Loading...
2014-2018 Equipment Replacement Plan (ERP)CITY OF HOPKINS FINANCE DEPARTMENT MEMORANDUM Date: July 16, 2013 To: Mayor & City Council From: Christine Harkess, Finance Director Subject: 2014-2018 Equipment Replacement Plan (ERP) Overview The City of Hopkins is beginning the process of establishing the 2014-2018 equipment replacement plan. Every year the city council reviews with the city manager and staff, the equipment planned for replacement for the next five years. The goal is to ensure the city's priorities and objectives are being met and the funding sources are reasonable and available. Departments were once again asked to assess the equipment planned for replacement, evaluate the estimated cost and life expectancy of the equipment with the intent to prolong equipment life expectancy when practical and to refurbishing equipment instead of replacing it. As the way we operate changes so do the demands on the ERP and as you will note from the cash flow statements. Heading into 2013 the fund had a serious cash flow issue which we resolved by selling Equipment Certificates. This bond issue is backed by the levy authority of the city and while the 2013 bond payment is paid with ERP fees this is not sustainable with the current level of expenditures, therefore the bond requirements going forward will be part of the debt levy. Attachments • Summary of changes in 2014-2018 ERP • Cash flow statements • Projects by Year • Project by Department • Projects by Funding Source ERP Goals • Maintain the integrity, reliability and safety of city equipment. • Provide funding for replacement of current equipment as needed. • Forecast funding needs and tax implications to assure strong long-term financial stability. EQUIPMENT REPLACEMENT PLAN 2014-2018 BACKGROUND AND SUMMARY OF CHANGES FROM 2013 PLAN Background The Equipment Replacement Plan is a twenty-year forecast and a five-year plan of equipment needs in the City of Hopkins. It is intended to inform the Council and citizens of the major equipment needs on the horizon. The first year of the plan becomes an adopted equipment budget and relates to the operating budget of the equipment replacement fund, which is approved on an annual basis. The remaining nineteen years represent an estimate of equipment needs and funding capabilities of the City. Funding requirements vary from year to year. In order to maintain a fairly consistent levy each year, the twenty-year schedule is projected with a 3% inflation factor for operating expenses and a yearly average dollar capital expenditure of $849,700. The cash flow requirements to fund equipment needs in the equipment replacement fund, will experience a roller coaster effect over the next 20 years given the projected equipment needs and 3% inflation rate. After reducing the intragovernmental charges by 50% in 2003 in response to the LGA cuts, charges were increased 2% in 2004 and 9% in 2006 and were not increased again until 2010 when they were raised by 2% and again by 5% in 2012. The rates were held flat for 2013. This has resulted in a steady decline in the working capital of the fund. In order to start building cash reserves annual increases are built into the cash projections beginning in 2014 with an 8% increase and continuing forward with increases of 9% over the next 4 years. The majority of items purchased with ERP funds are used by departments within the General Fund which accounts for the most of the operations of the city. Intergovernmental charges are at 66% of what they were in 2002 and at the current rate structure will not return to that level until 2021. In the last decade due to changes in technology and the way we operate there is more equipment in the plan; however the rate has not increased to accommodate the increase in equipment. Equipment that was purchased with grants such as digital squad cameras, laptop computers in squad cars and fire vehicles, AED's, infrared cameras and fitness equipment in the fire hall fitness room now are included in the ERP. The long term viability of the fund remains questionable and will result in difficult decisions regarding equipment and operations which were discussed at length during the period leading up to the preparation of the 2014 ERP. As discussed above are scheduling an 8% rate increase for 2014, and 9% for 2015-2018 and plan to sell Equipment Certificates to fund some of the equipment scheduled for 2016-2018. This will allow us to replace aging equipment and spread the payments over 10 years. The required Equipment Certificate payment will be part of the debt