Loading...
2022-2026 Capital Improvement Plan CAPITAL IMPROVEMENT PLAN 2022-2026 DATE: December 14, 2021 TO: Honorable Mayor and Members of the City Council FROM: Mike Mornson, City Manager SUBJECT: 2022-2026 CAPITAL IMPROVEMENT PLAN With this letter I respectfully submit the 2022-2026 Capital Improvement Plan. This five- year planning document represents the combined efforts of city staff, advisory commissions, residents and the City Council. The Capital Improvement Plan is a five-year forecast of project needs in the City of Hopkins. It is intended to alert the Council and residents to the major capital needs on the horizon. The first year of the plan becomes an adopted capital budget and relates almost completely to the operating budget that is approved on a yearly basis. The remaining four year represents an estimate of project needs and funding capabilities of the city. This plan does not include proposed equipment purchases. A document relating specifically to equipment replacement needs has been developed into a separate document. The Capital Improvement Plan is intended to serve as a planning tool and is therefore structured to present a meaningful, long-range perspective of the city’s capital programming needs. At the same time, sufficient projected detail is provided to enable those who review the information to make informed decisions on the programming of projects over the next several years. Please use the information provided to formulate plans, projects and questions. The Capital Improvement Plan can serve the community best by provoking thoughts and actions. This document was developed by the Finance Department with assistance of all city departments. I want to especially thank all those involved in the development of the Capital Improvement Plan and especially Steve Stadler, Public Works Director, Eric Klingbeil, City Engineer, Kersten Elverum, Planning and Economic Development Director, Ari Lenz, Assistant City Manager and Nick Bishop, Finance Director for their hard work and dedication. 1 2 Page City Manager's Message 1 Table of Contents 3 Introduction Introduction and Purpose 6 Program Descriptions Utilities Program 7 Transportation Program 8 Parks, Forestry, and Pavilion Program 10 General Public Buildings Program 11 Economic Development 13 Sources of Funding Sources of Funding 16 Funding Source Abreviations 19 Summary of Impacts on Major Funding Sources 22 Cash Flow Statements Park Capital Improvement Fund 26 Capital Improvement Fund 27 Permanent Improvement Revolving Fund (PIR)28 Municipal State Aid Fund 29 Water Utility Fund 30 Sewer Utility Fund 31 Storm Sewer Utiltiy Fund 32 Pavilion - Ice Arena Fund 33 Five-Year Project Summaries Projects by Year 36 Department Summary 39 Projects by Department 40 Funding Source Summary 42 Projects by Funding Source 43 Project Descriptions & Narratives General Public Buildings 49 Parks & Recreation 79 Streets 87 Utilities 97 CAPITAL IMPROVEMENT PLAN 2022-2026 TABLE OF CONTENTS 3 4 Introduction 5 INTRODUCTION AND PURPOSE The Capital Improvement Plan is a flexible plan based upon long-range physical planning and financial projections, which schedules the major public improvements that may be incurred by the City over the next five years. Flexibility of the Capital Improvement Plan is established through annual review, and revision if necessary. The annual review assures that the program will become a continuing part of the budgetary process and that it will be consistent with changing demands as well as changing patterns in cost and financial resources. Funds are appropriated only for the first year of the program, which is then included in the annual budget. The Capital Improvement Plan serves as a tool for implementing certain aspects of the City's comprehensive plan; therefore, the program describes the overall objectives of City development, the relationship between projects with respect to timing and need, and the City's fiscal capabilities. The Capital Improvement Plan can help assure: 1. A systematic approach to planning and initiating capital projects affording the opportunity to plan the location, timing, and financing of needed public improvements; 2. The development of a realistic program of capital spending within the City's projected fiscal capability to finance such projects, avoiding sharp change in the tax levy or bonded indebtedness; 3. The coordination of public and private improvement projects permitting adequate time for design and engineering to eliminate duplication of effort and expense; 4. The expenditure of public funds that is compatible with the City's adopted Comprehensive Plan; 5. That the public is kept informed of the proposed future projects and expenditures; 6. That private investors are aware of the City's long-range development program so that they may guide their development in a way that is compatible with the City's program; 7. Aid in achieving federal and/or state participation by providing the necessary planning and lead time necessary for a successful application in addition to meeting prerequisites needed for certain federal and state grants. 6 PROGRAM DESCRIPTIONS In order to effectively plan for and manage the projects contained in a Capital Improvement Plan, it is necessary to group similar activities into "Program Categories". The City of Hopkins' activities are divided into four program categories which are 1) Utilities, 2) Transportation, 3) Parks, Forestry and Pavilion, and 4) General Public Buildings. The City also includes an outline of proposed expenditures for unscheduled projects. Program categories are explained in the following sections. UTILITIES PROGRAM Program Description: The Utilities Program includes the municipal water, municipal sanitary sewer, storm sewer and refuse systems. Program Goal: Provide reliable, efficient, and safe utility service to all parts of the City with a minimum of adverse effects on the environment. Subprograms: Water, sanitary sewer, storm sewer, and refuse service. I. Municipal Water System Subprogram (WA) A. Subprogram Goal: The goal of the Municipal Water System subprogram is to provide water in sufficient quantities at sufficient pressure, with a high degree of reliability and safety to all parts of the City so as to satisfy the normal demands of the general public for water while at the same time providing sufficient reserves in case of fire emergency or power outages. B. Objectives: 1. Water quality shall meet the purity standards of the Minnesota Department of Health. 2. Any hydrant on the system shall, under maximum condition, deliver no less than 500 gallons per minute with a residual pressure of 20 pounds per square inch. 3. The system shall be looped to provide maximum reliability. 4. The supply and storage system shall be designed and maintained to have maximum reliability. 7 II. Municipal Sanitary Sewer Subprogram (SA) A. Subprogram Goal: The goal of the Municipal Sanitary Sewer subprogram is to promote a healthful environment by collecting all sewage from existing and projected development in a sanitary and economic manner. B. Objectives: 1. Provide sewer lines of adequate size and grade to collect and transmit all discharge sewage. 2. Prevent sewage from overflowing into the natural environment. 3. Prevent sewage back-ups. 4. Encourage or promote connection of all generators of sewage to the Municipal system. 5. Meet the effluent and infiltration standards of the Metropolitan Waste Control Commission. III. Storm Sewer Subprogram (SS) A. Subprogram Goal: Manage and control surface and ground waters in order to protect the man-made and natural environment in a safe and efficient manner. B. Objectives: 1. Prevent flooding. 2. Prevent damage to property due to erosion. 3. Meet water quality standards established by the controlling regulatory law or authority. TRANSPORTATION PROGRAM Program Description: This program includes streets, walkways, traffic signs and signals, vehicular parking facilities, and street lighting. Program Goal: Provide for the safe and efficient movement of people and goods throughout the city. Subprograms: Streets, Walkways/Sidewalks, Signs/Signals, Parking Facilities, and Street Lights. 