2022-2026 Equipment Replacement PlanEQUIPMENT REPLACEMENT PLAN
2022-2026
DATE: December 14, 2021
TO: Honorable Mayor and Members of the City Council
FROM: Mike Mornson, City Manager
SUBJECT: 2022-2026 EQUIPMENT REPLACEMENT PLAN
With this letter, I respectfully submit the 2022-2026 Equipment Replacement Plan. This
five-year planning document represents the combined efforts of city staff and the City
Council.
The Equipment Replacement Plan is a five-year forecast of equipment replacement needs
in the City of Hopkins. It is intended to alert the Council and residents of equipment
replacement needs that are needed to maintain the efficiency of city services and the
safety of city staff. The first year of the plan becomes the adopted budget, however the
equipment is again re-evaluated before final approval is given for the purchase. The
remaining four years represents estimated replacement needs and the related funding.
The Equipment Replacement Plan does not include proposed capital projects. A
document relating specifically to capital project needs has been developed into a separate
document.
The Equipment Replacement Plan is intended to serve as a planning tool and is therefore
structured to present a meaningful, long-range perspective of the city’s equipment needs
over the next 20 years. At the same time sufficient details on individual pieces of
equipment scheduled for replacement is provided to enable those who review the
information to make informed decisions of the city’s equipment needs over the next
several years.
Please use the information provided to assist in the understanding of the city’s equipment
needs as they relate to the delivery of service to the residents of Hopkins.
This document was developed by the Finance Department with the assistance of all city
departments. I wish to especially thank all those involved in the development of the
Equipment Replacement Plan, and especially Nate Stanley, Public Works Director, Brent
Johnson, Police Chief, Dale Specken, Fire Chief, Ari Lenz, Assistant City Manager, and
Nick Bishop, Finance Director for their hard work and dedication.
1
2
Page
City Manager's Message 1
Table of Contents 3
Introduction
Background and Summary of Changes from 2021 Plan 6
Cash Flow Statements
Equipment Replacement Fund 10
Five-Year Project Summaries
Projects by Year 12
Department Summary 15
Projects by Department 16
Funding Source Summary 19
Projects by Funding Source 20
Equipment Requests
Individual Equipment Request Details
Activity Center 24
Arts Center 27
Community Services - IT 31
Fire 45
HRA 55
Pavilion 56
Police 60
Public Works 72
Refuse 85
Water/Sewer 86
Twenty Year Replacement Schedule
Twenty Year Replacement Schedule by Department 92
Equipment Inventory 96
EQUIPMENT REPLACEMENT PLAN
2022-2026
TABLE OF CONTENTS
3
4
INTRODUCTION
5
EQUIPMENT REPLACEMENT PLAN 2022-2026
BACKGROUND AND SUMMARY OF CHANGES FROM 2021 PLAN
Background
The Equipment Replacement Plan is a twenty-year forecast and a five-year plan of equipment needs in
the City of Hopkins. It is intended to inform the Council and residents of the major equipment needs on
the horizon. The first year of the plan becomes an adopted equipment budget and relates to the
operating budget of the equipment replacement fund, which is approved on an annual basis. The
remaining nineteen years represent an estimate of equipment needs and funding capabilities of the City.
Funding requirements vary from year to year. In order to maintain a fairly consistent levy each year, the
twenty-year schedule is projected with a 3% inflation factor for operating expenses.
The cash flow requirements to fund equipment needs in the equipment replacement fund will experience
a roller coaster effect over the next 20 years given the projected equipment needs and 3% inflation rate.
The intragovernmental charges were increased in 2022 by 6% and will be increased by 6% in 2023
through 2026. The majority of items purchased with ERP funds are used by departments within the
General Fund which accounts for the most of the operations of the city. The fund will continue to rely
on a tax levy in 2022. There is not tax levy proposed for 2021. It is planned to be $250,000 for 2022-
2026.
There have been many changes in technology and the way we operate and as a result there is more
equipment in the plan; the funding rate has recently increased to accommodate the higher demand in
equipment. In addition, society is dictating some of the equipment under consideration. A few items
that have been under discussion in recent years was the increase need in information technology security
to help thwart virutal attacks from malicious entities as well as additional police protective equipment to
maintain the safety of both our police personnel and community at all times.
The long term viability of the fund remains questionable and will result in difficult decisions regarding
equipment and operations. These issues were addressed as part of the Financial Management Plan
(FMP) first completed in 2014. The FMP establishes funding mechanisms to get the fund to a constant
balance of $750,000. Items that will be considered and/or implemented are rate increases, a tax levy and
issuing equipment certificates.
Equipment Certificates were sold for $225,000 in 2020 and are planned to be sold in 2022 for the
replacement of a fire engine and dump truck. This financing source allows the City to replace aging
equipment and spread the payments over 10 years. The required Equipment Certificate payment will be
part of the debt levy in the applicable year.
Each year staff re-evaluates the equipment needs and adjusts the schedule accordingly. Changes to the
plan are reflected in the document. Refurbishments, extended life expectancy and closer cost estimates
of replacements have been incorporated into the plan. The equipment replacement charges in the
general fund represent approximately 3% of total general fund expenditures.
6
The Equipment Replacement Plan’s basic premise is scheduled replacement of present equipment. A
new item must, in the year proposed, be presented in the annual operating budget with a stipulation that
replacement will be necessary in the future. Flexibility of the Equipment Replacement Plan is
established through annual review and revision, if necessary.
Summary of Changes from 2021-2025 Plan
Highlights of changes from last year’s equipment replacement plan for the years 2022-2026:
CS - Activity Center: Replace Sanitizer/Heat Booster was added in 2022 for $20,000
CS - Arts Center: No changes
CS - IT: Network Infrastructure Update was removed for $23,400
IT – Sandbox Security Appliance was added for $45,000
Community Services: No changes
Fire: Fire Engine/Rescue in 2023 estimated costs increased from $725,000 to
$771,000 and also moved to 2022.
Emergency Operations Center Upgrade was removed from 2022 $12,000.
Fire Station Alerting System was moved up from 2025 to 2023 and increased
in estimated costs from $55,000 to $75,000.
HRA No changes
Police: Records Management System was delayed from 2022 to 2024.
Police Equipment was added to 2022 and 2025 at $25,000 for each year.
Public Works: Building/Equipment Services
No Changes
Engineering
No Changes
Parks/Forestry
No Changes
Streets/Traffic
No Changes
Refuse
No changes
Sewer/Water
No Changes
7
8
CASH FLOW STATEMENT
9
City of Hopkins
Equipment Replacement Fund (602)
Rate Change 9%6%6%6%6%6%
PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET
2021 2022 2023 2024 2025 2026
Working Capital Begin Year 499,556 784,628 845,691 457,710 393,415 253,715
Revenues from charges 631,845 669,755 709,941.30 752,538 797,690 845,551
Tax Levy 200,000 - 250,000 250,000 250,000 250,000
Federal Grant - - - - -
Interest earnings 500 785 1,175 2,289 1,967 1,269
Other revenues (sale of assets)33,125 15,000 35,000 35,000 40,000 40,000
Equipment Certificates (Bonds)- 996,000 - - - -
Capital Lease - -- - 250,000 -
Total Revenues 865,470 1,681,540 996,116 1,039,826 1,339,657 1,136,820
Expenditures (excludes Leases & Depr.) 34,899 35,248 35,600 36,668 37,768 38,901
Capital Outlay - Equipment 545,499 1,585,229 1,348,497 1,067,454 1,441,589 818,670
Total Expenses 580,398 1,620,477 1,384,097 1,104,122 1,479,357 857,571
Working Capital Ending Balance 784,628 845,691 457,710 393,415 253,715 532,964
(Unrestricted Net Position)
10
FIVE-YEAR
PROJECT SUMMARIES
11
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP
PROJECTS BY YEAR
2022 2026thru
Project Name Department Project #Priority Project Cost
2022
01-ERP-0038Activity Center - Kitchen Storage 5 17,000Comm Svcs - Activity Center
01-ERP-0042Activity Center - Replace Sanitizer/Heat Booster 2 20,000Comm Svcs - Activity Center
01-ERP-1105Art Center Jaycee Studio Audio Visual n/a 13,500Comm Svcs - Arts Center
01-ERP-0003CH - Network Server n/a 25,000Comm Svcs - IT
01-ERP-0006Computers n/a 34,729Comm Svcs - IT
01-ERP-0009Network Infrastructure Upgrade n/a 0Comm Svcs - IT
01-ERP-0017IT - Office 365 n/a 44,000Comm Svcs - IT
01-ERP-0020IT - Patching Automation Software 1 10,000Comm Svcs - IT
01-ERP-0022IT - Windows 10 Enterprise Upgrade n/a 42,000Comm Svcs - IT
01-ERP-0024IT - Sandbox Security Appliance n/a 45,000Comm Svcs - IT
01-ERP-0211PD - Network Server n/a 25,000Comm Svcs - IT
01-ERP-0105Fire Engine/Rescue (2)n/a 771,000Fire
01-ERP-0126Fire - Fire Helmets n/a 16,000Fire
01-ERP-0401HRA Copier n/a 16,500HRA
01-ERP-0200Marked Patrol Vehicles (7)n/a 110,000Police
01-ERP-0203PSO - Utility 4x4 n/a 72,100Police
01-ERP-0227Police Equipment n/a 25,000Police
01-ERP-03031 Ton Dump Truck (2)n/a 53,400Public Works: Streets/Traffic
01-ERP-0305Single Axle Dump Truck (2)n/a 225,000Public Works: Streets/Traffic
01-ERP-0309Skid Loader (2)n/a 50,000Public Works: Streets/Traffic
01-ERP-0555Generator (2)n/a 43,000Sewer
01-ERP-0560Sewer Televising Camera and Van 1 180,000Sewer
1,838,229Total for 2022
2023
01-ERP-0038Activity Center - Kitchen Storage 5 12,000Comm Svcs - Activity Center
01-ERP-0003CH - Network Server n/a 26,250Comm Svcs - IT
01-ERP-0004Telephone System n/a 89,600Comm Svcs - IT
01-ERP-0006Computers n/a 36,465Comm Svcs - IT
01-ERP-0015Backup Server n/a 72,120Comm Svcs - IT
01-ERP-0017IT - Office 365 n/a 44,000Comm Svcs - IT
01-ERP-0020IT - Patching Automation Software 1 10,000Comm Svcs - IT
01-ERP-0022IT - Windows 10 Enterprise Upgrade n/a 42,000Comm Svcs - IT
01-ERP-0211PD - Network Server n/a 26,250Comm Svcs - IT
01-ERP-0109Extrication Tool (1)n/a 32,000Fire
01-ERP-0127Fire - Lucus Device n/a 18,000Fire
01-ERP-0131Fire - Station Alerting System n/a 75,000Fire
01-ERP-04004x4 3/4 Ton Truck n/a 41,100HRA
01-ERP-0200Marked Patrol Vehicles (7)n/a 117,400Police
01-ERP-0214Tactical Ballistic Vests / Helmets - SWAT 3 76,512Police
01-ERP-0215Police - Portable Radios n/a 290,000Police
01-ERP-0217Taser Replacement n/a 90,000Police
01-ERP-0218Building Video Server n/a 22,000Police
01-ERP-08001/2 Ton Pickup Truck n/a 35,400Public Works: Parks/Forestry
Wednesday, December 8, 2021
12
Project Name Department Project #Priority Project Cost
01-ERP-0804Log Truck n/a 163,600Public Works: Parks/Forestry
01-ERP-03004x4 1/2 Ton Pickup with Plow n/a 28,900Public Works: Streets/Traffic
01-ERP-03041 Ton Traffic Boom Truck n/a 136,400Public Works: Streets/Traffic
1,484,997Total for 2023
2024
01-ERP-1107Art Center Theater Projection Screen 2 6,700Comm Svcs - Arts Center
01-ERP-0003CH - Network Server n/a 27,037Comm Svcs - IT
01-ERP-0006Computers n/a 37,559Comm Svcs - IT
01-ERP-0012Core Network Switch n/a 20,000Comm Svcs - IT
01-ERP-0017IT - Office 365 n/a 45,320Comm Svcs - IT
01-ERP-0020IT - Patching Automation Software 1 10,000Comm Svcs - IT
01-ERP-0022IT - Windows 10 Enterprise Upgrade n/a 63,000Comm Svcs - IT
01-ERP-0211PD - Network Server n/a 27,038Comm Svcs - IT
01-ERP-1003Pavilion - Floor Scrubber n/a 11,600Pavilion
01-ERP-0200Marked Patrol Vehicles (7)n/a 117,400Police
01-ERP-0212Squad Car Camera Systems/ Body Worn Camera n/a 160,000Police
01-ERP-0220Squad Computers n/a 90,000Police
01-ERP-0221Records Management System n/a 150,000Police
01-ERP-0814Trailer Flatbed n/a 10,000Public Works: Parks/Forestry
01-ERP-03031 Ton Dump Truck (2)n/a 49,500Public Works: Streets/Traffic
01-ERP-0308Front End Loaders (2)n/a 268,600Public Works: Streets/Traffic
1,093,754Total for 2024
2025
01-ERP-1109Art Center Floor Scrubber n/a 10,800Comm Svcs - Arts Center
01-ERP-0003CH - Network Server n/a 27,849Comm Svcs - IT
01-ERP-0005Financial Software - Various Depts.n/a 315,000Comm Svcs - IT
01-ERP-0006Computers n/a 38,686Comm Svcs - IT
01-ERP-0014Distribution Network Switches n/a 57,000Comm Svcs - IT
01-ERP-0017IT - Office 365 n/a 46,680Comm Svcs - IT
01-ERP-0020IT - Patching Automation Software 1 10,300Comm Svcs - IT
01-ERP-0022IT - Windows 10 Enterprise Upgrade n/a 43,260Comm Svcs - IT
01-ERP-0211PD - Network Server n/a 27,849Comm Svcs - IT
01-ERP-0052Electronic Inspections Processing 2 16,231Community Services
01-ERP-0108Self Contained Breathing Apparatus (SCBA) (45)n/a 250,000Fire
01-ERP-0112Thermal Imaging Camera (2)n/a 16,180Fire
01-ERP-0125Fire Radios - Portable and Mobile Devices n/a 386,000Fire
01-ERP-0200Marked Patrol Vehicles (7)n/a 117,400Police
01-ERP-0201Sergeant's Vehicle n/a 64,154Police
01-ERP-0227Police Equipment n/a 25,000Police
01-ERP-0900Refuse Truck (RAP-R) (2)n/a 275,200Refuse
1,727,589Total for 2025
2026
01-ERP-0035Activity Center - Floor Scrubber n/a 6,700Comm Svcs - Activity Center