levy in the applicable year. Each year staff re-evaluates the equipment needs and adjusts the schedule accordingly. Changes to the plan are reflected in the document. Refurbishments, extended life expectancy and closer cost estimates of replacements have been incorporated into the plan. The equipment replacement charges in the general fund represent approximately 2.8% of total general fund expenditures. The Equipment Replacement Plan's basic premise is scheduled replacement of present equipment. A new item must, in the year proposed, be presented in the annual operating budget with a stipulation that replacement will be necessary in the future. Flexibility of the Equipment Replacement Plan is established through annual review and revision, if necessary. Summary of Changes from 2013 Plan Highlights of changes from last year's equipment replacement plan for the years 2014-2018: Activity Center: There are no changes to Activity Center items in this ERP. Arts Center: The Theater projector replaced at a cost of $15,000 was rescheduled for 2018 at a cost of $17,100. The subsequent replacement had not been previously scheduled. The community room audio visual unit for $11,000 was moved from 2014 to 2015. A theater projection screen was added in 2014 at a cost of $5,000. This screen will replace the original retractable screen in the theater with a wider format screen to mesh with current technology. Theater presentation microphones were added in 2014 at a cost of $6,000. Three lapel and three hand held microphones will be replaced along with supporting transmitters, receivers, splitter kit and rack mount kit. A digital sign at a cost of $2,000 was added in 2015. This will be a programmable and highly visible digital sign for information at the information desk area. City Hall: Financial software was added in 2014 at a cost of $250,000. The current software company is not keeping up with security issues and staff has become increasingly frustrated with the operation of the current software. Community Services: There are no changes to Community Services items in this ERP. Fire: The fire utility vehicle used by the Fire Inspector and scheduled for 2016 at a cost of $35,000 was moved up to 2015 and the cost has been increased to $40,000 to reflect actual replacement cost. The duty chief vehicle schedule in 2015 was moved back to 2016. The cost remains at $37,000. The floor scrubber originally scheduled for 2016 was moved up to 2015. The Telesquirt fire truck scheduled for 2018 has been moved up to 2017 as the truck is beginning to have structural issues. Cost remains at $570,900. The dumbbells for the fitness room scheduled to be replaced in 2014 have been moved back to 2017. HRA There are no changes to HRA items in this ERP. Pavilion: There are no changes to Pavilion items in this ERP. Parking: There are no changes to the Parking Dept. items in this ERP. Police: Marked squad cars that are replaced on a 3 -year schedule at $71,200 have been increased to $90,000. Two cars are replaced each year in a three year cycle. The increase in cost is due to new models of police vehicles. The current equipment does not fit in the new models so new equipment needs to be purchased along with the cars. The sergeant's vehicle scheduled for replacement in 2015 at $37,800 has been increased to $45,000 for the same reason the marked squad car cost was increased. The administrative vehicles for the police chief and captain will be leased starting in 2014. The chief's car will be leased in 2014 and the captain's in 2015. These vehicles were previously purchased on alternate years. The vehicles will leased for 4 years. The second two years of each lease will be used by the investigative sergeant (chief's car) and a detective (captain's car). The ERP item reflects the lease and a corresponding amount to outfit the vehicles estimated at $5,000 per vehicle. The police services liaison vehicle scheduled for replacement in 2015 at a cost of $25,000 has been removed from the ERP as it is no longer needed. A Drug Task Force vehicle has been added in 2014 on a leased basis. As part of the SW Metro DTF a vehicle is not provided to officers and each department needs to supply one. This vehicle will be leased for four years with the second two years of the lease going to a detective. The ERP item reflects the lease and a corresponding amount to outfit the vehicle estimated at $5,000. A FOCUS (Focus On Crime Using Strategy) vehicle has been added in 2015 on a leased basis. This car will be used by the FOCUS officers in the performance of their duties. This