8 I. Streets Subprogram (ST) A. Subprogram Goal: The goal of the Streets subprogram is to provide safe, convenient, economic public streets to best facilitate the movement of vehicular traffic. B. Objectives: 1. Streets should be constructed with permanent surfaces, concrete curb and gutter, and with ancillary storm drainage, to standards established by the City. 2. Streets should be of a size and load capacity consistent with their functional classifications. 3. Timely major repair to preserve the basic capital investment in streets. II. Walkways/Sidewalks Subprogram (WS) A. Subprogram Goal: To provide a safe and convenient pedestrian system with incidental recreational benefits. III. Signs/Signals Subprogram (SI) A. Subprogram Goal: The goal of the Signs/Signals subprogram is to provide an efficient and orderly system of street and traffic signing so as to promote safe, convenient travel throughout the City. B. Objectives: 1. Signs and signals should be installed in conformity with the Minnesota Manual on Uniform Traffic Control Devices. 2. Periodic surveys and studies should be made to document the effectiveness of City signing patterns. IV. Parking Facilities Subprogram (PA) A. Subprogram Goal: To provide such supporting facilities as will promote maximum use of public parking spaces by employers, employees, customers, and visitors. B. Objectives: 1. Provide parking facilities for present and anticipated needs of the City of Hopkins. 9 V. Street Lights Subprogram (SL) A. Subprogram Goal: To provide a system of street lighting within the City that will promote safe and convenient vehicular and pedestrian travel on City Streets. B. Objectives: 1. To provide lighting at each street intersection within the City. 2. To provide mid-block street lighting in conformance with the City's street lighting policy, in order to provide equitable, cost efficient lighting. 3. To continually update the system so as to provide energy and cost efficient lighting. PARKS, FORESTRY AND PAVILION PROGRAM Program Description: This program includes community parks, neighborhood parks, open spaces, recreational structures and facilities. Program Goal: The goal of the Park and Recreation Program is to provide facilities for safe, stimulating, and comprehensive leisure time activities of Hopkins citizens. Subprograms: Neighborhood Facilities, Community Facilities I. Neighborhood Facilities Subprogram (NF) A. Subprogram Goals: To acquire ownership or use rights of park sites located to provide convenient walking access to all Hopkins citizens and to develop such sites to provide optimum recreational serviceability consistent with the preservation and enhancement of pleasing aesthetic qualities. B. Objectives: 1. Acquire property or use rights on those neighborhoods that do not have convenient walking access to neighborhood park facilities. 2. Develop neighborhood park facilities to meet the needs of various user groups. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Preserve and enhance the aesthetic qualities of neighborhood parks. 10 II. Community Facilities Subprogram (CF) A. Subprogram Goals: The goal of the Community Facilities subprogram is to develop, or acquire ownership or use rights of sites which serve the entire City and to provide facilities that serve community-wide needs. B. Objectives: 1. Acquire sites that have valuable and unique natural characteristics to preserve irreplaceable community resources. 2. Preserve by acquisition, gift, or other arrangement properties that have valuable historic-cultural qualities. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Construct or acquire structures and facilities necessary to meet the changing needs of the community. GENERAL PUBLIC BUILDINGS PROGRAM Program Description: The General Public Buildings Program includes all municipal buildings except those provided for in the Utility and Park Facilities Program. Program Goal: Provide buildings that are adequate and convenient for the efficient accommodation of City functions. Subprograms: Administrative Offices, Maintenance Facilities, Fire Facilities, Community Center. I. Administrative Offices Subprogram (AO) A. Subprogram Goal: The goal of the Administrative Offices subprogram is to provide facilities for the efficient and safe conduct of legislative and administrative functions of the City. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of the City services. 11 II. Maintenance Facilities Subprogram (MF) A. Subprogram Goal: The goal of the Maintenance Facilities subprogram is to provide facilities for the efficient and safe conduct of City maintenance functions. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of City services. III. Fire Facilities Subprogram (FF) A. Subprogram Goal: To provide a fire station, or stations, for storage of Fire Department equipment and for the training and meetings of volunteer fire fighters to provide prompt and efficient protection to life and property. B. Objectives: 1. Provide a maximum four-minute daytime and three-minute nighttime response to all points within the City. 2. Meet objective 1 through the use of volunteers. IV. Community Center Subprogram (CC) A. Subprogram Goal: To provide a community facility, or facilities, which meet the social, recreational, and cultural needs of all citizens, particularly senior citizens. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repairs. 2. Construct or acquire structures and facilities necessary to meet the changing needs of the City. 3. Upgrade facilities as necessary to provide for efficient, safe, and effective provision of City services. 12 ECONOMIC DEVELOPMENT PROGRAM Program Description: This program includes redevelopment projects that have been identified through adopted plans and goals of the City of Hopkins. Program Goal: To facilitate the redevelopment of key sites in order to achieve the state objectives of the project. Objectives: 1. Elimination of blight or blighting conditions 2. Creation of jobs 3. Increase property value(s) 4. Catalyst of additional redevelopment 5. Environmental clean-up 6. Increase transit-oriented development around LRT stations 13 14 Sources of Funding 15 SOURCES OF FUNDING In order to fund the anticipated Capital Improvements, the City must draw upon a variety of sources. Many of these sources have a specific or "dedicated" purpose (i.e., the water utility fund will finance water main installation but not a street overlay). Therefore, it is important to identify the uses and limitations of the various revenue sources. CURRENT REVENUES - GENERAL FUND (CR) This represents funding from current year revenue collections in the General Fund that support operations and capital outlay expenditures. Revenue sources include property tax levies, state aid payments, and various permit and license fees. This source of funding is generally used only for operations and small capital purchases. GENERAL FUND RESERVES (GR) Reserves of the general fund are the funds remaining after subtracting cash flow and emergency amounts from the City's cash balance, sometimes referred to as "fund balance". The use of General Fund Reserves is not recommended for Capital Improvements without significant staff and Council review. COMMUNICATION (formerly Cable TV) FUND (CT) This funding source consists of franchise fees received from the local Cable TV company, in excess of the amounts earmarked for the access programming and commission budgets. Expenditures are limited to cable-related facilities, or must have a cable related purpose. ECONOMIC DEVELOPMENT FUND (ED) This funding source was established by the Housing and Redevelopment Authority (HRA) and the City of Hopkins, to provide funding for the purpose of promoting development and redevelopment within the City. The Economic Development fund is a revolving fund administered by the HRA, intended to provide an ongoing funding source used to reduce or extend the long term debt involved with development and redevelopment activities. The HRA reviews all proposed uses of this fund on an individual basis. GRANT-IN-AID (GA) This is aid received from either the Federal or State government. In many cases, grants are made on matching basis, which means the City shares a portion of the costs of the project being funded. 