CR 10-059 - 2011-2015 Equipment Replacement PlanJuly 6, 2010 0 Proposed Action Council Report 2010-059 City of Hopkin 2011-2015 EQUIPMENT REPLACEMENT PLAN Staff recommends adoption of the following motion: Move to adopt the 2011-2015 Equipment Re lacement Plan. Overview The equipment replacement plan is a detailed summary of the next five years of a twenty-year replacement schedule, for equipment of the City of Hopkins. General and Special Revenue fund equipment items are placed in the Equipment Replacement Fund budget which derives its revenues from service charges to the General and Special Revenue funds, equipment sales and interest earnings. The Enterprise fund equipment in the plan is placed in the individual enterprise fund budgets, in the year in which the equipment is to be purchased. Approval of the 2011-2015 allows staff to incorporate the 2011 ERP items into the 2011 budgets and begin •preparation for their purchase. Items that fall under the Minnesota Statutes Uniform Bidding/Contracting Laws will require further approval by the council before their purchase. Staff is recommending adoption of the plan. Primary Issues to Consider • Should the annual service charges to the general and special revenue funds be adjusted? • What changes have occurred in the equipment replacement plan since last year? Supporting Information • Power point presentation • 2011-2015 Equipment Replacement Plan Christine M. Harkess, CPA, CGFM Finance Director Financial Impact: $ as provided in plan Budgeted: YIN X N Source: Various . Related Documents (CIP, ERP, etc.): ERP Notes: U • 0 City of Hopkins 2011-2015 r� k " ERP Future Hues in the Equipment Replacement fund are ed from charges to city departments that use the iment. flow projections are updated annually to ensure uate funds for scheduled replacements. • Funding challenges are foreseen in the future V , City Nall Equipment •The large city hall copy machine is scheduled for"re placement at a cost of $13,000 Engineering printer/scanner is leased on a 5- yearlease Document management scanner to be replaced at a cost of $6, Soo ERP Background • The'city has established an equipment replacement plan that is reviewed and adjusted on an annual basis. For 2011 the city is planning on replacing or upgrading seven vehicles and four pieces of equipment. • Following are some highlights of the plan. MW a City Hall Equipment u. •Annually the city replaces a portion of its obsolete ' corrputerswith newer technology. • ,$30,000 per year is allocated to replace old computers and s16,5oo per year is allocated for network upgrades. i p'! 4 i F � { j yy h � �• t f City of qfopkins • l oto first street South • Hopkins, W 55343-7573 • Phone: 952-935-8474 • Fax• 952-935-1834 Ino- Web address. www.hopkinsmn.com DATE: July 2010 TO: Honorable Mayor and Members of the City Council FROM: Rick Getschow, City Manager SUBJECT: 2011-2015 EQUIPMENT REPLACEMENT PLAN With this letter, I respectfully submit the 2011-2015 Equipment Replacement Plan. This five-year planning document represents the combined efforts of city staff and the City Council. The Equipment Replacement Plan is a five-year forecast of equipment replacement needs in the City of Hopkins. It is intended to alert the Council and citizens of equipment replacement needs that are needed to maintain the efficiency of city services and the safety of city staff. The first year of the plan becomes the adopted budget, however the equipment is again re-evaluated before final approval is given for the purchase. The • remaining four years represents estimated replacement needs and the related funding. The Equipment Replacement Plan does not include proposed capital projects. A document relating specifically to capital project needs has been developed into a separate document. • The Equipment Replacement Plan is intended to serve as a planning tool and is therefore structured to present a meaningful, long-range perspective of the city's equipment needs over the next 20 years. At the same time sufficient details on individual pieces of equipment scheduled for replacement is provided to enable those who review the information to make informed decisions of the city's equipment needs over the next several years. Please use the information provided to assist in the understanding of the city's equipment needs as they relate to the delivery of service to the citizens of Hopkins. This document was developed by the Finance Department with the assistance of all city departments. I wish to especially thank all those involved in the development of the Equipment Replacement Plan, and especially. Steve Stadler, Public Works Director, Connie Kurtz, Police Administrative Services Director, Dale Specken, Fire Chief, Jim Genellie, Assistant City Manager, Christine Harkess, Finance Director and Deb Dahlheimer, Sr. Finance Clerk for their hard work and dedication. Partnering with the Community to Enhance the Qaafity of Life 0 Inspire # Educate + Involve + Communicate • 9 EQUIPMENT REPLACEMENT PLAN 2011-2015 TABLE OF CONTENTS CITY MANAGER'S MESSAGE TABLE OF CONTENTS Page INTRODUCTION Background and Summary of Changes from 2010 Plan 1 FIVE YEAR SUMMARIES Equipment Replacement Fund Cash Flow 4 Projects by Year 5 Department Summary 8 Projects by Department 9 Funding Source Summary 12 Projects by Funding Source 13 Projects & Funding Source by Department 16 • EQUIPMENT REQUESTS Individual Equipment Request Details 21 TWENTY YEAR REPLACEMENT SCHEDULE Twenty Year Schedule by Department 82 EQUIPMENT AND BUILDING INVENTORY Vehicle/Equipment Inventory 87 Building Inventory 91 0 • EQUIPMENT REPLACEMENT PLAN 2011 - 2015 BACKGROUND AND SUMMARY OF CHANGES FROM 2010 PLAN Background The Equipment Replacement Plan is a twenty-year forecast and a five-year plan of equipment needs in the City of Hopkins. It is intended to inform the Council and citizens of the major equipment needs on the horizon. The first year of the plan becomes an adopted equipment budget and relates to the operating budget of the equipment replacement fund, which is approved on an annual basis. The remaining nineteen years represent an estimate of equipment needs and funding capabilities of the City. Funding requirements vary from year to year. In order to maintain a fairly consistent levy each year, the twenty-year schedule is projected with a 3% inflation factor for operating expenses and a yearly average dollar capital expenditure of $816,100. The cash flow requirements to fund equipment needs in the equipment replacement fund, will experience a roller coaster effect over the next 20 years given the projected equipment needs and 3% inflation rate. After reducing the intragoverninental charges by 50% in 2003 in response to the LGA cuts, charges were increased 2% in 2004 and 9% in 2006 and were not increased again until 2010 when they were raised by 2%. This has resulted in a steady decline in the working capital of the fund. Intragovernmental charges are at 58% of what they were in 2002 and at the • current rate structure will not return to that level until 2021. Unfortunately our equipment needs are not changing. The plan as presented proposes a 3% increase in charges for 2011, a 4% increase for 2012, a 5% increase in 2013 and a 6% increase in 2014 and 2015. Each year staff re-evaluates the equipment needs and adjusts the schedule accordingly. Changes to the plan are reflected in the document. Refurbishments, extended life expectancy and closer cost estimates of replacements have been incorporated into the plan. The equipment replacement charges in the general fund represent approximately 2.8% of total general fund expenditures. Future increases each year are needed to fund the equipment replacement plan without issuing debt. The Equipment Replacement Plan's basic premise is scheduled replacement of present equipment. A new item must, in the year proposed, be presented in the annual operating budget with a stipulation that replacement will be necessary in the future. Flexibility of the Equipment Replacement Plan is established through annual review and revision, if necessary. Summary of Changes from 2010 Plan Highlights of changes from last year's equipment replacement plan for the years 2011-2015: Activity Center: There were no changes to Activity Center items in this CIP. • Arts Center: Due to limited availability of the carpet extractor located in another city building the Arts Center added a carpet extractor for their building at a cost of $3,000 to be purchased in 2012. Due to high usage of this • unmanageable the equipment will be put on the schedule for earlier replacement. Parks/Forestry The '/2 ton pickup originally scheduled for replacement in 