CR 2013-077: 2014-2018 Capital Improvement Plan (CIP)-4coAugust 5, 2013 Council Report 2013-077 City of Hopkins 2014-2018 CAPITAL IMPROVEMENT PLAN Proposed Action Staff recommends adoption of the following motion: Move to adopt the 2014-2018 Capital Improvements Plan. Adoption of this motion will authorize staff to begin efforts to implement 2014 projects by including them in the 2014 budget process, and to begin the preliminary process for their implementation. Overview The Capital Improvements Plan is a planning document intended to help the City anticipate major capital items and to consider the financial impact of proceeding with those planned improvements. Discussions have been held with the Park Board and Planning Commission, as well as the City Council, in detailing proposed and necessary improvements. Staff is recommending adoption of the plan. Primary Issues to Consider • Does adoption of the CIP mean projects will be implemented? The CIP is a planning document, not an implementation action, and therefore, additional approvals will be necessary for projects to proceed. Appropriate notifications would also be made for those projects that have funding implications. • Are funds available for all projects? The plan outlines funding implications if all projects are implemented. Necessary funding changes have been anticipated as part of this plan, and are recommended therein Supporting Information • 2014-2018 CIP Power Point slides • 2014-2018 Capital Improvements Plan Christine M. Harkess, CPA, CGFM Finance Director Financial Impact: $ projects included in budgets Budgeted: Y/N X N Source: Various Related Documents (CIP, ERP, etc.): CIP Notes: CIP Background ■ The Capital Improvement Plan is a tool for long range capital planning and financial projections. ■ The plan is reviewed annually to ensure the overall objectives of City development, assessment of project needs and the City's fiscal capabilities. ■ Following are some highlights of the plan for 2014. Funding Sources Taxes Special assessments Special fees Municipal state aid Utilities revenues Other governmental units. The impact of specific capital projects are carefully considered prior to approval of the project. City Buildings ■ Activity Center ❑ Carpeting — Raspberry room, TV/Game room and hallways NIERY i i 2 City Buildings - cont ■ Arts Center Restroom improvements Storage, hanging, display systems Parks ■ Oakes Park — play equipment, drinking fountain, lighting ■ Valley Park — outdoor lighting ■ Skate Park Improvements . .: M i -- 40 .1 Skate Park Improvements 3 Pavilion Roof replacement for both north and south roof sections Street Improvements The city has a �- pavement management plan which provides information regarding scheduled - street repairs and improvements 4 all Street Improvements ■ Municipal State Aid street improvements ■ Residential Street & Utility improvements ■ Total Estimated Cost - $11,750,000 Street improvements - $11.150,000 Utility improvements - $575,000 Other street/road improvements - $25,000 Utility Improvements ■ In most cases, where street reconstruction takes place, storm sewer facilities either need upgrading or replacement. ■ In some cases water main and sanitary sewer needs to be rehabilitated. ■ In 2014 we are anticipating $900,000 in storm water utility improvements. 5 Utility Improvements - other Storm Drainage System Maintenance $ 20,000 Cottageville Park improvements $650,000 Shady Oak Pond - CSAH 61 $230,000 Cottageville Park tc Conclusion Alley with recent repairs ■ 2014 Improvements Total $13,042,800 ■ Funding ❑ Capital Improvement fund ❑ Cable Franchise Fees ❑ Other Government Unit ❑ Pavilion ❑ Park Dedication funds ❑ PIR/Bonding ❑ Special Assessments ❑ Utility funds $ 66,300 $ 9,500 $8,720,000 $ 120,000 $ 177,000 $2,355,000 $ 120,000 $1,475,000 R City of Hopkins CAPITAL IMPROVEMENT PLAN 2014-2018 WORK AHEAD '9 W I" - 1320 - City of Hopkins _ City of qfopkins 1010 first Street South • Nopkins, ` ` 55343-7573 • Phone: 952-935-8474 • Fax• 952.935.1834 Web address: unuw.hopkinsmn.com DATE: August 2013 TO: Honorable Mayor and Members of the City Council FROM: Mike Mornson, City Manager SUBJECT: 2014-2018 CAPITAL IMPROVEMENT PLAN With this letter I respectfully submit the 2014-2018 Capital Improvement Plan. This five- year planning document represents the combined efforts of city staff, advisory commissions, citizens and the City Council. The Capital Improvement Plan is a five-year forecast of project needs in the City of Hopkins. It is intended to alert the Council and citizens to the major capital needs on the horizon. The first year of the plan becomes an adopted capital budget and relates almost completely to the operating budget that is approved on a yearly basis. The remaining four year represents an estimate of project needs and funding capabilities of the city. This year's plan does not include proposed equipment purchases. A document relating specifically to equipment replacement needs has been developed into a separate document. The Capital Improvement Plan is intended to serve as a planning tool and is therefore structured to present a meaningful, long-range perspective of the city's capital programming needs. At the same time, sufficient projected detail is provided to enable those who review the information to make informed decisions on the programming of projects over the next several years. Please use the information provided to formulate plans, projects and questions. The Capital Improvement Plan can serve the community best by provoking thoughts and actions. This document was developed by the Finance Department with assistance of all city departments. I want to especially thank all those involved in the development of the Capital Improvement Plan and especially Steve Stadler, Public Works Director, Kersten Elverum, Planning and Economic Development Director, Christine Harkess, Finance Director, and Debbie Sperling, Administrative Assistant for their hard work and dedication. Partnering with the Community to Enhance the Quafity of Life • Inspire • Educate • Involve • Communicate • CAPITAL IMPROVEMENT PLAN 2014-2018 TABLE OF CONTENTS Page City Manager's Message 1 Table of Contents 2 Introduction Introduction and Purpose 5 Program Descriptions Utilities Program 6 Transportation Program 7 Parks, Forestry, and Pavilion Program 9 General Public Buildings Program 10 Economic Development 12 Sources of Funding Sources of Funding 15 Funding Source Abreviations 18 Programs and Categories 19 Summary of Impacts on Major Funding Sources 23 Cash Flow Statements Park Capital Improvement Fund 29 Capital Improvemetn Fund 30 Municipal State Aid Fund 31 Permanent Improvement Revolving Fund (PIR) 32 Street Improvement Franchise Fees 33 Water Utility Fund 34 Sewer Utility Fund 35 Storm Sewer Utiltiy Fund 36 Pavilion - Ice Arean Fund 37 Five -Year Project Summaries Projects by Year 41 Department Summary 44 Projects by Department 45 Funding Source Summary 48 Projects by Funding Source 49 Project Descriptions & Narratives Economic Development 55 General Public Buildings 61 Parks & Recreation 93 Streets 113 Street Improvement Map 115 Utilities 130 I Introduction 1320 - City of Hopkins INTRODUCTION AND PURPOSE The Capital Improvement Plan is a flexible plan based upon long-range physical planning and financial projections, which schedules the major public improvements that may be incurred by the City over the next five years. Flexibility of the Capital Improvement Plan is established through annual review, and revision if necessary. The annual review assures that the program will become a continuing part of the budgetary process and that it will be consistent with changing demands as well as changing patterns in cost and financial resources. Funds are appropriated only for the first year of the program, which is then included in the annual budget. The Capital Improvement Plan serves as a tool for implementing certain aspects of the City's comprehensive plan; therefore, the program describes the overall objectives of City development, the relationship between projects with respect to timing and need, and the City's fiscal capabilities. The Capital Improvement Plan can help assure: 1. A systematic approach to planning and initiating capital projects affording the opportunity to plan the location, timing, and financing of needed public improvements; 2. The development of a realistic program of capital spending within the City's projected fiscal capability to finance such projects, avoiding sharp change in the tax levy or bonded indebtedness; 3. The coordination of public and private improvement projects permitting adequate time for design and engineering to eliminate duplication of effort and expense; 4. The expenditure of public funds that is compatible with the City's adopted Comprehensive Plan; 5. That the public is kept informed of the proposed future projects and expenditures; 6. That private investors are aware of the City's long-range development program so that they may guide their development in a way that is compatible with the City's program; 7. Aid in achieving federal and/or state participation by providing the necessary planning and lead time necessary for a successful application in addition to meeting prerequisites needed for certain federal and state grants. PROGRAM DESCRIPTIONS In order to effectively plan for and manage the projects contained in a Capital Improvement Plan, it is necessary to group similar activities into "Program Categories". The City of Hopkins' activities are divided into four program categories which are 1) Utilities, 2) Transportation, 3) Parks, Forestry and Pavilion, and 4) General Public Buildings. The City also includes an outline of proposed expenditures for unscheduled projects. Program categories are explained in the following sections. UTILITIES PROGRAM Program Description: The Utilities Program includes the municipal water, municipal sanitary sewer, storm sewer and refuse systems. Program Goal: Provide reliable, efficient, and safe utility service to all parts of the City with a minimum of adverse effects on the environment. Subprograms: Water, sanitary sewer, storm sewer, and refuse service. I. Municipal Water System Subprogram (WA) A. Subprogram Goal: The goal of the Municipal Water System subprogram is to provide water in sufficient quantities at sufficient pressure, with a high degree of reliability and safety to all parts of the City so as to satisfy the normal demands of the general public for water while at the same time providing sufficient reserves in case of fire emergency or power outages. B. Objectives: 1. Water quality shall meet the purity standards of the Minnesota Department of Health. 2. Any hydrant on the system shall, under maximum condition, deliver no less than 500 gallons per minute with a residual pressure of 20 pounds per square inch. 3. The system shall be looped to provide maximum reliability. 4. The supply and storage system shall be designed and maintained to have maximum reliability. 6 II. Municipal Sanitary Sewer Subprogram (SA) A. Subprogram Goal: The goal of the Municipal Sanitary Sewer subprogram is to promote a healthful environment by collecting all sewage from existing and projected development in a sanitary and economic manner. B. Objectives: 1. Provide sewer lines of adequate size and grade to collect and transmit all discharge sewage. 2. Prevent sewage from overflowing into the natural environment. 3. Prevent sewage back-ups. 4. Encourage or promote connection of all generators of sewage to the Municipal system. 5. Meet the effluent and infiltration standards of the Metropolitan Waste Control Commission. III. Storm Sewer Subprogram (SS) A. Subprogram Goal: Manage and control surface and ground waters in order to protect the man-made and natural environment in a safe and efficient manner. B. Objectives: 1. Prevent flooding. 2. Prevent damage to property due to erosion. 3. Meet water quality standards established by the controlling regulatory law or authority. TRANSPORTATION PROGRAM Program Description: This program includes streets, walkways, traffic signs and signals, vehicular parking facilities, and street lighting. Program Goal: Provide for the safe and efficient movement of people and goods throughout the city. Subprograms: Streets, Walkways/Sidewalks, Signs/Signals, Parking Facilities, and Street Lights. I. Streets Subprogram (ST) A. Subprogram Goal: The goal of the Streets subprogram is to provide safe, convenient, economic public streets to best facilitate the movement of vehicular traffic. B. Objectives: 1. Streets should be constructed with permanent surfaces, concrete curb and gutter, and with ancillary storm drainage, to standards established by the City. 2. Streets should be of a size and load capacity consistent with their functional classifications. 3. Timely major repair to preserve the basic capital investment in streets. II. Walkways/Sidewalks Subprogram (WS) A. Subprogram Goal: To provide a safe and convenient pedestrian system with incidental recreational benefits. III. Signs/Signals Subprogram (SI) A. Subprogram Goal: The goal of the Signs/Signals subprogram is to provide an efficient and orderly system of street and traffic signing so as to promote safe, convenient travel throughout the City. B. Objectives: 1. Signs and signals should be installed in conformity with the Minnesota Manual on Uniform Traffic Control Devices. 2. Periodic surveys and studies should be made to document the effectiveness of City signing patterns. IV. Parking Facilities Subprogram (PA) A. Subprogram Goal: To provide such supporting facilities as will promote maximum use of public parking spaces by employers, employees, customers, and visitors. 0 B. Objectives: 1. Provide parking facilities for present and anticipated needs of the City of Hopkins. V. Street Lights Subprogram (SL) A. Subprogram Goal: To provide a system of street lighting within the City that will promote safe and convenient vehicular and pedestrian travel on City Streets. B. Objectives: 1. To provide lighting at each street intersection within the City. 2. To provide mid -block street lighting in conformance with the City's street lighting policy, in order to provide equitable, cost efficient lighting. 3. To continually update the system so as to provide energy and cost efficient lighting. PARKS, FORESTRY AND PAVILION PROGRAM Program Description: This program includes community parks, neighborhood parks, open spaces, recreational structures and facilities. Program Goal: The goal of the Park and Recreation Program is to provide facilities for safe, stimulating, and comprehensive leisure time activities of Hopkins citizens. Subprograms: Neighborhood Facilities, Community Facilities I. Neighborhood Facilities Subprogram (NF) A. Subprogram Goals: To acquire ownership or use rights of park sites located to provide convenient walking access to all Hopkins citizens and to develop such sites to provide optimum recreational serviceability consistent with the preservation and enhancement of pleasing aesthetic qualities. B. Objectives: 1. Acquire property or use rights on those neighborhoods that do not have convenient walking access to neighborhood park facilities. 2. Develop neighborhood park facilities to meet the needs of various user groups. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Preserve and enhance the aesthetic qualities of neighborhood parks. II. Community Facilities Subprogram (CF) A. Subprogram Goals: The goal of the Community Facilities subprogram is to develop, or acquire ownership or use rights of sites which serve the entire City and to provide facilities that serve community -wide needs. B. Objectives: 1. Acquire sites that have valuable and unique natural characteristics to preserve irreplaceable community resources. 2. Preserve by acquisition, gift, or other arrangement properties that have valuable historic -cultural qualities. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Construct or acquire structures and facilities necessary to meet the changing needs of the community. GENERAL PUBLIC BUILDINGS PROGRAM Program Description: The General Public Buildings Program includes all municipal buildings except those provided for in the Utility and Park Facilities Program. Program Goal: Provide buildings that are adequate and convenient for the efficient accommodation of City functions. Subprograms: Administrative Offices, Maintenance Facilities, Fire Facilities, Community Center. Administrative Offices Subprogram (AO) A. Subprogram Goal: The goal of the Administrative Offices subprogram is to provide facilities for the efficient and safe conduct of legislative and administrative functions of the City. 10 B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of the City services. II. Maintenance Facilities Subprogram (MF) A. Subprogram Goal: The goal of the Maintenance Facilities subprogram is to provide facilities for the efficient and safe conduct of City maintenance functions. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of City services. III. Fire Facilities Subprogram (FF) A. Subprogram Goal: To provide a fire station, or stations, for storage of Fire Department equipment and for the training and meetings of volunteer fire fighters to provide prompt and efficient protection to life and property. B. Objectives: 1. Provide a maximum four -minute daytime and three-minute nighttime response to all points within the City. 2. Meet objective 1 through the use of volunteers. IV. Community Center Subprogram (CC) A. Subprogram Goal: To provide a community facility, or facilities, which meet the social, recreational, and cultural needs of all citizens, particularly senior citizens. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repairs. if 2. Construct or acquire structures and facilities necessary to meet the changing needs of the City. 3. Upgrade facilities as necessary to provide for efficient, safe, and effective provision of City services. ECONOMIC DEVELOPMENT PROGRAM Program Description: This program includes redevelopment projects that have been identified through adopted plans and goals of the City of Hopkins. Program Goal: To facilitate the redevelopment of key sites in order to achieve the state objectives of the project. Objectives: 1. Elimination of blight or blighting conditions 2. Creation of jobs 3. Increase property value(s) 4. Catalyst of additional redevelopment 5. Environmental clean-up 6. Increase transit -oriented development around LRT stations 12 Sources of Funding 13 City of Hopkincs 14 SOURCES OF FUNDING In order to fund the anticipated Capital Improvements, the City must draw upon a variety of sources. Many of these sources have a specific or "dedicated" purpose (i.e., the water utility fund will finance water main installation but not a street overlay). Therefore, it is important to identify the uses and limitations of the various revenue sources. CURRENT REVENUES - GENERAL FUND (CR) This represents funding from current year revenue collections in the General Fund that support operations and capital outlay expenditures. Revenue sources include property tax levies, state aid payments, and various permit and license fees. This source of funding is generally used only for operations and small capital purchases. GENERAL FUND RESERVES (GR) Reserves of the general fund are the funds remaining after subtracting cash flow and emergency amounts from the City's cash balance, sometimes referred to as "fund balance". The use of General Fund Reserves is not recommended for Capital Improvements without significant staff and Council review. COMMUNICATION (formerly Cable TV) FUND (CT) This funding source consists of franchise fees received from the local Cable TV company, in excess of the amounts earmarked for the access programming and commission budgets. Expenditures are limited to cable -related facilities, or must have a cable related purpose. ECONOMIC DEVELOPMENT FUND (ED) This funding source was established by the Housing and Redevelopment Authority (HRA) and the City of Hopkins, to provide funding for the purpose of promoting development and redevelopment within the City. The Economic Development fund is a revolving fund administered by the HRA, intended to provide an ongoing funding source used to reduce or extend the long term debt involved with development and redevelopment activities. The HRA reviews all proposed uses of this fund on an individual basis. GRANT-IN-AID (GA) This is aid received from either the Federal or State government. In many cases, grants are made on matching basis, which means the City shares a portion of the costs of the project being funded. 15 MUNICIPAL STATE AID STREETS (MS) This funding source represents funds received from the State of Minnesota to support construction and maintenance of State Aid classified municipal streets. State law defines the types and limits of State Aid Streets expenditures. PERMANENT IMPROVEMENT REVOLVING/GENERAL OBLIGATION BONDS (PI) Improvements with a life of several years may be financed from the proceeds of a General Obligation Bond Issue. Law limits the total debt that can be incurred under this method of financing. With some exception, General Obligation Bonds are generally subject to a referendum process. Examples of projects, which may not require a referendum, are those financed through the use of special assessments where at least 20 percent of the project cost is assessed to the benefiting property owners. The remaining portion not assessed can be financed through general obligation bonds repaid by a tax levy. PRIVATE SECTOR FUNDING (PF) This funding source consists primarily of payments made by developers for the purchase of land, the installation of water, sewer, or streets or other related expenditures. It can also refer to donations made to the City by individuals or groups. OTHER GOVERNMENTAL UNITS (GU) These are funds received from Hennepin County, adjacent communities, etc. for projects that also benefit a jurisdiction other than the City of Hopkins. REVENUE BONDS (RB) These are bonds issued for improvements made for specific revenue producing facility or operation. The debt incurred is repaid from the revenue generated by the facility. If the revenue generated is insufficient, then the difference becomes an annual obligation of the taxpayers and becomes an additional tax levy. These are generally not subject to referendum. REAL ESTATE SALES FUND (RE) This funding source consists primarily of funds built up from the sale of City owned property. To date, the fund has been used for building improvements. Because the sale of both general City property and park/recreation property are accumulated into this fund, earmarking a portion for recreational purposes may be justified. 16 SPECIAL ASSESSMENT (SA) A number of projects may be realistically financed using Special Assessment to pay the ultimate cost. Almost any project can potentially be financed using the assessment process. In each case it is necessary to make a determination that the assessed property will benefit by the amount of the assessment. The cost of street reconstruction is shared by the property owner and the City. Special assessments to individual properties are capped per city policy. Concurrent improvement costs to the utility systems are assumed by the respective utility funds. TAX INCREMENT FINANCING (TF) This funding source results from the tax value of new development that is "incrementally" greater than the existing tax value. Typically, bonds are sold based on the assumption that the higher tax receipts will retire the bonds. However, the use of TIF funds through a "pay as you go" method has become more common. This type of funding can be used for public improvements within a redevelopment district to support the goals of redevelopment, specifically the elimination of blighted conditions. Approval of the Hopkins HRA should be anticipated prior to the commitment of these funds. State law strictly regulates the use of these funds. WATER FUNDS (WF) Water funds consist of revenue generated from the sale of water. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. SANITARY SEWER FUNDS (SF) Sanitary sewer funds consist of revenue generated from charges made for sewage disposal. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. STORM SEWER UTILITY REVENUES (SU) Storm sewer funds consist of revenue generated by charging storm water drainage fee to parcels of land for the availability and use of municipal storm sewer facilities. Expenditures from this funding source are related to drainage facilities. PAVILION FUND (PA) Pavilion Funds consist of revenues generated from rental fees collected from users of the Pavilion. These funds are utilized to pay for operating, and capital expenditures. 17 Funding Sources Communication (formerly Cable TV) Fund CT Current Revenues — General Fund CR General Fund Reserves GR Economic Development Fund ED Grant -In -Aid GA Housing and Redevelopment Authority HRA Municipal State -Aid Streets MS Other Government Units GU Park Dedication Fund PDF Pavilion Fund PA Permanent Improvement Revolving/General Obligation Bonds PI Private Sector Funds PF Real Estate Sales Fund RE Revenue Bonds RB Sanitary Sewer Fund SF Special Assessment SA Storm Sewer Fund SU Tax Increment Financing TF Water Fund WF 18 Programs and Categories Utilities Program Municipal Water System Category Municipal Sanitary Sewer Category Storm Sewer Category Transportation Program Streets Category Walkways/Sidewalks Category Signs/Signals Category Parking Facilities Category Street Lights Category Parks, Forestry and Pavilion Program Neighborhood Facilities Category Community Facilities Category General Public Buildings Program Administrative Offices Category Maintenance Facilities Category Fire Facilities Category Community Center Category Arts Center Category Economic Development Program 19 City of Hopkins 20 Summary of Impacts on Major Funding Sources 21 lm� City of Hopkins 22 SUMMARY OF PROJECT IMPACTS ON MAJOR FUNDING SOURCES CURRENT REVENUES/GENERAL FUND RESERVES Expenditures for 2013 are budgeted at an increase of 0.23% over the 2012 budget. The 2013 budget was compiled eliminating dispatch which was transferred to the County in August 2012 and a 2% salary increase. With the transfer of dispatch the 2013 budget was virtually stable. The 2014 budget has begun with levy limits for 2014 but the City will receive approximately $289,000 in LGA. The tax levy is the major source of revenues (82%) for the General Fund and therefore presents a challenge when levy limits are in place. Unassigned fund balance in the General Fund totals $4,488,876 at the end of 2012 and is projected to remain at that level for 2013. The State Auditor's Office recommends no less than five month of operating expenditures in reserves. For 2013 five months of expenditures would total $4,408,470 or 41.7%. At January 1, 2013 the unassigned fund balance was at 42.4% of budgeted expenditures. PERMANENT IMPROVEMENT REVOLVING FUND, (P.I.R.) - G.O. DEBT Funding from bonds is used to reimburse the P.I.R. fund for public improvement projects, which have been previously expended. The debt is funded by special assessment collections and city tax levies over a ten to fifteen year period. Bonds totaling $3,650,000 were sold in 2013 to fund the 2013 street improvement projects. The next bond sale is scheduled for 2014 and will be for 2014 Mainstreet Rehabilitation project and West Park Way overlay project. These bonds are expected to total approximately $2,300,000. The P.I.R. fund has completed substantial projects over the last three years totaling almost $7.7 million. This pace is expected to continue with scheduled projects for 2014 totaling $2,400,000 and future projects in the years 2015-2018 totaling over $9.7 million. Projects scheduled for 2014 include the Mainstreet Rehabilitation, West Park Road improvements, and Hobby Acres mill and overlay. The funding is provided for these projects by special assessments, $120,000 and PIR/Bonding, $2,300,000 for a total project estimated at $2,475,000. In the years 2015-2018 as mentioned above, the city has an aggressive residential street improvement schedule planned, in addition to major improvements to County Road 61 — Shady Oak Road, all of which will require bonding. STREET IMPROVEMENT FRANCHISE FEES Beginning in 2012 gas and electric fees were increased 66-70% from $0.70 for residential, $1.35 for Small non -demand, $6.00 for small demand and $42 for large commercial and industrial to offset the debt levy for street improvements and to hold down property taxes. In 2013 $85,620 was used to reduce the levy for the 2012B GO Improvement Bonds. In 2014 plans call to use $85,620 to write down the 2012B bond levy and $75,000 to write down the 23 2013A GO Improvement levy. The end result is to reduce the 2014 special levies by over $160,000 which then reduces the property tax levy needed for 2014. MUNICIPAL STATE AID FUND Funding for municipal state aid road projects comes from state MSA funding and is drawn down as projects are done. State funding is not sufficient for current planned projects as the City has been aggressive in doing MSA projects. In the queue for reimbursement is a request for $950,956 for the Minnetonka Mills Rd project and $894,020 for the 5`" St South project. These funds will be released as the annual allotment becomes available. At the current rate of reimbursement it will take five years to receive all funds due on these two projects. This pushes back receipt of funds for other eligible MSA funded projects; however those project requests will be placed in the queue for future allotment payments. Currently there is one MSA project scheduled for 2014-2015 and two for 2018. In 2014-2015 the County Road 61, Shady Oak Road project that involves the cities of Hopkins and Minnetonka, Hennepin County and the State will be done. The project is in the planning stages and has a scheduled construction start date of 2014. The project is estimated at $20.4 million of which $2.8 is Hopkins share of the project. hl 2018 projects for Co Rd 3 from Blake Road to Meadowbrook Road ($700,000 MSA share) and Sixth St S from 1 1 "' to 12°i Avenue for the extension of roadway and culvert crossing Nine Mile Creek ($400,000 MSA share) are scheduled. They too will be added to the queue for reimbursement. CAPITAL IMPROVEMENT FUND Funding for these improvements comes from a general tax levy that was implemented in 2005 at $25,000. With the exception of 2010 when the levy was eliminated due budget constraints as a result of the governor's MVHC unallotment. we have been able to steadily increase this levy and it is budgeted at $125,000 for 2014. Projects scheduled in 2014 total $66,300 and include carpet replacement in the Activity Center and Art Center improvements. PARK IMPROVEMENT FUND The source of funding for this fund is development fees charged to developers for park development, however staff and council are recommending adding $0.50 to the gas and electric franchise fee to generate additional revenue for needed park improvements. Developer payments are uncertain as they are dependent on future development and redevelopment in the city. Projects scheduled for 2014 total $177,000 and include play equipment, outdoor lighting and a drinking fountain in Oakes Park, outdoor lighting in Valley Park and Skate Park improvement. In 2012 redevelopment projects generated $164,000 in Park Dedication Fees and those funds will be exhausted by 2014. Additional development projects in the planning stages are anticipated to bring in additional funds within the next several years. The Park Board spent considerable time soliciting resident input on city parks and developed a long-range plan for the city's park system. This plan is the basis for future park improvements. WATER FUND 24 Implementing the rates as proposed in the Utility Master Plan (UMP) along with a bond sale in 2013 provide the funding needed for projects scheduled for 2013. Bonds will need to be sold in 2014 and each year thereafter in which there are water projects associated with the residential street improvement program. Projects planned for 2014 include $350,000 in water main improvements done in conjunction with street improvements and $95,000 for meter replacements. The public works facility improvement project annual transfer of $45,000 has been transferred to the Storm Sewer Utility fund for the years 2012-2023. As established by the Utility Master Plan completed in 2007 and reviewed every two years thereafter, annual incremental increases are planned for the next 17 years. Water rates will increase in 2014 by approximately 5% or $0.10 per 1,000 gallons of water and will be in line with the current UMP. SANITARY SEWER FUND Implementing the rates as proposed in the Utility Master Plan (UMP) along with a bond sale in 2013 provide the funding needed for projects scheduled for 2013. Bonds will need to be sold in 2014 and each year thereafter in which there are sewer projects associated with the residential street improvement program. Projects planned for 2014 include $225,000 in sewer main improvements done in conjunction with street improvement projects. In addition to the scheduled capital expenditures, the Metropolitan Waste Control Commission is projecting annual increases in its disposal charges to local governments. The public works facility improvement project annual transfer of $50,000 has been transferred to the Storm Sewer Utility fund for the years 2012-2023. As established by the Utility Master Plan completed in 2007 and reviewed every two years thereafter, annual incremental increases are planned for the next 17 years. Water rates will increase in 2014 by approximately 3.8% or $0.15 and will be in line with the current UMP. STORM SEWER FUND Bonds will be sold in 2014 for the 201 storm water management project. These bonds issues along with current revenues should provide the needed funding for scheduled projects. Projects scheduled for 2014 include an $880,000 storm water management project and $20,000 in storm drainage system maintenance. The public works facility improvement project will cost the storm sewer enterprise $25,000 a year for twenty years (2004-2023). In addition beginning in 2012 the Storm Sewer Utility fund will absorb the public works facility transfers for both the water fund ($45,000) and the sewer fund ($50,000) for a total increased cost of $95,000. 25 The most recent rate increase pursuant to the 2007 Utility Master Plan was done in 2009. This rate increase is expected to support the storm sewer- system well into the future and currently no additional rates increases are proposed. PAVILION FUND The Pavilion Fund was added to the CIP in 2006 to provide for future improvements that will be needed as this facility ages. As an Enterprise Fund capital items are usually funded within the fund but due to several large capital improvements over the past few years this fund while meeting its operational needs does not currently have adequate financial resources to meet future capital needs. Some of the improvements recently completed were done at the request of major leaseholders of the facility and are being paid by those leaseholders through long-term lease arrangements. This facility built in 1990 is starting to need repairs and replacement to areas that are heavily used; capital projects scheduled for 2014 include $120,000 for the Pavilion roof replacement. In 2015-2018 facility projects totaling $328,500 will be needed. As part of the 2014 budget process funding of these Pavilion capital needs will need to be addressed as well as future infrastructure needs which will continue to increase as the building ages and facility use remains in high demand. TAX INCREMENT FINANCING FUNDS Considering all tax increment districts, as a whole cash on hand, projected increments and loan repayments are sufficient to cover TIF project expenditures. The state has provided municipalities with a pooling tool to accommodate short -teen deficiencies within the districts. The city will be allowed to pool the districts tax increment revenues to cover outstanding debt. Currently none of the city's districts are projected to have shortfalls. 