16 MUNICIPAL STATE AID STREETS (MS) This funding source represents funds received from the State of Minnesota to support construction and maintenance of State Aid classified municipal streets. State law defines the types and limits of State Aid Streets expenditures. PERMANENT IMPROVEMENT REVOLVING/GENERAL OBLIGATION BONDS (PI) Improvements with a life of several years may be financed from the proceeds of a General Obligation Bond Issue. Law limits the total debt that can be incurred under this method of financing. With some exception, General Obligation Bonds are generally subject to a referendum process. Examples of projects, which may not require a referendum, are those financed through the use of special assessments where at least 20 percent of the project cost is assessed to the benefiting property owners. The remaining portion not assessed can be financed through general obligation bonds repaid by a tax levy. PRIVATE SECTOR FUNDING (PF) This funding source consists primarily of payments made by developers for the purchase of land, the installation of water, sewer, or streets or other related expenditures. It can also refer to donations made to the City by individuals or groups. OTHER GOVERNMENTAL UNITS (GU) These are funds received from Hennepin County, adjacent communities, etc. for projects that also benefit a jurisdiction other than the City of Hopkins. REVENUE BONDS (RB) These are bonds issued for improvements made for specific revenue producing facility or operation. The debt incurred is repaid from the revenue generated by the facility. If the revenue generated is insufficient, then the difference becomes an annual obligation of the taxpayers and becomes an additional tax levy. These are generally not subject to referendum. REAL ESTATE SALES FUND (RE) This funding source consists primarily of funds built up from the sale of City owned property. To date, the fund has been used for building improvements. Because the sale of both general City property and park/recreation property are accumulated into this fund, earmarking a portion for recreational purposes may be justified. 17 SPECIAL ASSESSMENT (SA) A number of projects may be realistically financed using Special Assessment to pay the ultimate cost. Almost any project can potentially be financed using the assessment process. In each case it is necessary to make a determination that the assessed property will benefit by the amount of the assessment. The cost of street reconstruction is shared by the property owner and the City. Special assessments to individual properties are capped per city policy. Concurrent improvement costs to the utility systems are assumed by the respective utility funds. TAX INCREMENT FINANCING (TF) This funding source results from the tax value of new development that is "incrementally" greater than the existing tax value. Typically, bonds are sold based on the assumption that the higher tax receipts will retire the bonds. However, the use of TIF funds through a "pay as you go" method has become more common. This type of funding can be used for public improvements within a redevelopment district to support the goals of redevelopment, specifically the elimination of blighted conditions. Approval of the Hopkins HRA should be anticipated prior to the commitment of these funds. State law strictly regulates the use of these funds. WATER FUNDS (WF) Water funds consist of revenue generated from the sale of water. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. SANITARY SEWER FUNDS (SF) Sanitary sewer funds consist of revenue generated from charges made for sewage disposal. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. STORM SEWER UTILITY REVENUES (SU) Storm sewer funds consist of revenue generated by charging storm water drainage fee to parcels of land for the availability and use of municipal storm sewer facilities. Expenditures from this funding source are related to drainage facilities. PAVILION FUND (PA) Pavilion Funds consist of revenues generated from rental fees collected from users of the Pavilion. These funds are utilized to pay for operating, and capital expenditures. 18 Funding Sources Communication (formerly Cable TV) Fund CT Current Revenues – General Fund CR General Fund Reserves GR Economic Development Fund ED Grant-In-Aid GA Housing and Redevelopment Authority HRA Municipal State-Aid Streets MS Other Government Units GU Park Dedication Fund PDF Pavilion Fund PA Permanent Improvement Revolving/General Obligation Bonds PI Private Sector Funds PF Real Estate Sales Fund RE Revenue Bonds RB Sanitary Sewer Fund SF Special Assessment SA Storm Sewer Fund SU Tax Increment Financing TF Water Fund WF 19 20 Summary of Impacts on Major Funding Sources 21 SUMMARY OF PROJECT IMPACTS ON MAJOR FUNDING SOURCES CURRENT REVENUES/GENERAL FUND RESERVES Expenditures for 2022 are budgeted at an increase of 2.68% over the 2021 budget. The 2022 budget has no levy limits and the City will receive approximately $880,000 in LGA. The tax levy is the major source of revenues (82%) for the General Fund and therefore presents a challenge when levy limits are in place. Unassigned fund balance in the General Fund totals $6,922,014 at the end of 2020 and is projected to remain at that level for 2021 or increase slightly. The State Auditor’s Office recommends no less than five month of operating expenditures in reserves. For 2021 five months of expenditures would total $6,744,400 or 41.7%. At January 1, 2021 the unassigned fund balance was at 42.8% of budgeted expenditures. PERMANENT IMPROVEMENT REVOLVING FUND, (P.I.R.) - G.O. DEBT Funding from bonds is used to reimburse the P.I.R. fund for public improvement projects, which have been previously expended. The debt is funded by special assessment collections and city tax levies over a ten to fifteen year period. Bonds totaling $3,720,000 were sold in 2021 to fund the second half of the 2020/2021 street improvement project. The next bond sale is scheduled for 2022 and will be for the 2022 street improvement project. These bonds are expected to total approximately $1,945,000. The P.I.R. fund has completed substantial projects over the last five years and this pace is expected to continue with scheduled projects for 2022 totaling $2,155,000 and future projects in the years 2023-2026 approximately $18 million. Projects scheduled for 2022 include the 6th Ave/7th Ave South street reconstruction project, pedestrian and bicycle access improvements, along with street overlay, street sign management programs and street lighting upgrades. The funding is provided for these projects by special assessments, PIR/Bonding and tax levy. In the years 2022-2026 as mentioned above, the city has an aggressive residential street improvement schedule planned, all of which will require bonding. MUNICIPAL STATE AID FUND Funding for municipal state aid road projects comes from state MSA funding and is drawn down as projects are done. State funding is not sufficient for current planned projects as the City has been aggressive in doing MSA projects. In the queue for reimbursement is a request for is the Shady Oak project. In late 2014 we received an advance on the Shady Oak project which essentially cleared up our receivable backlog for Excelsior Blvd and Minnetonka Mills Road. This leaves Shady Oak Road as the only project in the funding queue. Currently two MSA projects are scheduled. They are street improvements on County Road 3 from Shady Oak Road to Meadowbrook Road in 2023 and 17th Avenue in 2024. 