Loading...
HRA Re[prt 2013-07 Finidings of Substandard Properties - Block 64A231 - City of Hopkins August 1, 2013 HRA Report 2013-07 FINDINGS OF SUBSTANDARD PROPERTIES — BLOCK 64 Proposed Action Staff recommends approval of the following motion: move to adopt Resolution 494, finding the existence of structurally substandard real property that may be included in a tax increment district pursuant to Minnesota Statutes, Section 469.174. Subdivision 10 ldl. With this motion the properties may be demolished while preserving the ability to create a TIF district in the future using the substandard findings. Overview The City of Hopkins and the Hopkins Housing & Redevelopment Authority have a goal of redeveloping a large portion of Block 64 on the NW corner of Mainstreet and Fifth Avenue. Many of the properties, including the three that are included in the attached report, are substandard. This action is being taken to document the conditions so that the current owners (Hopkins/Doran LLC and the Hopkins HRA) can demolish the buildings without losing the ability to include them in the substandard building calculations for the purposes of establishing a TIF district in the future. Approving the Resolution will not require the HRA to establish a TIF district, but rather preserves the right. Under state statute, the HRA would have three years to create the district. Primary Issues to Consider This action has no immediate effect, but rather will serve to preserve the ability to establish a TIF District. Supporting Documents • TIF Analysis Findings for Hopkins Block 64 • r Resolution 494 Kersten Ey6rum ,Directo Planning & Development Financial Impact: $ 0 Budgeted: Y/N Source: Related Documents (CIP, ERP, etc.): Notes: 250 Third Avenue North, Suite 450 Minneapolis, Minnesota 55401 612.338.2029 Fax 612.338.2088 www.LHBcorp.com July 31, 2013 Kersten Elverum Director of Planning & Development 1010 1" Street South Hopkins, Minnesota 55343 TIF ANALYSIS FINDINGS FOR HOPKINS BLOCK 64 LHB was hired to inspect three buildings in Hopkins, MN: a service station located at 501 Mainstreet; an auto repair shop at 525 Mainstreet, and.a single family residence at 15 6t' Avenue in order to determine if they meet the definition of "Substandard" as defined by Minnesota Statutes, Section 469.174, subdivision 10. The buildings may potentially be included in a future Redevelopment TIF District, so will need to be compliant with all of the statutes pertaining to a Redevelopment District. CONCLUSION After inspecting and evaluating the buildings within the proposed TIF District on July 1, 2013 and applying current statutory criteria for a Redevelopment District under Minnesota Statutes, Section 469.174, Subdivision 10, it is our professional opinion that all three buildings qualify as substandard. The remainder of this letter and attachments describe our process and findings in detail. PART 2 — MINNESOTA STATUTE 469.174. SUBDIVISION 10 REOUIREMENTS The properties were inspected in accordance with the following requirements under Minnesota Statutes, Section 469.174, Subdivision 10(c), which states: Interior Inspection "The municipality may not make such determination [that the building is structurally substandard] without an interior inspection of the property..." Exterior Inspection and Other Means "An interior inspection of the property is not required, if the municipality finds that (1) the municipality or authority is unable to gain access to the property after using its best efforts to obtain permission from the party that owns or controls the property; and (2) the evidence otherwise supports a reasonable conclusion that the building is structurally substandard." Documentation "Written documentation of the findings and reasons why an interior inspection was not conducted must be made and retained under section 469.175, subdivision 3(1)." Duluth, MN Minneapolis, MN Page 2 of 4 July 30, 2013 Qualification Requirements Minnesota Statutes, Section 469.174, Subdivision 10 (a) (1) requires two tests for occupied parcels: A. Coverage Test ...°parcels consisting of 70 percent of the area of the district are occupied by buildings, streets, utilities, or paved or gravel parking lots" The coverage required by the parcel to be considered occupied is defined under Minnesota Statutes, Section 469.174, Subdivision: 10(e), which states: "For purposes of this subdivision, a parcel is not occupied by buildings, streets, utilities, or paved or gravel parking lots unless 15 percent of the area of the parcel contains building, streets, utilities, or paved or gravel parking lots." The LHB team reviewed three parcels, (labeled 1, 2, and 3 on the site diagram below). • Parcel 1 located at 501 Mainstreet is 17,290 sf with approximately 100 percent of the square footage occupied by buildings, and paved surfaces. • Parcel 2 located at 525 Mainstreet is 12,900 sf with approximately 100 percent of the square footage occupied by buildings, and paved surfaces. • Parcel 3 located at 15 6`f' Avenue South is 9,350 sf with approximately 21.4 percent of the square footage occupied by buildings, and paved surfaces. Findings: Parcels 1 and 2 (501 Mainstreet and 525 Mainstreet respectively) are fully covered by buildings, parking lots or other improvements, which exceeds the 15 percent parcel requirement. Parcel 3 (15 6`'' Avenue South), a single family residence, is partially covered by buildings, driveway or other improvements, but exceeds the 15 percent parcel requirement. Site Diagram Page 3 of 4 July 30, 2013 B. Condition of Buildings Test ..."and more than 50 percent of the buildings, not including outbuildings, are structurally substandard to a degree