26 Cash Flow Statements 27 -44ca City of Hopkins 28 Working Capital Beginning Year Revenues: Taxes (from matured Park Bonds) Interest Dedication fees Joint Rec refunds Franchise Fees (gas/elec) Hennepin County Grant Met Council - easememt/grant Grants - Private Foundations Donations - general Donations - benches Total Revenues Expenditures: C.I.P. Projects Cottageville Property Acquisition Skate Park commitment Total Expenditures Working Capital Year End PARK CAPITAL IMPROVEMENTS FUND (301) 07/26/2013 Actual Projected Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 112,195 82,902 188,179 105,361 (44,285) (96,314) (94,903) (133) 698 829 1,882 1,054 (1,329) (2,889) (2,847) 163,772 0 0 0 0 0 6,267 6,000 6,000 6,000 6,000 6,000 85,300 85,300 85,300 85,300 85,300 150,000 50,000 300,000 30,000 1,000 19,182 1,000 245,338 476,278 94,182 92,354 89,971 88,411 88,453 264,781 45,000 170,000 235,000 135,000 80,000 160,000 2,850 319,000 7,000 7,000 7,000 7,000 7,000 7,000 0 274,631 371,000 177,000 242,000 142,000 87,000 160,000 82,902 188,179 105,361 (44,285) (96,314) (94,903) (166,450) 29 Working Capital Beginning Year Revenues: Interest Transfers from General Fund Tax Levy Total Revenues Expenditures: C.I.P. Projects Transfer to General Fund Total Expenditures Working Capital Year End FACILITIES & BUILDINGS CAPITAL IMPROVEMENTS FUND (305) 0 7/2612 01 3 Actual Projected Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 272.471 135,687 160,865 220,369 342,871 460 (388,047) 916 678 804 1,102 1,714 2 (1,940) 123,397 125,000 125.000 150,000 150,000 150,000 150,000 124,313 125,678 125,804 151.102 151,714 150.002 148,060 261,098 100,500 66,300 28,600 494,125 538,510 52,000 261,098 100,500 66,300 28,600 494.125 538,510 52,000 135,687 160,865 220,369 342.871 460 (388,047) (291,987) 30 (3) Project Total Due Paid Balance State Aid Funds due City Total 07/26/2013 To Date Due 7/19/13 Excelsior Blvd MUNICIPAL STATE AID FUND (302) 3,243,792.74 3,243,792.74 - Actual Projected Projected Projected Projected Projected Projected 894,019.71 2012 2013 2014 2015 2016 2017 2018 Working Capital Beginning Bal 1,666,333 2,064,148 2,442,432 771,644 387,503 756,440 1,127,222 Revenues: State MSA Funds, projects 411,244 367,964 367,000 367,000 367,000 367,000 367,000 Hennepin County 25,770 Bond issue Total Revenues 425,038 404,055 379,212 370,858 368,938 370,782 372,636 Transfer Out for Projects CIP State Aid Projects 27,223 2,050,000 755,000 0 0 1,100,000 Shady Oak Land Accusition 25,770 Total Expenditures 27,223 25,770 2,050,000 755,000 0 0 1,100,000 Working Capital Ending Balance 2,064,148 2,442,432 771,644 387,503 756,440 1,127,222 399,858 includes cash, interest rcvbl, & A/P Cash Balance 12131120XX 2,062,940 Cash Balance 7/3/2013 2,405,279 ESTIMATED Cash Balance 12/31/20XX 734,491 350,349 719,287 1,090,069 362,705 (3) Project Total Due Paid Balance State Aid Funds due City Total From State To Date Due 7/19/13 Excelsior Blvd 5,408,756.28 3,243,792.74 3,243,792.74 - Minnetonka Blvd 1,231,889.51 950,955.56 10,475.54 940,480.02 5th Street South 1,165,881.73 894,019.71 - 894,019.71 Total 7,806,527.52 5,088,768.01 3,254,268.28 1,834,499.73 65.19% 41 Cash Flow Analysis P.I.R. FUND (501) 07126/2013 Actual Projected Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 Working Capital Beginning Year 563.533 2.389.701 480.535 287.916 234,887 152.216 47,064 Revenues: Special Assessment Revenues - from levy 735.405 170.172 29,570 24.215 0 0 0 Special Assessment Revenues - Prepaid 203.811 24.000 90,000 212,000 212,800 150,000 Interest 1,412 9,559 2.162 1,296 1,057 685 212 Bond Proceeds 3.297.573 1.906,296 2.300.000 1,885.000 2,388,000 2,392.200 2,450,000 Total Revenues 4,034,390 2.289.839 2,355.732 2.000.511 2.601.057 2,605.685 2,600,212 Expenditures: C.I.P. Projects 1,921,510 2,495,000 2.355,000 1.525,000 1,540,000 1,541,000 1,850,000 C.I.P. Projects - Special Assm 1,500,000 120,000 450,000 1,060,000 1,064,000 750,000 Transfers for SA Debt collected thru Assm Debt Service Transfers - 2007B 71,900 15,384 14.815 17.182 19.548 38,835 0 Debt Service Transfers - 2010A - Impry 156.592 62.203 58.536 61.358 64.180 67.002 69,824 Debt Service Transfers - 2010B - Rfdg 58.219 0 Debt Service Transfers 126,418 Total Expenditures 2.208.221 4.199.005 2.548.351 2.053.540 2,683.728 2,710,837 2.804,824 Working Capital Year End 2,389,701 480.535 287,916 234,887 152,216 47,064 (157,548) Total Projects Scheduled (CIP & SA) 1,921,510 3,995.000 2.475,000 1,975,000 2.600.000 2,605,000 2,600,000 32 Cash Flow Analysis Street Improvements - Franchise Fees (307) 07/26/2013 Working Capital Beginning Year Revenues: Franchise Fees Interest Total Revenues Expenditures: Transfer for Debt Service 2012B Bonds 2013A Bonds 2014 Bonds Total Expenditures Working Capital Year End Actual Projected Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 0 196,181 321,444 302,890 334,253 235,137 76,196 195,615 210,000 210,000 210,000 210,000 210,000 210,000 566 883 1,446 1,363 1,504 1,058 343 196,181 210,883 211,446 211,363 211,504 211,058 210,343 0 85,620 140,000 90,000 85,620 130,000 85,620 90,000 90,000 75,000 90,000 75,000 150,000 150,000 50,000 0 85,620 230,000 180,000 310,620 370,000 210,620 196,181 321,444 302,890 334,253 235,137 76,196 75,918 33 Working Capital Beginning Year Revenues: Operating Revenues Other Interest Bond Issuance Total Revenues Expenditures: Operation Expense Other Exp - bond issuance -fiscal fee Other Exp - int on current bonds Other Exp - int on refunded bonds Other Exp - int on 2009 bonds Other Exp - int on 2012 bonds Other Exp - int on 2013 bonds Equipment Replacement Items Capital Improvements Principal Bond payment Principal Bond payment - refunded Principal Bond pymnt - 2009 debt Principal Bond pymnt - 2012 debt Principal Bond pymnt - 2013 debt Capital Lease (PW Facility) (1) Total Expenditures Change in available funds Inventory change Bond Premium/Discount Exp Working Capital Ending Year (1) Capital Lease moved to Storm Sewer Rate History 1984 $0.85 1993 $1.05 1997 $1.10 2000 $1.20 2005 $1.40 Per Utility Master Plan (10/07) 2008 $1.65 2009 $1.86 2010 $1.90 2011 $1.94 - not increased, left at $1.90 2012 $1.96 2013 $2.02 2014 $2.08 ggest $2.18 +.10 2015 $2.14 2016 $2.20projected rate 2017 $2.27 increases WATER FUND - WORKING CAPITAL PROJECTION 07/26/2013 Actual Projected Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 (488.484) 76,872 (249,301) (103,657) (24,280) 244,951 475,211 1,403,420 1,300,600 1,364,980 1,377,850 1,416,550 1,461,500 1,506,450 134,451 140,280 152,149 158,533 165,235 172,272 179,661 (804) 0 0 0 0 0 0 760,000 868,955 350.000 200,000 430,000 200,000 600,000 2,297,067 2,309,835 1,867,129 1,736.383 2,011.785 1,833,772 2,286,111 1,080,074 1,002,998 1,037,781 1,073,846 1,111,244 1,150,027 1,190,249 21,327 39,470 0 0 0 11,475 7,587 2,700 25,350 24,225 22,850 21,350 19,725 17,887 13,185 14,179 13,379 12.529 11,629 10,729 22,713 17,431 16,431 15,431 14,381 75,000 0 6,800 0 61,700 388,050 1,248,000 350,000 200,000 436,000 200,000 600,000 210,000 170,000 175,000 180,000 50.000 50,000 50.000 50,000 50,000 55,000 40.000 40,000 40,000 45,000 45,000 45,000 50.000 50,000 50,000 55,000 0 0 0 0 0 0 0 1,738,921 2,636,008 1,721,485 1,657,006 1,742,554 1,603,512 1,988,246 558,146 (326,172) 145,644 79.377 269,231 230,260 297,865 (219) 7,428 76,872 (249,301) (103,657) (24,280) 244,951 475,211 773,076 2014 - 2018 financial data was taken from the Utility Master Plan done by City Engineer Notes - Income - 2008 and forward used utility master plan rates (fixture/no surcharge option) 34 Working Capital Beginning Year Revenues: Operating Revenues Other Interest Bond Issuance Total Revenues Expenditures: Operation Expense MWCC Charges (3% inflation) Other - Bond Issuance -fiscal fees Interest Expense Interest Expense - 2012 Debt Interest Expense - 2013 Debt Equipment Replacement Items Capital Improvements Principal Bond payment (2009) Principal Bond payment (2012) Principal Bond payment (2013) Capital Lease (PW Facility) (1) Total Expenditures Change in available funds Inventory change Bond Premium/Discount Exp Working Capital Ending Year (1) Capital Lease moved to Storm Sewer Rate History 1983 $1.50 1989 $1.75 1991 $2.00 1993 $2.50 1999 $2.25 Rate DECREASE 2006 $2.50 rate increase Per Utility Master Plan (10/07) 2008$2.70 2009$3.10 2010$3.40 2011 $3.70 - act 3.60 2012$3.75 2013$3.90 2014$4.05 2015$4.21 2016$4.38 projected rate 2017$4.55 increases SEWER FUND - WORKING CAPITAL PROJECTION 07/26/2013 Actual Projected Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 98,771 394,411 408,940 363,237 338,286 191,018 241,333 2,131,881 2,223,000 22,424 20,000 639 986 170,000 495,102 2,324,944 2,739,088 475,599 534,037 1,132,299 1,371,126 10,765 32,462 31,450 2,946 0 0 319,962 715,000 60,000 60,000 10,000 0 0 2,031,086 2,724,559 293,858 14,529 (167) 1,949 394,411 408,940 2,308,500 2,399,700 20,000 20,000 1,022 908 2,329,522 2,420,608 551,833 570,253 1,436,144 1,504,307 30,100 28,450 3,149 2,949 21,000 19,800 33,600 36,800 225,000 175,000 60,000 60,000 10,000 10,000 38,000 38,000 0 0 2,375,226 2,445,559 (45,703) (24,951) 2,496,600 2,593,500 20,000 20,000 846 478 2,517,446 2,613,978 589,319 609,053 1,575,771 1,650,698 26,575 24,463 2,749 2,549 18,700 17,500 33,600 26,400 305,000 120,000 65,000 65,000 10,000 10,000 38,000 38,000 0 0 2,664,714 2,563,663 (147,268) 50,315 2,696,100 20,000 603 2,716,703 629,484 1,729,256 22,187 2,349 59,700 325,000 65,000 10,000 38,000 2,880,976 (164,272) 363,237 338,286 191,018 241,333 77,060 2014 - 2018 rinancial data was taken from the Utility Master Plan done by City Engineer Notes - Income - 2008 and forward used utility master plan rates (no fixture option) 35 STORM SEWER FUND - WORKING CAPITAL PROJECTION 07/26/2013 36 Actual Projected Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 Working Capital Beginning Year 402.095 717.491 582,953 (77,988) (187,743) (9,243) 187.499 Revenues: Operating Revenues 795,755 795,755 795.755 795.755 795,755 795,755 795,755 Other 5,590 5,000 5.000 5,000 5,000 5,000 5,000 Interest 4.184 1.794 1,457 (195) (469) (23) 469 Bond Issuance 320,000 383,957 Total Revenues 1,125,529 1,186,506 802,212 800,560 800,286 800,732 801,224 Expenditures: Operation Expense 193,587 197.459 201,408 205,436 209,545 213,736 218,010 Other - Bond Issuance -fiscal fees 17.176 Bond Interest - existing 25,280 Bond Interest - 2009 refunded bonds 10.475 8,075 5,312 1,875 Bond Interest - 2010 bonds 16,348 15,935 15,348 14,585 13,623 12,485 11,173 Bond Interest - 2012 bonds 5,575 6,031 5,681 5,281 4,881 4,481 Bond Interest - 2013 bonds 10,054 7,738 7,338 6,888 6,388 Capital Outlay (per ERP) 0 0 0 0 0 0 0 Capital Improvements 249,504 769,000 900,000 320,000 156,000 131,000 321,000 2009 Principal Bond payment 120,000 120,000 125,000 125,000 2010 Principal Bond payment 60,000 70,000 65,000 70,000 70,000 70,000 70,000 2012 Principal Bond payment 15.000 15,000 20.000 20,000 20,000 20,000 2013 Principal Bond payment 20.000 20,000 25,000 25,000 Capital Lease - PW Facility (1) 120,000 120,000 120,000 120,000 120,000 120,000 120,000 Total Expenditures 812,369 1,321,044 1,463,153 910,315 621,787 603,989 796,052 Change in available funds 313.160 (134,538) (660,941) (109,755) 178,499 196,742 5,172 Inventory change (248) Bond Premium/Discount Exp (net) 2,485 Working Capital Ending Year 717,491 582,953 (77,988) (187,743) (9,243) 187,499 192,671 (1) In 2011 this includes Water, Sewer & Storm Sewer transfers Rate History (per month) 1989 $4.75 per quarter 1991 $6.00 per quarter 1992 $2.50 1993 $3.00 1998 $3.20 1999 $4.00 2006 $4.50 2009 $5.00 36 Working Capital Beginning Year Revenues: Operating Revenues Leases current lease expires in 2013 Other Donations (bleacher heating) Equipment Certificates Interest Total Revenues Expenditures: Operation Expense Capital Outlay Capital Improvements Payment on Equip Certific Interest Expense Payment on Interfund Loan Total Expenditures Change in available funds Bond Premium/Discount Exp (net) Working Capital Ending Year PAVILION - ICE ARENA - WORKING CAPITAL PROJECTIONS 07/26/2013 Actual Projected Projected Projected Projected Projected Projected 2012 2013 2014 2015 2016 2017 2018 (39,521) 117,122 (28,007) (118,891) (173,916) (285,380) (302,588) 360,774 378,813 397,753 417,641 438,523 460,449 483,472 38,000 38,000 19,000 7,993 10,000 10,000 10,000 10,000 10,000 10,000 172,852 1,033 580,652 426,813 426,753 427,641 448,523 470,449 493,472 357,515 368,240 379,288 390,666 402,386 414,458 426,892 - 185,000 - - - - - 45,053 - 120,000 69,000 135,000 51,000 73,500 - 3,092 18,350 23,000 22,600 22,200 21,800 1,028 23,143 15,609 - - 426,739 571,941 517,638 482,666 559,986 487,658 522,192 153,913 (145,128) (90,884) (55,025) (111,463) (17,209) (28,720) 2,730 117,122 (28,007) (118,891) (173,916) (285,380) (302,588) (331,308) 37 1320 - City of Hopkins 38 Five Year Project Summaries 39 -44ca City of Hopkins 40 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 2014 thru 2018 PROJECTS BY YEAR Project Name Department Project # Priority Project Cost 2 Replace Carpet - Activity Center Rooms Activity Center 08-C/P-AC015 n/a 36,000 Arts Center - Restroom Improvement Arts Center 13-CIP-AR002 1 9,000 Arts Center - Chairs and Tables Arts Center 13-C/P-AR003 1 14,800 Arts Center - Storage & Hanging, Display Systems Arts Center 13-C/P-AR004 1 6,500 Technology Improvement - Council Chambers & Studio Communications 13 C/P-CM001 n/a 9,500 Block 64 Redevelopment Project Development 06-C/P-D404 n/a 4,500,000 Pavilion Roof Replacement Pavilion 09-C/P-PO26 1 120,000 Valley Park - Outdoor Lighting Public Works: Parks 08-C/P-P001 n/a 40,000 Skate Park Public Works: Parks 08-C/P-P003 n/a 7,000 Oakes Park - Play Equipment Public Works: Parks 08-C/P-P016 n/a 100,000 Oakes Park -Drinking Fountain Public Works: Parks 13-C/P-PO38 n/a 10,000 Oakes Park - Lighting Public Works: Parks 13-C/P-PO72 n/a 40,000 Residential Street Improvements Public Works: Streets/Traffic 01-C/P-5101 n/a 400,000 Residential Street Improvements --Utilities Public Works: Streets/Traffic 01-C/P-5102 n/a 575,000 County Road 61 (Shady Oak Road) Public Works: Streets/Traffic 01-C/P-5106 n/a 8,200,000 Mainstreet Rehabilitation Public Works: Streets/Traffic 11-C/P-S121 3 2,000,000 2014 Street Overlay Project Public Works: Streets/Traffic 12-C/P-SO39 n/a 550,000 Pedestrian & Bicycle Access Improvements Public Works: Streets/Traffic 13-C/P-SO40 n/a 25,000 Storm Drainage System Maintenance - Alley Repairs Public Works: Utilities 01-C/P-0002 n/a 20,000 Storm Water Management Projects Public Works: Utilities 01-C/P-0003 n/a 880,000 Total for 2014 17,542,800 2015 Arts Center - Replace Information Desk and Kiosk Arts Center 12-CIPAR005 1 5,000 Arts Center - Re -landscape E & W faces of building Arts Center 13-C/P-AR001 2 3,600 Technology Improvement - Council Chambers & Studio Communications 13 C/P-CM001 n/a 35,000 Redevelopment, East Excelsior Boulevard Development 01-C/P-D4010 n/a 2,000,000 Blake Corridor Redevelopment Development 09-C/P-D406 n/a 5,000,000 8th Ave Streetscape and parking facility Development 12-C/P-D408 n/a 5,000,000 Pavilion Gas Fired Rooftop Furnace Pavilion 09-C/P-PO25 n/a 9,000 Pavilion Evaporator Condenser Replacement Pavilion 09-C/P-PO36 n/a 60,000 Public Works Garage Upgrade Public Works: Bldg/Equip Sery 13-C/P-BO 11 1 20,000 Skate Park Public Works: Parks 08-C/P-P003 n/a 7,000 Cottageville Park - Play Equipment Public Works: Parks 11-C/P-PO 19 n/a 120,000 Burnes Park - Warming House Public Works: Parks 13-C/P-PO40 n/a 60,000 Oakes Park - Replace Picnic Shelter Public Works: Parks 13-C/P-PO41 n/a 30,000 Valley Park - Construct Storage Building Public Works: Parks 13-C/P-PO42 n/a 25,000 Residential Street Improvements Public Works: Streets/Traffic 01-C/P-S101 n/a 1,500,000 Residential Street Improvements --Utilities Public Works: Streets/Traffic 01-C/P-S102 n/a 475,000 County Road 61 (Shady Oak Road) Public Works: Streets/Traffic 01-C/P-S106 n/a 12,250,000 Parking Lots Public Works: Streets/Traffic 06-C/P-S118 n/a 1,000,000 Pedestrian & Bicycle Access Improvements Public Works: Streets/Traffic 13-C/P-SO40 n/a 25,000 Light Rail Transit Stations (2) Public Works: Transportation 01-C/P-S502 n/a 150,000 Storm Drainage System Maintenance - Alley Repairs Public Works: Utilities 01-C/P-0002 n/a 20,000 Moudai, Juh 29. 