22 CAPITAL IMPROVEMENT FUND The Capital Improvement Fund received only tax levy support from 2005 through 2018. Gas and electric franchise fees were increased beginning in 2019, to support the capital improvement fund. The franchise fees are expected to generate $361,500 annually for the fund. The fund will receive $50,000 of tax levy support in 2022. The $106,400 of projects are scheduled at the Fire Station and Activity Center. PARK IMPROVEMENT FUND The source of funding for this fund is development fees charged to developers for park development, in addition to franchise fees from gas and electric services. The franchise fees are expected to supply approximately $305,000 to the fund for much needed park projects. Developer payments are uncertain as they are dependent on future development and redevelopment in the city. Projects scheduled for 2022 include Central Park Picnic Shelter Rehab, Central Park East Play Equipment Replacement and Shady Oak Beach Improvements. WATER FUND Increasing consumption charges and bond proceeds in 2022 provide the funding needed for projects scheduled for 2021. Bonds will need to be sold each year thereafter in which there are water projects associated with the residential street improvement program. Projects planned for 2022 total $3,450,000 and include water main improvements done in conjunction the with 6th Ave/7th Ave South street reconstruction project and trunk water main rehabilitation. SANITARY SEWER FUND Increasing consumption charges and bond proceeds in 2021 provide the funding needed for projects scheduled for 2021. Bonds will need to be sold each year thereafter in which there are sanitary sewer projects associated with the residential street improvement program. Projects planned for 2022 total $3,450,000 and include sewer line improvements done in conjunction the with 6th Ave/7th Ave South street reconstruction project. STORM SEWER FUND Bonds will be sold in 2021 for the 2021 storm water management project. These bonds issues along with current revenues should provide the needed funding for scheduled projects. Bonds will need to be sold each year thereafter in which there are storm sewer projects associated with the residential street improvement program. Projects planned for 2022 total $3,450,000 and include storm sewer improvements done in conjunction the with 6th Ave/7th Ave South street reconstruction project. The most recent rate increase pursuant to the 2007 Utility Master Plan was done in 2009. This rate increase is expected to support the storm sewer system well into the future and currently no additional rates increases are proposed. 23 PAVILION FUND This facility completed a significant upgrade project in 2018, with a total project cost of approximately $5,700,000. The new expanded facility has a new refrigeration system and was expanded to better meet the needs of the community. The project received contributions from the Park Improvement Fund along with outside organizations. A bond was issued for the remaining costs of approximately $3,200,000. The fund will continue to receive tax levy support in 2021 to pay ongoing debt service costs. Projects scheduled in 2022 are arena lighting replacement and an upgrade of audio visual and sound systems. 24 Cash Flow Statements 25 City of Hopkins Park Capital Improvements Fund (301) ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2020 2021 2022 2023 2024 2025 2026 Working Capital Begin Year (58,679) 43,357 302,300 302,300 297,495 405,192 453,966 Revenues Franchise Fees 301,082 300,200 305,022 305,022 305,022 305,022 305,022 Dedication Fees - 279,000 - - - - - Interest earnings - 43 452 473 2,975 4,052 4,540 Hennepin County Grants - - - - - - - Donations - - - - - - - Transfer In - - - - - - - Bond Proceeds - - - - - - - Total Revenues 301,082 579,243 305,474 305,495 307,997 309,074 309,562 Expenditures Current 26,209 7,000 7,000 7,000 7,000 7,000 7,000 Capital Projects 62,837 53,300 168,200 193,300 73,300 133,300 123,300 Transfer Out - - - - - - - Bond Payment Contribution (2015)10,000 10,000 10,000 10,000 10,000 10,000 10,000 Bond Payment Contribution (2016)100,000 100,000 100,000 100,000 110,000 110,000 110,000 Bond Payment Contribution (2017)- 150,000 20,274 - - - - Total Expenditures 199,046 320,300 305,474 310,300 200,300 260,300 250,300 Working Capital Ending Balance 43,357 302,300 302,300 297,495 405,192 453,966 513,228 (Unrestricted Net Position) 26 City of Hopkins Capital Improvements Fund (305) ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2020 2021 2022 2023 2024 2025 2026 Working Capital Begin Year 319,784 562,527 207,181 154,353 133,796 78,430 (77,992) Revenues from charges Tax Levy 74,726 - 50,000 200,000 200,000 200,000 200,000 Federal Grants 7,882 - - - - - - Interest earnings - 3,198 2,072 2,943 134 78 - Franchise Fees 362,460 361,456 361,500 361,500 361,500 361,500 361,500 Total Revenues 445,068 364,654 413,572 564,443 561,634 561,578 561,500 Expenditures Current 44,637 - - - - - - Capital Projects 157,688 - 106,400 225,000 257,000 358,000 38,500 City Hall Debt Service - 720,000 360,000 360,000 360,000 360,000 360,000 Total Expenditures 202,325 720,000 466,400 585,000 617,000 718,000 398,500 Working Capital Ending Balance 562,527 207,181 154,353 133,796 78,430 (77,992) 85,008 (Unrestricted Net Position) 27 City of Hopkins Permanent Improving Revolving Fund (501) ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2020 2021 2022 2023 2024 2025 2026 Working Capital Begin Year (1,097,452) (1,570,699) (1,861,735) 681,228 397,279 359,452 353,247 Revenues Tax Levy 697 - 110,000 - 175,000 175,000 175,000 Special Assessments (Prepaid)886,145 - 100,000 210,000 109,200 201,200 201,200 Reimbursements - - 2,534,892 - - - - Investments 53,196 964 8,071 6,051 3,973 3,595 3,532 Bond Proceeds 2,675,364 5,250,000 1,945,000 3,480,000 4,300,000 4,200,000 4,800,000 - - - - - Total Revenues 3,615,403 5,250,964 4,697,963 3,696,051 4,588,173 4,579,795 5,179,732 Expenditures Current 207,003 - - - - - - Residential Street Improvements 2,927,744 4,672,000 1,150,000 3,220,000 3,891,000 3,901,000 3,916,000 Central Business District Lighting Upgrades - - - 100,000 40,000 - - City Street Lighting Upgrades - - 110,000 190,000 200,000 90,000 225,000 Trail Segement - Bellgrove - 100,000 - - - - - Pedestrian & Bicycle Access Improvements - 25,000 25,000 25,000 25,000 100,000 25,000 Blake Road Corridor Improvements 443,272 - - - - - - Street Overlay Improvements 510,630 725,000 400,000 425,000 450,000 475,000 500,000 Street Sign Management - 20,000 20,000 20,000 20,000 20,000 20,000 Trunk Water Main Rehabilitation - - 450,000 - - - - Minnetonka Mills Signal Replacement - - - - - - 590,000 Transfer Out - - - - - - - Total Expenditures 4,088,650 5,542,000 2,155,000 3,980,000 4,626,000 4,586,000 5,276,000 Working Capital Ending Balance (1,570,699) (1,861,735) 681,228 397,279 359,452 353,247 256,979 (Unrestricted Net Position) 28 City of Hopkins Municipal State Aid Fund (302) ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2020 2021 2022 2023 2024 2025 2026 Working Capital Begin Year 504,933 997,186 1,551,091 2,108,300 2,666,066 3,224,390 3,224,390 Revenues State MSA Funds, projects 614,923 555,658 555,658 555,658 555,658 555,658 555,658 Interest Earnings 2,518 997 1,551 2,108 2,666 3,224 3,224 Total Revenues 617,441 556,655 557,209 557,766 558,324 Expenditures CIP State Aid Projects 125,188 2,750 - - - - 700,000 Total Expenditures 125,188 2,750 - - - - 700,000 Working Capital Ending Balance 997,186 1,551,091 2,108,300 2,666,066 3,224,390 3,224,390 2,524,390 (Unrestricted Net Position) 29 Water Fund - Working Capital Projection ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2020 2021 2022 2023 2024 2025 2026 Working Capital Begin Year (1,055,580) 530,820 646,363 746,575 666,882 561,145 393,467 Revenues Operating Revenues 2,208,012 2,318,413 2,434,333 2,556,050 2,683,852 2,818,045 2,958,947 Other 