requiring substantial renovation or clearance;" 1. Structurally substandard is defined under Minnesota Statutes, Section 469.174, Subdivision 10(b), which states: "For purposes of this subdivision, `structurally substandard' shall mean containing defects in structural elements or a combination of deficiencies in essential utilities and facilities, light and ventilation, fire protection including adequate egress, layout and condition of interior partitions, or similar factors, which defects or deficiencies are of sufficient total significance to justify substantial renovation or clearance." a. We do not count energy code deficiencies toward the thresholds required by Minnesota Statutes, Section 469.174, Subdivision 10(b)) defined as "structurally substandard", due to concerns expressed by the State of Minnesota Court of Appeals in the Walser Auto Sales, Inc. vs. City of Richfield case filed November l3, 2001. Findings: 501 Mainstreet, 525 Mainstreet, and 15 6d Avenue South all exceed the criteria required to be determined substandard buildings. Buildings are not eligible to be considered structurally substandard unless they meet certain additional criteria, as set forth in Subdivision 10(c) which states: "A building is not structurally substandard if it is in compliance with the building code applicable to new buildings or could be modified to satisfy the building code at a cost of less than 15 percent of the cost of constructing a new structure of the same square footage and type on the site. The municipality may find that a building is not disqualified as structurally substandard under the preceding sentence on the basis of reasonably available evidence, such as the size, type, and age of the building, the average cost of plumbing, electrical, or structural repairs, or other similar reliable evidence." "Items of evidence that support such a conclusion [that the building is not disqualified] include recent fire or police inspections, on-site property appraisals or housing inspections, exterior evidence of deterioration, or other similar reliable evidence." LHB counts energy code deficiencies toward the 15 percent code threshold required by Minnesota Statutes, Section 469.174, Subdivision 10(c)) for the following reasons: • The Minnesota energy code is one of ten building code areas highlighted by the Minnesota Department of Labor and Industry website where minimum construction standards are required by law. • The index page of the 2007 Minnesota Building Code lists the Minnesota Energy Code as a "Required Enforcement" area compared to an additional list of "Optional Enforcement" chapters. • The Senior Building Code Representative for the Construction Codes and Licensing Division of the Minnesota Department of Labor and Industry confirmed that the Minnesota Energy Code is being enforced throughout the State of Minnesota. • In a January 2002 report to the Minnesota Legislature, the Management Analysis Division of the Minnesota Department of Administration confirmed that the construction cost of new buildings complying with the Minnesota Energy Code is higher than buildings built prior to the enactment of the code. Page 4 of 4 July 30, 2013 Proper TIE analysis requires a comparison between the replacement value of a new building built under current code standards with the repairs that would be necessary to bring the existing building up to current code standards. In order for an equal comparison to be made, all applicable code chapters should be applied to both scenarios. Since current construction estimating software automatically applies the construction cost of complying with the Minnesota Energy Code, energy code deficiencies should also be identified in the existing structures. Findings: 501 Mainstreet, 525 Mainstreet, and 15 6`h Avenue South all exceed the building code deficiency criteria required to be determined substandard. TEAM CREDENTIALS Michael A. Fischer, AIA, LEED AP - Project PrincipaUTIF Analyst Michael has twenty-four years of architectural experience as project principal, project manager, project designer and project architect on municipal planning, educational, commercial and governmental projects. He is a Senior Vice President at LHB and currently leads the Minneapolis office. Michael completed a two-year Bush Fellowship at the Massachusetts Institute of Technology in 1999, earning Masters Degrees in City Planning and Real Estate Development. Michael has served on over 35 committees, boards and community task forces, including a term as a City Council President, Chair of a Metropolitan Planning organization, and most recently, Chair of the Planning Commission in Edina, Minnesota. He was one of four architects in the country to receive the National "Young Architects Citation" from the American Institute of Architects in 1997. Philip Waugh — Project Manager/TIF Analyst Philip is a project manager with 13 years of experience in historic preservation, building investigations, material research, and construction methods. He previously worked as a historic preservationist and also served as the preservation specialist at the St. Paul Heritage Preservation Commission. Currently, Philip sits on the Board of Directors for the Preservation Alliance of Minnesota. His current responsibilities include project management of historic preservation projects, performing building condition surveys and analysis, TIF analysis, writing preservation specifications, historic design reviews, writing Historic Preservation Tax Credit applications, preservation planning, and grant writing. We have attached a building condition/deficiency report, replacement cost worksheet, code - related