2011 was moved back to 2012 as its condition warranted extension of its life. The 3/4 ton pickup originally scheduled for replacement in 2011 was moved back to 2012 as its condition warranted extension of its life . The life of this truck was extended from 10 to 14 years. Riding Mower originally scheduled for replacement in 2011 was moved back to 2013 as its condition warranted extension of its life. A tractor (item 10 -ERP -806) originally scheduled for replacement in 2012 was eliminated and replaced with a toolcat that was purchased in 2010. The second tractor due for replacement in 2014 was moved back to 2016. Streets/Traffic The tandem dump truck (item 01 -ERP -306) originally scheduled for • replacement in 2013 was moved ahead to 2011 due to the current condition of the truck. The truck will be refurbished at a cost of $22,000 and its life extended to 2018. The second tandem dump truck scheduled for 2015 was moved ahead to 2013 due to the conditions of that truck. Skid Steer Loader originally scheduled for purchase in 2010 was moved back to 2011 as staff felt we could get another year of use from this piece of equipment. Sweeper due for replacement in 2013 at a cost of $164,500 was reduced by $8,100 to $156,400 to more accurately reflect the cost of replacement. Refuse There were no changes to refuse department items in this CIP. Water There were no changes to water department items in this CIP. Sewer There were no changes to sewer department items in this CIP. is Five Year Summaries • Memo Only Long Tenn Receivable 2007 Hockey Booster Loan repayment Cash Balance + LT Receivable • 0 95,609 75,609 55,609 35,609 15,609 - 18,783 15,640 12,497 9,354 6,211 3,068 1,126,779 1,248,046 1,154,439 1,170,936 503,752 EQUIPMENT REPLACEMENT FUND (602) 06/28/2010 Rate Change 0% 0% 2% 3% 4% 5% 6% 6% ACTUAL ACTUAL BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET 2008 2009 2010 2011 2012 2013 2014 2015 Working Capital Begin Year 1,371,188 1,033,705 1,161,011 1,087,404 1,123,901 476,717 151,896 83,082 Revenues from charges 287,127 287,463 293,212 302,009 314,089 329,793 349,581 370,556 Transfer In - Pavilion - Capital Lease 20,000 20,000 20,000 20,000 20,000 15,609 TransferIn- Pavilion - Hockey Loan 3,217 3,143 3,143 3,143 3,143 3,143 3,142 Federal & State Grants 12,154 52,545 Fire Truck Lease 425,000 Interest earnings 37,377 18,519 52,760 49,447 51,090 21,966 7,349 4,253 Otherrevenues (saleofassets) 16,150 10,258 25,000 25,000 25,000 25,000 30,000 30,000 Total Revenues 801,025 391,928 394,115 399,599 413,322 395,512 390,072 404,809 Expenditures (excludes Depr.) 25,604 25,248 26,005 26,786 27,589 28,417 29,269 30,147 expenditures include copier & eng scanner leases Fire Truck Financing Pymnts (2009-2018) 3,889 53,907 54,217 54,217 54,217 54,217 54,217 54,217 CapitalOutlay- Equipment 1,109,014 185,467 387,500 282,100 978,700 637,700 375,400 412,200 1,138,507 264,622 467,722 363,102 1,060,506 720,333 458,886 496,564 Working Capital Ending Balance 1,033,705 1,161,011 1,087,404 1,123,901 476,717 151,896 83,082 (8,673) Cash balance 1,031,170 1,171,437 1,098,830 1,135,317 488,143 163,321 94,508 1,753 Memo Only Long Tenn Receivable 2007 Hockey Booster Loan repayment Cash Balance + LT Receivable • 0 95,609 75,609 55,609 35,609 15,609 - 18,783 15,640 12,497 9,354 6,211 3,068 1,126,779 1,248,046 1,154,439 1,170,936 503,752 Project Name Department Project # Priority Project Cost • 2013 Activity Center Copy Machine Activity Center 01 -ERP -0030 n/a 15,000 Network Server City Hall Administration 07 -ERP -0003 n/a 8,000 Computers City Hall Administration 01 -ERP -0006 nla 30,000 City Hall Small Copy Machine Community Services 07 -ERP -0002 nla 20,000 Engineering Printer/Scanner Community Services 01 -ERP -0007 n/a 10,000 Document Management Scanner (3) Community Services 01 -ERP -0008 n/a 6,500 Aerial Truck Fire 01 -ERP -0106 nla 54,217 Thermal Imaging Camera (2) Fire 01 -ERP -0112 n/a 11,500 Marked Patrol Vehicles (6) Police 01 -ERP -0200 n/a 71,200 Police Administrative Vehicles (2) Police 01 -ERP -0204 n/a 29,600 Network Server (3) Police 01 -ERP -0211 nla 8,500 Tactical Ballistic Vests Police 01 -ERP -0214 nla 23,200 Radios - Portable and Mobile Devices Police 01 -ERP -0215 n/a 15,000 Engineering Van Public Works: Engineering 01 -ERP -0700 n/a 21,500 Riding Mowers (3) Public Works: Parks/Forestry 01 -ERP -0808 n/a 22,800 Brush Chipper Public Works: Parks/Forestry 01 -ERP -0813 nla 25,700 4X4 3/4 Ton Truck with Plow Public Works: Streets/Traffic 01 -ERP -0301 n/a 30,400 Tandem Dump Trucks (2) Public Works: Streets/Traffic 01 -ERP -0306 n/a 142,400 Sweeper Public Works: Streets/Traffic 01 -ERP -0317 nla 156,400 Backhoe Loader Water 01 -ERP -0502 n/a 134,800 Total for 2013 836,717 2014 Network Server City Hall Administration 07 -ERP -0003 n/a 8,000 Computers City Hall Administration 01 -ERP -0006 n/a 30,000 • Engineering Printer/Scanner Community Services 01 -ERP -0007 n/a 10,000 Document Management Scanner (3) Community Services 01 -ERP -0008 nla 6,500 Aerial Truck Fire 01 -ERP -0706 n/a 54,217 Automated External Defibrillator (2) Fire 01 -ERP -0720 n/a 7,200 Copier HRA 01 -ERP -0401 n/a 13,000 Ice Resurfacer Pavilion 07 -ERP -1000 n/a 180,000 Electric Ice Edger Pavilion 07 -ERP -1001 nla 5,000 Marked Patrol Vehicles (6) Police 01 -ERP -0200 nla 73,400 Utility 44 (unit 212) Police 01 -ERP -0203 nla 47,700 Police Administrative Vehicles (2) Police 01 -ERP -0204 n/a 30,500 Logging Recorder Police 01 -ERP -0270 n/a 36,900 Network Server (3) Police 01 -ERP -0217 n/a 8,500 Digital Squad Car Cameras Police 01 -ERP -0213 n/a 42,600 Radios - Portable and Mobile Devices Police 01 -ERP -0215 n/a 15,000 Riding Mowers (3) Public Works: Parks/Forestry 01 -ERP -0808 n/a 20,300 Asphalt Paver Public Works: Streets/Traffic 01 -ERP -0314 n/a 48,800 Refuse Truck (Rear -L) Refuse 01 -ERP -0901 n/a 101,600 44 3/4 Ton Truck Sewer 07 -ERP -0550 n/a 35,700 Total for 2014 774,917 2015 Network Server City Hall Administration 01 -ERP -0003 n/a 8,000 Telephone System City Hall Administration 01 -ERP -0004 n/a 89,600 Computers City Hall Administration 01 -ERP -0006 n/a 30,000 Engineering Printer/Scanner Community Services 01 -ERP -0007 n/a 12,000 Document Management Scanner (3) Community Services 01 -ERP -0008 nla 6,500 . Duty Chief Vehicle (1) Asst Chiefs Vehicles (2) Fire 01 -ERP -0103 nla 37,000 Aerial Truck Fire 01 -ERP -0106 n/a 54,217 Wednesday, June 30, 2010 6 City of Hopkins, MN . EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 DEPARTMENT SUMMARY Department 2011 2012 2013 2014 2015 Total Activity Center 15,000 15,000 Arts Center 12,100 3,300 15,400 City Hall Administration 38,000 38,000 38,000 38,000 127,600 279,600 Community Services 29,500 16,500 36,500 16,500 18,500 717,500 Fire 64,517 320,517 65,717 61,417 108,617 620,785 HRA 13,000 32,400 45,400 Pavilion 185,000 785,000 Police 156,300 184,200 147,500 254,600 190,300 932,900 Public Works: Engineering 21,500 21,500 Public Works: Parks/Forestry 156,100 48,500 20,300 224,900 Public Works: Streets/Traffic 58,000 327,600 329,200 48,800 47,000 810,600 Refuse 101,600 204,800 306,400 Sewer 35,700 35,700 Water 134,800 14,200 749,000 TOTAL 358,417 1,046,217 836,717 774,917 743,417 3,759,685 • 0 8 I14ednesday, June 30, 2010 Department Project# Priority 2011 2012 2013 2014 2015 Total • HRA Total 13,000 32,400 45,400 Pavilion Ice Resurfacer 01 -ERP -7000 n/a 180,000 180,000 Electric Ice Edger 01 -ERP -1001 n/a 5,000 5,000 Pavilion Total Police Marked Patrol Vehicles (6) 01 -ERP -0200 n/a Sergeant's Vehicle 01 -ERP -0201 n/a Utility 44 (unit 212) 01 -ERP -0203 n/a Police Administrative Vehicles (2) 01 -ERP -0204 n/a Police Services Liaison Vehicle 01 -ERP -0206 nla Copy Machine . 