01-ERP-1102Art Center Kitchen Catering Equipment n/a 7,100Comm Svcs - Arts Center
01-ERP-0003CH - Network Server n/a 28,684Comm Svcs - IT
01-ERP-0006Computers n/a 39,847Comm Svcs - IT
01-ERP-0015Backup Server n/a 78,808Comm Svcs - IT
01-ERP-0017IT - Office 365 n/a 48,080Comm Svcs - IT
01-ERP-0020IT - Patching Automation Software 1 10,609Comm Svcs - IT
01-ERP-0022IT - Windows 10 Enterprise Upgrade n/a 44,558Comm Svcs - IT
01-ERP-0024IT - Sandbox Security Appliance n/a 45,000Comm Svcs - IT
Wednesday, December 8, 2021
13
Project Name Department Project #Priority Project Cost
01-ERP-0211PD - Network Server n/a 28,684Comm Svcs - IT
01-ERP-0113Emergency Preparedness Sirens n/a 38,500Fire
01-ERP-1000Pavilion Ice Resurfacer n/a 165,000Pavilion
01-ERP-1001Pavilion - Electric Ice Edger n/a 8,900Pavilion
01-ERP-1002Pavilion Arena Scoreboard n/a 12,000Pavilion
01-ERP-0200Marked Patrol Vehicles (7)n/a 128,000Police
01-ERP-0202PSO / Parking Enforcement Vehicle n/a 60,000Police
01-ERP-0203PSO - Utility 4x4 n/a 86,100Police
01-ERP-0218Building Video Server n/a 17,000Police
01-ERP-07104X4 3/4 Ton Truck n/a 42,100Public Works: Bldg/Equip Serv
01-ERP-0808Riding Mowers (2)1 17,700Public Works: Parks/Forestry
01-ERP-0816Toolcat n/a 80,200Public Works: Parks/Forestry
01-ERP-0317Sign Machine (Traffic)n/a 18,100Public Works: Streets/Traffic
01-ERP-05513/4 Ton Utility Truck n/a 45,200Sewer
01-ERP-05013/4 Ton Utility Truck n/a 46,900Water
1,103,770Total for 2026
GRAND TOTAL 7,248,339
Wednesday, December 8, 2021
14
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP
DEPARTMENT SUMMARY
2022 2026thru
Total20222023202420252026Department
Comm Svcs - Activity Center 55,70037,000 12,000 6,700
Comm Svcs - Arts Center 38,10013,500 6,700 10,800 7,100
Comm Svcs - IT 1,693,262225,729 346,685 229,954 566,624 324,270
Community Services 16,23116,231
Fire 1,602,680787,000 125,000 652,180 38,500
HRA 57,60016,500 41,100
Pavilion 197,50011,600 185,900
Police 1,818,066207,100 595,912 517,400 206,554 291,100
Public Works: Bldg/Equip Serv 42,10042,100
Public Works: Parks/Forestry 306,900199,000 10,000 97,900
Public Works: Streets/Traffic 829,900328,400 165,300 318,100 18,100
Refuse 275,200275,200
Sewer 268,200223,000 45,200
Water 46,90046,900
1,838,229 1,484,997 1,093,754 1,727,589 1,103,770 7,248,339TOTAL
Wednesday, December 8, 202115
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP
PROJECTS BY DEPARTMENT
2022 2026thru
Total20222023202420252026DepartmentProject #Priority
Comm Svcs - Activity Center
01-ERP-0035 6,7006,700Activity Center - Floor Scrubber n/a
01-ERP-0038 29,00017,000 12,000Activity Center - Kitchen Storage 5
01-ERP-0042 20,00020,000Activity Center - Replace Sanitizer/Heat Booster 2
55,70037,000 12,000 6,700Comm Svcs - Activity Center Total
Comm Svcs - Arts Center
01-ERP-1102 7,1007,100Art Center Kitchen Catering Equipment n/a
01-ERP-1105 13,50013,500Art Center Jaycee Studio Audio Visual n/a
01-ERP-1107 6,7006,700Art Center Theater Projection Screen 2
01-ERP-1109 10,80010,800Art Center Floor Scrubber n/a
38,10013,500 6,700 10,800 7,100Comm Svcs - Arts Center Total
Comm Svcs - IT
01-ERP-0003 134,82025,000 26,250 27,037 27,849 28,684CH - Network Server n/a
01-ERP-0004 89,60089,600Telephone System n/a
01-ERP-0005 315,000315,000Financial Software - Various Depts.n/a
01-ERP-0006 187,28634,729 36,465 37,559 38,686 39,847Computersn/a
01-ERP-0009 00Network Infrastructure Upgrade n/a
01-ERP-0012 20,00020,000Core Network Switch n/a
01-ERP-0014 57,00057,000Distribution Network Switches n/a
01-ERP-0015 150,92872,120 78,808Backup Server n/a
01-ERP-0017 228,08044,000 44,000 45,320 46,680 48,080IT - Office 365 n/a
01-ERP-0020 50,90910,000 10,000 10,000 10,300 10,609IT - Patching Automation Software 1
01-ERP-0022 234,81842,000 42,000 63,000 43,260 44,558IT - Windows 10 Enterprise Upgrade n/a
01-ERP-0024 90,00045,000 45,000IT - Sandbox Security Appliance n/a
01-ERP-0211 134,82125,000 26,250 27,038 27,849 28,684PD - Network Server n/a
1,693,262225,729 346,685 229,954 566,624 324,270Comm Svcs - IT Total
Community Services
01-ERP-0052 16,23116,231Electronic Inspections Processing 2
16,23116,231Community Services Total
Fire
01-ERP-0105 771,000771,000Fire Engine/Rescue (2)n/a
01-ERP-0108 250,000250,000Self Contained Breathing Apparatus (SCBA) (45)n/a
01-ERP-0109 32,00032,000Extrication Tool (1)n/a
01-ERP-0112 16,18016,180Thermal Imaging Camera (2)n/a
01-ERP-0113 38,50038,500Emergency Preparedness Sirens n/a
01-ERP-0125 386,000386,000Fire Radios - Portable and Mobile Devices n/a
01-ERP-0126 16,00016,000Fire - Fire Helmets n/a
01-ERP-0127 18,00018,000Fire - Lucus Device n/a
01-ERP-0131 75,00075,000Fire - Station Alerting System n/a
Wednesday, December 8, 202116
Total20222023202420252026DepartmentProject #Priority
1,602,680787,000 125,000 652,180 38,500Fire Total
HRA
01-ERP-0400 41,10041,1004x4 3/4 Ton Truck n/a
01-ERP-0401 16,50016,500HRA Copier n/a
57,60016,500 41,100HRA Total
Pavilion
01-ERP-1000 165,000165,000Pavilion Ice Resurfacer n/a
01-ERP-1001 8,9008,900Pavilion - Electric Ice Edger n/a
01-ERP-1002 12,00012,000Pavilion Arena Scoreboard n/a
01-ERP-1003 11,60011,600Pavilion - Floor Scrubber n/a
197,50011,600 185,900Pavilion Total
Police
01-ERP-0200 590,200110,000 117,400 117,400 117,400 128,000Marked Patrol Vehicles (7)n/a
01-ERP-0201 64,15464,154Sergeant's Vehicle n/a
01-ERP-0202 60,00060,000PSO / Parking Enforcement Vehicle n/a
01-ERP-0203 158,20072,100 86,100PSO - Utility 4x4 n/a
01-ERP-0212 160,000160,000Squad Car Camera Systems/ Body Worn Camera n/a
01-ERP-0214 76,51276,512Tactical Ballistic Vests / Helmets - SWAT 3
01-ERP-0215 290,000290,000Police - Portable Radios n/a
01-ERP-0217 90,00090,000Taser Replacement n/a
01-ERP-0218 39,00022,000 17,000Building Video Server n/a
01-ERP-0220 90,00090,000Squad Computers n/a
01-ERP-0221 150,000150,000Records Management System n/a
01-ERP-0227 50,00025,000 25,000Police Equipment n/a
1,818,066207,100 595,912 517,400 206,554 291,100Police Total
Public Works: Bldg/Equip Serv
01-ERP-0710 42,10042,1004X4 3/4 Ton Truck n/a
42,10042,100Public Works: Bldg/Equip Serv Total
Public Works: Parks/Forestry
01-ERP-0800 35,40035,4001/2 Ton Pickup Truck n/a
01-ERP-0804 163,600163,600Log Truck n/a
01-ERP-0808 17,70017,700Riding Mowers (2)1
01-ERP-0814 10,00010,000Trailer Flatbed n/a
01-ERP-0816 80,20080,200Toolcatn/a
306,900199,000 10,000 97,900Public Works: Parks/Forestry Total
Public Works: Streets/Traffic
01-ERP-0300 28,90028,9004x4 1/2 Ton Pickup with Plow n/a
01-ERP-0303 102,90053,400 49,5001 Ton Dump Truck (2)n/a
01-ERP-0304 136,400136,4001 Ton Traffic Boom Truck n/a
01-ERP-0305 225,000225,000Single Axle Dump Truck (2)n/a
01-ERP-0308 268,600268,600Front End Loaders (2)n/a
01-ERP-0309 50,00050,000Skid Loader (2)n/a
01-ERP-0317 18,10018,100Sign Machine (Traffic)n/a
829,900328,400 165,300 318,100 18,100Public Works: Streets/Traffic Total
Wednesday, December 8, 202117
Total20222023202420252026DepartmentProject #Priority
Refuse
01-ERP-0900 275,200275,200Refuse Truck (RAP-R) (2)n/a
275,200275,200Refuse Total
Sewer
01-ERP-0551 45,20045,2003/4 Ton Utility Truck n/a
01-ERP-0555 43,00043,000Generator (2)n/a
01-ERP-0560 180,000180,000Sewer Televising Camera and Van 1
268,200223,000 45,200Sewer Total
Water
01-ERP-0501 46,90046,9003/4 Ton Utility Truck n/a
46,90046,900Water Total
GRAND TOTAL 7,248,3391,838,229 1,484,997 1,093,754 1,727,589 1,103,770
Wednesday, December 8, 202118
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP
FUNDING SOURCE SUMMARY
2022 thru 2026
TotalSource20222023202420252026
AC - Arts Center Fund 38,10013,500 6,700 10,800 7,100
Equipment Replacement Fund 6,261,4391,585,229 1,348,497 1,067,454 1,441,589 818,670
HRA - Housing and Redevelopment Authority 57,60016,500 41,100
PA - Pavilion Fund 197,50011,600 185,900
PKG - Parking Fund 8,0008,000
RF - Refuse Fund 357,00081,800 275,200
SF - Sanitary Sewer Fund 275,000223,000 6,800 45,200
WF - Water Fund 53,7006,800 46,900
1,838,229 1,484,997 1,093,754 1,727,589 1,103,770 7,248,339GRAND TOTAL
Wednesday, December 8, 2021
19
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP
PROJECTS BY FUNDING SOURCE
2022 2026thru
TotalSourceProject #Priority 2022 2023 2024 2025 2026
AC - Arts Center Fund
01-ERP-1102 7,1007,100Art Center Kitchen Catering Equipment n/a
01-ERP-1105 13,50013,500Art Center Jaycee Studio Audio Visual n/a
01-ERP-1107 6,7006,700Art Center Theater Projection Screen 2
01-ERP-1109 10,80010,800Art Center Floor Scrubber n/a
38,10013,500 6,700 10,800 7,100AC - Arts Center Fund Total
Equipment Replacement Fund
01-ERP-0003 134,82025,000 26,250 27,037 27,849 28,684CH - Network Server n/a
01-ERP-0004 76,00076,000Telephone System n/a
01-ERP-0005 315,000315,000Financial Software - Various Depts.n/a
01-ERP-0006 187,28634,729 36,465 37,559 38,686 39,847Computersn/a
01-ERP-0009 00Network Infrastructure Upgrade n/a
01-ERP-0012 20,00020,000Core Network Switch n/a
01-ERP-0014 57,00057,000Distribution Network Switches n/a
01-ERP-0015 150,92872,120 78,808Backup Server n/a
01-ERP-0017 228,08044,000 44,000 45,320 46,680 48,080IT - Office 365 n/a
01-ERP-0020 50,90910,000 10,000 10,000 10,300 10,609IT - Patching Automation Software 1
01-ERP-0022 234,81842,000 42,000 63,000 43,260 44,558IT - Windows 10 Enterprise Upgrade n/a
01-ERP-0024 90,00045,000 45,000IT - Sandbox Security Appliance n/a
01-ERP-0035 6,7006,700Activity Center - Floor Scrubber n/a
01-ERP-0038 29,00017,000 12,000Activity Center - Kitchen Storage 5
01-ERP-0042 20,00020,000Activity Center - Replace Sanitizer/Heat Booster 2
01-ERP-0052 16,23116,231Electronic Inspections Processing 2
01-ERP-0105 771,000771,000Fire Engine/Rescue (2)n/a
01-ERP-0108 250,000250,000Self Contained Breathing Apparatus (SCBA) (45)n/a
01-ERP-0109 32,00032,000Extrication Tool (1)n/a
01-ERP-0112 16,18016,180Thermal Imaging Camera (2)n/a
01-ERP-0113 38,50038,500Emergency Preparedness Sirens n/a
01-ERP-0125 386,000386,000Fire Radios - Portable and Mobile Devices n/a
01-ERP-0126 16,00016,000Fire - Fire Helmets n/a
01-ERP-0127 18,00018,000Fire - Lucus Device n/a
01-ERP-0131 75,00075,000Fire - Station Alerting System n/a
01-ERP-0200 590,200110,000 117,400 117,400 117,400 128,000Marked Patrol Vehicles (7)n/a
01-ERP-0201 64,15464,154Sergeant's Vehicle n/a
01-ERP-0202 60,00060,000PSO / Parking Enforcement Vehicle n/a
01-ERP-0203 158,20072,100 86,100PSO - Utility 4x4 n/a
01-ERP-0211 134,82125,000 26,250 27,038 27,849 28,684PD - Network Server n/a
01-ERP-0212 152,000152,000Squad Car Camera Systems/ Body Worn Camera n/a
01-ERP-0214 76,51276,512Tactical Ballistic Vests / Helmets - SWAT 3
01-ERP-0215 290,000290,000Police - Portable Radios n/a
01-ERP-0217 90,00090,000Taser Replacement n/a
01-ERP-0218 39,00022,000 17,000Building Video Server n/a
01-ERP-0220 90,00090,000Squad Computers n/a
Wednesday, December 8, 2021
20
TotalSourceProject #Priority 2022 2023 2024 2025 2026
01-ERP-0221 150,000150,000Records Management System n/a
01-ERP-0227 50,00025,000 25,000Police Equipment n/a
01-ERP-0300 28,90028,9004x4 1/2 Ton Pickup with Plow n/a
01-ERP-0303 102,90053,400 49,5001 Ton Dump Truck (2)n/a
01-ERP-0304 136,400136,4001 Ton Traffic Boom Truck n/a
01-ERP-0305 225,000225,000Single Axle Dump Truck (2)n/a
01-ERP-0308 268,600268,600Front End Loaders (2)n/a
01-ERP-0309 50,00050,000Skid Loader (2)n/a
01-ERP-0317 18,10018,100Sign Machine (Traffic)n/a
01-ERP-0710 42,10042,1004X4 3/4 Ton Truck n/a
01-ERP-0800 35,40035,4001/2 Ton Pickup Truck n/a
01-ERP-0804 81,80081,800Log Truck n/a
01-ERP-0808 17,70017,700Riding Mowers (2)1
01-ERP-0814 10,00010,000Trailer Flatbed n/a
01-ERP-0816 80,20080,200Toolcatn/a
6,261,4391,585,229 1,348,497 1,067,454 1,441,589 818,670Equipment Replacement Fund Total
HRA - Housing and Redevelopment A
01-ERP-0400 41,10041,1004x4 3/4 Ton Truck n/a
01-ERP-0401 16,50016,500HRA Copier n/a
57,60016,500 41,100HRA - Housing and Redevelopment
Authority Total
PA - Pavilion Fund
01-ERP-1000 165,000165,000Pavilion Ice Resurfacer n/a
01-ERP-1001 8,9008,900Pavilion - Electric Ice Edger n/a
01-ERP-1002 12,00012,000Pavilion Arena Scoreboard n/a
01-ERP-1003 11,60011,600Pavilion - Floor Scrubber n/a
197,50011,600 185,900PA - Pavilion Fund Total
PKG - Parking Fund
01-ERP-0212 8,0008,000Squad Car Camera Systems/ Body Worn Camera n/a
8,0008,000PKG - Parking Fund Total
RF - Refuse Fund
01-ERP-0804 81,80081,800Log Truck n/a
01-ERP-0900 275,200275,200Refuse Truck (RAP-R) (2)n/a
357,00081,800 275,200RF - Refuse Fund Total
SF - Sanitary Sewer Fund
01-ERP-0004 6,8006,800Telephone System n/a
01-ERP-0551 45,20045,2003/4 Ton Utility Truck n/a
01-ERP-0555 43,00043,000Generator (2)n/a
01-ERP-0560 180,000180,000Sewer Televising Camera and Van 1
275,000223,000 6,800 45,200SF - Sanitary Sewer Fund Total
WF - Water Fund
Wednesday, December 8, 2021
21
TotalSourceProject #Priority 2022 2023 2024 2025 2026
01-ERP-0004 6,8006,800Telephone System n/a
01-ERP-0501 46,90046,9003/4 Ton Utility Truck n/a
53,7006,800 46,900WF - Water Fund Total
7,248,3391,838,229 1,484,997 1,093,754 1,727,589 1,103,770GRAND TOTAL
Wednesday, December 8, 2021
22
EQUIPMENT REQUESTS
23
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Bldg/Equip Supt
2022 2026thru Department Comm Svcs - Activity Center
Description
Floor scrubbed is used to clean tiled floors at the Activity Center
Project #01-ERP-0035
Priority n/a
Justification
Floor scrubber has been used to the extent of it's useful life.
