2014-2018 Capital Improvement Plan (C.I.P.)CITY OF HOPKINS FINANCE DEPARTMENT MEMORANDUM Date: July 16, 2013 To: Mayor & City Council From: Christine Harkess, Finance Director Subject: 2014-2018 Capital Improvement Plan (C.I.P.) Attached is a proposed CIP which has undergone several staff revisions. At the work session we will review the 2014-2018 documents and incorporate any changes from the work session discussion. Included in this packet are the following — 1. Summary of changes in the 2014-2018 CIP 2. The cash flow statements by fund 3. Projects summarized by year for the years 2014-2018 4. Franchise Fee Increase proposal for Park projects Individual project sheets providing a description of the project, justification, and funding source are not included but can be provided if you are interested in reviewing them. Please let me know if you'd like to review the individual project sheets and I will email them to you. The presentation on Tuesday will be put up on the SMART board for ease of discussion. There are a lot of components and this will ensure we are all at the same point for the discussion and will allow staff to highlight items of interest easier. 2014-2018 CIP SUMMARY OF CHANGES Park Dedication Fund 1. Skate park commitment of $7,000 ends in 2014. Continuation for next three years is budgeted. 2. Recognized $300,000 to be received from Met Council to assist with land acquisition estimated at $319,000. Land acquisition costs are also shown. Both relate to Cottageville Park. 3. Park dedication fees beyond 2012 are not projected at the current time. 4. Franchise fees for park projects were added effective 2013 at $85,300 per year. 5. Parks were analyzed and needed projects put into the CIP. Capital Improvement Fund 1. Tax levy of $125,000 has been budgeted 2. In 2014 we've added $29,500 in Art Center projects 3. The Activity Center gymnasium roof was back from 2014 to 2016 — cost of $105,000 4. Public Works garage upgrade was budgeted for 2015-2016 at a cost of $120,000. 5. Art Center projects of $3,600 were added in 2015. 6. Art Center — replacement of the information desk and kiosk was moved from 2017 to 2015. Communications Fund 1. Council chambers and studio technology improvements totaling $95,000 were added for the years 2014-2018. MSA Fund 1. The County Road 3 project for $700,000 and the Sixth Street S project for $400,000 were both moved back from 2016 to 2018. 2. The current balance owing from the State is $1,834,499 on two projects and is being paid down by approximately $365,000 per year. PIR Fund 1. Bonds are projected to be sold each year we have a street project. 2. Franchise fees are being used to "buy down" the debt levy for the new bonds and future bonds. 3. Residential street improvements a. 2014 - $2,475,000 i. PIR - $2,355,000 — increase of $1,735,000 1. Added residential street improvements of $280,000 for West Park Road and 21" Ave N from Mainstreet to First St. 2. Moved the plan, design and implementation of the railroad quiet zone from 2014 to 2018. 3. Mainstreet Traffic Signal Upgrades — originally budgeted at $50,000 per year, this project is now Mainstreet Rehabilitation including traffic signals and road improvements. Cost is estimated at $1,500,000 net of a $500,000 grant request. 4. The 2014 street overlay project increased from $200,000 to $550,000 following evaluation of the road. 5. Pedestrian and bicycle access improvements have been added at $25,000 per year for 2014-2018. ii. SA - $120,000 — increase of $120,000 1. Added residential street improvements for 2014. b. 2015 - $1,975,000 i. PIR - $1,525,000 — decrease of $75,000 1. Decreased scope of residential street projects by $850,000 2. Moved Parking Lot 200 up from 2016 and added $600,000 in cost to re -do the Pavilion and City Hall parking lots which have deteriorated. Total cost of parking lots in PIR is $800,000. 3. Pedestrian and bicycle access improvements - $25,000 4. Mainstreet signal upgrades of $50,000 eliminated from 2015 and consolidated into larger Mainstreet project for 2014. ii. SA - $450,000 — decrease of $750,000 1. Decreased scope of residential street projects by $750,000 2016 - $2,600000 i. PIR - $1,540,000 — decrease of $325,000 1. Moved Sixth Street S project to 2018 and decreased cost to $100,000. 2. Moved parking lot 200 up to 2015 and increased cost to $800,000 3. Pedestrian and bicycle access improvements - $25,000 4. Mainstreet signal upgrades of $50,000 eliminated from 2016 and consolidated into larger Mainstreet project for 2014. ii. SA - $1,060,000 — no change 1. Increased residential street project by $350,000 d. 2017 - $2,605,000 i. PIR - $1,541,000 decrease of $25,000 1. Pedestrian and bicycle access improvements - $25,000 2. Mainstreet signal upgrades of $50,000 eliminated from 2017 and consolidated into larger Mainstreet project for 2014. ii. SA - $1,064,000 — no change e. 2018 - $2,600,000 i. PIR - $1,580,000 ii. SA - $750,000 4. New for 2014: a. Pedestrian and bicycle access improvements - $25,000 Water Fund 1. Residential street improvements a. 2014 - $350,000 — added residential street improvements for West Park Road and 21 st Ave N from Mainstreet to First St. b. 2015 - $200,000 — decrease of $600,000 due to reduction in scope of project c. 2016 - $200,000 — no change d. 2017 - $200,000 — no change e. 2018 - $600,000 2. St. Louis Park Emergency Connection — scheduled for 2016 at a cost of $211,000 3. Public Works Garage Upgrade - $25,000 water fund share Sanitary Sewer Fund 1. Residential street improvements a. 2014 - $225,000 — added residential street improvements for West Park Road and 21 st Ave N from Mainstreet to First St b. 2015 - $200,000 — decreased by $355,000 due to reduction in scope of project c. 2016 - $120,000 — no change d. 2017 - $120,000 — no change e. 2018 — 325,000 2. Lift Station #4 scheduled for 2016 at a cost of $160,000 3. Public Works Garage Upgrade - $25,000 sewer fund share Storm Sewer Fund 1. Residential street improvements a. 2014 - $0 — no projects scheduled b. 2015 - $100,000 — increased by $250,000 due to reduction in scope of project c. 2016 - $110,000 — no change d. 2017 - $110,000 — no change e. 2018 - $300,000 2. Storm water management project scheduled for 2014 has been increased from $200,000 to $230,000. 3. Cottageville Park storm water improvements were added at a cost of $650,000 4. Parking lot 200 moved to 2015 and Pavilion and City Hall parking lots added due to their condition. 