repair cost worksheet, and thumbnail photo sheets for each building and a summary worksheet for inclusion in your council resolution. Please contact me at (612) 752-6920 if you have any questions. LHB INC. MICHAEL A. FISCHER, AIA, LEED AP VICE PRESIDENT M:\13Proj\130391\400 Design\406 Reports\TIF\Final Report\Hopkins Block 64 Multiple Bldgs Letter of Finding 7-30- 2013.doc U) M S , 2 }( CL � E ( ) E || co !2 ! § 2 IF }) | | ƒ k \ ( | } § k � ) § \ ) ) § § � e § HOPKINS BLOCK 64 TIF DISTRICT BUILDING CODE AND CONDITION DEFICIENCIES REPORT July 31, 2013 Map No. & Building Name/Address: MAP ID 41 — 501 Mainstreet Inspection Date(s) & Time(s): March 11, 2005, 11:30 AM July 1, 2013; 1:30 PM Inspection Type: Interior and Exterior Summary of Deficiencies: It is our professional opinion that this building is Substandard because: - Substantial renovation is required to correct Conditions found. - Building Code deficiencies total more than 15% of replacement cost. Estimated Replacement Cost: $226,372 Estimated Cost to Correct Building Code Deficiencies: $ 40,100 Percentage of Replacement Cost for Building Code Deficiencies: 17.7% Description of Condition Deficiencies - Garage floor slab has many cracks and some unevenness. - Metal panel walls have some damage on northwest corner both low and high. - Painted CMU on north wall has excessive peeling. - CMU wall missing insulation and vapor barrier. - Gas island canopy has excessive peeling of paint on underside. - Gaps at door sills need to be sealed. Paint is peeling and metal corroding at N. windows. - Fascia at northwest corner of building has severe damage. - Provide accessible parking stalls, signage, and path to the entry. - Install fresh/makeup air for entire building. - Install an exhaust system for repair garage. - Remodel restroom to provide an accessible restroom; clear floor area, fixture clearances, grab bars, entry and access. - Install an accessible drinking fountain. - Install combustion air for gas fired furnace and heaters. - Install covers and proper wiring of all equipment and devices. - Install a fire rated partition and door between convenience store and repair garage. - Paint on ceiling of service bays is peeling very badly. Description of Code Deficiencies - Provide accessible parking stalls, signage, and path to the entry. - Install fresh/makeup air for entire building. - Install an exhaust system for repair garage. - Remodel restroom to provide an accessible restroom; clear floor area, fixture clearances, grab bars, entry and access. - Install an accessible drinking fountain. - Install combustion air for gas fired furnace and heaters. - Install covers and proper wiring of all equipment and devices. - Install a fire rated partition and door between convenience store and repair garage. Energy Code In addition to the building code deficiencies, the existing building does not comply with the current energy code; however, these deficiencies are not included in the estimated costs to correct code deficiencies or listed as condition deficiencies. - Buildings exterior envelope (walls, roof and foundation walls/perimeter slab) do not have insulation with R -values needed to meet current energy code requirements. - Building's heating, cooling and lighting are not as efficient as current energy code would require. HOPKINS BLOCK 64 TIF DISTRICT BUILDING CODE AND CONDITION DEFICIENCIES REPORT July 31, 2013 Map No. & Building Name/Address: MAP ID 42 — 525 Mainstreet Inspection Date(s) & Time(s): March 11, 2005, 11:00 AM/ Nov. 18, 2008, 9:10 AM July 1, 2013,1:30 PM Inspection Type: Interior and Exterior Summary of Deficiencies: It is our professional opinion that this building is Substandard because: - Substantial renovation is required to correct Conditions found. - Building Code deficiencies total more than 15% of replacement cost. Estimated Replacement Cost: $256,353 Estimated Cost to Correct Building Code Deficiencies: $ 49,290 Percentage of Replacement Cost for Building Code Deficiencies: 19.2% Description of Condition Deficiencies - Wood siding is in need of refinishing and, in some areas close to ground, replacement. - Wood near roof and soffit has damage at ends — replace. - Overhead door has damaged panels at bottom — replace. - East wall windows removed but openings not properly sealed for weather. - Most windows and doors OK, but some trim at overhead door damaged and needs repair/replacement. - Interior door to office area has minor damage. - Threshold at front exterior door is damaged and should be repaired. - Ceilings in service area in poor condition and not continuous (holes and open/sagging seams). - Tile floors throughout the facility are broken and in very poor condition. - Baseboard throughout the facility is in poor condition. - Wood paneling on office walls is bowed away from wall. - Door is missing from restroom. - Restroom walls are not impervious at sides of fixtures. - Provide accessible parking stall, signage and path to entry door. - Replace damaged storefront glazing at office area. - Repair water damaged ceiling at repair garage. - Repair plugged drain at mop sink in repair garage. - Replace rotted/deteriorated wood siding/trim to make weather tight. - Install fulltime fresh/makeup air ventilation system. - Install exhaust system in repair garage area. - Install exhaust fans in restrooms. - Remodel office restroom to be fully accessible. - Install GFCI outlets in restrooms and at break area sink. - Install a fire rated partition (1 Hour) between office area and repair garage area. - Upgrade east exterior wall to a one-hour fire rated construction since building is less than 10 feet to property line. Description