Budget Impact/Other
New item for 2016
Useful Life 10 yearsProject Name Activity Center - Floor Scrubber Category Equipment
Type Equipment
Future
Total Project Cost:$20,700
Total20222023202420252026Expenditures
6,7006,700Equipment
6,700 6,700Total
Total20222023202420252026Funding Sources
6,7006,700Equipment Replacement Fund
6,700 6,700Total
Wednesday, December 15, 2021
24
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Activity Ctr Director
2022 2026thru Department Comm Svcs - Activity Center
Description
Purchase of stainless steel enclosed cabinets for the kitchen over a 2-year span.
Project #01-ERP-0038
Priority 5 Future Consideration
Justification
The Activity Center kitchen presently has open type shelving cages, purchased in 1991. Shelving should be replaced with shelving conducive to
water as some shelves are used for storing silverware and coffee cups directly from the dishwasher. The present shelving is rusting. Enclosed units
are needed to secure items we use for our own kitchen operation from facility use renters, as well as proper storage of equipment from the dirt,
dust, and grim associated with everyday use of the kitchen.
Budget Impact/Other
Useful Life 30 yearsProject Name Activity Center - Kitchen Storage Category Equipment
Type Equipment
Future
Total Project Cost:$29,000
Total20222023202420252026Expenditures
29,00017,000 12,000Equipment
17,000 12,000 29,000Total
Total20222023202420252026Funding Sources
29,00017,000 12,000Equipment Replacement Fund
17,000 12,000 29,000Total
Wednesday, December 15, 2021
25
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact
2022 2026thru Department Comm Svcs - Activity Center
Description
Replace existing kitchen dish sanitizer and heat booster with newer model - if needed. Pricing is an estimate of the cost for the unit. It does not
include delivery or installation.
Project #01-ERP-0042
Priority 2 Very Important
Justification
There were some problems with the current unit in 2020. These have been repaired, however, the unit is quite old. If it continues to have problems,
especially with more kitchen use now that the Activity Center has reopened, it may be necessary to replace.
Budget Impact/Other
Useful Life 10 yearsProject Name Activity Center - Replace Sanitizer/Heat Booster Category Unassigned
Type Equipment
Future
Total Project Cost:$83,000
Total20222023202420252026Expenditures
20,00020,000Equipment
20,000 20,000Total
Total20222023202420252026Funding Sources
20,00020,000Equipment Replacement Fund
20,000 20,000Total
Wednesday, December 15, 2021
26
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Arts Center Director
2022 2026thru Department Comm Svcs - Arts Center
Description
Under counter freezer and refrigerator in catering kitchen.
Project #01-ERP-1102
Priority n/a
Justification
These units are used for storing food for HCA events and for rental clients.
Budget Impact/Other
Variance from 20 year plan - New item. Current pricing $2049 refrigerator, $2207 freezer plus delivery.
Estimate salvage/resale value on replaced item: $-0-
Useful Life 12 yearsProject Name Art Center Kitchen Catering Equipment Category Equipment
Type Equipment
Future
Total Project Cost:$22,223
Total20222023202420252026Expenditures
7,1007,100Equipment
7,100 7,100Total
Total20222023202420252026Funding Sources
7,1007,100AC - Arts Center Fund
7,100 7,100Total
Wednesday, December 15, 2021
27
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Arts Center Director
2022 2026thru Department Comm Svcs - Arts Center
Description
Install a projector in a ceiling mount. Wire speakers into the ceiling. Wire input for computer on front wall. Add two microphones. Mount
supporting hardware in rack that fits into closet.
Originally scheduled for the Community Room this project was moved to the Jaycee Studio as they found a greater need for this equipment in that
room.
Project #01-ERP-1105
Priority n/a
Justification
An increasing number of users of this room require media support. Current means of providing this include the use of an oversized A/V cart, cords
stretch across the floor and a large speaker on a stick. We can streamline the appearance and functionality by making these appropriate changes.
These changes also address safety concerns. They will help attract safety concerns. They will help attract and retain rental customers as well as
appropriately support our own activities.
Budget Impact/Other
Move this item from 2014 to 2015.
Useful Life 7 yearsProject Name Art Center Jaycee Studio Audio Visual Category Equipment
Type Equipment
Future
Total Project Cost:$61,515
Total20222023202420252026Expenditures
13,50013,500Equipment
13,500 13,500Total
Total20222023202420252026Funding Sources
13,50013,500AC - Arts Center Fund
13,500 13,500Total
Wednesday, December 15, 2021
28
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Arts Center Director
2022 2026thru Department Comm Svcs - Arts Center
Description
Replace original retractable projection screen in the theater with wider format screen to mesh with current technology.
Project #01-ERP-1107
Priority 2 Very Important
Justification
This is an item being requested more frequently from renters as they find the dimensions of the current screen do not match up with the
presentations they bring in.
Budget Impact/Other
Variance from 20-year plan: New item
Useful Life 10 yearsProject Name Art Center Theater Projection Screen Category Equipment
Type Equipment
Future
Total Project Cost:$32,794
Total20222023202420252026Expenditures
6,7006,700Equipment
6,700 6,700Total
Total20222023202420252026Funding Sources
6,7006,700AC - Arts Center Fund
6,700 6,700Total
Wednesday, December 15, 2021
29
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Arts Center Co-Director
2022 2026thru Department Comm Svcs - Arts Center
Description
26-inch auto scrubber
Project #01-ERP-1109
Priority n/a
Justification
Current scrubber has reached its lifetime and no longer spins fast enough to be effective.
Budget Impact/Other
Variance from 20 year plan - New item
Estimate salvage/resale value on replaced item: $-0-
Useful Life 10 yearsProject Name Art Center Floor Scrubber Category Equipment
Type Equipment
Future
Total Project Cost:$33,316
Total20222023202420252026Expenditures
10,80010,800Equipment
10,800 10,800Total
Total20222023202420252026Funding Sources
10,80010,800AC - Arts Center Fund
10,800 10,800Total
Wednesday, December 15, 2021
30
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2022 2026thru Department Comm Svcs - IT
Description
The network server is the hub of the network. New computers are faster and more reliable.
Project #01-ERP-0003
Priority n/a
Justification
Networking allows user to share information that is stored in a single location, the network server. This is more efficient because the information
does not have to be stored on many different computers. It also makes for better accuracy because as the information changes or is updated, every
user is working with the same data.
Budget Impact/Other
Changes reflect anticipated need for increased storage.
Useful Life 1 yearProject Name CH - Network Server Category Equipment
Type Equipment
Future
Total Project Cost:$1,113,900
Total20222023202420252026Expenditures
134,82025,000 26,250 27,037 27,849 28,684Equipment
25,000 26,250 27,037 27,849 28,684 134,820Total
Total20222023202420252026Funding Sources
134,82025,000 26,250 27,037 27,849 28,684Equipment Replacement Fund
25,000 26,250 27,037 27,849 28,684 134,820Total
Wednesday, December 15, 2021
31
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2022 2026thru Department Comm Svcs - IT
Description
Includes the PBX, the voice mail systems, and all telephone instruments. Currently there are over 200 extensions served by this system. Also
includes software for the PBX and voice mail systems.
Project #01-ERP-0004
Priority n/a
Justification
Making, receiving and routing telephone calls, storing voice mail messages, and providing telephone based information services (snow line, etc.)
Budget Impact/Other
Variance from 20 year plan - Upgrade to controller in 2009 delays complete replacement to 2015.
Estimate salvage/resale value on replaced item: $
Useful Life 8 yearsProject Name Telephone System Category Equipment
Type Equipment
Future
Total Project Cost:$490,131
Total20222023202420252026Expenditures
89,60089,600Equipment
89,600 89,600Total
Total20222023202420252026Funding Sources
76,00076,000Equipment Replacement Fund
6,8006,800SF - Sanitary Sewer Fund
6,8006,800WF - Water Fund
89,600 89,600Total
Wednesday, December 15, 2021
32
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Finance Director
2022 2026thru Department Comm Svcs - IT
Description
Finance software upgrade. Software currently used by Finance, City Clerk, Inspections and Public Works. This includes software for all finance
applications including general ledger, payroll, accounts payable, accounts receivable, fixed assets, utility billing; Business Licenses, Building
Permits, GIS Mapping, Purchasing, etc.
Project #01-ERP-0005
Priority n/a
Justification
Current software vendor is unable to keep up with technology and internet security standards. Staff is often frustrated with how the software
works and are often unable to get reports they need from the system.
Budget Impact/Other
Variance from 20 year plan - replacement needed in 2014
Estimate salvage/resale value on replaced item: $-0-
Useful Life 7 yearsProject Name Financial Software - Various Depts.Category Equipment
Type Equipment
Future
Total Project Cost:$1,593,000
Total20222023202420252026Expenditures
315,000315,000Equipment
315,000 315,000Total
Total20222023202420252026Funding Sources
315,000315,000Equipment Replacement Fund
315,000 315,000Total
Wednesday, December 15, 2021
33
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Finance Director/IT
2022 2026thru Department Comm Svcs - IT
Description
Personal computer purchases and upgrades for the entire City staff. Coordinating personal computer purchases from individual departments to one
fund.
Project #01-ERP-0006
Priority n/a
Justification
Tools enabling staff to perform job responsibilities efficiently and effectively.
Budget Impact/Other
Increase in expenditure a result of supporting more computers than when the original allotment was put in place.
Useful Life 3-5 yearsProject Name Computers Category Equipment
Type Equipment
Future
Total Project Cost:$1,852,679
Total20222023202420252026Expenditures
187,28634,729 36,465 37,559 38,686 39,847Equipment
34,729 36,465 37,559 38,686 39,847 187,286Total
Total20222023202420252026Funding Sources
187,28634,729 36,465 37,559 38,686 39,847Equipment Replacement Fund
34,729 36,465 37,559 38,686 39,847 187,286Total
Wednesday, December 15, 2021
34
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Finance Director/IT
2022 2026thru Department Comm Svcs - IT
Description
Install new and additional network wiring and equipment.
Project #01-ERP-0009
Priority n/a
Justification
Improve capacity, coverage and reliability. Installation will coincide with office space update.
Budget Impact/Other
Variance from 20 year plan - new item to replace substandard network wiring.
Estimate salvage/resale value on replaced item: $
Useful Life 15 yearsProject Name Network Infrastructure Upgrade Category Equipment
Type Equipment
Future
Total Project Cost:$51,456
Total20222023202420252026Expenditures
00Equipment
0 0Total
Total20222023202420252026Funding Sources
00Equipment Replacement Fund
0 0Total
Wednesday, December 15, 2021
35
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Finance Director/IT
2022 2026thru Department Comm Svcs - IT
Description
Provides layer 3 IP presence for the network, core switching connectivity, backbone on which all network communication is built and facilitates
fiber optic network connection to fire department.
2 - Cisco 3560E-24PD managed switch - $3,000 each
2 - Cisco X2-10GB-LR fiber optic transceiver - $1200 each
cost listed is for equipment only and does not include tax, shipping and other related costs
Project #01-ERP-0012
Priority n/a
Justification
Current two switches are obsolete, end of life and no longer supported by manufacturer. Past lost of service resulted in significant network outage
that was immediately noticed by many employees.
Budget Impact/Other
Variance from 20 year plan - Not currently in ERP but critical to network communication infrastructure. This is outside the budget for city hall
server network budget as the "Lisa" service is scheduled for replacement due to end of life, out of PCI compliance and obsolete.
2015 - change amount from $12,000 to $17,000 - more expensive than originally thought based on 2015 replacement.
Estimate salvage/resale value on replace item: - $-0-
Useful Life 6 yearsProject Name Core Network Switch Category Equipment
Type Equipment
Future
Total Project Cost:$133,878
Total20222023202420252026Expenditures
20,00020,000Equipment
20,000 20,000Total
Total20222023202420252026Funding Sources
20,00020,000Equipment Replacement Fund
20,000 20,000Total
Wednesday, December 15, 2021
36
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2022 2026thru Department Comm Svcs - IT
Description
We have 25 distribution network switches in our enterprise environment along with fiber optic transceivers and direct attach sfp cables to connect
them. Distribution switches connect to the core switches and bring the data to the actual endpoints such as desktops, servers, telephones, and
copiers.
Project #01-ERP-0014
Priority n/a
Justification
Replacement of these switches with current technology is vital to the function of the network as well as the safety of the data being passed through
the switch.
Budget Impact/Other
2016 - New item in ERP
Useful Life 5 yearsProject Name Distribution Network Switches Category Equipment
Type Equipment
Future
Total Project Cost:$338,486
Total20222023202420252026Expenditures
57,00057,000Equipment
57,000 57,000Total
Total20222023202420252026Funding Sources
57,00057,000Equipment Replacement Fund
57,000 57,000Total
Wednesday, December 15, 2021
37
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2022 2026thru Department Comm Svcs - IT
Description
Group of Dell servers to run Dell Rapid Recovery software to backup city computers and servers, along with Windows and VMWare licsensing
required to run the servers.
Project #01-ERP-0015
Priority n/a
Justification
Backup servers are essential to keep the electronic data for the city safe. We have overgrown our current system and are not able to backup
everything that needs to be backed up in a timely manor. Additinally restores on the curent system take hours to days. If we needed to restore a
critical server from backup, we would be looking at an unacceptable amount of downtime.
Budget Impact/Other
Useful Life 3 yearsProject Name Backup Server Category Equipment
Type Equipment
Future
Total Project Cost:$801,110
Total20222023202420252026Expenditures
150,92872,120 78,808Equipment
72,120 78,808 150,928Total
Total20222023202420252026Funding Sources
150,92872,120 78,808Equipment Replacement Fund
72,120 78,808 150,928Total
Wednesday, December 15, 2021
38
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2022 2026thru Department Comm Svcs - IT
Description
Transition from the legacy model of Microsoft Office to Office 365. This project would transition 25 percent of our users and devices per year.
Project #01-ERP-0017
Priority n/a
Justification
As we become a more mobile workforce embracing new mobile and remote technology we need to move away from the traditonal office that can
only be installed on a Windows computer and transition to the version of Office that can be used in the cloud and as a mobile app. Unfortunately,
as is becoming common with most enterprise softwre, you can no longer just purchase it out right, you must rent it from the software author. The
cost for Office 365 will now be a yearly ongoing cost. Office 365 is common at other cities, corporations, and educational environments.
Budget Impact/Other
Useful Life 1 yearProject Name IT - Office 365 Category Equipment
Type Equipment
Future
Total Project Cost:$2,420,118
Total20222023202420252026Expenditures
228,08044,000 44,000 45,320 46,680 48,080Equipment
44,000 44,000 45,320 46,680 48,080 228,080Total
Total20222023202420252026Funding Sources
228,08044,000 44,000 45,320 46,680 48,080Equipment Replacement Fund
44,000 44,000 45,320 46,680 48,080 228,080Total
Wednesday, December 15, 2021
39
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2022 2026thru Department Comm Svcs - IT
Description
Software to automate the delivery of critical and maintenance patches to our enterprise endpoints and yearly maintenance of the software going
forward.
Project #01-ERP-0020
Priority 1 Urgent
Justification
Microsoft software has to be patched the second Tuesday of every month. Adobe software has to be patched every time a critical vulnerability is
discovered, which can be twice in a week in a bad week. Other applications have to be patched as new releases are produced from vendors.