5. Public Works Garage Upgrade - $25,000 storm sewer fund share Pavilion Fund 1. Projects added for 2018 include: a. Mezzanine rooftop unit replacement - $24,500 b. Pavilion entry and lobby door replacement - $9,000 c. Painting of Pavilion exterior - $22,000 d. Painting the arena ceiling and bar joist - $20,000 PARK CAPITAL IMPROVEMENTS FUND (301) 07/0512013 Actual Projected Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 Working Capital Beginning Year 112,195 82,902 188,179 99,361 (56,345) (194,735) (122,278) Revenues: Taxes (from matured Park Bonds) (133) Interest 698 829 1,882 994 (1,690) (5,842) (3,668) Dedication fees 163,772 0 0 0 0 0 Joint Rec refunds 6,267 Franchise Fees (gas/elec) 85,300 85,300 85,300 85,300 85,300 Hennepin County Grant 150,000 Met Council - easememVgrant 50,000 300,000 Grants - Private Foundations 30,000 Donations - general 1,000 19,182 1,000 Donations - benches Transfer in - close fund 412 Total Revenues 245,338 476,278 88,182 86,294 83,610 79,458 81,632 Expenditures: C.I.P. Projects 264,781 45,000 170,000 235,000 215,000 0 160,000 Cottageville Property Acquisition 2,850 319,000 Skate Park commitment 7,000 7,000 7,000 7,000 7,000 7,000 0 Total Expenditures 274,631 371,000 177,000 242,000 222,000 7,000 160,000 Working Capital Year End 82,902 188,179 99,361 (56,345) (194,735) (122,278) (200,646) 2013 Proiects Actual 0 Oakes Park Play Equipment -moved to 2014 4,134 Maetzold Field 23,515 Burnes Park - Rotary project 45,000 Repair Tennis Courts - Burnes Park 7,000 3,500 Skate Park improvements - Yr 2 of 3 yr agreement 52,000 31,150 2014 Proiects 40,000 Valley Park - outdoor lighting 100,000 Oakes Park - Play equipment 10,000 Oakes Park - Drinking fountain 20,000 Oakes Park - lighting 7,000 Skate Park improvements - Yr 3 of 3 yr agreement 177,000 2015 Proiects 120,000 Cottageville Park - play equipment 60,000 Burnes Park - warming house 30,000 Oakes Park - picnic shelter 25,000 Valley Park - construct storage building 7,000 Skate Park improvements 242,000 2016 Proiects 100,000 Hilltop Park - play equipment 80,000 Valley Park - play equipment 35,000 Burnes Park - play equipment 7,000 Skate Park improvements 222,000 2017 Proiects 7,000 Skate Park improvements 2018 Proiects 60,000 Park Valley - play equpment 20,000 Burnes Park - resurface tennis courts 20,000 Oakes Park - tennis courts 60,000 Valley Park - warming house 160,000 U) 'D o O o O 0) 0 0 0 0 N (.D (fl co CD 7 C C Q L (i) Cf) in U) V O O O O O C o 00 0 10 L V - M't C V C) V M O V C N L CD a (DV ov m c 0 V o V V Cn CA N l�0 L a V O) V O M Cfl c o y v LO 0 O coo coo co O m r+ N M M 00 rl- C d N 0 0 N M m lv O iT n O.`.r��Mcv E N CD N N M Q O 'a C O O N w C CA O CT N N m7 00 N CO O) M LL co O O (D U) o if) � U) M C, d O Cl) V (P Q 0 co O V O O m co (n (D O (D w M 3 U tT N N C m CA m- O - NO Q O M N O y N M co n M W Cl) V Cl) r` y p O M M V) O N O f- M 0 0..�r` rn Z U) � ry U 'D (v 0 (n O O 4) N CO U) U) 0 W - N M - U) O CL 3 CDN L (V az 0L000 N 4)r -MOO N 0 W O O O O p C N 0 0 0 0 0) M — N 0) M o•cw -p c m E o (U � N O N Z 0 L @ co 06 «S c aciUUU W y m m rn d K w Cn Cn J 000000 000000 (D (D (D (D (D CD 0 0 0 0 0 0 CC) O to U) CC) 0 0 0 0 0 0 0 0 0 0 0 0 0 O M r.- 00 00 V O Cl) CD V V M O M— O O N c O O O O O o v O o O O o O o v (n O M (0 C`6 10 (D O N O V x L d U c0 •- V .- (D c (U @ C O :a r.- -- o LO a 0 N Cl) 00 d 0 O 0 0 00 0 0 .r H V (O c0 V (6 C d CO CSD 0) O Cl) 7 d O .L, c0 'i r-- M V E (q M Q 0 0 0 0 0 w '8 0 0 0 O O C O V N (D V C = N00 OMO = LL O CA c0 0 c0 0) LO N CD V CD 04 Q0 00000 V 00 0 0 0 w M 3 V V V CD V O C M 000 M COD M N Q N (14 (0 t` r .y N V � W (n V rnrn 00 M CY) V N O (0 — N V Cil 000000 N U) U) U) C() U) N Cf) LO O O U) M O O 000000 fN y 1-00000 NM —U) U) M O Lf) Lo 0 0 A 000000 p C y O O O O O O •0) (0 — M CT 00 CO M o C Q' CO CO -p Q U 7 i cd LL CU L E y Q m j C E W UmciiLi� N C_ f6 O i i > > o CL a) E E a) m m E) U W U U (n (n co O N N i C M 4) 0) LL N Cl) O N O r O 0 0 2 D LL 0 O O N O) 01 M O r N N O) O C14O N Co O a (( D O O CD O N N v 00 ) p O �7 O N O (0 N 0 O O 00 N N (D M IQ O 'C^ N V O 00 P� M N N - v N d (D 0 0 (0 0 (O O O (O N I - a O 00 O 00 O O Cl) O M (D d N 00 (O N (D O O 00 O 00 O o N O 04 U N O O a�a w Cl)0(D O �p N N M (D N O n N Na. - N 1� O O r- O r O O W O 00 O a 0o O (O O (D O O v 00 N V N O 00 N O O O N r 00 00 O O O O (O O O Dv a w (O f� N Cl)7 N OO LO '�^ N N N M (O O (D N N N d O a O a) O O O Op (O V 00 ad+ C N O N O (n O O M (O 00 (� N O n V O- (O N O00 O C) (O O r- eq w M00 V 'p N N 00 O -4O O N N cli IL (O O O N O N O O (O co (D a Cl) 1- O O O m O O M to 41 V (O O (O O -I O O V N O I-1 N O C 00 (O (O O 00 M O) 00 r- 00 N N N M Cl) M- 1� N IL N N N N N O W O O O V Cl) O 00 (O (D a O h ; (Oa) M O O 00 O O M N 0 M I- O 00 ( 0c) f) N O Cl) 0) (D W O O O ClN V W) O� N O O LQ O O N M (O r O O` N N N O) N N a N00 N r 00 V IL M (D N M O O O N O) r Cl) O r f- D) - O O r N O (O V 07 M N O L N N rIt 3(D M (0 O N On M O h N O N 07 C" O O N M Q M rh r N N E > N N a (D Q rn 3 C E m E O a r co co N d W N N j a) £ N > :33 c a d N N N a C > Q O N O O > > a 0. C d' (� d wO- w� N X W W _ fO d m N N co m m m d } E E N H H H H H yr N N a r r 0 0 0 U U r N N N tl/ () V O .Z a y m m w Z V y Q Q 0 O O d (n (n In U) V a) cO m w d aO. a a O a y caacyyyy c Y j CL o co �0000 0 CL 4) m WUUH 3 0 O O N O) 01 M O r N N O) DEBT LEVY ANALYSIS - USING FRANCHISE FEES TO WRITE DOWN DEBT LEVY 07/11/2013 Actual Actual Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 Lew Reauirements on Current Bonds Outstanding 766,110 2003 HRA Revenue Bonds - refunded 220,000 2007A Capital Improvement Bonds 765,900 2007B GO Improv Revolving Bonds 184,500 2010A Improvement Bonds 77,000 2010B Refunding Bonds (2002B Bonds) 59,000 2012A CIP Bonds 220,000 2012B Equipment Certificates 140,710 Less - Fees collected for EQ Certif (140,000) 2012B Bond issue 90,028 Franchise Fee Offset (90,000) 2013 Bond issue - first levy is in 2014 145,120 Franchise Fee Offset (85,620) Subtotal - Current Bonds 1,306,400 Future Debt Levies - Proiected 90,553 2014 Bond issue - first levy is in 2016 90,868 Franchise Fee Offset (75,000) 2015 Bond issue - first levy is in 2017 ($1.6M) (75,000) 2016 Bond issue - first levy is in 2018 ($1.9M) (230,000) 2017 Bond issue - first levy is in 2019 ($1.5M) (310,620) 763,800 766,110 186,520 188,093 77,000 79,175 0 Total All Debt 1,306,400 220,000 220,000 64,370 97,965 (64,370) 220,000 166,737 140,710 (107,657) (1) (140,000) 92,925 90,028 141,970 (90,000) 1,306,400 1,352,081 765,808 764,390 767,107 763,236 183,971 184,877 185,336 Total All Debt 1,306,400 82,194 79,437 81,472 82,942 220,000 220,000 199,600 197,762 96,285 94,605 92,925 96,495 141,970 143,125 144,175 145,120 (90,000) (85,620) (130,000) (85,620) 92,968 90,553 93,388 90,868 (90,000) (75,000) (90,000) (75,000) 1,403,196 1,416,367 1,344,003 1,215,803 188,165 192,470 191,120 (150,000) (150,000) (50,000) 143,000 140,150 157,000 Subtotal -Future Debt Levies 0 0 0 0 38,165 185,470 438,270 Total All Debt 1,306,400 1,306,400 1,352,081 1,403,196 1,454,532 1,529,473 1,654,073 Increase over prior year 65,400 0 45,681 51,115 51,336 74,941 124,601 5.27% 0% 3.50% 3.78% 3.66% 5.15% 8.15% Franchise Fees Collected 196,181 210,000 210,000 210,000 210,000 210,000 210,000 Used for Debt Service 0 (85,620) (230,000) (180,000) (310,620) (370,000) (210,620) Balance Available 196,181 320,561 300,561 330,561 229,941 69,941 69,321 2013 - franchise fees planned to use (107,657) (1) Savings from est levy levy 22,037 Actual franchise fees needed to balance levy with debt service req. (85,620) 2012B Levy Requirement 144,700 Actual Levy 166,737 Levy over amount needed 22,037 Cash Flow Analysis Street Improvements - Franchise Fees (307) 07/05/2013 Working Capital Beginning Year Revenues: Franchise Fees Interest Total Revenues Expenditures: Transfer for Debt Service 2012B Bonds 2013A Bonds 2014 Bonds Total Expenditures Working Capital Year End Actual Projected Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 0 196,181 321,444 302,890 334,253 235,137 76,196 195,615 210,000 210,000 210,000 210,000 210,000 210,000 566 883 1,446 1,363 1,504 1,058 343 196,181 210,883 211,446 211,363 211,504 211,058 210,343 0 85,620 140,000 90,000 85,620 130,000 85,620 90,000 90,000 75,000 90,000 75,000 150,000 150,000 50,000 0 85,620 230,000 180,000 310,620 370,000 210,620 196,181 321,444 302,890 334,253 235,137 76,196 75,918 07/10/2013 (3) Project Total Due MUNICIPAL STATE AID FUND (302) Balance State Aid Funds due City Total From State Actual Projected Projected Projected Projected Projected Projected - 2012 2013 2014 2015 2016 2017 2018 Working Capital Beginning Bal 1,666,333 2,064,148 2,442,432 771,644 387,503 756,440 1,127,222 Revenues: 65.19% State MSA Funds, projects 411,244 367,964 367,000 367,000 367,000 367,000 367,000 Hennepin County 25,770 Bondissue Total Revenues 425,038 404,055 379,212 370,858 368,938 370,782 372,636 Transfer Out for Projects CIP State Aid Projects 27,223 2,050,000 755,000 0 0 1,100,000 Shady Oak Land Acqusition 25,770 Total Expenditures 27,223 25,770 2,050,000 755,000 0 0 1,100,000 Working Capital Ending Balance 2,064,148 2,442,432 771,644 387,503 756,440 1,127,222 399,858 includes cash, interest rcvbl, & A/P Cash Balance 12131/20XX 2,062,940 Cash Balance 7/3/2013 2,405,279 ESTIMATED Cash Balance 12/31/20XX 734,491 350,349 719,287 1,090,069 362,705 2014 Shady Oak Rd 2015 Shady Oak Rd 2018 County Rd 3 700,000 Sixth St S 400,000 (3) Project Total Due Paid Balance State Aid Funds due City Total From State To Date Due 7/19/12 Excelsior Blvd 5,408,756.28 3,243,792.74 3,243,792.74 - Minnetonka Blvd 1,231,889.51 950,955.56 10,475.54 940,480.02 5th Street South 1,165,881.73 894,019.71 - 894,019.71 Total 7,806,527.52 5,088,768.01 3,254,268.28 1,834,499.73 65.19% WATER FUND - WORKING CAPITAL PROJECTION 07/10/2013 Actual Projected Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 Working Capital Beginning Year (488,484) 76,872 (249,301) (103,657) (24,280) 244,951 475,211 Revenues: Operating Revenues 1,403,420 1,300,600 1,364,980 1,377,850 1,416,550 1,461,500 1,506,450 Other 134,451 140,280 152,149 158,533 165,235 172,272 179,661 Interest (804) 0 0 0 0 0 0 Bond Issuance 760,000 868,955 350,000 200,000 430,000 200,000 600,000 Total Revenues 2,297,067 2,309,835 1,867,129 1,736,383 2,011,785 1,833,772 2,286,111 Expenditures: Operation Expense 1,080,074 1,002,998 1,037,781 1,073,846 1,111,244 1,150,027 1,190,249 Other Exp - bond issuance -fiscal fee 21,327 Other Exp - int on current bonds 39,470 0 0 0 Other Exp - int on refunded bonds 11,475 7,587 2,700 Other Exp - int on 2009 bonds 25,350 24,225 22,850 21,350 19,725 17,887 Other Exp - int on 2012 bonds 13,185 14,179 13,379 12,529 11,629 10,729 Other Exp - int on 2013 bonds 22,713 17,431 16,431 15,431 14,381 Other Exp - int on 2015 bonds Other Exp - int on 2016 bonds Other Exp - int on 2017 bonds Other Exp - int on 2018 bonds Equipment Replacement Items 75,000 0 6,800 0 61,700 Capital Improvements 388,050 1,248,000 350,000 200,000 436,000 200,000 600,000 Principal Bond payment 210,000 Principal Bond payment - refunded 170,000 175,000 180,000 Principal Bond pymnt - 2009 debt 50,000 50,000 50,000 50,000 50,000 55,000 Principal Bond pymnt - 2012 debt 40,000 40,000 40,000 45,000 45,000 45,000 Principal Bond pymnt - 2013 debt 50,000 50,000 50,000 55,000 Principal Bond pymnt - 2015 debt Principal Bond pymnt - 2016 debt Principal Bond pymnt - 2017 debt Principal Bond pymnt - 2018 debt Capital Lease (PW Facility) (1) 0 0 0 0 0 0 0 Total Expenditures 1,738,921 2,636,008 1,721,485 1,657,006 1,742,554 1,603,512 1,988,246 Change in available funds 558,146 (326,172) 145,644 79,377 269,231 230,260 297,865 Inventory change (219) Bond Premium/Discount Exp 7,428 Working Capital Ending Year 76,872 (249,301) (103,657) (24,280) 244,951 475,211 773,076 (1) Capital Lease moved to Storm Sewer Rate History 2014 - 2018 financial data was taken from the Utility Master Plan done by City Engineer 1984 $0.85 1993 $1.05 Notes - 1997 $1.10 Income - 2008 and forward used utility master plan rates (fixture/no surcharge option) 2000 $1.20 2014 -Residential street improvements - $350,000 2005 $1.40 2015 - Residential street improvements - $200,000 Per Utility Master Plan (10/07) 2016 - Residential street improv - $200,000; SLP Emergency Connection - $211,000 2008 $1.65 Public Works Garage Upgrade - $25,000 2009 $1.86 2017 - Residential street improvements - $200,000; 2010 $1.90 2018 - Residential street improvements - $600,000; 2011 $1.94 - not increased, left at $1.90 2012 $1.96 2013 $2.02 - suggest $2.12 - +.10 2014 $2.08 2015 $2.14 2016 $2.20projected 1 rate increases 2017 $2.27 Working Capital Beginning Year Revenues: Operating Revenues Other Interest Bond Issuance Total Revenues Expenditures: Operation Expense MWCC Charges (3% inflation) Other - Bond Issuance -fiscal fees Interest Expense Interest Expense - 2012 Debt Interest Expense - 2013 Debt Interest Expense - 2015 Debt Equipment Replacement Items Capital Improvements Principal Bond payment (2009) Principal Bond payment (2012) Principal Bond payment (2013) Principal Bond payment (2015) Capital Lease (PW Facility) (1) Total Expenditures Change in available funds Inventory change Bond Premium/Discount Exp Working Capital Ending Year (1) Capital Lease moved to Storm Sewer Rate History 1983 $1.50 1989 $1.75 1991 $2.00 1993 $2.50 1999 $2.25 Rate DECREASE 2006 $2.50 rate increase Per Utility Master Plan (10/07) 2008$2.70 2009$3.10 2010$3.40 2011 $3.70 - act 3.60 2012$3.75 2013$3.90 