of Code Deficiencies - Restroom walls are not impervious at sides of fixtures. Page 1 of 2 - Provide accessible parking stall, signage and path to entry door. - Install fulltime fresh/makeup air ventilation system. - Install exhaust system in repair garage area. - Install exhaust fans in restrooms. - Remodel office restroom to be fully accessible. - Install GFCI outlets in restrooms and at break area sink. - Install a fire rated partition (1 Hour) between office area and repair garage area. - Upgrade east exterior wall to a one-hour fire rated construction since building is less than 10 feet to property line. - Provide landing at exterior of entry door. Existing is sloped. - Provide 10" min. kickplate at entry door for accessibility requirement. - Install fire -resistive exit door into intervening office space or exterior wall. - Replace damaged storefront glazing at office area. - Provide fire -extinguishers in office area and repair garage. - Replace door for accessibility into private office and toilet room. - Replace door knob with lever handle for accessibility. - Repair water damaged ceiling at repair garage. - Repair plugged drain at mop sink in repair garage. - Install flammable trap at repair garage. - Install roof overflow scupper. - Replace deteriorated and non-compliant slope on roof. - Replace rotted/deteriorated wood siding/trim to make weather tight. Enerzy Code In addition to the building code deficiencies, the existing building does not comply with the current energy code; however, these deficiencies are not included in the estimated costs to correct code deficiencies or listed as condition deficiencies. - Buildings exterior envelope (walls, roof and foundation walls/perimeter slab) do not have insulation with R -values needed to meet current energy code requirements. - Building's heating, cooling and lighting are not as efficient as current energy code would require. Page 2 of 2 HOPKINS BLOCK 64 TIF DISTRICT BUILDING CODE AND CONDITION DEFICIENCIES REPORT July31,2013 Map No. & Building Name/Address: MAP ID #3 — 15 6`h Avenue North Inspection Date(s) & Time(s): March 11, 2005, 10:30 AM July 1, 2013, 1:45 PM Inspection Type: Interior and Exterior Summary of Deficiencies: It is our professional opinion that this building is Substandard because: - Substantial renovation is required to correct Conditions found. - Building Code deficiencies total more than 15% of replacement cost, NOT including $23,000 of energy code deficiencies. Estimated Replacement Cost: $236,003 Estimated Cost to Correct Building Code Deficiencies: $ 36,833 Percentage of Replacement Cost for Building Code Deficiencies: 15.6% Description of Condition Deficiencies - Detached garage east and west walls are moisture damaged at bottom that is partial buried into ground. - House and garage asphalt roof shingles are in poor condition. - Basement walls and floor show extensive mold growth. - Basement VCT tiles are loose and broken and most likely contain asbestos. - Paint on exterior trim and siding is chipped and peeling. - Gutters are clogged and have plants growing in them. - Downspouts and rainwater leaders on the south side are disconnected. - 2nd floor at east side has peeling paint. Ice dams/water damage are possible cause. - Front stoop steps and landing brick have been damaged water/freeze/thaw. - Landing outside front door is too low. - The chimney is not high enough above the roof. - Brick chimney needs repointing. - Brick stoop is damaged, with many loose and broken bricks. - Front entry stoop handrails are not anchored securely at damaged brick stoop. - Steel windows on house are corroding (storms and sashes) and need replacement. - Guardrail at upstairs hall and stair is loose. - Replace front stoop handrail and guardrail with code compliant (4" sphere) railings. - Replace guardrail at 2nd floor landing with code compliant (4" sphere) railing. - Install exhaust hood in kitchen. - Install GFCI outlets at bathroom, kitchen, laundry and garage. - Install arc fault current interrupter (AFCI) outlets at bedrooms, hallways and living rooms. - Install egress window and window well at basement. - Replace basement stair and railings to be code compliant, rise, run, railings and landing. - Replace main stair and railings to be code compliant, rise, run, railings and landing. - Install smoke detectors in both bedrooms and on each level including basement. - Install carbon monoxide detector within 10 feet of bedrooms. - Building lacks a furnace and ductwork in the basement. Install new furnace and connect to existing ductwork. - Install utility or laundry sink to provide for drainage of washing machine. Page 1 of 2 - Install new lavatory at 2nd Floor bathroom to replace missing one. Upgrade insulation throughout to be in compliance with Residential Code. - Upgrade windows throughout with energy efficient glass and windows to be in compliance with Residential Code. Descrivtion of Code Deficiencies - Replace front stoop handrail and guardrail with code compliant (4" sphere) railings. - Rebuild front stoop to provide landing within 1 '/2" below top of threshold per R311.4.3. - Replace guardrail at 2nd floor landing with code compliant (4" sphere) railing. - Install exhaust hood in kitchen. - Install GFCI outlets at bathroom, kitchen, laundry and garage. - Install arc fault current interrupter (AFCI) outlets at bedrooms, hallways and living rooms. - Install egress window and window well at basement. - Replace basement stair and railings to be code compliant, rise, run, railings and landing. - Replace main stair and railings to be code compliant, rise, run, railings and landing. - Install smoke detectors in