porcol 2: lata 14 and 15 ....pt tho Eaat 16 loot 01 lata 14 and IS, lata 16 through 26, Inclual.., BlacIc 4. WEST MINNEAPOLIS CENTER, H.nn.pln County. Mlnn.aoto. Porc.1 3: That port 01 wcot.d Monro. Avenu., d.dlcat.d in WEST MINNEAPOUS CENTER, lying balwoon tho W.at.rly o.t.nalon aera.. It 01 tho North IIn. 01 BlacIc 4, In aald plot, and tho Southweaterly ..tonalan acraaa It 01 tho Southeaaterly IIn. 01 Block 13, In aald plot, ....pt tho.. porta th.real ahawn DB Par..1 NOI. 29H and 34A on City 01 Hopkin. Right 01 Way Plat No. I: That part 01 VDcotocl Flrat Stroot North, decllcot.d In WEST MINNEAPOliS CENTER, lying botwo.n th. South.rly ..t.naklno acroaa II 01 th. Weat IIn. 01 tho Eoat 16.00 root 01 lot 14 and th. W.at IIn. of lot 14 In Block 4. WEST MINNEAPOliS CENTER, H.nn.pln County, Minn_to. (eon..) PrD "1I7212JOI02 AIM EDUFl/D/r ~ 5lI'P'Lr JJS 2ND sr NC o o .( , o .' ," , '..; NOTe: 5E:E PREl./MINAR'I PiA T OF DtCELSlOR QlOSS/NCS R)R crJMPl.CTe PROPERT'IINFfJRIIA nON. ~~ ~-~~~~~~-====-~.::., COUNTY ROAD NQ 8 iii .. It ~ ~ ) .._.~ STRI!fff!" fifi8"oU'Jl"E: Pl.AT 5811'58'211"1: 1147.80 -----------------1 I II ~I )L ------ ~ PIf) ""7:l12.Jt1102 _ ErIWWE1/T It _'I J>> 2ND ST NC ~ ~ II t a I ~ ~ I .. I I I I ,\ is ;t ~ ~ ti e .t ~ . OPUS. Opus Architects & Engineers, Inc. I" .. ...._ ......... . JJJQ-OItI ISI-MI-4C44 ----- .. - IIlDS1IIIIIlIlI ! 111M Itl:lIII = '" 'Ill .. 0 " = ~ llE5DI .... IIIUJIIt IlIIlm .... IlUI 11/27/06 IlIIlm .... Do_ -If D. WISNEWSKI CIIl:IlEIIIIf '- D. WISNEWSKI · ~:z.. oa: ~lhI ~;:...~ ..= :::::: NSplIIIIibIe lor DIlJ cIaimI. clamageI or -- :?:"~ ::':':-:=1Il': fIlL · ='= ==~:1 :": ~ 01 the _ to ..a, 01 :Cis. ~ and other .-1Id . onnDIian. . 'fhl8 ~t mar not be lIlIIId or copied -W-t prior writ... _L 01 righlI '--' ,..,... ,., . OPUS ~e~. Northwest, 1.. .. .... _ ......... . JJJQ-OItI ........ ----- .. IlIIlm EXCELSIOR CROSSINGS UlCI10I HOPKINS, MN HE!' mu: GRADE LEVEL SITE PLAN HE!' .... A1.0 ........ , , , , I I \ r , I \. : , I '\ : '\ : \ POND I '\ J '\ \\\ \.,-",,' ~r'-"j ~~~: 1 ~ Future ~ ~ q~velopmer~=: v ; A.~i;:r,:;j L~ , <.. MASTER SITE PLAN lIlMSIT 5lJlII EB 116 .rll66r Ill" POND : " : ~ / : ~ ~ ~ - II. \ \. , I I I \ I ! .rll..7 A"'\ ANALYSIS BUilDING A - 209,000 GSF Surface 41 0 2nd level 231 3rd level 179 Total Parking 820 820 / 209 = 3.92/1,000 GSF BUilDING B - 261,000 GSF Surface 569 2nd level 222 3rd level 174 Total Parking 965 965 / 261 = 3.69/1,000 GSF BUilDING C - 270,000 GSF Under Bldg. 58 Surface 392 2nd level 320 3rd level 296 Total Parking 1,066 1066 / 270 = 3.94/1,000 GSF \. '- III" , ~ \ \ \ , \ PARKING ------------------... I . OPUS. Opus Architects & Engineers, Inc. IGI!I .. - ... ....... . ......1. ==y:;. ~ 1lIIl1BOlll IlE5GI ..... II3L7D ...e:r ..... .. 11/27/0& ...e:r -- 0._ ~. D.W. CIIlI:IO III' D.W. o =~ ~ ~~"'=.: responsjbII lor ont cIoOM. ~ f1I :::-inI~ ~:~ IJa. o~~=:..=1~ responslblIily 01 the _ to wrifJ 01 = ~ and other ..lid . llfIIIOlioft. o TlIiI cIocument """ not lie UNCI Of' caplecI ";1'-1 priar wrllltlft _I. o 01 .....11 ....... ...... For . OPUSaa oes Northwest, L. .C. 1....-- ....... . II14I-I11' ~ ........ .. I'IIlIlll:f EXCELSIOR CROSSINGS LQDlOI HOPKINS, MN III1J 1IU UPPER LEVEL SITE PLAN r- A1.1\ ,...... = I a;; ~ = : Q ~ L ;- ..... t;H._~~~--.'1 f~'~~ ~;-'4 !: Future Dill. .._~ Oevelopmert ... :::1 )rfjfff~l~ }~l ~-_.... "pO MASTER SITE PLAN EB POND .. .rll..r ..0 : ... I .... l ~ ~ ~ ~ - , OPUSGD Opus Architects & Engineers, Inc. 11l35O Iron _ Wnt IlInnolonka, IIH 553Q-Ol10 151-1~ 151-G5&-1l1Z1 r.. REGISlRAllOH ISSUE RECORD IlfSJ;N MIII!flI PROJB:r NUIlIlER M367890 MlE 11/27/06 PROoIECllWWD J. W1LL.W.4S IlIlAWlIflt S. STICHA CHB:KEIl flt J. RADEMACHER · Errors may occur in the transmission 01 e1eclrDnic flI... Th. Opus companies are nol responsible for any claims, damages 01 .xpe..... """ing oul of the unauthorized use at the information conlained in eloctronic fiies. · Electronic fil.. may nat accurately reflect the final as-buill condition.. II is the responsibiflty of the user 10 verify all layouts, dimensions and olher related information. · This document may not be used or copied without prior written consent. lD all rights reserved ill . 1:45pm ~ 5ItEEl 1lII! LEVEL ONE FLOOR PLAN A- A2.01 PLOT DATE: November 27. 2006 Pnpand For OPUSGD OpUS Northwest, L.L.C. IIl350 _ ..... Tint Illn........ IIH 5S343 !151-151-~ BS2-ISf-45a faI PROJECl EXCELSIOR CROSSINGS BUilDING A LOCAlIJIl HOPKWS, MINNESOTA 393'-0" rc-------c-------c-------c----___~-----__ ____ ~ r r r r --r I I I I , , I , I -l- -l- ---k- --l--,- i i Ii! I J I I I -r--,-,--r--'-I--r--,-,--r-, I I I I I I I I I I ---~------~-------~-------~-------~-------~-------~ (DLEVEL1-FLOORPLAN ,- - 20'-0" o 10' ZJ' 40' 11'_ 1 SCALE: ,. = 20' 393'-0' F-------"-------"-------O-------b------_b______~--- r - -----r r !, I , , I 'I 'I I I -'--l-- --l--, " I I I i ! I I ! ~ ~~ ! I' -'--r--,-,--r--I~- --r- I I I I , I, " d--L--l ~----L__~ ~ -------~-------~-------~-------~-------~-------~ 2' LEVEL 2 - FLOOR PlAN ~ o I ~ o I ! .s:: 0- CD .. o E f I co o o N ti CD 1 ~ o ~ ! ~ I"] ~ ~ ~ ~ ~ ~ ::E ,/ t; I l.J old 0<( " 0- o L . OPUS Opus Architects & Engineers. Inc. 393' -0' ==-= D c - I I I I I I I I I I I I I -~- -~ --t-- ~ I I [J] I I I I I I I I I -1--\-\--1--\-\--1--\-1--1- I I I I I I I I I 1 _L--L--L--I---L- .L.:r LEVELS 3 THRU 5 - FLOOR PLAN ,. - 20'-0. 40' lusa .... .... - IIInnoIanb. IlIl 5SSG-Oll0 t51-1S1-4444 t51-1sa-.152t !as REGISIIlATION &gJE REI:OAD Errors may occur In the lIansmlsslon of e1ecbonlc mOl. The Opue companies ore not responsible for any claims, damages or expenses arising oul 01 the unouthorized use of the inlormolion conloined in e1eel1anic fil.... EJec:l1anic files may nol DCCIll1llely reflect the final os-built condillon.. II i. the responslbirlty of the user to verily 011 layouts, dimensions and other related information. This document may not be used or copied without prior written consent. C 011 rights reserved 0ESKlN NUllIER _ NUIlBER Y361890 ~1E 11/27/06 PRllJECl _ J. W1I.l1AUS DRAWN 111 D. UNZE CHECKED 111 J. RADEMACHER . 'ropand For OPUS OpUS Northwest, L.LC. - . 10351l .... load _ IIInnoIonJaI, 11M 55343 t51-ass-.<<44 t51~ !as PRQECI' EXCELSIOR CROSSINGS BUILDING A LllCATIlN HOPKINS, MINNESOTA SHEET 1IIlE LEVELS THREE - FIVE FLOOR PLAN AIER A2.02 PlOT DATE: November 'D. 2006 - 1:46pm ~ 'b ~ .c D- Ol o t I lD a a '" ,..: '" Ol ~ i!; Z ~ ~ '" ;a ~ i ~ I ~ i ~ ::E ,/ U I ... olll < " D- O L OPUSe Opus Architects & Engineers, Inc. 111350 8,.. Road _ _to, 11M 5943-0110 151-156-4444 ISl-15~ fax - . RfGISlRA110N ISSUE RECORD RECICl.E D.El: 333'-0 . . . I -----, ,----1----+-- I I mRAQE ! MURE P~NG I i I I I . -~ j -t-+- -LJ] E I ------.---_. IIECH Dl o I ~ PllIN NORTH ffi LOWER LEVEL - FLOOR PLAN DESX:N IllllIER I'Ro.ECI _ U367900 MlE 11/27/06 PRIlJECT _ J. W1~S DRAWN BY D. UNZE CHEl:KED BY J. RADEMACHER -40'-0- 333'-0. Errors may occur In the transmission 01 e1K1ronlc mIL Tho Opus companlel are nol responsible for any clolms. domoges or eKpenses arising oul 01 the unouthorized _ of the information conloined in electronic files. ~:; ~~b~ :~di~~r:1 ~fl:~ responsibiroty of the user to verify 011 :~~o~ensions and other reloled This document may nol be used or copied without prior written consent. 011 rights rBSllIVBd PNpand For . OPUS OpUS Northw St, L.L.C. 111350 ... Road _ ............ 11M 5m3 ISZ~ 15l~ fax PRIlJECT EXCELSIOR CROSSINGS BUILDING B lDCA110Il HOP~S, MINNESOTA 'b I ~ SHm1lJl.E LOWER LEVEL & LEVEL 1 FLOOR PLANS SNWIER A2.01 PLOT DATE: November 27, 2006 - 1:25pm ~ PllIN NORTH ffi . - 40'-0. LEVEL 1 - FLOOR PLAN 2 J:. Q. .. o ~ I ... o ~ ~ .. E j o I ~ '" ~ .b- i :s ~ I ~ ~ i ~ :s ...- (j I LoJ ~ < Q. o L . OPUS Opus Architects & Engineers, Inc. 1_ .... .... w..t 1IInnoIonk.. IIIl _0110 852-8S1-4l44 852-ISf-Q IaI REClSlRATlDN ~ -------- - -- -- ISSUE RECCRD DESICIl NUIlIIER PIlllJB:I N\lWBER t.l3679OO Mlt 11/27/06 PIlIlJB:I IIANAGER J. WILOOfS DRAWN B'f D. UNZE CItECICDI B'f J. RADEMACHER · Etrolll may occur In lIIe transmission of memni. fifes. The Opus companies lIIlI not responsible for any claim., damage. or expenses arising aul of !he unou1horizecl use of the infonnation conlained in electronic til... · ~~ ~b~il{ ::~d~ i~fl:: responsibifity of the user to verify 011 layouts, dimensions and other related lnfonnatian. · This doeument may not be used or copied without prior written consent. o all rights reserved I'npancf for . OPUS OpUS Northwest, L.l.C. 1_ SIIft .... Well IIlnooIonb, Illl SSW t51-6~ t51~ IaI PllOIEl:r EXCELSIOR CROSSINGS BUILDING B lllCA1IIlN HOP~S, MINNESOTA SJm lRlL LEVEL 2 & LEVELS 3 THRU 7 FLOOR PLANS 18- A2.021 DATE: November 27, 2006 - 1:26pm ~ PLAN NORTH ffi - 4O'-{J" -- ~.- i I I -+ I I I LEVEL 2 - FLOOR PLAN 333'-0' 333'-0 - - ~ , ~ ... I ~ PLOT PLAN NORTH ffi . ... 4O'-{J- LEVELS 3 THRU 7 - FLOOR PLAN 2 .s::; Q. .. D I J 10 o o N ... N .. "E ~ z 'N' o J ~ Dl ~ b d ~ ~ ~ ~ { ~ ~ ".- ~ I .... "" C ::0 Q. o L o OPUSGD Opus Architects & Engineers, Inc. 11l35ll .... had _ IlInnoIonh, IlH mG-Dl1D 152-&5&-#14 152-&5&-452l1 fa - REGISTIlATIDN I -=--! I I I I I I I I - 1 - - 1 -1- -::-- 1 --. I I I I . . 353'-0 ,. _JI~__ _ ISSIlE REl:OIID ffi \. LOWER LEVEL - FLOOR PLAN ,__-1.'_}_ L.____ - IIESCN IIlIIID PRQIECT JUIIlER 14367910 IlIlE 11/27/06 PRQJECI _ J. WILLIAMS DRAWN f1t R. THOMPSC CllECKED f1t J. RADEMACHER PLAN NORTH - 4O'-{J- ,- 353'-0' _--c------~-------~-------o-------c-------c-------~ I Errors may occur in the Irons mission of e1eclnlnlc m... Th. Opus companiel ore not responSIble for any cloims, damoges Dr IlCpOIISllI arising out of tho unauthorized use of the information conlained in eleelronic file.. I ~~ ~~b~ ~:~d':..~~t~t I~nth~ respansibffity at the user to verify all layouts, dimensions and other rwlated infonnation. I This document may nat be used Dr copied without prior written consent. ID all rights reserved I'nptn4 rar o OPUS OpUS Northwest L.LC. I -!- I I I .L I I I I I 1--1--1-1---- I I I I I -!- r I I 1 r .. I ~ 11l35ll .... Raad Wed ........... IlH 553U 952-ISI-44U 952~ fa PRQIECT EXCELSIOR CROSSINGS BUILDING C LDCAlIllII HOP~S, MINNESOTA b_______~_______~_______~_______>>_------~------~--- SIm 1IIII LOWER LEVEL & LEVEL 1 FLOOR PLANS SIm NUIIID C A2.01 PLOT DATE: November 27, 2006 - l:23pm~ PLAN ffi NORTH CD 40' -{J- ,- FLOOR PLAN LEVEL 2 .s= Q. lD o I I co .. .. N ... N lD 1 ~ z .. I ~ 01 ~ li- i 2 ~ I ~ ~ ~ ~ g! :d 3- c:; I '" old c( Q. o L OPUS Opus Architects & Engineers, Inc. 111350 I"", bod _ IIInnoIonka, IIH 55343-011 0 151-155-4144 851-IU-452I ,.. - ., 353'-0 _-----~-------~-------c-------a-------a-------~ ---0 I REGlSlllATIOH I -!-- I I I J. I I I I I -r--I-I--- I I I I --1-- I -!- I I I r I I I I- I I o I ~ ISSUE RECORD ---~-------~-------~------~--- 19_______~ ffi LEVEL 2 - FLOOR PLAN DESIGN tlJlllIER PROJECT NUIIIER M36791 0 !WE 11/27/06 PIIllIECT IoWIo\GER J.WJ~ IlRAWIlIf R. lHOMPSC CIlECKm If J. RADEMACHER PLAN NORTH 4d -fJ" ," 353'-0' c I I c I I . Errors may occur in the transmission of e1ectrani. mea. The Opue companies 011 not responsible for any claims. damages or oxpenses arising out of the unauthorized uso of the information contained in electronic filea. · ~.: ~:'b~ ~~~dc:,~r:.t"lr i~n~ responslbmly of the user to verify 011 layouts, dimensions and other related information. . This document may not be used or copied without prior written consent. all rights reseMd Pnpand For , OPUS. OpUS N rthwest, L.LC. IIIJSO .... bod _ IIIMoIonta, IIH m43 952-155-4144 952-151-4521 ,.. PROJECT EXCELSIOR CROSSINGS BUILDING C I.DCA1Dl HOP~S, MINNESOTA I -!-- I I I I I I I I I--r--I-I--r-- I I I I I ---1---1--1-----1---1-- I I --1-- I I -!- I I I r I 'b I ~ SHEET 1IIlE LOWER LEVEL & LEVEL 1 FLOOR PLANS ffi PLAN NORTH LEVELS 3 THRU 7 - FLOOR PLAN 2 SHEET Nl.UIlEII C A2.02 PLOT DATE: Ncwember 27, 2006 - 1:23pm.-J 40' -fJ" ," s:: Q. .. o ~ I '" o ~ ~ .. E ~ Z N o I ~ '" ~ b i ~ I ~ ! ~ ~ 2 ./ ~ I .... ~ << :::J c- o L . OPUS. Opus Architects & Engineers, Inc. lD35D B... had _ ~..IIM_DllD 151-151-4444 151-1~ far 1lEllISIIIA1IllN ISSUE RmlRD IlfSIGN NUIIIlER PRl!.B:I NUIIIIER M367890 ~lE 11/27/06 PIlIIJECf _ J. W11.UALtS DRAWN lit s. STICHA CHB:ICEIl lit J. RADEMACHER LMl~ -,5T=DT ~ - '43'=DT ~ -'2~ -~ ~ 1~ .1 ~ ~ ~--L~--------L~--------L~--------L~--------L~--------L~--------L~ ~ 15~ ~ 14~ ~ 12~ ~ 11~ ~ 10~ LJ, ~__~_______...L.. ...J LJ, WEST ELEVATION ,. - 20'-0. - MATERIAL LEGEND - .. PREFlNISHED METAl PANEl ~ RIBBED METAl PANEl .. SPANDREl ClASS CJ VISION CLASS CJ PRECAST CONCRETE .' 0 '0' 20' 40' 11'.- - SCALE: 1. 20' - 20'-0" ,. SOUTH ELEVATION 3 . Errors may occur In lhe transmission of e1ec!1llnic mes. Th. Opus componies OIl nol responsible for any claims. damages or oxpenses arising aul of tho unauthorized .... of the information canloinod in electronic files. . Electronic flies may nal accurctely ",neet the final as-buill condition.. II i. the responsibifily of the user to verify all layouts, dimensions and olhsr relolod information. . This document may not be used or copied without prior written consent. all rights rueMd P__ r.. OPUS Ee~.Northwest. 1D35D B... had _ ....-.. 11M 55345 951-151-4444 951-l5l-45ll far PIlGEr EXCELSIOR CROSSINGS BUILDING A lDCA1Il/I HOP~S. MINNESOTA SHED11II.E EXTERIOR ELEVATIONS AllER A3.01 PLOT DATE: November 27, 2005 - 1:21pm ~ - 20'-0" ,. NORTH ELEVATION 2 - 20'-0' ,. EAST ELEVATION 4 I ~ I co o ~ ~ .. ~ is z o ~ '" ~ ci ~ .., 2 ~ I ~ { ~ 2 ./ 6 I ..... "'" < ::0 c- o L - . ~ ~ 14~ 1~ ~ 11~ ~ 1~ -~ -~ -~ -~ ~ 1:;s;::"~;;;,:r;;':':;':i,;:.~rI>':?~r';j'i';'l I: "~:~::';~'=='~w::f~f :i: ~rrmni~mm niJ ~_______"""'____.J ~ .