vehicle will be leased for four years with the second two years of the lease going to a detective. The ERP item reflects the lease and a corresponding amount to outfit the vehicle estimated at $5,000. A logging recorded used by dispatch and scheduled for replacement in 2014 at a cost of $36,900 has been removed from the ERP. With dispatch moved to Hennepin County this item is no longer needed. Digital cameras for squad cars originally scheduled for 2014 have been moved back to 2015. The cost remains at $53,400. Mobile radios for squad cars originally scheduled for replacement in 2018 have been moved up according to car replacement. The current radios do not fit in the new model police cars so when new cars are purchased new radios will also be purchased and installed. Three were purchased in 2013, five will be purchased in 2014 and 2015 and three in 2016. The portable radios and mobiles for the Fire Dept. remain scheduled for 2018. Public Works: The lives of the equipment are annually reviewed by the public works department and over the past 10 years they have extended the lives of the 1 -ton trucks from 8 to 12 years and the dump trucks from 13 to 17 years. Extending the lives of major equipment comes with the risk of increased maintenance costs. When maintenance costs become unmanageable the equipment will be put on the schedule for earlier replacement. Engineering No changes Parks/Forestry A tractor scheduled for 2016 at a cost of $49,300 was moved up to 2014 at a cost of $52,000. This vehicle will be replaced with a tool cat that has a blower and broom attachment. Cost was increased to reflect actual replacement cost. A trucksteer originally scheduled for 2013 was moved back to 2014. The cost was reduced from $19,800 to $11,000 to reflect the purchase of an electric style workman. Riding mowers scheduled for 2014 and 2015 at a cost of $11,000 and $20,000 were moved back to 2015 and 2016 at the same cost. Streets/Traffic A roller used by the street department for asphalt repair and resurfacing and originally scheduled for 2014 was moved back to 2016. Cost remains at $45,900. An asphalt paver used by the street department was moved from 2014 to 2016. The cost remains at $48,800. A snow blower originally scheduled for replacement in 2016 at a cost of $102,300 has been moved up to 2014 and the cost reduced to $65,000 to reflect the purchase of a hydraulic powered blower. Refuse A rear loading refuse truck scheduled for replacement in 2014 at a cost of $101,600 has been moved back to 2015. Water There are no changes to water department items in this ERP. Sewer The 4x4 3/ Ton Truck originally scheduled for replacement in 2014 at a cost of $35,700 has been moved back to 2015 and the cost reduced to $30,000. EQUIPMENT REPLACEMENT FUND (602) 07/09/2013 Impact on General Fund 0 28,938 35,160 38,323 41,773 Rate Change 5% 0% 8% 9% 9% 9% 9% ACTUAL BUDGET BUDGET BUDGET BUDGET BUDGET BUDGET 2012 2013 2014 2015 2016 2017 2018 Working Capital Begin Year 890,189 1,084,440 1,069,566 674,200 573,558 215,593 865,741 Revenues from charges 316,784 316,784 342,127 372,918 406,481 443,064 482,940 Transfer in General Fund 50,000 50,000 509000 Transfer In - Pavilion - Capital Lease 20,000 15,609 Transfer In - Pavilion - Hockey Loan 3,143 3,143 3,142 Federal & State Grants Interest earnings 5,910 10,984 10,835 6,881 5,875 2,295 8,797 Other revenues (sale of assets) 47,834 25,000 30,000 30,000 30,000 30,000 30,000 Equipment Certificates (Bonds) 346,274 451,769 1,272,000 Total Revenues 739,944 823,289 436,104 459,799 492,355 1,747,359 521,736 Expenditures (excludes Depr.) 15,802 16,276 16,764 17,267 17,785 18,319 18,868 Fire Truck Financing Pymnts (2009-2018) 53,858 54,217 54,217 54,217 54,217 54,217 54,217 Capital Outlay - Equipment 476,034 703,300 760,488 488,958 778,318 1,024,676 1,246,448 2012 Equip Certificate Pymnts (10yr 3%) 64,370 Total Expenses 545,694 838,163 831,469 560,442 850,320 1,097,211 1,442,908 Working Capital Ending Balance 1,084,440 19069,566 674,200 573,558 215,593 865,741 (55,431) Actual/Estimated Cash balances 1,098,353 1,083,479 688,114 587,471 229,507 879,654 (41,517) Bond Memo 2012 Equip Certificate Pymnts (10yr 3%) 89,050 92,500 90,900 89,300 87,700 Tax Levy Requirements 64,370 97,965 96,285 94,605 92,925 96,495 2012 Equipment Certificates ERP # Year In ERP Estimated Cost Fund 12 Listing of Equipment to Purchase 2016 41,900 ERP 20 01 -ERP -01312 Items from 2012-2014 45,900 ERP 20 01 -ERP -0314 2016 48,800 ERP 10 Year Estimated 570,900 Item Life ERP # In ERP Cost Fund Quick Attach Pumper 10 01 -ERP -0105 