Loading...
Memo - Blake Road Corridor Collaborative Update9 R WA, P. V / Memorandum To: Honorable Mayor and Members of the City Council CC: Rick Getschow, City Manager From: John R. Bradford, City EngineerAA Date: 03/03/2011 Re: Public Meeting 4th Street North Sidewalks A public information meeting was held on February 16, 2011 for the 2011 Street Improvements Project. The topic of the meeting was a resident proposed sidewalk along 4th Street North between 12th and 17th Avenues North. We mailed a notice of the meeting and a drawing of the proposed sidewalk to all property owners along the proposed sidewalk route. We had 10 residents, representing 7 of the 18 residential properties along 4th Street North, attend including the main proponent for the sidewalk. All but one property owner was adamantly against a sidewalk in this location. The primary objections were a lack of perceived need, cost, and impact to property owners. The gentleman who initially proposed the sidewalk at the January Council meeting no longer supported the sidewalk on 0' Street North. The residents did suggest a painted sidewalk lane on the roadway for summer use. We do not endorse this suggestion for safety and liability concerns. A bike lane is something we could consider. Since this would only involve paint, we would recommend not implementing this until a comprehensive sidewalkibike route study is completed. Additionally, we would like to discuss the 14th Avenue North sidewalk at the worksession.