~ ~ ~ ~--L~--------L~--------L~--------L~--------L~--------L~--------L~ . OPUSGP Opus Architects & Engineers, Ine. 1_ I... _ ..., _.. llN S53G-0110 152-B51-U44 152-856--4521 !all IlEIlISIIlAlIlI LEVEL~ - iB5'~ LEVEL~ - i71'~ LEVEL~ - i57'~ LEVEL~ - i43'~ -~ 129'~ -~ ff5'~ LEVEL~ - fOo'~ I j, .!.....!, .!.....!, .!.....!, .!.....!, .!.....!, .!.....!, .!.....!, .!.....!, .L r ~ ~ --~ ~ --~ ~ --~ _1E'EL_4_ --~ --~ ~ --~ ~ ~ ~ ISSUE RECDRll DESICN tIAlBER PRO.B:I NUlIIIER ..367900 !lAtE 11/27/06 PRI1IECI IMNACEJl J. WII.UAMS DRAWN lJf D, UNZE CHEaCED IIr J. RADEMACHER SOUTH ELEV AnON ," - 20'-0" - MATERIAL LEGEND - ~ PREFlNISHEO METAL PANEl ~ RIBBED METAL PANEL .. SPANDREl GlASS CJ VISION GlASS CJ PRECAST CONCRETE 0 '0' 20' 40' .,-- - SCALE: 1- 20' WEST ELEVATION - 20'-0" ," 3 o Errors may occur In the tronsmlssion of electronic 1iIn. Tho Opus companiu ... nol responsible for any claims. domoges or exponoeo arising out af lhs unauthorizod lIII of the infannalion conloin"" in electronic files. t ~.: ~~b~i~ ~~~d=~r:el~ ~"th~ responsibility of the user to verify all layouts, dimon.ion. and othor relalod infonnalion. . This document may nol be used or copied without prior written consent. o all rights reserved I'nparod For . OPUSGP rthwest, IIWO Iron Road _ ~ llN 553U !l52~ 152-1S1-.15Z1 !all PRllIECI' EXCELSIOR CROSSINGS BUILDING B lllCA1lON HOPKtlS, MINNESOTA SHm lIII! EXTERIOR ELEVATIONS e~~~. N ~ --~ ~ --~ --~ ~ --~ --~ ~ _ _ -LML2A ~ ~ ~ J.E.VEl~ -1~ .J..EVE~ -'7~ -~ 15r::DT -~ -~ -~ ~ ... I ~ I ________________J I I J..___ SMUBER A3.01 PLOT DATE: November 27, 2006 - 1:23pm.-J - 20'-0' ," EAST ELEVATION 2 20'-0" ," NORTH ELEVATION 4 ., i [ ~ I '" a a N ~ " 1 j!; z a I ~ B '" ~ ~ ,.., ::E ~ I 2 I 3 -:f f ~ 3- CS I .... "'" < 0. o L . OPUS. Opus Architects & Engineers, Inc. lD350 Iron Roa' _ Il1MoIaoU, IIN 5534!-0110 151-15&-4444 151-651-.4521 fax RmIS1llAlIlN ISSUE RECORD DESM:N IIIUIIER PRo.JECT NUllBEIl ...367910 1lo\1E 11/27/06 PRIloIECf_ J. W1~S DRAlIN I1t D. UNZE CItEI:ICEIlI1t J. RADEMACHER . ErroI1l may occur In the transmission of e1ecbonlc mn. The Opus companies lI/'I nol responsible for any claims. damoges or expenses arising oul of the unauthorized """ of the information conlained in electronic fll... . Electronic IDes may nol accurately renecl the flnal as-built conditions. II i. the responslbifily of the user to verify all layouts. dimensions and olher related information. . This document may not be used or copied without prior written consent. all rights reserved Pnpand For . OPUS. O~us Northwest, L. .c. lD350 .... Road Wool IIInnolonka, UN 553U 151-ass-.u44 952-1S&-e2I fax PRWECT EXCELSIOR CROSSINGS BUILDING C LClCAlIlN HOPKtlS. MINNESOTA 5ItEEr 1III.E EXTERIOR ELEVATIONS le- A3.01 PLOT DATE: November 27. 2006 - 1:25pm ~ -~ 18~ ~ -~ ", 15~ I in ~ ~ - 14J~ - -~ 12~ - -~ 11~ .... -~ l00~ ...J --.b...0WQl LMl. ~ 87-0 LJ. LJ. L!. LJ. LJ. LJ. LJ. I I I I I L _ _ _..L__ __ _ --L ___________ -~ lB5~ -~ 17~ ..1M~ 15~ -~ 14~ -~ 12~ -~ 11~ -~ LJ, 10~ _ jJlWER LMl.~ 87-0 I I I I I I ..1.______I__...J L"!' I I L WEST ELEVATION l' - 20'-0' - MATERIAL LEGEND - III PREF1NISHEO METAL PANEl ~ RIBBED METAL PANEL .. SPANDREl GlASS c:=J VISION GlASS c:J PRECAST CONCRETE 2rf 40' 1" = 20' ~ lB5~ ~ 17~ ~ 15~ ~ 14~ -~ 12~ ...lMl~ 11~ ~ 1~ ~W~~ 8~ - 20'-0' l' LJ, I I I I I I ___L_-.J NORTH ELEVATION 2 ,U ~ lB5~ ~ 17~ ~ 15~ ~ 14~ ~ 129~ ~ -~ 10~ ----LQW~ ~ 8~ 20'-0 .!..J. ________...J 1. .!..J. L...!. EAST ELEVATION 4 LJ, .!.....!. 3 ). SOUTH ELEVATlON_ l' - 20'-0' ............... .:~:;:.:;.;:::' LJ, LJ, I I I I I L___.L_____--L III .. .. .. I I 10 o o N ~ .. ~ ~ z o I ~ '" '"' "" ~ ~ ~ ~ ~ t :d :=; ".- 6 I ... old < 0. o L . . OPUSGD Opus Architects & Engineers, Inc. \W~~ \W~~ l~ Pl~ 100 -00 ~. ,I~ 3~-'~~,F....... ~f:~tc < , : :;t~~~. ~----~ _ . ...:....... -- ._~ ':- .. L~ ":;:~F=:'" :'4: II' .:u..~ "1 [ ,~'_-:~~;::~~~'-~'~~~.~~'. ~n :;"'4 Tf ~ 1 r '- ~~( 1 '. :;.: f 1 - T r I 10350 I... Road Will IllMOtonka. 11M 55343-411 t52-i51...&40C4 t52-i51-.1S2t I.. REllIS1RATION l~ P2~ 11' -00 - ~~~~ :~~J~ ~"I' :---:-. ...'........ ~ . " EAST ELEVATION .., '..........1. ~ ~;'-" ~ .,.:.;< SOUTH ELEVATION 3 = 20'-0 ," NORTH ELEVATION 2 - 20'-0' ," ISSUE RECCllD ~~~~ ~~~ ~ 'OO~ =0 DESIGH NUllIIBl PRllJECT NIJIlHER .,367890 illiTE 11/27/06 PRO.IEI:I IINWlEII J. WILLIAMS DIlAWN " J. RADEMACHER CHECKED " J. RADEMACHER · Errors may occur in the tronsmission of electronic files. The Opus componi.. are not responsible for ony cloims, damages or expenses arising oul of the unauthoriled use of 1M information conloined in elecmlnic files. · Electronic files may not accurately reflect the finol as-built conditions. It is the responsibifify of the user to verify all layouts, dimensions ond other related informotion. · This document may not be used or copied without prior written consent. = oU rights reselYed I'nparod For OPUSGD O~us Northwest, L. .C. 10350 .... Road WnI II1n",Ionka. 11M 55343 152-i51...&40C4 .52-&56-.1S2t I.. PRWECr EXCELSIOR CROSSINGS BUILDING A lOCATION HOPKINS, MINNESOTA SHEEI mu: BUILDING A RAMP FLOOR PLANS & ELEVATIONS SHEEI NllIlIIEIl A A4.011 PLOT DATE: November 28, 2006 - 12:'JP~ ..!"~ " :J.; n I IT " '" ,'11 T "-0 I/J2 f ~';"-_::....~~ ~ . :.:_~ ':~~;: ':':(...j.~ L. r~~' " [ '~~'. ~~.. ~ "~"':"~' '; ,.~. . ]t' - __,'._~-.r~ - 'k if_ ,. "I'.. 'It fr<' ..V. . . ... '~=' .....<:q ~ -J[_~_ WEST ELEVATION RAMP - LEVEL 2 - FlOOR PLAN ~= .- 't:-':''';'::'::'''; --:-- ~ -~"'~~:~: .. ;- /.! ~ '-:-; :l:.~.: -~. ~ r' - ~.. 4 .llIlI'-O" ~.:..- ~ ':"~: . -::.- :"1 ':'::~__7..:._ '_' ..~ _.' -IT ". ..... ~':"'.-:: -'-~" '-. -- - ......:.....~... - ..~:..-=-:-~. _ _"l.~ -:. ....-:..: r j> '.:',~c". ~'_:'~-':;~'c:'~~'::~~r---"" ,..,~.~,::: ,:~~".~ :: ; i" ;.;~, '" ~~ '" , "C: ~:,' \~ "' ;,.:~,,:::; 0,. - ,- ,~~ ':"~ ,~~-'- :. ~,~ ~'2" _ ""': .... I.. ~ ... .. . ..' ....... ..' .. .. ".;: ~. I .' ... , ...... .' ...... " " . . 111 -00 OUT IN 1M--!' 5 4- l&- .J ~ ~8'-6' ,!!: IYP Hi ill ~ffi NORTH 0 10' ZO' 40' I. .-. .. SCAlE: ,- ... 20' MATERIAL LEGEND c=J VISION GlASS c=J PRECAST CONCRETE - 0 16' 32' 54' Lr.. - ..J SCALE: 1/32- 1'-0. 3lIt -0' ~8'-6' IYP 1 JJ p~ ffi (6 ). RAMP -LEVEL3 - FLOOR PLAN_ NORTH '/32" . "-0 .ok-- ! ~ co ~ ! ~ I '" o o N ~ .. i ~ o I ~ ~ '" !I: ~ i :::;; I o I ~ , I ~ f ~ :::;; "" ~ I UJ old < ., ::0 CL o L I::n~\I''''-' ~~I\O ~&5I~ I.. ;;;;; ~ \~1Y)ll \lO-\lO 1 \ ~ ~ :n: : ,,,::::;:~.,,i!:~";";;' ~"~' - ~ ~ ~ \ \ \ . E"DIS may occur i e\eclJOn'.e fileS. Tha I responSible IOf an .~ts onsing 0lIl 01 Ihe if\lormo\lDl1 IileS. . f.IeCll1l"'" Ii\eS ft41/ no\ oecurolel't (C1\eCI lhe finDI ai-built conditions. It '!' the res\lons'ili.lily 01 the user \0 venly all \QyOuts. dimens\allS and other related inlormO(IDn. . 1l\is document mrrI not be used or copied ",ithou\. prior "ritten consent. o 011 fItols -~ lleslQlll\1ll~ pRDJtCf llIJIBOl \1367900 w.1E ,,/27/06 ~~ J.~S I)IlI/Illll'l O. UI'l'lt. tl'f.CKUlll'l J. AAOE\N-.CHER ~ r- ~ ~ ~ '" 1.0' -0. ,. ~ - '~ '"~~ ;~;:;,{-~''J..' " ;-....-' '-' ",. - .(' :-..:. .' ", .' ',,, ,'.' .~ ,,':"'~:". ~ o 5Q\Iltl El-E"I;!\OlL- Y'fj' _'0' -- T\\ ", .~. ~'.~ .. .,' ~ ~9f ~ t ~'-\"":'" ~..,'~-::""'" ~"-'''_:''~)''''<- ';"'~' '7~ It'- ~ ~ ~ '" 20'-0. ,. .... :~ ~, .~' WES'T ELeJA:nON ....-....- ~.:~ .-~ . -;- ~ .- 40' .1ff o '0 . ~_20' sCALE: ... ~~,7=::: EVA'TION ifiEt: ~ - Y'fj' _,'if == ,/ - \l ~ V u Y'fj' - '0' 2 <';;'-~., -:-- ~... ~f" . OPUS opUS Northwest. L.\...C. ~:r~ ~~ ,.. pRDJtCf EXCELS\OR CROSS\NGS BU\LO\NG B ~1tlII I-\OP\QNS. tAlNNESOiA ,&'-6' Tf\' 14 .~' .~+- .~ -~ 64' ,'-0" - Mf'-. \E.R\AL LEGEND ~ o \j\SlON G\.ASS o PREctS"f CONCRElE ,{52" 32' ScALE: \6' o .. 20' -0' " g\EElmtt BU\LO\NG B AAN\P FLOOR p\P.NS & ELEVF\1\ONS s:! ~ B J\4.0~ ~~Pl ,'-0. ,/32. _ LE'JE.L 2 - fLOOR p\...N! ~P 5 ,'.0' 1/3'J.' AAJ-AP - LE.'lE.L 3 - fLOOR P~ 6 a'-r." 'N1' ttf .X' .~+- 'i \ ~ '" ~ , '8 ~ ~ lil '% i ...... o \ ~ ~ t 5 \ g \D t<\ ::&, ~ ~ ~ e ~ ~ \ ') ~~~\\O ~~I" ~UIIl ::w . n>C\. ~1Jb.. ~'f .. 1.0' -0' " ';.;;;;,. '., "' " '", " '. ~ ~S1 E\.~A.1\ON :-... '" .....-.. -.' ~.~-~ '\- ~ -~ ~ ~ ~ .. 1.0' -0. " 2 ') Not(Oi E\.eLA.1\ON 1 C 1\4.01 ~. ...,.... for . o,us. OpUS NorthWest. ,-.\-C. ~~~ ~:=~ \II pIlllJlCf EXCELS\OR CROSS\NGS 6U\LO\NG C \,llO-UIIl w>PlOMS. ~~ES01'" glEtlmIt BU\LO\NG C AAMP fLOOR pVJ'lS &. ELE\1 ~:nONS oc;\GII1IIJll18 pIlllJlCf~ ll36~'Q llI-'\t "/21/0& ~~ J.~ o_1ll J. AADE.W<-CI-IE.R ~I\'I J. AADE.w<-C\'If.R oIlII1 Ii\eS- . a.e\rQli1C liltS fl'41 rei ~turlll"ly ~Il\lect the "nol os-built <:o"otl.iollS. It ';; l~1 resllollSi'oilily 01 the user \Q venl1 ..' \QyOu\S,.Otl1le"siOlIS and o\,ller rllla\e6 ilIlQ!1'l\o\.il)llo . 'This dOCument rnr1'l not 'oil used or tOllied wi\,llout pr",r writlen <:onsent. (0 0" iq.'Is ~ ,,-0' ,/37.' ~ 7.0'-0' ,-E\[EL 2.. fLOOR p~ ~ ---~ l~ ~'1" " \N ~p. 'NES1 ELE\[A. 1\ON 5 ffi I$~ 4 p\JJ'l NORi\'l - MA. 1ER\t>.L LEGENO ,.... o ',/\SlO~ cVSS o pRECIS; coNCRot \ 64' "" 100' 31.' 16' sCA\.t.~ 20' ,~> o 10' sCA\.t.: \'-0' o ,~~ , /3'. t ; MMP . L~EL 3. fLoQR p\Jo.N .~~.~ ,~ ~- ~ 9("" ..,. .. ..t~.. - - ~'-o' .~~ ..,-:--;:- ~ -- ~ ? ~, .. '.,o,d, 6 ~ SOU"@. ELE\[A.1\ON 43<-( p~.. ~':':: ~~ \N ~ 3 +4-(;1, \ \ ~ S! t! \ ... o ~ ~ 'i; % \ ...... o \ ~ e.. '" ~ ~ ~ '" ~ ~\ o ~ ~ t & ~ \ ..... I ~ OPUS. Opus Architects & Engineers. Inc. 1I3SI .. ... .... == 5530-0111 ...--- ... ~t~MN :=~ F'-, RLK ( I1'CCDPOL'\"I'ED I "--/ 6110 Blue (;ude Dri\-e. Suire 100 lI6mx1onb, MN 5534l Phone. 952 9331J'r.2 ns. 925 933 1153 ...ww dkmc.ana Sf: ...... 11/27/06 - SITE PlAN REVIEW ~ ~, ~. .. ~ o If '" -' a: ..J ~ > a 0:: """"'..... a.. U35_7700 a.. Fllll.(CT ..... ~ ~V27 /06 >- PIID.ltT WMiD r- -.. (3 D<DOD .. , n . trrors mcIJ' accw i'l lhe transmission of V _llos.lIloCpus,",,-,".llIll Z --- .... ..., ....... -- ... ~~~ :n.U;~~= - fa... o . ~1I= ::= ~"::~ ~ef= Z responstbilllJ of the- uset to \letify aIt 1ayovlS"~ drmensions anct other 'elided W .::~ mar not be used or n. copted ';(houl prior .rltten cDnsent. tD all rights rtM1W6 I Z ........F. a e OPlUS. i= gg,,~I=:r.Lc. () 'D350 ... ... .... ........... MIl SSJO..01tO :J ==... 0:: .....cr r,; EXCELSIOR Z CROSSINGS a llJC101lll () HOPKINS, MK cr:: 5H[[1 1m! a TITLE SHEET ll. r- = a C1 z KEY MAP 3 ACRE CHIMNEY PARCEL ~ r-.. NORT1l y l o 200 400 ~- , SCAlE IN rEEl CONSTRUCTION PLANS for Site Improvments, Removals, Grading, Stormwater Pollution Prevention, and Utilities for EXCELSIOR CROSSINGS HOPKINS, MN SHEET INDEX SHEET DESCRIPTION Cl TITLE SHEET C2 ALTAjACSM LAND TITLE SURVEY (SUNDE LAND SURVEYING) C3 EXISTING CONDITIONS & REMOVALS PLAN C4 SIGN AGE AND DIMENSIONAL SITE PLAN C5 GRADING PLAN C6 PAVING PLAN C7 STORMWA TER POLLUTION PREVENTION PLAN C8 STORMWA TER POLLUTION PREVENTION DEl AILS C9 SANITARY jWATER MAIN PLAN ClO STORM SEWER PLAN Cll REGIONAL POND CONSTRUCTION PLAN C12 GENERAL DEl AILS C13 GENERAL DEl AILS C14 CROSS SECTION PLAN _55 '0'0 rlR51 $'TREET HCPICNS, .... ~ '010 rlRST 5lREU MCPIUMS. .. ..343 7DD . LINDEN AYE. 101 1115 .....[I.PCI.ls. UN ~.61 1~'. 0€S1NUl 5TRUT =APOLI5.. UN C"'... eo'",O)ot '7D$ DATA PARle ='0N1CA.. UN c.',)-It..... toG Cl\". AD .n [ ~ELAlCE."" ..- C.."........, la.>>D MEN ROAD WES ..NJtl'lClfrr11KA. ... ..313 Ctu)-USaOlU :.::r~~ DRY ...,., UTILITY CONTACT INFO unuT'r I COI4TACl ~ on PLANNING ... tee_CAN cm) ......,.D - - ONEE""'B I"" .-a..... ~ ~ EN...,., XCEl 1ftJ)- Uf- ENE""" ......OO[tlIICM AAItO'f H[IlIOoIlSl .... ....... F1BCA DP11C - IlIP 'lEIlLEliEI. I 8 OPUS.. Opus ArchitectS & Engineers, Inc. ,... .. .... .. -.._to ...- .........- .. ~~ \l=~ ~\ R.LK < zr.,."C01"'Pl")JUIo'11l.D ) ~ 611(J Blue t:uclc: f)n'lM:., Suite 100 N&aDe1nab. MN 35J.13 p.....,9S29D 0972 ""'925 9.. m) w..-w.&sac.com 6U_ \1/27/06 - Sm: PlAA REVIEW ..-- ~I, 105_7100 ...-\"*" g' .... ;1 11/27/06 g', fIO,(O_ -.. ~ OCDO .. :5 It - . Epors maJ octl# in the hammission at __ _ 1.. Opus <-"" ... "'" ,esponsd* tor on,' dudnS.. dornoges 01 ~tlf'6lllJouIol_WICI,IItlOrrnd- 011'" Wormat- ~ in ~ Des. . ttecbonit fileS ma:, nat acowotetr ,ef5td the f"dd D5-~ concSbons. It ;s the ,espoosi~lJ DI \M \IUf 1.0 verity 011 :lOUI~ ~ns and othef .eloled -..- . lhis doCUI"I'Cft\ nmy not be used Of copied wi'hoLd. plior .."ten consent. o .. .";gl>1s .- --'" , OPUS. OpUS NorthweSt Construction L.L.C. ,D3SD .. ...,..... .......... _ 5UO-I1" -- t>>.t>>-dlt .... fIO,(tT EXCELSIOR CROSSINGS """"" 1lOf'l<INS. M~ SIW- AL T AlASCM LAND TITLE SURVEY L - C2\1 ~ .J <( > o 0: a. a. <( >- t t) C) Z o Z ill 0. I Z o l- t) :J 0: I- (() Z o t) ex: o I.L l- o Z ALTAlASCM LAND TITLE SURVEY NOT TO SCALE FOR REFERENCE ONLY 'j a ~ l! 0 0( E \ ~ 0 ~ !; 0 " '" or 2 )0 ~ v , (' ":-~r #,!~ST- b- - d.. ar..6' ~ - -;;:;;;; - - - STEh'ED -r~ ....n...r - J " I] ~ <. ,., I II ~ 5 v'l? V' J ,. lM17ZI$IIlJtUJ (M'.I.UIlSMLrF~""~~ 'f R A :,.. :- A r:~.~'::':='~~to~ -..v-. 'Dk. u.c. ~.. fIla. ............Nll... ftIlIP" ~ ~ .,..c Wr ....... 'lW ,..nIl .. . .,........... ... .-.r"",~_jItIlIIIaJrt~"'1hc~ =.... ..-__"'- ~".T;~:~~~;.s." .... ::.:~ ':.-=-~-=:. -::;.. ~.~,~.:. ~~..:= ~ ~:::"" I ~.. -7'-1 =.:c~~;:m=: fI& ~:o"...-:-..... ,f__-...- ,_"- ~~::::::t'*~~~'" ~ t ~."> ~ '::".:r:;.-":"::' ~:. -:;;. ";...~:::-= ~ 2000l ~:;;.- ..._~:-...:.:::~...:':::=- \If>:: ,-,ct-.) ~*sr;&.)::~~- ~.... ~."""_''''''''''_~''---''''' =~.:'E-'",=;=~;:-"'::'''M :;.:::...-=~ '=' ~ 0;:-;':.:' ~ It:'''~''''~ l';) ~",:,:r..::""':~:.'" ;,':.:::".:::r--::.:- ~~~..~:;~~'::'''_:s'-.. ;:::-~-E...~~=.a e~..~~7!~ ~~E:J:!,,*, ~:t~" "'-"- .........-'~"'" a~.:s~"!.a-:=::Ei!Sf~":' of ::::.-;::-:;"- ~~~~~~..=.~';,.:..:;?Jr..:' .. kttn .t.r' ,.._...._...-....-.......- _..........,,~ ". -!m& :::. ":\ ~......:u = '::: :::. ":::: ~.:-: :;';.: ;r'" -" · -- u. - ,... - - =~-==~~:::.:'.:~:..";'..~~ - ,or ,-~ ~ ~.:::-..:=-'" ........... _ ......-.... .... .. ... .....' .. ALi;ii,lCl!lll.ND 1I1LEiUMiiYFCB ~.=. of _ _ _ _" om _~eo<T<"-_ __ OPt/SNCI1f1{I'EST; LLC ~:s;'~..r....:~=:-~;.?~ - ~J""wI"" 7r-.:.,DII ~.efe.17 ~""OIfW~o.:-s. ,....,.- oCllIl'W top..~~.ftIlIIoo:Ir..u-.13 -..! tQ t'ow"'-'w"''''-''' ......./wIInVCcu.....~~c-ntJL~ 1__'""*'" ..tIf'I....~.dIQItt.WNo.IZIDr>> -----.. ~------- --- ,...