2013 41 Project Name Mpartnlcnt Project # Priorit,N Project Cost Depot Recreation Area Recreation 10-CIP-RO02 2 500,000 1 otal for 2015 28,294,600 2 Replace Gynmasium Roof - Activity Center Activity Center 08-CIP-ACO 18 n/a 105,000 Activity Center - Raspberry Room Roof Replacement Activity Center 08-C/P-ACO24 n/a 80,000 Arts Center - Storage & Hanging, Display Systems Arts Center 13-CIP-AR004 1 3,125 City Hall Lobby Upgrade City Hall Administration 09-CIP-CH030 n/a 110,000 Technology Improvement - Council Chambers & Studio Communications 13 CIP-CM001 n/a 12,500 Replace Carpet and Apparatus Floor Finish - FD Fire 08-C/P-FDO19 n/a 56,000 Pavilion Overhead Door Improvement Pavilion 07-CIP-P314 n/a 40,000 Pavilion Indoor Turf Replacement Pavilion 10-CIP-P319 n/a 95,000 Replace Carpet - Police Station Police 08-CIP-PDO16 n/a 40,000 Public Works Garage Upgrade Public Works. Bldg/Equip Sery 13-CIP-BO 11 1 200,000 Skate Park Public Works: Parks 08-CIP-P003 n/a 7,000 Hilltop Park - Play Equipment Public Works: Parks 08-CIP-PO14 n/a 100,000 Burnes Park - Play Equipment Public Works: Parks 13-CIP-PO43 n/a 35,000 Residential Street Improvements Public Works Streets/Traffic 01-CIP-S101 n/a 2,500,000 Residential Street Improvements --Utilities Public Works, Streets/Traffic 01-CIP-S102 n/a 430,000 Citywide Concrete Alleys Public Works: Streets/Traffic 01-CIP-5103 n/a 75,000 Pedestrian & Bicycle Access Improvements Public Works: StreetslTraffic 13-CIP-SO40 n/a 25,000 Storm Drainage System Maintenance - Alley Repairs Public Works: Utilities 01-CIP-0001 n/a 21,000 Lift Station # 4 Public Works: Utilities 08-CIP-0001 n/a 160,000 St. Louis Park Emergency Connection Public Works: Utilities 08-CIP-0010 n/a 211,000 Total for 2016 4,305,625 2017 Activity Center - Lower Roof Replacement Activity Center 09-CIP-AC031 n/a 80,000 Arts Center - Replace 25 Ton Rooftop HVAC Unit Arts Center 08-CIP-AR013 n/a 100,000 Arts Center - Replace theatre seats and backs Arts Center 12-CIP-AR002 1 138,510 Arts Center - Replace 15 Rooftop HVAC units Arts Center 12-CIP-AR036 n/a 220,000 Technology Improvement - Council Chambers & Studio Communications 13 CIP-CM001 n/a 23,000 Pavilion skate Tile Replacement/Lobby Improvement Pavilion 07-CIP-P313 n/a 45,000 Pavilion - Desiccant Repl of Dehumidification Syst Pavilion 10-CIP-P320 n/a 6,000 Skate Park Public Works: Parks 08-CIP-P003 n/a 7,000 Valley Park - Play Equipment Public Works: Parks 08-CIP-P015 n/a 80,000 Residential Street Improvements Public Works: Streets/Traffic 01-C/P-S101 n/a 2,500,000 Residential Street Improvements --Utilities Public Works: Streets/Traffic 01-CIP-S102 n/a 430,000 Citywide Concrete Alleys Public Works: Streets/Traffic 01-CIP-S103 n/a 80,000 Pedestrian & Bicycle Access Improvements Public Works: Streets/Traffic 13-CIP-SO40 n/a 25,000 Eighth Avenue LRT Corridor Public Works: Transportation 01-CIP-5503 n/a 200,000 Storm Drainage System Maintenance - Alley Repairs Public Works: Utilities 01-CIP-0001 n/a 21,000 Total for 2017 3,955,510 2018 Art Center - Replace Lobby Carpet Arts Center 09-CIP-AR027 n/a 52,000 Technology Improvement - Council Chambers & Studio Communications 13 CIP-CM001 n/a 15,000 Mezzanine Rooftop Unit Replacement Pavilion 13-CIP-P321 1 24,500 Pavilion Entry and Lobby Door Replacement Pavilion 13-CIP-P324 3 7,000 Paint Pavilion Exterior Pavilion 13-CIP-P325 1 22,000 Pavilion -Painting the Arena Ceiling and Bar Joist Pavilion 13-CIP-P326 1 20,000 Park Valley - Play Equipment Public Works: Parks 08-CIP-P010 n/a 60,000 Burnes Park - Resurface Tennis Courts Public Works: Parks 08-CIP-PO 11 n/a 20,000 Oakes Park - Tennis Courts Public Works: Parks 13-CIP-PO44 n/a 20,000 t1mnu1ur. Jnli '9, 2013 42 Project Name Department Project # Priority Project Cost Valley Park - Warming House Public Works: Parks 13-C/P-PO45 n/a 60,000 Residential Street Improvements Public Works: Streets/Traffic 01-C/P--S101 n/a 2,250,000 Residential Street Improvements --Utilities Public Works: Streets/Traffic 01-C/P-S102 n/a 1,225,000 County Road 3 Public Works: Streets/Traffic 01-C/P-S104 n/a 2,300,000 Sixth Street South (11th to 12th Avenue South) Public Works: Streets/Traffic 01-C/P-S504 n/a 500,000 Plan, Design and Implement Railroad Quiet Zone Public Works: Streets/Traffic 11-C/P-S120 n/a 225,000 Pedestrian 8 Bicycle Access Improvements Public Works: Streets/Traffic 13-C/P-SO40 n/a 25,000 Storm Drainage System Maintenance - Alley Repairs Public Works: Utilities 01-C/P-0002 n/a 21,000 Total for 2018 6,846,500 GRAND TOTAL 60,945,035 Monday. July 29, 2013 43 City of Hopkins, MN CAPITAL IMPROI TAIENT PLAN 2014 ti,ru 2018 DEPARTMENT SUMMARY Department 2014 2015 2016 2017 2018 Total Activity Center 36,000 185.000 80,000 301,000 Arts Center 30,300 8,600 3,125 458,510 52,000 552,535 City Hall Administration 110,000 110,000 Communications 9,500 35,000 12,500 23,000 15,000 95,000 Development 4,500,000 12,000, 000 16, 500, 000 Fire 56,000 56,000 Pavilion 120,000 69,000 135,000 51.000 73,500 448,500 Police 40.000 40,000 Public Works: Bldg/Equip Sery 20,000 200,000 220,000 Public Works: Parks 197,000 242,000 142,000 87,000 160,000 828,000 Public Works:Streets/Traffic 11,750,000 15,250,000 3,030,000 3,035,000 6,525,000 39,590,000 Public Works: Transportation 150,000 200,000 350,000 Public Works: Utilities 900.000 20,000 392,000 21,000 21,000 1,354,000 Recreation 500,000 500,000 TOTAL 17,542,800 28,294,600 4,305,625 3,955,510 6,846,500 60,945,035 44 1Lwdu1. hili 'v_ _'N1; City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 2014 thru 2018 PROJECTS BY DEPARTMENT Department Project# Priority 2014 2015 2016 2017 2018 Total Activity Center I Replace Carpet - Activity Center Rooms 08-C/P-ACO 15 n/a 36,000 36,000 Replace Gynmasium Roof - Activity Center 08-C/P-ACO 18 n/a 105,000 105,000 Activity Center - Raspberry Room Roof Replacement 08-C/P-ACO24 n/a 80,000 80,000 Activity Center - Lower Roof Replacement 09-CIPAC031 n/a 80,000 80,000 Activity Center Total 36,000 185,000 80,000 301,000 Arts Center Arts Center- Replace 25 Ton Rooftop HVAC Unit 08-C/P-AR013 n/a 100,000 100,000 Art Center - Replace Lobby Carpet 09-C/P-AR027 n/a 52,000 52,000 Arts Center - Replace theatre seats and backs 12-C/P-AR002 1 138,510 138,510 Arts Center - Replace Information Desk and Kiosk 12-C/P-AR005 1 5,000 5,000 Arts Center - Replace 15 Rooftop HVAC units 12-C/P-AR036 n/a 220,000 220,000 Arts Center - Re -landscape E & W faces of building 13-C/P-AR001 2 3,600 3,600 Arts Center - Restroom Improvement 13-CIP-AR002 1 9,000 9,000 Arts Center - Chairs and Tables 13-CIPAR003 1 14,800 14,800 Arts Center - Storage & Hanging, Display Systems 13-C/P-AR004 1 6,500 3,125 9,625 Arts Center Total 30,300 8,600 3,125 458,510 52,000 552,535 City Hall Administration City Hall Lobby Upgrade 09-C/P-CH030 n/a 110,000 110,000 City Hall Administration Total 110,000 110,000 (Communications Technology Improvement - Council Chambers & Studio 13 C/P-CM001 n/a 9,500 35,000 12,500 23,000 15,000 95,000 Communications Total 9,500 35,000 12,500 23,000 15,000 95,000 (Development Redevelopment, East Excelsior Boulevard 01-CIP-D4010 n/a 2,000,000 2,000,000 Block 64 Redevelopment Project 06-CIP-D404 n/a 4,500,000 4,500,000 Blake Corridor Redevelopment 09-CIP-D406 n/a 5,000,000 5,000,000 8th Ave Streetscape and parking facility 12-CIP-D408 n/a 5,000,000 5,000,000 Development Total 4,500,000 12,000,000 16,500,000 Fire Replace Carpet and Apparatus Floor Finish - FD 08-CIP-FDO19 n/a 56,000 56,000 Fire Total 56,000 56,000 [Pavilion Pavilion skate Tile Replacement/Lobby Improvement 07-CIP-P313 n/a 45,000 45,000 Pavilion Overhead Door Improvement 07-CIP-P314 n/a 40,000 40,000 45 'Ill ; Department Project# Priority 2014 2015 2016 2017 2018 Total Pavilion Gas Fired Rooftop Furnace 09-C/P-PO25 n/a 9,000 9,000 Pavilion Roof Replacement 09-C/P-PO26 1 120,000 120,000 Pavilion Evaporator Condenser Replacement 09-C/P-PO36 n/a 60.000 60,000 Pavilion Indoor Turf Replacement 10-C1P-P319 n/a 95,000 95,000 Pavilion - Desiccant Repl of Dehumidification Syst 10-C/P-P320 n/a 6,000 6,000 Mezzanine Rooftop Unit Replacement 13-C/P-P321 1 24,500 24,500 Pavilion Entry and Lobby Door Replacement 13-C/P-P324 3 7,000 7,000 Paint Pavilion Exterior 13-C/P-P325 1 22,000 22,000 Pavilion -Painting the Arena Ceiling and Bar Joist 13-C/P-P326 1 20,000 20,000 Pavilion Total 120,000 69,000 135,000 51,000 73,500 448,500 Police Replace Carpet - Police Station 08-C/P-PDO16 n/a 40.000 40,000 Police Total 40,000 40,0010 Public Works: Bldg/Equip SerN, Public Works Garage Upgrade 13-C/P-B011 1 20,000 200 000 220,000 Public Works: Bldg/Equip Sery Total 20,000 200,000 220,000 Public Works: Parks Valley Park - Outdoor Lighting 08-CIP-POOI n/a 40,000 40,000 Skate Park 08-C1P-P003 n/a 7,000 7,000 7,000 7,000 28,000 Park Valley - Play Equipment 08-C/P-POIO n/a 60,000 60,000 Burnes Park - Resurface Tennis Courts 08-CIP-PO11 n/a 20,000 20,000 Hilltop Park - Play Equipment 08-C/P-P014 n/a 100,000 100,000 Valley Park - Play Equipment 08-C/P-P015 n/a 80,000 80,000 Oakes Park - Play Equipment 08-C/P-P016 n/a 100,000 100,000 Cottageville Park - Play Equipment 11-C/P-P019 n/a 120,000 120,000 Oakes Park -Drinking Fountain 13-CIP-PO38 n/a 10,000 10,000 Burnes Park - Waring House 13-CIP--PO40 n/a 60,000 60,000 Oakes Park - Replace Picnic Shelter 13-C/P-PO41 n/a 30,000 30,000 Valley Park - Construct Storage Building 13-C/P-PO42 n/a 25,000 25,000 Burnes Park - Play Equipment 13-C/P-PO43 n/a 35,000 35,000 Oakes Park - Tennis Courts 13-CIP-PO44 n/a 20,000 20,000 Valley Park- Warming House 13-C/P-PO45 n/a 60,000 60,000 Oakes Park - Lighting 13-CIP-PO72 n/a 40.000 40,000 Public Works: Parks Total 197,000 242,000 142,000 87,000 160,000 828,000 Public Works: Streets/Traffic Residential Street Improvements 01-C/P-5101 n/a 400,000 1,500,000 2,500,000 2,500,000 2,250,000 9,150,000 Residential Street Improvements -Utilities 01-C/P-S102 n/a 575,000 475,000 430,000 430,000 1,225,000 3,135,000 Citywide Concrete Alleys 01-C/P-5103 n/a 75,000 80,000 155,000 County Road 3 01-C1P-5104 n/a 2,300,000 2,300,000 County Road 61 (Shady Oak Road) 01-CIP-S106 n/a 8,200,000 12,250,000 20,450,000 Sixth Street South (11th to 12th Avenue South) 01-ClP-S504 n/a 500,000 500,000 Parking Lots 06-CIP-5118 n/a 1,000,000 1,000,000 Plan, Design and Implement Railroad Quiet Zone 11-C/P-S120 n/a 225,000 225,000 Mainstreet Rehabilitation 11-C1P-S 121 3 2,000,000 2,000,000 2014 Street Overlay Project 12-C/P-5039 n/a 550,000 550,000 Pedestrian & Bicycle Access Improvements 13-C/P-SO40 n/a 25,000 25,000 25,000 25,000 25,000 125,000 Public Works: Streets/Traffic Total 11,750,000 15,250,000 3,030,000 3,035,000 6,525,000 39,590,000 46 Mondur..11111 _9' 2013 Department Project# Priority 2014 2015 2016 2017 2018 Total iPublic Works: Transportation Light Rail Transit Stations (2) 01-C/P-S502 n/a 150,000 150,000 Eighth Avenue LRT Corridor 01-ClP-S503 n/a 200,000 200,000 Public Works: Transportation Total 150,000 200,000 350,000 Public Works: Utilities Storm Drainage System Maintenance - Alley Repairs 01-C/P-0002 n/a 20,000 20,000 21,000 21,000 21,000 103,000 Storm Water Management Projects 01-CIP-0003 n/a 880,000 880,000 Lift Station # 4 08-C/P-0001 n/a 160,000 160,000 St. Louis Park Emergency Connection 08-CIP-U0f0 n/a 211,000 211,000 Public Works: Utilities Total 900,000 20,000 392,000 21,000 21,000 1,354,000 Recreation i Depot Recreation Area 10-CIP-RO02 2 500,000 500,000 Recreation Total 500.000 500,000 GRAND TOTAL 17,542,800 28,294,600 4,305,625 3,955,510 6,846,500 60,945,035 47 Mondor. Judi 29. 2013 City of Hopkins, MN C.-1PITa41. 1.t11'ROI F.11 V"T PLAN 2014 th 2018 1'L;NUING SOURCE SUMMARY Source 2014 2015 2016 2017 2018 Total Cl - Capital Improvement Fund 66.300 28,600 494,125 538,510 52,000 1,179,535 CT- Cable Franchise Fees 9,500 35,000 12,500 23,000 15,000 95,000 ED - Economic Development Fund 1,000,000 5,000,000 6,000,000 GU - Other Governmental Units 6,670,000 12,345.000 100,000 1,600,000 20,715,000 MS - Municipal State Aid Streets 2,050,000 755.000 1,100,000 3,905,000 PA - Pavilion Fund 120,000 69,000 135,000 51,000 73,500 448,500 PDF- Park Dedication Fund 177,000 242,000 222,000 7,000 160,000 808,000 PI - PIR/General Obligation Bonds 2,355,000 1,525,000 1,540,000 1,541,000 1,850,000 8,811,000 RF - Refuse Fund 25,000 25,000 SA - Special Assessment 120.000 450.000 1.060,000 1.064,000 750,000 3,444,000 SF - Sanitary Sewer Fund 225,000 175,000 305.000 120,000 325,000 1,150,000 SU- Storm Sewer Fund 900,000 320,000 156,000 131,000 321,000 1,828,000 TF -Tax Increment Financing 3,500.000 7,150,000 100,000 10,750,000 WF - Water Fund 350,000 200.000 436.000 200,000 600,000 1,786,000 GR:XN1)'IU'I'A1, 17,542,800 28,294,600 4,385,625 3,875,510 6,846,500 60,945,035 Alnndur..hi11 29 _'0l3 48 City of Hopkins, MN CAPITAL IMPROVEMENT PLAN 2014 thru 2018 PROJECTS BY FUNDING SOURCE Source Project# Priority 2014 2015 2016 2017 2018 Total C1 - Capital Improvement Fund 01-CIP-S106 Eighth Avenue LRT Corridor 01-CIP-S503 Depot Recreation Area 10-CIP-RO02 Mainstreet Rehabilitation Replace Carpet - Activity Center Rooms 08-C/P-AC015 n/a 36,000 500,000 n/a 20,000 36,000 Replace Gynmasium Roof - Activity Center 08-C/P-AC018 n/a 100,000 1,600,000 20,715,000 105,000 105,000 Activity Center - Raspberry Room Roof Replacement 08-C/P-ACO24 n/a 80,000 80,000 Arts Center - Replace 25 Ton Rooftop HVAC Unit 08-C/P-AR013 n/a 100,000 100,000 Replace Carpet and Apparatus Floor Finish - FD 08-C/P-FDO19 n/a 56,000 56,000 Replace Carpet - Police Station 08-C/P-PDO16 n/a 40,000 40,000 Activity Center - Lower Roof Replacement 09-C/P-AC031 n/a 80,000 80,000 Art Center - Replace Lobby Carpet 09-C/P-AR027 n/a 52,000 52,000 City Hall Lobby Upgrade 09-C/P-CH030 n/a 110,000 110,000 Arts Center - Replace theatre seats and backs 12-C/P-AR002 1 138,510 138,510 Arts Center - Replace Information Desk and Kiosk 12-C/P-AR005 1 5,000 5,000 Arts Center - Replace 15 Rooftop HVAC units 12-CIPAR036 n/a 220,000 220,000 Arts Center - Re -landscape E & W faces of building 13-C/P-AROOI 2 3,600 3,600 Arts Center - Restroom Improvement 13-CIP-AR002 1 9,000 9,000 Arts Center - Chairs and Tables 13-CIPAR003 1 14,800 14,800 Arts Center - Storage & Hanging, Display Systems 13-CIPAR004 1 6,500 3,125 9,625 Public Works Garage Upgrade 13-C/P-BO 11 1 20,000 100,000 120,000 CI - Capital Improvement Fund Total CI' - Cable Franchise Fees Technology Improvement - Council Chambers & Studio 13 C/P-CM001 n/a CT - Cable Franchise Fees Total IED - Economic Development Fund Block 64 Redevelopment Project 06-C/P-D404 8th Ave Streetscape and parking facility 12-C/P-D408 ED - Economic Development Fund Total GU - Other Governmental Units 28,600 494,125 538,510 Residential Street Improvements 01-C/P-5101 County Road 3 01-CIP--S104 County Road 61 (Shady Oak Road) 01-CIP-S106 Eighth Avenue LRT Corridor 01-CIP-S503 Depot Recreation Area 10-CIP-RO02 Mainstreet Rehabilitation 11-C/P-S121 Oakes Park - Lighting 13-CIP-PO72 GU - Other Governmental Units Total n/a n/a 66,300 28,600 494,125 538,510 52,000 1,179,535 9,500 35,000 12,500 23,000 15,000 95,000 9,500 35,000 12,500 23,000 15,000 95,000 1,000,000 5,000,000 1,000,000 5,000,000 1,000,000 5,000,000 6,000,000 n/a 800,000 800,000 n/a 1,600,000 1,600,000 n/a 6,150,000 11,045,000 17,195,000 n/a 100,000 100,000 2 500,000 500,000 3 500,000 500,000 n/a 20,000 20,000 6,670,000 12,345,000 100,000 1,600,000 20,715,000 49 A9untim. Juh 29. 2013 Source Project# Prioril) 2014 2015 2016 2017 2018 Total MS - Municinal State Aid Streets 1 County Road 3 01-CIP-S104 n/a 700,000 700,000 County Road 61 (Shady Oak Road) 01-CIP-S106 n/a 2,050,000 755,000 2,805,000 Sixth Street South (11th to 12th Avenue South) 01-CIP-S504 n/a 400,000 400,000 MS - Municipal State Aid Streets Total 2,050,000 755,000 1,100,000 3,905,000 [PPA - Pavilion Fund Pavilion skate Tile Replacement/Lobby Improvement 07-CIP-P313 n/a 45,000 45,000 Pavilion Overhead Door Improvement 07-CIP-P314 n/a 40,000 40,000 Pavilion Gas Fired Rooftop Furnace 09-CIP-PO25 n/a 9,000 9,000 Pavilion Roof Replacement 09-CIP-PO26 1 120.000 110,000 Pavilion Evaporator Condenser Replacement 09-CIP-PO36 n/a 60,000 60,000 Pavilion Indoor Turf Replacement 10-CIP-P319 n/a 95,000 95,000 Pavilion - Desiccant Rept of Dehumidification Syst 10-CIP-P320 n/a 6,000 6,000 Mezzanine Rooftop Unit Replacement 13-CIP-P321 1 24,500 24,500 Pavilion Entry and Lobby Door Replacement 13-CIP-P324 3 7,000 7,000 Paint Pavilion Exterior 13-CIP-P325 1 22,000 22,000 Pavilion -Painting the Arena Ceiling and Bar Joist 13-CIP-P326 1 20,000 20,000 PA - Pavilion Fund Total 120,000 69,000 135,000 51,000 73,500 448,500 PDF- Park Dedication Fund Valley Park - Outdoor Lighting 08-C/P-POOL n/a 40,000 40,000 Skate Park 08-CIP-P003 n/a 7.000 7,000 7.000 7,000 18,000 Park Valley - Play Equipment 08-CIP-POIO n/a 60,000 60,000 Burnes Park - Resurface Tennis Courts 08-CIP-PO 11 n/a 20,000 20,000 Hilltop Park - Play Equipment 08-CIP-PO14 n/a 100,000 100,000 Valley Park - Play Equipment 08-C/P-P015 n/a 80,000 80,000 Oakes Park - Play Equipment 08 -0/P -P016 n/a 100,000 100,000 Cottageville Park - Play Equipment 11-C/P-P019 n/a 120,000 120,000 Oakes Park -Drinking Fountain 13-CIP-PO38 n/a 10,000 10,000 Burnes Park - Warming House 13-CIP-PO40 n/a 60,000 60,000 Oakes Park - Replace Picnic Shelter 13-C/P-PO41 n/a 30,000 30,000 Valley Park - Construct Storage Building 13-C/P-PO42 n/a 25.000 25,000 Burnes Park - Play Equipment 13-C/P-PO43 n/a 35,000 35,000 Oakes Park - Tennis Courts 13-CIP-PO44 n/a 20,000 20,000 Valley Park - Warming House 13-CIP-PO45 n/a 60,000 60,000 Oakes Park - Lighting 13-CIP-PO72 n/a 20,000 20,000 PDF- Park Dedication Fund Total 177,000 242,000 222,000 7,000 160,000 808,000 PI - PIR/General Obligation Bonds Residential Street Improvements 01-C/P-5101 n/a 280,000 500,000 1,500,000 1,500,000 1,500,000 5,280,000 Citywide Concrete Alleys 01-CIP-S 103 n/a 15,000 16,000 31,000 County Road 61 (Shady Oak Road) 01-CIP-S106 n/a 200,000 200,000 Sixth Street South (11th to 12th Avenue South) 01-CIP-S504 n/a 100,000 100,000 Parking Lots 06-CIP-S118 n/a 800,000 800,000 Plan, Design and Implement Railroad Quiet Zone 11-C/P-S120 n/a 225,000 225,000 Mainstreet Rehabilitation 11-C/P-S121 3 1,500,000 1,500,000 2014 Street Overlay Project 12-C/P-SO39 n/a 550,000 550,000 Pedestrian & Bicycle Access Improvements 13-CIP-SO40 n/a 25,000 25,000 25,000 25,000 25,000 115,000 tiunrlur..luh' _'�/. _'lllj 50 Source Project# PrioritN, 2014 2015 2016 2017 2018 Total PI - PIR/General Obligation Bonds Total 2,355,000 1,525,000 1,540,000 1,541,000 1,850,000 8,811,000 RF - Refuse Fund Public Works Garage Upgrade 13-C/P-8011 1 25,000 25,000 RF - Refuse Fund Total 25,000 25,000 ISA - Special Assessment Residential Street Improvements 01 -OP -S101 n/a 120,000 200,000 1,000,000 1,000,000 750,000 3,070,000 Citywide Concrete Alleys 01-C/P-S103 n/a 60,000 64,000 124,000 County Road 61 (Shady Oak Road) 01-CIP-S106 n/a 250,000 250,000 SA - Special Assessment Total 120,000 450,000 1,060,000 1,064,000 750,000 3,444,000 SF - Sanitary Sewer Fund � Residential Street Improvements --Utilities 01-C/P-S102 n/a 225,000 175,000 120,000 120,000 325,000 965,000 Lift Station # 4 08-CIP-0001 n/a 160,000 160,000 Public Works Garage Upgrade 13-C/P-B011 1 25,000 25,000 SF - Sanitary Sewer Fund Total 225,000 175,000 305,000 120,000 325,000 1,150,000 �SU - Storm Sewer Fund Residential Street Improvements --Utilities 01-C/P-S102 n/a 0 100,000 110,000 110,000 300,000 620,000 Storm Drainage System Maintenance - Alley Repairs 01-C/P-0002 n/a 20,000 20,000 21,000 21,000 21,000 103,000 Storm Water Management Projects 01-CIP-0003 n/a 880,000 880,000 Parking Lots 06-CIP-S 118 n/a 200,000 200,000 Public Works Garage Upgrade 13-C/P-B011 1 25,000 25,000 SU - Storm Sewer Fund Total 900,000 320,000 156,000 131,000 321,000 1,828,000 TF - Tax Increment Financing Redevelopment, East Excelsior Boulevard 01-C/P-04010 n/a 2,000,000 2,000,000 Light Rail Transit Stations (2) 01-C/P-S502 n/a 150,000 150,000 Eighth Avenue LRT Corridor 01-CIP-S503 n/a 100,000 100,000 Block 64 Redevelopment Project 06-C/P-D404 n/a 3,500,000 3,500,000 Blake Corridor Redevelopment 09-C/P-D406 n/a 5,000,000 5,000,000 TF - Tax Increment Financing Total 3,500,000 7,150,000 100,000 10,750,000 JVVF - Water Fund Residential Street Improvements --Utilities 01-CIP-S102 n/a 350,000 200,000 200,000 200,000 600,000 1,550,000 St. Louis Park Emergency Connection 08-CIP-UOIO n/a 211,000 211,000 Public Works Garage Upgrade 13-CIP-BO 11 1 25,000 25,000 WF - Water Fund Total 350,000 200,000 436,000 200,000 600,000 1,786,000 GRAND TOTAL 17,542,800 28,294,600 4,385,625 3,875,510 6,846,500 60,945,035 A1onclnr. Juh 29. 