both bedrooms and in basement. - Install carbon monoxide detector within 10 feet of bedrooms. - The chimney is not high enough above the roof. Code minimum is 3'-0". Extend chimney min. 12" higher. - Building lacks a furnace and ductwork in the basement. Install new furnace and connect to existing ductwork. - Install utility or laundry sink to provide for drainage of washing machine. - Install new lavatory at 2nd Floor bathroom to replace missing one. Energy Code Deficiencies - Upgrade insulation throughout to be in compliance with Residential Code. - Upgrade windows throughout with energy efficient windows to be in compliance with Residential Code. The lot is currently zoned R4 Medium High Density Multiple Family. A single family house is not a conforming use in this zone. And since the house has been unoccupied for more than one year, any subsequent use or occupancy on the lot would need to conform. Further, the lot does not meet the minimum 150' width required in the R4 zone. Even if a variance was given for the inadequate lot width, the existing structure could not reasonably be modified to house a permitted use. The finished portion of the basement has significant and widespread mold growth. This will require clean up to make the space useable, however as the Minnesota Department of Health notes, there is not a legal requirement for a homeowner to address mold issues in his/her own home. However, a landlord is required to maintain habitable units and a significant mold problem would impair habitability of a space. Page 2 of 2 Building Replacement Cost Report Estimate Name: Hopkins Garage/Service Station snzMain Street, Hopkins, xxm MAP /mwz Garage, Repair with Enameled Sandwich Panel Building Type: Steel Frame Location: MINNEAPOLIS, MN � Story Count: z 8o*Height (/.pl: zz RoorArea <s.pl: 1647 Labor Type: Opm Basement Included: No Data Release: vea,zozs ' Cost Per Square Foot: 5137.45 ,— Building Cost: $226'372 %ofTvta| cvstpe,sa Cost A1010 Standard Foundations $3.35 $s'szr Strip footing, concrete, reinforced, load 11.1 uLF' soil bearing capacity s Azoan Slab onGrade $8.02 $13,209 Slab ongrade, 6^thick, light industrial, reinforced A2010 Basement Excavation $0.75 $z'zss Excavate and fill, 2'OOOSF, 4'deep, sand gravel, orcommon earth, onsite x2020 Basement Walls $7.49 $12'336 Foundation wvU' c|p.4'wall height, di/ectc^otc' .148 cv/|r, 7.2 po' o^ ML a1020 Roof Construction $6s0 $10\376 bay, zVpspsuperimposed load, sz.s''deep, 4opsptotal load n2010 Exterior Walls $13.50 $zz'zss Metal siding, steel, sandwich panels, factory fabricated, z^polystyrene, oaoao Exterior Windows $8.00 $13'176 Windows, aluminum, sliding, standard glass, 5' x»' Facing panel, textured aluminum, 4'xn'xs/z6^ plywood backing, single eaoso Exterior Doors $*.zo $15,152 Door, steel 1ngauge, hollow metal, zdoor with frame, nolabel, 3''0^x7'' 000r,uee|24gavge.overhmu. sectional, manual operation, zz''o'', 12'- B3010 Roof Coverings $7.20 $zz'osu Roofing, corrugated, steel, galvanized, zzga' 1.45 psF Insulation, rigid, roof deck, fiberglass. 3'x4' or 4'x8' sheets, 15/16" thick, c1010 . Partitions $3.10 $5,106 Lightweight block 4''thick 5/8^gypsum board, taped &finished, painted onzx4studs z6^OI. czoao Interior Doors $zzo $z'*ro Door, single leaf, kdsteel frame, hollow metal, commercial quality, flush, czoso Fittings $1.80 $z'yas SubTotal 100% $124.95 $205,793 Toilet partitions, cubicles, ceiling hung, stainless steel C3010 Wall Finishes $2.85 $4,694 Painting, masonry or concrete, latex, brushwork, primer & 2 coats Painting, masonry or concrete, latex, brushwork, addition for block filler C3020 Floor Finishes $1.34 $2,207 Concrete topping, hardeners, metallic additive, minimum Vinyl, composition tile, minimum C3030 Ceiling Finishes $1.00 $1,647 Acoustic ceilings, 5/8" fiberglass board, 24" x 48" tile, tee grid, suspended M NET= NEED D2010 Plumbing Fixtures $4.20 $6,917 Water closet, vitreous china, bowl only with flush valve, wall hung Urinal, vitreous china, wall hung Lavatory w/trim, wall hung, PE on Cl, 19" x 17" Service sink w/trim, PE on Cl,wall hung w/rim guard, 24" x 20" Water cooler, electric, wall hung, wheelchair type, 7.5 GPH D2020 Domestic Water Distribution $3.00 $4,941 Gas fired water heater, residential, 100< F rise, 30 gal tank, 32 GPH D3050 Terminal & Package Units $11.00 $18,117 Rooftop, single zone, air conditioner, factories, 10,000 SF, 33.33 ton D3090 Other HVAC Systems/Equip $5.50 $9,059 Garage, single exhaust, 3" outlet, cars & light trucks, 1 bay Garage, single exhaust, 3" outlet, additional bays up to seven bays D4010 Sprinklers $0.00 $0 Wet pipe sprinkler systems, steel, ordinary hazard, 1 floor, 10,000 SF D4020 Standpipes $0.00 $0 Wet standpipe risers, class III, steel, black, sch 40, 4" diam pipe, 1 floor D5010 Electrical Service/Distribution $4.20 $6,917 Service installation, includes breakers, metering, 20' conduit & wire, 3 Feeder installation 600 V, including RGS conduit and XHHW wire, 200 A Switchgear installation, incl switchboard, panels & circuit breaker, D5020 Lighting and Branch Wiring $6.00 $9,882 Receptacles incl plate, box, conduit, wire, 4 per 1000 SF, .5 watts per SF Miscellaneous power, 1 watt D5030 Communications and Security $2.20 $3,623 Communication and alarm systems, fire detection, addressable, Internet wiring, 4 data/voice outlets per 1000 S.F. D5090 Other Electrical Systems $0.00 $0 Generator sets, w/battery, charger, muffler and transfer switch, Equipment & Furnishings E1030 Vehicular Equipment 13.75 $22,646 Architectural equipment, auto equipment hoists, single post, 4 ton E1090 Other Equipment 0 0 SubTotal 100% $124.95 $205,793 Contractor Fees (General