2012 245,000 ERP Single Axel Dump Truck 17 01 -ERP -0305 2012 127,400 ERP Front End Loader 15 01 -ERP -0308 2012 172,000 ERP Backhoe 20 01 -ERP -502 2013 75,000 Water Regenerative Air Sweeper 12 01 -ERP -0311 2013 185,000 ERP Total ERP 804,400 Ice Resurfacer 12 01 -ERP -1001 2014 180,000 Pavilion Grand Total 984,400 2017 Equipment Certificates Listing of Equipment to Purchase Items from 2017 -2018 Item Skid Loader Roller Asphalt Paver Telesquirt Engine #2 Water Truck Skid Loader 4x2 1 Ton Dump Truck Single Axel Dump Truck Tandem Dump Truck 4x4 1/2 Ton Truck Total Life ERP # Year In ERP Estimated Cost Fund 12 01 -ERP -0309 2016 41,900 ERP 20 01 -ERP -01312 2016 45,900 ERP 20 01 -ERP -0314 2016 48,800 ERP 10 01 -ERP -0100 2017 570,900 ERP 22 01 -ERP -0307 2017 150,000 ERP 12 01 -ERP -0815 2017 32,000 ERP 12 01 -ERP -0302 2018 54,600 ERP 17 01 -ERP -0305 2018 124,000 ERP 17 01 -ERP -0306 2018 173,200 ERP 10 01 -ERP -0710 2018 31,300 ERP ERP REFUSE FUND - WORKING CAPITAL PROJECTION 07/05/2013 Actual Projected Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 Working Capital Beginning Year 531,787 627,351 748,108 860,763 708,765 853,210 1,039,311 Revenues: Operating Revenues Refuse Collection 705,912 x 738,786 738,786 x 788,786 788,786 x 838,786 838,786 Recycling Rates x 138,097 138,097 x 146,197 146,197 x 154,297 154,297 x 162,397 Bulk Collection 13,328 12,000 12,000 12,000 12,000 12,000 12,000 Yard Waste 9,470 10,000 10,000 10,000 10,000 10,000 10,000 Recycling rebates 28,881 30,000 30,000 30,000 30,000 30,000 30,000 Miscellaneous (penalties) 11,599 10,000 10,000 10,000 10,000 10,000 10,000 Grants 17,795 19,000 18,500 18,000 17,500 17,000 16,500 Gain on sale of assets 0 Interest 3,945 3,137 3,741 4,304 3,544 4,266 5,197 Total Revenues 929,027 961,020 969,224 1,019,287 1,026,127 1,076,350 1,084,880 Expenditures: Operation Expense 807,192 815,264 831,569 839,885 856,682 865,249 882,554 Transfer Out Capital Outlay (per ERP) 306,400 Capital Projects per CIP Capital Lease (PW Facility) 25,000 25,000 25,000 25,000 25,000 25,000 25,000 Total Expenditures 832,192 840,264 856,569 1,171,285 881,682 890,249 907,554 Change in available funds 96,835 120,756 112,655 (151,997) 144,445 186,100 177,326 Inventory change (1,271) Working Capital Ending Year 627,351 748,108 860,763 708,765 853,210 1,039,311 1,216,636 Rate History 1989 $15.10 1991 $17.25 x = year this rate will be raised 1995 $11.00-14.45 refuse $2.25 recycling fee 2002 $2.75 recycle fee 2005 $13.20, 15.90, 17.25, refuse 2008 $3.25 recycling fee 2009 $15.85, 18.55, 21.25, refuse 2009 $3.50 recycling fee 2010 $3.75 recycling fee 2011 $16.85, $19.85, $23.15 refuse Refuse accounts as of 7/2012 = 2,742 2012 $4.00 recycling fee On average recycling accounts total 2700 per month 2013 $16.85, $20.85, $24.30 refuse Each $0.25 increase generates approximately $8,100 additional revenue per year 2014 $4.25 recycling fee 2015 $18.85; $21.85, $25.15 refuse 2016 $4.50 recycling fee 2017 $19.85; $22.85; $26.15 refuse 2018 $4.75 recycling fee 2019 $20.85, $23.85; $27.15 refuse 2020 $5.00 recycling fee City of Hopkins, MN EQUIPMENT REPLA CEMENT PLAN 2014 thru 2018 PROJECTS BY YEAR Project Name Department Project # Priority Project Cost 2014 Art Center Theater Projection Screen Arts Center 01 -ERP -1107 2 5,000 Art Center Theater Presentation Microphones Arts Center 01 -ERP -1108 1 6,000 Network Server City Hall Administration 01 -ERP -0003 n/a 8,000 Financial Software - Various Depts City Hall Administration 01 -ERP -0005 n/a 250,000 Computers City Hall Administration 01 -ERP -0006 n/a 30,000 Election Equipment Community Services 07 -ERP -0077 n/a 50,000 Aerial Truck Fire 07 -ERP -0706 n/a 54,217 Automated External Defibrillator (2) Fire 07 -ERP -0720 n/a 7,200 Workout Equipment - Dumb Bells Fire 01 -ERP -0722 n/a 5,000 HRA Copier HRA 01 -ERP -0407 n/a 13,000 Marked Patrol Vehicles (6) Police 01 -ERP -0200 n/a 90,000 PSO - Utility 44 (unit 212) Police 07 -ERP -0203 n/a 47,700 Police Administrative Vehicles (2) Police 01 -ERP -0204 n/a 4,694 Police Admin Cars - outfit leased vehicles Police 07 -ERP -0204a n/a 5,000 Drug Task Force Vehicle Police 01 -ERP -0206 n/a 4,694 Drug Task Force Vehicle - outfit leased vehicle Police 07 -ERP -0206a n/a 5,000 Network Server (3) Police 01 -ERP -0277 n/a 8,500 Mobile Data Computers Police 01 -ERP -0272 n/a 62,700 Radios - Portable and Mobile Devices Police 07 -ERP -0215 n/a 20,500 Engineering Van Public Works: Engineering 07 -ERP -0700 n/a 2,000 3/4 Ton Utility Truck Public Works: Parks/Forestry 07 -ERP -0802 n/a 32,200 Tractor Public Works: Parks/Forestry 01 -ERP -0806 n/a 52,000 Trucksters (3) Public Works: Parks/Forestry 01 -ERP -0807 n/a 11,000 Snow Blower Public Works: Streets/Traffic 01 -ERP -0375 n/a 65,000 Total for 2014 839,405 20 Art Center Community Room Audio Visual Arts Center 01 -ERP -1105 n/a 11,000 Arts Center - Digital Information Sign Arts Center 07 -ERP -1106 2 2,000 Network Server City Hall Administration 07 -ERP -0003 n/a 8,000 Telephone System City Hall Administration 01 -ERP -0004 n/a 89,600 Computers City Hall Administration 07 -ERP -0006 n/a 30,000 Fire Utility Vehicle (Pick Up Truck) Fire 01 -ERP -0705a n/a 40,000 Aerial Truck Fire 07 -ERP -0106 n/a 54,217 Floor Scrubber Fire 01 -ERP -0114 n/a 14,300 Workout Equipment - Eliptical Fire 01 -ERP -0116 n/a 5,800 Workout Equipment - Summit Trainer Fire 07 -ERP -0117 n/a 5,800 Workout Equipment - Weight Lifting Fire 07 -ERP -0119 n/a 5,800 44 3/4 Ton Truck HRA 01 -ERP -0400 n/a 32,400 Marked Patrol Vehicles (6) Police 07 -ERP -0200 n/a 90,000 Sergeant's Vehicle Police 07 -ERP -0207 n/a 45,000 Police Administrative Vehicles (2) Police 01 -ERP -0204 n/a 9,529 Police Admin Cars - outfit leased vehicles Police 01 -ERP -0204a n/a 5,000 Drug Task Force Vehicle Police 01 -ERP -0206 n/a 4,694 Tuesday, Juh' 09, 2013 Project Name Department Project # Priority Project Cost Focus Car Police 01 -ERP -0270 n/a 4,835 Focus Car - outfit leased vehicle Police 01 -ERP -0270a n/a 5,000 Network Server (3) Police 07 -ERP -0277 n/a 8,500 Digital Squad Car Cameras Police 07 -ERP -0273 n/a 53,400 Radios - Portable and Mobile Devices Police 01 -ERP -0275 n/a 20,500 Riding Mowers (2) Public Works: Parks/Forestry 07 -ERP -0808 n/a 11,000 4X4 3/4 Ton Truck with Plow Public Works: Streets/Traffic 07 -ERP -0301 n/a 30,400 Sign Machine (Traffic) Public Works: Streets/Traffic 07 -ERP -0377 n/a 13,400 Refuse Truck (RAP -R) (2) Refuse 07 -ERP -0900 n/a 204,800 Refuse Truck (Rear -L) Refuse 07 -ERP -0907 n/a 101,600 44 3/4 Ton Truck Sewer 07 -ERP -0550 n/a 30,000 Total for 2016 866,135 2017 Art Center Video Camera Updates Total for 2015 07 -ERP -7103 n/a 936,575 20� City Hall Administration 01 -ERP -0003 n/a 8,000 Network Server City Hall Administration 07 -ERP -0003 n/a 8,000 Computers City Hall Administration 07 -ERP -0006 n/a 30,000 Duty Chief Vehicle Fire 07 -ERP -0703 n/a 37,000 Aerial Truck Fire 01 -ERP -0106 n/a 54,217 Air Compressor Fire 07 -ERP -0707 n/a 34,900 Self Contained Breathing Apparatus (45) Fire 01 -ERP -0108 n/a 250,000 Marked Patrol Vehicles (6) Police 07 -ERP -0200 n/a 90,000 Parking Enforcement Vehicle (Parking Fund) Police 01 -ERP -0202 n/a 27,200 Police Administrative Vehicles (2) Police 01 -ERP -0204 n/a 14,509 Police Admin Cars - outfit leased vehicles Police 07 -ERP -0204a n/a 5,000 SWAT Vehicle Police 01 -ERP -0205 n/a 30,000 Drug Task Force Vehicle Police 07 -ERP -0206 n/a 9,674 Drug Task Force Vehicle - outfit leased vehicle Police 07 -ERP -0206a n/a 5,000 Copy Machine - Police Dept Police 01 -ERP -0209 n/a 22,100 Focus Car Police 07 -ERP -0270 n/a 4,835 Network Server (3) Police 07 -ERP -0211 n/a 8,500 Radios - Portable and Mobile Devices Police 07 -ERP -0215 n/a 12,300 Riding Mowers (2) Public Works: Parks/Forestry 07 -ERP -0808 n/a 20,000 Slope Mower Public Works: Parks/Forestry 01 -ERP -0809 n/a 32,700 Skid Loader (2) Public Works: Streets/Traffic 07 -ERP -0309 n/a 41,900 Roller Public Works: Streets/Traffic 07 -ERP -0312 n/a 45,900 Asphalt Paver Public Works: Streets/Traffic 01 -ERP -0314 n/a 48,800 3/4 Ton Utility Truck Sewer 01 -ERP -0557 n/a 33,600 Total for 2016 866,135 2017 Art Center Video Camera Updates Arts Center 07 -ERP -7103 n/a 3,700 Network Server City Hall Administration 01 -ERP -0003 n/a 8,000 Computers City Hall Administration 07 -ERP -0006 n/a 30,000 Document Management Scanner (2) Community Services 07 -ERP -0008 n/a 6,000 Tele -Squirt (Engine 2) Fire 07 -ERP -0100 n/a 570,900 Aerial Truck Fire 01 -ERP -0106 n/a 54,217 Thermal Imaging Camera (2) Fire 01 -ERP -0712 n/a 12,900 Workout Equipment - Treadmill Fire 01 -ERP -0778 n/a 5,800 Marked Patrol Vehicles (6) Police 07 -ERP -0200 n/a 98,000 Police Administrative Vehicles (2) Police 01 -ERP -0204 n/a 19,638 Police Admin Cars - outfit leased vehicles Police 01 -ERP -0204a n/a 5,000 Drug Task Force Vehicle Police 01 -ERP -0206 n/a 9,674 Focus Car Police 07 -ERP -0210 n/a 9,964 Focus Car - outfit leased vehicle Police 07 -ERP -0210a n/a 5,000 Network Server (3) Police 01 -ERP -0211 n/a 8,500 Tuesdav, Ju1v 09, 2013 Project Name Department Project # Priority, Project Cost Taser Replacement Police 01 -ERP -0217 3 