8,888 9,066 9,247 9,432 9,621 9,813 10,009 Federal Grants 21,162 Bond Proceeds - Capital 2,413,258 2,100,000 3,500,000 1,450,000 1,550,000 1,550,000 1,550,000 Bond Proceeds - Refunding 975,985 - - - - - - Total Revenues 5,627,305 4,427,478 5,943,580 4,015,482 4,243,473 4,377,858 4,518,957 Expenditures Operating Expenditures 1,382,816 1,424,300 1,467,029 1,511,040 1,556,372 1,603,063 1,651,155 Interest/Fiscal Agent Expense 104,182 146,435 139,738 129,135 118,838 100,474 100,474 Capital Outlay 1,829,342 2,071,000 3,450,000 1,430,000 1,524,000 1,542,000 1,542,000 Bond Payments 234,250 195,200 286,600 525,000 625,000 750,000 825,000 Transfer Out - Bond Payments 465,220 475,000 500,000 500,000 525,000 550,000 550,000 Total Expenses 4,015,810 4,311,935 5,843,367 4,095,175 4,349,210 4,545,537 4,668,629 Inventory Change (968) Bond Premium/Discount Expense (24,127) Working Capital Ending Balance 530,820 646,363 746,575 666,882 561,145 393,467 243,795 (Unrestricted Net Position) 30 Sewer Fund - Working Capital Projection ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2020 2021 2022 2023 2024 2025 2026 Working Capital Begin Year 783,242 1,865,854 1,890,857 1,818,035 1,666,228 1,356,707 1,061,269 Revenues Operating Revenues 2,922,572 2,981,023 3,070,454 3,162,568 3,257,445 3,355,168 3,455,823 Other 4,140 4,181 4,265 4,350 4,437 4,526 4,617 Interest - 18,659 18,909 18,180 16,662 13,567 10,613 Intergovernmental Grants 1,851 - - - - - - Bond Proceeds - Capital 1,981,412 1,800,000 975,000 1,450,000 1,550,000 1,625,000 1,625,000 Bond Proceeds - Refunding 426,251 Total Revenues 5,336,226 4,803,863 4,068,628 4,635,098 4,828,544 4,998,261 5,096,052 Expenditures Operating Expenditures 2,131,093 2,195,026 2,260,877 2,328,703 2,398,564 2,470,521 2,544,636 Interest/Fiscal Agent Expense 90,594 126,835 118,073 110,203 102,501 88,179 88,179 Capital Outlay 1,452,981 1,757,000 947,500 1,418,000 1,587,000 1,610,000 1,602,000 Bond Payments 173,500 310,000 425,000 540,000 650,000 725,000 725,000 Transfer Out - Bond Payments 385,134 390,000 390,000 390,000 400,000 400,000 400,000 Total Expenses 4,233,302 4,778,861 4,141,450 4,786,906 5,138,065 5,293,700 5,359,815 Inventory Change (534) Bond Premium/Discount Expense (19,778) Working Capital Ending Balance 1,865,854 1,890,857 1,818,035 1,666,228 1,356,707 1,061,269 797,506 (Unrestricted Net Position) 31 Storm Sewer Fund - Working Capital Projection ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2020 2021 2022 2023 2024 2025 2026 Working Capital Begin Year 1,565,796 2,712,760 2,597,276 2,347,151 2,027,987 2,052,322 1,495,592 Revenues Operating Revenues 799,266 799,266 799,266 799,266 799,266 799,266 799,266 Federal Grants 3,262 Other 1,339 1,339 1,339 1,339 1,339 1,339 Interest 4,180 27,128 25,973 23,472 20,280 20,523 14,956 Intergovernmental Grants - - - - - - Bond Proceeds - Capital 1,956,009 975,000 450,000 550,000 1,100,000 650,000 650000 Bond Proceeds - Refunding 419,852 Total Revenues 3,183,908 1,802,733 1,276,578 1,374,077 1,920,885 1,471,128 1,464,222 Expenditures Operating Expenditures 235,397 242,459 249,733 257,225 264,941 272,890 281,076 Interest/Fiscal Agent Expense 39,434 84,758 76,970 70,016 64,608 53,969 53,969 Capital Outlay - Construction 1,429,851 964,000 410,000 506,000 627,000 646,000 639,000 Bond Payments 127,250 377,000 450,000 485,000 520,000 605,000 655,000 Transfer Out - Bond Payments 196,276 250,000 340,000 375,000 420,000 450,000 450,000 Total Expenses 2,028,208 1,918,217 1,526,703 1,693,241 1,896,549 2,027,859 2,079,045 Inventory Change - Bond Premium/Discount Expense (8,736) Working Capital Ending Balance 2,712,760 2,597,276 2,347,151 2,027,987 2,052,322 1,495,592 880,768 (Unrestricted Net Position) 32 Pavilion Fund - Working Capital Projection (747) ACTUAL PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2020 2021 2022 2023 2024 2025 2026 Working Capital Begin Year (269,677) (312,840) (300,811) (267,915) (173,598) (99,465) (20,773) Revenues Property Taxes 288,525 340,383 418,000 490,383 490,383 490,383 490,383 Federal Grants 54,802 Operating Revenues 315,222 479,410 488,998 498,778 508,754 518,929 529,307 Other 6,388 6,516 16,646 6,779 6,915 7,053 7,194 Bond Proceeds - Refunding 20,000 - - - - - - Total Revenues 684,937 826,309 923,644 995,940 1,006,051 1,016,365 1,026,884 Expenditures Operating Expenditures 466,583 480,580 494,998 509,848 525,143 540,898 557,125 Interest/Fiscal Agent Expense 91,510 91,700 85,750 79,775 79,775 79,775 79,775 Capital Outlay - Construction (28,614) - 78,000 95,000 105,000 90,000 - Bond Payments 195,000 220,000 210,000 195,000 200,000 205,000 210,000 Transfer Out - Bond Payments - 22,000 22,000 22,000 22,000 22,000 22,000 Total Expenses 724,479 814,280 890,748 901,623 931,918 937,673 868,900 Bond Premium/Discount Expense (3,621) Working Capital Ending Balance (312,840) (300,811) (267,915) (173,598) (99,465) (20,773) 137,212 (Unrestricted Net Position) 33 34 Five Year Project Summaries 35 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP PROJECTS BY YEAR 2022 2026thru Project Name Department Project #Priority Project Cost 2022 19-CIP-AC048Activity Center - Gym Acoustical Panels n/a 15,000Comm Svcs - Activity Center 21-CIP-AC049Activity Center - Replace Carpeting in Common Area 2 18,200Comm Svcs - Activity Center 21-CIP-AC050Activity Center - Recover Chairs 2 10,000Comm Svcs - Activity Center 21-CIP-AC051Activity Center - Painting Common Areas 2 18,200Comm Svcs - Activity Center 14-CIP-AR003Arts Center - Paint Theatre 2 24,086Comm Svcs - Arts Center 19-CIP-AR002Arts Center - Outdoor Signage/lighting 2 10,000Comm Svcs - Arts Center 19-CIP-AR003Arts Center - Tile Flooring 1 18,000Comm Svcs - Arts Center 19-CIP-AR005Arts Center - Key Card Exterior & Interior Access 2 20,000Comm Svcs - Arts Center 19-CIP-AR006Arts Center - Fire Panel 2 30,000Comm Svcs - Arts Center 21-CIP-AR002Arts Center - Green Room & West Hallway Carpeting 2 16,010Comm Svcs - Arts Center 21-CIP-AR003Arts Center - Replace JC Studio Flooring 1 18,095Comm Svcs - Arts Center 08-CIP-FD123Fire Station - Replace Boilers n/a 45,000Fire 19-CIP-PV331Pavilion - Arena Lighting Replacement 2 18,000Pavilion 19-CIP-PV332Pavilion - Pav/Cent Park Sound System 2 70,000Pavilion 20-CIP-P071Central Park Picnic Shelters Rehab n/a 60,000Public Works: Parks 20-CIP-P072Central Park East Play Equipment Replacement n/a 100,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 2,375,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 400,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 110,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 25,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 52,500Public Works: Utilities 19-CIP-U017Trunk Water Main Rehabilitation 2 3,955,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 25,000Recreation 7,478,091Total for 2022 2023 08-CIP-AC024Activity Center - Raspberry Room Roof Replacement n/a 80,000Comm Svcs - Activity Center 09-CIP-AC031Activity Center - Lower Roof Replacement n/a 80,000Comm Svcs - Activity Center 19-CIP-AC045Activity Center - Facility Improvements n/a 10,000Comm Svcs - Activity Center 19-CIP-AR002Arts Center - Outdoor Signage/lighting 2 25,000Comm Svcs - Arts Center 19-CIP-AR007Arts Center - Roof Replacement 2 150,000Comm Svcs - Arts Center 19-CIP-PV330Pavilion - Indoor Turf System Replacement 2 95,000Pavilion 21-CIP-B101907 Mainstreet (HHS) Windows & Front/Back Door 5 55,000Public Works: Bldg/Equip Serv 13-CIP-P044Improve Courts at Oakes Park and Cottageville Park n/a 190,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 6,493,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 425,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S001Central Business District Lighting Upgrades n/a 100,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 190,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 26,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 55,000Public Works: Utilities Wednesday, December 8, 2021 36 Project Name Department