01 -ERP -0209 nla Logging Recorder 01 -ERP -0270 n/a Network Server (3) 01 -ERP -0211 n/a Mobile Data Computers 01 -ERP -0212 nla Digital Squad Car Cameras 07 -ERP -0213 n/a Tactical Ballistic Vests 01 -ERP -0214 n/a Radios - Portable and Mobile Devices 01 -ERP -0215 n/a Police Total 19,700 Public Works: Engineering . Engineering Van 01 -ERP -0700 n/a Public Works: Engineering Total 36,900 8,500 8,500 8,500 8,500 Public Works: Parks/Forestry 1/2 Ton Pickup Truck 01 -ERP -0800 n/a 44 3/4Ton Trucks (2) 01 -ERP -0801 n/a 3/4 Ton Utility Truck 01 -ERP -0802 n/a Trucksters (3) 01 -ERP -0807 n/a Riding Mowers (3) 01 -ERP -0808 n/a Brush Chipper 01 -ERP -0813 n/a Public Works: Parks/Forestry Total 15,000 15,000 15,000 15,000 Public Works: Streets/Traffic 44 3/4 Ton Pickup with Plow 01 -ERP -0300 n/a 4X4 3/4 Ton Truck with Plow 07 -ERP -0301 nla 1 Ton Dump Truck (2) 01 -ERP -0303 n/a 1 Ton Traffic Boom Truck 01 -ERP -0304 nla Tandem Dump Trucks (2) 01 -ERP -0306 n/a Front End Loaders (2) 01 -ERP -0308 n/a Skid Loader (2) 01 -ERP -0309 n/a Sweeper 01 -ERP -0371 n/a Roller 01 -ERP -0312 n/a Asphalt Paver 01 -ERP -0314 n/a • Sign Machine (Traffic) 01 -ERP -0377 n/a Public Works: Streets/Traffic Total 33,600 33,600 30,400 185,000 34,700 185,000 67,200 69,200 71,200 73,400 75,600 356,600 33,600 36,000 156,400 156,400 37,800 71,400 48,800 48,800 13,400 47,700 47,700 27,900 28,800 29,600 30,500 31,400 148,200 22,000 22,000 19,100 19,700 36,900 36,900 8,500 8,500 8,500 8,500 8,500 42,500 62,700 62,700 42,600 42,600 23,200 23,200 15,000 15,000 15,000 15,000 60,000 156,300 184,200 147,500 254,600 190,300 932,900 21,500 21,500 21,500 21,500 26,400 26,400 67,400 67,400 32,200 32,200 19,800 79,800 10,300 22,800 20,300 53,400 25,700 25,700 156,100 48,500 20,300 214,900 33,600 33,600 30,400 30,400 34,700 34,700 75,000 75,000 22,000 142,400 164,400 172,000 172,000 36,000 36,000 156,400 156,400 45,900 45,900 48,800 48,800 13,400 13,400 58,000 327,600 329,200 48,800 47,000 810,600 10 Ifednesday, June 30, 2010 • • City of Hopkins, MN EQUIPMENT REPLACEMENT PLAN 2011 ffim 2015 FUNDING SOURCE SUMMARY Source 2011 2012 2013 2014 2015 Total AC - Arts Center Fund 12,100 3,300 15,400 Bonds/Lease 54,217 54,217 54,217 54,217 54,217 271,085 Equipment Replacement Fund 292,100 988,700 647,700 385,400 424,200 2,738,100 HRA - Housing and Redevelopment Authority 13,000 32,400 45,400 PA- Pavilion Fund 185,000 185,000 RF - Refuse Fund 101,600 204,800 306,400 SF - Sanitary Sewer Fund 35,700 6,800 42,500 WF - Water Fund 134,800 21,000 155,800 GRAND TOTAL 358,417 1,046,217 836,717 774,917 743,417 3,759,685 12 I,Yednesday, June 30, 2010 Source Project# Priority 2011 2012 2013 2014 2015 Total 4X4 314 Ton Truck with Plow 01 -ERP -0301 n/a 30,400 30,400 1 Ton Dump Truck (2) 01 -ERP -0303 n/a 34,700 34,700 1 Ton Traffic Boom Truck 01 -ERP -0304 n/a 75,000 75,000 Tandem Dump Trucks (2) 01 -ERP -0306 n/a 22,000 142,400 764,400 Front End Loaders (2) 07 -ERP -0308 nla 172,000 772,000 Skid Loader (2) 01 -ERP -0309 n/a 36,000 36,000 Sweeper 01 -ERP -0311 n/a 156,400 156,400 Roller 01 -ERP -0372 nla 45,900 45,900 Asphalt Paver 07 -ERP -0314 n/a 48,800 48,800 Sign Machine (Traffic) 01 -ERP -0317 n/a 13,400 13,400 Engineering Van D7 -ERP -0700 n/a 21,500 21,500 1/2 Ton Pickup Truck 01 -ERP -0800 n/a 26,400 26,400 44 3/4Ton Trucks (2) 01 -ERP -0801 n/a 67,400 67,400 3/4 Ton Utility Truck 01 -ERP -0802 n/a 32,200 32,200 Trucksters (3) 01 -ERP -0807 n/a 19,800 19,800 Riding Mowers (3) 07 -ERP -0808 n/a 10,300 22,800 20,300 53,400 Brush Chipper 01 -ERP -0813 n/a 25,700 25,700 Equipment Replacement Fund Total 292,100 988,700 647,700 385,400 424,200 2,738,100 HRA - Housing and Redevelopment A 44 3/4 Ton Truck 01 -ERP -0400 n/a 32,400 32,400 Copier 01 -ERP -0401 n/a 13,000 13,000 HRA - Housing and Redevelopment 13,000 32,400 45,400 Authority Total • PA Fund -Pavilion Ice Resurfacer 01 -ERP -1000 nla 180,000 180,000 Electric Ice Edger 01 -ERP -1001 n/a 5,000 5,000 PA - Pavilion Fund Total 185,000 185,000 RF - Refuse Fund Refuse Truck (RAP -R) (2) 01 -ERP -0900 n/a 204,800 204,800 Refuse Truck (Rear -L) 01 -ERP -0901 nla 101,600 101,600 RF - Refuse Fund Total 101,600 204,800 306,400 SF - Sanitary Sewer Fund Telephone System 07 -ERP -0004 n/a 6,800 6,800 4x4 3/4 Ton Truck 01 -ERP -0550 n/a 35,700 35,700 SF - Sanitary Sewer Fund Total 35,700 6,800 42,500 WF - Water Fund Telephone System 01 -ERP -0004 n/a 6,800 6,800 Backhoe Loader 01 -ERP -0502 n/a 134,800 734,800 Public Works Copy Machine 07 -ERP -0506 n/a 14,200 14,209 WF - Water Fund Total 134,800 21,000 155,800 • Wednesday, June 30, 2010 14 City of Hopkins, MN City Hall Administration Network Server . 01 -ERP -0003 n/a EQ UIPMENT REPLACEMENT PLAN 2011 thru 2015 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 2011 2012 2013 2014 2015 Total 8,000 Activity Center 8,000 40,000 Telephone System 01 -ERP -0004 n/a Activity Center Copy Machine 01 -ERP -0030 n/a 15,000 15,000 20,000 89,600 Activity Center Total 15,000 15,000 30,000 Equipment Replacement Fund 15,000 15,000 30,000 150,000 Activity Center Total 15,000 15,000 38,000 Arts Center 38,000 127,600 279,600 Art Center Copy Machine 01 -ERP -1100 n/a 12,100 12,100 Art Center Carpet Extractor 01 -ERP -1101 n/a 3,300 3,300 38,000 38,000 Arts Center Total 12,100 3,300 15,400 • AC - Arts Center Fund 12,100 3,300 15,400 Arts Center Total 12,100 3,300 15,400 City Hall Administration Network Server . 01 -ERP -0003 n/a 8,000 8,000 8,000 8,000 8,000 40,000 Telephone System 01 -ERP -0004 n/a n/a 20,000 20,000 89,600 89,600 Computers 01 -ERP -0006 n/a 30,000 30,000 30,000 4000 30,000 150,000 City Hall Administration Total 38,000 38,000 38,000 38,000 127,600 279,600 Equipment Replacement Fund 38,000 38,000 38,000 38,000 114,000 266,000 SF - Sanitary Sewer Fund 6,800 6,800 WF- Water Fund 6,800 6,800 City Hall Administration Total Community Services City Hall Main Copy Machine - Oce' Copier 01 -ERP -0001 City Hall Small Copy Machine 01 -ERP -0002 Engineering Printer/Scanner 01 -ERP -0007 0 Document Management Scanner (3) 01 -ERP -0008 16 Wednesday, June 30, 2010 38,000 38,000 38,000 38,000 127,600 279,600 n/a 13,000 13,000 n/a 20,000 20,000 n/a 10,000 10,000 10,000 10,000 12,000 52,000 n/a 6,500 6,500 6,500 6,500 6,500 32,500 16 Wednesday, June 30, 2010 Department Project# Priority 2011 2012 2013 2014 2015 Total • Pavilion Total 185,000 185,000 Police Marked Patrol Vehicles (6) 01-ERP-0200 n/a 67,200 69,200 71,200 73,400 75,600 356,600 Sergeant's Vehicle 01-ERP-0201 n/a 33,600 37,800 71,400 Utility 44 (unit 212) 01-ERP-0203 n/a 47,700 47,700 Police Administrative Vehicles (2) 01-ERP-0204 n/a 27,900 28,800 29,600 30,500 31,400 148,200 Police Services Liaison Vehicle 01-ERP-0206 n/a 22,000 22,000 Copy Machine 01-ERP-0209 n/a 19,100 19,100 Logging Recorder 01-ERP-0210 n/a 36,900 36,900 Network Server (3) 01-ERP-0211 n/a 8,500 8,500 8,500 8,500 8,500 42,500 Mobile Data Computers 01-ERP-0212 n/a 62,700 62,700 Digital Squad Car Cameras 01-ERP-0213 n/a 42,600 42,600 Tactical Ballistic Vests 01-ERP-0214 n/a 23,200 23,200 Radios - Portable and Mobile Devices 01-ERP-0215 n/a 15,000 15,000 15,000 15,000 60,000 Police Total 156,300 184,200 147,500 254,600 190,300 932,900 Equipment Replacement Fund 156,300 184,200 147,500 254,600 190,300 932,900 Police Total 156,300 184,200 147,500 254,600 190,300 932,900 • Public Works: Engineering Engineering Van 01-ERP-0700 n/a 21,500 21,500 Public Works: Engineering Total 21,500 21,500 Equipment Replacement Fund 21,500 21,500 Public Works: Engineering Total 21,500 21,500 Public Works: Parks/Forestry 1/2 Ton Pickup Truck 01-ERP-0800 n/a 26,400 26,400 4x4 314Ton Trucks (2) 01-ERP-0801 n/a 67,400 67,400 3/4 Ton Utility Truck 01-ERP-0802 n/a 32,200 32,200 Trucksters (3) 01-ERP-0807 n/a 19,800 19,800 Riding Mowers (3) 01-ERP-0808 n/a 10,300 22,800 20,300 53,400 Brush Chipper 01-ERP-0813 n/a 25,700 25,700 Public Works: Parks/Forestry Total 156,100 48,500 20,300 224,900 Equipment Replacement Fund 156,100 48,500 20,300 224,900 Public Works: Parks/Forestry Total 156,100 48,500 20,300 224,900 Wednesday, Jwze 30, 2010 18 • • • 1. Department Project# Priority 2011 2012 2013 2014 2015 Total Water Total 134,800 14,200 149,000 Grand Total 358,417 1,046,217 836,717 774,917 743,417 3,759,665 20 Wednesday, June 30, 2010 • Equipment Requests 0 EQUIPMENT REPLACEMENT PLAN 2011 rhru 2015 • City of Hopkins, MN • Project# 01 -ERP -0001 Project Name City Hall Main Copy Machine - Oce' Copier Type Equipment Department Community Services Useful Life 5 years Contact City Clerk Category Equipment Priority n/a Future Description I Total Project Cost: $160,000 Copy machine to service needs of all departments located at City Hall. 1. Variety of copying tasks. 