~~111& lu:_~;_~"*........,~~,.1'MI.....,... ~... ZiI7l ~ ~ IIlIIMit. #vIpIA 31. 2aC>>) -- \At \. .. 1. 'UW ,.,... ~ tD .. ,...,..... ....... .......... ~ ........ ,..- - ~~....tD1"" T'" .. .... k tscta A. . II'!I Co ~ Ld s..wr h i.-....... c.- ~ .... 'Nt ~ ef Trc:oa:. It ~&t~-s:k~i?5H:1:~~ -~ \.IJb~~ I.... 7.'- _10...... Q, 'fIlES! ~UJIftIIr....,.....,..,.. ",,-*3. 4, "'. eM '1'__ _PwoIIz..e ...Ct7..~Il5Pt-..,....".... ..~c.-"'........- ~= =-... ttlOl34 .... .. ._t ..... I .....1.... ,'" wtst ~ CDoTIR.......... .......lAW... ..,.,.,..m:... O\J "" ..............WoJP'tdIl.... lj M .. ...... will- ~ ~ .., ... ... -.0 ~ t)IIIf ...... tile ......,......... --. ., h' .... .. .. ... L.c ~ ... ... &.~ ~ ___. ., ,.. ..........., 1M fA .... L.t r; u.:: ~.....~=:. -;:....::~ 'n =---"".......:::r = =:;r.= ac:Mca,..~"""" d ...,AcIlfikl, l. ......~ ut. u... It ~ the &.t .. fMs..4 \._ ~ ... lI.. Lobl 11 ....,. .. -.............. .... WEST .............---- -" =::::=:."::':.=..~,l:..-:J ~=-=.,:~ =- ":=' ~ ~~ _ .."::.I:"..:-'....::::.='.......r: ::. ~m'"&:l".. ""= :::-:r .......:~.J.~-::.::.. ~~.......... ........ _...... t-) l \ \ \L""'::-"'::-'::: - - - - - I I ; I : I I , .1 I I I T'1M " t f I I , I I I I I I I i I I ! I I ri ~~ .-....- - ~....- , t.=-' WAf J l<r1O"- I i ! ! I I I ! ! I i I I I I I l~ '/r; ~ , 1 ; i \ DETA I . I 1..1- ~",........, I ~~ I'C!:~ ~ I AT : ~ i ~ , I I M '~k ,~ ! ~T TO SCAL~ ~,. ..../21f T.l"1;~ So" -=,JIIlO'" - . =-~~~T.U. _ 02M SEE~~~~'-='.'=-- \ - .......... :::.;; .. ~... ~~ \)~j.\l< W" ,\.....~~ ~, ~~ ~ \'''' SuP' ,Qs<I< p~~~~;) 1103 &\\\l"ll~;.",;,;.."f>>.: 'J519 &J,nt I'W>"" w..... ____ ---- ,.., ~~.. ~~ ::.- MO--- ,tC. :::::--- 6'lf. ...... 0&- "/2; I \It'IIt'fl snt~ J <{' / o (t' rJ!P ..... (l.. 1l~_11(lQ (l.. ""'" ....., <{ ~/2;/0& r ~c.1;...<l" r -'" - 06"'" " o It\ .t........, V _u,.;c~ -7~ ~ oI'.... -0 .:.~ ,....... z ~.. ,,\ Jl'l\QI'ma" UJ .,ti6 4CC-' (l.. <:: ~ , z ........t.. o ~ or\U)S. \=- ~~~::-:XLc o ,"""....~~~.,\I ~-- 'J ~.......... ... tt. td" r EXCELS\OR ill CROSS\NGS Z L 0 ,p1Ol O~."'lI 9U'- tt. EX\S1\NG ~ 0 CONO\1\ONS &. ~ U. Rf.l''\()Vp.\.S pVJ'l r' = . ~~ 0 C'= ~. ,," Z .. ~'I tl;" 151 ~ '0 wi ~, ~, It ;. ,"" ,_~ 01 lIP" ~... ... "",._~ar ...."''''',,-....>11! ......... ;. ~ ly.eno<' \\ is ,be "ec1y 01\ ...i>I<d .~ ...-DID" ~...~ ~ "g G3):'- U:;,.- 'JP' -.-.-'- -.-.-'- -:;:::- -~- -~ sN01"",.,...o.1 -->>-- --~~-- ~1OI'It lj(.C11 · · ",104 eA5" · · ",_ eA5" ~ 0 0 SlG"""~ '" '" .;:::.:::. -' - -:;;:-- fOIt~.I-1lt ~ .. Gl>1t v...,.; --"'-- --",,-- GAS..... __C----C-- ~nlc;fj\lt --",-- --",-- ~nlt;1lllC 11 '4 \lGI" P<llE. ........ pOIlEll P<llE. --..-- --...-- ~Il) c;.eoJ; ~ --...-- --...-- ~~roJ.1II9O" __..-- --..-- ~Il)~ --",-- --",-- ::::::::::::: _0- _.- REtv\O\/ ~L NOlES """"""", """" ,ooP '""" _~.:::f'~ ~ E~s11NG U1\\JtlES "",,,0 loP()GRl\f't'\I~E COl'llR...c1oR n<E ~:f,"::'::~ '" ",,,,,,,,- ~;';"'t:;g:s f~tA 'n\E f'\.I'NS- 0.... t.RE. tJ'PRO~IilA 'IE. />.\.1. E~Sl\1'lG U1\l.llY l~~S~. t6!>1_454-OO(2) roR ~,~ s::...... """,,,, -..- ",-, .- ",,- ~ '" "" ':~;'" '" RE."!A0'J/>.\.s- COl'llR:;l~ ~~~O:':~~I'RcM:~1S ~'n\ ~ ......G n<E """"" """ ...- 'IE tXlS1ING 1'R1'J,.,lE UlIullES COl'llRt.C1oR 10 R~10~C~o.ro- COOROIN~1E AClI"'1IES'M1\{ AS NtcESSt.RY. Cv"' "" V" \I1ll.llY ~ANIES- El\,.t roR />.\.L RE.lotO'J/>.\.S NO'lEO ON C~lRAC1oR IS RE~~lIC"lIOl'lS "",,,0 fEES ARE. l\{E 'i"~~~'Jr~ 1tiE CONtRAC1oR- .... ,...... .".".. '" " ~ ":'~'" PRoPERlY \Jl'lE pER SlAlE. "",,,0 l........- eE.t'lCHtJ\AR\<.S ... ~ 1 loP "'" '" ... "" ........... ",,, '" ..... 'SO . ()\'l soo'n\ SloE. r:!i 2140 Sl. N.t. (\.t'J,.,lION .. 92:3.10 ftEl alA ,2.) "" '" _..... ,_ ""."" of","" 51. N.E. ~ ~Sl SlOE C1i \51 M-LE'I 'llESl ii.~~~O:~';4.96 ftEl loP ""': ,1i' ~ ~~~ ~~v;-itON .. 925.4!) rEEl EU.",.,lIONS 5\'10.... Jilt BAsED ON "!ANOO1 A1.10& AI /'NO 1.10& A1. aE.NOIlottJll<S ,3.) B'" -, ". ~0'4 ~M1J,1I~~ ~~I} ~~~ atS" JIll> fl1..\. ,,1tI \ cE01t~ ~C~"lI(JMS '. , .~~... ~JJ13~~ ..... , " , .... I,. \ " , ~ .... , \. \ , " 4:..', " "- .... ", " " " '" , " \ " <.;, "- " '- i " '" " , ..., '-...... " , \ , , , '-...... , ....... ........ " / " "'" ~......... // ........ , /'" ........ '. ........... ...., / " " \ / "- ",,> I '- r ..... ,~ -....--- ------ - - '" " tllllf JoL\.E't -. -. I - -~-. i - \ J , .J ";.,...,,/ -{l. ,'4 ~c.. 1)ilI'>It 10 at llEI'O'>ltO · ~o iC.Gt~~ to JA~ ;1. to i.H ci>i" 'ItlIt~t. ~s~'I\OM- ... '. ......, ........ ..... " " " ',. ", , " \ ...... /~"'''' ..... '\ P {>.N IS 13{>.S(O \JPON ()(IS1ING CONOI1IONS OoN\Ji~~ 1~( 13\JILO\NG &: SI1( {>.SS\JM (0 R(MO\[ {>.LS \[(RlfY {>.Cl\J {>.L 0(MOU1ION p\-\{>.SL coO~if:~~~~ O~M(N IS. ()(\SIING COONOI1\ON5 PRIOR 1 (0 {>.I'IO MAY 1'101 CON0l110N5 '/111\-\11'1 511( '\~~G( t5;~gION5' fl(LO \[(RlfY R(PR(5(Nl {>.Cl\J{>.L ()(IS' " ' / ." / I / (' f '\ I. '.. 'I) \ i ( "I \ \ 0) to .... CJ ~ ~ ~ ~ () ..... ~ ~ ~ CO \ I ~ (O)rQJJ~e Opus Architects & Engineers, Inc. -1 1~""~"" ........... WI SS3U-Ol ",-- ",.......- ... g~'~MNMN a~~ ~\ RLK t~J uc. ""-_ t__rpoo~,.............. _.........., -........,.... ....................,- :..:':.~~~I_h [11'00" l'TICI) OCCU' ~ lhe lrunvnis.sfon oj rtecl~ rOles.. T~ 0p.6 t~ tn not ,npons:;bIe- 101 D/'I'1 doilTK,. c1C11'TlO9" Of' nPf"15ll'l Ol'ising cul or IhI- waautt1ofOnd 1M' 01 1M normaliClf\ COllt~ in riK\tonic ....... [)eocI'DnC fitrs troy nol occ~otriJ ,~Iect Ihf ftnal DS-~' conditions.. n ;50 the- f~i1iI1o1l~\,Koe1'lo.,.,;r,oS1 loyovls.. dimtns;ons ond cthft .etated in/ormation. lhis docume-nl mOJ not be uSoe"d Ot copitd without ptq .tintn conSoe1lI Clollrighlsr~ "'D1IlLI SIGNAGE & DIMENSIONAL SITE PLAN C4 z -.. a 1J (Q)rQJJ~e ~ gg~t~n:;~~L.c. o lcmo............... :J ~...~~o ""~ m-l>>-.a.>>!'" 0:: FOO.(C! f-(f) EXCELSIOR Z CROSSINGS a 10C>>00 o HOPKINS. MN 0:: a lL I- a z Mmncmnh.. MN 35~3 11/27/06 - SITE PlAN REViEW 0"1[_ ..J 4: > a a: ",.,. ..-. a.. 1135_7700 Q. P'IIO.I:C1)U8J1l 4: ~V27 /06 >- I'JIQ,(Cl WrHlGE. f- -.. o (9' z O. z w. a.. I EXISTING - -- t :. "'., " .', .. j SITE NOTES CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND ELEVATIONS OF EXISTiNG UTILITIES AND TOPOGRAPHIC FEATURES PRIOR TO THE COt.4t.4ENCEt.4ENT Of' SITE GRADING. THE CONTRACTOR SHALL It.4tJEOIA ITL Y NOTIFY THE ENGINEER Of' DISCREPANCIES OR VARIATIONS FROM THE PLANS. SHO~ TO THE FACE Of' NOITD. 1 T o 50 00 r--_ I SCAlE IN ET ALL SiGNAGE NOT PROITCTED BY CURB, LOCAITD IN PARKING LOT OR OTHER PAVED AREAS TO BE PLACED IN SITEL CASiNG, FILLED WITH CONCREIT AND PAINTED YEUOW. REFER TO DETAIL ANY/ALL STOP SIGNS TO INQ.UDE A 24" WIDE PAINTED STOP BAR, IN 'MillE PAINT, PLACED AT THE STOP SiGN LOCATION, A tJINIt.4UtJ Of' 4' FROt.I CROSSWALK, IF APPLICABLE. ALL STOP BARS SHAlL EXITND FROtJ DIRECTIONAL TRANSiTION BETWEEN LANES TO THE CURB. REFE TO ARCHIlECTUAL SiTE PLAN FOR DETAILS OF BUILDING INFO AND SiTE PARCEL DATA. IN UNLESS SIGNAGE & STRIPING NOTES ALL SlIT SlGNAGE CONTRACTOR SHALL PAINT ANY/ALL DIRECTIONAL TRAFFIC ARROWS, AS SHO~, IN WHIIT PAINT. CONCRETE FOOTING AND lB' UNLESS Of' CURB RADII SHALL BE 5.0' UNLESS OTHERWISE NOTED. WITHIN PUBLIC RIGHT OF WAY TO BE B624. CURB AND GuTTER TO BE B612 UNLESS OTHER.....SE CONSTRUCITD AT ALL CURB HANDICAPPED PARKING PROVIDED PER ADA CODE. CONTRACTOR SHALL PAINT ALL HANDICAPPED STALLS, HANDICAPPED LOGOS AND CROSS HATCH HANDICAPPED LOADING AISLES WITH BLUE PAVEMENT tJARKING PAINT, 4 WIDTH. 6" R7-8b BUILDING DltJENSiONS REFER TO THE OUTSIDE FACE OF BUILDING UNLESS OTHERWISE NOITO. 90' PARKING STALL I) .... 0. CURB BACK S 9' BEHIND THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND STRIPING AS SHO~ ON THIS PLAN. PROPOSED ---- ---- R5-1 SIGNAGE LEGEND @ STOP SiGN (24" X 24- Rl- <Bl HC PARKING - VAN ACCESSIBLE <0 HC PARKING 12" X 1B- R7-&n) @ NO PARKING FIRE LANE () DROP orF AREA - NO PARKING ~ PEDESTRIAN CROSSING (r ..... 6. ALL SiGNAGE SHALL INQ.UDE POST STEEL CASING 'MiERE REOUIRED. 30 ALL SiGNS TO BE PLACED 1 B UNLESS OTHER.....SE NOTED. ALL PEDESTRIAN RMlPS TO BE CROSSiNGS OF SIDE WALK. DO NOT ENITR (30' ALL DII.IENSiONS ARE OTHERWISE NOITD. TYPICAL FUU SIZE OTHERWISE NOTED. LEGEND PRa='[RTT LJt( ~lCf'.A" CURB """ BlfUWlolOJS P&'o(:W(H CCJl'tCR[l{ PA.'.OIC"" BTVWtOJS P.. TH rooa: _ ....., PQ.[ POtVl PQ.[ 50"" HAICJIC>>> P ARKM(i ---------u---O------ L L j ~~ '3EGION!-L POND PLANS FO .-.-.ct!!~!=Y PARCITUET Ales- - '-11___ I r~l.1 B1a fLE [ilJ 8 EJ EJ CURB CURB ALL ALL ~ Q) @ 10 ~ lBl <D r U Z:Nl::"TY I UI<E (llP) I Bl -, ~ J ;;or...oiiUlAR Bloor REl AINING WAll. I AN) l -i NE I;':'-;~:... . 5TREt~~~ 2ND OJ ~ .... 0- ~ ~ ~'t ~ o ~ ~ A,,'t OJ . . . ~ ~ ::;' ~I ~, ~, '0, uJ' "'1 ~'l 0.1 ~I It' """ -....\ ,01' l<J1O""\S. DIfnens'G w.....- . 'thIS f:tO;Cl"IfflCf1t may not be used at c.opieO without pr'iot ..,ttet' consen\. Cl <II """......... z ~........... o "OPUSCl t= ~::::ELc. o ,--......... 'J ~... ~1..... ~-"" -........... C! .""U:I \; EXCELS\OR Z CROSS\NGS 0....- U tIQPKl\'IS.l.\N C! ,.nr 111\1 o GRAD\NG pLAN U. \- o Z C5 ~=-~" ;i-~'" =~ 1.l<o;.~ ~utb,N" ~, ~ ~ 6tlU'B1ucUrdeOtWc..~K lOtl ~)I!l5S341 pt,on<' .S~ 93' rm1 .....~ ." US, ...-.&Jso<"- ,......,~'''' Uol-'.... fill"" __ ,.........117 .."....".."".-,..,.,............~'.".. .1J.1~Pr~~.,...,.... \OIdOl...$tO\.oI~ uc.1lO -- "",,-' opus p.rV""'~- EogioeelS. loc. o~1t- .....""'" 11/27/06 - S\'tE plJtN a[VlE'll ~ '> o C! 1P'"' ....-. 0. l.\35_17OO 0. .-. ...... <!. ~~/27/06 )- .-. ....... \- -" _ ",,010''' o , GRAO\NG NOTES ""'.."'"" ",,,,- _ ,,"," .,,,- '"" ",,,- " _ _"" '"" ,_"'"~ rEA"""" ,..... 10 1liE CQIoIMENCEloAENT or $ITE GRAOING THE CONTRACTOR ..",- -.".., .,,,,,, "" [""",,,, " -"..,"" OR VARIAlIOtlS fROM THE pv.NS. ALL ElCISlING U1I\.11'( LOCAlIONS Sl'Io'M'l ARE APPROlCllAATE. CONTACT "GoPtiEQ STATE ONE CALL" (65,_454-00(2) fOR uTIUT"I LOCATIONS. 48 HOURS PRIOR TO EXCAVAlION. CONTIU.CTOl' SI'IAlL STRIP. STOCKPILE A"'O RE_sPRE"O SUfflOE"''t ,oPSOIL TO PRO>'/\O( " \AINIIoIUM 4 INOI otp1li (_",,,,,) 10 "'- """,.EO "[,, 10 " -,0 OR SEEOEO. 1liE $ITE GRAOING oPERATIONS. 'M"lEN COMPLEiEO. SI'IALL RESUI.' IN "'-l "REAS BtlNG GRAOEO 10 "PLAN S1.lBGRAOE ELEVA,ION', 1li15 "PLAN SUBGRAOt ELEVATION" SHALL BE CONSIS1EN' .TI'I 1l'lE GtOltCHNICAl REPORT rOR BUlLOING AND p,,\lEMEMl "REAS. 1liE "PLAN SUBGRAOE ELEVATION" IN THE PARKING lO't AND ORIvE.WA"I AREAS SHAU. BE OEiERloIlNEO 8"1 CHECKING 1liE PA\lEloIENT SEClION PE'AILS '"" "'.- " ,,,,,,, ,..,... rOR .00'- ..' "",,, or VARIOUS p"-\lEIoIENi SECTIONS. ALL sPOT tI.EV"T\O"'S REPRESENT flNISHEO SURrACE OR GlJT1ER LINt GQ,,-QtS UNLESS OTHERWISE NOlEO. HORI!ONT"l SIiE REfER TO 'Slit pv.N fOR CURRENT OIloIENSIONS ANO v.'fOU1. _~G ""...","' """"" " ""'" ...... ~ or I-Ivrt ToP or SPIKE IN 2ND PowER poLE souTH of 2ND S1 N.E. ON WEST $IDE or 1ST ...u.E"I WEST or JIICKSON AVE. S EI.EVA1\~ ~ 91496 rEEl ToP NUT or 1ST tiRE. HyORANl WES1 or JAO<SON "vt. S. ON THt NORiH $lot or EXCEL$lOR BLVD. tLtVA11~ ~ 925.45 fEET @. -:'::J ~ ~ 169 ELEVA'IONS SI'IOV<lN ARE BASEl> ON loINOOT BE.NCHIoIARl<S A2706 "' ,.1'lO 2706 A2 ;$~ oo;-:J:~ LEGEND ~ ,QP(lGR."...c: \Itlll. (OM"'''' _~ __flY ,QP(lGR."...c: (OM1GUI _rP- - - _fl/l.- -- tOGtISIlt1\.... - - - - - - - - pOMll1OCA- ..plL\ItI. - - - =-----= ..,0< C1II'ItlI<"'C - to.. - -....,- _~ 0 0 sPot nJ:Y~"'" " lIDll 00 " eoc oc ""_~ ",oK Jj!!!!. ".-st'Otll ->>- ->>- ""...",t -",--"'- <1>10< BA5'" · · <1>,0< 819' ,.....u.l · · ~1_"",.....s: · 0 fVllEO tllO .. t> fVllEO tllO ., " ". .. .. sa.,rtHCt ~ ----- JIQCll cCNS.....c- t"lll.,.cE tlt05l"" cOlO'1IOo "..-E' ~,""1OI"1IO~ """"",,lOITfIlO~ <:QMl:Jlltt p~'<It"" BENCHMARKS Bioi '1.) ioP NUT Of 2N0 fiRE. HyORANT EASl ON SOUll'l SlOE or 2ND ST. 1'1 E El.tV"TION ~ 92~'0 rE.ET ~ ft\.,.t.. PO'lO \.IMtA Bioi ,2) Bioi 13.) &~:p1p GR ~--------~-------- .A~' .:::..::::-..::.:- - ~ - - - - -,,' -- -..... '. j /- -- ~J \ g-\ -4 d~\ \ " --- \~ :, " \ " . ' . . , ' -\; i l ~ t. i \ r \ i \ i \ / ;~ .:'..#1..... ~ 0, fo .... 0- ~ .\" ~ ~ () ~ ~ ~ Co \ , , ~ -- _,.n- -.-.-.- - ._,,- -"'-- Wr;;' '0' )C 800,1)0 X flOODI 1 D01 ->)- ->>- -IU- -D'- . ~ . .. . 0 ~ t> . It> ~ Wt:::.WNt::,~\~Wi, Of/Y..:00:r.::zhJ ~$;~~~~~il I... C..... '.. . 1 I @ (Q)~QJJ~c Opus Architects & Engineers, Inc. EXISTING --~- ___t;01--- - - - - LEGEND TOPOCR~ ~I C'ONlCkJR lOPOCRAPH< ~I(AJA [OG[ Of'lll(1\ANO POiO HQRWAl ... n [)I1Ot aN""""'( SOL BORIPfC. /''/ ( ________~ L________ L'---l.-J~Rffi - L POND P-LArt- - -\ ~ I I FOR CHI~ARcrrrn=-TNLS _ fu.. ~ L 2ND STReeT He r- I . .-J t~.........,... ~ "'1HU-O !:u~. Ul-D'-&l'J 1_ g~rt~iNMN ~rr;~~ toNCR(l[ PA~\ RLK I lNCORJ'OJI.'\.n:,D ) "-./ I......, ~I..,..,.......... _ ..._eII.,. _.. _ m'.w.cl................. """"'1-'1 =-~l:"-;:I: _ ~~ _ u. [rrol'3. may DCC~ ~ the \tOllsmiuion of eleclrcrW;filt$.lbf:Op.I$c~o'fnot rfsponsible lor 0"7 doims.., dOlTlog" 01' npensrs o,ising oul 01 the ~1hoI;nd 11M of Ihlt irllcrmoliDt'l tonlO:"ld ;" eirdrotlic fil... Electronic filfs may not OCC\ltatel)' ~lect lhlf finol os-buil1 conditions_ 11 i'5 the '~po"sib...t, or the us..- to ...,il, oD 10you'S. d;m.nsions ond oU.,., ,elale" ;"lorma\iOl'\. lhis document ma)' not be u)Cd Of' coPied _ilhout prior written consent. _r_ I (Q)~QJJ~~ OpUS Northwest Construction L.L.C. """"0 EXCELSIOR CROSSINGS PAVING PLAN C6 MinDe-mnh, MN 5534'; Phrmc:. Y52 9331J0r,2 FlU,: 925 9 '*.....dIUnc.ztln'l fCJ:.o...........1tnf ='u: IDolJ-O 11/27/06 - SITE PLAN REViEW 01.1[_ z a I- o :Jl It I- (f) Z a~ o HOPKINS. MN It ~ a lL I- a z ..J ~ > a It lOCO ...-, n. 10(35_7700 Q. PR1.(OMM8IJI ~ ~~/27/06 >- PAlU:O""""'lA I- ..-.. o (9 z o z w n. I DA....IP(T1l[ CATOi BAS- CA101 8~ "'......1 SlQRw tIIlA...o.r flARED [NO f'LAR(D [MJ _/ ... RAP ROOI: ~1MuC11ICH [NfRANC( [R05lON CON111O.. ..........