20,900 Stump Cutter Public Works: Parks/Forestry 07 -ERP -0812 n/a 21,200 Skid Loader Public Works: Parks/Forestry 07 -ERP -0875 n/a 32,000 Water Truck Public Works: Streets/Traffic 07 -ERP -0307 n/a 150,000 Striper Public Works: Streets/Traffic 07 -ERP -0313 n/a 11,200 Generator (2) Sewer 07 -ERP -0555 n/a 26,400 1/2 Ton Truck Water 07 -ERP -0500 n/a 26,800 3/4 Ton Utility Truck Water 01 -ERP -0507 n/a 34,900 2018 Art Center Theater Projector Network Server Computers Core Network Switch Document Management Scanner (2) Aerial Truck Automated External Defibrillator (2) Marked Patrol Vehicles (6) Police Administrative Vehicles (2) Police Admin Cars - outfit leased vehicles Drug Task Force Vehicle Drug Task Force Vehicle - outfit leased vehicle Focus Car Network Server (3) Tactical Ballistic Vests Radios - Portable and Mobile Devices 4X4 1/2 Ton Truck Turf Sweeper Toolcat 42 1 Ton Dump Truck Single Axle Dump Truck (3) Tandem Dump Truck GRAND TOTAL Total for 2017 1,170,693 Arts Center 07 -ERP -7704 n/a 17,100 City Hall Administration 07 -ERP -0003 n/a 8,000 City Hall Administration 07 -ERP -0006 n/a 30,000 City Hall Administration 07 -ERP -0072 n/a 12,000 Community Services 07 -ERP -0008 n/a 6,000 Fire 07 -ERP -0706 n/a 54,217 Fire 01 -ERP -0720 n/a 7,800 Police 01 -ERP -0200 n/a 98,000 Police 01 -ERP -0204 n/a 20,224 Police 01 -ERP -0204a n/a 5,000 Police 01 -ERP -0206 n/a 10,260 Police 07 -ERP -0206a n/a 5,000 Police 01 -ERP -0210 n/a 9,964 Police 07 -ERP -0217 n/a 8,500 Police 07 -ERP -0274 n/a 26,900 Police 07 -ERP -0215 n/a 534,400 Public Works: Bldg/Equip Sery 01 -ERP -0770 n/a 31,300 Public Works: Parks/Forestry 01 -ERP -0871 n/a 18,000 Public Works: Parks/Forestry 07 -ERP -0876 n/a 63,300 Public Works: Streets/Traffic 07 -ERP -0302 n/a 54,600 Public Works: Streets/Traffic 07 -ERP -0305 n/a 124,000 Public Works: Streets/Traffic 07 -ERP -0306 n/a 173,200 Total for 2018 1,317,765 5,130,573 Tuesday, July 09, 2013 City of Hopkins, MN EQUIPMENT REPLA CEMENT PLAN 2014 thru 2018 PROJECTS BY DEPARTMENT Department Project# Priority 2014 2015 2016 2017 2018 Total (Arts Center Art Center Video Camera Updates 01 -ERP -7703 n/a 3,700 3,700 Art Center Theater Projector 01 -ERP -1104 n/a 17,100 77,100 Art Center Community Room Audio Visual 01 -ERP -1105 n/a 11,000 17,000 Arts Center- Digital Information Sign 01 -ERP -7706 2 2,000 2,000 Art Center Theater Projection Screen 01 -ERP -7707 2 5,000 5,000 Art Center Theater Presentation Microphones 01 -ERP -1708 1 6,000 6,000 Arts Center Total 11,000 13,000 3,700 17,100 44,800 City Hall Administration I Network Server 07 -ERP -0003 n/a 8,000 8,000 8,000 8,000 8,000 40,000 Telephone System 07 -ERP -0004 n/a 89,600 89,600 Financial Software - Various Depts 07 -ERP -0005 n/a 250,000 250,000 Computers 07 -ERP -0006 n/a 30,000 30,000 30,000 30,000 30,000 750,000 Core Network Switch 01 -ERP -0012 n/a 12,000 72,000 City Hall Administration Total 288,000 127,600 38,000 38,000 50,000 541,600 Community Services Document Management Scanner (2) 01 -ERP -0008 n/a 6,000 6,000 12,000 Election Equipment 01 -ERP -0011 n/a 50,000 50,000 Community Services Total 50,000 6,000 6,000 62,000 IFire Tele -Squirt (Engine 2) 01 -ERP -0700 n/a 570,900 570,900 Duty Chief Vehicle 01 -ERP -0103 n/a 37,000 37,000 Fire Utility Vehicle (Pick Up Truck) 07 -ERP -0105a n/a 40,000 40,000 Aerial Truck 07 -ERP -0706 n/a 54,217 54,217 54,217 54,217 54,217 271,085 Air Compressor 01 -ERP -0707 n/a 34,900 34,900 Self Contained Breathing Apparatus (45) 07 -ERP -0108 n/a 250,000 250,000 Thermal Imaging Camera (2) 07 -ERP -0172 n/a 12,900 12,900 Floor Scrubber 01 -ERP -0174 n/a 14,300 14,300 Workout Equipment - Eliptical 07 -ERP -0176 n/a 5,800 5,800 Workout Equipment - Summit Trainer 01 -ERP -0117 n/a 5,800 5,800 Workout Equipment - Treadmill 01 -ERP -0178 n/a 5,800 5,800 Workout Equipment - Weight Lifting 01 -ERP -0779 n/a 5,800 5,800 Automated External Defibrillator (2) 07 -ERP -0120 n/a 7,200 7,800 15,000 Workout Equipment - Dumb Bells 01 -ERP -0722 n/a 5,000 5,000 Fire Total 66,417 125,917 376,117 643,817 62,017 1,274,285 HRA 44 3/4 Ton Truck 07 -ERP -0400 n/a 32,400 32,400 HRA Copier 01 -ERP -0407 n/a 13,000 13,000 Tuesday. Juh 09, 2013 Department Project# Priority 2014 2015 2016 2017 2018 Total HRA Total 13,000 32,400 45,400 Police Marked Patrol Vehicles (6) 07 -ERP -0200 n/a 90,000 90,000 90,000 98,000 98,000 466,000 Sergeant's Vehicle 01 -ERP -0201 n/a 45,000 45,000 Parking Enforcement Vehicle (Parking Fund) 01 -ERP -0202 n/a 27,200 31,300 27,200 PSO - Utility 44 (unit 212) 01 -ERP -0203 n/a 47,700 31,300 47,700 