Conditions,overhead,Profit) Architectural Fees 10.00% $12.50 $20,579 0.00% $0.00 $0 User Fees 0.00% $0.00 Total Building Cost 1 $137.45 $226,372 Code deficiency Cost Report Hopkins, MN Proposed Block 64 TIF District Project No. 130391 MAP ID #1 PID 24-117-22-42-0009 Address 501 MAINSTREET Unit Code Related Cost Items Unit cost Units Quantity Total General Site Provide accessible parking stalls, signage, and path to the entry $ 600.00 Lump sum 1 $ 600.00 Accessibility Items Remodel restroom to provide an accessible restroom; clear floor area, fixture clearances, grab bars, entry and access. $ 14,000.00 Lump sum 1 $ 14,000.00 Install and accessible drinking fountain $ 2,500.00 Lump sum 1 $ 2,500.00 Fire Protection Install a fire rated partition and door between convenience store and repair garage $ 4,000.00 Lump Sum 1 $ 4,000.00 Mechanical- Electrical Install fresh/makeup air for entire building $ 8,000.00 Lump sum 1 $ 8,000.00 Install an exhaust system for repair garage $ 9,000.00 Lump sum 1 $ 9,000.00 Install combustion air for gas fired furnace and heaters. $ 300.00 3 $ 900.00 Install covers and proper wiring of all equipment and devices $ 1,100.00 lump sum 1 $ 1,100.00 Total Code Improvements $ 40,100.00 Page 1 of 1 To -7, 101 0001.JPG 101 G002.JPG 1010003 JPG 1010004 JPG 101 0005.JPG 101 0006.J PG 101 0007,JPG 101 0011.JPG 101 C012.JPG 101 0008 JPG 101 0009.JPG 101 0010.JPG TIV 'IN y_ 101 0013 JPG 101_0014 JPG 101 0015.JPG 101 0016.JPG 101 -CO 17.JPG 101 _0021.JPG 1010018 JPG 101 0019.JPG 101 0020.JPG Building Replacement Cost Report Estimate Name: Hopkins Repair Shop 525 Main Street, Hopkins, MN MAP ID #2 Garage, Repair with Stucco on Concrete Block / Building Type: Wood Frame Location: MINNEAPOLIS, MN Story Count: 1 .y Story Height (LF.): 14 _ -- Floor Area (S.F.) 1925 Labor Type: OPN Basement Included: No Data Release: Year 2013 Costs are derived from a building model with basic components. Cost Per Square Foot: $133.16 Scope differences and market conditions can ca use costs to vary significantly. Building Cost: $256,323 % of Total Cost Per S.F. Cost ,A Substructure A1010 Standard Foundations $3.35 $6,449 Strip footing, concrete, reinforced, load 11.1 KLF, soil bearing capacity 6 A1030 Slab on Grade $8.02 $15,439 Slab on grade, 6" thick, light industrial, reinforced A2010 Basement Excavation $0.75 $1,444 Excavate and fill, 2,000 SF, 4' deep, sand gravel, or common earth, on site A2020 Basement Walls $7.49 $14,418 Foundation wall, CIP, 4' wall height, direct chute, .148 CVLF, 7.2 PLF, 12" own Normm 81020 Roof Construction $6.30 $12,128 bay, 20 PSF superimposed load, 32.5" deep, 40 PSF total load 82010 Exterior Walls $13.50 $25,988 Cement stucco, 7/8" thick, plywood sheathing, 1x8 fascia, R30 insulation, 82020 Exterior Windows $8.00 $15,400 Windows, aluminum, sliding, standard glass, Six 3' Facing panel, textured aluminum, 4'x 8'x 5/16" plywood backing, single 82030 Exterior Doors $6.80 $13,090 Door, steel 18 gauge, hollow metal, 1 door with frame, no label, 3'-0" x 7' - Door, steel 24 gauge, overhead, sectional, manual operation, 12'-0" x 12'- B3010 Roof Coverings $7.20 $13,860 Asphalt roofing, strip shingles, inorganic, Class C, 4" slope, 235-240 C Interiors C1010 Partitions �® $3.10 $5,968 Lightweight block 4" thick 5/8" gypsum board, taped & finished, painted on 2 x 4 studs 16" O.C. C1020 Interior Doors $1.20 $2,310 Door, single leaf, kd steel frame, hollow metal, commercial quality, flush, C1030 Fittings $1.80 $3,465 Toilet partitions, cubicles, ceiling hung, stainless steel C3010 Wall Finishes $2.85 $5,486 Painting, masonry or concrete, latex, brushwork, primer & 2 coats Painting, masonry or concrete, latex, brushwork, addition for block filler C3020 Floor Finishes $1.34 $2,580 Concrete topping, hardeners, metallic additive, minimum Vinyl, composition tile, minimum 03030 Ceiling Finishes $1.00 $1,925 Acoustic ceilings, 5/8" fiberglass board, 24" x 48'' tile, tee grid, suspended D2010 Plumbing Fixtures $4.20 $8,085 Water closet, vitreous china, bowl only with flush valve, wall hung Urinal, vitreous china, wall hung Lavatory w/trim, wall hung, PE on Cl, 19" x 17" Service sink w/trim, PE on Cl,wall hung w/rim guard, 24" x 20" Water cooler, electric, wall hung, wheelchair type, 7.5 GPH D2020 Domestic Water Distribution $3.00 $5,775 Gas fired water heater, residential, 100< F rise, 30 gal tank, 32 GPH D3050 Terminal & Package Units $10.00 $19,250 Rooftop, single zone, air conditioner, factories, 10,000 SF, 33.33 ton D3090 Other HVAC Systems/Equip $5.00 $9,625 Garage, single exhaust, 3" outlet, cars & light trucks, 1 bay Garage, single exhaust, 3" outlet, additional bays up to seven bays D4010 Sprinklers $0.00 $0 Wet pipe sprinkler systems, steel, ordinary hazard, 1 floor, 10,000 SF D4020 Standpipes $0.00 $0 Wet standpipe risers, class III, steel, black, sch 40, 4" diam pipe, 1 floor D5010 Electrical Service/Distribution $4.20 $8,085 Service installation, includes breakers, metering, 20' conduit & wire, 3 Feeder installation 600 V, including RGS conduit and XHHW wire, 200 A Switchgear installation, incl switchboard, panels & circuit breaker, D5020 Lighting and Branch Wiring $6.00 $11,550 Receptacles incl plate, box, conduit, wire, 4 per 1000 SF, .5 watts per SF Miscellaneous power, 1 watt D5030 Communications and Security $2.20 $4,235 Communication and alarm systems, fire detection, addressable, Internet wiring, 4 data/voice outlets per 1000 S.F. D5090 Other Electrical Systems $0.00 $0 Generator sets, w/battery, charger, muffler and transfer switch, M. E1030 Vehicular Equipment 13.75 $26,469 Architectural equipment, auto equipment hoists, single post, 4 ton E1090 Other Equipment 0 0 SubTotal 