[ H(#.VT DuTT """'..caJS HOfNAl Dun bllu....D.1S CCHCR(lt ~"'''''w(N GRADING NOTES CONTRACTOR SHAll FIELD VERIFY lOCATIONS AND HEVA TIONS OF EXISTING UTILITIES AND TOPOGRAPHIC FEATURES PRIOR TO THE COlotlAENCEIolENT OF SITE GRADING. THE CONTRACTOR SHAll IlAlAED1ATEl Y NOTIFY THE ENGINEER OF DISCREPANCIES OR VARIA liONS FROIol THE PLANS. Blot SUNDE lAND SURVEYiNG. HWY 169 THE SITE GRADING OPERA liONS. WHEN COMPLETED. SHALL RESULT IN All AREAS BEING GRADED TO "PLAN SUB GRADE HEVA TlON" THIS "PLAN SUBGRADE ELEVATION" SHAll BE CONSlSTENl 'MTH THE GEOTECHNICAL REPORT FOR BUilDING AND PAVElAENT AREAS. THE "PLAN SUBGRADE ElEVATION" IN THE PARKING lOT AND DRIVEWAY AREAS SHAU BE DETERMINED BY CHECKING THE PAVEIolENT SECTION DETAilS AND REFERRING TO PAVING PLAN FOR lOCATIONS AND 1I1olITS OF VARIOUS PAVEMENT SECTIONS. TOP OF SPIKE IN 2ND POWER POLE SOUTH OF 2ND S1. N.E. ON WEST SIDE OF 1ST AllEY WEST or JACKSON AVE. S. [LEVA TlON = 914.96 FEET lOP NUT OF 1ST FIRE HYDRANT WEST OF JACKSON AVE. S. ON THE NORTH SIDE OF EXCELSIOR BLVD. fL( VA TlON = 925.45 FEET MNDOT ~ ,-." NORTH '7 l FOR CONTRAC10R SHAll STRIP, STOCKPILE AND RE- SPREAD SUmaENT TOPSOil TO PROVIDE A MINIIolUIol 4 INCH DEPTH (COIotPACTED) TO All DISTURBED AREAS TO BE SODDED OR SEEDED. OR BENCHMARKS ---- CONTACT .GOPHER STATE ONE CAll" (651-454-0002 UTILITY lOCATIONS. 46 HOURS PRIOR TO EXCAVATION. All SPOT ELEVATIONS REPRESENT FINISHED SURFACE GUTTER LINE GRADES UNLESS OTHERWiSE NOTED. HORI ZONT Al SITE BENCHMARKS BM II.) TOP NUT OF 2ND FIRE HYDRANT EAST OF ON SOUTH SIDE OF 2ND ST. N.E. "''''/00 t.. '/1' BIT. BAst. COURSE. C(RWt(D PLAI'll - ..../00, SP[c. 23~ L VNwJ!JOJ~ ~~(:~~~t~S ~ (lOOX CAuSH[D ..../DOl sPEC 2111 ~ RLK , ;::~./' 1-11'1- 1111. -cARTNG COURSE. C(RWI[ - -/UO' SP(c. 2J~ LVWE.!loO~ REFER TO SUE PLAN FOR CURRENT DlIolENSION5 AND LAYOUT. EXISTING TOPOGRAPHY PROVIDED BY ElEVA TION:; SHOVoN ARE BASED ON .0.2706 Al AND 2706 .0.2 :':":~11~S(l';:~~ln"'t( .' ..cc. eAS(, c....ss ~ (100'% (JIll III(CYQ.[D CONCR(tr) ""'Aa C()t.lPAClTO\I NORMAL DUTY HLAVY DUTY p'iiVE'M'EN'f ...../D01 PVMT-O 12. 13. Blot 8' -1 -i J IIIII,l "11111 .::- f f jf ct:::::: --J -_I I l -i POND A ~ ~ POND OJ '0 "- O' ~ ~ ~'" ~ ~ ~ J.../q J...'" l:() . . ~;;"II' ~... ?t~~ !Il'l 1l....1tl'~ ~, Oul....~ ~ 6H\l'lll",,~~~~..\1l\l \,_~I1912 "",92591;1\;3 ......-- - .-.......... .....:=::;~~... -:;,~~r...--- ~ O,,'\f.-- \,lC. tlO--- ~ ,,/21/06 - SlIt ~ R('II(W ~ )> o t! I1!P' ..,-. ~I 0.. \I~]l00 ~'. n ........ ..,-. \PI U- ~, 4. ~/21/o& t; ........ ;.iooIP U.l' )- ~\ r- ........ ...' - ......, .. ~. o -- <!) .EII'''~~~: -7 ~~:7:::-"':::: ~ t.- -:r;::~"'" ~;. ..,.:If""" - p.o. o . \:"::. ~Sl ~::1 ;:~ Z ~.-:;::~~~ \U .::=-",......, """...,t~.,...s Of n c0P<4 .~ ",lOt ...\\1.' <o.....t. ~ Cl .,. ~ ........ \ 5 . orus- _ opUS l'lOl\hwes\ r- conSUUc\ion I..L.C. o :=;;~~.. :> ~... {t........ \- E)<CELS\OR (J) CROSS\NGS Z O~ o~.l/.ll ~1I1Il (t SiORMW1(fE.R "0 POlLUi\ON U. PReJal1\ON plAN ~L C7 ~, 6E.NCHN\AR\($ at.! ,\) 10P tlut ~ 21'10 fiRE ",~~1E E~st . oN SOIJ1\'\ Slot: ~ 2tlO Sl. 1'1. . ELEVAtioN '" 92:5.\0 fEEt 2NO p()'fIE.R pOLE s().l1tl Of 2tlO et.I p.) 1f~. ~":1 SloE ~ \Sl A\.LE'l 'iiE$1 f;Ji J~CKSOtl AVE. S. ELE"AtlON '" 9\0\.96 ~E1 RE ~AN1 'fiES1 f;Ji J~SoN ...,>-1 l~'t':: ~ ,::,... "'" <Yi "",'" "",. (LEVA tlOtl '" 92~.0\~ fEEt "",,_..- ... ....... OK -' --' A2706 #t.\ ~D 2706 />.2 \69 ~eo-- - - ~,,'tlt~ - -" - - ,olll ,.alI'f'L ...UJII.1~ __ -=' -- - "lD 1ll\0l c:D'-- lOb " 000Jl0 _ ..,-oG ........011 gO'I p.t'I~_ .J!If!/- ->>- ~,..oPt _......- _..- s~51- -'"-. ~,.s. .. ::.::~ : ~ stQlOll~ ,.. .. ~ ~ ..1--.... ~; ..v .,.ott01O' ~ f\.OI'EllpCl"/~'fIIifI' ~ !;Ll ~ ~ llO<" ~- D\1R..,cl ~ cGM\1I<L ...-c' ------- Of l'I"fi'l -\ L--------- -------- '- ~ ; ....-------,/ 1'".' ~. i\ ~ \ ; \ 1 \ \1 ~ i\ 1 \ ~ -- ~J'11 \ . 8-\ -4 ~1, ==--:=J \' --- \ \ -\ ........'.) / .... l\ ~ ~ 0- ~ .... C1 ~ ).,. ~ ~ Cl ~ ~ ~ Co \ I , OPUS. Opus Architects & Engineers, Inc. IlIS5I .. .... WIlt == 5SSG-011&1 -... ~~MN It=~ ,--..., RLK I ~mooa..'\'1'ED J "-/ 6110 Blue (:u-dc D~. ~uitc teN) Nmnemnb.. MN 55343 Phone 952 9J3. Q9i2 Fa. 925 933 119 ..ww.uJanc.c:nm . ....,. ...,... ....... - ...... .. - .. ..... ""... ...__ .. .... I _ :...~~~w--- ... 01.1[_ uc. NCl._ ISSllEIIttllOII 11/27/06 - SITE PLAN REVIEW ...J 4: > a r! ...... - c.. M35_77oo c.. """"'- 4: DOlE tl/27/06 >- I'lOItl _ t _sr a """""or CJ . Ernn mDJ oct" in the transmission of __I..ClpoG_..... Z responsible for DnJ' cIoms. darnoqes 01 I!lIptfISeSllI'iUlgoutollbtllNll4horizedua or .. ~tton canIained .. eledrDnic 0 Dos. . Dedrane mes ..., not oc<urolel)o rellOCl the r.nal os-bu.1l cDnCStions. It IS thlo Z respon5l""" Df the- user to verify oJ lapul$. dimensions and other ,etatacl W -- . This document me, not be- used or c.. copied .ithout prior .ritten consent. II .. rigIols .......... r Z -.. a , OPUJS. I- Opus Northwesl Construction l LC. a 1GSS1 .. ..... .... ::> ii: ~DflD r! I'lIO.UT I- EXCELSIOR en CROSSINGS z a IClCAlUl a HOPKINS. !IN r! MtI_ STORMWA TER a POLLUTION LL PREVENTION DETAilS I- C81 a z --.l INSPECTION AND RECORD RETENTION lHE SWPPP. ALl OlANGES TO IT, AlII) IHSPEcnONS AND IIA1NlENANCE RECORDS IIUST BE KEPT .o.r THE SITE OURING CONSTRUcnorc BY THE PERMITTEE WHO HAS OPERAnorcAL CONTROl. CF lHE PORnON CF 1HE SITE. AlL OWNERS IIUST KEEP THE s.-pp ON FIlE FOR THREE YEARS AFTER lHE S\JBIIITTAL CF THE NOlICE or TERIIINAnON. INQ.UDING THE FOLLOWING INFDRIIA nON< lHE PERIIITTEE IIUST IIIPLEIIENT THE SWPPP AND INSTALL BlIP'S IDENTIFIED IN lHE SWPPP IN AN APPROPRIATE AND FUNcnONAL IIANNER. JIDm! :n.!j~ ot&~ri~ ~;.:JlZE SlICR ~ ~1~'tS ;:.r=T~~L~:i ~~ _\'OOT ,. ANY OTHER PERIIITS REQUIRED FOR THE PRCl.f:CT. 2. RECORDS CF ALL IN5PEcnON AlII) IIA1NTENANCE CONllUC1ED DURING CONSTRUCnON. J. ALl PERMANENT OPERAlJON AlII) IIA1NTENANCE AGREEIIENTS lHAT HAIlE BEEN IIIPLEllENTED. INO.UOING AlL RIGHT CF WAY. CONTRACTS. COIIENANTS. AlII) OlllER BINDING REOUlREIIElITS REGARDING PERPETUAL IIA1NTENANCE. .. ALL REOUIRED CALCULA nONS FOR DESIGN CF THE TEIlPORARY AlII) PERIIANENT STDRII WATER IIANAGEIlENT SYSTEIIS. THE PER\IlTTEE IlUST RW1INEL Y INSPECT THE SITE ONCE EllERY 7 DAYS DURING AC1I\IE CONSlRUClKlN AlII) WITHIN 24 HOURS AFTER A RAINFALl EVENl GREATER lHAN D.~ 1N000S IN 24 HOURS. AlL INSPEcnONS AlII) IIA1NTENANCE CONDUCTEO ~G CONSlRUcnON IIUST BE RECORDED IN WRITING AlII) RETAINED IIlH THE SWPPP. THE LOCA nON OF AREAS NOT TO BE DISTURBED MUST BI DELINEATED ON lHE SITE BEFORE DEIlELOPIIENT BEGINS. AlL EXPOSED AREAS WllH A CONnNUOUS POSInllE SLOPE WllHlN 2110 FEET OF A SURFACE WATER IIUSl HAIlE TEIIPORARY EROSION PROTECTION OR PERIIANENT COlIER FOR lHE EXPOSED SOIL AREA. YEAR ROUND. WITH THE fOLLOWING IIAXlIlUII nllES AND AREA CAN RElIAIN OPEN< WHEN lHE AREA IS NOT ACn\lE1. Y BEING WORKED: 1. SLOPES STEEPER lHAN 3: 1 (7 DAYS). 2. SLOPES CF lD:\ TO 3:1 (14 DAYS) J. SLOPES CF lD: 1 OR FLATTER (21 DAYS). RESPONSIBILITIES lHE PROPERTY OYlNER OR CONTRACTOR IIUST SUBIIIT A COIIPLETED NPDES APPUCAnON FORII WllH lHE S<4OO APPuCAnON FEE. lHE OWNER AND OPERATOR (USUALLY THE GENERAL CONTRACTOR) ARE JOINlL Y RESPONSIBLE FOR ALL TERIIS AND CONDlnONS OF lHE PERlIl1. PROPERTY OWNER OR CONTRACTOR TO SUBIIIT NPDES NOllCE CF INTENT PERIIIT 7 DAYS PRIOR TO lHE BEGINNING OF CONSTRucnON. CONTRACTOR 10 SUBIIIT NPDES NOTICE OF TERIIINA nON TO IIPCA WllHlN ONE WEEK CF nNAL RESTORA11ON ACCEPTANCE. CONTRAClOR TO 1I0N11OR AND REPORT ON STORII WATER IIANAGEIIENT REOUIRElIENTS PER lIPCA. I lHE OTY WILL INSPECT SILl FENCE PRIOR TO ANY LAND AL TERA nON. AlL SILT FENCE SHALl BE CONSlRUCTED WllH WOOD OR STEEL POSTS (SEE DETAIL). FOR STORlI WATER DISCHARGES FRDlI CONSTRUcnON PRO.ECTS WHERE lHE OWNER OR OPERATOR OlANGES. THE NEW OWNER OR OPERATOR IIUST SUBIIIT A SUBlllI/lSlON REGlSTRA nON WITHIN SEllEN (7) DAYS CF ANY CF lHE FOLLOWING: T. ASSUIIING OPERA nONAL CONTROL OF lHE SITE. 2. CDlIIIENONG WORK ON THEIR PORnON CF lHE SITE. J. LEGAl. TRANSFER. SALE OR Q.OSlNG ON THE PROPERTY. iitvl5tll1 t-ot ii='ii':"'ii OGN-7 STANDARD DETAILS ROCK ENTRANCE TO CONSTRUCTION SITE CITY OF HOPKINS ..... '" IIIIIIlJ 1. 'M . .... 18(ICM ..oc 1tC tII1DUD FElICE. Uti!. t. DltI1C .... rets IIAD ftlI. CRIUC Id' JJC ODIWfLL Sloe IF 11C 1REJOI'.. ). ... .oe.. 10 1ElllEP1" CIUI1'Y COIIlRV'AlI. DI51lttCr UlDSIIIlt .... SlDIIiIEWJ co.-. ...... WIJIE .oR 111$1 IE: A ...1_ CIF r ItI1'O IIC. GIIUO .... lei _ ....- MOIll ,. .IGIIUL ...... IGIIf'Aa.. .... La' WI IlL' FDICl CII bit: UPMIU. SIDE aGe M f'DItE'LIRE. .., 11m "ILl.. a. __..".". sPMSD .. 10 . fHY WMT IF _1I11t ICSW IS tat usa " ..... till ,..Ie.. II' ... IESlIt IS U5D 1'0 ,..,.., N ,,,,Ie snn. ..,. ..... PACO aft 10 . fEEl _1IfI. ... ...... ....,.IJIC'Z ~ID ~ IS ur-'ISllDt. RECORDS SHOUlD INQ.UDE: \. DATE AND 1lIIE CF INSPECnorcs. 2. NAIlE CF PERSON CONOUCllNG INSPEClJON. J. FINDING or INSPECnON INQ.UIlING CORREcnllE AC1ION. DETAILS OF CDRREcnllE ACTION (DATE. 1IIIE. PARTY COlIPlEnNG IIA1NTENANCE) 4. DATE AND AIIOUNl CF RAINFALl GREATER lHAN O.S 1N000S IN 24 HOURS. 5. DOCUMENTAllON CF OlANGES TO SWPPP. IN AREAS CF PRCl.f:CT WHERE ANAL sTABlUzAnorc IS COoIPI..ETE. INSPECnONS CAN BE REDUCED TO ONCE A IIONlH. INSPEClIONS CAN BE SUSPENDED DUE TO FROZEN GROUND CONOInONS UNTIL FIRST RUNOFF OCCURS OR CONSTRUCnON ACnl/lllES RE5UIIE. NOTICE OF TERMINATION PERIIITTEES IIUST SUBl/IT A NOllCE or TERlllNAlJON (NOT) WITHIN 30 DAYS IF ONE OR IIORE CF THE FOllOWING CONDITIONS HAIlE BEEN MET: 1. fINAL STAIlIUZAnON HAS BEEN ACHIEIlED ON ALl PORTIONS CF lHE SITE FOR WHlOl PERIIITTEE IS RESPONSIBlE. INQ.UDING lHE IlOIOVAL CF ALl TEllPORARY IIEASURES SUOl AS SIll FENCE. %. ANOlHER OWNER HAS ASSUIIED CONlRllL OIlER ALL PORTIONS CF THE SITE lHAT HAIlE NOT AOlIEVEIl FINAL STAIIIlIZAllON. J. IN 1HE CASE or RESlDENllAL CONSTRUcnON. TEIIPORAIlY EROSION PROTEcnllN AlII) DOWN GRADlENl PERIMETER CONlRllL FOR INDlI/lDUAL LOTS HAS BEEN CClllPU:TED AlII) THE RESIDENCE HAS BEEN TRANSFERRED 10 1H[ _EOWNER. AlL EROSION CONTROL IIEASURES IIUST BE INSTALLED AND IIA1NTAlNED ACCORDING 10 THE DETAILS INQ.UDED IN lHE CONSTRUcnON DOCUIIENTS. ALL SILT MUST BE REIIOVEO FROU SIlT FENCE WHEN IT REAOlES A HEIGHT EOUAL TO ONE-THIRD CF lHE HEIGHl CF lHE SILl fENCE. lHE CONTRACTOR IIUST PERFORII ANY CORRECTJ\IE IIEASURES ORDERED BY lHE OTY, LOCAL COIlERNlIENT UNIT, OR IIPCA WITHIN 2. HOURS OF SUOl NOnCE. THE CONTRACTOR SHAlL ALSO PLACE ANY ADOITIONAL EROSION CONTROL IlEASURES DEEIIED NECESSARY BY lHE OTY OR IIPCA WITHIN 24 HOURS or NOnCE. AlL IlEASURES IIUST BE REPLACED OR REPAIRED WllH lHE APPROVAL CF OTY. AND MPCA. WHEN lHEY BECOIIE NONFUNCnONAL. lHE OYlNER IIUST IDEN11FY A PERSON KNOWlEDGEABLE AND EXPERIENCED IN THE APPLICA liON OF EROSION PREVENTION AND SEDIIIENT CONTROL BIIP.S WHO WILl; I. OVERSEE THE IIIPLEMENTA nON or lHE SWPPP 2. OIlERSEE lHE INST AlLA lION, INSPEcnON AND IIA1NTENANCE CF EROSION PREVENnON AND SEDIMENT CONTROL BIIP'S BEFORE AND DURING CONSlRUcnON. ORANGE POI. Y SNOW FENONG IIUSl BE PLACED AROUND AlL NATURAL FEATURES lHAT ARE TO BE PRESERVED. THIS INQ.UDES ALl TREES. WElLANDS. SLOPES. ETC. IN LOCA nONS WHERE PlACEIIENT CF PROTEcnON FENONG COINODES WITH lHE PlACElIENl CF SILT FENCE. lHE TOP PORnON CF lHE SILT FENCE IIAY BE PAINTED ORANGE AND CAUnON RIBBON IIAY BE INSTALLED IN ACCORDANCE WllH THE DETAIL PROVIDED IN THE CONSlRucnON SPEOFlCA nON. RIBBON IIUSl BE IIA1NT AlNED AT ALL TillES IF THIS AL lERNAnllE IS TO BE USED. CONTRACTOR 5HAU. BE RESPONSIBLE FOR KEEPING EXISTING PAII!:D SURFACES a.EAN CF SEDIIIENT BY STREET SWEEPING ROADWAYS WHEN A SlGNlnCANT ACCuIlULA nON OF SEDllIENl OCCURS ON THESE SURf ACES. ANY SEDIIIENT TRACKED CFF - SITE IS 10 BE REMOVED WllHlN 24 HOURS. SWEEPING IIUST ALSO OCCUR WHEN DIRECTED BY lHE OTY. CONTAC' PHONE lHE OWNER IIUST IDENnFY WHO WILL HAIlE lHE LONG TERII RESPONSIBILITY FOR LONG 1ERII OPERA nON AND IIA1NTENANCE CF lHE PERIIANENT STORII WATER IIANAGEIIENT SYSlElI AND DEVELOP A OlAlN CF RESPONSIBILITY WITH ALL OPERA TORS ON lHE SITE TO ENSURE THAT THE SWPPP WILL BE IMPLEMENTED AND STAY IN EFFECT UN11l FINAL STAllIUZAnON AND SUBlIllTAL Of THE NOT. PERIIITTEE IIUST ENSURE FINAL STABlUZAlJON CF lHE SITE AlII) SUBlolIT lHE NOT WllHIN 30 DAYS CF FINAL STAlllUZAnON. FIr.AL STABllIZA liON CAN BE AOIIEVEIl IN 1HE FOLLOWING WAY: 1. ALl SOIl DISTURBING ACnl/lllES ARE COIIPlE1E AlII) A UNIFORlI PERENNIAL IlEGETAnllE COlIER WllH A DENSITY CF 70S OVER lHE ENTIRE PERI/lOOS SURF ACE HAS BEEN AOtIEIIED INQ.UDING: - STABIlIZA nON or DlTOtES AlII) SWAlES. -REIIOVAL or ALl TEllPORARY S\'NTHEnc AND SlRUCTURAL BIIP's. -REIIOVAL CF SEDIMENTS FROII SlORM WATER CONVEYANCES AND PERIIANENT WATER OUAUTY BASINS. FOR RESlDENnAL DEIlELllPIIENTS. FINAl. STAlllLIZA lION HAS BEEN AOtlEIlED MIEN: - TElIPORARY EROSION PROTEClJON AND DOWN GRADIENT PERIMETER CONlROL FOR INllI1IlDUAL LOTS HAIlE BEEN CDlIPI.E1ED. -lHE RESIDENCE HAS BEEN TRANSFERRED TO THE HDlIEOWNER. THE PERIIITTEE IlUST DlS~TE THE IIPCA 'HCIIIEOWNER FACl SHEEr TO THE HlIIIEOWNER. lHE CONTRACTOR IS TO PlACE A THREE fOOT WIDE STRIP CF SOlI BEHIND lHE CURB FOlLOWING BACKFILLING TO PREIlENT EROSION IN lHlS AREA. lHlS INnLTRAnON/fILTRAnON SYSTEIIS SHOUlO NOT BE EXCAVATED TO FINAL GRADE UNnL THE CONTRlBUnNG DRAINAGE AREA HAS BEEN RJlL Y STAIlllIZED. CONTRACTOR TO PROVIDE SIll FENCE PROTEcnON AT ALL CA lOt BASIN INLETS (SEE DETAIL). EROSION CONTROL BLANKEl SHALL BE INSTAlLED ON ALL SlOPES 3:.1 OR STEEPER. TEIIPORARY AND PERIIANENT SEDlIIENTATION BASINS lIUST BE DRAINED AND SEDIIIENT REIIOVED ONCE lHE SEDlIIENT COLLECTED REAOlES ONE-lHIRD lHE STORAGE VOLUIIE WllHlN 72 HOURS. AS FIELD CONDITIONS ALLOW. AlL SEDlIIENl DEPOSI1S WllHIN SURFACE WATERS IIUST BE REIIOVED AND RESTABlUZED WITHIN 7 DAYS CF DISCOIlERY. INClUDES DELTAS AND STORII SEWER SEDIIIENT DEPOSITS. CONTACT PHONE REQUIREMENTS THE PERllJTTEE lIUST ......END lHE SWPPP AS NECESSARY 10 INQ.UDE ADDlnONAL REOUIREMENTS. SUOl AS ADDlnONAL OR IIOOIFlED BlIP's, DESIGNED TO CORRECl PROBlEIIS IDENTIFIED OR ADDRESS SlTUA nONS WHENEIlER: \. lHERE IS A OlANGE IN DESIGN. CONSTRUCTION. OPERA nON OR IIA1NTENANCE. 2. WEAlHER OR SEASONAL CONDlllONS THAI HAil!: SIGNIFICANT EFFECT ON DISOlARGE. 