2014$4.05 2015$4.21 2016$4.38 projected rate 2017$4.55 increases these are the correct rates per the UMP SEWER FUND - WORKING CAPITAL PROJECTION Actual Projected 2012 2013 98,771 394,411 2,131,881 2,223,000 22,424 20,000 639 986 170,000 495,102 2,324,944 2,739,088 475,599 534,037 1,132,299 1,371,126 10,765 32,462 31,450 2,946 0 0 319,962 715,000 60,000 60,000 10,000 0 0 2,031,086 2,724,559 293,858 14,529 (167) 1,949 394,411 408,940 07/05/2013 Projected Projected Projected Projected Projected 2014 2015 2016 2017 2018 408,940 363,237 338,286 191,018 241,333 2,308,500 2,399,700 2,496,600 2,593,500 2,696,100 20,000 20,000 20,000 20,000 20,000 1,022 908 846 478 603 2,329,522 2,420,608 2,517,446 2,613,978 2,716,703 551,833 570,253 1,436,144 1,504,307 30,100 28,450 3,149 2,949 21,000 19,800 0 0 2,375,226 2,445,559 (45,703) (24,951) 589,319 36,800 225,000 175,000 60,000 60,000 10,000 10,000 38,000 38,000 0 0 2,375,226 2,445,559 (45,703) (24,951) 589,319 609,053 1,575,771 1,650,698 26,575 24,463 2,749 2,549 18,700 17,500 33,600 26,400 305,000 120,000 65,000 65,000 10,000 10,000 38,000 38,000 0 0 2,664,714 2,563,663 (147,268) 50,315 629,484 1,729,256 22,187 2,349 59,700 325,000 65,000 10,000 38,000 2,880,976 (164,272) 363,237 338,286 191,018 241,333 77,060 2014 - 2018 financial data was taken from the Utility Master Plan done by City Engineer Notes - Income - 2008 and forward used utility master plan rates (no fixture option) 2014 - Residential Street Improvements - $225,000; 2015 - Residential Street Improvements - $175,000; 2016 - Residential Street Improvements - $120,000; Lift Station #4 - $160,000 Public Works Garage Upgrade - $25,000 2017 - Residential Street Improvements - $120,000; 2018 - Residential Street Improvements - $325,000; STORM SEWER FUND - WORKING CAPITAL PROJECTION 07/11/2013 1998 $3.20 Notes - 1999 $4.00 2014 - Residential Street Improvements - $0; Storm Drainage Maint - $20,000; 2006 $4.50 Storm Water Mgmt Projects - $230,000 2009 $5.00 Cottageville Park storm water improvements - $650,000 2015 - Residential Street Improvements - $100,000; Storm Drainage Maint - $20,000; Parking Lot 200 - $200,000 2016 - Residential Street Imp - $110,000; Storm Drainage Maint - $21,000; Public Works Garage Upgrade - $25,000 2017 - Residential Street Imp - $110,000; Storm Drainage Maint - $21,000; 2018 - Residential Street Imp - $300,000; Storm Drainage Maint - $21,000; Actual Projected Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 Working Capital Beginning Year 402,095 744,314 633,853 (6,300) (99,416) 92,927 302,410 Revenues: Operating Revenues 795,755 795,755 795,755 795,755 795,755 795,755 795,755 Other 5,590 5,000 5,000 5,000 5,000 5,000 5,000 Interest 4,184 1,861 1,585 (16) (249) 232 756 Bond Issuance 320,000 383,957 Total Revenues 1,125,529 1,186,573 802,340 800,739 800,506 800,987 801,511 Expenditures: Operation Expense 193,587 197,459 201,408 205,436 209,545 213,736 218,010 Other - Bond Issuance -fiscal fees 17,176 Bond Interest - existing 25,280 Bond Interest - 2009 refunded bonds 0 0 0 Bond Interest - 2010 bonds 0 0 0 0 0 0 Bond Interest - 2012 bonds 5,575 6,031 5,681 5,281 4,881 4,481 Bond Interest - 2013 bonds 10,054 7,738 7,338 6,888 6,388 Capital Outlay (per ERP) 0 0 0 0 0 0 0 Capital Improvements 249,504 769,000 900,000 320,000 156,000 131,000 321,000 2003 Principal Bond payment 2009 Principal Bond payment 120,000 120,000 125,000 125,000 2010 Principal Bond payment 60,000 70,000 65,000 70,000 70,000 70,000 70,000 2012 Principal Bond payment 15,000 15,000 20,000 20,000 20,000 20,000 2013 Principal Bond payment 20,000 20,000 25,000 25,000 Capital Lease - PW Facility (1) 120,000 120,000 120,000 120,000 120,000 120,000 120,000 Total Expenditures 785,546 1,297,034 1,442,493 893,855 608,164 591,504 784,879 Change in available funds 339,983 (110,461) (640,154) (93,116) 192,343 209,483 16,632 Inventory change (248) Bond Premium/Discount Exp (net) 2,485 Working Capital Ending Year 744,314 633,853 (6,300) (99,416) 92,927 302,410 319,042 (1) In 2011 this includes Water, Sewer & Storm Sewer transfers Rate History (per month) 1989 $4.75 per quarter 1991 $6.00 per quarter 1992 $2.50 1993 $3.00 1998 $3.20 Notes - 1999 $4.00 2014 - Residential Street Improvements - $0; Storm Drainage Maint - $20,000; 2006 $4.50 Storm Water Mgmt Projects - $230,000 2009 $5.00 Cottageville Park storm water improvements - $650,000 2015 - Residential Street Improvements - $100,000; Storm Drainage Maint - $20,000; Parking Lot 200 - $200,000 2016 - Residential Street Imp - $110,000; Storm Drainage Maint - $21,000; Public Works Garage Upgrade - $25,000 2017 - Residential Street Imp - $110,000; Storm Drainage Maint - $21,000; 2018 - Residential Street Imp - $300,000; Storm Drainage Maint - $21,000; 2013 Proiects 65,000 Bldg Mgmt System Repl/Upgrade 22,000 Art Center - carpet rept - theater & dressing rooms 11,000 Art Center - Seal floors in restroom & kitchen 0 3,822 Arts Cener - studio dance floor 0 28,474 Activity Center - Kitchen upgrades 2,500 Art Center - repl mini blinds w/roller blinds 100,500 32,296 2014 Proiects 36,000 Activity Center - Raspberry room carpet 9,000 Arts Center - Restroom Improvements 14,800 Arts Center - Chairs & Tables 6,500 Arts Center - Storage, Hanging Display System 66,300 2015 Proiects 5,000 Arts Center - Replace Information Kiosk 3,600 Arts Center - Landscaping 20,000 Public Works Garage Upgrade - engineering 28,600 2016 Proiects 105,000 Activity Ctr - replace gymnasium roof 80,000 Activity Center - Raspberry Room roof replacement 56,000 Fire Dept - Repl carpet & apparatus floor finish 40,000 Police Dept - replace carpet 110,000 City Hall Lobby Upgrade 3,125 Arts Center - Storage, Hanging Display System 100,000 Public Works Garage Upgrade (total project = $200,000 - $100K from Ent Funds) 494,125 2017 Proiects 100,000 Arts Center - HVAC units - 1, 25 ton unit 80,000 Activity Center - lower roof repl 138,510 Art Center - Replace Theater seats & backs 220,000 Art Center - Replace HVAC - 15-20 units 538,510 2018 Proiects 52,000 Art Center - lobby carpet FACILITIES & BUILDINGS 07/05/2013 CAPITAL IMPROVEMENTS FUND (305) Actual Projected Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 Working Capital Beginning Year 272,471 135,687 160,865 220,369 342,871 460 (388,047) Revenues: Interest 916 678 804 1,102 1,714 2 (1,940) Transfers from General Fund Tax Levy 123,397 125,000 125,000 150,000 150,000 150,000 150,000 Total Revenues 124,313 125,678 125,804 151,102 151,714 150,002 148,060 Expenditures: C.I.P. Projects 261,098 100,500 66,300 28,600 494,125 538,510 52,000 Transfer to General Fund Total Expenditures 261,098 100,500 66,300 28,600 