2. High volume product copier. is leased. This copier may not make it to 2011. Justification Daily use to make copies of correspondence and forms. Periodically produce documents, i.e., budgets, financial reports, council reports and updates, city code revisions, various department reports, and hearing and information notices. Machine will duplex, sort, collate and staple copies. Budget Impact/Other Variance from 20 year plan - lease renewed for 36 months. Plan to purchase new copier in 2011. Cost reduced by $1,000 due to pricing reductions. Estimate salvage/resale value on replaced item: $-0- Prior Expenditures 2011 2012 2013 2014 2015 Total Future —94,2-00-1 Equipment 13,000 13,000 52,800 Total Total 13,000 13,000 Total Prior Funding Sources 2011 2012 2013 2014 2015 Total Future —94,-2-00-1 Equipment Replacement Fund 13,000 13,000 52,800 Total Total 13,000 13,000 Total N Wednesday, Juice 30, 2010 EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 • City of Hopkins, MN Project# 01 -ERP -0003 Project Name Network Server Type Equipment Department City Hall Administration Useful Life 1 year Contact Finance Director/IT Category Equipment Priority n/a Future Description I Total Project Cost: 5225,000 The network server is the hub of the network. New computers are faster and more reliable. Justification Nehvorking allows user to share information that is stored in a single location, the network server. This is more efficient because the information does not have to be stored on many different computers. It also makes for better accuracy because as the information changes or is updated, every user is working with the same data. Budget Impact/Other Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $-0- Prior Expenditures 2011 2012 2013 2014 2015 Total Future 65,000 1 Equipment 8,000 8,000 8,000 8,000 8,000 40,000 120,000 Total Total 8,000 8,000 8,000 8,000 8,000 40,000 Total Prior Funding Sources 2011 2012 2013 2014 2015 Total Future 65,000 Equipment Replacement Fund 8,000 8,000 8,000 8,000 8,000 40,000120,000 Total Total 8,000 8,000 8,000 8,000 8,000 40,000 Total Wednesday, June 30, 2010 23 EQUIPMENT REPLACEMENT PLAN 2011 awu 2015 • City of Hopkins, MN ,7 • Project# 01 -ERP -0006 Project Name Computers Type Equipment Department City Hall Administration Useful Life 3-5 years Contact Finance Director/IT Category Equipment Priority n/a Future Description I Total Project Cost: 5900,000 Personal computer purchases and upgrades for the entire City staff. Coordinating personal computer purchases from individual departments to one Justification Fools enabling staff to perform job responsibilities efficiently and effectively. Impact/Other from 20 year plan - none salvage/resale value on replaced item: $-0- Prior Expenditures 300,000 Equipment Total 2011 2012 2013 2014 2015 Total Future 30,000 30,000 30,000 30,000 30,000 150,000 1 450,000 Total 30,000 30,000 30,000 30,000 30,000 150,000 Total Prior Funding Sources 2011 2012 2013 2014 2015 Total . Future 300,000 Equipment Replacement Fund 30,000 30,000 30,000 30,000 30,000 150,000 450,000 Total Total 30,000 30,000 30,000 30,000 30,000 150,000 Total 25 Wednesday, June 30, 2010 • 0 EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 City of Hopkins, MN Project# 01 -ERP -0008 ProjectName Document Management Scanner (3) Type Equipment Useful Life 3 years Category Equipment Future Description Department Community Services Contact City Clerk Priority n/a Total Project Cost: $149,500 document (11" x17'') scanner for document management and retention as well as general administrative use. Three scanners each replaced every three years. One replaced in 2009, 2012, 2015....... — note we did not replace one in 2009; unit was repaired to extend the life. One replaced in 2010, 2013, 2016......... One replaced in 2011, 2014, 2017 ............. One additional small scanner was added to the scanning station in 2009. This scanner previously was used by the Inspections secretary. This scanner does not handle 11" x 17" paper so can not do all documents. Scanners will be evaluated each year for replacement. If scanners are working properly their life will be extended. Justification We have been getting up to three Tree Trust volunteers to work on scanning and the small scanner only handles documents up to 8'/2" x 14". We would like to replace this scanner with a large document scanner to fully utilize out volunteers. Budget Impact/Other Variance from 20 year plan - item scheduled for 2009 was not replaced. Unit was repaired to extend its life. One additional scanner was added to the replacement shedule in 2010. Estimate salvage/resale value on replaced item: $500-$1,000 Prior IExpenditures 2011 2011 2012 2013 2014 2015 Total Future 19,500 Equipment 6,500 6,500 6,500 6,500 6,500 32,500 97,500 Total 6,500 Total 6,500 6,500 6,500 6,500 6,500 32,500 Total Prior Funding Sources 2011 2012 2013 2014 2015 Total Future 1 —9.50-01 Equipment Replacement Fund 6,500 6,500 6,500 6,500 6,500 32,500 97,500 Total Total 6,500 6,500 6,500 6,500 6,500 32,500 Total Wednesday, Juice 30, 2010 27 • • EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 City of Hopkins, MN Project# 01 -ERP -0103 Project Name Duty Chief Vehicle (1) Asst. Chiefs Vehicles (2) Type Equipment Useful Life 15 years Category Vehicles Future Department Fire Contact Fire Chief Priority n/a DescriptionI Total Project Cost: $254,200 k marked passenger vehicle for use by the Duty Chief and Assistant Chiefs in transporting required equipment, reference materials and personnel .or emergency response, and routine Fire Department business. Curent vehicles: 2010 Chevrolet Tahoe (Chief) 2006 Dodge Durango (Asst. Chief) Chevrolet Impala (Asst. Chief) to be replaced with 2015 SUV Justification Used by the Fire Chief and Asst. Chiefs when responding to fires and other emergencies. Used for official business in and out of the city and for fire fighter travel on official Fire Department business. Eventually 3 SUV's - replaced every 5 years with 15 year life. New - chief, cycle down to Asst. Chief I and Asst. Chief 2. from 20 year plan - Add 2 vehicles and change life to 15 years. salvage/resale value on replaced item: $4,000 Prior Expenditures 64,500 1 Vehicles Total 2011 2012 2013 2014 2015 Total Future 37,000 37,000 1 152,700 Total 37,000 37,000 Total Prior Funding Sources 2011 2012 2013 2014 2015 Total Future 64,500 . Equipment Replacement Fund 37,000 37,000 1 152,700 Total Total 37,000 37,000 Total Wednesday, June 30, 2010 29 • L� EQUIPMENT REPLACEMENT PLAN 2011 a7ru 2015 City of Hopkins, MN Project# 01 -ERP -0106 Project Name Aerial Truck Type Equipment Useful Life 20 years Category Vehicles Future Department Fire Contact Fire Chief Priority n/a Description I Total Project Cost: $2,559,597 One hundred foot aerial ladder truck with a 1500 GPM fire pump and a full compliment of ground ladders. Lease payments due 2009-2018 on 2008 purchase of Pierce Aerial Truck. Payments due semi-annually each April 23 and October 23. vehicle: 2008 Pierce Arrow XT Aerial Ladder Justification Vehicle was purchased in 2008 at a total cost of $870,427.08 including mounted equipment. Vehicle was paid using $445,427.08 in ERP cash and i 10 -year capital lease of $425,000. At the end of the lease term payments (P&I) will total $542,170. Total costs of aerial including cash ?ayments equals $987,597. from 20 year plan - .Lease payments on financing added to the plan. salvage/resale value on replaced item: $ Prior Expenditures 2011 2012 2013 2014 2015 Total Future 553,861 Equipment 54,217 54,217 54,217 54,217 54,217 271,085 F 1,734,651 Total Total 54,217 54,217 54,217 54,217 54,217 271,085 Total Prior 553,861 Total Funding Sources 2011 2012 2013 2014 2015 Total Future Bonds/Lease 54,217 54,217 54,217 54,217 54,217 271,085 17734,651 Total 54,217 54,217 54,217 54,217 54,217 271,085 Total 31 Mednesday, JU77e 30, 2010 EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 • City of Hopkins, MN Project# . 01 -ERP -0110 Project Name Copy Machine Type Equipment Useful Life 8 years Category Equipment Future Description Fire Station copy machine. Department Fire Contact Fire Chief Priority n/a Total Project Cost: $47,400 Current equipment: 2003 Ricoh Aficio 1035P Justification Copying business papers, training records, etc. •Budget Impact/Other Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $500 Prior Expenditures 2011 7,400 Equipment 10,300 Total Total 10,300 Prior Funding Sources 7,4001 Equipment Replacer Total • 2012 2013 2014 2015 Total Future 10,300 1 29,700 10,300 Total 2011 2012 2013 2014 2015 Total Future Fund 10,300 10,300 1 29,700 Total 10,300 10,300 Total 33 Wednesday, June 30, 2010 EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 City of Hopkins, MN Project # 01 -ERP -0116 Project Name workout Equipment - Eliptical Type Equipment Useful Life 6 years Category Equipment Future Department Fire Contact Fire Chief Priority n/a Description I Total Project Cost: 520,300 Workout equipment used in Fire Department workout room. One eliptical machine replaced on a 6 year cycle, one every 3 years. Justification rbis equipment is available to all City employees for health and wellness. Budget Impact/Other Variance from 20 year plan - had two eliptical machines in the ERP. One was replaced along with the stairmaster with a summit trainer. The remaining eliptical is scheduled for replacement in 2015. Estimate salvage/resale value on replaced item: $ Expenditures 2011 2012 2013 2014 2015 Total Future Equipment 5,800 5,800 F 14,500 Total 5,800 5,800 Total Funding Sources 2011 2012 2013 2014 2015 Total Future Equipment Replacement Fund 5,800 5,800 F 