3. INSPEcnON OR INllES11GAnON BY SITE OPERATORS. LOCAL. STATE. OR FEDERAL OFFIOALS INDICATE THE SWPPP IS NOT EFFEC1I\IE. . 4. lHE SWPPP IS NOl AOtIEI/lNG lHE GENERAL OB.ECnVES OF CONTROlUNG POllUTANTS OR THE SWPPP IS NOT CONSlSTENl WllH lHE TERUS AND CONDITIONS CF lHlS PERIIIT. 5. THE IIPCA DE1ERIIINES lHAT DISCHARGE III. Y CAUSE OR CONTRIBUTE TO NON-A11A1N11ENT CF ANY APPliCABLE WATER OUAl.ITY STANDARD OR THE SWPPP DOES NOT INCORPORATE THE REOUIREllENTS RELATED TO AN APPROVED 10TAL IIAXlIIUII DAILY LOAD (TIIDL): lHE RllNCFF FRDlI lHE SITE DISCHARGES TO AN IIoIPAlRED WATER WHlOl HAS AN APPROIIED TIIDl AND HAS NOl BEEN PROPERLY DE1A1LEO IN THE SWPPP. SEQUENCE OF CONSTRUCTION (RECOIIlIENDEO SEQUENCE - CONTRACTOR 10 DE TERIIIN[ FINAL SEOUENCE.) CONTRACTOR TO VERIFY lHAl ALL PERIIIIS HAIlE BEEN OBTAINED. CONTRACTOR TO SOlEOUlE FIELD IlEETlNG WllH OTY OR LGU AND/OR WATERSHED. DURING EXCAVA nON. SEDIIIENT AND EROSION CONTROL DEI/lCES SHOULD BE U11LIZED TO PREIlENT SEDllIENTAnON AND lHE AREA IIUST BE STAKED OFF AND IIARKED SO lHAT HEAVY CONSTRUCTION EOUIPIIENT WILL NOT CDlIPACT lHE SOIL. ALL INFlL TRA liON AREAS IIUST BE INSPECTED TO ENSURE THAT NO SEDIIIENT FRDlI ONGOING CONSTRucnON IS REAOllNG lHE INFIL TRA liON AREA. SlORII WATER PONDS. SEDllIENT BARRIERS AND OTHER IIEASURES INTENDED 10 TRAP SEDIIIENT ON-SITE WILL BE CONSlRUCTED AS A FIRST STEP IN GRADING. AND WILL BE IIADE FUNcnONAl BEFORE lAND DIS1URBANCE TAKES PlACE UPSLOPE. EARTHEN STRUCTURES SUOl AS D......S. DIKES AND DlIlERSlllNS IIUST BE SEEDED AND IIULOtED WllHlN 48 HOURS CF INS1ALLA liON. unuTY AlII) PAI/lNG WORK WILL CDlIlIENCE UPON COIIPLETlON CF THE GRADING OPERAnONs. AlL EROSION CONTROl. IIEASURES AND PROTEcnllE FENONG IIUST BE INSTALLED AND INSPECTED BY lHE OTY OR LOCAl. GOVERNIIENT UNIT PRIOR TO BEGINNING CF ANY GRADING. Al:.vJ5tDt 9-Ol I~ DGN-5 STANDARD DETAilS SILT F~HCE DETAIL CITY Of HOPKINS -." ~ ~rabI& ec~aCY EDl'1: p:OW1o1eu . Itzll_t......:f~....c ~.o.= Ills =- t#II1 to r:.,;d.h>.Il:acslPIQl ;;-E::;E~::" ~~~~~7~ :;d"::"::'~'':__fj/_/': ~~".;,,":.,..... t- "trr '1 _9':v......u 80:. c r_g pII !f ~ '""_......ID. =~ ~ ':"':IDX -1 ......_fIII ~~ . III' I."': .\. ,\. ...-.-- I =a!/':'::::- c'.': \ ~ '-, '. .11(........, . II- ;',-=,~ ===1 l'::brF*l~ ~ f;.R=tlla. ~~... t,-:..Iiw."rn_ lIClI~widI .. .......t:IpICII:J :~~.:;:.;~ Ln ~ ofhmaL ~~':':DC c.a:il1 =1 GRADING I r--. -~ l I~ GRADING ,;--- GRD-18 2r 1"""-'SAFt SEllIwEHT RI.X.::sa GRD.1'" 'NfllASAr[ 2" . J' DEIIRlS I RLK -~ CONlRCX.. 8~R-DG . - ---. ~ a · CCUECDON DE\tCt -- .n FOR USE ..1M OITCH CRAT[' alLET CAS11NCS '~ .... ....-.. .......J -- CONTRACTOR TO INSTALl ALL PERIMETER SEDIllENT CONlRDL DEI/lCES, CONSlRUClJON ENTRANCES, AND PROTECnllE FENONG FOR TREES. DITCHES. AlII) EXl5nNG WATER BODIES AND AREAS TO REIIAIN UNDISTURBED. CONTRAC1OR TO CONSlRUCT STORM WATER AND/OR 1OIPORARY SEDIMENTA liON BASINS. CONTRACTOR TO CONTACT OTY OR lGU NfO/OR WA1[RSHED FOR APPROVAL CF SEDlllENT CONTROL DEI/lCES. CONTRAClOR 10 RWGH GRADE SITE AlII) INSIALl U1IlInEs. CONTRACTOR 10 INSTALl TElIPORAIlY EROSION CONlROL DEI/lCES AS NtCESSARY. CONTRACTOR 10 All TE..-oAARY SEIlIUENTAnorc IASlNS. CQlIPAcnNG 10 SPEOFIED DENSlT1l:S. REllOIIE ALl UNSUITABLE SEDIIoIENT PER RECOIIIIENDAlJON CF GEOTEOtHICAL ENGINEER. 2. J. 4. ~- I. 7. SEDIIIENT CONTROL DEI/lCES IIUST BE USED TO MINllIlZE SEDIMEN ENTERING SURFACE WATER, INQ.UDING CURB ANO GuTTER AND STORII SEWER INLETS. HE 1IIIlNG AND INSTAlLAnON CF SEDlIIENT CONTROL DEI/lCES CAN BE ADJUSTED TO ACCOlllIllllATE SHORT TERM ACTlI/lTIES SUOl AS ClEARING AND GRUBBING. ALl STORII DRAIN INLETS IIUST BE PROTECTED WITH BliP'S ROCK CONSTRUCTION ENTRANCES OR EOUIVALENT SYSTEII IIUST BE USED 10 IIlNIIlIZE TRACKING FRDlI SITE. If lHE DOYoN GRAIlIENl TREA TIolENI SYSTEII SWPPP IIUSl BE AMENDED.. ALL DOWN GRA!lJENT PERIIIETER SEDllIENl CONTROLS SHOULD BE IN PLACE BEfORE ANY uP GRADIENT DISlRURBANCE BEGINS, AND IIA1NTAlNED UNnL FINAL STAlIIlIZAnON. OVER LOADED. IS RESPREAD TOPSOIL AND ES1ABlISH TURF ON ALL ROUGH GRADED AREAS OTHER THAN lHOSE DESIGNATED FOR PADS. BlTUIIINOUS, AND CONCRETE WITHIN 4B HOURS AFTER COIIPlEllON CF EARTH 1I01/lNG. GENERAL AREA SEED 1I1X: IINDOl SPEC. 3876.2 1I1XTURE 1308. IIULOt: lINDOT TYPE \ DISC ANOtORED, 2 TONS PER ACRE. FER1ILJZER: CDlIIIEROAL 10/10/10 (PHOSPHATE lIl1lTED TO NO IIORE lHAN 400 LBS. PER ACRE) AND CONTRACTOR 10 FORlIULATE A PLAN TO ADDRESS ANY ACOOENTAL DISCHARGE CF POlLUTANTS OR POTENTIALLY HAZARDOUS IIA TERlAlS. THIS PlAN SHOULD INQ.UDE CONTAlNIIENT, CONTRACnNG CF LOCAL AND STATE AGENCIES. IIlnG4l1ON AND IlISPOSAL. RESPREAD TOPSOIL AlII) ESTABLISH TURF ON ALL nNAL GRADED AREAS W1lHIN 72 HOURS AFTER COIIPLETION OF FINAL GRADING GENERAL AREA SEED 1I1X: IINOOT SPEC. 3876.2 IIIXTURE SOB. IIULOt: IINDOl TYPE 1 DISC ANOlOREO, 2 TONS PER ACRE FERnllZER: CDlIlIEROAL 10/10/tO (PHOSPHATE lIl1lTED TO NO IIORE lHAN 4110 LBS/AC) CONTRACTOR TO DISPOSE OF AlL TRASH AND POTENTIAllY HAZARDOUS IIATERIALS IN ACCORDANCE WITH LOCAL. STATE. FEDERAL STANDARDS. CONTRACTOR 10 INSTALl SUBBASE AND IlASI: fOR PAVEIoIENT. CONTlIACTOR 10 INSTALl B1TUlIINOUS SUM Aa. CONTlIACTOR TO INSTALl EROSION CONlRllL 8l._ETS WITH PC""ANENT SEED I0Il](. ONCI: AU. DISTURBED AREAS HAIlE BEEN STAlllLIZ'ED, OBTAIN """'OVAL FRDlI THE OTY ENGINEER ANO WITHIN TWO WEEKS CF rlNAL STABltlZA norc. L I. ID. I. DEWATERING Acnl/lnES THAT IIAY HAIlE SEDIMENT-LADEN DISCHARGE IIUSl DlSOIARGE INTO A IEIIPORARY OR PERIIANEN SEDIIIENTA1ION BASIN WHEN POSSIBLE. OlHERWlSE IT IIUST BE DISCHARGED THROUGH SOliE fORII CF BliP. HAVE APPROVED ENERGY lHE CONTRACTOR SHALL COMPlETELY REMOVE ALL TEIlPORARY EROSION AND SEIlIIIENT CONTROl IIEASURES UPON ES1ABlISHlIENI or FINAL IIEASURES AND SITE STABILlZAnON CONTRACTOR SHALL OllEREXCAVA1E TElIPORARY SEDllIENl POND 8011011 IF POOR SUBSOILS BECOME SA TURA TED AND REPLACE WITH COIlPACTED FILL MATERIAL PER REOUIREMENTS OF GEOTEOlNICAL REPORT. ALL OUTfLOWS FRDlI BIIP.S MUS DISSIPATION SUOl AS RIP RAP. IIA1NTAlN ALL EROSION CONTROL ITEIIS. ROIOIIE ACCUIIULATED SEDIMENTS. Q.EAN UP IIUD TRACKED FRDlI lHE SITE ON 10 ADJACENT STREETS. AlII) CONTROL OUSl (PER IINDOT SPEC 2130 AS NECESSARY TO ELllIlNA TE SlGNlnCANT DUST PER REOUIREIIENTS OF ENGINEER. O""'ER, AND/OR OTY, UNTIl. suOt TIllE AS lHE ENGINEER HAS ACCEPTED lHE WORK. CONTROL IXI/lCES IITHIN lWO nNAL 30 DAYS CF CONTRACTOR TO REIIOVE SEDIIoIEN WEEKS CF APPROVAL IUIUII NOTICE OF TER....NA nON WllHlN SIA11l.IZAnON. 12. 13. TEIIPORARY SlOCKPIlES IIAY BE LEn ON THE SITE FOR USE IN BACKRll REPLENISHMENT. STOCKPIlES IIUST HAVE SILT FENCE OR OlHER EFFECTIVE BIIP"S TO CONTROL RUNOFF. STOCKPILES CANNOT BE PLACED IN SURFACE WATER CONII!:YANCE OEI/lCl:S (CURB AND GUTTER, SWALES OR DITOlES). TOPSOIL W1U BE RESPREAD PROGRESSIVELY AS lHE GRAIlING WORK CONTINUES- IF STOCKPILES ARE 10 RElIAIN FOR IIORE lHAN 60 DAYS. TEMPORARY SEEDING IIUST BE PLACED. I ~ , OPUS. Opus ArchitectS & Engineers. Inc. ,- .. ... ... =.: 5SMJ..41tO -.. g~~MW ~=~ ~\ R.LK ''J' 6110 Blue Cudc Orne" Suite 100 Nannctcab.)IN 53)43 Pbnae: ~52 4J33I)972 fU'Y23 9331153 __.dbnc: mm .~-IiIr......... -~~ - - ..... .. ~ ........ .... ... I _ ~:,~~~--- LlC.1IO._ - REVIEW ...I ~ o fY :;_0;: ~ a. PIQa1 um ~ a. r-1[ N <( 11/27/06 ~ PllDmtMJWOl ~ >- .... ~ t: omED Br ~ () . rrrors ftIaJI Ota.r in the transmission af C) _lles.llleOpus...............noe .......... I.. ..., ........ ........ .. npensa orising: ouI of 0. lIflauIhoI'iftd \R Z ~M ftDl'lNlIion toI'Ilai...s ift eleclrone - . Electronic mes rnDJ not DCCU'atel) relied O the rlllQl as-buill c:DnCR.ons. tl is the- ~ or 'he- UMf to "er:ly 01 Z ~ IM'Ieftsions ond other relDtecl W . ~~= ;;: ::'.:: ~HtI~ a. 0 .. "ghIs --- I Z -... o 'OPUS. ~ ~~~.C. () 111!SO' .. ... ..... ~ =.: s.sstH1.. ...J m-....... ... fYPIllm f-CfJ EXCELSIOR Z CROSSINGS O~ () HOPKINS. PolK fY HEr 1IIl1 o SANITARYSEWERI U. WATER MAIN PLAN f- r;ro = o C9 z DAlE_ 11/27/06 SITE PlAN LEGEND ~ ~ PIlClPIJIT'tLH: ---- - - - r_'LH: --------- --------- .. _....SE_ ->- ->- ~-- --:::c-;:::: == ~== ==~== ~=-;:-u -~-- -~- - DltAlNaE -;"- -D1'- ba ~: ::: IWeKI.E : : S1llIIIl ......u . 0 f1.MED DCl .. I> f1.MEDDClW/_RAP . ., WAtERYAII -1- - J- __'W/V"'>I[ .. _ GAl[ YAL'C ... ... POST ItDCt.nR YAI..'tlE: . . GAS"", -uc- -1lG- 0CFIt€AD ELEClRIC - CIl- - C1(- UICJOIGRCMrG ELEC1RC -w - -1Il- CM!Rt€AD CAIU 1EarttSICIII -..- -O'b'- UICJOIGRCMrG CAll.[ 1ELE\'ISI(III -....- -ufto- NllCAD 1D.EPHCJrIE -. - - It- UICJOIGRCMrG l'E\D'HQIC - VI - - u1- FIBER CP1IC' 'IELEPHGNE -lID - - RI- POIIlR PIll! .... .... UTILITY NOTES CONTRACTOR SHAlL nELD VERIfY lOCATIONS AND ELEVATIONS OF EXISTING UTILITIES AND TOPOGRAPHIC FEATURES PRIOR TO lHE COMMENCEMENT OF SITE GRADING. THE CONlRACTOR SHAll IMMEDIATELY NOTIry THE ENGINEER OF DISCREPANCIES OR VARIAllONS mOM THE PLANS. All EXISTING UTIUTY LOCATIONS SHO\\IN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CAlL" (651-454-0002) rOR UTILITY lOCATIONS. 48 HOURS PRIOR TO EXCAVATION. WATER MAIN. SANITARY SEWER'" STORM SEWER CONSTRUCTION SHAlL CONrORM TO THE CURRENT EDITION or 'STANDARD SPEOnCA llONS rOR WATER MAIN AND SER\IICE UN( INSTAllATION AND SANITARY SE~ AND STORM SEWER INSTAlLATION" AS PREPARED BY THE OTY ENGINEERS ASSOOATlON OF MINNESOTA. CATOt BASINS AND MANHOlES IN PAVED AREAS SHAll BE SUMPED 0.04 rEET. All CA TOt BASINS IN GUTTERS SHAlL BE SUMPED 0.15 rEET PER DETAILS. RIM ELEVATIONS SHO\\IN ON THIS PlAN DO NOT REf'lECT SUMPED ELEVATIONS. ER TO SITE PlAN rOR CURRENT HORIZONTAl DIMENSIONS I LAYOUT. WATER PIPE TO BE DUCTILE IRON PIPE (D.LP.) Q.ASS 52 ESS OlHERWISE NOTED. nRE HYDRANTS SHAll BE LOCATED 5 rEEl BEHIND BAO< CURB UNlESS OTHERWISE NOTED. 2.5' 10 169 TOP or SPIKE IN 2ND POWER POLE SOUTH or 2ND ST. N.E. ON WEST SIDE OF 1ST ALLEY WEST OF JAO<SON AVE. S. ELEVATION = 914.96 rEET TOP NUT or 1ST nRE HYDRANT WEST OF JAO<SON AVE. S. ON THE NORTH SIDE OF EXCELSIOR Bt YD. ELEVATION = 925.45 rEET ELEVATIONS SHO\\IN ARE BASED ON MNDOl A2706 A1 AND 2706 A2 BENCHt.tARKS 1 1 o 50 100 r--_ , SCAlE IN EEl HYDRANT CONSISTS OF: HYDRANT. GATE VAlVE, IP WAlERMAlN AND ANY HYDRANT EXTENSION. t EXTENSIONS SHAll BE INODENTAL A MINIMUM or 18 INCHES OF VERTICAL SEPARATION AND rEET OF HORIZONTAl SEPARATION IS REOUIRED rOR All UTIlITIES. UNLESS OTHERWISE NOTED. AlL SANITARY SEWER PIPE TO BE POlYVINYl CHlORIDE PIPE (P.V.C.) SDR 35 UNlESS OTHERWISE NOTED. CONTRACTOR SHAlL MAINTAIN AS-BUILT PlANS THROUGHOUT CONSlRUCTION AND SUBMIT THESE PLANS TO ENGINEER UPON COMPlETION OF WORK. orHWY BENCHMARKS BU I' TOP NUT or 2ND r1RE HYDRANT EAST ON SOUTH SIDE OF 2ND ST. N.E. ELEVATION = 923.10 rEET 12. 13. 8M BM .1/ 1~' 1 J I !!) / rJ/, I I ' I" -- .. H' -1 -1 :=!J 0} ~ 0- ~ ~ ~~ ~ ~ ~ ~ G) I I , (Q)PllJS. Opus Architecls & Engineers. Inc. ~~MNMN 1== ,"", RLK ''=/' LJC.1IlI._ J ....., C1W1ifr ... .. __ .. ...... ~ _ _ ..... .., 6at ......... .... ..... J_ :...~~~r.,..-- ... 0.1[_ 11/27/06 - SITE PlAN REVIEW .J ~ > a D: ___ C. 10135_7700 C. FIlIl.IO_ ~ ~/27/06 r FIlIlm__ I- _or (3 OUXID .. , n . EmNs mGJ' oct... in- lhf Itonsmis:sioll al V oI!drlrit _ lI>t Opos ........... ... not Z rnponsiblr lor DnJ doirns. damageS or ~ird=:' :,:,.,--:-.:::: - Iles. o . EIecIIonic GIos ..., "'" octvolelJ _ the JinaI as-buitI conc5ttOf'lS. ft is. the Z respcIf'$~ 01 the user let "er;J7 all IoJoul$. dimensions 0ft4 other rdoled W . ~umcnt may not be used or C. copied _"thou. prtof' .aten consent. O"righIs_ btinncmnb, MN 55J.I3 Pbnac ';Z9D I",~ fu, '2"33 w.....dkmc.mm lI3S .. ~ ... == !DG-In" -.. STORM SEWER STRUCTURE SCHEDULE SlRUCTURE 1RUC1\JRE s CASTING M1SCEU.ANEOUS NUMBER 1OlA.) TYPE NOTES FE5-1oo - - 3Ii OIAYElPt WI 1R~..z:o C8IoIH-110 60 R-3067 - CB-lIl 2X R-3067 - SNH-I20 60 R-1733 - C8IoIH-I30 60 R-3067 - C8IoIH-I40 60" R-3067 - CBIllIl-l41 411 R-4352 - C8IoIH-I50 R-3067 - C8IoIH-'6O R-3067 - ca.IH-170 54 R-2501 - CBIIII-'71 48 R-4352 - CBIolH-1SQ 54 - I - CB-181 2X3 R-3067 - C8IoIH-I90 411 R-3067 - CB-191 2X3 R-3067 - FE5- 200 - - 2< ./~:O S1UIl-210 54- R-1733 - ClIUH- \I 48 R-3067 - CB-212 2X R-3067 - - 3 2 - I - C8IoIH-230 48 R-25Ol - CB-240 2X R-3067 - fES-300 - - 2.t DAUElER ./~:.m 5lUH-310 60- R-3067 - CBUH-311 48" R-3067 ca.IH-312 48 R-3067 CB-313 2X3 R-3067 - CBIIH-314 48 R-3067 - CB-315 2 R-3067 - CB-316 2'X$' R- 3067 - CBIIH- 320 :or R-3067 CIlllH-330 :w R-3067 - 5111H-340 :or R-1733 - CIIUH-3S0 :or R-3067 - C8IoIH-J60 :w R-3067 - 5111H-370 :or R-173J - CBIIH-J80 :w R-3067 - CB-390 :!!: R-3067 - FES-4oo - - 24 DMEIDI ./~:O SlUH-410 S4"" R-173J - OS-4n ~ HMlA - FE5-412 - - ' ...... ./.v:~:=o ca....-420 :or R-3067 - C8IoIH-421 4ii"" R-3067 - 05-422 ~ HMI.'" 5 - FE5-42J - - 12 DtMIElER ./~ S1IIH-430 ~ R-I73J - 1O-4JI - - S:;~~ I - - 4ii"" R-1733 - ~==:: I 4ii"" R-3067 - 4ir R-1733 OS-461 I ~ H"ALA 5500 - FE5-462 I 12 QlMlE1[R ------.J - - ./~:o 5111H-470 ' 4ii"" R-3067 - ~ 4ii"" H"ALA - os:48Oi ~ R-4342 - rES-SOO i JIi [lAMETER - - w, ~:o - yj DAUEtER FES-5'O I - - ./~:O lInET-6llO 4ii"" R-4342 5iiii=6iD 4ir R-4352 ~ 4ir R=i342 SlMH-710 4ii"" ii=m2 iiiii:fi='8OO 4ii"" iHJ42 5lUH-810 4ii"" R-4352 ~ 4ir R-4342 5111H-910 4ir R-4352 lUnET-IOOl 4ii"" R-4342 S1IIH-1OIO 4ii"" R-4352 lUnET-nOC 4ir R-4342 S1llH-1Il0 4ir R-4352 05-475 s' , Ii 1 ~, , }I [l]'[ rH 11- 8" !:. -, -- . 81 -, -r ~J j J ;. ~ EESHEETC10FOR~....... r:....~AI~~CELDET. -~ --a-a, . 12!.-2 --...--_._ SN 00. >>-"=L->. >>->~Ea : " ~ "" ~"f ~ ~ I ~ C10 t Z ~ -.. a ~ OPUJs. i= gg:~~.c. () 1a3.W .. ... .... ~ == 5SMS-O\11 ..J- 1U.....sa ... D:>em I-C/) EXCELSIOR Z CROSSINGS o t_ o HOPKINS, MN 0: 9<ET 1IIt( a STORM SEWER lL PLAN I-r;;; a z NTS ~ ,...... NORJ71 ~ l o 50 '00 ~ , SCAlE IN rEET FEATURE POND OUTLET STRUCTURE- LEGEND ~ ~ _"UOC ---- - - - EASE>I[N1 uoc --------- --------- SW'TAII"f... ->- ->- SANTAII'Y'CIICDIMI -..- - n._ SEPnc2... -.. --------- --------- SAN..... "-.I . 0 SlCIIN SE." ->>- ->>- DRMnu: -Dt- -Ot_ CAIOO _ . II CA10t __ tuMICll . . SIC1R11_1 . 