494,125 538,510 52,000 Working Capital Year End 135,687 160,865 220,369 342,871 460 (388,047) (291,987) 2013 Proiects 65,000 Bldg Mgmt System Repl/Upgrade 22,000 Art Center - carpet rept - theater & dressing rooms 11,000 Art Center - Seal floors in restroom & kitchen 0 3,822 Arts Cener - studio dance floor 0 28,474 Activity Center - Kitchen upgrades 2,500 Art Center - repl mini blinds w/roller blinds 100,500 32,296 2014 Proiects 36,000 Activity Center - Raspberry room carpet 9,000 Arts Center - Restroom Improvements 14,800 Arts Center - Chairs & Tables 6,500 Arts Center - Storage, Hanging Display System 66,300 2015 Proiects 5,000 Arts Center - Replace Information Kiosk 3,600 Arts Center - Landscaping 20,000 Public Works Garage Upgrade - engineering 28,600 2016 Proiects 105,000 Activity Ctr - replace gymnasium roof 80,000 Activity Center - Raspberry Room roof replacement 56,000 Fire Dept - Repl carpet & apparatus floor finish 40,000 Police Dept - replace carpet 110,000 City Hall Lobby Upgrade 3,125 Arts Center - Storage, Hanging Display System 100,000 Public Works Garage Upgrade (total project = $200,000 - $100K from Ent Funds) 494,125 2017 Proiects 100,000 Arts Center - HVAC units - 1, 25 ton unit 80,000 Activity Center - lower roof repl 138,510 Art Center - Replace Theater seats & backs 220,000 Art Center - Replace HVAC - 15-20 units 538,510 2018 Proiects 52,000 Art Center - lobby carpet PAVILION - ICE ARENA - WORKING CAPITAL PROJECTIONS 07/08/2013 Note: The School District lease expires in November 2013. A new lease will be negotiated with the School District, however a projected amount for the new lease is unknown at this time. The current lease amount of $38,000 was left as a placeholder. Actual Projected Projected Projected Projected Projected Projected Roof Replacement 2012 2013 2014 2015 2016 2017 2018 Working Capital Beginning Year (39,521) 117,122 (28,007) (118,891) (173,916) (285,380) (302,588) Revenues: CIP 2016 95,000 Indoor Turf Replacement CIP 135,000 Operating Revenues 360,774 378,813 397,753 417,641 438,523 460,449 483,472 Leases 38,000 38,000 19,000 CIP 2018 24,500 current lease expires in 2013 2018 7,000 Pavilion Entry & Lobby Door Replacement 2018 22,000 Other 7,993 10,000 10,000 10,000 10,000 10,000 10,000 Donations (bleacher heating) Capital Improvements 2014 - 2018 total $448,500 Equipment Certificates 172,852 Interest 1,033 Total Revenues 580,652 426,813 426,753 427,641 448,523 470,449 493,472 Expenditures: Operation Expense 357,515 368,240 379,288 390,666 402,386 414,458 426,892 Capital Outlay - 185,000 - - - - - Capital Improvements 45,053 - 120,000 69,000 135,000 51,000 73,500 Payment on Equip Certific - 3,092 18,350 23,000 22,600 22,200 21,800 Interest Expense 1,028 Payment on Interfund Loan 23,143 15,609 - Total Expenditures 426,739 571,941 517,638 482,666 559,986 487,658 522,192 Change in available funds 153,913 (145,128) (90,884) (55,025) (111,463) (17,209) (28,720) Bond Premium/Discount Exp (net) 2,730 Working Capital Ending Year 117,122 (28,007) (118,891) (173,916) (285,380) (302,588) (331,308) Note: The School District lease expires in November 2013. A new lease will be negotiated with the School District, however a projected amount for the new lease is unknown at this time. The current lease amount of $38,000 was left as a placeholder. Pavilion Pro'ects CIP 2014 120,000 Roof Replacement CIP 2015 9,000 Gas Fired Rooftop Furnace CIP 2015 60,000 Evaporator Condenser Replacement CIP 69,000 CIP 2016 40,000 Overhead Door Replacement CIP 2016 95,000 Indoor Turf Replacement CIP 135,000 CIP 2017 6,000 Desiccant Repl of Dehumidification System CIP 2017 45,000 Skate Tile Lobby Improvement 51,000 CIP 2018 24,500 Mezzanine Rooftop Unit Replacement 2018 7,000 Pavilion Entry & Lobby Door Replacement 2018 22,000 Paint Pavilion Exterior 2018 20,000 Painting the Arena Ceiling and Bar Joist 73,500 Capital Improvements 2014 - 2018 total $448,500 Working Capital Beginning Year Revenues: Franchise Fees Franchise Fees - PEG Fees Interest Total Revenues Expenditures: Expense Transfer Out Capital Outlay Total Expenditures Change in available funds Working Capital Ending Year 07105/2013 COMMUNICATIONS (Cable TV) - WORKING CAPITAL PROJECTIONS Actual Projected Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 401,424 381,181 397,568 405,974 385,261 383,203 366,761 218,554 210,000 210,000 210,000 210,000 210,000 210,000 12,918 15,000 15,000 15,000 15,000 15,000 15,000 2,215 1,525 1,590 1,624 1,541 1,533 1,467 233,687 226,525 226,590 226,624 226,541 226,533 226,467 114,774 118,217 121,764 125,417 129,179 133,055 137,046 86,920 86,920 86,920 86,920 86,920 86,920 86,920 52,236 5,000 9,500 35,000 12,500 23,000 15,000 253,930 210,137 218,184 247,337 228,599 242,975 238,966 (20,243) 16,387 8,406 (20,713) (2,058) (16,442) (12,499) 381,181 397,568 405,974 385,261 383,203 366,761 354,261 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 2014 thru 2018 PROJECTS BY YEAR Project Name Department Project # Priority Project Cost 2014 Replace Carpet - Activity Center Rooms Activity Center 08-C/P-AC075 n/a 36,000 Arts Center - Restroom Improvement Arts Center 73-CIP-AR002 1 9,000 Arts Center - Chairs and Tables Arts Center 73-C/P-AR003 1 14,800 Arts Center - Storage & Hanging, Display Systems Arts Center 73-C/P-AR004 1 6,500 Technology Improvement - Council Chambers & Studio Communications 13 C/P-CM001 n/a 9,500 Block 64 Redevelopment Project Development 06-C/P-D404 n/a 4,500,000 Pavilion Roof Replacement Pavilion 09-C/P-PO26 1 120,000 Valley Park - Outdoor Lighting Public Works: Parks 08-C/P-P001 n/a 40,000 Oakes Park - Play Equipment Public Works: Parks 08-C/P-P016 n/a 100,000 Oakes Park -Drinking Fountain Public Works: Parks 13-C/P-PO38 n/a 10,000 Oakes Park - Lighting Public Works: Parks 73-C/P-PO72 n/a 40,000 Residential Street Improvements Public Works: Streets/Traffic 07-C/P-5707 n/a 400,000 Residential Street Improvements --Utilities Public Works: Streets/Traffic 07-C/P-5702 n/a 575,000 County Road 61 (Shady Oak Road) Public Works: Streets/Traffic 07-C/P-S706 n/a 8,200,000 Mainstreet Rehabilitation Public Works: Streets/Traffic 11-C/P-5127 3 2,000,000 2014 Street Overlay Project Public Works: Streets/Traffic 12-C/P-SO39 n/a 550,000 Pedestrian & Bicycle Access Improvements Public Works: Streets/Traffic 13-C/P-SO40 n/a 25,000 Storm Drainage System Maintenance - Alley Repairs Public Works: Utilities 07-C/P-0002 n/a 20,000 Storm Water Management Projects Public Works: Utilities 07-C/P-0003 n/a 880,000 Skate Park Recreation 08 CIP-R001 n/a 7,000 Total for 2014 17,542,800 201 Arts Center - Replace Information Desk and Kiosk Arts Center 12-C/P-AR005 1 