14,500 Total 5,800 5,800 Total Wednesday, June 30, 2010 35 EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 M City of Hopkins, MN • Project 01 -ERP -0118 Project Name workout Equipment- Treadmill Type Equipment Useful Life 5 years Category Equipment Future Department Fire Contact Fire Chief Priority n/a Description I Total Project Cost: $25,300 Workout equipment used in the Fire Department workout room. One treadmill replaced on a 5 year cycle. Justification This equipment is available to all City employees for health and wellness. Budget Impact(Other Variance from 20 year plan - move back one year from 2011.to 2012. Estimate salvage/resale value on replaced item: $ Expenditures 2011 2012 2013 2014 2015 Total Future Equipment 5,000 5,000 F 20,300 Total 5,000 5,000 Total Funding Sources 2011 2012 2013 2014 2015 Total Future Equipment Replacement Fund 5,000 5,000 20,300 Total 5,000 5,000 Total 37 Wednesday, Jm7e 30, 2010 L_J • EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 City of Hopkins, MN Project 01 -ERP -0120 Project Name Automated External Defibrillator (2) Type Equipment Useful Life 3 years Category Equipment Future Department Fire Contact Fire Chief Priority n/a Description I Total Project Cost: $49,100 3efibrillator is used to help get someones heart restarted during a cardiac arrest. awn 2 - both are replaced at one time due to changing technology. Current equipment: 2010 - 4 AEDs I 2010 ERP had 2 AEDs schedule for replacement at $6,000. Four were purchased. Justification With changes in technology, the AED's should be replaced every four years. Cost - $3,000 per unit Budget Impact/Other Variance from 20 year plan - adjustment from 3 years to 4 years. Estimate salvage/resale value on replaced item: $ Prior Expenditures 6,000 Equipment Total 2011 2012 , 2013 2014 2015 Total Future 7,200 7,200 1 35,900 Total 7,200 7,200 Total Prior Funding Sources 2011 2012 2013 2014 2015 Total Future 6,000 Equipment Replacement Fund 7,200 7,200 35,900 Total Total 7,200 7,200 Total 39 Mednesday, June 30, 2010 EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 • City of Hopkins, MN 0 0 Project# 01 -ERP -0200 Project Name Marked Patrol Vehicles (6) Type Equipment Useful Life 3 years Category Vehicles Future Department Police Contact Police Chief Priority n/a Description I Total Project Cost: $2,374,300 Marked patrol vehicles used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties. Fleet consists of 6 patrol vehicles - 5 marked, 1 unmarked. . Current vehicles: (2) 2010 Ford Crown Victorias, (1) 2009 Ford Crown Victoria, (2) 2008 Ford Crown Victorias, (1) 2007 Ford Crown Victoria Justification Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for routine and emergency operations. Vehicles contain secure seating for prisoner transport. Variance from 20 year plan - Original replacement schedule was modified several years ago during the LGA cuts. The proposed purchase schedule is to realign the replacement of squads more evenly. Estimate salvaee/resale value on replaced item: $4,000 each Prior Expenditures 570,500 Vehicles Total 2011 2012 2013 2014 2015 Total Future 67,200 69,200 71,200 73,400 75,600 356,600 1 1,447,200 Total 67;200 69,200 71,200 73,400 75,600 356,600 Total Prior Funding Sources 2011 2012 2013 2014 2015 Total Future 570,500 1 Equipment Replacement Fund 67,200 69,200 71,200 73,400 75,600 356,600 F 1,447,200 Total Total 67,200 69,200 71,200 73,400 75,600 356,600 Total 41 Wednesday, June 30, 2010 EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 • City of Hopkins, MN Project# 01 -ERP -0203 Project Name Utility 4A (unit 212) Type Equipment Useful Life 6 years Category Vehicles Future Description t wheel drive uitlity vehicle. Department Police Contact Police Chief Priority n/a Total Project Cost: $247,600 Current vehicle: 2008 Chevrolet Tahoe Justification Vehicle is normally used by public service officers for a wide variety of uses such as transporting animals and equipment. The 4 wheel drive vehicle is also used at, times as a patrol vehicle, particularly in the winter in extreme snow conditions. •Budget Impact/Other Variance from 20 year plan - can move replacement back one year to 2009 - new engine. Estimate salvage/resale value on replaced item: $5,000 Prior Expenditures 2011 2012 2013 2014 2015 Total Future 67,400 Vehicles 47,700 47,700 132,500 Total Total 47,700 47,700 Total • Prior Funding Sources 2011 2012 2013 2014 2015 Total Future —67,4-0-01 Equipment Replacement Fund 47,700 47,700 1 132,500 Total Total 47,700 47,700 Total 43 Wednesday, Ane 30, 2010 EQUIPMENT REPLACEMENT PLAN 2011 rhru 2015 City of Hopkins, MN Project # 01 -ERP -0206 Project Name Police Services Liaison Vehicle Type Equipment Useful Life 15 years Category Vehicles Future Department Police Contact Police Chief Priority n/a Description I Total Project Cost: $56,300 �urrent vehicle was leased to Police Department. Used by Police Services Liaison for transport to schools, neighborhood meetings, training and mblic relations events. vehicle: 2001 Chrysler PT Cruiser Justification 2001 PT Cruiser was leased to the Police Department for a nominal fee and detailing and wheels were also donated. The City purchased the vehicle from the leasor in 2005. •Budget Impact/Other Variance from 20 year plan - extended life from 10 to 15 years Estimate salvage/resale value on replaced item: $1,000 Expenditures 2011 2012 2013 2014 2015 Total Future Vehicles 22,000 22,000 34,300 Total 22,000 22,000 Total Funding Sources 2011 2012 2013 2014 2015 Total Future Equipment Replacement Fund 22,000 22,000 F 34,300 Total 22,000 22,000 Total Wednesday, June 30, 2010 M EQUIPMENT REPLACEMENT PLAN City of Hopkins, MN Project# 01 -ERP -0210 Project Name Logging Recorder Type Equipment Useful Life 7 years Category Equipment Future Department Police Contact Police Chief Priority n/a 2011 thru 2015 Description I Total Project Cost: $138,100 The police logging recorder is a device which records all telephone and radio transmissions produced/received by the Police Department. 2005 Mercom loRRina recorder Justification Records all incoming/outgoing phone calls from the dispatch center and all radio transmissions from police, fire and interop radio talkgroups. Equipment is necessary in case questions arise as to how calls for service or events were handled or dispatched. Budget Impact/Other • Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $-0- • Expenditures 2011 2012 2013 2014 2015 Total Future Equipment 36,900 36,900 101,200 Total 36,900 36,900 Total Funding Sources 2011 2012 2013 2014 2015 Total Future Equipment Replacement Fund 36,900 36,900101,200 Total 36,900 36,900 Total 47 Wednesday, June 30, 2010 • Prior Expenditures 4-7,0001 Equipment Total EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 City of Hopkins, MN Project# 01 -ERP -0212 Project Name Mobile Data Computers Type Equipment Useful Life 5 years Category Equipment Future Department Police Contact Police Chief Priority n/a Description Total Project Cost: 5297,800 Mobile data computers installed in 11 squad cars used to receive calls from dispatch, query information from various databases, communicate car to car. Justification Limited life of 5 years - replacement necessary. Budget Impact/Other Variance from 20 year plan - Increase cost from $54,500 to $62,700 ($5,700 x 11) to better reflect actual cost of MDC/docking station. Estimate salvage/resale value on replaced item: $-0- • 2011 2012 2013 2014 2015 Total Future 62,700 62,700 188,100 Total 62,700 62,700 Total Prior Funding Sources 47,000 Equipment Replacement Fund Total Total 2011 2012 2013 2014 2015 Total Future 62,700 62,700 188,100 62,700 62,700 Total Wednesday, June 30,2070 EQUIPMENT REPLACEMENT PLAN 2011 rhru 2015 • City of Hopkins, MN Project 01 -ERP -0214 Project Name Tactical Ballistic Vests Type Equipment Useful Life 5 years Category Equipment Future Department Police Contact Police Chief Priority n/a Description I Total Project Cost: $137,500 tactical ballistic vests worn by members of the Hopkins Police Department High-risk Entry and Assault Team (HEAT). These vests offer a higher level of protection against weapon assault than the regular duty ballistic vest.. Justification Federal and State grant monies have been available through the Ballistic Vest Program over the past several years. These grants only pay a portion of the total cost of the vest, leaving the Police Department to pay the balance. There is no guarantee that these grants will be available in the future. Warranty on the current vests expires in 2007. Cost: 9 vests x $2,133 = $19,197 (today's cost). Does not include any applicable taxes. Budget Impact(Other Variance from 20 year plan - new item. Note: regular bullet proof vests funded by federal/state grants Estimate salvage/resale value on replaced item:. $ • Prior Expenditures 2011 2012 2013 2014 2015 Total Future —20—,00-01 Equipment 23,200 23,20094,300 Total Total 23,200 23,200 Total Prior Funding Sources 20,000 Equipment Replacement Fund Total Total 0 2011 2012 2013 2014 2015 51 23,200 23,200 Total Future 23,200 94,300 23,200 Total Wednesday, Juice 30, 2010 • EQUIPMENT REPLACEMENT PLAN 2011 thm 2015 City of Hopkins, MN Project# 01 -ERP -0300 Project Name 4x4 3/4 Ton Pickup with Plow Type Equipment Department Public Works: Streets/Traffic Useful Life 10 years Contact Public Works Director Category Vehicles Priority n/a Future Description I Total Project Cost: $103,800 Pickup used by various divisions of Public Works. Current vehicle: 1997 Chevrolet 3/4 Ton 4X4 Justification ILight hauling and transportation for supervisors. Maintenance garage service vehicle. Budget Impact(Other Variance from 20 year plan - Increase expenditure to reflect actual cost. Change from 1/2 ton pickup to 3/4 ton 4x4 pickup. Estimate salvage/resale value on replaced item: $1,500 Prior Expenditures 2011 2012 2013 2014 2015 Total Future 25,000 Vehicles 33,600 33,600 1 45,200 Total Total 33,600 33,600 Total Prior Funding Sources 2011 2012 2013 2014 2015 Total Future 25,000 Equipment Replacement Fund 33,600 33,6001 45,200 Total Total 33,600 33,600 Total Wednesday, June 30, 2010 53 EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 • City of Hopkins, MN • Project# 01 -ERP -0303 ProjectName 1 Ton Dump Truck (2) Type Equipment Department Public Works: Streets/Traffic Useful Life 12 years Contact Public Works Director Category Vehicles Priority n/a Future Description I Total Project Cost: $205,500 Truck is used in the Street Division of Public Works. Current vehicles: 1997 Ford F350 & 2000 Ford F450 I Justification (Vehicle used by various departments for street and park maintenance and light hauling. Budget Impact/Other Variance from 20 year plan - move back from 2009 to 2010. Estimate salvage/resale value on replaced item: $3;500 Prior Expenditures 75900 Vehicles Total 2011 2012 2013 2014 2015 Total Future 34,700 34,700 102,900 Total 34,700 34,700 Total Prior Funding Sources 2011 2012 2013 2014 2015 Total Future 67,900 Equipment Replacement Fund 34,700 34,700 1 102,900 Total Total 34,700 34,700 Total 55 Wednesday, Juice 30, 2010 EQUIPMENT REPLACEMENT PLAN 10 City of Hopkins, MN • Project# 01 -ERP -0306 Project Name Tandem Dump Trucks (2) 2011 thru 2015 Type Equipment Department Public Works: Streets/Traffic Useful Life l7 years Contact Public Works Director Category Vehicles Priority n/a Future Description I Total Project Cost: $576,100 Sump trucks used in Streets Division of Public Works. Current vehicles: 1996 Ford L-8000 & 1998 Ford LT8500 I Justification (Trucks used for heavy hauling, snow plowing and sanding. Budget Impact/Other Variance from 20 year plan - Move 2013 to2011 - budget $22,000 to refurb 98 Ford Tandem with new style box and drop sander and pre -wetting salt option - extend life to 2018. Move 2015 purchase to 2013 due to conditions of truck. Estimate salvage/resale value on replaced item: $-0- Expenditures 2011 2012 2013 2014 2015 Total Future Vehicles 22,000 142,400 164,400 1 411,700 Total 22,000 142,400 164,400 Total Funding Sources 2011 2012 2013 2014 2015 Total Future Replacement Fund 22,000 142,400 164,400 1 411,700 Total 22,000 142,400 164,400 Total Wednesday, June 30, 2010 57 • • EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 City of Hopkins, MN Ei ect#01-ER -0309 ect Name Skid Loader (2) Type Equipment Department Public Works: Streets/Traffic Useful Life 12 years Contact Public Works Director Category Equipment Priority n/a Future Description Total Project Cost: $187,600 Loading trucks, landscape work, snow removal, material handling. Current equipment: 1998 John Deere 8875 Skid Loader & 2004 Bobcat S -1851R Skid Loader Justification Equipment Replacement Fund Budget Impact(Other Variance from 20 year plan - move back from 2010 to 2011. Estimate salvage/resale value on replaced item: $ Expenditures 2011 2012 2013 2014 2015 Total Future Equipment 36,000 36,000 151,600 Total 36,000 36,000 Total Funding Sources 2011 2012 2013 2014 2015 Total Future Equipment Replacement Fund 36,000 36,000 151,600 Total 36,000 36.000 Total Wednesday, June 30, 2010 59 EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 City of Hopkins, MN Project# 01—ERP-0312 Project Name Roller Type Equipment Department Public Works: Streets/Traffic Useful Life 20 years Contact Public Works Director Category Equipment Priority n/a Future Description I Total Project Cost: $45,900 Used by Street Department for asphalt repair and resurfacing. 1989 Ingersoll Rand Roller Justification Budget Impact(Other Variance from 20 year plan - None Estimate salvage/resale value on replaced item: $ Expenditures 2011 2012 2013 2014 2015 Total Equipment 45,900 45,900 Toff 45,900 45,900 Funding Sources 2011 2012 2013 2014 2015 Total Equipment Replacement Fund 45,900 45,900 TOW 45,900 45,900 1T'ednesday, June 30, 2010 61 EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 City of Hopkins, MN Project# 01 -ERP -0317 Project Name Sign Machine (Traffic) Type Equipment Department Public Works: Streets/Traffic Useful Life 10 years Contact Public Works Director Category Equipment Priority n/a Future Description I Total Project Cost: $31,500 vlahcine used by the Traffic Division of Public Works to make traffic signs and related signs and decals for general city use. Current equipment: 2005 Signcad Sign Making System Justification Existing machine is not repairable and needs updating/ Budget Impact/Other Variance from 20 year plan - new Estimate salvage/resale value on replaced item: 5 -0 - 'Expenditures 2011 2012 2013 2014 2015 Total Future Equipment 13,400 13,400 18,100 Total 13,400 13,400 Total Funding Sources 2011 2012 2013 2014 2015 Total Future Equipment Replacement Fund Total • 63 13,400 13,400 L 18,100 13,400 13,400 Total Mednesday, June 30, 2010 EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 City of Houkins, MN Project# 01 -ERR -0401 Project Name Copier Type Equipment Useful Life 8 years Category Equipment Future Department HRA Contact Finance Director Priority n/a Description I Total Project Cost: 550,400 �oior copy machine to service the needs of the HRA. High volume product copier to do a variety of copying tasks. Current equipment: Imagistics ZB35 Justification Daily use to make copies of correspondence, forms and rental documents. Periodically produce documents such as resident newsletters and marketing. Machine will duplex, sort, collate and staple copies. Budget Impact/Other is Variance from 20 year plan - New item. Estimate salvage/resale value on replace item: $ - 0 - Expenditures 2011 2012 2013 2014 2015 Total Future Equipment 13,000 13,000 37,400 Total 13,000 13,000 Total Funding Sources 2011 2012 2013 2014 2015 Total Future HRA - Housing and Redevelop 13,000 13,000 37,400 Total 13,000 13,000 Total Wednesday, June 30, 20/0 65 0 EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 City of Hopkins, MN Project# 01 -ERP -0506 Project Name Public Works Copy Machine Type Equipment Department Water Useful Life 5 years Contact Public Works Director Category Equipment Priority n/a Future Description I Total Project Cost: 594,700 Copy machine to service needs of all division of Public Works. 