Police Administrative Vehicles (2) 01 -ERP -0204 n/a 4,694 9,529 14,509 19,638 20,224 68,594 Police Admin Cars - outfit leased vehicles 07 -ERP -0204a n/a 5,000 5,000 5,000 5,000 5,000 25,000 SWAT Vehicle 07 -ERP -0205 n/a 2,000 30,000 30,000 Drug Task Force Vehicle 07 -ERP -0206 n/a 4,694 4,694 9,674 9,674 10,260 38,996 Drug Task Force Vehicle - outfit leased vehicle 07 -ERP -0206a n/a 5,000 5,000 5,000 15,000 Copy Machine - Police Dept 07 -ERP -0209 n/a 52,000 22,100 22,100 Focus Car 07 -ERP -0270 n/a 11,000 4,835 4,835 9,964 9,964 29,598 Focus Car- outfit leased vehicle 01 -ERP -0270a n/a 5,000 20,000 5,000 70,000 Network Server (3) 01 -ERP -0271 n/a 8,500 8,500 8,500 8,500 8,500 42,500 Mobile Data Computers 01 -ERP -0212 n/a 62,700 18,000 62,700 Digital Squad Car Cameras 07 -ERP -0213 n/a 53,400 21,200 53,400 Tactical Ballistic Vests 07 -ERP -0274 n/a 32,000 26,900 26,900 Radios - Portable and Mobile Devices 07 -ERP -0275 n/a 20,500 20,500 12,300 534,400 587,700 Taser Replacement 07 -ERP -0277 3 95,200 11,000 52,700 20,900 81,300 20,900 Police Total 248,788 246,458 229,118 176,676 718,248 1,619,288 (Public Works: Bldg/Equip Ser-,, 04 1/2 Ton Truck 07 -ERP -0710 n/a 31,300 37,300 Public Works: Bldg/Equip Sery Total 31,300 31,300 Public Works: Engineering Engineering Van 07 -ERP -0700 n/a 2,000 2,000 Public Works: Engineering Total 2,000 2,000 Public Works: Parks/Forestry i 3/4 Ton Utility Truck 01 -ERP -0802 n/a 32,200 32,200 Tractor 01 -ERP -0806 n/a 52,000 52,000 Trucksters (3) 01 -ERP -0807 n/a 11,000 11,000 Riding Mowers (2) 01 -ERP -0808 n/a 11,000 20,000 31,000 Slope Mower 01 -ERP -0809 n/a 32,700 32,700 Turf Sweeper 01 -ERP -0817 n/a 18,000 78,000 Stump Cutter 07 -ERP -0812 n/a 21,200 21,200 Skid Loader 07 -ERP -0875 n/a 32,000 32,000 Toolcat 01 -ERP -0876 n/a 63,300 63,300 Public Works: Parks/Forestry Total 95,200 11,000 52,700 53,200 81,300 293,400 �iublic Works: Streets/Traffic 4X4 3/4 Ton Truck with Plow 07 -ERP -0307 n/a 30,400 30,400 42 1 Ton Dump Truck 01 -ERP -0302 n/a 54,600 54,600 Single Axle Dump Truck (3) 01 -ERP -0305 n/a 124,000 724,000 Tandem Dump Truck 07 -ERP -0306 n/a 173,200 173,200 Water Truck 07 -ERP -0307 n/a 150,000 750,000 Skid Loader (2) 07 -ERP -0309 n/a 41,900 47,900 Roller 07 -ERP -0312 n/a 45,900 45,900 Striper 07 -ERP -0313 n/a 11,200 11,200 hiesdai. Juh 09, 2013 Department Project# Priority 2014 2015 2016 2017 2018 Total Asphalt Paver 01 -ERP -0314 n/a 48,800 48,800 Snow Blower 07 -ERP -0315 n/a 65,000 65,000 Sign Machine (Traffic) 07 -ERP -0377 n/a 13,400 13,400 Public Works: Streets/Traffic Total 65,000 43,800 136,600 161,200 351,800 758,400 .Refuse Refuse Truck (RAP -R) (2) 07 -ERP -0900 n/a 204,800 204,800 Refuse Truck (Rear -L) 07 -ERP -0907 n/a 101,600 701,600 Refuse Total 306,400 306,400 Sewer 44 3/4 Ton Truck 07 -ERP -0550 n/a 30,000 30,000 3/4 Ton Utility Truck 07 -ERP -0557 n/a 33,600 33,600 Generator (2) 07 -ERP -0555 n/a 26,400 26,400 Sewer Total 30,000 33,600 26,400 90,000 (Water 1/2 Ton Truck 07 -ERP -0500 n/a 26,800 26,800 3/4 Ton Utility Truck 01 -ERP -0507 n/a 34,900 34,900 Water Total 61,700 61,700 GRAND TOTAL 839,405 936,575 866,135 1,170,693 1,317,765 5,130,573 Tuesday. Juh09, 2013 City of Hopkins, MN EQUIPMENT REPLACEMENT PLAN 2014 thru 2018 PROJECTS BY FUNDING SOURCE Source Project# Priority 2014 2015 2016 2017 2018 Total IAC - Arts Center Fund 171,085 (Equipment Replacement Fund Art Center Video Camera Updates 07 -ERP -1103 n/a 3,700 01 -ERP -0003 3,700 Art Center Theater Projector 01 -ERP -1704 n/a 8,000 8,000 8,000 17,100 17,100 Art Center Community Room Audio Visual O7 -ERP -1105 n/a 11,000 11,000 Art Center Theater Presentation Microphones 01 -ERP -1708 1 6,000 n/a 250,000 6,000 AC - Arts Center Fund Total 6,000 11,000 3,700 17,100 37,800 30,000 30,000 30,000 30,000 150,000 Document Management Scanner (2) 01 -ERP -0008 n/a 6,000 Bonds/Lease Aerial Truck 07 -ERP -0706 n/a 54,217 54,217 54,217 54,217 54,217 277,085 Bonds/Lease Total 54,217 54,217 54,217 54,217 54,217 171,085 (Equipment Replacement Fund Network Server 01 -ERP -0003 n/a 8,000 8,000 8,000 8,000 8,000 40,000 Telephone System 07 -ERP -0004 n/a 76,000 76,000 Financial Software - Various Depts 01 -ERP -0005 n/a 250,000 250,000 Computers 07 -ERP -0006 n/a 30,000 30,000 30,000 30,000 30,000 150,000 Document Management Scanner (2) 01 -ERP -0008 n/a 6,000 6,000 12,000 Election Equipment 01 -ERP -0077 n/a 50,000 50,000 Core Network Switch 07 -ERP -0072 n/a 12,000 72,000 Tele -Squirt (Engine 2) 07 -ERP -0100 n/a 570,900 570,900 Duty Chief Vehicle 01 -ERP -0103 n/a 37,000 37,000 Fire Utility