0 J\.AllEOEIG ~ l> flARED EIIO ./ _ _ .. It> WA'JERWMrt -t- -(- .... H_r ., "'*..: ... ~ CAlt v....W "' N POST NJlCA1011 ".-c . . CAS.... -c_ -uc.- OVEAlCAIIWC_ -..- -Clt- utCJ(ACRQJfC) 1,"_ - \It - - Ul- 0VEAt€AD CAaI .U"'" -1IIItY_ -on._ UlCJ[ACACIJtG CAiaC 'IU\I9OI -.....- -u-.._ CJ\l(-':AD~ -.r- -crr- UtCIERCROJNO tn.cflMOC - UI - - IIT- FlS(R OP'AC 1I'~ -"0- - '0- POIll(JI PO.! ... ~ ALL UTILITY NOTES. SHEET C8 rOR REF'ER TO NOTE \ \ NOTES REFER TO AI.TA/"C$lIo 1."''10 iln.E suRVEY fOR COloIPLEiE EXIS'TING CONOlllONS- REfER iO SHEET 2 fOR Rt.-ovAl. NOiES ",",0 lEGEND. ~ ~ .~ ~ - NOTES REFER TO SHEE'T 5 FOR GRfIDlNG NOiES ",",0 LEGEND. REfER 'TO SIiEE'T a FOR u1\\.I'T'( NOiES AND LE:GENO. - \ [~~ o 0 "S 111 e>SE WJRSL. ctRnr1Ell .......' ...,00' Sftt. 23SO ,~)08 4" IdJ. ~ 0.- 5 I..... tll\Iso1EIl oR IttC'fO.tll~1f.l ",,/'>0' 9<< 22\' ___Ad: ~"'1lON ~ ---=: ~ ..%:~ lll~""" sEt1lON '0' ~;;; - 1 -e::r opus Archi\eclS &. Engineers. \nc. .....--..... ~:-" ~~ \=~ ~ ~ 6'W llluc c..oe p,;.e,:;W'" 1\)U ~fdN;;:l4; \'bnO"9!l29;)fl9"'2 fD,92 ..--- . .-., -'" """ ...".. ... ~.. .... :".:, -:;::.;1~'::::"'- ....... _s..w"~ ::.:=------- 0..1E- uc.1IO--- - ..- ..... 11/27/0f> - SliE !'\AM REV\Lfl ,--- , , ZNO ~ tl" 101 NOTES REfER TO SHEEl 4 rOR Sl1E NOiES AND LEGEND. REfER 'TO SHEET \0 FoR LANOSCM'E NOtES ANO lEGEND. - - .""....-" :'......-.. i9" p.. a. . / ~ ~t-~~ -- %- .~ - &- ~ &.- 0-, i 0. 'It '01'0 ~ \ ~~E~ k. X1S11M(; P1'I01ECiNilNG ~~UC1JON -..:== G\ 'i' -.~. %-~~ - .. " ... -- RE"'O'IE "360 fES _.__. .'~ SJIl."..Gt __: - - J 4:. > o (! 0. :;; ~\ 0. .-0"- :::' ~ 114 ~II "" " f27/OD .. )- .-0"'- ~I '-- _If ~I l ...' G .-"' ~i C) 'E'--'-""'"~ ......,..;<\lIlS.1llO-.............."'" Z ,~l.....,-~.. _ r:~~~ o . ':..... lieS _ ""' -"""" RIled Z ... ~.... ..-~ con6l..... " is ... ,~ol....-...-;ly... , , , ..,...... ..,....;01$ ..., olttef .....06 u.a "'~ 0. . ~::'~ % ';'a,:: ~ , O..~,........ Z ~f" Q t OPUS. \- OpUS Nor\hW9sl o COIls\IUc:\iOn L.Le. 'J ~~.. ex:. ,.,__0>>0 ... ~ ~CE.LS\OR Z CROSSINGS o ,<<>"" o tI(lPKlNS,NIl ex:. gUl'llll1 o REG\ONAL POND U. CONS1RUC1\ON pLAN \- ~ -=== ~ C11 ..00l' S\lE 0"- 1 1" ~ 10 Itlst1 12 N\.5 WllHIM .. , I OPUS. Opus Architects & Engineers. Inc. lL":.~~MN ~;J;,'l,~~ /" RLK '''-J' NInnetnab.)IN 5534] Pboae,;Z'3311'J72 _'2H33 ........dkio<.mm ,- .. ... .. == 5DG-011O 151__ ... ~ ~ SEE SS-3 FOR TOP SECTION DETAIL INSIDE DROP - 2 FEET MAX. -- e'T . STANDARD DETAILS ~~. _. a.. STANDARD .DROP _OLE an Pl. .... C!TY OF HOPK J NS SS-4A IIUII'IILE CASTlllC &lID aJWtIt. ..,. IlL 11 OR .IPPfICWED ...... .Im .. [,) CDfI'ER' '1(1 MI.!. ~'~~ 2'........a.rs.O' GUP... _.10 .......=l1IUIIllKllll...... ... ..cast KeJJOII 1UU. . JIUlCU ! . . IMrCDla'laT -..a. CIK SEU)DI.. 1- ~ ~. ]. M.L ...1111$ IElIllED "CIIIIIS SMIU. . "'C _. ...11- .. M..._ SUI 'IIIJCOlUS S. na .. ,.O' ..,.... IIICIlhSI: ntlCUDS ,- F'DlI EACII .. " CllPz. mEalU .. ....... w. .. ....0IlCI: ~1II .. ...... 1twtO ICSII. ~ ". ; 1=:': ".. . '. "..... . .. t' ....:. .'. ;::<t. ,," .,.:: eo _,... SECT IllN A-A ~ ~e . ~ - '5ECTlDII'~";' . A ""'* en STANDARO. DETAILS ~~stIl. _. OT, STANDARD SANITARY SEWER _OlE n Pl..... . CITY. OF 'HlFK INS SS-3 I ) RE.V''KOs I HI2 i Cln........, SS-I i I "" ~2~1~~' .T EIlD SlRVICES 5IUU. lIE t:11ttE./ I ? DRIL<kD 1Il1'O pm. USE SIDOLE 1f1lK Q.IIIP FeR MoL WYlS. lID PAOTIIUDIJIG fliPS .'t&. IE flERM.mo o. M'a. orP1W III g AEOUt1lEO ~~ta 5Efl'E .....!ea:..~"'~TRm ._ D.I.... DR PoY". OR ~ 40) . 'It OR tltl $OR 2'6 -.,sT II US!': FOR- PVt DUPE. lK11t 15. Dr GRMIE ,}.:l~r VI( ,. & to ra.oca fllDSttlDl ~ ~.UI ]a ~ I nD'.' , . :: !I C .... i! US[ "CIA ~TOAS ,... NCC-M ~ ~'~;."'..p;~. STANDARD DETAILS SERVICE CONNECTION ClTY OF HOPKINS - - .. - -""1_17=::3'-0' ......l ......... st...... fPlMT.....,. :;::;~. =:.~'"" :.:r: :::~. ...~ '~ ~ "IS~ saR. - 1IOTt.. t. GUt WAftS ... IIlCUJR[lt _1111 At 1IYDRAWrS. 2"..FIRE MTDRMtS SMALL .. "AJtI1'ED REO al ,tit fICTDA'T. '.1'" OF I'UII: IMIUNT 1I:511i1t ELlvnlClt StHU. 8( , c. ~ 'hi'"'' ....ham ~ f..'tIftUST kOCSINC' 1M' "$a IE REOUJRlD .. CUL~-$IlCS. S.....L ....1$ 1_1.1101" T-tIG;TS s.t.I&.L . STAIa.ESS srED.. _ .... STl.NDARD DETAILS .~~' 1 _. ft. HYDRANT AND GATE VALVE .1 NSTAlL loTI ON In ...~.... CITY OF HDPK INS .-2 I ...J ~ > a c:: ......_ a. U35_71lIO a. PIIIl.m - ~ ~V27 /06 >- 1IlIlS.T_ r- _or U OI00Jr , n . Emn mDJ' Ottw it the transmission at V _ Des. The Dp.a ClIIqlJries .. .... _.... I.. ..., _ -... .. Z ~inI==::'::-~= - ..... o . EIKltonic files InOJ' not DCClI'aleIJ rtllect thr f.nol as-buill concS1iDns. II is lhe Z respon$IbilitJ of lhe- user to 'lef'ify 01 = dimensions and other ,efated ill . ~~t rTI01 not be used Of c.. copied .ilhout prior .,inm ~onsent. Cl .. hghIs ._ I Z ....... F. a ~ OPlUJS. ~ ~:::~~~~.C. () 1D3SD .. ... ... ~ =.: mtHn. ..J 1St-15I-A>>t ,. c:: .....0- ~ EXCELSIOR Z CROSSINGS a ,DCAlDt () HOPKINS, toIN c:: 9CtT 1IIU a GENERAL LL DETAILS bl Z l .....p C8'Ii1r .... .. .... .. ...... ., ... . ...... ., ~ ......... ... ... . - :.::.~~r.p...-- .... DAlE_ uc.1tD._ """- II /27/06 - SITE PLAN REVIEW I .. ~ ~ ~i a!1 -.J C12 tNEENAH CASTING NO. R-3067 WITH n,., DR. Ol. OR TYPE V GRATE OR APPROVED EOUAL I !lIIJUI, 'I.,...... _"tlL ra_ ~=:'=I?:':-'::'IIf.. 2.,,",U CA" ..... .oo 4' .... .... - &..IC. _ ,.'.. ...-.~_. _.., - I ._ITI"~ ......... 1101 II.""... IMI. JO .,. ...... ~ikif;,~..." .. t-.ot&.la..T UIrIDUt~;;r. .. ,., G'JIO .- 8."" DICIU 'DC. ...-.. .II'E"JstD~ ,...., cn"". fIIOo. ST-Z i -"'~-' - NOTEI All. IIOlTS IlUST , . 8IE "STAI...ESS STEEL _en STANDARD DETAILS JltV'tSEO: '""" - IPI'RIW. awa .. .4TERlIAIN WET 1AP ClfT "'. aa. C (TY Of' HOPJt INS .-7 -. --- ..ru. f6 .- ....-. ....- .:e: 1mIE. - "Y_ LUOS ~~~ =IIJ:::1II= JlII!W KIGS 1. ___ tit. usn at ..\ ........ "111'1 ~.::..~'" aID _'''''''' ...... . 1IIIUP aatX,llC At au. TIl... ~ .. SlEEVES at -.... .... tU au .ICI.UDltIC '--'11"" . If A'''''' S1UL. ""'* "'r STANDARD DETAILS olsm. _. ... ..." TYPICAl IIEGAltlG LOCATION .n":. _ cln Of' ~OPKINS W-3 - . ~ -. ~ ~~! g ~8r J ~ l ~. i .~ ~; :ti!!:e . ~ ~:::~ iii : n~= '!~ .~:-.: ~:i:: ~~ ~ ::I:i:i w., 'i~!i O::CS "r I~~ il I cl;US ~.. ,/ ~~~.;~ 1t ~:~ !i -r- I ~:~ _ il! I;' I -le- 0" :~ . , ! I ~~rt of: S :Ii i~;i:~ i~P I !i~~!!5 ~ lid I ~.~.w~ ~ i :~i::I; 11" .,- ~ e:'~"::: ~ "i-!~5C ~ ~~=f~Si w 'ele::~.. ~.: .: .;. ... RtYISlO. 2-<< I".... lID. .-1 STANDARD DETA.rLS AND WAtER SERVICE CllNNE"CTlON CITY OF HOPKINS SEwER ~~~ ~ ........ M~f ." ROCK BEDDING T~~.;~ It':..;i:.::.... NECESSMtY 10 $TIIU..Jzt. ~ STANDARD DETAILS .YISED&. t-II. -... SANITARY SEIlER BEDD ING IU.....1tD. CITY Of' HOPKINS SS-S - - --_..- -- - -' - ~ COIf'AClD &.. 111 '2'- SMD OV&JI I'fPC ~ It SIIIl .. lUST lIE USO> niR.... ~ .DlEPElt 'hlPt 15. H\.DIr GItAIJ[. sAlin BEDDI~. 1;k~.r SAND"SHAl.L CWGDI .llK "'1DOf SPEc. 3t49 27<---1 CASIil15 .l1EO bCII: ........ ".-...L SlC1'1DIS. ~ si... 'IIIlcons 5...11t ;:; ~..I::-::", ~c:s 'hwJ .410 Me IItJJFGAeI. wI'" ...... IIV'O IllSII. ...... "." STANDARO DETAILS ~~. _. ... STOR" SEWER MANHOlE WITK CONE SECT lOlt tI"......, CITY OF HOPKINS 5T-l N.\. _ " lGITaIt .nio aucs ... CAS1'I'" .. ... DUfSIIDE " allC'S. ~':""IS .. IlIV' .. ....1Dt. 'hIl IMusr ser.._ IIIlEDr&JD.T. IELDW nc ~ KcrlOlf SJUU . ,.-.." "'*t .. ICIIMT.. MOTEr .LL IIOlTS _T BE 'STAI...ESS STEEL ClJCCRElt &LOCK' ,COoP~ GA.uu..M eaar ILL (R RIJCS HEYISIO, ,...." C.I" PI... 110. W-7 STANDARD OETAfLS Wo\TERlJAIN WET TAP CITY OF HOPK INS ~....._"" [APMW.. 87: t - ~~ T!r,..e f ...l............ _ J~ ~~J;. ~~..lj::!.... .~n..>;:~ ~~\W T -; .-;n T'rLEft w T IMO. 58. 59 "601 f ~~E:8 " 591 ~ BI88Y T T rHO. 57. 58. 59 " &OJ -1- 1 C"TE VAlVE BOXES l!:;:~ TYLEIl 68&0 al~' ~~E:_~~3S1 i =" _'K~~n = .... ~;a::!.j M'f'b" ~r'ftlw ..... lit. . STANDARD DETAilS _. ... GATE VALVE AND BOX INSTALLATlOlt CITY OF HOPKINS mER {,86S ~LUR "-10361 BIBBY 8-5'50 ....1 ,. III tn" IlELOlt ~JIP == :,';...~'=~::r- PllrwIDt fI" fJI ..... &NUI1I01'. '00: CRIOE~ I ~ OPUJS ~ e Opus Architects & Engineers.lnc. 1aB .. ... ..., =: SS14H111 m____ .. H:.e.lji.MN r=~ ~\ RLK I lJ\."COJ\POIl..\'1'ED } \.......-/ 611fJ Slue Urdc Dnve..Sunc ttln Minnoooab, MN 55:143 Phone 952 9331J9""2 Fu: 925 933 1153 www.dkmc.com ,....,_IiIrItllll....pIu. ........... __.........,iISI'Kt .............. _._ ::'~'==- ~r..--- .. OA1[_ L1C. NO._ I5SL(IlltIIID II /27/06 - SIlE PlAN REVIEW "'" UN( CDPACTtD SIMJ CII 11'.- .TD 1-\12- CUM RDCtl uS GPltCTEDl ~. .... UN( . me _ . asEASM.ICII8CI:ItMS . wttEssaAY 10 STIlL fUZE 1/.- 10 ,..,,- . UNSTABLE OR .llET CONDITIONS IIIJIU. 24-U&- 5l.M CfII.JIJC F. NEENIdI 11-)061 C&STlNO.. .. EQUAL. _I_ D..L... 0..;- lit ~T1PE ., GRATE. 01HER PGtaITIM.U acC:En....& U1'Ol BAS"' 051.,55 IlEPENQIJIG. tAlI 1NE eJ~'tJMCE$ ~ Sl&tE.Q Ta Cl't'l APPIIO'IM.: IEEIWI R-I!i&'-=J. IIEDIJwE GRATE &. c:ASTtIC ~ CbIMt .-en CElNCAWE GR.lt' '" CAST'" .' tIEDtM ZS'U taNVEJt GR&.TE. & CASTile '\ == :-4~:'~,f'=. I I I / -- ,-. - _ClST IIEIIIF_' _n sue. RMDIEk DR SIMILAR GASatt nPI' ...'ItlIIA\. TO -= I'Ul:al ._ Sl.18. AND taP " .........t. 'SECT IDI. AU. ....Ions III ......otE 111"- ...... G&SIlDSo _CAST ~ .......u SECTI'" ~ .J ~ > a 0:: __ a. U35_noo a. ""'"'- ~ ~V27 /06 ~ _a_ t- -.. o omc.. r n . E,rotS mDJ 0CCUf 1ft the lronsmi:ssion Df V ___l..Opoa_...ooI Z ,e5po1lS1"lR lor ..,. doims. dcII'nogeS Dt :-:.:::=.= ~ -:-~,:: - ,.... o . ElKlrone fdes mDJ not DCCUfotelJ ,ef~ 1he f.nor as-buill c0nc5bDns. It is the Z ft'Sponsibltl, 01 the user to \letifJ' 011 JoyoulS.. dimHsIOns and athet relaled W . ~':::-umcnt mar not be used or a. copied .about prior .,iUen consent. CI 01 rights rtSIrf'Wlt I Z _r. a @ OPU~e ~ g~:c:~l.c. () law .. ... .... :J ..........._mt)-O'lll m-_ -.... ... O::AUtJ t-C/) EXCELSIOR Z CROSSINGS alL01Ul () HOPKINS. UN 0:: H[T 1lIlt a GENERAl LL DETAilS t- r;m = a C13 z IlEYlstD' - iYil:i ST-6 RMf q.RrOUtMO 10 SUtfOIIT Rd'IIAI' =~~.:~=:r. ~ ~~~ . ~:r. - .t.... AS REOI.hAEG '0 IUff'OIIT RIP'IID _ N8I5T SK1'tD15 ...... Pll5&1-.L .. ..... c. DtAIETEJI .-..a.I Kttll*S .. .tfl Sl~ IP 10 S. 0'....... IICItMCUSU .....\. . ClIIIDIID DlIIII'II 'hC curslDiE -.It IllS.... .... ..,. 'htIC&JeS C" Fe. ,...' CIO'1L .111C1lasl. hlltallSS ,- All [.eN .. . DEP1II _AXIl ,.. I.' ... JlEIIIIIf"aRCE Wl?,! 6-a5-. tonG II[5IL. . --GROt1J eoT"rUY TO t~ OIA. F PIN:. PREC~T STm:;-=::,~~~C11 BASIN _tLE- ~ WlT.H IlEc!fTfC'WF:CWA1NSO" SUS- - CI;;':; STANDARD PETAILS STORM SEllER BEDDING CITY OF HOPKINS -- -... --. w. - :"~:E=' Ir. - =::X':.':an w.. ::'~PM-AftOt 36' ~ ~ /:S ~ "rlO._ RIPIW' REDllIRm Ot:; ~ L tn_ t ~I_l: cuss 'If . 5: I f 1$ . I I 1. 10 , III 24 tl . J ]0 14 tZ n ]5 " 'of If 4Z " 22 I' .. 2G H , . tt~. _30--4D I tv t. ua.....27. .ta. ,,", _ '8 ...- -':~1 wG _ ..........~ '_,C ~ SECT! ON B-B CE. ON( Cl!6IC TIlIO IS aPPfIOIl"'TD.' ,_. JlE,VJSQb - l~ ST-3A l ;j :l :I,'!!.J, . c~~ i i i:i :.~~h !~ :l:;~ ~n!I:!. :~ ~li !!t!! ;;' ~. ~lIlii~ m ...~.~.. is &.c a..... ~ Z ~.; "':ji I !! ~~, ~ ~ili ~ ~ !i Ii ~l . STAl.lDAIlO DETAILS DETAIL FOR FLARED' END SECTIONS CITY OF HOPKINS - ~-r iIIA_eut __... RIPRAP I ~ ~~"I, OST ......om .. I..~t .... lilt..... .r.. U ,~ IS U5ElI tll lIE lAST J 5ECT11IG ptK me- IUJ_ flLIn All) III'I\.CTS. ~ 2 TIE -'1 FA51tNERS PER .JOtIlT ~ ~I.IlI.ED AT so FRGf TOP OR eaflDII .. sa.. ~ st-~ 'IPE. be t .,.; TIE'" .,.. SIZES '2- to 2"_ t 31." tit "0Il ".FE. srZES :SO" 1'0 II.... .. ~ .. TIE FCR"PIP[ Sins. OVER n". ; . rs__RSIIIE_llElII'lI[JIlI< .....owE.. amrut :IE SIZE LUS 18.. ~1-. JlECII'U_., - . 'ASII GUARDS WILL IE REWIRED (111.- Gt JUI!D PLACED .181 iIIIGOl.flSFt. III fiLACE " lIASK CUARDS :=Y=J~ ~~fI~':rslE(:r St~.. _USElI_C1 ~.I!!L ~.:L:: . i!'. '1; 42- '(!.. 1,1: := G ~ ..... '""" " ~ . C~T 'Aii'iSii. 9-OT nii:i ST-3 RJPRAP REOUIREll= SEE STl). PL. PUCE RIPUP MOUND SIPES _ 1MR ... rs r.E." I AI "'.. JIDCICS a-t .___.. tall SJlIL.. . IIUCQ ._ 1JE LaID ....IDII ,. tIlE CURl ..f'aT ._ t.EJ)llmI_ ,.. I!ltJ_CItl:ltIG IIClDS AT CAtDI MSIIIS . U.. .. 10 nET ... LbC.... =. ,;g.IS. SN.IU. ... SfU'. 2SSl. x:.. 8618 SURMOUNT ABLE _u 86t' QII8 10 IJ[ USED At RADIUS. SEE tin Pl.A1E NO...-stJ!1-5 MJnA -. I'U' VIUAI" Of IASllfs"c.ftED.EnEHOauaNASIlEOtJIREDfOQaJAli U'IC"", CIIIlII-MC1'ICl AREA AT aClJON A-A SUOJ ':'tlA.TO...'IO'OSS SlCI'IOtt AlMA '" .c.1.-AJ ..m'.Eb f)CJT VElOCIT\". IIICJ1'E. - W,.VllAllllfttCOHfDlll..lO.....TUftALnRr......CH.vMtL lOP Of fUr....... FlOOR CW'" .....0. AT 'JNt SAMEUlYArtoHQII tOW(_ 1KANN.\tvRo\1 ~""'L 1O'nI*'" tIC........... -=--== NOlES: AU. posy a PI.ANK 9IAU. K PR[SSUR[ lAEAlED II ACCORDNM:[ .1M _ (3401) .... _/IICl.1S rASltNEJlS SHAll .: GALv.....zm It ACCQADMa .1M _ (3392) ,...s AS ttECESSART ,--.... RLK ''=/' B PQfC) wnn ~ I'lUM eASJtt .TN RtPRAP /"" ....... ,~ "-=:i '--" ---- GRADING 8MF1.EO WER POND A DESGI IISCHNtCt - USE PUle 0-" . U1 ds 1.11 cr., CL51p., G.4& n CJlEHRC. ...a Lf REo.; fQp or SIClIIAIOt . IOUI3 eontN or 5iKIAt[R _ 1tt.&7 tlDRMllL WAlER LEW:l - tQQ.oo BClnaw OF' WEIR _ ....7 fQ.!:!Q..!. DESICIt DtSCHARCZ: - USE' Jl(M 0-" . G.t7 cl. 0.17 cia , a.!t 'P- , Q.,a& n ~NIfC - .....2 IF REo.: lOP (F SKU.IER - "3. 7i BCllJt11 CF SKNUER . "1 67 NClRMAl WATEIt LE\O. - 912.00 eonr;u ar IIOA - '1G.87 POND 4-INRLTRATION D[SICIrI DSCHAACE - US( pt_ o-IN .. 0.13 cis G.B3 cis I 0.5 rps / 0.4 n OP(JMC . .1 & LF REQ: ~1: ~.:..o.9~!L:J.67 "'Al WAtER Lnn _ 91.&.00 eontu ar .. - 91287 '0" " 3CMIlEJI DllEA1I;D l\MII:R PLA*S .-1'".'2-al-r"J,5- eoTlOW f6 5MWWEJI ....... ACalECA1t ~~ YC)Q' 3USM.. ~ _..... 1r' D[PlM ON aOtEzal rAMIe I 2~" R~AU. IIlEM fttf .not .~~~ ia~= t IlUJbIG 1 .... ....""" : APf\.IED '" ~a <D ~ 1- ." 5TANOAIlO DlTAILS "':.!..'f" ORa.. IY;. STANDARD DETAILS 2"'~ _....1 TYP I tAL TRA Il CROSS SECT! ON ttn..... _.... PEDESTIIIAll CIlIlt -oJ" 1'1& It RIGIlT-llF"-WAY In....... CITY OF HOPKINS SPP-l - CITY HOPKINS ' SPP-U A-, -DRAW Btl S:JANOARO DETAILS R[Yj5{oi: tIIlAWt a'f' STAIlOARD DETAILS "YISED: DRAW .Y' ..... 