2005 Ricoh Aficio 2238C Justification Making copies for various departments. Budget Impact/Other Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $800 Prior Expenditures 2011 2012 2013 2014 2015 Total Future 22,800 Equipment 14,200 14,200 1 57,700 Total Total 14,200 14,200 Total Prior Funding Sources 2011 2012 2013 2014 2015 Total Future 22,800 WF - Water Fund 14,200 14,200 57,700 Total Total 14,200 14,200 Total 67 Wednesday, June 30, 2010 EQUIPMENT REPLACEMENT PLAN 2011 rhru 2015 City of Houkins, MN 'roject# 01 -ERR -0700 'rojectName Engineering Van Type Equipment Department Public Works: Engineering Useful Life 10 years Contact Public Works Director Category Vehicles Priority n/a Future Description I Total Project Cost: $66,400 Van used by Engineering Department for survey equipment and on job site work. Current vehicle: 2000 Chevrolet Suburban Justification Transportation to and from job site, hauling of surveying and traffic counting equipment. Budget Impact/Other Variance from 20 year plan - increase amount from 14,300 to 16,000 to reflect actual cost. Purchase used Suburban from Hennepin Co, 2002 auction -price is $13,000 to $14,000 + $2,000 for equipment. Estimate salvage/resale value on replaced item: $2,500 Prior Expenditures 2011 2012 2013 2014 2015 Total Future F---1-6,-00-01 Vehicles 21,500 21,500 28,900 Total Total 21,500 21,500 Total Prior Funding Sources 2011 2012 2013 2014 2015 Total Future 16,000 Equipment Replacement Fund 21,500 21,500 28,900 Total Total 21,500 21,500 Total Wednesday, Juice 30, 2010 69 EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 City of Hopkins. MN Project# 01 -ERP -0801 Project Name 4x4 3/4Ton Trucks (2) Type Equipment Department Public Works: Parks/Forestry Useful Life 8 years Contact Public Works Director Category Vehicles Priority n/a Future Description I Total Project Cost: $313,800 Ducks used by Parks Division of Public Works. Current vehicles: 2004 Ford F350 4X4 & 2004 Ford F350 4X4 I Justification Snow plowing, hauling, transportation. Units are heavily used. Budget Impact/Other Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $ Prior Expenditures 2011 2012 2013 2014 2015 Total Future 53,200 Vehicles 67,400 67,400 1 193,200 Total Total 67,400 67,400 Total 67,400 67,400 • Prior Funding Sources 2011 2012 2013 2014 2015 Total Future 53,200 Equipment Replacement Fund 67,400 67,400 193,200 Total Total 67,400 67,400 Total Wednesday, June 30, 2010 71 11 • EQUIPMENT REPLACEMENT PLAN 2011 rhru 2015 City of Hopkins, MN Project# 01 -ERP -0807 Project Name Trucksters (3) Type Equipment Department Public Works: Parks/Forestry Useful Life 15 years Contact Public Works Director Category Equipment Priority n/a Future Description I Total Project Cost: $114,700 Fruckster used by Parks Division of Public Works for ballfield and parks maintenance. (Current equipment 1996 Toro Workman, 2004 Toro Workman 3200 2004 Toro Workman 2110 Justification _ Park maintenance, ballfield grooming and weed spraying. from 20 year plan - None salvage/resale value on replaced item: $1,400 each Prior Expenditures 2011 2012 2013 2014 2015 Total Future 29,900 1 Equipment 19,800 19,800 65,000 Total Total 19.800 19,800 Total Prior Funding Sources 2011 2012 2013 2014 2015 Total Future F---29,9-0-01 Equipment Replacement Fund 19,800 19,800 F 65,000 Total Total 19,800 19.800 Total 73 Wednesday, June 30, 2010 EQUIPMENT REPLACEMENT PLAN City of Honkins. MN 'roject# 01 -ERP -0813 ?rojectName Brush Chipper 2011 thru 2015 Type Equipment Department Public Works: Parks/Forestry Useful Life 20 years Contact Public Works Director Category Equipment Priority n/a Future Description I Total Project Cost: $25,700 3rush chipper used for Forestry and .brush pick up operations of Public Works. Current equipment: 1993 Brush Bandit Justification •Budget Impact/Other Variance from 20 year plan - change to usable life to 20 years - move back from 2009 to 2013. Estimate salvage/resale value on replaced item: $ • Expenditures 2011 2012 2013 2014 2015 Total Equipment 25,700 25,700 Total 25,700 25,700 Funding Sources 2011 2012 2013 2014 2015 Total Equipment Replacement Fund 25,700 25,700 TOW 25,700 25,700 75 Wednesday, June 30, 2010 EQUIPMENT REPLACEMENT PLAN 2011 r iru 2015 Citv of Honkins- MN Project# 01 -ERP -0901 Project Name Refuse Truck (Rear -L) Type Equipment Useful Life 10 years Category Vehicles Future Department Refuse Contact Public Works Director Priority n/a Description I Total Project Cost: $238,200 Zefuse truck used by Refuse Utility Division of Public Works. Current vehicle: 1996 Fre Justification Residential waste pick up. 70 Budget Impact/Other Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $9,000 Expenditures 2011 2012 2013 2014 2015 Total Future Vehicles 101,600 101,600 136,600 Total 101,600 101,600 Total Funding Sources 2011 2012 2013 2014 2015 Total Future RF - Refuse Fund Total • 77 101,600 101,600 1 136,600 101,600 101,600 Total Wednesday, June 30, 2010 EQUIPMENT REPLACEMENT PLAN 2011 thru 2015 Citv of Houkins. MN Project # 01 -ERP -1001 Project Name Electric Ice Edger Type Equipment Department Pavilion Useful Life 10 years Contact Facilities Director Category Equipment Priority n/a Future Description I Total Project Cost: $11,700 Electric ice edger used for ice maintenance of the Pavilion's ice sheet. An edger is used to shave the ice next to the boards to remove ice buildup :hat the ice resurface cannot reach. I Justification I For the Pavilion to be exempt from the changing state statutes for air quality in ice arenas, the gas fueled edger must be replaced with an electric Budget Impact/Other Vairance from 20 year plan - New item. Estimate salvage/resale value on replaced item: $ • Expenditures 2011 2012 2013 2014 2015 Total Future Equipment 5,000 5,000 1 6,700 TOW 5,000 5,000 Total Funding Sources 2011 2012 2013 2014 2015 Total Future PA - Pavilion Fund 5,000 5,000 1 6,700 Total 5,000 5,000 Total 79 Wednesday, June 30, 2010 EQUIPMENT REPLACEMENT PLAN 2011 th,-u 2015 • City of Hopkins, MN • Project 01 -ERP -1101 Project Name Art Center Carpet Extractor Type Equipment Department Arts Center Useful Life 10 years Contact Facilities Director Category Equipment Priority n/a Future Description ( Total Project Cost: $7,700 The carpet extractor is used at the Arts Center and occassionally in other city facilities. The equipment is used to clean carpets on a regular basis between annual contractual cleanings, to remove spots and stains, and to pick up spills. Justification fhe current equipment is over 12 years old and very corroded from the dirt, water and cleaning chemicals. With regular touch up cleaning and -emoval of stains in the Arts Center carpet with this extractor, the need to pay contractual cleaners to deep clean the carpet is reduced to once or tiwice annually. Budget Impact(Other Variance from 20 year plan - New item. Estimate salvage/resale value on replace item: $ Expenditures 2011 2012 2013 2014 2015 Total Future Equipment 3,300 3,300 1 4,400 Total 3,300 3,300 Total Funding Sources 2011 2012 2013 2014 2015 Total Future AC - Arts Center Fund 3,300 3,300 4,400 Total 3,300 3,300 Total 81 Wednesday, June 30, 2010 C 20 Year Replacement Schedule • • 3D -Jun -10 EQUIPMENT REPLACEMENT SCHEDULE $777,400 INFLATION FACTOR 3.0 % - REPL EQUIPMENT/ VEHICLES YRS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 ACTIVITY CENTER ERP -030 Copy Machine 7 _ 15,000 . - _ - 18,400 _ 22,600 ERP -03 I... Reftigerator/Freezer 30 ,SUBTOTAL 15,000 1 18,400 22,600 ARTSCENTER ERP -1100 Copy Machine 7 12,100 14,900 _ 18,300 ERP -1101 Carpet Extractor - IG 3,300 - - _ 4,400 - 12,100 3,300 14,900 _ 4,400 18,300 CITY HALL ADMIN ERP -003 Network Upgrade I 8,000 8,000 8,000 8,000 8,000 8,000 _ 8,000 8,000 8,000 8,000 _. 8,000 .8,000 8,000 8,000 8,000 8,000 8,000 8,000 _... 8,000 8,000 ERP -004.. Phone System ... 8 . _.._ _.. _. 76,000 76,000 ERP -006 Computers 3-5 30,000 30,000 30,000 30,000 30,000 30,000 - 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 .ERP -009 Network Infrastructure Upgrade 15 - -23,400 EQUIPMENT SUBTOTAL 38,000 38,000 38,000 38,000 114,000 38,000 38,000 33,000 38,000 38,000 38,000 61,400 114,000 38,000 38,000 38,000 38,000 38,000 38,000 38,000 COMMUNITY SERVICES ERP -001 Main Copier 5 13,000 15,000 17,500 20,300 - ERP -002. Small Copier, 5 -. 20,000 - 23,200 26,900 - 31,200 ERP -007 Engineering Printer/Scanner ERP -008 Document Mgmt. Scanner (3) 5 3 10,000 6,500 10,000 6,500 10,000 6,500 10,000 6,500 12,000 6,500 12,000 6,500. 12,000 6,500 12,000 6,500 12,000 6,500 14,000 : 6,500: 14,000 6,500. 14,000 - 6,500 -. 14,000 6,500.. 14,000 6,500 16,000 6,500. 16,000 6,500 16,000 6,500 - 16,000 -" 6,500. 16,000 6,500 18,000 6,500 ERP -010 Election Bombs 20 EQUIPMENT SUBTOTAL 29,500 16,500 36,500 16,500 18,500 33,500 18,500 41,700 18,500 20,500 38,000 20,500 47,400 20,500 22,500 42,800 22,500 53,700 22,500 24,500 FIRE ERP -100 Tele -Squirt E-2 _ 10 -. _ .. _ .. _ 470,900 .ERP -101- Fire Pumper E-3 25 - ERP -102 Heavy Rescue R-4 25 - - 100,000 .ERP -103 Duty Chief Vehicle 15 - .51,100. - ERP -103 Asst. Chief Vehicle 15 44,100 - - ERP -103 Asst. Chief Vehicle 15 37,000 57,500 . ERP -104 Fire Paimper E-1. X - ERP -105 Quick. Attack Pumper/Rescue T 15 234,000 364,600 GRP -105a Utility Vehicle 10 35,000 47,000 ERP -106 Aerial Truck L-9 20 54,217 54,217 54,217 54,217 54,217 54,217 54,217 54,217 - 1,572,000 VEHICLES SUBTOTAL 54,217 288,217 54,217 54,217 91,217 89,217 525,117 54,217 44,100 151,100 47,000 997,600 1,572,000 57,500 .ERP -107.... Air Compressor -15 _.34,900 ERP -109 Extracting Tool (2) 1022,300 27,400 30,000 36,900_ ERP -110 Copy Machine 8... _ 10,300 - - : 13,100. 16,600 ERP -207 Radio System 15 211,100 - ERP -112 Thermal Imaging Camera (2) 10 11,500 12,900 - .15,400 -17,400. - ERP -113 Emergency Preparedness Siren 20 - 38,500 ERP- 114.Floor Scrubber 12 10,400,. _ ,.. 