100% $121.05 $233,021 Contractor Fees (General Conditions,Overhead,Profit) 10.00% $12.11 $23,302 Architectural Fees 0.00% $0.00 $0 User Fees 0.00% $0.00 $0 Code deficiency Cost Report Hopkins, MN Proposed Block 64 TIF District Project No. 130391 MAP ID #2 PID 24-117-22-42-0166 Address 525 MAINSTREET Unit Code Related Cost Items Unit cost Units Quantity Total General Install impervious floor and wall finishes at restrooms at plumbing fixtures $ 1,600.00 ea 2 $ 3,200.00 Provide accessible parking stall, signage and path to entry door $ 500.00 lump sum 1 $ 500.00 Accessibility Items Remodel office restroom to be fully accessible $ 7,000.00 Lump sum 1 $ 7,000.00 Lump sum 1 $ - Lump sum 1 $ - Fire Protection Install a fire rated partition (1 Hour) between office area and repair garage area Upgrade east exterior wall to a one hour fire rated construction since building is less $ 4,400.00 Lump Sum 1 $ 4,400.00 than 10 feet to property line $ 11,000.00 Lump Sum 1 $ 11,000.00 Mechanical- Electrical Install fulltime fresh/makeup air ventilation system $ 12,000.00 Lump sum 1 $ 12,000.00 Install exhaust system in repair garage area $ 10,000.00 Lump sum 1 $ 10,000.00 Install exhaust fans in restrooms $ 220.00 ea 2 $ 440.00 Install GFCI outlets in restrooms and at break area sink $ 250.00 ea 3 $ 750.00 Total Code Improvements $ 49,290.00 Page 1 of 1 4 lidOtto 101 0107.JPG 101 0108.JPG 101 0109 JPG 101 0110.JPG 101 C111.JPG 4� b 101 0112.JPG 101 -Cl 13.JPG 101 0114 JPG 101 0115 JPG 101 0116.JPG 101 0117.JPG 101 0118.JPG 101 0119 JPG 1010120 JPG 1010121 JPG .r . 101 0122.JPG 1010123 JPG 1010124 JPG 101 0125.JPG 101 0126.JPG 101 0127.JPG 101 0128.JPG 101 0129 JPG 101 0130.JPG 101 0131.JPG 101 0132.JPG 101 0133.JPG 1010134 JPG r - F 1010135 JPG 101 0136.JPG 101 0137.JPG U-11 G 1 i8 JPG 1010139 JPG 101 01 :0 JPG 101 0141.JPG 101 0142.JPG 101 0143.JPG 101_0144 JPG 101_0145 JPG 101 0147.JPG 101 0148.JPG 101 0152.JPG 101 0153.JPG 101 __ 0149.JPG 101_0150.JPG 101 0146.JPG Building Replacement Cost Report 15 6th Avenue North, Hopkins MAP ID #3 This is an estimate for a single-family residence built under competitive conditions in Zip area 553-555 Hopkins, Minnesota in 2013. This estimate includes a foundation as required for normal soil conditions, excavation for foundation and doors, windows, trim, electric wiring and fixtures, rough and finish plumbing, built-in appliances, supervision, design fees, permits, utility hook-ups, the contractors' contingency, overhead and profit. Approximate size of building 1,800 sf Cost per sf $ 131.11 Item Name Material Labor Equipment Total Excavation 3,333.00 835 4,168.00 Foundation, Piers, Flatwork 6,861.00 11,295.00 1,699.00 19,855.00 Rough Hardware 670 1105 167 1,942.00 Rough Carpentry 20,000.00 18,000.00 - 38,000.00 Insulation 2,200.00 3,300.00 5,500.00 Exterior Finish 11,812.00 7,383.00 879 20,074.00 Exterior Trim 800 1,318.00 199 2,317.00 Doors 2,028.00 1,781.00 3,809.00 Windows 3,492.00 2,485.00 5,977.00 Finish Hardware 338 297 635.00 Garage Door 957 409 1,366.00 Roofing, Flashing, Fascia 6,000.00 6,000.00 12,000.00 Finish Carpentry 1,231.00 3,000.00 4,231.00 Interior Wall Finish 3,000.00 5,500.00 8,500.00 Painting 2,500.00 5,000.00 7,500.00 Wiring 3,585.00 5,000.00 8,585.00 Lighting Fixtures 2,688.00 885 3,573.00 Flooring 2,641.00 3,922.00 6,563.00 Carpeting 2,000.00 1,962.00 - 3,962.00 Bath Accessories 1,302.00 839 2,141.00 Shower & Tub Enclosure 831 729 1,560.00 Countertops 2,513.00 2,205.00 4,718.00 Cabinets 6,000.00 2,720.00 8,720.00 Built In Appliances 4,020.00 587 4,607.00 Plumbing Rough -in and Connection 2,500.00 5,000.00 550 8,050.00 Plumbing Fixtures 2,000.00 2,541.00 4,541.00 Heating and Cooling Systems 3,843.00 5,764.00 9,607.00 Unit Heating and Cooling 0.00 Fireplace and Chimney 0 Subtotal Direct Job Costs $95,812.00 $102,360.00 $4,329.00 $202,501.00 Final Cleanup 1,115.00 1,115.00 Insurance 7,806.00 7,806.00 Permits & Utilities 4,740.00 4,740.00 Plans & Specs 1115.00 1115.00 Subtotal Indirect Job Costs $13,661.00 $1,115.00 $14,776.00 Contractor Markup 19,162.40 19,162.40 Total Cost $128,635.40 $103,475.00 $3,893.00 $236,003.40 Code deficiency Cost Report Hopkins, MN Proposed Block 64 TIF District Project No. 130391 MAP ID #3 PID 24-117-22-42-0017 Address 15 6TH AVE N Code Related Cost Items Accessibility Items Exiting Unit Unit Cost Units Quantity Total Replace damaged brick stoop with a compliant one $ 2,000.00 lump 1 $ 2,000.00 Replace front stoop handrail and guardrail with code compliant railings $ 1,800.00 lump 1 $ 1,800.00 Replace guardrail at 2nd floor landing with code compliant railing $ 2,200.00 lump 1 $ 2,200.00 Basement stair - excess variation in height of risers, guard too low revise select risers $ 350.00 Riser 13 $ 4,550.00 Provide new railing at 14 feet per stair $ 50.00 Foot 14 $ 700.00 2nd Floor stair - revise railing to code revise select risers $ 350.00 Riser 14 $ 4,900.00 Provide new railing at 14 feet per stair $ 50.00 Foot 14 $ 700.00 Egress from habitable basement room provide egress window and window well $ 3,600.00 lump 1 $ 3,600.00 Fire Protection Fire alarms Install smoke detectors at bedrooms, main floor and basement $ 225.00 ea 4 $ 900.00 Install CO detector outside bedrooms $ 225.00 ea 1 $ 225.00 Exterior Construction Provide code compliant exterior wall covering Repair damaged siding - various locations $ 5.00 SF 200 $ 1,000.00 Repoint chimney joints $ 4.50 SF 24 $ 108.00 Extend chimney $ 500.00 lump 1 $ 500.00 Roof Construction Revise roof to provide adequate ventilation MN1305.1507.10.1 to 1305.1507.15.1 Install new soffit and roof vents lump 1 $ - Mechanical- Electrical Provide new furnace and basement ductwork to