Currently our staff must touch every endpoint for the majority of the software installs. We are using up an inordinate amount of staff time to patch
all of our endpoints only to have to restart the cycle 3 weeks later. Automation of this process would free up staff time to work on other projects
and problems for the city. Approx. two full weeks of 1FTE per month or 960 hours per year saved.
Budget Impact/Other
Useful Life 1 yearProject Name IT - Patching Automation Software Category Equipment
Type Equipment
Future
Total Project Cost:$321,169
Total20222023202420252026Expenditures
50,90910,000 10,000 10,000 10,300 10,609Equipment
10,000 10,000 10,000 10,300 10,609 50,909Total
Total20222023202420252026Funding Sources
50,90910,000 10,000 10,000 10,300 10,609Equipment Replacement Fund
10,000 10,000 10,000 10,300 10,609 50,909Total
Wednesday, December 15, 2021
40
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2022 2026thru Department Comm Svcs - IT
Description
Upgrade Windows 10 Pro software to Windows 10 Enterprise. Required to renew every 3 years. This plan would bring the PD into compliance in
2020 then upgrade 60 city computers a year until all city computers are upgraded. Each batch of 60 computers needs to be renewed every 3 years.
It is estimated that it will take 3 years to fully upgrade the city to Windows 10 Enterprise.
Project #01-ERP-0022
Priority n/a
Justification
The BCA has mandated that we move to Enterprise edition for our Windows computers in the PD. Microsoft is changing the way they deliver
Windows. It is becoming like Office, where you will no longer own Windows outright, you will have to rent it from them. We have to switch to
Enterprise in the PD for compliance reasons, but it is strongly suggested that we plan on switching to Enterprise for all city computers as well.
There may come a time where we are forced to switch to Enterprise edition for the city. It would be ideal to plan ahead and budget money for a
gradual upgrade for the city so it doesn't come as a surprise.
Budget Impact/Other
Useful Life 1 yearProject Name IT - Windows 10 Enterprise Upgrade Category Unassigned
Type Equipment
Future
Total Project Cost:$1,201,909
Total20222023202420252026Expenditures
234,81842,000 42,000 63,000 43,260 44,558Equipment
42,000 42,000 63,000 43,260 44,558 234,818Total
Total20222023202420252026Funding Sources
234,81842,000 42,000 63,000 43,260 44,558Equipment Replacement Fund
42,000 42,000 63,000 43,260 44,558 234,818Total
Wednesday, December 15, 2021
41
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2022 2026thru Department Comm Svcs - IT
Description
The sandbox is a security appliance that integrates into the overall security fabric of the city providing an automated method of detecting malware.
Project #01-ERP-0024
Priority n/a
Justification
The city relies on our sandbox as a place to investigate questionable files that user received to determine if they are safe to open. The sandbox
performs automated analysis that would normally take a significatn amount of manual time invested to determine if an item is dangerous. This
allows the IT department to perform investigations in minutes instead of hours. The existing sandbox has proved extremly useful over the last 5
years and needs to be replaced because it is no longer supported by the ventor
Budget Impact/Other
Useful Life 5 yearsProject Name IT - Sandbox Security Appliance Category Equipment
Type Equipment
Future
Total Project Cost:$272,000
Total20222023202420252026Expenditures
90,00045,000 45,000Equipment
45,000 45,000 90,000Total
Total20222023202420252026Funding Sources
90,00045,000 45,000Equipment Replacement Fund
45,000 45,000 90,000Total
Wednesday, December 15, 2021
42
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact IT Director
2022 2026thru Department Comm Svcs - IT
Description
Computer servers store information and system programs for Police Department.
Project #01-ERP-0211
Priority n/a
Justification
Annual replacement cycle allows development of system storage program. Use of newer servers for heavy use programs while older servers
used for data storage
Budget Impact/Other
Useful Life 1 yearProject Name PD - Network Server Category Equipment
Type Equipment
Future
Total Project Cost:$1,118,901
Total20222023202420252026Expenditures
134,82125,000 26,250 27,038 27,849 28,684Equipment
25,000 26,250 27,038 27,849 28,684 134,821Total
Total20222023202420252026Funding Sources
134,82125,000 26,250 27,038 27,849 28,684Equipment Replacement Fund
25,000 26,250 27,038 27,849 28,684 134,821Total
Wednesday, December 15, 2021
43
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Asst City Manager
2022 2026thru Department Community Services
Description
Included in this request are equipment needed to move to an electronic plan review and inspections process.
Revu -Bluebeam electronic plan review software - 2020 - $1,100 (useful life 8-10 years)
Ipads - 2020 - $5,400 (useful life 5-6 years)
Rental Inspection software - 2020 - $7,500 (useful life 7-10 years)
Project #01-ERP-0052
Priority 2 Very Important
Justification
As more and more contractors and architects ask to submit plan electronically, Blubeam software will enable inspectors to perform electronic plan
reviews which will make the plan review process more efficient and enhance customer service. As the inspection and construction industry
becomes more paperless, iPads will enable inspectors to use mobile technology to keep up with the requests of engineers, architect, contractors,
landlords and residents. Ipads are a key piece that will enable staff to view electronic plans in the field. Going paperless will eventually eliminate
our need for paper plan scanning and sorting which is very time consuming and costs $1,500 - $2,000 per year.
The software company currently used by Rental Inspectors has recently gone out of business and support for the software is going to be on a very
limited basis after 2020. Because rental inspections effect such a large part of the city and the department, I believe getting a new software in place
before the existing software stops functioning is essential to the rental inspection program.
Budget Impact/Other
Useful Life 5-7 yearsProject Name Electronic Inspections Processing Category Equipment
Type Equipment
Future
Total Project Cost:$96,150
Total20222023202420252026Expenditures
16,23116,231Equipment
16,231 16,231Total
Total20222023202420252026Funding Sources
16,23116,231Equipment Replacement Fund
16,231 16,231Total
Wednesday, December 15, 2021
44
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2022 2026thru Department Fire
Description
Duty Crew Vehicles to respond to all calls.
Current vehicle: 2012 Ford F550 (#104)
Current Vehicle: 2006 Peterbilt Fire Pumper 357 (#103)
Project #01-ERP-0105
Priority n/a
Justification
2012 Rescue (#104) will be replaced by the a fire engine for day to day operation. The current vehicle is undersized for the type of truck it is on.
We have spent $70,000 on maintenance cost since 2014. With going to overnight duty crews in Aug of 2021 and going to 24-hour duty crews in
2022, we will need a larger truck to fit more personnel. This would be a 10-year truck. It will be utilized as a first out response vehicle.
2006 Peterbilt Fire Pumper 357 (#103) will be replaced in 2027 and will also be on a 10 year rotation.
Budget Impact/Other
The replacement schedule for 2012 Rescue (#104) has been advanced from 2023 to 2022.
The replacement schedule for 2006 Peterbilt Fire Pumper 357 (#103) has been delayed from 2026 to 2027.
Useful Life 10 yearsProject Name Fire Engine/Rescue (2)Category Vehicles
Type Equipment
Future
Total Project Cost:$3,232,000
Total20222023202420252026Expenditures
771,000771,000Equipment
771,000 771,000Total
Total20222023202420252026Funding Sources
771,000771,000Equipment Replacement Fund
771,000 771,000Total
Wednesday, December 15, 2021
45
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2022 2026thru Department Fire
Description
Breathing apparatus for interior firefighting for firefighters.
Project #01-ERP-0108
Priority n/a
Justification
The breathing apparatus was taken out of the ERP in 2006 because we thought we were getting a grant. Grant was not successful. The SCBA's
(45) need to be replaced because they are at the end of their life and cannot be hydro tested any longer.
Budget Impact/Other
Variance from 20 year plan - Move back to 2025. Purchased SCBA's in 2015 with grant funds.
Estimate salvage/resale value on replaced item: $
Useful Life 10 yearsProject Name Self Contained Breathing Apparatus (SCBA) (45)Category Equipment
Type Equipment
Future
Total Project Cost:$752,000
Total20222023202420252026Expenditures
250,000250,000Equipment
250,000 250,000Total
Total20222023202420252026Funding Sources
250,000250,000Equipment Replacement Fund
250,000 250,000Total
Wednesday, December 15, 2021
46
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2022 2026thru Department Fire
Description
Hydraulic rescue and extrication tool with spreader, cutters and hydraulic ram.
Project #01-ERP-0109
Priority n/a
Justification
All vehicle and industrial rescue situations which will require patient disentanglement or entrapment. This tool will be added to the purchase of the
quick attack pumper. The tool will be scaled down to a smaller tool, possibly reducing cost.
Budget Impact/Other
Estimate salvage/resale value on replaced item: $1,000
Purchased: 2007
Useful Life 10 yearsProject Name Extrication Tool (1)Category Equipment
Type Equipment
Future
Total Project Cost:$234,800
Total20222023202420252026Expenditures
32,00032,000Equipment
32,000 32,000Total
Total20222023202420252026Funding Sources
32,00032,000Equipment Replacement Fund
32,000 32,000Total
Wednesday, December 15, 2021
47
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2022 2026thru Department Fire
Description
Used by our fire companies to locate victims trapped in a smoke filled building. It helps us determine where fire and heat may be hidden allowing
for faster extinguishment.
Note: purchased 2013 & 2017
Project #01-ERP-0112
Priority n/a
Justification
Current camera is ten years old and has been through many hot fires and needs to be replaced. Current camera was purchased with donation money.
Budget Impact/Other
Variance from 20 year plan - department owns 2 cameras.
Reoccuring expenditure.
Estimate salvage/resale value on replaced item: $-0-
Useful Life 10 yearsProject Name Thermal Imaging Camera (2)Category Equipment
Type Equipment
Future
Total Project Cost:$144,885
Total20222023202420252026Expenditures
16,18016,180Equipment
16,180 16,180Total
Total20222023202420252026Funding Sources
16,18016,180Equipment Replacement Fund
16,180 16,180Total
Wednesday, December 15, 2021
48
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2022 2026thru Department Fire
Description
Emergency warning system for City of Hopkins.
Project #01-ERP-0113
Priority n/a
Justification
Budget Impact/Other
Variance from 20 year plan - None
Estimate salvage/resale value on replaced item: $-0-
Useful Life 20 yearsProject Name Emergency Preparedness Sirens Category Equipment
Type Equipment
Future
Total Project Cost:$65,500
Total20222023202420252026Expenditures
38,50038,500Equipment
38,500 38,500Total
Total20222023202420252026Funding Sources
38,50038,500Equipment Replacement Fund
38,500 38,500Total
Wednesday, December 15, 2021
49
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2022 2026thru Department Fire
Description
Portable and mobile radios used by the police departments to allow the department to communicate on one frequency.
Fire has 50 portable and 13 mobile radios along with 50 pagers.
Cost in ERP includes portable radios (30), portable radio's encrypted (20), mobile radio's (13), pagers (50), chargers single (60), charger base (3)
plus other needed equipment. Details of all items are on file with Fire and Finance Depts.
Project #01-ERP-0125
Priority n/a
Justification
Provides radios so that the police, fire and public works can communicate on a common radio frequency during an emergency and multiple county
interoperability.
Budget Impact/Other
In 2016 the Fire radios were separated from Police for better accountability. Project was adjusted for current pricing.
2025 - 356,500 FD
2025 - 29,500 PW
Useful Life 5-7 yearsProject Name Fire Radios - Portable and Mobile Devices Category Equipment
Type Equipment
Future
Total Project Cost:$2,335,328
Total20222023202420252026Expenditures
386,000386,000Equipment
386,000 386,000Total
Total20222023202420252026Funding Sources
386,000386,000Equipment Replacement Fund
386,000 386,000Total
Wednesday, December 15, 2021
50
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2022 2026thru Department Fire
Description
Fire Helmets for firefighters. Helmets are used for safety of personnel at Fire and other Emergency incidents. In 2017, the NFPA and OSHA
Standard changed to recommending helmet change every 10 years.
Project #01-ERP-0126
Priority n/a
Justification
Safety of Firefighters. Current helmets useful life will be up in 2022.
Budget Impact/Other
Reoccuring every 10 years.
Useful Life 10 yearsProject Name Fire - Fire Helmets Category Equipment
Type Equipment
Future
Total Project Cost:$58,191
Total20222023202420252026Expenditures
16,00016,000Equipment
16,000 16,000Total
Total20222023202420252026Funding Sources
16,00016,000Equipment Replacement Fund
16,000 16,000Total
Wednesday, December 15, 2021
51
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2022 2026thru Department Fire
Description
Lucus device is used to assist CPR during full arrest. The current device was purchased in 2016 and with changed in technology, it is
recommended to update every 5 years.
Project #01-ERP-0127
Priority n/a
Justification
To continue to serve citizens of Hopkins during medical incidents.
Budget Impact/Other
Reoccurs every 5 years.
Useful Life 5 yearsProject Name Fire - Lucus Device Category Equipment
Type Equipment
Future
Total Project Cost:$98,686
Total20222023202420252026Expenditures
18,00018,000Equipment
18,000 18,000Total
Total20222023202420252026Funding Sources
18,00018,000Equipment Replacement Fund
18,000 18,000Total
Wednesday, December 15, 2021
52
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Fire Chief
2022 2026thru Department Fire
Description
This sytem would alert members throughout the station when there is a call. This system will integrate with the new paging system that Hennepin
County is adopting.
Project #01-ERP-0131
Priority n/a
Justification
Help with quicker response to in coming calls. Will prepare the station for future 24 hour duty crew shifts and overnights.
Budget Impact/Other
Useful LifeProject Name Fire - Station Alerting System Category Buildings: Fire Facilities
Type Equipment
Future
Total Project Cost:$75,000
Total20222023202420252026Expenditures
75,00075,000Equipment
75,000 75,000Total
Total20222023202420252026Funding Sources
75,00075,000Equipment Replacement Fund
75,000 75,000Total
Wednesday, December 15, 2021
53
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Unassigned
2022 2026thru Department HRA
Description
4 wheel drive 3/4 ton truck to be used by Public Housing maintenance staff. Includes snow plow.
Current vehicle: 2015 Chevrolet Pickup
Project #01-ERP-0400
Priority n/a
Justification
Transportation for Public Housing Superintendent and snow plowing at various HRA properties around the city.
Budget Impact/Other
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $1,800
Useful Life 8 yearsProject Name 4x4 3/4 Ton Truck Category Vehicles
Type Equipment
Future
Total Project Cost:$214,400
Total20222023202420252026Expenditures
41,10041,100Vehicles
41,100 41,100Total
Total20222023202420252026Funding Sources
41,10041,100HRA - Housing and
Redevelopment Authority
41,100 41,100Total
Wednesday, December 15, 2021
54
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Finance Director
2022 2026thru Department HRA
Description
Color copy machine to service the needs of the HRA. High volume product copier to do a variety of copying tasks.
Current equipment: Imagistics ZB35
Project #01-ERP-0401
Priority n/a
Justification
Daily use to make copies of correspondence, forms and rental documents. Periodically produce documents such as resident newsletters and
marketing. Machine will duplex, sort, collate and staple copies.
Budget Impact/Other
Variance from 20 year plan - New item.
Estimate salvage/resale value on replace item: $ - 0 -
Useful Life 8 yearsProject Name HRA Copier Category Equipment
Type Equipment
Future
Total Project Cost:$76,900
Total20222023202420252026Expenditures
16,50016,500Equipment
16,500 16,500Total
Total20222023202420252026Funding Sources
16,50016,500HRA - Housing and
Redevelopment Authority
16,500 16,500Total
Wednesday, December 15, 2021
55
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Facilities Director
2022 2026thru Department Pavilion
Description
Ice resurfacer used by the Pavilion for ice sheet maintenance.
Current equipment: Zamboni Ice Resurfacer
2014 cost = $116,205.93
Asset ID #5176
Project #01-ERP-1000
Priority n/a
Justification
Replace existing electric (battery) ice resurfacer. The current electric ice resurfacer was purchased in 2014 and has a useful life of 12 years and is
scheduled for replacement in 2026.