5,000 Arts Center - Re -landscape E & W faces of building Arts Center 13-C/P-AR007 2 3,600 Technology Improvement - Council Chambers & Studio Communications 13 C/P-CM001 n/a 35,000 Redevelopment, East Excelsior Boulevard Development 01-C/P-D4010 n/a 2,000,000 Blake Corridor Redevelopment Development 09-C/P-D406 n/a 5,000,000 8th Ave Streetscape and parking facility Development 12-C/P-D408 n/a 5,000,000 Pavilion Gas Fired Rooftop Furnace Pavilion 09-C/P-PO25 n/a 9,000 Pavilion Evaporator Condenser Replacement Pavilion 09-C/P-PO36 n/a 60,000 Public Works Garage Upgrade Public Works: Bldg/Equip Sery 73-C/P-8011 1 20,000 Cottageville Park - Play Equipment Public Works: Parks 71-C/P-PO79 n/a 120,000 Burnes Park - Warming House Public Works: Parks 73-C/P-PO40 n/a 60,000 Oakes Park - Replace Picnic Shelter Public Works: Parks 13-C/P-PO47 n/a 30,000 Valley Park - Construct Storage Building Public Works: Parks 13-C/P-PO42 n/a 25,000 Residential Street Improvements Public Works: Streets/Traffic 01-C/P-5701 n/a 1,500,000 Residential Street Improvements --Utilities Public Works: Streets/Traffic 07-C/P-5702 n/a 475,000 County Road 61 (Shady Oak Road) Public Works: Streets/Traffic 01-C/P-S706 n/a 12,250,000 Parking Lots Public Works: Streets/Traffic 06-C/P-S718 n/a 1,000,000 Pedestrian & Bicycle Access Improvements Public Works: Streets/Traffic 73-C/P-SO40 n/a 25,000 Light Rail Transit Stations (2) Public Works: Transportation 01-C/P-S502 n/a 150,000 Storm Drainage System Maintenance - Alley Repairs Public Works: Utilities 07-C/P-0002 n/a 20,000 Skate Park Recreation 08-CIP-R001 We 7,000 7hursdnr, Juh 11, 20/3 Project Name Department Project # Priority Project Cost Depot Recreation Area Recreation 70-CIP-RO02 2 500,000 Total for 2015 28,294,600 F20� Replace Gynmasium Roof - Activity Center Activity Center 08-C/P-AC078 n/a 105,000 Activity Center - Raspberry Room Roof Replacement Activity Center 08-C/P-ACO24 n/a 80,000 Arts Center - Storage & Hanging, Display Systems Arts Center 13-CIP-AR004 1 3,125 City Hall Lobby Upgrade City Hall Administration 09-CIP-CH030 n/a 110,000 Technology Improvement - Council Chambers & Studio Communications 73 C/P-CM007 n/a 12,500 Replace Carpet and Apparatus Floor Finish - FD Fire 08-C/P-FDO79 n/a 56,000 Pavilion Overhead Door Improvement Pavilion 07-C/P-P314 n/a 40,000 Pavilion Indoor Turf Replacement Pavilion 10-C/P-P319 n/a 95,000 Replace Carpet - Police Station Police 08-C/P-PDO76 n/a 40,000 Public Works Garage Upgrade Public Works: Bldg/Equip Sery 13-CIP-8011 1 200,000 Hilltop Park - Play Equipment Public Works: Parks 08-C/P-P074 n/a 100,000 Burnes Park - Play Equipment Public Works: Parks 13-C/P-PO43 n/a 35,000 Residential Street Improvements Public Works: Streets/Traffic 07-CIP-SIOI n/a 2,500,000 Residential Street Improvements --Utilities Public Works: Streets/Traffic 07-CIP-5702 n/a 430,000 Citywide Concrete Alleys Public Works: Streets/Traffic 01-CIP-S703 n/a 75,000 Pedestrian & Bicycle Access Improvements Public Works: Streets/Traffic 73-CIP-SO40 n/a 25,000 Storm Drainage System Maintenance - Alley Repairs Public Works: Utilities 07-CIP-0002 n/a 21,000 Lift Station # 4 Public Works: Utilities 08-CIP-0001 n/a 160,000 St. Louis Park Emergency Connection Public Works: Utilities 08-CIP-0070 n/a 211,000 Skate Park Recreation 08-CIP-ROOI n/a 7,000 Total for 2016 4,305,625 2017 Activity Center - Lower Roof Replacement Activity Center 09-C/P-AC037 n/a 80,000 Arts Center - Replace 25 Ton Rooftop HVAC Unit Arts Center 08-C/P-AR073 n/a 100,000 Arts Center - Replace theatre seats and backs Arts Center 72-C/P-AR002 1 138,510 Arts Center - Replace 15 Rooftop HVAC units Arts Center 72-C/P-AR036 n/a 220,000 Technology Improvement - Council Chambers & Studio Communications 13 CIP-CM007 n/a 23,000 Pavilion skate Tile Replacement/Lobby Improvement Pavilion 07-CIP-P313 n/a 45,000 Pavilion - Desiccant Repl of Dehumidification Syst Pavilion 10-CIP-P320 n/a 6,000 Valley Park - Play Equipment Public Works: Parks 08-CIP-PO75 n/a 80,000 Residential Street Improvements Public Works: Streets/Traffic 01-CIP-5101 n/a 2,500,000 Residential Street Improvements --Utilities Public Works: Streets/Traffic 07-CIP-5102 n/a 430,000 Citywide Concrete Alleys Public Works: Streets/Traffic 07-CIP-S703 n/a 80,000 Pedestrian & Bicycle Access Improvements Public Works: Streets/Traffic 73-CIP-SO40 n/a 25,000 Eighth Avenue LRT Corridor Public Works: Transportation 07-CIP-S503 n/a 200,000 Storm Drainage System Maintenance - Alley Repairs Public Works: Utilities 07-CIP-0002 n/a 21,000 Skate Park Recreation 08-CIP-R001 n/a 7,000 Total for 2017 3,955,510 20-J Art Center- Replace Lobby Carpet Arts Center 09-C/P-AR027 n/a 52,000 Technology Improvement - Council Chambers & Studio Communications 13 CIP-CM007 n/a 15,000 Mezzanine Rooftop Unit Replacement Pavilion 73-C/P-P321 1 24,500 Pavilion Entry and Lobby Door Replacement Pavilion 13-C/P-P324 3 7,000 Paint Pavilion Exterior Pavilion 13-C/P-P325 1 22,000 Pavilion -Painting the Arena Ceiling and Bar Joist Pavilion 13-C/P-P326 1 20,000 Park Valley - Play Equipment Public Works: Parks 08-C/P-P010 n/a 60,000 Burnes Park - Resurface Tennis Courts Public Works: Parks 08-C/P-P017 n/a 20,000 Oakes Park - Tennis Courts Public Works: Parks 13-CIP-PO44 n/a 20,000 Thursday. Julr 1/, 2013 Project Name Department Project # Priority Project Cost Valley Park - Warming House Public Works: Parks 73-C/P-P045 n/a 60,000 Residential Street Improvements Public Works: Streets/Traffic 07-C/P-5101 n/a 2,250,000 Residential Street Improvements --Utilities Public Works: Streets/Traffic 07-C/P-5102 n/a 1,225,000 County Road 3 Public Works: Streets/Traffic 01-C/P-5104 n/a 2,300,000 Sixth Street South (11th to 12th Avenue South) Public Works: Streets/Traffic 07-C/P-5504 n/a 500,000 Plan, Design and Implement Railroad Quiet Zone Public Works: Streets/Traffic 11-C/P-S 720 n/a 225,000 Pedestrian & Bicycle Access Improvements Public Works: Streets/Traffic 13-C/P-SO40 n/a 25,000 Storm Drainage System Maintenance - Alley Repairs Public Works: Utilities 07-C/P-0002 n/a 21,000 Total for 2018 GRAND TOTAL 6,846,500 60,945,035 '1'hursday. Juh1/. 