Vehicle (Pick Up Truck) 07 -ERP -0105a n/a 40,000 40,000 Air Compressor 07 -ERP -0707 n/a 34,900 34,900 Self Contained Breathing Apparatus (45) 07 -ERP -0708 n/a 250,000 250,000 Thermal Imaging Camera (2) 07 -ERP -0112 n/a 12,900 12,900 Floor Scrubber 07 -ERP -0774 n/a 14,300 14,300 Workout Equipment - Eliptical 07 -ERP -0116 n/a 5,800 5,800 Workout Equipment - Summit Trainer 07 -ERP -0117 n/a 5,800 5,800 Workout Equipment - Treadmill 07 -ERP -0178 n/a 5,800 5,800 Workout Equipment - Weight Lifting 07 -ERP -0719 n/a 5,800 5,800 Automated External Defibrillator (2) 07 -ERP -0120 n/a 7,200 7,800 15,000 Workout Equipment - Dumb Bells 07 -ERP -0122 n/a 5,000 5,000 Marked Patrol Vehicles (6) 01 -ERP -0200 n/a 90,000 90,000 90,000 98,000 98,000 466,000 Sergeant's Vehicle 01 -ERP -0207 n/a 45,000 45,000 Parking Enforcement Vehicle (Parking Fund) 07 -ERP -0202 n/a 27,200 27,200 PSO - Utility 4x4 (unit 212) 01 -ERP -0203 n/a 47,700 47,700 Police Administrative Vehicles (2) 01 -ERP -0204 n/a 4,694 9,529 14,509 19,638 20,224 68,594 Police Admin Cars - outfit leased vehicles 01 -ERP -0204a n/a 5,000 5,000 5,000 5,000 5,000 25,000 SWAT Vehicle 01 -ERP -0205 n/a 30,000 30,000 Drug Task Force Vehicle 07 -ERP -0206 n/a 4,694 4,694 9,674 9,674 10,260 38,996 Drug Task Force Vehicle - outfit leased vehicle 07 -ERP -0206a n/a 5,000 5,000 5,000 15,000 Copy Machine - Police Dept 07 -ERP -0209 n/a 22,100 22,700 Tuesdnr, Ah 09. 2013 Source Project# Priority 2014 2015 2016 2017 2018 Total Focus Car 01 -ERP -0210 n/a 760,488 4,835 4,835 9,964 9,964 29,598 Focus Car - outfit leased vehicle 01 -ERP -0210a n/a 4x4 3/4 Ton Truck 5,000 n/a 5,000 32,400 10,000 Network Server (3) 07 -ERP -0277 n/a 8,500 8,500 8,500 8,500 8,500 42,500 Mobile Data Computers 07 -ERP -0212 n/a 57,000 57,000 Digital Squad Car Cameras 07 -ERP -0213 n/a 53,400 Mobile Data Computers 01 -ERP -0212 53,400 Tactical Ballistic Vests 01 -ERP -0214 n/a PKG - Parking Fund Total 5,700 26,900 26,900 Radios - Portable and Mobile Devices 01 -ERP -0215 n/a 20,500 20,500 12,300 Refuse Truck (RAP -R) (2) 534,400 587,700 Taser Replacement 07 -ERP -0277 3 Refuse Truck (Rear -L) 01 -ERP -0907 n/a 20,900 101,600 20,900 4X4 3/4 Ton Truck with Plow 07 -ERP -0301 n/a 30,400 306,400 30,400 42 1 Ton Dump Truck 07 -ERP -0302 n/a 54,600 54,600 Single Axle Dump Truck (3) 07 -ERP -0305 n/a 124,000 124,000 Tandem Dump Truck 07 -ERP -0306 n/a 173,200 773,200 Water Truck 07 -ERP -0307 n/a 150,000 750,000 Skid Loader (2) 01 -ERP -0309 n/a 41,900 41,900 Roller 07 -ERP -0372 n/a 45,900 45,900 Striper 07 -ERP -0313 n/a 11,200 71,200 Asphalt Paver 01 -ERP -0314 n/a 48,800 48,800 Snow Blower 01 -ERP -0315 n/a 65,000 65,000 Sign Machine (Traffic) 01 -ERP -0377 n/a 13,400 13,400 Engineering Van 07 -ERP -0700 n/a 2,000 2,000 4X41/2 Ton Truck 07 -ERP -0770 n/a 31,300 31,300 3/4 Ton Utility Truck 01 -ERP -0802 n/a 32,200 32,200 Tractor 07 -ERP -0806 n/a 52,000 52,000 Trucksters (3) 07 -ERP -0807 n/a 11,000 17,000 Riding Mowers (2) 07 -ERP -0808 n/a 11,000 20,000 31,000 Slope Mower 01 -ERP -0809 n/a 32,700 32,700 Turf Sweeper 01 -ERP -0811 n/a 18,000 18,000 Stump Cutter 07 -ERP -0812 n/a 21,200 27,200 Skid Loader 01 -ERP -0815 n/a 32,000 32,000 Toolcat 07 -ERP -0876 n/a 63,300 63,300 Arts Center- Digital Information Sign 07 -ERP -1106 2 2,000 2,000 Art Center Theater Projection Screen 07 -ERP -1107 2 5,000 5,000 Equipment Replacement Fund Total 760,488 488,958 778,318 1,024,676 1,246,448 4,298,888 HRA - Housing and Redevelopment A 4x4 3/4 Ton Truck 07 -ERP -0400 n/a 32,400 32,400 HRA Copier 01 -ERP -0401 n/a 13,000 73,000 HRA - Housing and Redevelopment 13,000 32,400 45,400 Authority Total PKG - Parking Fund Mobile Data Computers 01 -ERP -0212 n/a 5,700 5,700 PKG - Parking Fund Total 5,700 5,700 IRF - Refuse Fund Refuse Truck (RAP -R) (2) 01 -ERP -0900 n/a 204,800 204,800 Refuse Truck (Rear -L) 01 -ERP -0907 n/a 101,600 107,600 RF - Refuse Fund Total 306,400 306,400 SF - Sanitary Sewer Fund Tues(hiv. ,1uh09. 2013 Source Project# PrioritN 2014 2015 2016 2017 2018 Total Telephone System 01 -ERP -0004 n/a 6,800 6,800 44 3/4 Ton Truck 01 -ERP -0550 n/a 30,000 30,000 3/4 Ton Utility Truck 07 -ERP -0557 n/a 33,600 33,600 Generator (2) 01 -ERP -0555 n/a 26,400 26,400 SF - Sanitary Sewer Fund Total 36,800 33,600 26,400 96,800 INET - Water Fund � Telephone System 01 -ERP -0004 n/a 6,800 6,800 1/2 Ton Truck 01 -ERP -0500 n/a 26,800 26,800 3/4 Ton Utility Truck 01 -ERP -0501 n/a 34,900 34,900 WF - Water Fund Total 6,800 61,700 68,500 GRAND TOTAL 839,405 936,575 866,135 1,170,693 1,317,765 5,130,573 Tuesday, Juh 09. 2013