Budget Impact/Other
Variance from 20 year plan - Decrease cost due to 2014 purchase price. Move back one year.
Estimate salvage/resale value on replaced item: $30,000
Useful Life 12 yearsProject Name Pavilion Ice Resurfacer Category Equipment
Type Equipment
Future
Total Project Cost:$640,251
Total20222023202420252026Expenditures
165,000165,000Equipment
165,000 165,000Total
Total20222023202420252026Funding Sources
165,000165,000PA - Pavilion Fund
165,000 165,000Total
Wednesday, December 15, 2021
56
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Facilities Director
2022 2026thru Department Pavilion
Description
Electric ice edger used for ice maintenance of the Pavilion's ice sheet. An edger is used to shave the ice next to the boards to remove ice buildup
that the ice resurfacer cannot reach.
2014 cost = $6,281.25
Asset ID #5174
Project #01-ERP-1001
Priority n/a
Justification
Replace the current battery fueled ice edger with a new model of battery ice edger. Scheduled to replace at the end of useful life should occur in
2026, the model was purchased in 2014.
Budget Impact/Other
Variance from 20 year plan - New item.
Estimate salvage/resale value on replaced item: $
Useful Life 10 yearsProject Name Pavilion - Electric Ice Edger Category Equipment
Type Equipment
Future
Total Project Cost:$25,861
Total20222023202420252026Expenditures
8,9008,900Equipment
8,900 8,900Total
Total20222023202420252026Funding Sources
8,9008,900PA - Pavilion Fund
8,900 8,900Total
Wednesday, December 15, 2021
57
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Facilities Director
2022 2026thru Department Pavilion
Description
Arena scoreboard used for hockey, lacrosse, soccer and other activities in the arena.
Project #01-ERP-1002
Priority n/a
Justification
The current scoreboard was purchased and installed in 2014 with donations from HYHA and other city funds.
Budget Impact/Other
Variance from 20 year plan - Originally scheduled for 2016, the scoreboard was replaced in 2014 with donations from HYHA and other city
funds. Replacement is now scheduled again for 2026.
Estimate salvage/resale value on replaced item: $0
Useful Life 20 yearsProject Name Pavilion Arena Scoreboard Category Equipment
Type Equipment
Future
Total Project Cost:$33,674
Total20222023202420252026Expenditures
12,00012,000Equipment
12,000 12,000Total
Total20222023202420252026Funding Sources
12,00012,000PA - Pavilion Fund
12,000 12,000Total
Wednesday, December 15, 2021
58
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Pavilion Manager
2022 2026thru Department Pavilion
Description
26" to 28" battery operated walk behind floor scrubber. Floor scrubber is used to clean the arenas concrete floor and tiled surfaces throughout the
building.
2014 cost = $8,651.94
Asset ID #5172
Project #01-ERP-1003
Priority n/a
Justification
Replace the existing floor scrubber with new model. Current floor scrubber was purchased in 2014 and is scheduled to be replaced in 2024.
Budget Impact/Other
Variance from 20 year plan - New item
Estimate salvage/resale value on replaced item: $
Useful Life 10 yearsProject Name Pavilion - Floor Scrubber Category Equipment
Type Equipment
Future
Total Project Cost:$48,167
Total20222023202420252026Expenditures
11,60011,600Equipment
11,600 11,600Total
Total20222023202420252026Funding Sources
11,60011,600PA - Pavilion Fund
11,600 11,600Total
Wednesday, December 15, 2021
59
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2022 2026thru Department Police
Description
Marked patrol vehicles used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties.
Fleet consists of 7 marked patrol vehicles
Project #01-ERP-0200
Priority n/a
Justification
Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for
routine and emergency operations. Vehicles contain secure seating for prisoner transport.
Budget Impact/Other
Useful Life 3 yearsProject Name Marked Patrol Vehicles (7)Category Vehicles
Type Equipment
Future
Total Project Cost:$4,669,200
Total20222023202420252026Expenditures
590,200110,000 117,400 117,400 117,400 128,000Vehicles
110,000 117,400 117,400 117,400 128,000 590,200Total
Total20222023202420252026Funding Sources
590,200110,000 117,400 117,400 117,400 128,000Equipment Replacement Fund
110,000 117,400 117,400 117,400 128,000 590,200Total
Wednesday, December 15, 2021
60
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2022 2026thru Department Police
Description
Marked patrol vehicle used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties.
4 year rotation.
Current vehicle: 2021 Ford Utility (#201)
VIN #1FM5K8AB6MGB53652
Project #01-ERP-0201
Priority n/a
Justification
Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for
routine and emergency operations. Vehicles contain secure seating for prisoner transport.
Budget Impact/Other
Useful Life 4 yearsProject Name Sergeant's Vehicle Category Vehicles
Type Equipment
Future
Total Project Cost:$596,642
Total20222023202420252026Expenditures
64,15464,154Vehicles
64,154 64,154Total
Total20222023202420252026Funding Sources
64,15464,154Equipment Replacement Fund
64,154 64,154Total
Wednesday, December 15, 2021
61
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2022 2026thru Department Police
Description
Marked patrol vehicle used by Parking Enforcement Officer to respond to calls for service, enforce parking laws, and perfom duties as assigned.
Current Vehicle: 2021 Ford Utility (#211)
VIN# 1FM5K8AB3MGB53656
Project #01-ERP-0202
Priority n/a
Justification
Use by parking enforcement officers in the course of their duties enforcing parking regulations in the downtown area.
Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for
routine and emergency operations. Vehicles contain secure seating for prisoner transport.
Budget Impact/Other
2016 - Change in replacement schedule due to full time use of vehicle and change of position responsibilities. Next replacement scheduled for
2021 from 2026
Useful Life 5 yearsProject Name PSO / Parking Enforcement Vehicle Category Vehicles
Type Equipment
Future
Total Project Cost:$412,572
Total20222023202420252026Expenditures
60,00060,000Vehicles
60,000 60,000Total
Total20222023202420252026Funding Sources
60,00060,000Equipment Replacement Fund
60,000 60,000Total
Wednesday, December 15, 2021
62
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2022 2026thru Department Police
Description
Four wheel drive marked patrol vehicle used by PSOs to respond to calls for service, handle animal complaints, and perform other duties
associated with department operations.
Current vehicle: 2018 Ford F150 (#212)
VIN# 1FTEW1PG2JKE86443
Project #01-ERP-0203
Priority n/a
Justification
Vehicle is normally used by public service officers for a wide variety of uses such as transporting animals, prisoners and equipment. The 4 wheel
drive vehicle is also used at times as a patrol vehicle, particularly in the winter in extreme snow conditions.
Budget Impact/Other
2016 - Variance from 20 year plan - Change in replacement schedule due to full time use of vehicle. Changing useful life from 6 years to 4 years
Useful Life 4 yearsProject Name PSO - Utility 4x4 Category Vehicles
Type Equipment
Future
Total Project Cost:$795,189
Total20222023202420252026Expenditures
158,20072,100 86,100Vehicles
72,100 86,100 158,200Total
Total20222023202420252026Funding Sources
158,20072,100 86,100Equipment Replacement Fund
72,100 86,100 158,200Total
Wednesday, December 15, 2021
63
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2022 2026thru Department Police
Description
Squad car camera systems are used to document events inside and outside of the patrol vehicles. The cameras utilize a forward facing camera and a
prisoner transport area camaera.
Body cameras capture interactions between the officers and the public for transparency. Body cameras also capture evidence used in future court
proceedings.
Project #01-ERP-0212
Priority n/a
Justification
The police vehicle cameras are a necessary component of the patrol vehicles. Evidentiary information is collected from the cameras and often used
in court. Cameras also provide a snapshot of an officers interaction with the public so we are able to maintain transparency and public trust with
our operations.
Budget Impact/Other
Integrated camera system - 11 Squad car cameras and 24 body cameras
Squad cameras 6,000/each. Body cameras 1,200/each.
Annual costs/maintenance = $17,325 (Body Cameras 3 year warranty, Squad Cameras 5 year warranty)
Useful Life 5 yearsProject Name Squad Car Camera Systems/ Body Worn Camera Category Equipment
Type Equipment
Future
Total Project Cost:$866,921
Total20222023202420252026Expenditures
160,000160,000Equipment
160,000 160,000Total
Total20222023202420252026Funding Sources
152,000152,000Equipment Replacement Fund
8,0008,000PKG - Parking Fund
160,000 160,000Total
Wednesday, December 15, 2021
64
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2022 2026thru Department Police
Description
12 Tactical Ballistical Vests worn by members of the Hopkins Police Department SWAT (Special Weapons and Tactics) team. These vests offer a
higher level of protection for officers involved in high risk situations; this protection offers a higher level of ballistic protection compared to regular
duty vests. SWAT team members also require ballistic helmets on the same rotational cycle. Equipment breakdown: 12 vests @ $4,215 =
$50,580. 12 ballistic helmets @ $642 = $7,716. 2 New protective shields @ $2,864 = $5,729. 12 Radio headsets @ $1,042 = $12,500.
Project #01-ERP-0214
Priority 3 Important
Justification
Variance - Change in vendor equipment pricing and SWAT team staffing levels. Current price is reflective of a twelve person (fully staffed)
SWAT team with current vendor pricing.
Budget Impact/Other
5 year replacement schedule
Useful Life 5 yearsProject Name Tactical Ballistic Vests / Helmets - SWAT Category Equipment
Type Equipment
Future
Total Project Cost:$623,626
Total20222023202420252026Expenditures
76,51276,512Equipment
76,512 76,512Total
Total20222023202420252026Funding Sources
76,51276,512Equipment Replacement Fund
76,512 76,512Total
Wednesday, December 15, 2021
65
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2022 2026thru Department Police
Description
Portable radios used by the police departments to allow the department to communicate on one frequency.
Estimated Replacement Cost
Portable - $4,500 x 50 = $225,000
Plus chargers, shoulder mic's and batteries - $11,300
TOTAL = $236,300
Project #01-ERP-0215
Priority n/a
Justification
Provides radios so that the police, fire and public works can communicate on a common radio frequency during an emergency and multiple county
interoperability.
Budget Impact/Other
Radio's have a 7-10 year life expectancy. Portables need replacement due to manufacturer issues and county requirements. Increase in cost from
$3,800 to $4,500 per radior. Mobile radios were removed and now will be included with the vehicles as they are replaced.
Estimate salvage/resale value on replaced item: $0
Useful Life 5-7 yearsProject Name Police - Portable Radios Category Equipment
Type Equipment
Future
Total Project Cost:$1,906,203
Total20222023202420252026Expenditures
290,000290,000Equipment
290,000 290,000Total
Total20222023202420252026Funding Sources
290,000290,000Equipment Replacement Fund
290,000 290,000Total
Wednesday, December 15, 2021
66
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Captain
2022 2026thru Department Police
Description
Tasers can prevent officers and the public from injuries.Taser technology continues to develop and are worn/ carried 24/7. Tasers have a useful life
expectancy of approximately 5 years.
Project #01-ERP-0217
Priority n/a
Justification
Tasers are a crtical tool for Law Enforcement for control purposes during use of force encounters.
Budget Impact/Other
35- X2 Tasers, each officer has their own taser.
Total overall cost of Tasers in 2020 was $81,130 ($2,1318 x 35)
Useful Life 4 yearsProject Name Taser Replacement Category Equipment
Type Equipment
Future
Total Project Cost:$721,905
Total20222023202420252026Expenditures
90,00090,000Equipment
90,000 90,000Total
Total20222023202420252026Funding Sources
90,00090,000Equipment Replacement Fund
90,000 90,000Total
Wednesday, December 15, 2021
67
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief/IT
2022 2026thru Department Police
Description
Building Video Server hardware and associated software is used to store video recorded by the cameras in and around the police department
including interview rooms as well as booking. We record approximately 6 TB of video every 2-3 weeks. Large amounts of storage are required for
30 days of archival storage on the server itself.
Project #01-ERP-0218
Priority n/a
Justification
Maintenance agreement with software vendor needs to be renewed every three years. Computer hardware should be refreshed around the same
time to minimize drive failure and take advantage of new storage technology.
Budget Impact/Other
Variance from 20 year plan - Change in replacement schedule and estimated cost. Current equipment was purchased with DTF funding. Beginning
in 2020 it will be funded with ERP funds.
Estimate salvage/resale value on replaced item: $-0-
Useful Life 4 yearsProject Name Building Video Server Category Equipment
Type Equipment
Future
Total Project Cost:$157,907
Total20222023202420252026Expenditures
39,00022,000 17,000Equipment
22,000 17,000 39,000Total
Total20222023202420252026Funding Sources
39,00022,000 17,000Equipment Replacement Fund
22,000 17,000 39,000Total
Wednesday, December 15, 2021
68
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief/IT
2022 2026thru Department Police
Description
Mobile Data Computers are used in the squad cars to receive calls for service from dispatch, query information from criminal justice databases, and
facilitate communication between squad cars.
Replacement in 2019 for 12 computers. To be replaced in 2024.
Project #01-ERP-0220
Priority n/a
Justification
Mobile Data Computers have a limited life expectancy. The computers facilitate the basic response to emergency calls for service to which police
officers respond. Vital information is forwarded to officers via the mobile data computers. Officers complete investigative reports, issue traffic
related warnings and citations, and process arrest incidents from the mobile data computers.
As technology evolves the officers must be able to access information using up to date computers that can process the large amount of data and
applications. Mobile data computers are currently used to host the squad car video camera system and have the potential to be integrated with a
possible body worn camera.
Budget Impact/Other
Change in replacement year to accurately reflect life expectancy in relation to when the computers were purchased.
Useful Life 5 yearsProject Name Squad Computers Category Equipment
Type Equipment
Future
Total Project Cost:$561,242
Total20222023202420252026Expenditures
90,00090,000Equipment
90,000 90,000Total
Total20222023202420252026Funding Sources
90,00090,000Equipment Replacement Fund
90,000 90,000Total
Wednesday, December 15, 2021
69
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief/IT
2022 2026thru Department Police
Description
LETG - Records Management System was purchased at the end of 2012. This maintains all police records and reports.
Project #01-ERP-0221
Priority n/a
Justification
A new RMS system may be needed by 2022.
Budget Impact/Other
Current cost to maintain system is $29,368 anually.
Useful LifeProject Name Records Management System Category Equipment
Type Equipment
Future
Total Project Cost:$150,000
Total20222023202420252026Expenditures
150,000150,000Equipment
150,000 150,000Total
Total20222023202420252026Funding Sources
150,000150,000Equipment Replacement Fund
150,000 150,000Total
Wednesday, December 15, 2021
70
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Police Chief
2022 2026thru Department Police
Description
The police department needs to maintain law and order during times of civil unrest. We need to allow for the peaceful demonstrations and first
amendment rights of our community members, while ensuring that we have the ability to keep everyone safe and property from being damaged.
This requires specialized equipment for each of our officer.
Project #01-ERP-0227
Priority n/a
Justification
Community safety is our priority and specialized equipment is necessary to perform this core function. This includes full face shielts, soft body
armor (turltle gear), gas masks and less lethal munitions, which are necessary to keep officer and the community members safe. The general fund
supported numerous acquisitions and purchases in 2021, however this was only a temporary solution.
Budget Impact/Other
Useful Life 3 yearsProject Name Police Equipment Category Equipment
Type Equipment
Future
Total Project Cost:$214,381
Total20222023202420252026Expenditures
50,00025,000 25,000Equipment
25,000 25,000 50,000Total
Total20222023202420252026Funding Sources
50,00025,000 25,000Equipment Replacement Fund
25,000 25,000 50,000Total
Wednesday, December 15, 2021
71
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Public Works: Bldg/Equip Ser
Description
Pickup used by various divisions of Public Works.
Project #01-ERP-0710
Priority n/a
Justification
Light hauling and transportation for supervisors. Maintenance garage service vehicle.
Budget Impact/Other
Variance from 20 year plan - move up from 2009 to 2008 - Fire Dept. has requested to acquire surplus pickup for its use by daytime responders.
Estimated useful life reduced from 10 to 8 years.