replace missing $ 8,000.00 each 1 $ 8,000.00 replace missing lav in bathroom $ 1,000.00 each 1 $ 1,000.00 replace missing laundry sink $ 600.00 each 1 $ 600.00 Provide ventilation hood at range $ 800.00 lump 1 $ 800.00 Provide GFCI protected receptacles at sink locations Kitchen $ 250.00 each 3 $ 750.00 Bathroom $ 250.00 each 1 $ 250.00 Laundry $ 250.00 each 1 $ 250.00 Garage $ 250.00 each 1 $ 250.00 Provide AFCI protected receptacles at sink locations Living Room $ 250.00 each 3 $ 750.00 Bedrooms $ 250.00 each 2 $ 500.00 Hallways $ 250.00 each 2 $ 500.00 Total Code Improvements $ 36,833.00 Page 1 of 2 Unit Code Related Cost Items Unit Cost Units Quantity Total Energy Code Replace windows $ 15,000.00 lump 1 $ 15,000.00 Add insulation. $ 8,000.00 lump 1 $ 8,000.00 Provide additional ventilation to comply with current code for fresh air MN 1346.0403 Section 403.3 Assumes 30% of floor area is non -code compliant Mechanical equipment, ductwork and units $ 6.75 SF 540 $ 3,645.00 Additional electrical service and distribution for mechanical equipment $ 2.00 SF 540 $ 1,080.00 Page 2 of 2 101_0070.JPG rr A _ 101_0080.JPG 101 _0085.JPG v rip 101_0071.JPG 101_0076.JPG 101_0081.JPG 101 _0072.J PG 101 _0073.JPG 101 _0077.J PG 101 _0078.JPG 101_0074.JPG :e 101_0079.JPG 101 _0082.JPG 101 _0083.JPG 101 _0084.JPG 101 _0086.JPG 101_0087.JPG 101 _0088.JPG 101_0090.JPG 101_0091.JPG 101 _0092.JPG 101 _0093.JPG ,v �r 'r► wM_ • i• 101 0095.JPG 101 0096.JPG 101 0097.JPG 101 0098.JPG 101 _0089.JPG 101_0099.JPG 101_0100.JPG 101_0101.JPG 101_0102.JPG 101_0103.JPG 101_0104.JPG t 101 0105.JPG w 1010106 JPG HOUSING AND REDEVELOPMENT AUTHORITY IN AND FOR THE CITY OF HOPKINS, MINNESOTA Hennepin County, Minnesota RESOLUTION NO. 494 A RESOLUTION FINDING THE EXISTENCE OF STRUCTURALLY SUBSTANDARD BUILDINGS ON REAL PROPERTY THAT MAY BE INCLUDED IN A TAX INCREMENT DISTRICT, PURSUANT TO MINNESOTA STATUTES, SECTION 469.174, SUBDIVISION 10(d) WHEREAS, the Housing and Redevelopment Authority In and For the City of Hopkins, Minnesota (the "Authority"), has caused to be inspected certain parcels of real property located within the City of Hopkins, Minnesota (the "City"), which parcels of real property are collectively referred to herein as the "Property" and the addresses of which are set forth on the attached Exhibit A; and WHEREAS, the Property contains buildings that the Authority believes qualify as "structurally substandard" within the meaning of Minnesota Statutes, section 469.174, subd. 10 of the Minnesota tax increment financing laws; and WHEREAS, the Authority intends to undertake or assist in the redevelopment of the Property and, in this regard, has determined that it may create a new tax increment financing district to encompass the Property and to provide a funding source for the redevelopment of the Property; and WHEREAS, the Authority desires to demolish or cause to be demolished the buildings located on the Property prior to the time that a new tax increment district can be created; and WHEREAS, Minnesota Statutes, section 469.174, subd. 10(d), provides that a parcel of property on which a structurally substandard building has been demolished by a tax increment authority or by a developer under a development agreement with the authority may still be treated as occupied by such building for purposes of creating a tax increment financing district if prior to the demolition the authority finds by resolution that the parcel was occupied by a structurally substandard building and that the authority intends to include the parcel in a tax increment district; and WHEREAS, the Authority by this resolution intends to preserve its ability to deem the Property as occupied by structurally substandard buildings for purposes of including the Property in a future tax increment financing district. NOW, THEREFORE, be it hereby resolved by the Board of Commissioners of the Authority as follows: 1. Based upon all of the information available to the Authority, including reports of the Authority's consultants, staff and City building officials, the Authority finds that each parcel of the Property is occupied by a structurally substandard building for the following reasons: a. At least 15 percent of the area of each parcel comprising the Property is occupied by buildings, streets, utilities, paved or gravel parking lots or other similar structures; b. Each building located on the Property contains defects in structural elements or a combination of deficiencies in essential utilities and facilities, light and ventilation, fire protection including adequate egress, layout and condition of interior partitions, or similar factors, which defects or deficiencies are of sufficient total significance to justify substantial renovation or clearance; and C. The buildings are not in compliance with the building code applicable to new buildings and could not be modified to satisfy the building code at a cost of less than 15 percent of the cost of constructing a new structure of the same square footage and type on the site. 2. The demolition of the buildings on the Property will be undertaken by the Authority or financed by the Authority or by a developer under a development agreement with the Authority. 3. After demolition of the buildings the Authority intends to include the Property in a new tax increment district if such district is created. Adopted by the Board of Commissioners of the Housing and Redevelopment Authority In and For the City of Hopkins, Minnesota, this 5th day of August 2013. Chair Secretary ��i:i ; •1 Addresses of Property 501 Mainstreet, Hopkins, Minnesota 525 Mainstreet, Hopkins, Minnesota 15 6t' Avenue, Hopkins, Minnesota