2-l1l1 ~: ."L STlNDARO CURB DETAILS Ic~;r_';'"1 l-....I CONCRETE WALK 'SECTION ItlT.... ..., J~ CITY Of HOPKINS CI TY Of HOPX"(NS STRT-ZA I SECTION A-A COGtRUCT CONe. CO!mltl. .IOIIIIS SUCR 1JI4T NO PAHEL U W..tER TltNl 10C) so. ". PLAN _ STANOARD DETAILS INDUSTRtAlJ COIIoIERCIAL DRIVEWAY CITY.OF HOPKINS DA.U.. BY: ~ OpUS Ar\Olln"v- Engineers. \nt. ~,::..... ~.. ~..~ \~~ @ ~ 'C./ 61'\) BNc Qsdc prio.-c.SPiSC 11)0 ~MJ'l;;J4! p_~;'l.~:U~ .....'l25~:u\l;) .............- t .,.,...,-"'........"...... ~-.., :,.:,r:;.;~ ,;:::: ..... III ... SlIIW ., ....... DI\'Il- ur..1tO.-- -- - -"""'" \\/11/06 - SlIt Pl.Ml REVIEW ~-~ > _0 1:20 ~ -....... U- \l3!l_7100 a. .............. <{ ~/21/0& )- _tt """"" r -.. o ~. In ._"'" v """"""'~ Z~ - 1\115- o .tJe<IrD"":~..."",,,,,,~rellet\ Z "'" r..... ..-..... ,006'-' ft ;s - f~J at 'nil: .... tD .,t<<'Ir 01 ~.... o__cd lU .,... "",_I tn01 not be "sed 0< 0- ,QPletl ..""'"" pr;o< ..\11" "'....... o <II foiG .-.e' 1 Z __f" o ~ Ow>USe f= ~\~~.c. () ~~,::..... J ~.. a: _CI r(f) EXCELS\OR Z CROSS\NGS OUJOlO' () ll()l'KIlISNK a: ,cp1l1ll o CROSS u.. SE.CnONS \- ~-= o C14 z ~I 1:11 ~ tl ~I, 0' 0:' ...' ~I, 0: \ scALE: '\:20 SCAlE: 1:20 SCALE: 1:20 p~ GtofI~ 8 SCAlE: !'tOTE; CONiRJ'ocTOIt TO suaMlT SHOP ORAW\l'IG FOIt flEVlEW Po: ==---- .... r"''''''' REGIOI'I"L PONO OU1LE.l .... ...t ",01110 ootO' .... " slRU<'-- 911 :$ " " Oln.lt pIPE - cu1 n._ 10 QtlOt c ~w: s"'7.o .SEC1\ON C-C' ~ ~ ~ pl\RlOHG GtofI~C A Vol'< - SEE SHEET C10 FOR \ \ l5IlM~~S- - - -u- - - - - ~ '0 .... ()" ~ \ , . . . lANDSCAPE PLAN LEGEND Q EXI5T11<<$ TREES Q);) FlWPOSEP TREES ,>.ND 5HRl.65 _ !:OD I'lI1RRI6AOON 1'€l1.AND SEED l'VO JRRJ6AT~ ~"'~ ~:cED I"VO IAAI6AllON \ \ i p.i~ S -{ y.~ p. ,",,0 ~o. \69 / ,/ / / .- /.. // // .....-' ......... ......... ......... ......... ......... ......... ....... ......... ......... ......... PRQPERT~ LINE ......... ......... ......... /') ,',~' , ,/' ___""J < L1 OVERALL LANDSCAPE PLAN lOCATION HOPKINS, MN Pllo..c:r EXCELSIOR CROSSINGS Ilnnt1onka. WM 55><<1-0110 51-m-~, 51-1~-4511 p..,...... ~ OPUS~ OpUS Northwest Construction L.L.C. This document may not be copied without prior written Ii) eU rights reserved Errors may occur in the transmission of electronic files. The Opus ctImpcnies Ofe not responsible for any claims, damoges or etpenses arising cu1 of the unoulhorized use of the information contained in electronic files. . Electronic files may not accurately reflect the linol os-built conditions. n is the responsibility of the user to verify 011 layouts. dimensions and other related information. OIoT[ 11/16/06 PllllLO llWoCOl D. BAN GASSER ORAWN BT CHC O1(()([O BT GrE Df50i1 JrlJ'WB[R M35_7700 PRo.n:T "...,BU ISSUE RECORD 1/27/06 CllY o used or consent. SUBMmAl 10lSC Dr", hod '1.-.1 W'nM1onk(l" Wit ~U4J-OUD 9S1-1~-~1 ~ OPUSe OpUS Ard1itects & Engineers, Inc. PlOf'l'" ror e opus. opusN~ CO~n L.L.C. 1~_Jl4<Cl"'''' l1\li........ Vl ~~14,..Q. t~1~-.I+I4 eu-i!li.A!>2t ,.. l"! ._""""N~ ~~ ~._..... ~\1f. ee. c E' I \ \12" cAl- ee. EN! w ". - Opus~ &. eng\neet'S, \nc. \Q~_IIaOCl"o>l lliftllO\...... Il1l !6141-0\ ,~_~4 'S1.~-4lo2J '" /: /. / \ r /:/ .f , / . /~ ,( ~ --- \ \ /rl ~ 1/1 'ffJ/ \ \" , II 100 jlt l J~ - \- '" '- ,,', 'i/)f ~, -;-~~' ~ " '\ \. \ 91.,.- ~~,'~.< ,___ / . '" '1:_' "-'>~ ..... ~~ 9f.3 , , . . " " ".",' - ..,..~ ,,,,-.;< . .'.,'. '." ,,":,.~:-.~"...- '- "-- - ,,'. .:X"8 .. ~ .<" ',' ''':' ~~ '.... -'- - l'I'o.' -,-' _N, ~'" " , ~'''I ,- -, ' ~~'~' ~""'~~~ '- "- . .~. ,,' ,-,,,. ..' '''~~~~' - - ....... . ... '" ,-"~" ,',' ,~"', . ,N N' .x-.,.:s ~""~ ,., . ' .' "......... ,'" ",,~'~,*-." .JS"""~ .~~ , , ""'" =. . :-- ' ..' .S' ' 'N' St~,~~ ' ,-~,' '. ~~~ ,....:~,,: ,," ",;" ~ ',,:' .~' ,~} , , ' ..,.~ , _,~," ~ ~ _~ ,~_ , ~. to.. ,-,~~~'Ss.~ ' r ..~" ':'~'" ,''.': ~{: I ~._I-"',.-'n. ..- '--, ,,-,' " ","N" .,,' "..' " . fI .'~~~ ~ .. 0-" ,,,' "", ". ')f1l \ ItII' ~,~~~,,, ,~~,~ " f ,I , ."",",. ,..' N'" {,;r;, J1~ '- .": I 8 '/ 3~'!:::~l ,~".,: ."-:-",, ~ \(1 ,I \.~ ,0" ", ,.,,~ ... ,., . ' ,'" " ' " " 8,1 ~':',,~~ ,,-:-'" ~ "N"'-,,~ ,"'-' II ... \\1 "...'" - - ",.,,; F..:~::'-" , : ' ~~:.:,,~~ ..~~ -':;,,' II...... \.~. - )', ,:" .," 1. / ~", ",",.,,,,..,"" ,'~' . \I~_ -"'1' I /j ~$..- -' " ' - / ",,,.. . " N':':';-1'.W''!>' N<:i#'" ' v · //1 . -:<, ,~- - " - . ...' ~~."", ,'" ' .' .,' . .' "" . / :~, ..,,/,-,~~..';l'''' ',1'" [(ff/'-,,- {, ,~,":R~ ~ AW.J~" ~~"*'~".." I I lZiI' · \ .""' ~': ~ .1' :_,~:~'~" \ !lll~1~)/J ?)'}ii;;~ ",.' .' ',>'._" ~><::~o:"",~ ,',' .. I' \ \ \ II it ".:-- ,',' Q 4::~:',:,..~..'}: ~ . ~! IJ / / ,,~\~ dr i.' A~~;~'~~~~:;;.~#-~":""/P Wftb\ I I \\V\t I~J.f,.JJI Q // _~~~"., ~.,:,:::::.~.::--~~~~_'~' ',' ~.." /J 'lfti~/I~T€"~( II \\ ,) / r' ;;;~r:1 IJ'I I // / .....:...~,'%~~ . c>.. ~~" ,". "'-' --.:; ..:, ~,,~.:,,;i. ~. , ..' ~J, , \.)jiQ \ \ -'~.. '::"-'~f-~"j' 'I '0--:::ll//I~ / F ~~~~,.", ~:~' .. ",.,~~~~~.,,~,... '.Y I. JOAt), ~ll :-,-'- ~':--f ~" ~~g._~I.J~"" / r'N~~~~.'" ." .: ~""" ",!'..~~,-"",.,."., 'I r, · 'JfJ "..' ,~ />hr:F:'-, /I!./ ",,'!fi ~'*-~~~ .~ ~~'li;~ ,", ~~~~:. ~.. 1/ // i i . - -' ,'-.: = n<F/;- F. ".., """""..,,~' ".~'.. ,..." ,.., .",' ," , ' .' , .. ' ;: -'k/t*-$ Z:' ~~...~~~ ~ \!.:.~...:~~.~~'-~~~"'': / i !Y111!~ I I r .,,'" .'~' If/ ~O!F [,,-, r" .t,~': ..:4~' ~ " ,,"'i' ~"-. "'N~~ .,_~~~~. .,'..' , . 1 Ill! '1fjJ I \ .<! ::: .' 'I ::-/~ -7 // ~:~~~:, ,.".~~~'.)l . I j~~! ~~{\ \ if,~'(":Jn~l / ~ . # A ~,-=." .,' ' .,' ." _ ~""'''', ,'''' ,~~' .....". ~...,,<,., .. ' .' I fIJIll, I. ,,~, ,,,,-' ' , fI .....' ..."'- / ~ "" ~ ~~~~~' -.:;,:-~' . '1ilI>~ ~~""'l"-.* .~~~.:,,~' ..' ': .<"'" ~litil!IJ 'dJr \ \ \ \ ~. .,' .' :' ~ II ....._ _ ' ,~' ,~.: ",~:".. '., <,*",,"..~'l"">'''' :.,.~""~'.'" "':;-"i"-?"i'-~ '.. , ~ .. r: I' '" \ J' . . : " , ~:;~/ _..:::.. ?~~,~,::::'~:i!'~.~:~.~~':~.~-':~::/ ~ (gt ~~Z~/"1fhflJ 1;~~1f /)\ I)~ i ~,,::~ -.,:,;,L ,!er! '-"" ., "...", .~",., " ' , .,.' =--,.,,~. ~__"..'" ~_ . ., ".If! U \j' -.,' .", II .i~-"I' .~ ,~W~~' ,,~:,~~~~~ ,~~~-<::.,~~Ill>-~~ ~,,,,:.-'" ..',: ' I11I1I11 III / I t/ -: ,- - ~1!' I." _ fI'" '.~' *,,,,,. '. ' .. .,,~~~'*'~'w"". ' . . " ,., ,'~.~' . .. . ,\' . . ' . . ' ___ ,~".:~~~t__.,._l1r;~';' 11.1~{7Jz~ i~~1 ~ ~!1J /f-''lh' J/ Y ~~~~I~'$~~~'IiS!i~~"''''I-''''''''~'\>''''''~'''''' .~.,;.;,.." .~~ ' ~.', ~ ,r~ ,,,IJ/,I ~ !i!]'" ~.. . __---9~~'-~ ~.:~~~.~~~~'~}$f;.~"~': !J~Jll/ll ,,*11'1.... .~' ~~' ... , ~, . " ''''~~~' ~"-f~,,,,,,>,,,'-- "-=",,,,_,,,, ~ ' , ' " 'I I 7i:~llh "f1," I ( .,' .1 ~ ~ ~_:~~; :~<:~;::~,~~~~~.l.~~'.ii' ~:' f ~Z~I/~I.Z'/l.lllfft~ ,,~Z~)~!I '\. '\/ :::~::::'-(fj:'" J . ' __,' ~~ "",-'" .""''''1!'''-'~''~'<-. ~. " I. Z ~/) I'j, 1,,/ " -- ,~x~"'- ~__ __- --"''''' _ .... , : _'~~t:::'::~-( ::-:~_ ~, ,...." ,:' "ZZ 'ill j~ r~(fIW\ :' :~' ':!!~ I, >...; . , : -f-!~'h!'~i~''?;~''''''~~~~'''~'~ ::~:~" ,~' N ',': ,1'ZI.ZI/I/;t ~~~ II ,:-' ,-:-, ~ ,"'" .."" ""....~~~ .:;fif:if>"i1,.."-'- ~ :' ...~ Z~:,/l0'1} fIIr,/lI) \ - - ~ . V ""'"'" ,~ .~..."",=~." . ~~' ' . ' ' ' ' ~ ", ' . .v _ ~r ....~...'0.,;- ". ,~~~ ,~ ' 0~7I I 1 ( ~ -~ ' _ ~~_ ///~~:; ~:_'~~."_:'~~~:::':': ~.:~;;:,~:~*~~::.' . 'if ~/J11 \ )A ~~II~~:~~':~~/r:;v f __' ':- ~~, ~~~, ~':~. ~ "Iml/I) } I 1 ,~:t 1.I)j1/~ .. '" " 'N' ..."",~," . l~" I ( ',~" r /J~.II ~ _ /""or., ""III1~~-:~ " ,,\. ~ m~, I ( ~. :~ -.:;~" .~, ... I \ '\ J ) If' '-"'7 .> :" ':-l1r:;:F{ \ ' ' ,..N' ' I U' 1I I I' -~ ~ ,~,,~ /,'" 'l \ ~_" ~ "'-~.~.: / ~~ / .,~, .." '. ' ~tJ ~ " ~ ~~ / ~ ~ I Y , '" ,,,!Ilj 1 tI \ . l! ,1 '" ~ ~~ .....-, I \ / I / I I / - / / / / I I 1 / t' I I I I I I I / / I ---_/ ~ ~ot.......... o ~ '------/ '------,------ '------,------ '------ v ~'-2\~,- ~~~)I r"W::// ~,~ /7/ t ~~ I I I ,............. -- ~ '(4'D /' y ~ ~ '< ~ /Poivo EI CI yo E 'OCtJ \ , ~, '<'~ ,/> ~~ ~~ ~ ~ .3 ~ -~ "/27/06 C{l'( SUB~ITIA\. LDl1'11CIll ~NS.UN. _tl1ll\.E ENLARGED LANDSCAPE pLAN L~ / I / / I I / f' I I I I I I I .I / / ----"" ~~ ~~_OIlO tU_~44 '$1-~ I.. !JGGIIlfJIIElI t.l35_7700 ~lf,IIStR Ql.1t "/' 6/06 ~~ C. BANG~st.R Dfl/IIllII! CHC Qlttl\tll II! Gft . ErtO's may occur i. the tra.smissiaft at .\eC\ro<Ue \1ItS. The 0pIlS ..mPlllittS ... noI responsibl. tor 0"1 claimS, clOma~e' or ~ arising out 01 Ihe ","",",a.Isd oSS 01 lhe inlormobon contained in elcello.1t nd. . tlec\fOl\ie IiIeS raat ,01 o......I.ly rellect lhe tinol o,-buill condilions. II is Ihe respon","bdi~ of the uS'" to ..,ily oil 10yoO\$. dimeft$iO'S ond other relol.d inlormalion. . 1n.s document ma'f not be used or copied w.\!IOut pr'ior written consent oU righ\S rese,...o r........ for o OPUS. OpUS NO~ Co~Ol'\ LJ-C. ,__l\OQCI'tI", lI\ftMI..... lItI ~O' 10 tU_IS~4 1U-1Sl-~ \.. ~\~ E)(.CELS\OR CROSS\NGS SlEEI NlI'gal ... --- OpUS ArCh\\edS & Engineers, \nc. ........ ............... ............... ............... ............... ............... ............... ............... ............... ............... ............... ............... ............... ............... ............... ............... ............... ............... ............... " " ~&EO ",",m.o\l'lOl I 10350 I... Road Woot III_t.. 11M 553oI!-o' 15.1,,_ 15.1"'-'" . Errors may occur in the transmissiDn of electronic fa... Tho Opus componies are nal responsible for any claims. damages ar expenses arising oui of the uncutharized use at the mformation contained m electronic files. . Electronie files may nat accurotely relleel the final os-buill conditions. n IS Ihe responsibilily 01 the user 10 verily an layout!. dimensions and other related mlarmalion. . This document may not be used or copied without prior written consent II) an righbJ reserved G OPUSe OpUS Architects & Engineers, Inc. SUBMITTAl CITY ISSUE RECXlRD 11/27/06 IlESIGH IIJIIlER M35_nOO PROJECT IIJIIIER ~1[ 11/16/06 PROJECT IWl!CER D. BANGASSER IlRAlYN Sf CHC OlECKl:D BY GFE REGlS11lAlIlN I I I / / \, \ i \ I I I I / I " "- '\ \ '9 - ~ ~f ~ ~. CJ - ~ b< .~ OJ'' 0;,,<0 ~ . . I ~ 7 ~ 0) \ ( ~ I / .... MA~.IOM.R WI). ~ D",.-pc:x I"U.CH H l " I BLACX WILLe &PRlJCE e' HT. eta. b21 YEW 'TAUNTON 6PREAOINCiJ' 24" PIA. CONT, ,.' o.c. 4"1 ~ ..., .6-..1 .4 . Hr. CONT. lj' 0 , { III o is ~ k: I I I +- =- ---t / / ~ -L ..i...- t.. -. '-. - ONE WAY ) """(--;--/ / / I ( ~// ( ---/.. ~ ..\ J ,I i ( r I 5 ~~ ~ \~, ~ \---== ~ ,. - - ~,~. )(, --- ~4 " :--.. ~ ~.~-~-;;1 J ~ It -- ~---- BOULEYARD - ~ 21 I liLAC 'COMMON pU~E'~ 30. HT. CONT. Eo' o.c. ......:::.::~ 1'1 JUNIPER 'ARCADIA' ~ 24. OIA. CaNT. !>' OC. ~ Prepored For G OPUS~ Opus Northwest Conslructlon l.LC. 10350 B.... Rood Wool 1Il1lMhlllka, MN ~3-o1 15.1-156-4444 1SJ-6&-~ I.. 7-"Y~~r------ -<: / --------o,~S - - - 3@r ~ON.L.J;~ ~ =-.-::-::' - -- - - - -,..,............::::: -=- -=-=--:.=-......-- / ,~ /- - -- - ~ -- -- ~ ---"....,.. -- L. ........ / ........... -- - -5- -- --- - - - [\,- - - - ~3-- ~ ...n-:.. r~/, :!;j .........- .................. "~ ~'\ I ~ ~ \, -~ E%CEL 8/017 ~I<'" ---------- - PRQlEJ:! EXCELSIOR CROSSINGS LOCAtION HOPKINS, MN SHmmLE ENLARGED LANDSCAPE PLAN -.:::::::::: ~ ~ T I ~%-~~ ---~~ . ~~. -~ ~ ~ ~ " -....;;:: ........ ~ . "-"'~ -- .4 L1 I T ...I ~ ,---' ~ ; ;:-... ~ -- . ~- ----/ --........ "j ~ '--------.. - - - -9,;>3-- _, I ,,- ---- ~ '" ~ "" ~~ " I ~ R OPUS. ~ tecb;& Opus ArchI Engineers, Inc. ~ I:="-:: :1."~DItD ==la 0 ~V16/06 PROJEtl _R D. BANGASSER DRAWN Br CHC CHECKED Br GfE - Errors may occur in the transmission 01 elecwn.. Ia... lhe Opus compan.es Ire nDt responsible fDr any claims, damages or expenses arising DuI of the unauthorized use af the information contained in electronic files. - Dectranic files may nal oCCllralely rellec\ the final os-buift conditions. It is the respDnsibiloty DI the user tD verily 011 layouts. dimensions and other refoted information. - This document may not be used or copied without prior writlen consent. C DII right. r....rved "" \ \,\ 1 I. f f /1 /1 // I / / // ~<<t II ~ h~ I ~v / ~ I. ~ftl , ~~~. , .......: ~ 7 14 (.,/. EXISTING CCiI"I'1EIOiCI // <'" )"""" 0 ~> ~ bj,./ \0 ~ '/ '/ I ~ - - ' .......' f ~ ~ - ) f , f -. - - - ~ ..... , i '<, ;J I , -....:: - - - ~ ..... ~ ~ ~ ~ ~ ~ ~ ~~; ~ ~'}..' ~ ~ t , I f I ~ III I ( I ;;1 \ ) / ( I I I. I I " I I J I I I ' ~ ! \ \ i / ! / , : I J I i I i I 1 I / I I i ' \ " ') ~ .-... ~ ' I '.9 ~ ,<0 ~'~ ~/ /~ .110[ ~ T :::J::j .~ ~ ~ t::l ~ ~~~ d>O '- ---- ..----- Pr.partd for ~ OPUS. OpUS Northwest Construcllon LLC. lDJSD... Roa. Waf llin_lea. 11M ~DIlD 952-15&_ 952-151~ loa PROJrCl EXCELSIOR CROSSINGS LDCIJ10N HOPIQNS, MN SlEET tnlE ENLARGED LANDSCAPE PLAN L 1.5~ I 6 I ABI-l 'AUTI-"'I PURPLE' 3 1/2' C:AL. ~e. , I BLAOC WILLe, ~E 8' 1oIT. /Se. II I LIND.... 'IIIIE!OMClNO' 3 1/2- CAL. ESe. 161 CPA."'- I! '6PR1Nat SNOlIJ' 1112' CAL. ea. 10 I .lJNIN.. 'ARCADIA' 24' 1)14 CClNT. !O. OJ:;. ~ OAYLIL T '!lTELLA OE OIO:E' fYM .fI"JL~,if' (REl)) ENLARGED LANDSCAPE PlAN , h, 'tiT-I-- " " / ","",~:11 'f;(..,/ II ~, - 0/ ()~:.t C?> \~ .... - \ ' CO ~ '" "3-- - " 'i ~,/ X \ ~. " '~ ~ ~ ,,~V' ~ J \'\\\\\\\ % "\\\' MAIN ~ "\ \ \ PROJEC::T ~ 1<\" ENTRY /--) ~ ~ -_/ / ~ ~-- / /' -~~ / ~ / ~ / ~ / ~ ./ ~/ ~ \" \""""" I ,,\' '\ "", " 1 ,. "ft ,,_1?lr. (~Q) - ~ "....... ,,~ ~ --, " ........_-, ;; / ~~_ 610E1 V { ---- /< ~-- ~~-_---9T. ,7 _ _ J-_- j----r-- --~.-:::_------------- --- ~ ~ -'- ...--- - ...--- ~ . - ~ ------...,.. -- .... \ - -- .... . - - ........ " . ./-- 0;'1-'\ -- T ) -II -A'o/ ,/ -;:J' (~ ~ ~ " , \., ./7 II 1:1, ~ ~~ ~~7).(:J..u 961 JLN;;;~IA' /' 24" OIA ' O.c. 23 LILAC:: 'c::oMMCIN,,",-,RFLE' J -- - -..... 30' HT. CONT. 6' 0 ~ , " ~ " ~-~ \., ~.--;. I / / /) I~ -', ..~.., . . . . _ ::..------'r I I _ _..,.-1 _ L \ )i ~ ~ PR!llECI EXCELSIOR CROSSINGS \DCAlIOH HOPKINS, MN - SItED 1iTI.f CENTRAL AREA LANDSCAPE PLAN .6 8 OPUS. . Opus Architects & Engineers, Inc. \Q3S0 .... :t S:~allD ~ 152-&Sl-45D "'" . . \ \ \ ~" \ \ \ \ .' ; \ \ \ ~ jf~ I \\ "'" \l~~ ". 'l "" < \ / ) ~ ~ ,'-'f</N~ / / I / P S~ / / / I / __ SUWffiAL ~ }I..,", ./ ({ I I . 11/V /06 CI1't ~NT~AIN . .