2013 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 2014 thru 2018 PROJECTS BY DEPARTMENT Department Project# Priority 2014 2015 2016 2017 2018 Total Activity Center Replace Carpet - Activity Center Rooms 08-C/P-AC075 n/a 36,000 36,000 Replace Gynmasium Roof - Activity Center 08-C/P-AC078 n/a 105,000 705,000 Activity Center - Raspberry Room Roof Replacement 08-C/P-ACO24 n/a 80,000 80,000 Activity Center - Lower Roof Replacement 09-C/P-AC037 n/a 80,000 80,000 Activity Center Total 36,000 185,000 80,000 301,000 Arts Center Arts Center - Replace 25 Ton Rooftop HVAC Unit 08-C/P-AR073 n/a 100,000 100,000 Art Center - Replace Lobby Carpet 09-C/P-AR027 n/a 52,000 52,000 Arts Center - Replace theatre seats and backs 12-C/P-AR002 1 138,510 738,510 Arts Center - Replace Information Desk and Kiosk 72-C/P-AR005 1 5,000 5,000 Arts Center- Replace 15 Rooftop HVAC units 12-C/P-AR036 n/a 220,000 220,000 Arts Center- Re -landscape E & W faces of building 13-C/P-AR007 2 3,600 3,600 Arts Center- Restroom Improvement 13-CIP-AR002 1 9,000 9,000 Arts Center - Chairs and Tables 13-C/P-AR003 1 14,800 14,800 Arts Center - Storage & Hanging, Display Systems 73-C/P-AR004 1 6,500 3,125 9,625 Arts Center Total 30,300 8,600 3,125 458,510 52,000 552,535 City Hall Administration City Hall Lobby Upgrade 09-C/P-CH030 n/a 110,000 110,000 City Hall Administration Total 110,000 110,000 (Communications Technology Improvement - Council Chambers & Studio 73 C/P-CM001 n/a 9,500 35,000 12,500 23,000 15,000 95,000 Communications Total 9,500 35,000 12,500 23,000 15,000 95,000 Development i Redevelopment, East Excelsior Boulevard 07-C/P-D4010 n/a 2,000,000 2,000,000 Block 64 Redevelopment Project 06-C/P-D404 n/a 4,500,000 4,500,000 Blake Corridor Redevelopment 09-C/P-D406 n/a 5,000,000 5,000,000 8th Ave Streetscape and parking facility 72-C/P-D408 n/a 5,000,000 5,000,000 Development Total 4,500,000 12,000,000 16,500,000 Fire Replace Carpet and Apparatus Floor Finish - FD 08-C/P-FDO79 n/a 56,000 56,000 Fire Total 56,000 56,000 Pavilion Pavilion skate Tile Replacement/Lobby Improvement 07-C/P-P313 n/a 45,000 45,000 Pavilion Overhead Door Improvement 07-C/P-P314 n/a 40,000 40,000 Thursday, July //, 20/3 Department Project# Priority 2014 2015 2016 2017 2018 Total Pavilion Gas Fired Rooftop Furnace 09-C/P-P025 n/a 9,000 9,000 Pavilion Roof Replacement 09-CIP-P026 1 120,000 120,000 Pavilion Evaporator Condenser Replacement 09-C/P-P036 n/a 60,000 60,000 Pavilion Indoor Turf Replacement 70-C/P-P379 n/a 95,000 95,000 Pavilion - Desiccant Repl of Dehumidification Syst 70-C/P-P320 n/a 6,000 6,000 Mezzanine Rooftop Unit Replacement 13-C/P-P321 1 24,500 24,500 Pavilion Entry and Lobby Door Replacement 73-C/P-P324 3 7,000 7,000 Paint Pavilion Exterior 13-C/P-P325 1 22,000 22,000 Pavilion -Painting the Arena Ceiling and Bar Joist 73-C/P-P326 1 20,000 20,000 Pavilion Total 120,000 69,000 135,000 51,000 73,500 448,500 Police Replace Carpet - Police Station 08-C/P-PD016 n/a 40,000 40,000 Police Total 40,000 40,000 --__ ---- Public Works: B1 Equip Sery -�J Public Works Garage Upgrade 73-CIP-8017 1 20,000 200,000 220,000 Public Works: Bldg/Equip Sery Total 20,000 200,000 220,000 Public Works: Parks Valley Park - Outdoor Lighting 08-C/P-POO 1 n/a 40,000 40,000 Park Valley - Play Equipment 08-C/P-P010 n/a 60,000 60,000 Burnes Park - Resurface Tennis Courts 08-CIP-P071 n/a 20,000 20,000 Hilltop Park - Play Equipment 08-C/P-P014 n/a 100,000 100,000 Valley Park - Play Equipment 08-C/P-P015 n/a 80,000 80,000 Oakes Park - Play Equipment 08-CIP-P016 n/a 100,000 700,000 Cottageville Park - Play Equipment 11-CIP-P079 n/a 120,000 720,000 Oakes Park -Drinking Fountain 13-CIP-P038 n/a 10,000 70,000 Burnes Park - Warming House 13-CIP-P040 n/a 60,000 60,000 Oakes Park - Replace Picnic Shelter 73-CIP-P041 n/a 30,000 30,000 Valley Park - Construct Storage Building 73-C/P-P042 n/a 25,000 25,000 Burnes Park - Play Equipment 13-C/P-P043 n/a 35,000 35,000 Oakes Park - Tennis Courts 13-CIP-P044 n/a 20,000 20,000 Valley Park - Warming House 73-C/P-P045 n/a 60,000 60,000 Oakes Park - Lighting 73-CIP-P072 n/a 40,000 40,000 Public Works: Parks Total 190,000 235,000 135,000 80,000 160,000 800,000 Public Works: Streets/Traffic Residential Street Improvements 07-C/P-5101 n/a 400,000 1,500,000 2,500,000 2,500,000 2,250,000 9,150,000 Residential Street Improvements --Utilities 07-C/P-5702 n/a 575,000 475,000 430,000 430,000 1,225,000 3,735,000 Citywide Concrete Alleys 01-C/P-5703 n/a 75,000 80,000 155,000 County Road 3 07-CIP-5704 n/a 2,300,000 2,300,000 County Road 61 (Shady Oak Road) 01-C1P-5706 n/a 8,200,000 12,250,000 20,450,000 Sixth Street South (11th to 12th Avenue South) 07-C1P-5504 n/a 500,000 500,000 Parking Lots 06-C1P-5118 n/a 1,000,000 1,000,000 Plan, Design and Implement Railroad Quiet Zone 11-CIP-S120 n/a 225,000 225,000 Mainstreet Rehabilitation 11-CIP-5727 3 2,000,000 2,000,000 2014 Street Overlay Project 72-CIP-5039 n/a 550,000 550,000 Pedestrian 8 Bicycle Access Improvements 13-CIP-SO40 n/a 25,000 25,000 25,000 25,000 25,000 125,000 Public Works: Streets/Traffic Total 11,750,000 15,250,000 3,030,000 3,035,000 6,525,000 39,590,000 Public Works: Transportation Thursday, July 11, 2013 Department Project# Priority 2014 2015 2016 2017 2018 Total Light Rail Transit Stations (2) 07-C/P-5502 n/a 150,000 750,000 Eighth Avenue LRT Corridor 07-CIP-S503 n/a 200,000 200,000 Public Works: Transportation Total 150,000 200,000 350,000 (Public Works: Utilities Storm Drainage System Maintenance -Alley Repairs 01-CIP-0002 n/a 20,000 20,000 21,000 21,000 21,000 103,000 Storm Water Management Projects 01-CIP-0003 n/a 880,000 880,000 Lift Station # 4 08-C/P-0001 n/a 160,000 760,000 St. Louis Park Emergency Connection 08-CIP-UO10 n/a 211,000 277,000 Public Works: Utilities Total 900,000 20,000 392,000 21,000 21,000 1,354,000 Recreation Skate Park 08-CIP-R007 n/a 7,000 7,000 7,000 7,000 28,000 Depot Recreation Area 10-CIP-R002 2 500,000 500,000 Recreation Total 7,000 507,000 7,000 7,000 528,000 GRAND TOTAL 17,542,800 28,294,600 4,305,625 3,955,510 6,846,500 60,945,035 Thursday, July 1/, 2013 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 2014 thru 2018 PROJECTS BY FUNDING SOURCE Source Proiect# Priority 2014 2015 2016 2017 2018 Total Cl - Capital Improvement Fund Replace Carpet - Activity Center Rooms 08-C/P-AC015 n/a 36,000 36,000 Replace Gynmasium Roof - Activity Center 08-CIP-AC078 n/a 105,000 105,000 Activity Center - Raspberry Room Roof Replacement 08-CIP-ACO24 n/a 80,000 80,000 Arts Center - Replace 25 Ton Rooftop HVAC Unit 08-CIP-AR013 n/a 100,000 700,000 Replace Carpet and Apparatus Floor Finish - FD 08-CIP-FD019 n/a 56,000 56,000 Replace Carpet - Police Station 08-CIP-PD016 n/a 40,000 40,000 Activity Center - Lower Roof Replacement 09-CIP-AC037 n/a 80,000 80,000 Art Center - Replace Lobby Carpet 09-CIP-AR027 n/a 52,000 52,000 City Hall Lobby Upgrade 09-CIP-CH030 n/a 110,000 110,000 Arts Center - Replace theatre seats and backs 72-CIP-AR002 1 138,510 738,510 Arts Center - Replace Information Desk and Kiosk 72-CIP-AR005 1 5,000 5,000 Arts Center - Replace 15 Rooftop HVAC units 12-CIP-AR036 n/a 220,000 220,000 Arts Center - Re -landscape E & W faces of building 13-CIP-AR007 2 3,600 3,600 Arts Center - Restroom Improvement 13-CIP-AR002 1 9,000 9,000 Arts Center - Chairs and Tables 73-CIP-AR003 1 14,800 14,800 Arts Center - Storage & Hanging, Display Systems 73-CIP-AR004 1 6,500 3,125 9,625 Public Works Garage Upgrade 73-CIP-8071 1 20,000 100,000 720,000 Cl - Capital Improvement Fund Total 66,300 28,600 494,125 538,510 52,000 1,179,535 CT - Cable Franchise Fees Technology Improvement - Council Chambers & Studio 73 CIP-CM001 n/a 9,500 35,000 12,500 23,000 15,000 95,000 CT - Cable Franchise Fees Total 9,500 35,000 12,500 23,000 15,000 95,000 �ED - Economic Development Fund Block 64 Redevelopment Project 06-CIP-D404 n/a 1,000,000 7,000,000 8th Ave Streetscape and parking facility 12-CIP-D408 n/a 5,000,000 51000,000 ED - Economic Development Fund Total 1,000,000 5,000,000 6,000000 GU - Other Governmental Units Residential Street Improvements 01-CIP-5101 n/a 800,000 800,000 County Road 3 07-CIP-5104 n/a 1,600,000 7,600,000 County Road 61 (Shady Oak Road) 07-CIP-S706 n/a 6,150,000 11,045,000 17,195,000 Eighth Avenue LRT Corridor 07-CIP-5503 n/a 100,000 100,000 Depot Recreation Area 70-CIP-RO02 2 500,000 500,000 Mainstreet Rehabilitation 71-CIP-5121 3 500,000 500,000 Oakes Park - Lighting 73-CIP-PO72 n/a 20,000 20,000 GU - Other Governmental Units Total 6,670,000 12,345,000 100,000 1,600,000 20,715,000 Thursday. Juh//, 20/3 Source Project# Priority 2014 2015 2016 2017 2018 Total Thursday, July 11, 2013 MS - Municipal State Aid Streets County Road 3 07-CIP-5704 n/a 700,000 700,000 County Road 61 (Shady Oak Road) 07-CIP-5106 n/a 2,050,000 755,000 2,805,000 Sixth Street South (11th to 12th Avenue South) 07-CIP-5504 n/a 400,000 400,000 MS - Municipal State Aid Streets Total 2,050,000 755,000 1,100,000 3,905,000 IPA - Pavilion Fund -- Pavilion skate Tile Replacement/Lobby Improvement 07-CIP-P313 n/a 45,000 45,000 Pavilion Overhead Door Improvement 07-CIP-P374 n/a 40,000 40,000 Pavilion Gas Fired Rooftop Furnace 09-CIP-PO25 n/a 9,000 9,000 Pavilion Roof Replacement 09-CIP-PO26 1 120,000 720,000 Pavilion Evaporator Condenser Replacement 09-CIP-PO36 n/a 60,000 60,000 Pavilion Indoor Turf Replacement 10-CIP-P319 n/a 95,000 95,000 Pavilion - Desiccant Repl of Dehumidification Syst 10-CIP-P320 n/a 6,000 6,000 Mezzanine Rooftop Unit Replacement 73-CIP-P321 1 24,500 24,500 Pavilion Entry and Lobby Door Replacement 73-CIP-P324 3 7,000 7,000 Paint Pavilion Exterior 73-CIP-P325 1 22,000 22,000 Pavilion -Painting the Arena Ceiling and Bar Joist 73-CIP-P326 1 20,000 20,000 PA - Pavilion Fund Total 120,000 69,000 135,000 51,000 73,500 448,500 IPDF- Park Dedication Fund Valley Park - Outdoor Lighting 08-CIP-Poo l n/a 40,000 40,000 Park Valley - Play Equipment 08-CIP-PO70 n/a 60,000 60,000 Burnes Park - Resurface Tennis Courts 08-CIP-Po71 n/a 20,000 20,000 Hilltop Park - Play Equipment 08-CIP-PO74 n/a 100,000 700,000 Valley Park - Play Equipment 08-CIP-PO75 n/a 80,000 80,000 Oakes Park - Play Equipment 08-CIP-PO76 n/a 100,000 700,000 Skate Park 08-CIP-RO07 n/a 7,000 7,000 7,000 7,000 28,000 Cottageville Park - Play Equipment 77-CIP-PO79 n/a 120,000 720,000 Oakes Park -Drinking Fountain 13-CIP-PO38 n/a 10,000 70,000 Burnes Park - Warming House 73-CIP-PO40 n/a 60,000 60,000 Oakes Park - Replace Picnic Shelter 73-CIP-PO41 n/a 30,000 30,000 Valley Park - Construct Storage Building 13-CIP-PO42 n/a 25,000 25,000 Burnes Park - Play Equipment 13-CIP-PO43 n/a 35,000 35,000 Oakes Park - Tennis Courts 73-CIP-PO44 n/a 20,000 20,000 Valley Park - Warming House 13-CIP-PO45 n/a 60,000 60,000 Oakes Park - Lighting 73-CIP-PO72 n/a 20,000 20,000 PDF- Park Dedication Fund Total 177,000 242,000 222,000 7,000 160,000 808,000 PI - PIR/General Obligation Bonds Residential Street Improvements 01-CIP-5101 n/a 280,000 500,000 1,500,000 1,500,000 1,500,000 5,280,000 Citywide Concrete Alleys 07-CIP-5103 n/a 15,000 16,000 31,000 County Road 61 (Shady Oak Road) 07-CIP-5106 n/a 200,000 200,000 Sixth Street South (11th to 12th Avenue South) 07-CIP-5504 n/a 100,000 700,000 Parking Lots 06-CIP-5118 n/a 800,000 800,000 Plan, Design and Implement Railroad Quiet Zone 71-CIP-S120 n/a 225,000 225,000 Mainstreet Rehabilitation 11-CIP-5127 3 1,500,000 7,500,000 2014 Street Overlay Project 72-CIP-SO39 n/a 550,000 550,000 Pedestrian & Bicycle Access Improvements 13-CIP-SO40 n/a 25,000 25,000 25,000 25,000 25,000 725,000 Thursday, July 11, 2013 Source Project# Priority, 2014 2015 2016 2017 2018 Total PI - PIR/General Obligation Bonds Total 2,355,000 1,525,000 1,540,000 1,541,000 1,850,000 8,811,000 RF - Refuse Fund Public Works Garage Upgrade 73-C/P-8011 1 25,000 25,000 RF - Refuse Fund Total 25,000 25,000 ISA - Special Assessment Residential Street Improvements 07-CIP-5101 n/a 120,000 200,000 1,000,000 1,000,000 750,000 3,070,000 Citywide Concrete Alleys 01-CIP-S103 n/a 60,000 64,000 724,000 County Road 61 (Shady Oak Road) 07-CIP-S706 n/a 250,000 250,000 SA - Special Assessment Total 120,000 450,000 1,060,000 1,064,000 750,000 3,444,000 SF - Sanitary Sewer Fund Residential Street Improvements--Utilities 07-C/P-5102 n/a 225,000 175,000 120,000 120,000 325,000 965,000 Lift Station # 4 08 C/P-0001 n/a 160,000 760,000 Public Works Garage Upgrade 13-C/P-8017 1 25,000 25,000 SF - Sanitary Sewer Fund Total 225,000 175,000 305,000 120,000 325,000 1,150,000 ISU - Storm Sewer Fund Residential Street Improvements--Utilities 01-CIP-5102 n/a 0 100,000 110,000 110,000 300,000 620,000 Storm Drainage System Maintenance - Alley Repairs 01-CIP-0002 n/a 20,000 20,000 21,000 21,000 21,000 103,000 Storm Water Management Projects 01-CIP-0003 n/a 880,000 880,000 Parking Lots 06-CIP-S 178 n/a 200,000 200,000 Public Works Garage Upgrade 73-CIP-8011 1 25,000 25,000 SU - Storm Sewer Fund Total 900,000 320,000 156,000 131,000 321,000 1,828,000 TF - Tax Increment Financing Redevelopment, East Excelsior Boulevard 07-C/P-D4070 n/a 2,000,000 2,000,000 Light Rail Transit Stations (2) 07-C/P-5502 n/a 150,000 750,000 Eighth Avenue LRT Corridor 07-CIP-5503 n/a 100,000 700,000 Block 64 Redevelopment Project 06-C/P-D404 n/a 3,500,000 3,500,000 Blake Corridor Redevelopment 09-C/P-D406 n/a 5,000,000 51000,000 TF - Tax Increment Financing Total 3,500,000 7,150,000 100,000 10,750,000 IWF - Water Fund Residential Street Improvements--Utilities 01-C/P-5102 n/a 350,000 200,000 200,000 200,000 600,000 7,550,000 St. Louis Park Emergency Connection 08-CIP-UO10 n/a 211,000 217,000 Public Works Garage Upgrade 13-C/P-8017 1 25,000 25,000 WF - Water Fund Total 350,000 200,000 436,000 200,000 600,000 1,786,000 GRAND TOTAL 17,542,800 28,294,600 4,385,625 3,875,510 6,846,500 60,945,035 Thursday. Juh 11, 2013