Estimate salvage/resale value on replaced item: $1,500
Useful Life 8 yearsProject Name 4X4 3/4 Ton Truck Category Vehicles
Type Equipment
Future
Total Project Cost:$222,289
Total20222023202420252026Expenditures
42,10042,100Vehicles
42,100 42,100Total
Total20222023202420252026Funding Sources
42,10042,100Equipment Replacement Fund
42,100 42,100Total
Wednesday, December 15, 2021
72
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Public Works: Parks/Forestry
Description
Pickup used by Park Division of Public Works.
Project #01-ERP-0800
Priority n/a
Justification
Budget Impact/Other
Estimate salvage/resale value on replaced item: $
Useful Life 10 yearsProject Name 1/2 Ton Pickup Truck Category Vehicles
Type Equipment
Future
Total Project Cost:$173,369
Total20222023202420252026Expenditures
35,40035,400Vehicles
35,400 35,400Total
Total20222023202420252026Funding Sources
35,40035,400Equipment Replacement Fund
35,400 35,400Total
Wednesday, December 15, 2021
73
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Public Works: Parks/Forestry
Description
Truck is used for hauling brush and logs in the Forestry department.
Current vehicle: 2007 International LP4600 Log Truck (#811)
Project #01-ERP-0804
Priority n/a
Justification
Budget Impact/Other
Variance from 20 year plan - 50% Equipment Replacement/50% Refuse - increase amount to $105,000 to reflect actual cost.
Estimated useful life reduced from 20 to 15 years.
Useful Life 15 yearsProject Name Log Truck Category Vehicles
Type Equipment
Future
Total Project Cost:$523,484
Total20222023202420252026Expenditures
163,600163,600Vehicles
163,600 163,600Total
Total20222023202420252026Funding Sources
81,80081,800Equipment Replacement Fund
81,80081,800RF - Refuse Fund
163,600 163,600Total
Wednesday, December 15, 2021
74
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Bldg/Equip Supt
2022 2026thru Department Public Works: Parks/Forestry
Description
Riding mowers used by Parks Division of Public Works.
Current equipment: 2004 Toro Zero Turn (#826), 2006 Jacobson Rotary Mower (#823)
Project #01-ERP-0808
Priority 1 Urgent
Justification
Mowing city parks and right of ways.
Move replacement of #826 to 2021 - Ran 10 years past useful life
Move replacement of #823 to 2021
Both replacements of current vehicles were held off in 2020 due to the COVID-19 Pandemic.
Budget Impact/Other
2021 - Replace 2004 Zero Turn #826 at $15,000
2021 - Replace 2006 Jacobson #823 at $35,000
The Jacobson will be replaced with 7500-D Zmaster Toro Zero Turn
Useful Life 6 yearsProject Name Riding Mowers (2)Category Equipment
Type Equipment
Future
Total Project Cost:$323,930
Total20222023202420252026Expenditures
17,70017,700Equipment
17,700 17,700Total
Total20222023202420252026Funding Sources
17,70017,700Equipment Replacement Fund
17,700 17,700Total
Wednesday, December 15, 2021
75
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Public Works: Parks/Forestry
Description
Used to haul multiple riding mowers
Current trailor: Unit #845, 1997 Remackle Trailer, overhauled/refurbished in 2016
Project #01-ERP-0814
Priority n/a
Justification
Allows one truck to pull two riding mowers to parks
Budget Impact/Other
Variance from 20 year plan - extend life 4 years due to overhaul/refurbishment.
Estimate salvage/resale value on replaced item: $
2016-Increased estimated replacement cost from $2,200 to $10,000
Useful Life 15 yearsProject Name Trailer Flatbed Category Equipment
Type Equipment
Future
Total Project Cost:$26,980
Total20222023202420252026Expenditures
10,00010,000Equipment
10,000 10,000Total
Total20222023202420252026Funding Sources
10,00010,000Equipment Replacement Fund
10,000 10,000Total
Wednesday, December 15, 2021
76
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Public Works: Parks/Forestry
Description
Use by Public Works for snow removal, skating rinks, sweeping, ballfield maintenance and transportation of people and materials.
Current vehicle: 2010 Bobcat (#815)
Project #01-ERP-0816
Priority n/a
Justification
New machine.
Budget Impact/Other
Variance from 20 year plan - New item which replaces one tractor.
Estimate salvage/resale value on replaced item: $
Useful Life 8 yearsProject Name Toolcat Category Equipment
Type Equipment
Future
Total Project Cost:$423,804
Total20222023202420252026Expenditures
80,20080,200Equipment
80,200 80,200Total
Total20222023202420252026Funding Sources
80,20080,200Equipment Replacement Fund
80,200 80,200Total
Wednesday, December 15, 2021
77
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Public Works: Streets/Traffic
Description
Pickup used by various divisions of Public Works.
Current vehicle: 2013 Ford F-150 (#301)
Project #01-ERP-0300
Priority n/a
Justification
Light hauling and transportation for supervisors. Maintenance garage service vehicle.
Budget Impact/Other
Variance from 20 year plan - Move up from 2015 to 2013. Replace with 1/2 ton 4x4 pickup. Reduce amount from 33,600 to 21,500..
Estimate salvage/resale value on replaced item: $1,500
Useful Life 10 yearsProject Name 4x4 1/2 Ton Pickup with Plow Category Vehicles
Type Equipment
Future
Total Project Cost:$114,200
Total20222023202420252026Expenditures
28,90028,900Vehicles
28,900 28,900Total
Total20222023202420252026Funding Sources
28,90028,900Equipment Replacement Fund
28,900 28,900Total
Wednesday, December 15, 2021
78
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Public Works: Streets/Traffic
Description
Truck is used in the Street Division of Public Works.
Current vehicles: 2000 Ford F450 (#805) & 2011 Ford F350 (#308)
Project #01-ERP-0303
Priority n/a
Justification
Vehicle used by various departments for street and park maintenance and light hauling.
Budget Impact/Other
Variance from 20 year plan - move back from 2009 to 2010.
Estimated useful life reduced from 12 to 8 years.
Estimate salvage/resale value on replaced item: $3,500
Useful Life 10 yearsProject Name 1 Ton Dump Truck (2)Category Vehicles
Type Equipment
Future
Total Project Cost:$281,600
Total20222023202420252026Expenditures
102,90053,400 49,500Vehicles
53,400 49,500 102,900Total
Total20222023202420252026Funding Sources
102,90053,400 49,500Equipment Replacement Fund
53,400 49,500 102,900Total
Wednesday, December 15, 2021
79
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Public Works: Streets/Traffic
Description
Boom truck used in Street and Traffic Divisions of Public Works.
Current vehicle: 2012 Ford F450 (#309)
Project #01-ERP-0304
Priority n/a
Justification
Vehicle used by Traffic Department for signal and light pole maintenance.
Budget Impact/Other
Variance from 20 year plan - Increase amount to reflect actual.
Estimate salvage/resale value on replaced item: $8,000
Useful life moved from 17 years to 12 years.
Useful Life 12 yearsProject Name 1 Ton Traffic Boom Truck Category Vehicles
Type Equipment
Future
Total Project Cost:$413,400
Total20222023202420252026Expenditures
136,400136,400Vehicles
136,400 136,400Total
Total20222023202420252026Funding Sources
136,400136,400Equipment Replacement Fund
136,400 136,400Total
Wednesday, December 15, 2021
80
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Public Works: Streets/Traffic
Description
Single axle dump truck used by various division of Public Works.
Current vehicles: 2005 Freightliner M2 106 (#312) and 2011 Freightliner MZ-1068 (#311)
Project #01-ERP-0305
Priority n/a
Justification
Vehicle used for heavy hauling, snow plowing and sanding.
Moved single axel dump truck due in 2018 to a tandem axel dump truck in 2018. Done to increase snow hauling and other material hauling
capacity.
Budget Impact/Other
Variance from 20 year plan - Move 1 truck from single axle to tandem axel to increase hauling capacity for snow and road materials.
Estimate salvage/resale value on replaced item: $4,500 each
We will then have 2 single axel (change from 3) dump trucks and 2 (change from 1) tandem axel dump trucks.
Estimated useful life reduced from 17 to 15 years.
Useful Life 15 yearsProject Name Single Axle Dump Truck (2)Category Vehicles
Type Equipment
Future
Total Project Cost:$643,000
Total20222023202420252026Expenditures
225,000225,000Vehicles
225,000 225,000Total
Total20222023202420252026Funding Sources
225,000225,000Equipment Replacement Fund
225,000 225,000Total
Wednesday, December 15, 2021
81
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Public Works: Streets/Traffic
Description
Current equipment: 2005 Caterpillar 938G (#322)
Project #01-ERP-0308
Priority n/a
Justification
Budget Impact/Other
Variance from 20 year plan - None
Estimate salvage/resale value on replaced item: $
Useful Life 15-18 yearsProject Name Front End Loaders (2)Category Equipment
Type Equipment
Future
Total Project Cost:$1,267,100
Total20222023202420252026Expenditures
268,600268,600Equipment
268,600 268,600Total
Total20222023202420252026Funding Sources
268,600268,600Equipment Replacement Fund
268,600 268,600Total
Wednesday, December 15, 2021
82
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Public Works: Streets/Traffic
Description
Loading trucks, landscape work, snow removal, material handling.
Current equipment: 2011 Bobcat S650 Skid-Steer Loader (#325)
Project #01-ERP-0309
Priority n/a
Justification
Budget Impact/Other
Estimate salvage/resale value on replaced item: $
Useful Life 10 yearsProject Name Skid Loader (2)Category Equipment
Type Equipment
Future
Total Project Cost:$258,900
Total20222023202420252026Expenditures
50,00050,000Equipment
50,000 50,000Total
Total20222023202420252026Funding Sources
50,00050,000Equipment Replacement Fund
50,000 50,000Total
Wednesday, December 15, 2021
83
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Public Works: Streets/Traffic
Description
Machine used by the Traffic Division of Public Works to make traffic signs and related signs and decals for general city use.
Current equipment: 2005 Signcad Sign Making System (#353)
Project #01-ERP-0317
Priority n/a
Justification
Existing machine is not repairable and needs updating.
Budget Impact/Other
Variance from 20 year plan - Move back to 2016
Estimate salvage/resale value on replaced item: $-0-
Useful Life 10 yearsProject Name Sign Machine (Traffic)Category Equipment
Type Equipment
Future
Total Project Cost:$55,823
Total20222023202420252026Expenditures
18,10018,100Equipment
18,100 18,100Total
Total20222023202420252026Funding Sources
18,10018,100Equipment Replacement Fund
18,100 18,100Total
Wednesday, December 15, 2021
84
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Bldg/Equip Supt
2022 2026thru Department Refuse
Description
Refuse truck used by Refuse Utility Division of Public Works.
Current vehicle: 2011 Freightliner Rapid Rail (#900)
Project #01-ERP-0900
Priority n/a
Justification
Residential waste pick up.
Budget Impact/Other
Variance from 20 year plan - increase cost to reflect actual
Estimate salvage/resale value on replaced item: $18,000
Useful Life 8 yearsProject Name Refuse Truck (RAP-R) (2)Category Vehicles
Type Equipment
Future
Total Project Cost:$1,950,700
Total20222023202420252026Expenditures
275,200275,200Vehicles
275,200 275,200Total
Total20222023202420252026Funding Sources
275,200275,200RF - Refuse Fund
275,200 275,200Total
Wednesday, December 15, 2021
85
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Sewer
Description
3/4 ton utility truck used by the Water/Sewer Division of Public Works.
Current vehicle: 2007 Chevrolet Pickup (#505)
Project #01-ERP-0551
Priority n/a
Justification
Transportation to and from job sites, box carries tools used by personnel for job site repairs and light hauling.
Budget Impact/Other
Variance from 20 year plan - none
Estimate salvage/resale value on replaced item: $2,500
Useful Life 10 yearsProject Name 3/4 Ton Utility Truck Category Vehicles
Type Equipment
Future
Total Project Cost:$190,546
Total20222023202420252026Expenditures
45,20045,200Vehicles
45,200 45,200Total
Total20222023202420252026Funding Sources
45,20045,200SF - Sanitary Sewer Fund
45,200 45,200Total
Wednesday, December 15, 2021
86
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Sewer
Description
Portable generator used by Water/Sewer Divisions of Public Works.
Current equipment: 2022 Generator (#535), "PW Generator " 2010 Caterpillar C15 (#537)
Project #01-ERP-0555
Priority n/a
Justification
Emergency back up generator for lift stations and pumps, off site power for lights and welding.
Budget Impact/Other
Estimated useful life reduced from 25 to 20 years.
Estimate salvage/resale value on replaced item: $2,500
Useful Life 20 yearsProject Name Generator (2)Category Equipment
Type Equipment
Future
Total Project Cost:$79,000
Total20222023202420252026Expenditures
43,00043,000Equipment
43,000 43,000Total
Total20222023202420252026Funding Sources
43,00043,000SF - Sanitary Sewer Fund
43,000 43,000Total
Wednesday, December 15, 2021
87
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Sewer
Description
Sewer inspection Crawler (Televising Camera) with Ford Transit Van used by Utility crews to televise sanitary and storm sewers annually.
Project #01-ERP-0560
Priority 1 Urgent
Justification
Better effectiviness, efficiency and cost. Currently the televising for our sanitary lines go out for bids, RFP's for 2020's work averaged over
$33,000. The payback would be 6 years and with the camera's useful life as 12-15 years, we would benefit 6-9 years of induring no costs other than
maintenance before needing to replace. We're at the mercy of the contractor for a timley completion of televising, the best scenario is to televise
immediately after jetting to make sure the sanitary lines are clean of debris or damage. With this we can react immediately to resolve any issues we
may find.
Budget Impact/Other
Estimate salvage/resale value at the end of useful life is $30,000.
Useful Life 12 yearsProject Name Sewer Televising Camera and Van Category Utilities: Municipal Sanitary Se
Type Equipment
Future
Total Project Cost:$436,600
Total20222023202420252026Expenditures
180,000180,000Equipment
180,000 180,000Total
Total20222023202420252026Funding Sources
180,000180,000SF - Sanitary Sewer Fund
180,000 180,000Total
Wednesday, December 15, 2021
88
EQUIPMENT REPLACEMENT PLAN
City of Hopkins, MN - ERP Contact Public Works Director
2022 2026thru Department Water
Description
3/4 ton utility truck used by the Water Division of Public Works.
Current vehicle: 2006 Chevrolet Pickup
Project #01-ERP-0501
Priority n/a
Justification
Transportation to and from job sites, box carries tools used by personnel for job site repairs and light hauling.