~jifl / \ } '\ \ I / -------:.:.~~ / /, \ ~ . '."- I I 1 \ :j::.P" Ii I) '\ \ t:X~. . . .. ..; 7' \ "~~'" ..~, \ \ \ . '.. . \ \ ~ · ~~.W / /' \ 1 1:>< . .A-- -""., .' / \ \ ~~I.:f~~. ::, . \ / \ I 'to. ~n~ -..LJ;!. / "I ,', ~. dill;" ~l\ f;' ~ .1 J.. \ I I ' ~ ~ '0' .J' " '\ I /. ~ e~e ,'\ ."_ I ~ . .n' ~/~ ..;: <: . \ I , -~ .~, r zw r~ '.' I "\ . I)QI \ \~:m~, I :::s~:-~ " Ie' .1.~ -- · ~~ '" 11',\ ',., / '~"fiiX I '/ / \ Z ~ . . .... r,vF.F""Z=/ ~~.r..~ ":'..'.. 'OJ / 'Q' .... ,,<//. ~/ . . . .. '.1l1l.~ .. 'l/- ~ . . '<, ..... 1./.iP" '..:. C' . 'FA ,h r.;. .. ..... ~ , ~ ~ ~ .' .'. ..' ~'<!. "',<., '" - - h / t) ....... /<i. % '. . I~ -.ll-t 0 '. /" "''''''0 .. ~ ~-.~~:~_. : ~'::':I:""::: ~~':''--' "..' \: ~/;r' Di, Y // ~,:-:,~ <- plOlOf"O& . . . e\}.., m' , I~' " ::1\ , ~ \ .. ':"':. ~". .: . ..... '<'" \ f'" . . .. . . H . " ". ~. '. "::::.,::,,~ ~~~. ,,'.' ". -~ .-:-:' I eJ( ~, . , \ I ,.< . " . ..." , ~::-.f. -. ..,...,,:~, _ 0 ~.:-::~\ I ~:-~ ~ '. ~ .... L.-J \..~ L:-::-~ = ~ \ , . ': C, - ~. : ~.. . _ '>--. W ~ _3 . . . . . --... \ I ~ '. -1 . ..' . - --- ----..... ?- ~"" ~...~ \ f ; '. ~ . .~...- .........:, ,. ", I ~.' ':.' .... EP I'~ /\:~ I I . , ~ '.' ~ ~ . I I . "--,, '-"". . . . . . \, ' 'l'\JPR..... ._ __ ~ "~ . .'. \ .~ OLL"" .. . ':i ~';"~ ~:-::-. A, I I I . .,'. ....." ~ /I.... .'. I :', :.... '. \ .. " 'iL... ~ """".... ;:\:;:.::; / \ I .'::~ I I I -!4:7,!; ....--- ..::J:::(; ~.,. / \ i I ..' '~J /..., _ v~ . .. . \ I ....,' 0) "1 ~"T Jll<"".9 .;;;':-:-';:- I ~. () / =-... AN' 7.0 .... -......- I , 0: ....- 'J.9 '" L..... _ I ~ ~ 76' .: ",. .-.' -'-./ I <,.-, ) ...... . '[6 .... / ! < (" 0-1..- ..... :.......: .'-'.' .-.' / I I o ::J "-'1 - . .... ....M... '.:.:. ....;........:-.... J ~ ~ 'Y4 .~ ." .~..-~~0:r/::;::.:;.~ ~~ "~ _ ~ /' I.~ >- .T~~1t: j ~ilS; 'c~ ~ ~ ~,,~~ ;!. , .___~ .~ ~~~~ e rI , _ ~ ?) ~ . -.-- . ,=-".. / \ \ IIfSlGN NUIlIIER I 1.135_7700 J PlIIlJtCI MIlIiIlER / DAn 11/16/06 r PIlOJEClIlAllAGEll D. BANGASSER , _BY ~ CHC I CIEOCEIl BY ( GFE ! . Errors may occur in the transmission af e1ec\rllnic taos, The Opus CDIlIpon;U ole nDl responsible lor any claims, damages or J expOllSl!$ ari$;ng oul of lhe unaulhoritod .... 01 the inrarmDllon contained in electronic Illes, I · Elec:\ronic files may not occurolely rellecl the final 0$- bu~1 condilion.. It is the I responsibility 01 the user \0 verily oll loyoul.. dimensions and other reloted informutinn. I · This document may not be used OT copied without prior wriU.n consent. I e aU righls reserved \ - \ / I / \ I I I I f \ / I I, 'If ~r.r G OPUS. OpuS NorthweSt COnstruction LLC. l~a Bro. Rood Wool _1,"IeG, IIIl 55541-0 m-651-44# 152-&:15-4521 ,.. L1 SIIED "'-"BU -~ " ~ ~ ~ ~ ,fa <0 ~~ ~\ CO g '1Xl\lN '/77<0(. I( ~. ~D euILC>N:i . ~ IJ ~ ~ ~ ~ ~ ~ ';r // 77'r</ ~ % '// I' ~~. ~ AIloI 0~r{: 'T'>V ~ " II ~ ~ ~ ~ ~ - J ~ 1 .. T~ POCl<!I I r L{1~ ~ ~ ~ ~ ~ % ~ :/',0' //. I*~ j ~ % ~ - ~ ~ ~ L OPUS. Opus Art:hitects & engineers, Inc. 1039 ... load _ III..-Iea, UN m.s-G110 151-151-_ 15l-I51~21 101 8 ~ REGISIRATlOIf SUBMITTAL . Errors may occur in \he transmiSSIon of electronic files. the OpIlS companies are noL responsible fDr any claims. damages or expenses arising DuI Df the unauthorized use or the information contained in l elec1tDr\lC files. . Eleclronic iii.. may nDt accurDleb' reflecl the final os-buiJt conditions. It is the responsibility of the user to verify all layouls, dimen.ions and other related information. . This document may not be used or copied without prior wrillen consenl. II) all rights r.served Prtpond ror i OPUS. OpUS N rthwest COnstnJcUon LLC. 10350 Brill Rood W..t llI.......kD. UN m.s-GIIO 152-151-444<1 152-151-4521 101 PlllllECT EXCELSIOR CROSSINGS LDCA110H HOPI<INS. MN SHEET Tm! LANDSCAPE DETAILS SHEET N\.ljBER L 1.7 ISSIJI:_ 11/27/06 CllY DESIGN NUlIIIEll M35_7700 PlllllECTNlMIIER Of.1E 11/16/06 PlllllECT _I D. BANGASSER DRAM< BY CHC CHECKED BY GFE "=10'-0 l~~Ll ~~ OJ 0 ) ~ ~Co' Ix C0 ~NGoFJCJ~ :/ / POND 2 REllISIRATIllN ISSlf:RrcOIlll . 11 /27/06 CITY IX5ICN NlJIIIER M35_7700 PROJECI NlJIIIER Ql'lt 11/16/06 PROJECT NAHACER D. BANGASSER ORAMI BY CHC C1f[cxro Il'l' GrE . Errors may occur in the transmission of d!:C\ronic files. lhe Opus campanies are not responsible for any claims, damages or expenses arising aut of the unauthorized use of the mformation contolned in electronic Ides. " Electranic m.. may nat accuralely relied the final as-buill conditions. II is the responsibilily of Ihe user to verify all layouts. dimensions and other related information. . This document may not be used or copied without prior written consent lil aD righls re..rved p~r" OPUS~ OpUS Northwest Construction L.LC. IOJ~ Bron Road West Ill_lea, III :l534Hlll0 152-151-4444 !52-ISI-.t5Z9 fal 8 , OPUS~ Opus Architects & Englneers,lno. ,_ ..... Iloo4 WNI iii........... IIN :l534!-01' 152-151-4444 152-151-4521 I.. SUBMITIAl 8 . PROJECT EXCELSIOR CROSSINGS LOCATION HOPKINS, MN !HE! mu: LANDSCAPE DETAILS L1 I~- ~ c:o/ ~ ~"'- V~/LL~ / , ~ FOUNTAIN I _ rt::....- - ~ ~/ ~ 7 j~~ ~ // ~~A G~/ ~ j~~ ;~~~~,::-"->7 ~ ~~~~ ~ ~~ . ... ."._7 I/'- N~'~ l ~ &" !..!.A. F'OT. 1048" o.c. / 1/ ) C 18 CCN"PL E' / _ L-'".L PClND l2lI'L ~J.t.POtl 24"0f7 (-/ ./\ f ~ ~iS 1& ~IV ~ i--(REP) ~H 1/ ~ / \ 1\ /'I, L ~ A.-I' ,:71 .A t .~) ~ r I j- g ..2~~, I ~t-- Kr.. ~ I I i ~ ---/ A:::.. ' .. _ _ o~ --... ,v l ~ c.... ,,/ ~ (R1 ~) 7 '_ ~ ']7;- ~ r/ n ~ M"'~ ........... ....'...AN g\ U IlI'J .. _" __. ~..,. L~HT' \- ...... b " ;' A~'" f ~ ~ \ 1 ~ I' //JX 51> fUt.9l*,li"l(.POOfllN' ~ R'IO 0 ~ ... /.'\ ./1 A. ~ "'" "' ' / ~ // "'E") /' ,I I ~..., II ~ ~ ~~'W ~;" \ \. ~ - 'IT tr... ~~ 1 \.. V / / / / / /)<;/ / IY .....Tl1'oIIA& 'WAYE (ptNQ , .~..., A' \ / U......'~ ~ """-! 'i:/ / / / / / h'X/ .I .' ~ !':,AT. D' 0.0. ~ _ ''''''''....,.,.... _"..,. 7-::'< ,,~ ,y . 8041~:;A_:e:~~TI.6 ) I ~D) :~) ~~ .,.~~ 2.:2 :~Aea'MA~~UP4. ~ ~ ~.~~. rr(\ 0. ~ [J~ t-1-- ~~ ~ 11>" fU8,llt .li"l(.~~. (FlEpJ I./' g \.) &-' r, ..) ( V,.. (REP) 42 \LIA~""ARINao.~ ~ '\"......I .. HTCONT, .' 0.0. ~ K un T~' [.. I:) ro< V ~ .~ ~ 'W ]. ~ 1> IJl :/ V h t?S I( 'C' (./1/' ~ t!:' P . ~ ~ ~~ ~ ~~tr . . J..'rVUD' ~~ .,. r<;:9 . . ~,.~~~~ @'P ~ ~ 7\ ........,. . ...., ...~ ,~"'\ ( · 1 ~~~~r~~ \~K"-I T ~ ~~ ,. J ~ rr J,W' >rL ~ W""~-j,>", ~'.I""" ,~~ D '" ~ ~ V::: '/j ~ 'j 0 '" CEHT'.-l . I ~~ r~ ~I ~: l ~ p)~ ~ ~OE "/ I _ ~ ~I 01 [, .~ 7 7: ~" .J .L ({ . ~ 'K) rt't. m ~ gO" ..." '" ~'~L7k~ 1 ~ ~~b..L ~~bl:Tr " HT \ ,"f / / I/~ /- /' ~I )( '1 ",r.;..~ L &J I \. \ /' ~,/',0.;-:; "/L4~ ~I:'~/') . . ~ :/. 0/~ lfi ~""':' ~ ~ ~ #fl~~k ~ ~ '/~~ \ 0/~~~. ~ 2~:~ ~~ r:-If' ~ ~' ~~. I 1 ~~~I<I~ ~ ~. '- ~;I j0 -- . ~ y.,,~ )/ _ i\,' '''fif.~'/ \'~" ~~ \\ .~7 K)A;~~ ~~D ~ :\:~~ ~ ~ :::\:-:~ ~~ . /: o7~iGAREAS -- FOUNTAIN I T?l'" J --- ~ ~ -J T i ,& ~c:o 0\ 9' MIN. TO PAVED 5UF<:FAc.E:, HIP 2 >- CONIFEROUS SHRUB NO SCALE , OPUS OpUS ArchItects & Engineers, Inc. IS5IIE R!CllRD 1/27/06 CITY SUBMmAL . ErrofS may occur in the transmission of eledronic meso The Opus com_ ore not responsible for any claims, damages or expenses arising out of the unauthonzed use of Ihe informot,on conlained in eleclronic file.. . Dectranic tiles may not accurately reflect the f,nal as-buill canclilians. It is the responSIbility of Ihe user 10 verify all layouts, dimensions and other related information. . This document may not be used or copied without prior written consent @ 011 rights reserved 8 ~ ,,",porod r... OPUSGD OpUS Northwest ConsIrucUon LL.C. 10550 Ilrtn R.Del W... Mlnnttoftlca. tiN 55)43-0110 '52-656-44<44 '52-656-4529 I.. PROJECT EXCELSIOR CROSSINGS lOCAnON HOPKINS, MN SHEElTlllE LANDSCAPE DETAILS AND PLANT LIST 10350 ... .... "." M1nMlonb. 11M 5SJ43-1 952-656-4444 952-151-_ lax DESOl NUIlIlER M35_7700 PROJECT NUlIlOl OAT! 11/16/06 PROJECT .......wI D. BANGASSER DRAWN BY CHC CHEactO BY GfE R(CI51IlA_ LAV'lN OF<: PL.ANTINl!1I SED 6ENEAAL NC:m$a iPLANTLIST:SHEETL1.1ONLY - U\NCI5G.....-e ~TClR ~ VISIT Sl1E PRlClR TO sueMITTlN6 BII:' TO BEG.OH! ' Common&BoIanII....- c:.oMf'LeTB.... ,....,..LIAR ",TH 51T!! GONC/ITIote. . -............. ,.,., - AU. ~ AN "INI~ ~1N6 TO ee PONe B'I" OTH!RS. , . OS_ ! IofoLw - lot:) PLANTIN6 I'IfLL Be INSTALLEP UolTlL ALL 6RAP1Iok5o -'ND GON$T~TION AAS ElEEN !. .....t... c:.oMf'Le'A:p IN IMI4!PI"TI! ~ ! ! - IT 16 THe FU!5PONlW5ILI'N' af' THe 0JI'tER C GClNT'IllAGTOR TO IDeNTlP'Y" ALL ; ~~. c:oNCIUIT$, 1'If~. eTC;. OM THe~. 1PLANTUST - I,. THeR!!! 16 A P~NC;'Y' ~ TIe NIJMl!leR af' f'I...oIIN'1"5 ~ ON Tte PLAN Laty. AND TI'E tuolBeR OF f'LANT6lilHCH"fi IN THe PLANT LIST. T1E tuooeeR OF PLANTS SHOI'lN ~ OM TIe PLAN rtLL TAIl:e ~ i. i - AU. GONTAltER HA'TERLIlL TO 151! 6ROt'tl IN GONTAlteR A MINIMUM OF 6 HOtI'TI-5. ~ - AU. MAT!!~AL eHALL GOMI'L'Y' I'IfTH THe LI"ITST I!I)fT'ON Of" THe ~1c.AH STANDARD ~ I"OR ~'\" SToelC. NoeRlc.AH ~IATION Of" NJRSeRYI'eN. ~ - Ftl!PAlR AU. P~ TO PROl"eRT'Y' !'ROM PLANTlN6 Ol'eAATlONS AT NO c;osT TO THl! r ONER. L I - ~ I'Ei'l PLANT MATERI..... 'nflt(:lU6H OlE ~,Io,R '\'VIR FOR ~1PUCU5 t ~ UP" TO 5-1/.2' c.AL. . GONII'I!!lt6 UP" TO II' HT. ~ ~ze ",LL 51! ~D r I"OR 'I1"lO ~M ~ P'ItOM Tlt-e af' """"'SlCNAL AGGePTANCoe. ~ - AU. PAOP06EI:) PLANTS 5HALL Be I.OGATI!E) GAREPILL" 16 SHOi"f'l ON THe ~ AND t 5HALl. BE ~ S"/' ~....-e M.C:H1n:c;T BEFORE THE"/' ARE INST.....LECl. ~ - ~TOR ~ Slel>T1M\! MAQlN! l'\O'oIIS) MATERIAL USN ~TE SIZE r ~?APe,.Olt. 5 & 5 r'lITH ~ MGHITeGTS ~AL. t I - L.ANP5GN'E ~TClR SHALL ENSURE THII.T toEl'I TREES MOVEI:' ONTO THE SITE ME r =~.:r~~~~ ~~ ;.~~!lO~~~ 'M! !o01~ OP THIS PRO.EGT (tEAV'( TO t - ~ ~TOR IS ReGIUI~1:' TO ~CI"IeR""", ~ I~TlON 0URIN6 ~ ~01:7 ~T1N60 TO ~~IN6, "1!I!I:)1Iok5o. 1"RUNlN6. f'e$T ~ AND ~TeP ITI!M6. 1HIS I'IILL 151! PRePAAEI:' AND DELI~ TO orteR AFTER f'ROVISlONAL INSf'EG.TlON IoPF'ROVAL AAS BEeN CIoNEN S"/' ~....-e MGHITeGTS. - r<<APPIN6 HA~AL 5HALL 51! ~TI!t) TREe l"l'fQTI!CT\ON I'IfTH THE! SIze op 'TlJElI! I' I:'IA. (MIl4J LM6I!R THAN TIe c.ALl~ INCH Size Of" ~e TO I5e PfllO'1'e(;TI!I:). rIRAP AU. TREe6. exGePT ~'I" ~ 5HALL 151! PRO'TeGo'Tet) PRIOR TO 1211 AND nee& ~ ISY 511. - FOL. 'Y' 1!P6eR LtLI!5& !ll"eC:oIPII!E) OTHeRl'llSl!, 5HALL BI! s..AQ:: V1N'l'L EDGeR. elTletlc OL 'Y'-aLA a.-.a..es 1"'-. ~ t::NI~ $T'I'LE EJ:I6oER OR ClUTc.H eoBAA $T'I'LE ~ - ~ MJLGH ",LL I5e S. Dee" 1"-1 1/.2" I:'IA. ~P ~IYE~ ROa: ",TH I'el' c:.HE" (;LOTH. - 5" DEEP I'lOOI:) HJLGH ",LL Be INST"'-LECl UNC/ER ALL 'I1'lEES NO SHRL.eS THAT .IooRE ISOL"TEO f'AQM ~ ARE-'S AND 6eIERAL SHRIJS HA55ES. - ~~ ,.AMlCo n'IL TSl HAT) TO HAve A COl"BlNEO 1'E1&HT OF 4.!H~.:l OZ. ~ S..... F.aaRlCo eHO\U) BE U.V. STAl5ILJZl:I:) AND HAve A "I\IE YEAR MINlHJH I'EATJoERABILITl" FAc.TOR IN RJLL 5UN..16HT. FAeRICo TO Bf PHILLIPS DUON R OR EGlJIVALENT. SAHPLe ReGIUlRED FOR APPRl:NAL. - AU. Pl.ANTIN6 5HALL ReGEIVE PERnLIZER Ab FOLLOr'6o 5UI+lER NO FALL Pl..AlmN60 - ElEFORE I'IINTER FREEZE-uP APPLY 0-:20-:20 6RAItIJ\R IN 5JlU(;ER ARl:lt.Nl7 PLANT AT THI! RA1E af' 1012 OZ. c.I'\N PfR 2-5" ~ TRee C 1-6 oz. c.AN I'ULL PER 5HRI.e. I"OLLClI'I UP" I'IITH THE s.AHe AJolClUNT op 10-10-10 THE FOLLOI'IIN6 Sl"R1N6. - SOP SHALL ee H1iSHLAND SOP. so- .. IO()' R.OU..S f'ReFfRREO I"lHERe Af'PL1c.ABLE:. TO BE LI"III:' PARIlLLEL TO THE c.oNTOUtS AND HAVE STA66EReI:l .JOINTS. ON SLOPES STEEPER THAN 5.1 OR DRAlNMe foI'IALE5. THE SOP SHALL BE STNa:O INTO TIE 6ROIJIoID. SCARIl"'f TIE EJCI5T1N6 6AAOE5 rlITIf FIELP cu"TIV"TOR TO A MIN. OEPTH OF 12' f'FtIOR TO '"'-"Go1N6 af' TOf'!C)IL AND ,.INl9H 6RA.D1N60 I"OFt ~. IMtEI:7IATa'l' PRIOR TO PLA.c.N SOP. ~TOR SHALL AI"PL.... 10-6-4 FERTILIZER AT THE RAT!! OF' 10 f'OUNDS PER 1000 SGl. FT. - c.RA5N'P\..E TREeS SHA.LL II"VE NO BRi'INCoHES eeI..ON 5f>' ABOVE THE ROOT 6AU.. ANt) II"VE NO V c.ROTc:.IES. - c.ALIPE~ OF' ALL mee ~ UP" TO AND INGoUOIN6 4' SHALL Be MEASURED 6' AeGNe 6RGlI.tlD LEVEL, AND 12' ABOVE 6ROUND LI:VEL FOR LAR6ER SIZES. - I:)EG.IDIJOUS ~ SHA.LL HAVE HINHJM OF FIVE (5) CoAtES AT 5F'ec.IFIED HEl61lT lJNI.E56 c:meRl'llSE NOTE!:) IN PL..AKT LIST. - AU. PLANTlN6 ~ ~e;IVIN6 6ROlJNDGOVER. PERe,"Al..5. ANNUAl..5 . VIlES SHALl.. REG.EM: A HIM. e" DEPTH OF PL..AKTIN6 SOIL (455 TOPSOIL. <455 PEAT OR ~ 10lli ~J. - JIILL PERENNIAL ElEI:'S I"IERI! 'TU-IPS AND ~/O.!.s ~ f'l.AIoITEI:). NO FILTER """T I"IILL BE IN9TALLeJ:) Ato MJL.C.H~ I'tILL NOT ee "NY' ~ THAN 2'. J'ILL OTHER f'eReNNI/O.!. ~ I'IILL ~1Ve "~RIC; AND A '" t'EPTH Of' I'I.lLCH. - NHlA.L5 TO ESE P\...A.NTEP NO LI"I'T!:R THAN 15 ..JJNe ,t6 F"eR PLAN. "NY' AHNJAL. PI.ANTIN6 t)ONE ~ THAT I:'ATe tot.$T HAVE PLANT MATERIAL APPROVED B'I' C)I'INER I ~e ARc.H1TEc.T. - II" THE c.oN'l'RAc.TOR 1"eeL5 AN eMOR H/'I5 B!9:N M-'PE ~AAPIN6 9/"}G.IN6 OR HA.lUl11e!!o OF' A ~CoI~ Dr' ~r MA~R1AL IIIDlCoM!;!) ON THE "LAN. NOTIN THE ~E A.Rc.HITEc.T PRIOR TO THE INSTALLATION OF' PVoNT HATERIAL. - AU. HEI"L'" IN!TALLeD PL..AKT """reFIIIAL SliALL ESE PLANreD IN ..eLL-DRAllE!) AREAS. GONTRAc.TOR SHA.LL AVOID INSTALLIN60 /W'( Pt-ANT """TERIAL IN PRAlNI'6E ~ OR Jl'ET . POORL. Y DRAIHED AREAS. - ALL ~ ~I"II!E) Ab ~ !!>eI!!1:)' TO ae !leeDl!l:' "ITH HNl'OT ~et:1 MIX "5OA AT A RATE OF' 150 Le5j}G.. I"IITH 2 TONS f>t1ReI:)DeD AND f'IJNQ-tED IN PLAGoE STRAI'I PER Ac.RE. H'I"DRO$EEDIIok5o , HULGHIIok5o IS NO AGGEPTAeLf At TERN.l.TE. - JIILL ~ SHOI'IN OM PLAt4 I'IILL BE INSTALLEI:' (Pt...HI1ED) 50 THAT APf'l<C)XJ"""TEL'l' 115 OF THe Ac.TUAL VERTIc.AL IlEI~ OF THE E\OUU)ER I'IILL ElE BELOI'I ~ LeyeL. NO elOI.\.[)I!!l: I'IILL 51! SET ON ~ OR IN AN UNlJSU/O.!. ~ITIOM. LAViN OR PAVED 5IJFi:FAc.E 9" L.AYEF<: OF V'lOOD c.HIP MUL.c.H LINE OF PLANTINl!1I PIT I"IHEN LE~END PLAN11:D INDIVIDUALL. Y \7 ~~~Wrfe~b~c.oMPAc.T SOIL: Q EXlSTIN6 TREES ~. PROPO:fP ~ ;" Cll AND SI-R.e5 II' '\: _ SOD I'VIRRl6ATJCtol _ I'IEltAND SEEP rvo IMI6ATlON _ RCU6H SEEP 1"10 IMI6ATlOH 1 ~ 9 L1 DECIDUOUS TREE SLOPING SITE NO SCALE 5 DECIDUOUS TREE LEVEL SITE NO SCALE 4 PEPTH CONIFEROUS TREE NO SCALE 3 DECIDUOUS SHRUBS NO SCALE L