3013 51 -.4ca City of Hopkins 52 Project Descriptions And Narratives 53 -.4ca City of Hopkins 54 Economic Development 55 1320 - City of Hopkins 56 CAPITAL IMPROVEMENT PLAN 2014 thru 2018 Department Development City of Hopkins, MN Contact ED Director Project u 01-CIP-D4010 Type Improvement Useful Life Unassigned Project dame Redevelopment, East Excelsior Boulevard P � Category Economic Development Future Priority n/a Description Total Project Cost: $2,000,000 North side of Excelsior Boulevard from Highway 169 to approximately Blake Road. Redevelopment of older commercial area. Based on the adopted redevelopment plan, it would involve commercial, and residential uses. Identified in the East End Redevelopment Study. Justification Excelsior Boulevard was upgraded in this area, providing for additional property on the north side of the roadway. The buildings in this area are older and no longer the highest and best use for this property. The funding amount is an estimate and will vary depending on the scope and timing of the project, likely to be completed along with the construction of the SWLRT Blake Station. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 2,000,000 2,000,000 Total 2,000,000 2,000,000 Funding Sources 2014 2015 2016 2017 2018 Total TF - Tax Increment Financing 2,000,000 2,000,000 Total 2,000,000 2,000,000 Budget Impact/Other Monday, July 29, 2013 57 CAPITAL IMPROVEMENT PLAN 2014 i1wit 2018 Department Uevclopment City of Hopkins, MN Contact 1:1) Director Project # 06-CIP-D404 1'.% pe Improvement t serol Life Project Name Block 64 Redevelopment Project ('alc;;or� I[conomic Development Future Priority n,a Description total Project Cost: $4,51111,000 Redevelopment of block between 5th and 6th AvrnueS, north of Mainstrect, South of I st Street North. There currently is no proposed schedule for Justification Will redevelop older commercial and residential areas. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 4,500,000 4,500,000 Total 4,500,000 4,500,000 Funding Sources 2014 2015 2016 2017 2018 Total ED - Economic Development F 1,000.000 1,000,000 TF - Tax Increment Financing 3,500,000 3,500,000 Total 4,500,000 4,500,000 Budget Impact/Other 1ln11dui. h1h 'Y, _'OL', 58 CAPITAL IMPROVEMENT PLAN 2014 thru 2018 Department Development City of Hopkins, MN Contact ED Director L oject # 09-CIP-D406 oject Name Blake Corridor Redevelopment Type Improvement Useful Life Category Economic Development Future Priority n/a tion Total Project Cost: $5,000,000 pment of properties along the Blake Road Corridor including the Cottageville Park area. Justification Removal of blighted and/or obsolete structures, improve access to transit and improve livability of the area. Expenditures 2014 2015 2016 2017 2018 Total Land Acquisition/Demolition 5,000,000 5,000,000 Total 5,000,000 5,00000 Funding Sources 2014 2015 2016 2017 2018 Total TF - Tax Increment Financing 5,000,000 5,000,000 Total 5,000,000 5,000,000 Budget Impact/Other tlundgr, July 29, 2013 59 CAPITAL IMPROVEMENT PLAN 2014 th t, 2018 Department Development City of Hopkins, MN Contact ED Director Project # 12-CIP-D408 I N pe Impoven'ent I seful Life Project Name 8th Ave Streetsca a and parking acility p p g fCategur� Economic Development Future Prioril.N n Description Dotal Project Cost: $5,000,000 Sidewalks, landscaping, Public An. Bike Lancs. Stmt furniture. and ether pedestrian and bike improvements. Parking Ramp Construction, north of Mainstreet between 8th and 9th Ave South Justification The City of Hopkins has planned for Sth Avenue to be the gateway to the dmntown from Excelsior Bled to the Hopkins SWLRT Station. For this to be accomplished, 8th Ave must be transformed into a pedestrian and hike friendly two -block stretch. The proposed parking ramp will be used to support transit -oriented de\ clopntcnt. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 5,000,000 5,000,000 Total 5,000,000 5,000,000 Funding Sources 2014 2015 2016 2017 2018 "Total ED - Economic Development F 5,000.000 5,000,000 Total 5,000,000 5,000,000 Budget Impact/Other LCA TOD Grant, various grant development Accounts. Bonds 60 hlnndar. Juh -'9. 2013 General Public Buildings 61 -4ca City of Hopkins 62 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN 1Project # 08-CIP-AC015 1'roject Name Replace Carpet -Activity Center Rooms 2014 rhru 2018 Department Activity Center Contact Facilities Director Type Improvement Useful Life Category Buildings: Activity Center Future Priority n/a Description Total Project Cost: $36,000 replace Carpeting in Activity Center Raspberry Rooms, TV/Game Room; hallways. Justification Carpet is 18 years old, worn and requires replacement. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 36,000 36,000 Total 36,000 36•000 Funding Sources 2014 2015 2016 2017 2018 Total Cl - Capital Improvement Fund 36,000 .36,000 Total 36,000 36,000 Budget Impact/Other Monday, July 29, 20/3 63 CAPITAL IMPROVEMENT PLAN 2014 i1m, 2018 Department Activity Center City of Hopkins, MN Comact Public Works Director Project # 08—CIP—AC018 lope Improvement t setid Life 25 years Project Name Re lace G nmasium Roof - Activity Center P Y Categon Buildings: Activity ('enter Future Priorits n a Description total Project Cost: $1(15,(100 Existing roof was installed in 1989 and is at the end of its projected useful lite. Portion is cost share with Raspberry Rid1ge Condo Assn. Justification 3oof was installed in 1989 and is at the end of its 25 year useful life. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 105,000 105,000 Total Funding Sources 2014 105,000 2015 2016 2017 105,000 2018 Total Cl - Capital Improvement Fund 105,000 105,000 Total 105,000 105,000 Budget Impact/Other goof in good condition - moi e project from 2014 to 2016 and re -c\ aluate in 2 years. th>ndn..h1/1 '% 'N/; 64 CAPITAL IMPROVEMENT PLAN 2014 /111.1, 2018 Department Activity Center City of Hopkins, MN Contact PW Director Project # 08-CIP-ACO24 Type Improvement Useful Life Project Name Activity Center - Raspberry Room Roof Replacement Category Buildings: Activity Center Future Priority n/a Description Total Project Cost: $80,000 Built up asphalt roofing system covering Raspberry Rooms, Craft Room and Hallways at the Activity Center isting roof was replaced in 1992, Expected life is 25 years. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 80,000 80,000 Total 80,000 80,000 Funding Sources 2014 2015 2016 2017 2018 Total Cl - Capital Improvement Fund 80,000 80,000 Total 80,000 80,000 Budget Impact/Other nspection, repair and upkeep of roofing systems prevent deterioration of interior building structure and damage to interior components of building. Monday, July 29, 2013 65 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN Project # 09-CIP-AC031 Project Name Activity Center - Lower Roof Replacement Future Description Built up Roof on Activity Center Raspberry Rooms and Halh� ay. Justification Existing roof was installed in 1992. estimated replacement due in 2017. 2014 ihra 2018 Dep:u'uucnt Activity Center Contact Ply' Director I vpc Improvement useful Life 25 years Category Buildings: Activity Center Priorirh it I otal Project Cost: $80,000 Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 80,000 80,000 Total 80,000 80,000 Funding Sources 2014 2015 2016 2017 2018 Total Cl - Capital Improvement Fund 80,000 80,000 Total 8000 80,000 Budget Impact/Other 66 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN 2014 thri, 2018 Department Arts Center Contact Public Works Director Project # 08-CIP-AR013 Project Name Arts Center - Replace 25 Ton Rooftop HVAC Unit Future Description teplace existing 25 ton rooftop HVAC unit Justification Tanned replacement at 20 years estimated useful life. Type Improvement Useful Life Category Buildings: Arts Center Priority n/a Total Project Cost: $100,000 Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 100,000 100,000 Total 100,000 100,000 Funding Sources 2014 2015 2016 2017 2018 Total Cl - Capital Improvement Fund 100,000 100,000 Budget Impact/Other Total 100,000 100,000 67 Monday, Jul1 29, 2013 CAPITAL IMPROVEMENT PLAN 2014 th, it 2018 City of Hopkins, MN Project # 09-CIP-AR027 Project Name Art Center -Replace Lobby Carpet Future Department Arts Center Contact Arts Center Director I vpe Improvement l seful Lite 10 years Categ,or� Buildings: Arts Center Priorih n Description 1 oral Project Cost: $52,000 leplace the lobby carpet including staircases. second floor. elc\ ator tlool _ coat room and dance studio dressing room. TED PROJECT SHCEDULE: Futurc 2018 Justification The Lobby carpet will be at the end of it's useful life in a high traffic area like the lobby. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 52,000 52,000 Total 52,000 52,000 Funding Sources 2014 2015 2016 2017 2018 Total Cl - Capital Improvement Fund 52,000 52,000 Total 52,000 52,000 Budget Impact/Other 68 CAPITAL IMPROVEMENT PLAN 2014 thri, 2018 City of Hopkins, MN 1Project# 12-CIP-AR002 I"roject Name Arts Center - Replace theatre seats and backs Future Department Arts Center Contact Arts Center Director Type Improvement Useful Life 20 years Category Buildings: Arts Center Priority 1 Urgent Description I Total Project Cost: $138,510 Remove and replace theater seats and backs. (Keeping existing stanchions) Based on quote from Cosney (they recently did Eisenhower seating) with Classic Quattro seat, 33" low back, waterfall back and seat tailoring. Sherpa Shire -Grade G fabric (similar to existing), plush foam seat, 2" back foam, lexan seat numbers, demo and removal of existing seats and backs includes attic stock. 2011 pricing $116,000 with 3% inflation compounded over 5 years $138,510 Justification Seats will be 20 years old in 2017 and will have exceeded useful life. Stanchions should still be usable. Quote includes replacement of all seats and backs. This is not due until 2017 but wanted to get as much info as possible now to allow for time to plan. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 138,510 138,510 Total 138,510 138,510 Funding Sources 2014 2015 2016 2017 2018 Total Cl - Capital Improvement Fund 138,510 138,510 Total 138,510 138,510 Budget Impact/Other Could consider replacing main tloor one year and balcony another year if required by cash flow. Need tow weeks in theater to make exchange. Work on stage at same time okay will install team. Opportunity to potentially do a "seat sponsor" funding program similar to what was done before Reheat nroiect in 2037 Monday, July 29, 2013 69 CAPITAL IMPROVEMENT PLAN 2014 dint 2018 City of Hopkins, MN Project # 12-CIP-AR005 Project Name Arts Center - Replace Information Desk and Kiosk Future Description Replace informational Kiosk and desk with more functional information center. Justification Department .Arts ('enter Contact Arts Center Director I .N pc Improvement t seful Life 15 years ( atcgon Buildings: Arts Center Prioriq I Urgent Total Project Cost: $5,000 -urrent informational kiosk and inli,rmation desk are not ideal tier a..isting visitors xs ith tx ay finding and disseminating information. Gucsts trriving are frequently confused and hav c a hard time finding location oof Meetings. Etc. Also, is c would like to be able to display larger concert )osters, the rental brochure, membership brochures and more. Ne would like to move this project from 2017 to 2015 as our intormatiun Kiosk is failing and its function can easily be incorporated into the nformational design. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 5.000 5,000 Total 5,000 5,000 Funding Sources 2014 2015 2016 2017 2018 Total Cl - Capital Improvement Fund 5,000 5,000 Total 5,000 5,000 Budget Impact/Other 70 CAPITAL IMPROVEMENT PLAN 2014 rhr , 2018 City of Hopkins, MN Project # 12-CIP-AR036 Project Name Arts Center - Replace 15 Rooftop HVAC units Future Department Arts Center Contact Bldg/Equip Supt Type Improvement Useful Life 20 years Category Buildings: Arts Center Priority n/a Description Total Project Cost: $220,000 Zooftop heating and AC units were installed in 1997. Useful life is 20 years. 15 total units from 25 tons to 5 ton. Justification Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 220,000 220,000 Total 220,000 220,000 Funding Sources 2014 2015 2016 2017 2018 Total Cl - Capital Improvement Fund 220,000 220,000 Total 220,000 220,000 Budget Impact/Other 71 Monday, July 29, 2013 CAPITAL IMPROVEMENT PLAN 2014 i1m, 2018 UcparUnenl Arls ('enter City of Hopkins, MN Contact Arts Center Co -Director Project # 13-CIP-AROOI 1.% pe Improvement l %dill Life IS years Project Name Arts Center - e Re-landsca E & «' faces of building g (atcgor� Buildings: Arts Center Future Priorirh 2 Very Important Description notal Project Cost: $3,600 2emove old shrubs, rework beds. install nc\c plantings and mulch. Project inclucs hiring. a company to design and install. shrubs are dying. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 3,600 3,600 Total Funding Sources 2014 3,600 2015 2016 3,600 2017 2018 Total CI - Capital Improvement Fund 3,600 3,600 Total 3,600 3,600 Budget Impact/Other 72 Wonder. Juh 29. 2013 CAPITAL IMPROVEMENT PLAN 2014 dirn 2018 City of Hopkins, MN Project # 13-CIP-AR002 Project Name Arts Center - Restroom Improvement Future Department Arts Center Contact Arts Center Co -Director Type Improvement Useful Life 10 - 12 years Category Buildings: Arts Center Priority I Urgent Description 7 Total Project Cost: $9,000 Jrinal Partitions: Need to replace the partitions between urinals in both men's restrooms. ( Useful life of 10 years) Zestroom Countertops: Replace countertops in all 4 restrooms (Useful life of 12 years) Priority #2 ?ush Plate or Button: ($250 times 4 = $1000) Add push plate or button door openers to all restrooms for handicapped accessability. (Useful life A 10 years) Priority#1 Justification 71 Jrinal Partitions: Existing panels have rusted, making them difficult to keep clean and unappealing to patrons. (Useful life of 10 years) Zestroom Countertops: Material stains and finish show all water marks. Further the pitch of the counters, holds water on top. Even though ;leared multiple times a day, they appear dingy and dirty. (Useful life of 12 years) kdd push buttons to restroom doors: Current handles are difficult for persons in wheelchair or with limited arm mobility to operate. Adding a )ush plate of button would address the issue and be in keeping with our commitment to being an accessible community resource and venue. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 9,000 9,000 Total 9,000 9,000 Funding Sources 2014 2015 2016 2017 2018 Total Cl - Capital Improvement Fund 9,000 9,000 Budget Impact/Other Total 9,000 9,000 73 Monday, Jul, 29, 20/3 CAPITAL IMPROVEMENT PLAN 2014 thru 2018 City of Hopkins, MN Project # 13-CIP-AR003 Project Name Arts Center - Chairs and Tables Future Ucparuneul Arts Cerner Contact Arts (entcr Co -Director I I pc 1111provellicilt t %eful Life S - 15 vcars Category Buildings: Arts Center Priorih I Urecnt Description Total Project Cost: $14,800 Replace Tabletops in Art Classroom: Replace damaged tabletops in art classroom (useful life of 8 years, priority it I ) Tables and Chairs: Replace remaining old stacking_ chairs \v ith ones to match chairs purchased in 2012. Replace the broken 60" round tables with lighter weight tables, and replace the old 8' tacles that require 2 people to carry lv ith lightweight tables. 80 chairs a1 560.00 each. 6 - 60 " Duralite tables @ $360.00 each, 6 - 8' Duralite tables ra S340.00 each. (Useful life - 12 years ---------Priority = I ) 4 adjustable tables tier lobby. 4 talbcs ra S 150.00 each (uscfull life of 15 years and priority , 2) Justification Replace tabletops in art classroom: These tabletops receive hard usage and are not failing. Need to replace thein not only for our own use, but also to provide adequate support to tenant and rental uses. such as conlnlumity education. (Uscfull life of 8 years. Priority # 1) Chairs and Tables: The old stacking chairs are breaking and unsafe. The lvelds are breaking and they precarioush stack. The large round tables are very heavy, the legs are breaking off of the table base. and the same is happening with the hea\ricr 8 ' tables. Age and use is catching up. (Useful life of 12 years and priority is »" 1) Additional C66 Tables: We often need more of the smaller tables for cvents. S0111c of' the current tables have aged to the point they no longer adiust. (Useful life of 15 vears and prioril\ .. 2 ) Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 14,800 14,800 Total 14,800 14,800 Funding Sources 2014 2015 2016 2017 2018 'Total Cl - Capital Improvement Fund 14,800 14,800 Total 14,800 14,800 Budget Impact/Other 74 ifoaden..h111 '1/ -'lll i CAPITAL IMPROVEMENT PLAN 2014 thrit 2018 City of Hopkins, MN Project # 13-CIP-AR004 Project Name Arts Center - Storage & Hanging, Display Systems Future Department Arts Center Contact Arts Center Co -Director Type Improvement Useful Life 15-20 years Category Buildings: Arts Center Priority 1 Urgent Description Total Project Cost: $9,625 -langing Display System in Jaycee Studio and Community Room: Wall mounted rails with rod & hook system (adjustable) on one wall of each •oom to allow renters as well as tenants and HCA to hang artwork or decor items for events and meetings. (Priority # 2) rage in Art Class: Build storage units in the art classroom along East wall and move the cabinets currently on East wall to South wall next to sink area. (useful life 20 years and priority # 1) Ideally we would like to do this in 2013. Closets: to life of 15 Justification Storage and Hanging Display System: The Art Center has no way of exhibiting items heavier then cardstock in these spaces. System must be ]exible and unobtrusive when not in use as these are multi -use spaces. (Priority # 2) )rage in art classroom: This would create neater storage of art classroom materials such as easels. It would also create dedicated space in which store gallery materials such as pedestals, vatrines and shelves - Something that does not exist at present. This would decrease the damage to Ilery materials we currently experience. (useful life of 20 years, priority # 1) more efficient storage would eliminate the need to rent of 1 Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 6,500 3,125 9,625 Total 6,500 3,125 9,625 Funding Sources 2014 2015 2016 2017 2018 Total Cl - Capital Improvement Fund 6,500 3,125 9,625 Total 6,500 3,125 9,625 Budget Impact/Other 75 Monday, July 29, 2013 CAPITAL IMPROVEMENT PLAN 2014 1hr,, 2018 City of Hopkins, MN Project # 09-CIP-CH030 Project Name City Hall Lobby Upgrade Future Department City liall ;\dntinistration Contact Public A\ orks Director I ape Improvement I seful Life 20 years Catcgor� Bldg: City Ilall Priorih n I otal Project Cost: $110,000 Hall Lobby Upgrade was proposed as part of the 2007 Cit\r Hall upgrade Carpet projcct. This part leas not completed exceeding estinruc,. Justification :xisting lobby is dated, ceiling tiles have yc11oviced and �N aI1paper has numerous stains from 19 years of scr\ icc. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 110,000 110,000 Total 110,000 110,000 Funding Sources 2014 2015 2016 2017 2018 Total Cl - Capital Improvement Fund 110.000 110,000 Total 110,000 110,000 Budget Impact/Other 76 61unilur. Ails 29. 'lll CAPITAL IMPROVEMENT PLAN 2014 th r, 2018 City of Hopkins, MN Project # 13 CIP-CM001 Project Name Technology Improvement - Council Chambers & Studio Future 2014 - Installation of surge protection and uninterruptible power supplies in the studio. 2015 - Upgrade equipment in the Council Chamber presentation table 2016 - Replace current document camera with high resolution camera. 2017 - Projection system 2018 - Sound system 2019 - Council chamber cameras Department Communications Contact Asst City Manager Type Improvement Useful Life 10 years Category Bldg: City Hall Priority n/a Total Project Cost: $95,000 14 - current and future technology improvements are processor based and are sensitive to power fluctuations 15 - The current presentation swithcing configuration requires the control room operator to determine what is presented to the room. -senters do not have much control over their presentations and outside presenters need to use the City computer system. e new equipment will allow the presenter to use their own equipment which will simplify the process while protecting the City's mputer network. 16 - The existing camera is standard definition. The new camera will be high resolution 17 - Current projectors are 10 years old and low resolution. 18 - Current ceiling speakers are old and need to be replaced. Lobby speakers have no volume control. 19 - Current cameras will be 15 years old by 2019 and are standard definition. Replace with high definition cameras. Expenditures 2014 2015 2016 2017 2018 Total Communications 9,500 35,000 12,500 23,000 15,000 95,000 Total 9,500 35,000 12,500 23,000 15,000 95,000 Funding Sources 2014 2015 2016 2017 2018 Total CT - Cable Franchise Fees 9,500 35,000 12,500 23,000 15,000 95,000 Total 9,500 35,000 12,500 23,000 15,000 95,000 Monday, July 29, 2013 77 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN 2014 iirr rr 2018 Department Piro Contact Fire Chicf project # 08-CIP-FDO19 Project Name Replace Carpet and Apparatus Floor Finish - FD Future Description replace carpet and apparatus floor finish systems. 1Icpc Improvement t seful Life 10 year's Caldor} Buildings: Fire Facilities Priority n'a Total Project Cost: $56,0110 Justification Planned replacement at end of estimated 10 year useful life. Classroom and 2nd and 3rd Floor entryway and louge replacement, due to exccssi\ use of classroom and lounge. FD spoke with Steve Stadler and he was A tsith nwyin(, it up to 10 years from 15 years. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 56,000 56,000 Total 56,000 56,000 Funding Sources 2014 2015 2016 2017 2018 'Total CI - Capital Improvement Fund 56,000 56,000 Total 56,000 56,000 udget Impact/Other iginal plan replacement was 15 years. Due to exccssiye use of classroom and lounge the life was mored to 10 years. Mon(nr. Juh 29.'0/ i 78 CAPITAL IMPROVEMENT PLAN 2014 rhru 2018 City of Hopkins, MN Project # 07-CIP-P313 Project Name Pavilion skate Tile Replacement/Lobby Improvement Future Department Pavilion Contact PW Director Type Improvement Useful Life 10 years Category Parks/Fores/Pay.: Comm. Facil Priority n/a Description I Total Project Cost: $97,000 teplacement of existing skate tile and adding skate tile and ceramic tile to the lobby. Replacement of existing tile in team rooms, arena, warming •oom , and referees room: 5,500 square feet. Install skate tile to a portion of lobby so skaters can access drinking fountains; 500 square feet. nstall ceramic tile in the entryway and a portion of the lobby: 500 square feet. -loor has a 10 Year Life - Put in CIP again for 2017 for evalutaion. May only need to do the high traffice areas. Justification �urrent skate tile is 16 years old and is the original tile; the wear layer of the tile is worn through in the high traffic areas. Original tile was not slued, which increases maintenance and can create gaps in seams. This can allow skates to touch the concrete underneath the tile. Lobby skate tnd ceramic tile would add to the building aesthetics. When done in 2007 this project cost $41,339.30. Prior Expenditures 2014 2015 2016 2017 2018 Total F-75-2,556-51 Construction/Maintenance 45,000 45,000 Total Total 45.E 45.000 Prior Funding Sources 2014 2015 2016 2017 2018 Total 52,000 PA - Pavilion Fund 45,000 45,000 Total Total 45,000 45,000 tile glued down will save on maintenance, be safer, and improve facility appearance and marketability. Monday, July 29, 20/3 79 CAPITAL IMPROVEMENT PLAN 2014 /hru 2018 � 7 Department Pavilion City Of Hopkins, �/11V Contacl Public vWorks Director Project # 07-CIP-P314 rcPC Improvement I seful Life 30 years Project Name Pavilion Overhead Door Improvement p Catcgor) Bldgs: Pavillion Future Priorih n Description I ocal Project Cost: $40,000 Remove and lock -in four of the six ownccad doors on the vN cst side of the Pay ilion \N ith a portion to have \tindo\v s or glass block to allo\slight to come through. Install automatic openers on the remaining tour o\ crhead doors in the arena. ESTIMATED PROJECT SCHEDULE: 2015 Justification Currently the overhead doors are seldom utilized and the remo\ al and installation of glass blocks or xN indoxcs \s ill decrease the need to use arena lighting and add to arena aesthetics. Saving on repairs and maintenance of the rcmo%ed doors. Pay ilion user groups ham e asked for this project. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 40,000 40,000 Total 40,000 40,000 Funding Sources 2014 2015 2016 2017 2018 Total PA - Pavilion Fund 40,000 40,000 Total 40.E 40,000 Budget Impact/Other ?otential savings on utilities and greater satisfaction from user groups Na ith arena aesthetics. llnndur..hnh _'V. '0/3 80 CAPITAL IMPROVEMENT PLAN 2014 ihru 2018 City of Hopkins, MN Project # 09-CIP-PO25 Project Name Pavilion Gas Fired Rooftop Furnace Future Description temove and replace existing gas fired rooftop furnace used for heating the team rooms. 3STIMATED PROJECT SCHEDULE: Spring/Summer 2015 Department Pavilion Contact Public Works Director Type Improvement Useful Life 20 years Category Bldgs: Pavillion Priority n/a Total Project Cost: $9,000 Justification �urrent unit was installed during construction of the facility in 1990. Planned replacement for end of estimated useful life. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 9,000 9,000 Total 9,000 91000 Funding Sources 2014 2015 2016 2017 2018 Total PA - Pavilion Fund 9,000 9,000 Total 9,000 9,000 Budget Impact/Other iavings on utilities due to increase in efficiency of new units. 81 Monday, July 29, 2013 CAPITAL IMPROVEMENT PLAN 2014 th) it 2018 City of Hopkins, MN Project # 09-CIP-PO26 Project Name Pavilion Roof Replacement Future Department Pavilion Contact Public Works Director pe Improvement t seful Life 25 years Cat('gor\ 131(tLs: Pavillnm Priority I Urgent Description l otrl Project (ost: $1211,0110 Removal and replacement of existing ballast and membrane for both the north and south roof sections. Justification Repairs made in 2005 extended the life of the roof but it is nrnc 25 years old and has surpassed manutacturers recommendation for replacements. The current roof has leaks and gig en the current condition of the membrane more failures are expected. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 120,000 120,000 Total 120,000 120,000 Funding Sources 2014 2015 2016 2017 2018 Total PA - Pavilion Fund 120,000 120,000 Total 120,000 120,000 Roof leaks can potentially be hannful to the steel roof deck and may cause damage to eyuipmcnt and interior of Pavilion, impacting operations and adding cost to roof replacement. Mondur. A& "l. 1013 82 CAPITAL IMPROVEMENT PLAN 2014 /hrn 2018 Department Pavilion City of Hopkins, MN Contact Public Works Director Project # 09-CIP-P036 Type Improvement Useful Life 15-25 years Project Name Pavilion Evaporator Condenser Replacement P P Category Bldgs: Pavillion Future Priority n/a Description71 Total Project Cost: $60,000 Remove and replace existing condenser with a new condenser, sump tank, pump and fan motors. ESTIMATED PROJECT SCHEDULE: 2015 Justification Existing condenser has extensive scaling and has experienced a loss in efficiency causing higher head pressures and putting greater strain on Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 60,000 60,000 Total 60,000 60,000 Funding Sources 2014 2015 2016 2017 2018 Total PA - Pavilion Fund 60,000 60,000 Total 60,000 60,000 Budget Impact/Other 71 3iven the age, scaling, and corrosion of the existing condenser a freon leak could potentially develop causing greater expense and need for repair. Monday, Jul. 29, 20/3 83 CAPITAL IMPROVEMENT PLAN 2014 ingot 2018 City of Hopkins, MN F oject # 10-CIP-P319 oject Name Pavilion Indoor Turf Replacement Future new turf for the Pavilion's arena Department Pavilion Contact Facilities Director ,,pe Improvement I seful Life 15 years C ategor� Bldgs: Pavillion I'riorit) ma Total Project Cost: $95,00() Justification The current turf was purchased in 1998 and has a useful life of 15 years (2013). the turf is sho\a ing signs of wear and has been patched in a few treas. Replacement will be needed by 2016. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 95.000 95,000 Total 95,000 95,000 Funding Sources 2014 2015 2016 2017 2018 Total PA - Pavilion Fund 95.000 95,000 Total 95,000 95,000 Budget Impact/Other 'ossible resale of the existing turf may offset sonic of the cost of a new turf system. t londul..11dl _'9. _'ll/' 84 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN 2014 /hru 2018 Department Pavilion Contact Facilities Director Project # 10-CIP-P320 Type Improvement Useful Life 10 years Project Name Pavilion - Desiccant Repl of Dehumidification Syst Category Bldgs: Pavillion Future Priority n/a Description71 Total Project Cost: $6,000 Purchase and replace the desiccant medium used in the Pavilion's dehumidification system. Justification The current desiccant has never been replaced and has surpassed its useful life. New desiccant will make the system run more efficient and effectively saving on natural gas and electricity. Also provide dryer air which can have a positive effect on ice quality and indirectly cause more ,fficient operation of the refrigeration equipment. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 6,000 6,000 Total 6,000 6,000 Funding Sources 2014 2015 2016 2017 2018 Total PA - Pavilion Fund 6,000 6,000 Total 6,000 6,000 Budget Impact/Other Monda , July 29, 2013 85 CAPITAL IMPROVEMENT PLAN 2014 thru 2018 Department Pavilion City of Hopkins, MN Contact Don Olson Project # 13-CIP-P321 1.% pe Improvement I seful Life 15 years Project lame Mezzanine RooftopUnit Replacement P ('atc;;on Bldgs: Pavillion Future Priorih I llrecnt Description I otal Project Cost: $24,500 Purchase and installation of (3) rooftop HVAC units that suPP�' hcatilh' and cowling It) the Pay ilions Mcz/anine Justification Che current units were installed in 2003 and are at the end of their useful lite. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 24,500 24,500 Total Funding Sources 2014 24,500 2015 2016 2017 2018 24,500 Total PA - Pavilion Fund 24,500 24,500 Total Budget Impact/Other 24,500 24,500 11mul r..lula '9.201,,' 86 CAPITAL IMPROVEMENT PLAN 2014 rhru 2018 Department Pavilion City of Hopkins, MN Contact Don Olson Project # 13-CIP-P324 Type Improvement Useful Life 25 years Project Name pavilion Entryand Lobb Door Replacement 3' l� Category Bldgs: Pavillion Future Priority 3Important Description71 Total Project Cost: $7,000 Purchase and install (10) doors, closers, and push bars to replace the current doors at the entrance to the Pavilion. Justification Phe current doors were installed when the facility was built in 1990 and have exceeded their useful life. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 7,000 7,000 Total 7,000 7,000 Funding Sources 2014 2015 2016 2017 2018 Total PA - Pavilion Fund 7,000 7,000 Budget Impact/Other Total 7,000 7,000 87 Monday, July 19,1013 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN Project # 13-CIP-P325 Project Name Paint Pavilion Exterior Future Description 'lire a painting contractor to pain the Pavilions exterior. 2014 11mt 2018 Depart men Pavilion Contact Don Olson .% pe Improvcnim C seful Lite 25 Veiu's ('ategor� 131dp: Pavillion Priorith I th'eent I otal Project Cost: $22,000 Justification Che exterior block of the facility has not been painted since the facility \v as built and the current paint is faded and chipped in areas. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 22,000 22,000 Total 22,000 22,000 Funding Sources 2014 2015 2016 2017 2018 Total PA - Pavilion Fund 22,000 22,000 Total 22,000 22,000 Budget Impact/Other Vmldai. Jill, 58 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN 2014 /hru 2018 Department Pavilion Contact Don Olson Project # 13-CIP-P326 Project Name Pavilion -Painting the Arena Ceiling and Bar Joist Type Improvement Useful Life 25 years Category Bldgs: Pavillion Future Priority 1 Urgent )escription Total Project Cost: $20,000 ire a painting contractor to clean, prep, and paint the roof deck and bar joist in the arena. Justification rhe current coating was painted when the facility was built and is in need of recoating to protect roof deck and bar joist from rust. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 20,000 20,000 Total 20,000 20,000 Funding Sources 2014 2015 2016 2017 2018 Total PA - Pavilion Fund 20,000 20,000 Total 20,000 20,000 Budget Impact/Other Monday, July 29, 2013 89 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN ject # 08-CIP-PDO16 jest Name Replace Carpet - Police Station Future Police Station Carpeting 2014 thru 2018 Department Police Contact Policc Chief 'I.N pe Improvement t seful Life 7 years Categon Buildings: Police Department Priorio n a 1 ural Project Cost: $40,000 Justification Planned replacement at end of estimated 10 year useful life. This is a 2411our day work center that required the shorter carpet replacement cycle. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 40,000 40,000 Total 40,000 40,000 Funding Sources 2014 2015 2016 2017 2018 Total Cl - Capital Improvement Fund 40.000 40,000 Total 40,000 40,000 get Impact/Other have to look at other flooring option tier dispatch. tic combination of carpet and tilt due to \k ear under desk areas. ously in at a 7 year life - moved back to 10 year life A4ondur. Joh 21), 2013 90 CAPITAL IMPROVEMENT PLAN 2014 thru 2018 Department Public Works: Bldg/Equip Ser City of Hopkins, MN Contact Public Works Director Project # 13-CIP-BOl l Type Improvement Useful Life 30 years Project Name Public Works Garage Upgrade g lig Category Buildings: Maintenance Facilit Future Priority 1 Urgent Description Total Project Cost: $220,000 The current Vehicle Maintenance Garage at Public Works was constucted in 1981, an addition was added in 1995. The floor hoist was installed in 1989. The concrete flooring and drainage system are in very poor condition. The current below grade vehicle lift needs to be relocated above grade to prevent groundwater contamination from an undetectable failure in the piping or hoist. A roll -around above grade hoist sytem will need to be utilized in place of the existing below grade hoist. Due to the sloping of the existing floor and its condition it would need to be replaced to be able to use this type of lift. Existing ventilation, installed in 1989 will also need to be upgraded to meet current regulations on air quality. The concrete flooring and drainage system are in very poor condition. A small twin post above ground lift will be utilized for cars and light trucks. Stage 1: 2015: Site evaluation and cost estimates, plans and specifications Stage 2: 2016 Construction 1 Justification Current garage area needs to be brought up to new requirments for above and below ground hoists. Ventilation ststem needs to be brounght up to current standards and to prevent garage fumes from catering office area. Floor and drain system in poor condition. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 20,000 200,000 220,000 Total 20,000 200,000 220,000 Funding Sources 2014 2015 2016 2017 2018 Total Cl - Capital Improvement Fund 20,000 100,000 120,000 RF - Refuse Fund 25,000 25,000 SF - Sanitary Sewer Fund 25,000 25,000 SU - Storm Sewer Fund 25,000 25,000 WF - Water Fund 25,000 25,000 Total 20,000 200,000 220,000 Budget Impact/Other 91 Monday, July 29, 2013 1320 - City of Hopkins 92 Parks and Recreation 93 -.4ca City of Hopkins 94 CAPITAL IMPROVEMENT PLAN 2014 rhru 2018 City of Hopkins, MN Project # 08-CIP-P001 Project Name Valley Park - Outdoor Lighting Future Department Public Works: Parks Contact Public Works Director Type Improvement Useful Life Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $75,000 Park Lighting - The lighitng for open skate and hockey needs replacement due to age and energy inefficiency. fisting fixtures are old & energy inefficient. Prior Expenditures 2014 2015 2016 2017 2018 Total 35,000 Construction/Maintenance 40,000 40,000 Total Total 40,000 40,000 Prior Funding Sources 2014 2015 2016 2017 2018 Total 35,000 PDF- Park Dedication Fund 40,000 40,000 Total Total 40.000 40.000 Budget Impact/Other Added lighting upgrade in 2013 95 Monday, July 29, 2013 CAPITAL IMPROVEMENT PLAN 2014 1111-1t 2018 City of Hopkins, MN 'roject # 08-CIP-P003 'roject Name Skate Park Future equipment enhancments to O� erpass Skate Park Department Public Works: Parks Contact Facilities Director IN Pe Improvement I seful Lire 15 years CatcP,or� PSV - Parks Priorih n a Total Project Cost: $70,000 Justification Per our agreement with 3rd Lair, Mio manages the Skate Park. u c need to put S7.000 of enhancements into the Skate Park for the years 2006-2008. The agreement for 2009-2011 requires annual enhancements of S7.000. The agreement for 2012-2014 is currently being rcnctced for 57.000 cath year. Me current agreement of $7,000 per year is expected to be continued ton 2015-2017 Per the Overpass Skate Park Operators Agreement. the city annualh puts an amount specified in the agreement of enhancements into the park to change/improve the park each year to keep the park atuacticc and challcmaimu, to users. Prior Expenditures 2014 2015 2016 2017 2018 Total F-7427,5656-1 construction/Maintenance 7,000 7,000 7,000 7,000 28,000 Total Total 7,000 7,000 7,000 7,000 28,000 Prior Funding Sources 42,000 PDF- Park Dedication Fund Total Total 2014 2015 2016 2017 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 2018 Total 28,000 28,000 Budget Impact/Other Formerly budgeted in Skate Park Enterprise Fund. xrhich Baas eliminated 12 31 2005. It is no\c budgeted in the Park Dedication Fund. Mundai. ✓nh1), 201 i 96 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN Project # 08-CIP-POIO Project Name Park Valley - Play Equipment Future Description Zeplace park play equipment Justification Jpgrade of park play equipment after 20 - 25 years of use. 2014 thru 2018 Department Public Works: Parks Contact PW Director Type Improvement Useful Life Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $60,000 Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 60,000 60,000 Total 60,000 60,000 Funding Sources 2014 2015 2016 2017 2018 Total PDF- Park Dedication Fund 60,000 60,000 Total 60,000 60•000 Budget Impact/Other Moved from 2014 to 2018 and increased cost from $45,000 to $60,000. Monday, July 29, 2013 97 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN r-i ect # 08-CIP-POl 1 ect Name Burnes Park - Resurface Tennis Courts 2014 tarn 2018 Department Public Works: Parks Contact Facilities Director l .Npe Improvement t w1til Life Calcgor� Parks/Pores/Pay.: Comm. Facil Future Priorit.N n Description I otal Project Cost: $30,000 �rackseal and apply new surface color coat to Burnes Park tennis eexirts. 'eriodic repairs needed to ensure quality safe Playing surface. Justification Work needed to restore asphalt surtacc condition and extend life of tennis courts. Prior Expenditures 2014 2015 2016 2017 2018 Total 10,000 Construction/Maintenance Total Total _ Prior Funding Sources 2014 2015 2016 2017 2018 Total 20,000 20,000 20,000 20,000 10,000 PDF- Park Dedication Fund Total Total _ Budget Impact/Other Work last done in 2009 - periodically needs repairs. 98 20,000 20,000 20,000 20,000 Al"10111. Juh 29. 201", CAPITAL IMPROVEMENT PLAN City of Hopkins, MN Project # 08-CIP-PO14 Project Name Hilltop Park - Play Equipment Future park play equipment. 2014 /hvi, 2018 Department Public Works: Parks Contact Facilities Director Justification Zeplace park play equipment after 20-25 years - installed in 1990 and needs replacement Type Improvement Useful Life Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $100,000 Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 100,000 100,000 Total 100,000 100,000 Funding Sources 2014 2015 2016 2017 2018 Total PDF- Park Dedication Fund 100,000 100,000 Total 100,000 100,000 Budget Impact/Other 71 'roject changed from $45,000 to $100,000 and moved from 2014 top 2016 Monday, July, 29, 2013 99 CAPITAL IMPROVEMENT PLAN 2014 1a11, 2018 City of Hopkins, MN Project # 08-CIP-P015 Project Name Valley Park - Play Equipment Future park play equipment. Department Public Works: Parks Contact Facilities Director lope Improvement l seful Life Cmvgorn Parks Forts Pay.: Comm. Facil Priorit.N it a I ocal Project Cost: $145,000 Justification 'lay container upgraded in 2012 and rope climber installed. Other existing pla\ equipment \\ its installed in 1992 and needs replacement. Prior Expenditures 2014 2015 2016 2017 2018 Total 65,000 Construction/Maintenance 80,000 80,000 Total Total 80,000 80,000 Prior Funding Sources 2014 2015 2016 2017 2018 Total 65,000 PDF- Park Dedication Fund 80,000 80,000 Total Total 80,000 80,000 Budget project to incicude play equipment replacement in 2117 100 lbmd i, .huh 'v 'UI CAPITAL IMPROVEMENT PLAN City of Hopkins, MN Project # 08-CIP-PO16 Project Name Oakes Park - Play Equipment Future ption park play equipment. Justification )pgradc of park play equipment after 20-25 years of use. 2014 rhr-r 2018 Department Public Works: Parks Contact Facilities Director Type Improvement Useful Life Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $100,000 Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 100,000 100,000 Total 100,000 100,000 Funding Sources 2014 2015 2016 2017 2018 Total PDF- Park Dedication Fund 100,000 100,000 Total 100,000 100,000 Budget Impact/Other Monday, July 29, 10/3 101 CAPITAL IMPROVEMENT PLAN 2014 th tt 2018 Department Public Works: Parks City Of Hopkins, MN Contact Facilities Director Project # 11-CIP-P019 I .� pe Improvement I %eful Life Project Name Cotta eville Park - Play Equipment gCategory PVN' - Parks Future Priority n a Description total Project Cost: $165,000 Install play equiment. - The existing play equipment teas installed in 1990. Nc\+ play equipment is consistent NN ith overall park improvement master plan. Justification n accordance with new park master plan. replace existing 23 year old play uquipnunt. Prior Expenditures 2014 2015 2016 2017 2018 Total 45,000 Construction/Maintenance 120.000 120,000 Total Prior Total Funding Sources 2014 120,000 2015 2016 120,000 2017 2018 Total 45,000 PDF- Park Dedication Fund 120,000 120,000 Total Total 120,000 120,000 project in 2013 102 Afomhn. Juh 29. 2013 CAPITAL IMPROVEMENT PLAN 2014 thru 2018 City of Hopkins, MN Project# 13-CIP-PO38 Project Name Oakes Park -Drinking Fountain Future Install Drinking Fountain - $10,000 the park has no outside drinking fountain. Department Public Works: Parks Contact Public Works Director Type Improvement Useful Life Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $10,000 Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 10,000 10,000 Total 10,000 10,000 Funding Sources 2014 2015 2016 2017 2018 Total PDF- Park Dedication Fund 10,000 10,000 Total 10,000 10,000 Budget Impact/Other Vew to CIP in 2013 103 Monday, July 29, 2013 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN Project # 13-CIP-PO40 Project Name Burnes Park - Warming House Future Description Rehab Warming House - 2014 thru 2018 Ueparnncnt Public Works: Parks Contact Public Works Director 1.% pe Improvement I seful Life Cmegor? Parks Fores Pay.: Comm. Pacil Priorih n a Total Project Cost: $60,0011 The existing warming house is 40+ years old and looks dates and drab. Install new rolling, exterior treanncnt and landscaping. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 60.000 60,000 Total Funding Sources 2014 60,000 2015 2016 2017 60,000 2018 Total PDF- Park Dedication Fund 60.000 60,000 Total 60,000 60,000 Budget Impact/Other slew to CIP in 2013 104 Vmldui. Jule _'v. 'Ul CAPITAL IMPROVEMENT PLAN City of Hopkins, MN F oject # 13-CIP-PO41 oject Name Oakes Park - Replace Picnic Shelter Future picnic shelter - 2014 thru 2018 Ucpartmcnt Public Works: Parks Contact Public Works Director Justification Existing shelter is 30+ years old and deteriorated, concrete slab floor is heaving. Type Improvement Useful Life Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $30,000 Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 30,000 30,000 Total Funding Sources 2014 30,000 2015 2016 30,000 2017 2018 Total PDF- Park Dedication Fund 30,000 30,000 Total 30,000 30,000 Monday, July 29, 2013 105 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN Protect # 13-CIP-PO42 Project Name Valley Park - Construct Storage Building Future Description 'onstruct storage building - $25.00(; 2014 thrii 2018 Department Public Works: Parks Contact Public Works Director 1) PC Improvcmcnt Lseful Life Category Parks/Foresllay.: Comm. Facil Priorits n I otal Project Cost: 525,000 Justification Storage area needed to support organi/ations using the athletic tleids and tier park maintenance needs. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 25.000 25,000 Total 25,000 25,000 Funding Sources 2014 2015 2016 2017 2018 Total PDF- Park Dedication Fund 25,000 25,000 Total 25,000 25,000 Budget Impact/Other Vew to CIP in 2013 hiondui. Juh '9. 2013 ITIil., CAPITAL IMPROVEMENT PLAN 2014 thru 2018 City of Hopkins, MN LI oject# 13-CIP-PO43 oject Name Burnes Park- Play Equipment Future Description Replace 2-5 play equipment - $35,000 Play Equipment - $200,000 in 2025 Department Public Works: Parks Contact Public Works Director Type Improvement Useful Life F 200,000 Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $235,000 Justification existing equipment was installed in 1996. This large park and its play equipment are heavily used by area residents and for large picnic events. Expenditures 2014 2015 2016 2017 2018 Total Future Construction/Maintenance 35,000 35,000 F 200,000 Total 35,000 35,000 Total Funding Sources 2014 2015 2016 2017 2018 Total Future PDF- Park Dedication Fund 35,000 35,000 200,000 Total 35,000 35.000 Total Budget Impact/C Vew to CIP in 2013 107 Monday, July 29, 2013 CAPITAL IMPROVEMENT PLAN 20141/11,,2018 City of Hopkins, MN Project a 13-CIP-PO44 Project Name Oakes Park - Tennis Courts Future tennis courts - $20,000 - Tennis Courts Reconstruct = S 180.000 (2 untrts) Justification Periodic repairs needed to ensure quality safe playing surface Department Public Works: Parks Contact Public Works Director } pe Inrprovemcnt l scful Life Catcpror� Parks%Pores/Pay.: Comm. Facil Priorih n a Intal Projcct Cost• $200,000 Expenditures 2014 2015 2016 2017 2018 Total Future Construction/Maintenance 20,000 20,000 180,000 Total 20,000 20,000 Total Funding Sources 2014 2015 2016 2017 2018 Total Future PDF- Park Dedication Fund 20,000 20,000 F 180,000 Total 20,000 20,000 Total Budget Impact/Other added to CIP in 2013 108 .Alundui..111/1 29. 20/3 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN Li ect# 13-CIP-PO45 ect Name Valley Park- Warming House Future Warming House - $60,000 2014 //i i, 2018 Department Public Works: Parks Contact Public Works Director Type Improvement Useful Life Category Parks/Fores/Pay.: Comm. Facil Priority n/a Total Project Cost: $60,000 Justification The existing warming house is 40+ years old and looks dated and drab. Install new roofing, elextrical upgrades, plumbinf upgrades, exterior treatements and landscaping. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 60,000 60,000 Total 60•000 60,000 Funding Sources 2014 2015 2016 2017 2018 Total PDF- Park Dedication Fund 60,000 60,000 Total 60,000 60,000 Budget Impact/Other Added to CIP in 2013 Monday, July 29, 2013 109 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN Project #13-CIP-PO72 Project Name Oakes Park - Lighting Future 2014 i1wit 2018 Department Public Works: Parks Contact ate/Upgrade Lighting - $40,000 - $20,000 from MCES due to moi ing the hockey rink for their lift station. I N pe Unassigned t scful Life Catepor� Unassigned Priorih it a Total Project (bet: $40,000 Justification Che lighting for open skate and hockey needs replacement due to age and cncrgy inefficiency and must be relocated for the MCES lift station Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 40.000 40,000 Total 40,000 40,000 Funding Sources 2014 2015 2016 2017 2018 Total GU - Other Governmental Unit 20,000 20,000 PDF- Park Dedication Fund 20,000 20,000 Total 40,000 40,000 Mondor. Joh�), 201 , 110 CAPITAL IMPROVEMENT PLAN 2014 hrit 2018 City of Hopkins, MN Project # 10-CIP-RO02 Project Name Depot Recreation Area Future Department Recreation Contact PW Director Type Improvement Useful Life 25 years Category PW - Parks Priority 2 Very Important Description I Total Project Cost: $500,000 This project includes the addition of an outdoor multipurpose rink/court and support building on property west of the Depot facility. These amenities are proposed to be utilized as part of Depot youth engagement activities and as part of the community rec leagues and playground programs. The multipurpose rink/court will include an asphalt surface and hockey dasher boards for skating and broomball use in the winter; and equipment to accommodate basketball, inline skating, volleyball and soccer uses in the spring, summer and fall months. The support facility will include equipment for a bike maintenance and repair site sponsored by the Depot, as well as restrooms, storage areas and a general multipurposearea to be used as a warming house in the winter. Grant of $150.000 will be aDDlied for. Justification Phe Depot site has needed outdoor amenities for its target audience since its founding. A year-round sports "anchor" at the Depot site to :omplement arts and music and entreprenurial business experience for youth will provide additional reniforcemement of positive behaviors. As nore people come to the Depot for youth activities as well as general use during daytime hours, such a facility could be used all day and into the wening hours. Proximity to the rail corridor will accord high visibility and symbolize active living and community connections in a walkable, )ike-able community. Rec league broomball or hockey could share ice with free skating times. Local business employees could take advantage of he facilty over lunch times. Easy trail access makes the Depot and easy ride for kids who would come there to play. The Depot has been working oward more bike -oriented prgrams open to the whole community (e.g. Bike Scream Sundays) and has some connections already with local bike etailer/advocates at Freewheel by hosting a bike equipment vending machine on site. Dedicated space would give new possibilities to this aspect )f the "Depot on the Move" Initiative. Expenditures 2014 2015 2016 2017 2018 Total Construction 500,000 500,000 Total 500,000 500,000 Funding Sources 2014 2015 2016 2017 2018 Total GU - Other Governmental Unit 500,000 500,000 Total 500,000 500,000 Budget Impact/Other in Monday, July 29, 2013 -44ca city of Hopkins 112 Streets, Traffic & Transportation -4ca City of Hopkins 114 a_ Q V W > z z o Z O � � U 2 V a w N w x z Q � Z z Y 0 2 Ix Q 'nom V 11 a_ V Q Ix O 0 a C C C CC W O 7 7 l J L 7 l J g l CL t U U V U U Q Q lf) lD N f— co a O O 00 O O N N NN N N U t 4 V C City of Hopkins Hot CAPITAL IMPROVEMENT PLAN 20141/11-1,2018 City of Hopkins, MN Project # 01-CIP-5101 Project Name Residential Street Improvements Future Department Public Works: Streets/Traffic Contact Public Works Director Type Improvement Useful Life Unassigned Category Trans: Streets Priority n/a Description71 Total Project Cost: $19,140,000 Program to improve streets needing repair or reconstruction as indicated by street condition survey, or as part of an area street improvement. 2014: West Park Road, 21 st Ave North - Mainstreet to First Street North 2015: Lake Street from Tyler Ave to Texas Ave. 2016 - 2017: Park Valley and Peaceful Valley Reclamation Project - East and West Park Valley Road; 9th Avenue South between Westbrooke Way and 7th Street South; 6th Street South between 10th Avenue and 6th Ave South; 7th Street South between 10th Avenue and East Park Valley Road; 5th Ave South between 5th Street South and 7th Street South 2018: Texas Avenue from Lake Street to Cambridge Street; Oxford Street from Blake Road to Texas Ace; Cambridge Street from Blake Road to Texas Ave; Murphy Street from Lake Street to Oxford Street. Justification Ongoing street improvements determined through Pavement Management Program. Prior Expenditures 2014 2015 2016 2017 2018 Total 9,990,000 Construction/Maintenance 400,000 1,500,000 2,500,000 2,500,000 2,250,000 9,150,000 Total Total 400,000 1,500,000 2,500,000 2,500,000 2,250,1100 9,150,000 Prior Funding Sources 9,990,000 GU - Other Governmental Unit Total PI - PIR/General Obligation Bo SA - Special Assessment Impact/Other 2014 2015 2016 2017 2018 Total 800,000 800,000 280,000 500,000 1,500,000 1,500,000 1,500,000 5,280,000 120,000 200,000 1,000,000 1,000,000 750,000 3,070,000 Total 400,000 1,500,000 2,500,000 2,500,000 2,250,000 9,150,000 onsistent with the City Council adopted Roadway Improvement Policy, street ratings, and Pavement Management Program. Monday, Jult 29, 2013 117 CAPITAL IMPROVEMENT PLAN 2014 ih t, 2018 City of Hopkins, MN Project # 01-CIP-5102 Project Name Residential Street Improvements --Utilities Future Department Public 'mks: Streets/Traffic Contact Public Works Director 1.