Budget Impact/Other
Variance from 20 year plan - moved up from 2017 to 2016
Estimate salvage/resale value on replaced item: $2,500
Useful Life 10 yearsProject Name 3/4 Ton Utility Truck Category Vehicles
Type Equipment
Future
Total Project Cost:$144,929
Total20222023202420252026Expenditures
46,90046,900Vehicles
46,900 46,900Total
Total20222023202420252026Funding Sources
46,90046,900WF - Water Fund
46,900 46,900Total
Wednesday, December 15, 2021
89
90
TWENTY-YEAR
REPLACEMENT SCHEDULE
91
12/14/2021 EQUIPMENT REPLACEMENT SCHEDULE
Net General Fund 20 Year Average:1,746,400$
INFLATION FACTOR 3.0%
REPL
EQUIPMENT /VEHICLES YRS 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 Total
ACTIVITY CENTER
ERP-0032 Sound System 15 0 0 0 0 0 0 0 0 13,700 0 0 0 0 0 0 0 0 0 0 0 0
ERP-0035 Floor Scrubber 10 0 0 0 0 6,700 0 0 0 0 0 0 0 0 0 9,000 0 0 0 0 0 0
ERP-0037 Security System Upgrade 15-18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31,160 0 0 0 0 0 0
ERP-0038 Kitchen Storage 30 17,000 12,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ERP-0041 A/V Replacement & Upgrade 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 97,568 0 0 0 0 0 0
ERP-0042 Replace Sanitizer/Heat Booster 10 20,000 0 0 0 0 0 0 0 0 0 27,000 0 0 0 0 0 0 0 0 0 36,000
SUBTOTAL 37,000 12,000 0 0 6,700 0 0 0 13,700 0 27,000 0 0 0 137,728 0 0 0 0 0 36,000 270,128
ARTS CENTER
ERP-1102 Kitchen Catering Equipment 12 0 0 0 0 7,100 0 0 0 0 0 0 0 0 0 0 0 10,123 0 0 0 0
ERP-1105 Community Room A/V 7 13,500 0 0 0 0 0 0 16,600 0 0 0 0 0 0 20,415 0 0 0 0 0 0
ERP-1107 Theater Projection Screen 10 0 0 6,700 0 0 0 0 0 0 0 0 0 9,000 0 0 0 0 0 0 0 0
ERP-1109 Floor Scrubber 10 0 0 0 10,800 0 0 0 0 0 0 0 0 0 14,516 0 0 0 0 0 0 0
13,500 0 6,700 10,800 7,100 0 0 16,600 0 0 0 0 9,000 14,516 20,415 0 10,123 0 0 0 0 108,754
COMMUNITY SERVICES
ERP-0108 Document Management Scanner (2) 4 0 0 0 0 0 0 14,300 0 0 0 16,000 0 0 0 18,007 0 0 0 20,266 0 0
ERP-0010 Election Booths 20 0 0 0 0 0 0 0 0 13,439 0 0 0 0 0 0 0 0 0 0 0 0
ERP-0051 Exterior Security Camera System 15 0 0 0 0 0 0 0 0 0 0 0 0 0 62,319 0 0 0 0 0 0 0
ERP-0052 Electronic Inspections Processing 5-7 0 0 0 16,231 0 0 0 0 18,817 0 0 0 0 21,814 0 0 0 0 25,288 0 0
EQUIPMENT SUBTOTAL 0 0 0 16,231 0 0 14,300 0 32,256 0 16,000 0 0 84,133 18,007 0 0 0 45,554 0 0 226,481
FIRE
ERP-0100 Tele-Squirt E-2 10 0 0 0 0 0 1,000,000 0 0 0 0 0 0 0 0 0 1,343,916 0 0 0 0 0
ERP-0101 Fire Pumper E-3 20 0 0 0 0 0 900,000 0 0 0 0 0 0 0 0 0 1,250,000 0 0 0 0 0
ERP-0105 Quick Attack Pumper/Rescue R-8 10 771,000 0 0 0 0 0 0 0 0 0 1,050,000 0 0 0 0 0 0 0 0 0 1,411,000
ERP-0106 Aerial Truck 20 0 0 0 0 0 0 1,572,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VEHICLES SUBTOTAL 771,000 0 0 0 0 1,900,000 1,572,000 0 0 0 1,050,000 0 0 0 0 2,593,916 0 0 0 0 1,411,000 9,297,916
ERP-0107 Air Compressor 15 0 0 0 0 0 0 0 0 0 54,400 0 0 0 0 0 0 0 0 0 0 0
ERP-0108 Breathing Apparatus (45) (SCBA)10 0 0 0 250,000 0 0 0 0 0 0 0 0 0 336,000 0 0 0 0 0 0 0
ERP-0109 Extrication Tool (2)10 0 32,000 0 0 0 0 0 36,900 0 0 40,300 0 0 0 0 0 0 0 0 0 54,000
ERP-0112 Thermal Imaging Camera (2)10 0 0 0 16,180 0 17,400 0 0 0 0 0 20,700 0 0 0 23,384 0 0 0 0 0
ERP-0113 Emergency Preparedness Siren 20 0 0 0 0 38,500 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ERP-0114 Floor Scrubber 12 0 0 0 0 0 20,300 0 0 0 0 0 0 0 0 0 0 28,941 0 0 0
ERP-0125 Radios-Portable & Mobile 5-7 0 0 0 386,000 0 0 0 0 0 0 459,581 0 0 0 0 0 0 546,297 0 0 0
ERP-0126 Helmets 10 16,000 0 0 0 0 0 0 0 0 0 18,000 0 0 0 0 0 0 0 0 0 24,191
ERP-0127 Lucus Device 5 0 18,000 0 0 0 0 18,500 0 0 0 0 19,000 0 0 0 0 20,000 0 0 0 0
ERP-0128 Hose Replacement 20 0 0 0 0 0 0 0 0 0 0 0 51,068 0 0 0 0 0 0 0 0 0
ERP-0131 Station Alerting System 0 75,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EQUIPMENT SUBTOTAL 16,000 125,000 0 652,180 38,500 37,700 18,500 36,900 0 54,400 517,881 90,768 0 336,000 0 23,384 20,000 575,238 0 0 78,191 2,620,642
IT
ERP-0003 City Hall - Network Upgrade 1 25,000 26,250 27,037 27,849 28,684 29,545 30,431 31,344 32,284 33,253 34,251 35,279 36,337 37,427 38,550 39,706 40,897 42,124 43,388 44,690 46,030
ERP-0004 Phone System 8 0 89,600 0 0 0 0 0 0 0 110,700 0 0 0 0 0 0 0 140,231 0 0 0
ERP-0005 Financial Software 7 0 0 0 315,000 0 0 0 0 0 0 387,000 0 0 0 0 0 0 476,000 0 0 0
ERP-0006 Computers 3-5 34,729 36,465 37,559 38,686 39,847 41,042 42,273 43,541 44,847 46,192 47,578 49,005 50,475 51,990 53,549 55,155 56,810 58,514 60,269 62,078 63,940
ERP-0009 Network Infrastructure Upgrade 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36,456 0 0 0 0 0
ERP-0012 Core Network Switch 6 0 0 20,000 0 0 0 0 0 24,000 0 0 0 0 0 28,658 0 0 0 0 0 34,220
ERP-0014 Distribution Network Switches 5 0 0 0 57,000 0 0 0 0 66,079 0 0 0 0 76,603 0 0 0 0 88,804 0 0
ERP-0015 Backup Server 3 0 72,120 0 0 78,808 0 0 86,115 0 0 94,100 0 102,826 0 0 112,361 0 122,780 0
ERP-0017 Office 365 1 44,000 44,000 45,320 46,680 48,080 49,522 51,008 52,538 54,114 55,738 57,410 59,132 60,906 62,733 64,615 66,554 68,551 70,607 72,725 74,907 77,154
ERP-0020 Patching Automation Software 5 10,000 10,000 10,000 10,300 10,609 10,927 11,255 11,593 11,941 12,299 12,668 13,048 13,439 13,842 14,258 14,685 15,126 15,580 16,047 16,528 17,024
ERP-0024 Sandbox Security Appliance 5 45,000 0 0 0 45,000 0 0 0 0 52,000 0 0 0 0 60,000 0 0 0 0 70,000 0
ERP-0211 Police - Network Server (3)3 25,000 26,250 27,038 27,849 28,684 29,545 30,431 31,344 32,284 33,253 34,251 35,279 36,337 37,427 38,550 39,706 40,897 42,124 43,388 44,690 46,030
ERP-0022 Windows 10 Enterprise Upgrade 1 42,000 42,000 63,000 43,260 44,558 45,895 47,271 48,690 50,150 51,655 53,204 54,800 56,444 58,138 59,882 61,678 63,529 65,435 67,398 69,420 71,502
EQUIPMENT SUBTOTAL 225,729 346,685 229,954 566,624 324,270 206,475 212,669 305,164 315,700 395,089 720,462 246,543 253,939 440,985 358,062 313,941 398,171 910,615 392,019 505,093 355,902 8,024,091
POLICE
ERP-0200 Squad 3 110,000 117,400 117,400 117,400 128,000 128,000 128,000 140,000 140,000 140,000 153,200 153,200 153,000 157,000 160,000 165,000 170,000 175,000 180,000 185,000 190,000
ERP-0201 Sergeant Vehicle #209 4 0 0 0 64,154 0 0 0 72,206 0 0 0 81,268 0 0 0 91,467 0 0 0 102,947 0
ERP-0202 Parking Vehicle #211 10 0 0 0 0 60,000 0 0 0 0 69,557 0 0 0 0 80,636 0 0 0 0 93,479 0
ERP-0203 PSO Utility 4x4 #212 6 72,100 0 0 0 86,100 0 0 0 96,905 0 0 0 109,067 0 0 0 122,755 0 0 0 138,162
ERP-0205 SWAT Vehicle #240 15 0 0 0 0 0 0 0 0 0 77,900 0 0 0 0 0 0 0 0 0 0 0
VEHICLES SUBTOTAL 182,100 117,400 117,400 181,554 274,100 128,000 128,000 212,206 236,905 287,457 153,200 234,468 262,067 157,000 240,636 256,467 292,755 175,000 180,000 381,426 328,162 4,526,303
ERP-0208 Computer System 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ERP-0212 Mobile Data Computers/Digital Cameras 7 0 0 160,000 0 0 0 0 121,724 0 0 0 0 141,111 0 0 0 0 163,586 0 0 0
ERP-0214 Tactical Ballistic Vests (9)5 0 76,512 0 0 0 0 88,697 0 0 0 0 102,825 0 0 0 0 119,203 0 0 0 0
ERP-0215 Radios-Portable & Mobile 5-7 0 290,000 0 0 0 0 0 0 356,664 0 0 0 0 0 438,652 0 0 0 0 0
ERP-0217 Taser Replacement 4 0 90,000 0 0 0 90,041 0 0 101,342 0 0 114,060 0 0 0 128,375 0 0 0
ERP-0218 Building Video Server 4 0 22,000 0 0 17,000 0 0 0 17,000 0 0 0 19,134 0 0 0 21,535 0 0 0 24,238
ERP-0220 Squad Computers 5 0 0 90,000 0 0 0 0 100,000 0 0 0 0 87,418 0 0 0 0 101,342 0 0 0
ERP-0221 Records Management System 0 0 150,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ERP-0222 Body Worn Camera 5 0 0 0 0 0 165,000 0 0 0 0 0 0 0 0 175,000 0 0 0 214,500 0 0
ERP-0227 Police Equipment 3 25,000 0 0 25,000 0 0 27,318 0 0 29,851 0 0 32,619 0 0 35,644 0 0 38,949 0 0
EQUIPMENT SUBTOTAL 25,000 478,512 400,000 25,000 17,000 255,041 116,015 221,724 373,664 131,193 0 102,825 280,282 114,060 175,000 474,296 140,738 393,303 253,449 0 24,238 4,001,341
92
12/14/2021 EQUIPMENT REPLACEMENT SCHEDULE
Net General Fund 20 Year Average:1,746,400$
INFLATION FACTOR 3.0%
REPL
EQUIPMENT /VEHICLES YRS 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 Total
P.W. BLDG./EQUIPMENT SVCS
ERP-0710 1/2 Ton Truck 10 0 0 0 0 42,100 0 0 0 0 0 0 0 53,331 0 0 0 0 0 0 0 67,558
ERP-0711 Vehicle Washer 12 0 0 0 0 0 0 0 8,300 0 0 0 0 0 0 0 0 0 0 0 11,500 0
ERP-0712 4x4 3/4 Ton Pick-up Truck 15 0 0 0 0 0 0 0 0 0 0 50,000 0 0 0 0 0 0 0 0 0 0
ERP-0714 PW - Truck Scan Kit 10 0 0 0 0 0 14,143 0 0 0 0 0 0 0 0 0 19,009 0 0 0 0 0
ERP-0715 PW - Forklift 15 0 0 0 0 0 0 0 0 0 0 0 36,714 0 0 0 0 0 0 0 0 0
0 0 0 0 42,100 14,143 0 8,300 0 0 50,000 36,714 53,331 0 0 19,009 0 0 0 11,500 67,558 302,655
P.W. ENGINEERING
ERP-0700 Engineering Van 15 0 0 0 0 0 0 0 38,800 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 38,800 0 0 0 0 0 0 0 0 0 0 0 0 38,800
P.W. PARKS & FORESTRY
ERP-0800 1/2 Ton Truck 10 0 35,400 0 0 0 0 0 0 0 0 0 47,600 0 0 0 0 0 0 0 0 0
ERP-0801 4x4 3/4 Ton Truck 8 0 0 0 0 0 0 108,000 0 0 0 0 0 0 0 136,811 0 0 0 0 0 0
ERP-0802 3/4 Ton Utility Truck 10 0 0 0 0 0 0 0 0 48,700 0 0 0 0 0 0 0 0 0 0 0 0
ERP-0804 Log Truck (50% w/Refuse)20 81,800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 254,884 0 0 0 0
ERP-0805 Aerial Lift 20 0 0 0 0 0 0 0 0 228,900 0 0 0 0 0 0 0 0 0 0 0 0
ERP-0806 Tractor 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ERP-0807 Truckster 15 0 0 0 0 0 17,140 0 0 0 0 0 0 53,200 0 0 0 0 0 0 0 0
ERP-0808 Riding Mower 6 0 17,700 32,100 21,135 38,329 0 0 0 25,000 0 45,766 0 0
ERP-0810 Large Turf Mower (#825)10 0 0 0 0 0 0 121,609 0 0 0 0 0 0 0 154,050 0 0 0 0 0 0
ERP-0812 Stump Cutter 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 76,032 0 0 0 0 0
ERP-0813 Brush Clipper 20 0 0 0 0 0 0 0 0 0 0 0 43,700 0 0 0 0 0 0 0 0 0
ERP-0814 Trailer Flatbed 15 0 0 10,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15,580 0 0 0
ERP-0815 Skid Loader 12 0 0 0 0 0 0 0 45,600 0 0 0 0 0 0 0 0 0 0 0 65,014 0
ERP-0816 Toolcat 8 0 0 0 0 80,200 0 0 0 0 0 0 0 101,600 0 0 0 0 0 0 0 128,704
ERP-0817 Grass Seed Applicator 20 0 0 0 0 0 0 0 0 17,900 0 0 0 0 0 0 0 0 0 0 0 0
VEHICLES SUBTOTAL 0 117,200 10,000 0 97,900 17,140 261,709 45,600 295,500 0 21,135 91,300 193,129 0 290,861 76,032 279,884 15,580 45,766 65,014 128,704 2,052,454
P.W. STREETS/TRAFFIC
ERP-0300 4x4 3/4 Ton Truck/Plow 10 0 28,900 0 0 0 0 0 0 0 0 0 38,800 0 0 0 0 0 0 0 0 0
ERP-0301 4x4 3/4 Ton Truck/Plow 8 0 0 0 0 38,500 0 0 0 0 0 0 0 0 48,800 0 0 0 0 0
ERP-0302 4x2 1 Ton Dump Truck 12 0 0 0 0 0 0 0 0 77,800 0 0 0 0 0 0 0 0 0 104,600 0 0
ERP-0303 1 Ton Dump Truck 12 53,400 0 49,500 0 0 0 0 0 0 0 0 0 76,100 0 0 0 0 0 0 0 0
ERP-0304 1 Ton Boom Truck 17 0 136,400 0 0 0 0 0 0 0 0 0 0 194,500 0 0 0 0 0 0 0
ERP-0305 Single Axle Dump Truck 17 225,000 0 0 0 0 0 0 0 210,600 0 0 0 0 0 0 0 0 0 0 0 0