14,800 ERP -115 Floor Sweeper 12 .3,900 5,500 ERP -116 Workout Equip -Eliptical 6 5,800 - 6,700 7,800. ERP -117 WorkoutEquip - Summit Traim 5 5,800 6,700 7,800 9,000_ ERP -118 WorkoutEquip- Treadmill 5 '5,000 - 5,800 - 6,700 _.7,800 - ERP -119 Workout Equip -Weight Lifting 5 - 5,800 6,700. _ 7,800 9,000 ERP -120 Defibrillator (2) 4, 7,200 7,800 .. 8,600 9,300 .10,200 ERP -122 WorkoutEquip - Dumb Bells 10 5,000 6,700 EQUIPMENT SUBTOTAL - 10,300 32,300 11,500 7,200 17,400 14,300 53,600 218,900 40,500 13,400 6,700 52,000 15,400 15,600 47,800 49,600 20,300 36,900 .28,200 82 84 REEL EQUIPMENT NEIRCLES YRS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 P.W. PARKS & FORESTRY ERP -800 1/2 Ton Truck 10 26,400 _. _.. 35,400 _ .ERP -801 4x43/4 Ton: Truck. 8 33,700 - 42,600 :. 54,000.. ERP -801 4x4 3/4 Ton Truck 8 33,700 42,600 54,000 ERP -802 3/4 Ton Utility Truck 10 32,200 - 48,700 ERP -804 Log Truck (50% w/Rcfuse) 15 81,800 ERP -805 Aerial Lift 20. - 228,900 ERP -806 Tractor 30 49,300 :ERP -807 Truckster 15 19,800 ... 30,800 ERP -807 Truckster - 15 -. 23,000 e ERP -307. Truckster . ' 15 11,200 - ERP -803 Mower 8 22,800 28,900 36,600 ERP -808 Mower 8 20,300 25,700 - 32,600 ERP -808 Mower 8 _ 10,300 13,000 16,500 ERP -809 Slope Mower 15 - - 32,700: ERP -810 Large Turf Mower 10 92,700 124,600 ERP -811 TurfSweeper 15 - 18,000 - ERP -812 Stump Cutter 20 .. 21,200 .ERP -813 Bruslt Clipper- 20 25,700 ERP -814 TrailcrFlatbed 15 2,200 ERP -815 Skid Loader 12 32,000 45,600 ERP -816 Toolcat 8 63,300 80,200 VEHICLES SUBTOTAL 156,100 48,500 20,300 82,000 53,200 81,300 34,200 193,100 28,900 142,900 128,900 30,800 124,500 82,200 386,100 P.W. STREETS/TRAFFIC ERP -300 4x4 3/4 Ton Truck/1'low 10 33,600 - 45,200 ERP -301 4x43/4 TonTruck/Plow 8 30,400. .38,500 48,800 ERP -302 4x2 1 Ton Dump Truck 12 54,600 77,800 .ERP -303 1 Ton Dump Truck - 12 34,700 49,500 . ERP -303 I Ton Dump Truck 12 53,400 - ERP -304. 1 Ton Boom Truck 17 75,000 _ - 124,000 ERP -305 Single Axle Dump Truck 17 - 132,100 ERP -305 Single Axle Dump Truck 17 - 124,000 ERP -306 Tandem Dump Truck 17 142,400 238,500 ERP -306 Tandem Dump Truck 17 22,000. 173,200 ERP -307 Water Truck 22 150,000 ERP -308 Front End Loader 15 172,000 - 268,000. GRP -308 Front End Loader 18 268,600 - - - ERP -309 Skid Loader 12 41,900 - 59,700 ERP -309 Skid Loader 12 36,000 50,000 :ERP -310 Grader • 20 - ... 167,300 ERP -311 Sweeper 12 156,400 223,000 ERP -312 Roller 20 45,900 ERP -313 Striper 12 - - 11,200 BRP -314 Paver. 20 48,800 ERP -315 Snow Blower 20 102,300 ERP -316 Trailer 20 - ERP -317 Sign Machine 10 13,400 - 18,100 VEHICLES SUBTOTAL 58,000 327,600 329,200 48,300 47,000 144,200 161,200 351,800 170,600 103,400 268,600 49,500 453,600 268,000 59,700 .172,800 316,300 84 • REPL EQUU'MENT/VEHICLF.S YRS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 GENERALFUND-VEHICLES/EQUIP 240,917 869,917 554,217 274,917 305,017 480,817 853,017 635,317 197,100 377,500 371,300 378,000 481,000 189,000 748,500 430,100 1,502,900 1,955,600 416,500 961,000 GENERAL FUND -OTHER EQUIP 105,400 173,000 147,700 164,700 173,400 173,400 .13.1,401 396,300 761;800 163,100 122,100 '177,200 220,100.E 23.1,500 124,600 99,600 181,800 218,900 227,500 163,500 114,200 HRA _ 13,000 32,400 16,500 41,100 20,900 ARTSCENTER 12,100 3,300 14,900 - 4,400. 18,300 WATER 134,800 21,000 61,700 59,700 16,500 6,800 19,100 82,900 41,700 22,100 SEWER 35,700 6,800 33,600 26,400 59,700 180,800 23,000 6,800 48,000 45,200 REFUSE 101,600 204,800 59,700 247,300 81,800 136,600 275,200 144,800 STORM SEWER PAVILION 185,000 - 6,700 256,600 GENERAL FUND TOTAL 346,317 1,042,917 701,917 439,617 478,417 612,218 1,249,317 1,399,117 360,200 499,600 548,500 598,100 712,500 313,600 848,100 611,900 1,721,800 2,183,100 580,000 1,075,200 HRA TOTAL 13,000 32,400 .16,500 _ 41,100 20,900 ARTS CENTER FUND TOTAL 12,100 3,300 14,900 - 4,400 18,300 UTILITYFUNDSTOTAL 134,800 322,300 232,600 33,600 88,100 179,100 . ,444,600 104,800 13,600 191,300 294,300 301,800 82,900 41,700 166,900 358,417 1,046,217 836,717 774,917 743,417 645,818 1,337,417 1,593,117 360,200 944,200 548,500 723,800 767,200 504,900 1,160,700 913,700 1,804,700 2,224,800 580,000 1,263,000 GENERAL FUND SALVAGE 30,000 35,000 35,000 35,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 NET GENERAL FUND 316,3.17 1,007,917 666,917. 404,617 ..438,417 '572,218 1,209,317 1,359,117. 320,200 , 459,600 508,500 5581100s 672,500','.273,600 808,100 .571;900 1,681,800 2,143,100 540,000 1,035,200 20 YEAR AVERAGES:- Total Averaac ACTIVITY CENTER ADMINISTRATION 56,001 2,800 CITY HALL ADMINISTRATION 935,400 46,800 .CONIMUNITY.SERVICES 565,100 28,300 FIRE EQUIPMENT 4,079,936 204,000 FIREADMINISTRATION. 691,900 34,600. - POLICE EQUIPINFENT 3,095,600 154,800 POLICE ADMINISTRATION 1,786,800 ' 89,300 - PUBLIC WORKS ADMINISTRATION 56,300 2,800 - BLDG.IEQUIPMENT:SERVICES EQUIPMENT 81,700 4,100 ENGINEERING ENGINEERING EQUIPMENT 50,400 2,500 PARKSMORESTRY EQUIPMENT 1,593,000 79,700 STREET EQUIPMENT 3,330,300 166,500 - - GENERAL FUND VE•HICLE/EQUIPMENT 12,230,936 611,500 GENERAL FUND OTHER EQUIPMENT. - 4,091,501 204,600 . GENERAL FUND TOTAL 16,322,437 816,100 'HRA. 123,900 6,200. ARTS CENTER FUND 53,000 2,700 WATER UTILITY FUND 4GG,300. - 23,300 SEWER UTILITY FUND 466,000 23,300 REF- USE UTILITY FUND _ :1,251,800 - 62,600; STORM SEWER UTILITY FUND PAVILIONFUND ..448,300:. 22,400 UTILITY VEI ICLES/EQUIPMENT 2,809,300 140,500 86 • Equipment and Building Inventory 40 0 CITY OF HOPKINS • VEHICLE/EQUIPMENT INVENTORY 06/15/2010 CURRENT REPLACEMENT UNIT # YEAR MAKE MODEL COST FIRE DEPARTMENT 100 2006 DODGE DURANGO 28,300 102. 1989 FORD L9000 TELE -SQUIRT $240,000 103. 2006 PETERBILT PUMPER 403,300 104. 1991 PETERBILT HEAVY RESCUE 190,000 105. 1998 FORD CROWN VICTORIA 22,000 106. 2004 FORD CROWN VICTORIA 28,100 107. 1993 PETERBILT PUMPER 225,000 108. 1995 CHEV 4X4 LITE RESCUE 25,000 109 2008 PIERCE AERO XT 845,000 110 2010 CHEVROLET TAHOE 30,000 115. 1952 MACK PUMPER 4,000 120. 1995 CHEVROLET SUBURBAN 121. 2005 FREIGHTLINER M2 • POLICE DEPARTMENT 200. 2010 FORD CROWN VICTORIA $30,000 201. 2008 FORD CROWN VICTORIA 28,100 202. 2008 FORD CROWN VICTORIA 28,100 203. 2009 FORD CROWN VICTORIA 28,160 204. 2007 FORD CROWN VICTORIA 29,000 206. 2007 FORD CROWN VICTORIA 29,000. 207. 2010 FORD CROWN VICTORIA 30,000 208. 2007 FORD CROWN VICTORIA 29,000 211. 2006 JEEP LIBERTY 18,800 212. 2008 CHEV TAHOE 36,000 213. 2010 CHEV IMPALA 26,000 214. 2007 DODGE CHARGER 28,000 215. 2009 CHEV IMPALA 25,000 216. 2005 CHEV IMPALA 20,000 217. 2008 FORD TAURUS 22,000 218. 2006 FORD 500 21,800 240. 1998 CHEV P40 VAN 20,000 241. 2001 CHRYSLER PT CRUISER 18,000 87 • • CITY OF HOPKINS VEHICLE/EQUIPMENT INVENTORY 06/15/2010 UNIT # YEAR MAKE PARKS/FORESTRY DIVISION 800. 803. 804. 805. 810. 811. 812. 816. 817. 818. 819. 820. 821. 822. 824.. 825. 826. 828. 832. 833. 834. 836. 840. 844. 845. 846. 2001 2004 2004 1998 1993 2006 2010 1984 1982 1996 1987 2004 2004 2001 1996 2010 2004 2001 1997 2004 1993 1991 2010 1997 2001 FORD FORD FORD DODGE INTERNATIONAL INTERNATIONAL FREIGHTLINER FORD FORD TORO CUSHMAN TORO TORO TORO TORO TORO TORO DEW EZE VERMEER BOBCAT BRUSH BANDIT RYAN VICTORIAN FELLING REMACKEL DRESSEN 411. 2007 CHEV 89 MODEL RANGER4X4 F350 F350 RAM 3500 LP 4700 LP 4600 LOG TRUCK AERIAL LIFT TRACTOR 2910 TRACTOR 2610 TRUCKSTER HAULSTER WORKMAN 3200 WORKMAN 2110 325-D MOWER GROUND MASTER 4100D MOWER Z587L ATM72 STUMP CTR 630A SKID LOADER CHIPPER 250 SOD CUTTER TRAILER TRAILER TRAILER 8110 2500 HD CURRENT REPLACEMENT COST $18,000 23,000 23,000 24,000 50,000 45,000 130,000 22,000 22,000 13,000 5,000 15,000 7,900 18,000 16,000 53,000 8,900 21,000 15,400 22,000 14,000 2,000 2,000 4,000 5,000 2,000 $17,500 . CITY OF HOPKINS BUILDING INVENTORY June 2010 Location/Descrit)tion Replacement Cost City Hall $3,370,837 1010 1st Street S. Police Station 3,801,157 1010 1st Street S. Fire Station 4,091,653 101 17th Avenue S. Hopkins Activity Center 1,324,718 33 14th Avenue S. Ice Arena/Pavilion 4,404,998 11000 Excelsior Boulevard Arts Center 5,439,674 1111 Mainstreet PW Admin/Garage 6,217,636 • 11100 Excelsior Boulevard Moline Reservoir 1,613,617 10421 Excelsor Boulevard Blake Tower Reservoir 806,810 151 Tyler Avenue S. Well #1 Filtration Plant 208,424 10421 Excelsior Boulevard Filtration Plant 1,391,782 1401 Elmo Park Service Road Well #4 Workshop/Storage 283,492 1401 Elmo Park Service Road Well #5 114,299 1205 Highway? Well #6 114,299 801 Highway 7 Lift Station #1 - 21st 107,574 • 202 21 st Avenue N. 91 • • Location/Description Replacement Cost Dow Towers (76 Units) HRA 22 5th Avenue S. 20th Avenue Townhouses (10 Units) HRA 29 20th Avenue S. Parking Ramp 4,409,208 10th Avenue and Mainstreet Depot Coffee House 469,400 9451 Excelsior Boulevard Overpass Skate Park 7,331 100 Washington Avenue 93