% pe Improvement t seful Life Unassigned Catekor� brans: Streets Priority n4i Description Total Project Cost: $7,885,000 .ocations to be determined as they are consistent frith the street reconstruction program. ?rogram to reconstruct deteriorated vrater main and sanitary surer and to proyidc Storni serer improrcmcnts in conjunction with street mprovement projects. Consistent with the Storm Water Managcmcnt Plan. Water and Scwcr Utility Master Plan. and tclerision inspections. Justification In most cases where street reconstruction takes place. storm scvrcr facilities either need upgrading or need to he installed new. In sonic cases. water main and sanitary sewer need to be rehabilitated in conjunction Frith Street reconstruction. The numbers assume the city funding 100" o of major storm sewer, water main, and sanitary sewer re construction. These costs are to he used in conjunction Frith street reconstruction costs shown on 01-CIP-S101. Prior Expenditures 2014 2015 2016 2017 2018 Total 4,750,000 Construction/Maintenance 575,000 475,000 430,000 430,000 1,225,000 3,135,000 Total Total 575,000 475,000 430,000 430,000 1,225,000 3,135,000 Prior Funding Sources 2014 2015 2016 2017 2018 Total 4,750,000 SF - Sanitary Sewer Fund 225,000 175.000 120.000 120,000 325,000 965,000 Total SU - Storm Sewer Fund 0 100,000 110.000 110,000 300,000 620,000 WF - Water Fund 350.000 200.000 200,000 200,000 600,000 1,550,000 Total 575,000 475,000 430,000 430,000 1,225,000 3,135,000 Budget Impact/Other Public Hearing - year prior to planned construction Plans and specifications - year prior to planned construction Bid - year of planned construction Consistent with the Storm Water Managcmcnt Plan. Nater and ScvN er Utility Master Plan, and telcrision inspections. hlondui. A& _N 2013 118 CAPITAL IMPROVEMENT PLAN 2014 rhru 2018 City of Hopkins, MN Project # 01-CIP-S103 Project Name Citywide Concrete Alleys Future Department Public Works: Streets/Traffic Contact Public Works Director Type Improvement Useful Life Unassigned Category Trans: Streets Priority n/a Description Total Project Cost: $1,368,000 17016: Alley South of Mainstreet between 8th and 9th Ave South !017: Alley south of 6th Street South and North of Nine Mile Creek, between 11th Avenue South and 10th Avenue South. 3rogram to construct concrete alleys in areas designated as poor on the Alley Condition Survey. Justification Che city has had a policy of constructing concrete alleys for a number of years. This policy has proved to be sound by the concrete alleys' lurability and low maintenance costs. Current policy has the city share at 20% of the cost in residential areas. The city will experience cost avines due to lower maintenance costs. Prior Expenditures 2014 2015 2016 2017 2018 Total 1,213,000 1 construction/Maintenance 75,000 80,000 155,000 Total Total 75,000 80,000 155,000 Prior Funding Sources 2014 2015 2016 2017 2018 Total 1,213,000 PI - PIR/General Obligation Bo Total SA - Special Assessment Total 75,000 80,000 155,000 15,000 16,000 31,000 60,000 64,000 124,000 Budget Impact/Other ,onsistent with the City Council adopted Roadway Improvement Policy and Alley ratings. Monday, July 29, 20/3 119 CAPITAL IMPROVEMENT PLAN 2014 rht tt 2018 City of Hopkins, MN Project # 01-CIP-5104 Project Name County Road 3 Department Public \\'orks: Streets Iraffic Contact Public Works Director lope Improvement t seful life Unassigned Categon brans: Streets Future Priorih ma Description I total Project Cost: $2,300,000 �ounty Road 3 from Shady Oak Road to Meadow hrook Road. I-ighting, landscaping, street, etc. improvcments along Excelsior Bou lcvand from the east to vycst cite limits. 30 Bond payments to be financed by a combination of existing TIF rev enuc, Municipal State Aid read funds, additional T1 revenue created by -conomic development, grant funds, and, as it last resort. general city revenue Segment 1: Construction - 1998 1999 Segment 2: Planning - 2004; bidding and construction (median upgrades only) - 2005 Segment 3: Planning and acquisition - 1999 2001. bidding construction - 2002 2001 2004 Segment 4: Planning and acquisition - Not in County funding plan F funded work includes the fol lo\\ ing: signalized intersection will be constructed at Monroe .A%enue. A second intersection \\ ill also he built at Jackson Ave St. Louis Street. There II also be a reconfiguration of Monroc AvCm1C and Mihv aukee south of E.xcclsior Boulcvard. This vcork is being completed in conjunction vyith reconstruction of Excelsior Boulevard from Highvray 169 to Blake Road. The intersection is beim, constructed to facilitate redevelopment oi SuverValu north annex site. Justification Deficiencies in terms of roadway condition. traffic pedestrian nuov cntcnl. satety and aesthetics appear in all ti)ur segments of County Road 3: - Segment 1 from Shady Oak Road to I I th A\ critic S.: upgrade existing undi\ idcd road\\ M. upgrade I I th A\ cnuc intersection to meet future needs, implement beautification program --completed in 1998 - Segment 2 from 1 lth Avenue S. to H\\\ 169: median pa\ ers eonstruction - Segment 3 from Highway 169 to Blakc Road: upgrade cyisting narrow undiv idcd roadvvm. resolve satcty issues at railroad crossing. improcc north -south access, account for future LRT access. address rcdc\ elopnlcnt needs. add integration for full access at Jackson Avenue. - Segment 4 from Blake Road to I\lcado\\ brook Road: upsradc road\\m . implement hcautificalion pro rant. Prior 0 Total Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintena nce Total 2,300,000 2,300,000 2,300,000 2,300,000 Prior Funding Sources 2014 2015 2016 2017 2018 Total �0 GU - Other Governmental Unit 1,600,000 1,600,000 Total MS - Municipal State Aid Stree 700,000 700,000 Total 2,300,000 2,300,000 Budget Impact/Other GO bond payments to be financed by a combination of existing TIF re%enuc. Municipal Statc Aid road funds. additional TIF revenue created by economic development, grant funds. and, as a last resort, general city reyQnuo. Segment 1: Construction - 1998/ 1999 Segment 2: Planning - 2005; bidding and construction (median upgrades only) - 2006 Segment 3: Planning and acquisition - 1999 2000. bidding construction - 2003 2004 Segment 4: Planning and acquisition - Not in County Funding Plan Consistent with Hennet)in County CIP and City Council action. rh,ndui. Juh _'v. '0/3 120 CAPITAL IMPROVEMENT PLAN 2014 thl-11 2018 City of Hopkins, MN Project # 01-CIP-S106 Project Name County Road 61 (Shady Oak Road) Future Oak Road from County Road 3 to T.H. 7, Mainstreet from 20th Avenue to Shady Oak Road. ig, landscaping, street, etc., improvements from County Road 3 to T.H. 7 ,truction and amenities on Mainstreet from 20th Avenue to Shady Oak Road. ;truction of West Park Road, 2nd Street N., and 21 st Avenue N. (2nd Street -4th Street N.) also 01-CIP U003 for the Storm Sewer Management associated with this Department Public Works: Streets/Traffic Contact Public Works Director Type Improvement Useful Life Unassigned Category Trans: Streets Priority n/a Total Project Cost: $20,450,000 Justification 3eficiencies appear on Shady Oak Road in terms of roadway conditions, traffic/pedestrian movement, safety, and aesthetics. Upgrade an tndivided roadway, resolve safety issues with number of driveway access points and intersection at Mainstreet. Lighting needs upgrading and )rovide beautification program. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 8,200,000 12,250,000 20,450,000 Total 8,200,000 12,250,000 20,450,000 Funding Sources 2014 2015 2016 2017 2018 Total GU - Other Governmental Unit 6,150,000 11,045,000 17,195,000 MS - Municipal State Aid Stree 2,050,000 755,000 2,805,000 PI - PIR/General Obligation Bo 200,000 200,000 SA - Special Assessment 250,000 250,000 Total 8,200,000 12,250,000 20,450,000 Budget Impact/Other >_012-2014: Planning and acquisition 4/2015: Bidding and construction with Hennepin County CIP, city's desire to upgrade the roadway, and reconstruction program for all of Mainstreet. totals share of the county moiect is 121 Mondor. Ali- 29, 2013 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN EProject # 01-CIP-S504 ProiectNarne Sixth Street South (11th to 12th Avenue South) Future Sixth Street South from I Ith Avenue South to 12th Avenue South. Extension of roadway and box culvert crossing at Nine Mile Creek. 2014 1111 -rt 2018 Ucparnncnt Public Works: Streets ''I7affic Contact Public Works Director .pe Improvement I seful life Unassiened Catcgorc 7 cans: Streets Priorith ma Total Projecl Cost: $500,000 project will offer a second access to the industrial area (fire access). Will direct some of the existing industrial traffic north, away trom the mial intersection at Seventh Street and 1 I th A\ enuc. Will connect a Current dead-end alley. \+ 'est of 1 I th Avenue. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 500,000 500,000 Total 500,000 500,000 Funding Sources 2014 2015 2016 2017 2018 Total MS - Municipal State Aid Stree 400,000 400,000 PI - PIR/General Obligation Bo 100,000 100,000 Total 500,000 500,000 Budget Impact/Other 'urrently on MSA plans. `WA Wondur../uh 'l. 2013 CAPITAL IMPROVEMENT PLAN 2014 thru 2018 Department Public Works: Streets/Traffic City of Hopkins, MN Contact Public Works Director •oject # 06-CIP-S118 Type Improvement Useful Life •oject Name Parkin Lots Parking Category Trans: Parking Facilities Future Priority n/a escription Total Project Cost: $1,000,000 15: Municipal Parking Lot 200, south of Mainstreet between 8th and 9th Avenues, Pavilion parking lot, City Hall Parking Lot. habilitate parking lot pavement Justification 'avement has deteriorated to the point where cracksealing and sealcoating are not effective. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 1,000,000 1,000,000 Total Funding Sources 2014 1,000,000 2015 2016 1,000,000 2017 2018 Total PI - PIR/General Obligation Bo SU - Storm Sewer Fund 800,000 200,000 800,000 200,000 Total Budget Impact/Other 1.000.000 1,000,000 Monday, July 29, 2013 123 CAPITAL IMPROVEMENT PLAN 2014 thri, 2018 City of Hopkins, MN Project # 11-CIP-S120 Project Name Plan, Design and Implement Railroad Quiet Zone Future Deparnnent Public \\ orks: Suects'I raI is Contact I acilities Director 13 pe Improvement t seruI Lire 30 vears Categon Trans: Streets Priorit,N n Description notal Project Cost: $255,000 Modify existing railroad grade crossings to satin\_ Federal Railroad Administration (FRA) requirements to create a Wiistle-Free Quiet Zone for the CP Railroad corridor. Phase 1: Plan and coordinate requirements with FRA and SWLRT proiject office. Dcsign necessary supplemental safety measures (SSM). Phase 11: Construct SSM's and implement Quiet Zone. Justification Train horns sound in early morning hours and arc disruptive to nearby residential areas. Prior Expenditures 2014 2015 2016 2017 2018 Total 30,000 Construction/Maintenance 225,000 225,000 Total Total 225,000 225,000 Prior Funding Sources 2014 2015 2016 2017 2018 Total 30,000 PI - PIR/General Obligation Bo Total Total Budget Impact/Other 124 225,000 225,000 225,000 225,000 Alowhii—Juh 29, CAPITAL IMPROVEMENT PLAN 2014 thri, 2018 City of Hopkins, MN Project # 11-CIP-S121 Project Name Mainstreet Rehabilitation Future Description Department Public Works: Streets/Traffic Contact Facilities Director Type Improvement Useful Life 30 years Category Trans: Streets Priority 3Important Total Project Cost: $2,300,000 project includes a mill and overlay from 5th Ave North to 13th Ave North, upgrade of pedestrian facilities to include enhanced crosswalks, valk repair and traffic signal upgrades. Justification Pavement, sidewalk, pavers and traffic signals are becoming worn and in need of updating. Prior Expenditures 2014 2015 2016 2017 2018 Total 300,000 Construction/Maintenance 2,000,000 2,000,000 Total Total 2,000,000 2,000,000 Prior Funding Sources 2014 2015 2016 2017 2018 Total 300,000 GU - Other Governmental Unit 500,000 500,000 Total PI - PIR/General Obligation Bo 1,500,000 1,500,000 Total 2,000,000 2,000,000 Budget Impact/Other 125 Monday, July 19, 20/3 CAPITAL IMPROVEMENT PLAN 2014 hrit hr,2018 City of Hopkins, MN Project # 12-CIP-SO39 Project'"rue 2014 Street Overlay Project Future 14 - 3,000 LF of Mill and Overlay in the HoW, Acres. Justification daintain streets that are in need of work but do not need to he reconstructed. dill and overlay is needed dt fix deteriorating pavement. Last reeonsnructcd in 1988. Department Public works: Streets -Traffic Contact PW Director 1) PC Improvement I soul Lire Cato;on Trans: Streets Priorih na I otel Project Cost: $550,000 Expenditures 2014 2015 2016 2017 2018 Total Construction 550.000 550,000 Total 550,000 550,000 Funding Sources 2014 2015 2016 2017 2018 Total PI - PIR/General Obligation Bo 550,000 550,000 Total 550,000 550,000 Budget Impact/Other ,Jew item added in 2012 for 2014 ?013 - Project increased from 5300,000 to S550.000 126 Mundur../ult 21). -'ll/; CAPITAL IMPROVEMENT PLAN City of Hopkins, MN Project # 13-CIP-SO40 Project Name Pedestrian & Bicycle Access Improvements Future escription 14-2018 - Painting bike lanes, constructing trails and sidewalks 2014 thrtt 2018 Department Public Works: Streets/Traffic Contact PW Director Type Improvement Useful Life 20 years Category Trans: Streets Priority n/a Total Project Cost: $125,000 Justification �ouncil recently adopted plan to increase pedestrian and bicycle access and safety. These improvements begin to implement that plan. Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 25,000 25,000 25,000 25,000 25,000 125,000 Total 25,000 25,000 25,000 25,000 25,000 125,000 Funding Sources 2014 2015 2016 2017 2018 Total PI - PIR/General Obligation Bo 25,000 25,000 25,000 25,000 25,000 125,000 Total 25,000 25,000 25,000 25,000 25,000 125,000 Budget Impact/Other Monday, July 29, 2013 127 CAPITAL IMPROVEMENT PLAN 2014 thri, 2018 City of Hopkins, MN Project # 01-CIP-5502 Project Name Light Rail Transit Stations (2) Future Department Public Works: lYansportation Contact Public Works Director I's pe Improvement t seful Life Unassigned ('ategmr brans: Sucets Prioril.N n a Description I otal Project Cost: $150,000 1) Intersection of Third Street South and Fifth A� cnue South 2) Second Street Northeast Supplemental improvements to Wo Li(Tht Rail Transit (LRT) station,; in the proposed HCRRA locations. HCRRA proposes to construct th+o stations along the Soutlm est Con idor. The proposed expenditures trould he in addition to the funds tided by the HCRRA. The additional funds vcould be used to ensure the stations are high quality in appearance. Budget Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 150,000 150,000 Total 150,000 150,000 Funding Sources 2014 2015 2016 2017 2018 Total TF - Tax Increment Financing 150.000 150,000 Total 150,000 150,000 on HCRRA plans. with plans for LRT stops in Hopkins by Hennepin Count\,. 128 Muntlar. Juh 9. 'Ill i CAPITAL IMPROVEMENT PLAN City of Hopkins, MN Project # 01—CIP—S503 Project Name Eighth Avenue LRT Corridor 2014 thru 2018 Department Public Works: Transportation Contact Public Works Director Type Improvement Useful Life Unassigned Category Trans: Streets Future Priority n/a Description71 Total Project Cost: $200,000 --ighth Avenue from County Road 3 to Mainstreet design and installtion of pedestrian improvements and streetscape improvements Justification Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 200,000 200,000 Total 200,000 200,000 Funding Sources 2014 2015 2016 2017 2018 Total GU - Other Governmental Unit 100,000 100,000 TF - Tax Increment Financing 100,000 100,000 Total 200•000 200,000 Budget Impact/Other dependent on Metropolitan Council SWLRT plans Monday, July 19, 2013 129 Utilities 1 S( CAPITAL IMPROVEMENT PLAN 2014 rhl-1, 2018 City of Hopkins, MN Project # 01-CIP-UO02 Project Name Storm Drainage System Maintenance - Alley Repairs Future 4-2018 Concrete alley repairs Justification knnual alley pavement concrete slab repairs are needed. Department Public Works: Utilities Contact Public Works Director Type Improvement Useful Life Unassigned Category Utilities: Municipal Sanitary S Priority n/a Total Project Cost: $189,000 Prior Expenditures 2014 2015 2016 2017 2018 Total F-8-6-,0-0-01 Construction/Maintenance 20,000 20,000 21,000 21,000 21,000 103,000 Total Total 20,000 20,000 21,000 21,000 21,000 103,000 Prior Funding Sources 2014 2015 2016 2017 2018 Total 86,000 SU - Storm Sewer Fund 20,000 20,000 21,000 21,000 21,000 103,000 Total Total 20,000 20,000 21,000 21,000 21,000 103,000 with the Storm Water Management Plan. 131 Monday, July 29, 2013 CAPITAL IMPROVEMENT PLAN 2014 the it 2018 �,�71V Ucp:u1mcnt Public Ati'orks: Utilities 1Y1 City of Hopkins, Contact Public Works Director Project # 01-CIP-UO03 I .\ Pc 1111proveln`itt I scful Life Unassigned Project Name Storm Water Management Projects 1; J Categor� Utilities: Storm Sewer Future Priorh% n a Description Total Project Cost: $880,000 2014: Provide outlet pipe to Shadv Oak Pond into CSAH 61 storm drainage piping in crnijunction vv ith Shady Oak Road reconsn action - S2"1( U 2014: Cottageville Park storm\ iter impro<cmetns - S650.000 Justification >hady Oak Pond has no outlet and floods streets and residential property if not pumped. 'onsistent with City Council appro\ ed action plan of Octobcr 21. 1997. the City's Storm Management Plan, and Shady Oak Road reconstruction Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 880,000 880,000 Total 880,000 880,000 Funding Sources 2014 2015 2016 2017 2018 'Total SU - Storm Sewer Fund 880.000 880,000 Total 880,000 880,000 Budget Impact/Other Zonsistent with City Council approx ed Action Plan of October 21, 1997. the City's Storm Management Plan, and Shady Oak Road reconstruction 132 CAPITAL IMPROVEMENT PLAN 2014 thru 2018 City of Hopkins, MN Project # 08-CIP-UO01 Project Name Lift Station # 4 Future Description Rehabilitate LS No. 4 Justification Lift station No. 4 was identified for rehab in the 2007 comprehensive utility plan Regular major maintenance identified in the 2007 comprehensive utility plan. Department Public Works: Utilities Contact Public Works Director Type Improvement Useful Life Category Utilities: Municipal Sanitary S Priority n/a Total Project Cost: $160,000 Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 160,000 160,000 Total 160,000 160,000 Funding Sources 2014 2015 2016 2017 2018 Total SF - Sanitary Sewer Fund 160,000 160,000 Total 160,000 160,000 Budget Impact/Other 133 Monday. July 29, 2013 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN Project # 08-CIP-UO10 Project Name St. Louis Park Emergence Connection Future Description St. Louis Park emergency connection. 2014 th tt 2018 Department Public \\orks: Utilities Contact Facilities Director Items identified in 2007 comprehensi\ c utility plan to pro\ ide safe and rcliabk: \v ater. 1 .% pe Improvement t ceful LUC Category Utilities: Municipal Sanitary S Prioritc na I otal Project ( osf: $211,000 Expenditures 2014 2015 2016 2017 2018 Total Construction/Maintenance 211,000 211,000 Total Funding Sources 2014 2015 211,000 2016 2017 211,000 2018 Total WF - Water Fund 211,000 211,000 Total Budget Impact/Other 211,000 211,000 hlundur. Juh '9 '01", 134