ERP-0306 Tandem Dump Truck 17 0 0 0 0 0 0 0 0 0 0 0 0 286,000 294,000 0 0 0 0 0 0 0
ERP-0307 Water Truck 22 0 0 0 0 0 0 0 0 0 201,000 0 0 0 0 0 0 0 0 0 0 0
ERP-0308 Front End Loader 15 0 268,600 0 0 268,000 0 0 0 0 0 0 0 0 0 0 0 418,500 0 0 0
ERP-0309 Skid Loader 12 50,000 0 0 0 0 0 59,700 0 0 0 0 0 71,300 0 0 0 0 0 0 0 0
ERP-0311 Sweeper 20 0 0 0 0 0 0 0 0 0 319,000 0 0 0 0 0 0 0 0 0 0 0
ERP-0312 Roller 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 82,000 0 0 0 0 0
ERP-0313 Striper 12 0 0 0 0 0 0 0 16,000 0 0 0 0 0 0 0 0 0 0 0 0 0
ERP-0314 Paver 20 0 0 0 0 0 0 0 0 0 0 120,000 0 0 0 0 0 0 0 0 0 0
ERP-0315 Snow Blower 20 0 0 0 0 0 0 0 0 0 0 0 0 117,000 0 0 0 0 0 0 0 0
ERP-0316 Trailer 20 0 0 0 0 0 0 0 0 8,850 0 0 0 0 0 0 0 0 0 0 0 0
ERP-0317 Sign Machine 10 0 0 0 0 18,100 0 0 0 0 0 0 0 0 0 24,323 0 0 0 0 0 0
ERP-0318 Asphalt Hot Mix Heating Box - Trailer 10 0 0 0 0 0 0 0 31,509 0 0 0 0 0 0 0 0 0 42,300 0 0 0
ERP-0319 Regenerative Air Sweeper 20 0 0 0 0 0 0 210,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ERP-0320 Planer 20 0 0 0 0 0 0 0 0 0 18,600 0 0 0 0 0 0 0 0 0 0 0
ERP-0321 Wheel Loader 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 200,000 0 0
VEHICLES SUBTOTAL 328,400 165,300 318,100 0 18,100 306,500 269,700 47,509 297,250 538,600 120,000 38,800 550,400 488,500 24,323 130,800 0 460,800 304,600 0 0 4,407,682
HRA
ERP-0400 4x4 3/4 Ton Truck 8 0 41,100 0 0 0 0 0 0 0 52,100 0 0 0 0 0 0 0 66,000 0 0 0
ERP-0401 Copier 8 16,500 0 0 0 0 0 0 0 20,900 0 0 0 0 0 0 0 26,500 0 0 0 0
SUBTOTAL 16,500 41,100 0 0 0 0 0 0 20,900 52,100 0 0 0 0 0 0 26,500 66,000 0 0 0 223,100
PAVILION
ERP-1000 Ice Resurfacer 12 0 0 0 0 165,000 0 0 0 0 0 0 0 0 0 0 0 235,251 0 0 0 0
ERP-1001 Electric Ice Edger 12 0 0 0 0 8,900 0 0 0 0 0 0 0 0 0 11,961 0 0 0 0 0 0
ERP-1002 Arena Scoreboard 20 0 0 0 0 12,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ERP-1003 Floor Scrubber 10 0 0 11,600 0 0 0 0 0 0 0 0 0 15,600 0 0 0 0 0 0 0 0
ERP-1004 Scissor Lift 15 0 0 0 0 0 0 0 16,200 0 0 0 0 0 0 0 0 0 0 0 0 0
SUBTOTAL 0 0 11,600 0 185,900 0 0 16,200 0 0 0 0 15,600 0 11,961 0 235,251 0 0 0 0 476,512
REFUSE
ERP-0900 Refuse Truck (RAP-R)10 0 0 0 275,200 0 0 0 0 0 363,200 0 0 0 0 0 0 0 0 0 488,100 0
ERP-0901 Refuse Truck (Rear-L)15 0 0 0 0 0 0 0 0 0 0 136,500 0 0 0 0 0 0 0 0 0
ERP-0803 Swap Loader 20 0 0 0 0 0 0 0 0 0 0 0 171,000 0 0 0 0 0 0 0 0 0
ERP-0804 Log Truck (50% w/Forestry)20 81,800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SUBTOTAL 0 81,800 0 275,200 0 0 0 0 0 363,200 136,500 171,000 0 0 0 0 0 0 0 488,100 0 1,515,800
WATER
ERP-0500 1./2 Ton Truck 10 0 0 0 0 0 36,000 0 0 0 0 0 0 0 0 0 48,381 0 0 0 0 0
ERP-0501 3/4 Ton Utility Truck 10 0 0 0 0 46,900 0 0 0 0 0 0 0 0 0 63,029 0 0 0 0 0 0
ERP-0502 Backhoe 20 0 0 0 0 0 0 0 0 0 0 153,700 0 0 0 0 0 0 0 0 0 0
ERP-0503 Air Compressor 15 0 0 0 0 0 0 0 0 0 0 0 0 40,000 0 0 0 0 0 0 0 0
ERP-0509 Water Treatment Plant 10 0 0 0 0 0 134,392 0 0 0 0 0 0 0 0 0 180,613 0 0 0 0 0
SUBTOTAL 0 0 0 0 46,900 170,392 0 0 0 0 153,700 0 40,000 0 63,029 228,994 0 0 0 0 0 703,015
SEWER
ERP-0551 3/4 Ton Utility Truck 10 0 0 0 0 45,200 0 0 0 0 0 0 0 0 0 60,746 0 0 0 0 0 0
ERP-0552 Jet Vactor 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 750,000 0 0 0 0 0
ERP-0555 Generator 25 43,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ERP-0560 Televising Camera and Van 12 180,000 0 0 0 0 0 0 0 0 0 0 0 256,600 0 0 0 0 0 0 0 0
SUBTOTAL 223,000 0 0 0 45,200 0 0 0 0 0 0 0 256,600 0 60,746 750,000 0 0 0 0 0 1,335,546
93
12/14/2021 EQUIPMENT REPLACEMENT SCHEDULE
Net General Fund 20 Year Average:1,746,400$
INFLATION FACTOR 3.0%
REPL
EQUIPMENT /VEHICLES YRS 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 Total
GENERAL FUND-VEHICLES/EQUIP 1,281,500 399,900 445,500 181,554 432,200 2,351,640 2,231,409 305,315 868,455 826,057 1,394,335 364,568 1,058,927 645,500 555,820 3,057,215 572,639 651,380 530,366 446,440 1,935,424 20,536,144
GENERAL FUND-OTHER EQUIP 303,729 962,197 629,954 1,260,035 386,470 513,359 361,484 572,088 735,320 580,682 1,281,343 476,850 534,220 975,178 688,797 830,630 558,909 1,879,156 691,022 516,593 494,331 15,232,348
HRA 16,500 41,100 0 0 0 0 0 0 20,900 52,100 0 0 0 0 0 0 26,500 66,000 0 0 0 223,100
ARTS CENTER 13,500 0 6,700 10,800 7,100 0 0 16,600 0 0 0 0 9,000 14,516 20,415 0 10,123 0 0 0 0 108,754
REFUSE - 81,800 0 275,200 0 0 0 0 0 363,200 136,500 171,000 0 0 0 0 0 0 0 488,100 0 1,515,800
PAVILION - 0 11,600 0 185,900 0 0 16,200 0 0 0 0 15,600 0 11,961 0 235,251 0 0 0 0 476,512
WATER - 0 0 0 46,900 170,392 0 0 0 0 153,700 0 40,000 0 63,029 228,994 0 0 0 0 0 703,015
SEWER 223,000 0 0 0 45,200 0 0 0 0 0 0 0 256,600 0 60,746 750,000 0 0 0 0 0 1,335,546
GENERAL FUND TOTAL 1,585,229 1,362,097 1,075,454 1,441,589 818,670 2,864,999 2,592,893 877,403 1,603,775 1,406,739 2,675,678 841,418 1,593,147 1,620,678 1,244,617 3,887,845 1,131,548 2,530,536 1,221,388 963,033 2,429,755 35,768,492
HRA TOTAL 16,500 41,100 0 0 0 0 0 0 20,900 52,100 0 0 0 0 0 0 26,500 66,000 0 0 0 223,100
ARTS CENTER FUND TOTAL 13,500 0 6,700 10,800 7,100 0 0 16,600 0 0 0 0 9,000 14,516 20,415 0 10,123 0 0 0 0 108,754
ENTERPRISE FUNDS TOTAL 223,000 81,800 11,600 275,200 278,000 170,392 0 16,200 0 363,200 290,200 171,000 312,200 0 135,736 978,994 235,251 0 0 488,100 0 4,030,873
TOTAL ALL FUNDS 1,838,229 1,484,997 1,093,754 1,727,589 1,103,770 3,035,391 2,592,893 910,203 1,624,675 1,822,039 2,965,878 1,012,418 1,914,347 1,635,194 1,400,768 4,866,839 1,403,422 2,596,536 1,221,388 1,451,133 2,429,755 40,131,219
GENERAL FUND SALVAGE 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 840,000
NET GENERAL FUND 1,545,229 1,322,097 1,035,454 1,401,589 778,670 2,824,999 2,552,893 837,403 1,563,775 1,366,739 2,635,678 801,418 1,553,147 1,580,678 1,204,617 3,847,845 1,091,548 2,490,536 1,181,388 923,033 2,389,755 34,928,492
20 YEAR AVERAGES:Total Average
ACTIVITY CENTER ADMINISTRATION 270,128 13,500
IT 8,024,091 401,200 0
COMMUNITY SERVICES 226,481 11,300
FIRE EQUIPMENT 9,297,916 464,900
FIRE ADMINISTRATION 2,620,642 131,000
POLICE EQUIPMENT 4,526,303 226,300
POLICE ADMINISTRATION 4,001,341 200,100
PUBLIC WORKS ADMINISTRATION 0 0
BLDG./EQUIPMENT SERVICES EQUIPMENT 302,655 15,100
ENGINEERING EQUIPMENT 38,800 1,900
PARKS/FORESTRY EQUIPMENT 2,052,454 102,600
STREET EQUIPMENT 4,407,682 220,400
GENERAL FUND VEHICLE/EQUIPMENT 20,625,810 1,031,300
GENERAL FUND OTHER EQUIPMENT 15,142,682 757,100
GENERAL FUND TOTAL 35,768,492 1,788,400
HRA FUND 223,100 11,200
ARTS CENTER FUND 108,754 5,400
REFUSE FUND 1,515,800 75,800
PAVILION FUND 476,512 23,800
WATER FUND 703,015 35,200
SEWER FUND 1,335,546 66,800
UTILITY VEHICLES/EQUIPMENT 4,362,727 218,100
40,131,219 -
94
EQUIPMENT INVENTORY
95
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
FALL, 2021
UNIT #YEAR MAKE MODEL VALUE
FIRE DEPARTMENT
100 2017 PIERCE IMPEL 900,000$
103 2006 PETERBILT 357 420,000
104 2012 FORD F550 248,500
105 2016 FORD F150 25,000
106 2019 FORD EXPLORER 55,000
107 2019 FORD EXPLORER 55,000
108 2019 FORD F150 33,000
109 2008 PIERCE AREO XT 874,000
110 2017 FORD EXPLORER 47,500
115 1952 MACK NONE 4,000
POLICE DEPARTMENT
200 2018 FORD UTILITY 49,000$
201 2021 FORD UTILITY 57,000
202 2021 FORD UTILITY 57,000
205 2020 FORD UTILITY 54,000
206 2020 FORD UTILITY 54,000
207 2021 FORD UTILITY 57,000
208 2021 FORD UTILITY 57,000
209 2018 FORD UTILITY 49,000
211 2021 FORD UTILITY 57,000
213 2020 CHEVROLET BLAZER 54,000
214 2018 FORD EXPLORER 49,000
216 2011 FORD TAURUS 30,000
218 2013 FORD UTILITY BLUE 40,000
219 2013 FORD TAURUS 24,000
220 2017 FORD EXPLORER 50,000
221 2019 FORD EXPLORER 55,000
240 2017 FORD TRANSIT-350 67,000
299 2021 FORD F150 60,000
DWI.2016 FORD UTILITY 49,000
96
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
FALL, 2021
UNIT #YEAR MAKE MODEL VALUE
STREET/TRAFFIC DIVISION
301 2013 FORD F-150 19,500$
302 2018 FORD F350 DRW 54,600
303 2016 FORD F-250 26,500
307 2006 FORD F-350 27,400
308 2011 FORD F-350 20,300
309 2012 FORD F-450 30,300
311 2011 FREIGHTLINER M2-106V 79,400
312 2004 FREIGHTLINER M2-106 98,000
315 2017 FREIGHTLINER 114SD 221,700
317 2016 FREIGHTLINER M2-106 69,400
318 2019 FREIGHTLINER 114SD 235,000
320 2020 CATERPILLAR 926M 232,000
321 2012 CATERPILLAR 924K 177,500
322 2005 CATERPILLAR 938G 157,800
325 2011 BOBCAT S-650 35,100
327 2019 ELGIN PELICAN 230,000
328 2013 ISUZU 435 REGEN SWEEP 145,300
329 2017 BOMAG BW120 SL5 ROLLE 45,900
331 2016 BOBCAT S-650 35,100
337 1994 CATERPILLAR AP200B 17,000
344 1996 SNO-GO WK800 58,000
346 2017 SNO- GO SG WK-800 160,000
348 2014 SPARKS T6202 TRAILER 5,300
350 1993 TOWMASTER T14 TRAILER 4,000
351 2004 TENNANT SWEEPER 3640 10,000
352 2017 FALCON PATCH TRAILER 15,000
ENGINEERING DIVISION
706 2015 FORD TRANSIT 250 24,000$
BUILDING MAINTENANCE & EQUIPMENT SERVICES
701 2016 FORD UTILITY 34,000$
702 2004 FORD F350 18,000
703 2015 FORD UTILITY 35,000
705 2018 FORD F350 30,000
706 2015 FORD TRANSIT 250 29,700
707 2020 FORD F250 35,000
712 2015 FORD UTILITY 35,000
713 2014 FORD UTILITY 30,000
750 2018 CLARK GTS25-FORKLIFT 25,000
97
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
FALL, 2021
UNIT #YEAR MAKE MODEL VALUE
PARKS/FORESTRY DIVISION
800 2013 FORD F-150 23,700$
801 2012 FORD F-350 24,100
804 1995 CHEVROLET CC31403 45,000
806 2016 FORD TRANSIT 350 29,700
807 2006 FORD F250 18,000
811 2006 INTERNATIONAL LOG TRUCK 45,000
812 2010 FREIGHTLINER AERIAL LIFT 130,000
813 2019 FREIGHTLINER M2-106 235,000
814 2020 FORD F350 43,000
815 2020 FORD F350 43,000
816 2014 BOBCAT 5610 50,900
817 2018 BOBCAT 5600 63,300
818 2017 TORO WORKMAN HDX 13,000
820 2004 TORO WORKMAN 3200 15,000
822 2014 TORO MDE 18,000
824 2020 TORO GM4000 68,000
825 2021 TORO Z MASTER 6000 15,000
826 2021 TORO Z MASTER 7500 35,000
828 2001 DEWEZE ATM-72 21,000
829 2016 TORO 3280-D 10,000
831 2016 RAYCO RG45X 3,400
834 2013 VERMEER BRUSH CHIPPER 29,800
835 2016 BOBCAT S70 55,000
843 2007 CARR TRAILER 2,500
844 2010 FELLING FT-6T 6,000
845 1997 REMACKEL DT-D7-E 3,500
846 2001 DRESSEN 8110 2,000
848 2017 LOAD TRAIL TILT DECK 5,400
98
CITY OF HOPKINS
VEHICLE/EQUIPMENT INVENTORY
FALL, 2021
UNIT #YEAR MAKE MODEL VALUE
WATER/SEWER
502 2017 FORD F-150 SUPERCAB 28,000
503 2015 FORD F-350 24,000
508 2016 FORD TRANSIT CONNECT 25,000
509 2016 FORD F-350 65,000
510 2016 FORD F-350 30,000
531 2017 FREIGHTLINER 114SD 425,400
533 2012 CATERPILLAR 420-EH2 87,700
535 1992 KOHLER GEN/TRL 10,000
537 2010 CATERPILLAR C15 144,300
PAVILION
802 2012 FORD F-350 20,000$
808 2014 ZAMBONI 552 126,000
809 2002 OLYMPIA MILLINEUM 87,800
REFUSE
902 2015 FREIGHTLINER M2-106 232,500
903 2015 PETERBILT REAR LOADER 155,000
905 2021 FREIGHTLINER M2-106 217,572
99