Project #Priority Project Cost 16-CIP-R003Shady Oak Beach Improvements 3 10,000Recreation 8,029,000Total for 2023 2024 19-CIP-AC045Activity Center - Facility Improvements n/a 175,000Comm Svcs - Activity Center 19-CIP-AR002Arts Center - Outdoor Signage/lighting 2 10,000Comm Svcs - Arts Center 08-CIP-B121Fire Station: Replace 25 Ton AHU n/a 82,000Fire 20-CIP-PV334Pavilion - Arena Exit Door Replacement 3 105,000Pavilion 21-CIP-P073Repair Valley Park Basketball Court n/a 70,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 7,542,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 450,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S001Central Business District Lighting Upgrades n/a 40,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 200,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 27,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 60,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 10,000Recreation 8,816,000Total for 2024 2025 08-CIP-CH011City Hall- Site Landscaping Improvement n/a 100,000City Hall Administration 20-CIP-PV333Pavilion - Mezzanine Flooring Replacement 3 90,000Pavilion 08-CIP-PD215City Hall Police Station Rooftop n/a 240,000Police 08-CIP-B023Public Works - Replace Overhead Doors n/a 90,000Public Works: Bldg/Equip Serv 21-CIP-P074Repair Burnes Park Tennis Courts n/a 130,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 7,552,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 100,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 475,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 90,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 28,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 65,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 10,000Recreation 8,990,000Total for 2025 2026 09-CIP-CH032Council Chambers HVAC Unit n/a 15,000City Hall Administration 16-CIP-AC034Activity Ctr - Lounge/Comptr/Lib - Tables & Chairs n/a 23,500Comm Svcs - Activity Center 21-CIP-P075Repair Play Courts-Interlachen, Elmo & Park Valley n/a 120,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 7,567,000Public Works: Streets/Traffic 01-CIP-S104County Road 3 n/a 2,300,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 500,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 225,000Public Works: Streets/Traffic 20-CIP-S005Minnetonka Mills/5th St N Signal Replacement 5 600,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 29,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 75,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 10,000Recreation 11,509,500Total for 2026 Wednesday, December 8, 2021 37 Project Name Department Project #Priority Project Cost GRAND TOTAL 44,822,591 Wednesday, December 8, 2021 38 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP DEPARTMENT SUMMARY 2022 2026thru Total20222023202420252026Department City Hall Administration 115,000100,000 15,000 Comm Svcs - Activity Center 429,90061,400 170,000 175,000 23,500 Comm Svcs - Arts Center 321,191136,191 175,000 10,000 Fire 127,00045,000 82,000 Pavilion 378,00088,000 95,000 105,000 90,000 Police 240,000240,000 Public Works: Bldg/Equip Serv 145,00055,000 90,000 Public Works: Parks 670,000160,000 190,000 70,000 130,000 120,000 Public Works: Streets/Traffic 37,934,0002,930,000 7,253,000 8,277,000 8,237,000 11,237,000 Public Works: Utilities 4,397,5004,032,500 81,000 87,000 93,000 104,000 Recreation 65,00025,000 10,000 10,000 10,000 10,000 7,478,091 8,029,000 8,816,000 8,990,000 11,509,500 44,822,591TOTAL Wednesday, December 8, 202139 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP PROJECTS BY DEPARTMENT 2022 2026thru Total20222023202420252026DepartmentProject Priorit City Hall Administration 08-CIP-CH011 100,000100,000City Hall- Site Landscaping Improvement n/a 09-CIP-CH032 15,00015,000Council Chambers HVAC Unit n/a 115,000100,000 15,000City Hall Administration Total Comm Svcs - Activity Center 08-CIP-AC024 80,00080,000Activity Center - Raspberry Room Roof Replacement n/a 09-CIP-AC031 80,00080,000Activity Center - Lower Roof Replacement n/a 16-CIP-AC034 23,50023,500Activity Ctr - Lounge/Comptr/Lib - Tables & Chairs n/a 19-CIP-AC045 185,00010,000 175,000Activity Center - Facility Improvements n/a 19-CIP-AC048 15,00015,000Activity Center - Gym Acoustical Panels n/a 21-CIP-AC049 18,20018,200Activity Center - Replace Carpeting in Common Area 2 21-CIP-AC050 10,00010,000Activity Center - Recover Chairs 2 21-CIP-AC051 18,20018,200Activity Center - Painting Common Areas 2 429,90061,400 170,000 175,000 23,500Comm Svcs - Activity Center Total Comm Svcs - Arts Center 14-CIP-AR003 24,08624,086Arts Center - Paint Theatre 2 19-CIP-AR002 45,00010,000 25,000 10,000Arts Center - Outdoor Signage/lighting 2 19-CIP-AR003 18,00018,000Arts Center - Tile Flooring 1 19-CIP-AR005 20,00020,000Arts Center - Key Card Exterior & Interior Access 2 19-CIP-AR006 30,00030,000Arts Center - Fire Panel 2 19-CIP-AR007 150,000150,000Arts Center - Roof Replacement 2 21-CIP-AR002 16,01016,010Arts Center - Green Room & West Hallway Carpeting 2 21-CIP-AR003 18,09518,095Arts Center - Replace JC Studio Flooring 1 321,191136,191 175,000 10,000Comm Svcs - Arts Center Total Fire 08-CIP-B121 82,00082,000Fire Station: Replace 25 Ton AHU n/a 08-CIP-FD123 45,00045,000Fire Station - Replace Boilers n/a 127,00045,000 82,000Fire Total Pavilion 19-CIP-PV330 95,00095,000Pavilion - Indoor Turf System Replacement 2 19-CIP-PV331 18,00018,000Pavilion - Arena Lighting Replacement 2 19-CIP-PV332 70,00070,000Pavilion - Pav/Cent Park Sound System 2 20-CIP-PV333 90,00090,000Pavilion - Mezzanine Flooring Replacement 3 20-CIP-PV334 105,000105,000Pavilion - Arena Exit Door Replacement 3 378,00088,000 95,000 105,000 90,000Pavilion Total Police 08-CIP-PD215 240,000240,000City Hall Police Station Rooftop n/a Wednesday, December 8, 202140 Total20222023202420252026DepartmentProject Priorit 240,000240,000Police Total Public Works: Bldg/Equip Serv 08-CIP-B023 90,00090,000Public Works - Replace Overhead Doors n/a 21-CIP-B101 55,00055,000907 Mainstreet (HHS) Windows & Front/Back Door 5 145,00055,000 90,000Public Works: Bldg/Equip Serv Total Public Works: Parks 13-CIP-P044 190,000190,000Improve Courts at Oakes Park and Cottageville Park n/a 20-CIP-P071 60,00060,000Central Park Picnic Shelters Rehab n/a 20-CIP-P072 100,000100,000Central Park East Play Equipment Replacement n/a 21-CIP-P073 70,00070,000Repair Valley Park Basketball Court n/a 21-CIP-P074 130,000130,000Repair Burnes Park Tennis Courts n/a 21-CIP-P075 120,000120,000Repair Play Courts-Interlachen, Elmo & Park Valley n/a 670,000160,000 190,000 70,000 130,000 120,000Public Works: Parks Total Public Works: Streets/Traffic 01-CIP-S101 31,529,0002,375,000 6,493,000 7,542,000 7,552,000 7,567,000Residential Street Improvements and Utilities n/a 01-CIP-S104 2,300,0002,300,000County Road 3 n/a 13-CIP-S040 200,00025,000 25,000 25,000 100,000 25,000Pedestrian & Bicycle Access Improvements n/a 16-CIP-S041 2,250,000400,000 425,000 450,000 475,000 500,000Street Rehabilitation Improvements n/a 16-CIP-S042 100,00020,000 20,000 20,000 20,000 20,000Street Sign Management n/a 20-CIP-S001 140,000100,000 40,000Central Business District Lighting Upgrades n/a 20-CIP-S002 815,000110,000 190,000 200,000 90,000 225,000City Street Lighting Upgrades n/a 20-CIP-S005 600,000600,000Minnetonka Mills/5th St N Signal Replacement 5 37,934,0002,930,000 7,253,000 8,277,000 8,237,000 11,237,000Public Works: Streets/Traffic Total Public Works: Utilities 01-CIP-U002 135,00025,000 26,000 27,000 28,000 29,000Storm Drainage System Maintenance - Alley Repairs n/a 18-CIP-U016 307,50052,500 55,000 60,000 65,000 75,000Sewer Lining 2 19-CIP-U017 3,955,0003,955,000Trunk Water Main Rehabilitation 2 4,397,5004,032,500 81,000 87,000 93,000 104,000Public Works: Utilities Total Recreation 16-CIP-R003 65,00025,000 10,000 10,000 10,000 10,000Shady Oak Beach Improvements 3 65,00025,000 10,000 10,000 10,000 10,000Recreation Total GRAND TOTAL 44,822,5917,478,091 8,029,000 8,816,000 8,990,000 11,509,500 Wednesday, December 8, 202141 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP FUNDING SOURCE SUMMARY 2022 thru 2026 TotalSource20222023202420252026 AC - Arts Center Fund 321,191136,191 175,000 10,000 CI - Capital Improvement Fund 984,900106,400 225,000 257,000 358,000 38,500 GU - Other Governmental Units 1,643,60016,800 6,700 6,700 6,700 1,606,700 MS - Municipal State Aid Streets 700,000700,000 PA - Pavilion Fund 368,00078,000 95,000 105,000 90,000 PDF- Park Dedication Fund 691,400168,200 193,300 73,300 133,300 123,300 PF - Private Sector Funds 10,00010,000 PI - PIR/General Obligation Bonds 16,055,0001,655,000 2,930,000 3,620,000 3,580,000 4,270,000 RF - Refuse Fund 18,00018,000 SA - Special Assessment 4,568,000500,000 1,050,000 1,006,000 1,006,000 1,006,000 SF - Sanitary Sewer Fund 7,164,500947,500 1,418,000 1,587,000 1,610,000 1,602,000 SU - Storm Sewer Fund 2,828,000410,000 506,000 627,000 646,000 639,000 WF - Water Fund 9,470,0003,450,000 1,430,000 1,524,000 1,542,000 1,524,000 7,478,091 8,029,000 8,816,000 8,990,000 11,509,500 44,822,591GRAND TOTAL Wednesday, December 8, 2021 42 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP PROJECTS BY FUNDING SOURCE 2022 2026thru TotalSourceProject Priority 2022 2023 2024 2025 2026 AC - Arts Center Fund 14-CIP-AR003 24,08624,086Arts Center - Paint Theatre 2 19-CIP-AR002 45,00010,000 25,000 10,000Arts Center - Outdoor Signage/lighting 2 19-CIP-AR003 18,00018,000Arts Center - Tile Flooring 1 19-CIP-AR005 20,00020,000Arts Center - Key Card Exterior & Interior Access 2 19-CIP-AR006 30,00030,000Arts Center - Fire Panel 2 19-CIP-AR007 150,000150,000Arts Center - Roof Replacement 2 21-CIP-AR002 16,01016,010Arts Center - Green Room & West Hallway Carpeting 2 21-CIP-AR003 18,09518,095Arts Center - Replace JC Studio Flooring 1 321,191136,191 175,000 10,000AC - Arts Center Fund Total CI - Capital Improvement Fund 08-CIP-AC024 80,00080,000Activity Center - Raspberry Room Roof Replacement n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 08-CIP-B121 82,00082,000Fire Station: Replace 25 Ton AHU n/a 08-CIP-CH011 100,000100,000City Hall- Site Landscaping Improvement n/a 08-CIP-FD123 45,00045,000Fire Station - Replace Boilers n/a 08-CIP-PD215 240,000240,000City Hall Police Station Rooftop n/a 09-CIP-AC031 80,00080,000Activity Center - Lower Roof Replacement n/a 09-CIP-CH032 15,00015,000Council Chambers HVAC Unit n/a 16-CIP-AC034 23,50023,500Activity Ctr - Lounge/Comptr/Lib - Tables & Chairs n/a 19-CIP-AC045 185,00010,000 175,000Activity Center - Facility Improvements n/a 19-CIP-AC048 15,00015,000Activity Center - Gym Acoustical Panels n/a 21-CIP-AC049 18,20018,200Activity Center - Replace Carpeting in Common Area 2 21-CIP-AC050 10,00010,000Activity Center - Recover Chairs 2 21-CIP-AC051 18,20018,200Activity Center - Painting Common Areas 2 21-CIP-B101 55,00055,000907 Mainstreet (HHS) Windows & Front/Back Door 5 984,900106,400 225,000 257,000 358,000 38,500CI - Capital Improvement Fund Total GU - Other Governmental Units 01-CIP-S104 1,600,0001,600,000County Road 3 n/a 16-CIP-R003 43,60016,800 6,700 6,700 6,700 6,700Shady Oak Beach Improvements 3 1,643,60016,800 6,700 6,700 6,700 1,606,700GU - Other Governmental Units Total MS - Municipal State Aid Streets 01-CIP-S104 700,000700,000County Road 3 n/a 700,000700,000MS - Municipal State Aid Streets Total PA - Pavilion Fund 19-CIP-PV330 95,00095,000Pavilion - Indoor Turf System Replacement 2 Wednesday, December 8, 2021 43 TotalSourceProject Priority 2022 2023 2024 2025 2026 19-CIP-PV331 18,00018,000Pavilion - Arena Lighting Replacement 2 19-CIP-PV332 60,00060,000Pavilion - Pav/Cent Park Sound System 2 20-CIP-PV333 90,00090,000Pavilion - Mezzanine Flooring Replacement 3 20-CIP-PV334 105,000105,000Pavilion - Arena Exit Door Replacement 3 368,00078,000 95,000 105,000 90,000PA - Pavilion Fund Total PDF- Park Dedication Fund 13-CIP-P044 190,000190,000Improve Courts at Oakes Park and Cottageville Park n/a 16-CIP-R003 21,4008,200 3,300 3,300 3,300 3,300Shady Oak Beach Improvements 3 20-CIP-P071 60,00060,000Central Park Picnic Shelters Rehab n/a 20-CIP-P072 100,000100,000Central Park East Play Equipment Replacement n/a 21-CIP-P073 70,00070,000Repair Valley Park Basketball Court n/a 21-CIP-P074 130,000130,000Repair Burnes Park Tennis Courts n/a 21-CIP-P075 120,000120,000Repair Play Courts-Interlachen, Elmo & Park Valley n/a 691,400168,200 193,300 73,300 133,300 123,300PDF- Park Dedication Fund Total PF - Private Sector Funds 19-CIP-PV332 10,00010,000Pavilion - Pav/Cent Park Sound System 2 10,00010,000PF - Private Sector Funds Total PI - PIR/General Obligation Bonds 01-CIP-S101 11,510,000650,000 2,170,000 2,885,000 2,895,000 2,910,000Residential Street Improvements and Utilities n/a 13-CIP-S040 200,00025,000 25,000 25,000 100,000 25,000Pedestrian & Bicycle Access Improvements n/a 16-CIP-S041 2,250,000400,000 425,000 450,000 475,000 500,000Street Rehabilitation Improvements n/a 16-CIP-S042 100,00020,000 20,000 20,000 20,000 20,000Street Sign Management n/a 19-CIP-U017 450,000450,000Trunk Water Main Rehabilitation 2 20-CIP-S001 140,000100,000 40,000Central Business District Lighting Upgrades n/a 20-CIP-S002 815,000110,000 190,000 200,000 90,000 225,000City Street Lighting Upgrades n/a 20-CIP-S005 590,000590,000Minnetonka Mills/5th St N Signal Replacement 5 16,055,0001,655,000 2,930,000 3,620,000 3,580,000 4,270,000PI - PIR/General Obligation Bonds Total RF - Refuse Fund 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 18,00018,000RF - Refuse Fund Total SA - Special Assessment 01-CIP-S101 4,568,000500,000 1,050,000 1,006,000 1,006,000 1,006,000Residential Street Improvements and Utilities n/a 4,568,000500,000 1,050,000 1,006,000 1,006,000 1,006,000SA - Special Assessment Total SF - Sanitary Sewer Fund 01-CIP-S101 6,444,000500,000 1,363,000 1,527,000 1,527,000 1,527,000Residential Street Improvements and Utilities n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 18-CIP-U016 307,50052,500 55,000 60,000 65,000 75,000Sewer Lining 2 19-CIP-U017 395,000395,000Trunk Water Main Rehabilitation 2 Wednesday, December 8, 2021 44 TotalSourceProject Priority 2022 2023 2024 2025 2026 7,164,500947,500 1,418,000 1,587,000 1,610,000 1,602,000SF - Sanitary Sewer Fund Total SU - Storm Sewer Fund 01-CIP-S101 2,505,000225,000 480,000 600,000 600,000 600,000Residential Street Improvements and Utilities n/a 01-CIP-U002 135,00025,000 26,000 27,000 28,000 29,000Storm Drainage System Maintenance - Alley Repairs n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 19-CIP-U017 160,000160,000Trunk Water Main Rehabilitation 2 20-CIP-S005 10,00010,000Minnetonka Mills/5th St N Signal Replacement 5 2,828,000410,000 506,000 627,000 646,000 639,000SU - Storm Sewer Fund Total WF - Water Fund 01-CIP-S101 6,502,000500,000 1,430,000 1,524,000 1,524,000 1,524,000Residential Street Improvements and Utilities n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 19-CIP-U017 2,950,0002,950,000Trunk Water Main Rehabilitation 2 9,470,0003,450,000 1,430,000 1,524,000 1,542,000 1,524,000WF - Water Fund Total 44,822,5917,478,091 8,029,000 8,816,000 8,990,000 11,509,500GRAND TOTAL Wednesday, December 8, 2021 45 46 Project Descriptions And Narratives 47 48 General Public Buildings 49 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Asst City Manager 2022 2026 thru Department City Hall Administration Description Site Landscaping Improvement Project #08-CIP-CH011 Priority n/a Justification Budget Impact/Other Useful LifeProject Name City Hall- Site Landscaping Improvement Category Bldgs: Administrative Offices Type Improvement Future Total Project Cost:$100,000 Total2022 2023 2024 2025 2026Expenditures 100,000100,000Construction/Maintenance 100,000 100,000Total Total2022 2023 2024 2025 2026Funding Sources 100,000100,000CI - Capital Improvement Fund 100,000 100,000Total Wednesday, December 8, 2021 50 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2022 2026 thru Department City Hall Administration Description 10 Ton Heating and Air Conditioning Unit for City Hall Council Chambers Project #09-CIP-CH032 Priority n/a Justification Unit was replaced in 2004, needs to be put on schedule. Budget Impact/Other Useful Life 20 yearsProject Name Council Chambers HVAC Unit Category Bldg: City Hall Type Improvement Future Total Project Cost:$15,000 Total2022 2023 2024 2025 2026Expenditures 15,00015,000Construction/Maintenance 15,000 15,000Total Total2022 2023 2024 2025 2026Funding Sources 15,00015,000CI - Capital Improvement Fund 15,000 15,000Total Wednesday, December 8, 2021 51 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2022 2026 thru Department Comm Svcs - Activity Center Description Built up asphalt roofing system covering Raspberry Rooms, Craft Room and Hallways at the Activity Center Project #08-CIP-AC024 Priority n/a Justification Existing roof was replaced in 1992. Following inspection in 2018, move out to 2023. Budget Impact/Other Inspection, repair and upkeep of roofing systems prevent deterioration of interior building structure and damage to interior components of building. Variance from 20 year plan: Moved from 2018 to 2023 and all roof components will be done with one contract for better bids. Useful Life 25 yearsProject Name Activity Center - Raspberry Room Roof Replacement Category Buildings: Activity Center Type Improvement Future Total Project Cost:$80,000 Total2022 2023 2024 2025 2026Expenditures 80,00080,000Construction/Maintenance 80,000 80,000Total Total2022 2023 2024 2025 2026Funding Sources 80,00080,000CI - Capital Improvement Fund 80,000 80,000Total Wednesday, December 8, 2021 52 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2022 2026 thru Department Comm Svcs - Activity Center Description Built up Roof on Activity Center Raspberry Rooms and Hallway. Project #09-CIP-AC031 Priority n/a Justification Existing roof was installed in 1992. Budget Impact/Other Variance from 20 year plan: Moved from 2018 to 2023 and all roof components will be done with one contract for better bids. Useful Life 25 yearsProject Name Activity Center - Lower Roof Replacement Category Buildings: Activity Center Type Improvement Future Total Project Cost:$80,000 Total2022 2023 2024 2025 2026Expenditures 80,00080,000Construction/Maintenance 80,000 80,000Total Total2022 2023 2024 2025 2026Funding Sources 80,00080,000CI - Capital Improvement Fund 80,000 80,000Total Wednesday, December 8, 2021 53 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Activity Ctr Director 2022 2026 thru Department Comm Svcs - Activity Center Description 13 tables and 48 chairs in the lounge/computer/library. These particular chairs and tables will match or compliment the existing furniture in these areas. 48 Lowenstein MuranoSB chairs, Model 365L = $15,257 13 laminate top 36" x 6' tables with base = $1,500 Delivery and set up = $70 Project #16-CIP-AC034 Priority n/a Justification With the 2015 enhancements of the l lounge/computer room/library areas additional tables and chairs will complete these areas for immediate use. Budget Impact/Other Variance from 20 year plan - New item Useful Life 10 yearsProject Name Activity Ctr - Lounge/Comptr/Lib - Tables & Chairs Category Equipment Type Improvement Future Total Project Cost:$41,047 Total2022 2023 2024 2025 2026Expenditures 23,50023,500Equipment 23,500 23,500Total Total2022 2023 2024 2025 2026Funding Sources 23,50023,500CI - Capital Improvement Fund 23,500 23,500Total Wednesday, December 8, 2021 54 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Asst City Manager 2022 2026 thru Department Comm Svcs - Activity Center Description Several projects have been proposed in previous CIPs. With the unknowns of the future of the Historical Society, we would like to combine several projects into one larger project and complete a facility needs assessment in 2022. Project dependent on status of Historical Society. Project #19-CIP-AC045 Priority n/a Justification The project would aim to update several areas of the facility that have not been updated since 1990 (some areas were renovated in 2012) and address a few larger concerns: use of former historical society area, eastside room configurations (increases maximum capacity of the gymnasium), office/reception enhancements. We will spend 2021 gathering data on current programming usage, 2022 developing a plan and 2023 would be construction. We would also suggest to correlate AV updates to the facility with the project. Budget Impact/Other Useful Life 30 yearsProject Name Activity Center - Facility Improvements Category Buildings: Activity Center Type Improvement Future Total Project Cost:$185,000 Total2022 2023 2024 2025 2026Expenditures 185,00010,000 175,000Construction 10,000 175,000 185,000Total Total2022 2023 2024 2025 2026Funding Sources 185,00010,000 175,000CI - Capital Improvement Fund 10,000 175,000 185,000Total Wednesday, December 8, 2021 55 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Activity Ctr Director 2022 2026 thru Department Comm Svcs - Activity Center Description Install additional acoustical panels in the gymnasium to enhance our guests hearing experiences when attending classes, lectures, health fairs, dinners, and recreational events. Project #19-CIP-AC048 Priority n/a Justification We added 1 row of acoustical panels on the gym walls in 2017. Even though the panels have helped in the sound issues in the gym, more assistance is needed. Another row of acoustical panels will help our older participants when trying to listen to instructors, speakers, individual conversation at health fairs and dinners, enjoying musical and recreational events. Budget Impact/Other Useful Life 30 yearsProject Name Activity Center - Gym Acoustical Panels Category Buildings: Activity Center Type Improvement Future Total Project Cost:$15,000 Total2022 2023 2024 2025 2026Expenditures 15,00015,000Construction 15,000 15,000Total Total2022 2023 2024 2025 2026Funding Sources 15,00015,000CI - Capital Improvement Fund 15,000 15,000Total Wednesday, December 8, 2021 56 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2022 2026 thru Department Comm Svcs - Activity Center Description Demo existing carpet and grind existing adhesive Install Carpet tile in hallway, Computer area, Raspberry Room, Library Install millwork base and transitions Project #21-CIP-AC049 Priority 2 Very Important Justification The current flooring in the common areas of the Activity Center is showing wear. Installing carpet squares will give the Center a fresh clean look and allow for square replacement when stains occur. Installing Walk off carpet in the entry hall will help to reduce salt and dirt from being spread beyond the entry way, saving on cleaning and wear and tear of the carpets. Budget Impact/Other Useful Life 10 yearsProject Name Activity Center - Replace Carpeting in Common Area Category Buildings: Activity Center Type Improvement Future Total Project Cost:$18,200 Total2022 2023 2024 2025 2026Expenditures 18,20018,200Construction 18,200 18,200Total Total2022 2023 2024 2025 2026Funding Sources 18,20018,200CI - Capital Improvement Fund 18,200 18,200Total Wednesday, December 8, 2021 57 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2022 2026 thru Department Comm Svcs - Activity Center Description Recover the lounge area chairs and the Raspberry Room Chairs (100 chairs) Pricing includes the cost of fabric, stain treatment, pick up, labor, and delivery Hopkins City staff would need to remove cushion portion from chair frame Before moving forward, research will be done to see if it is more economical to replace the chairs Project #21-CIP-AC050 Priority 2 Very Important Justification The fabric on many of the chairs is worn and stained with food and liquid. Recovering will give them a fresh look and updated colors. Budget Impact/Other Useful Life 10 yearsProject Name Activity Center - Recover Chairs Category Buildings: Activity Center Type Improvement Future Total Project Cost:$10,000 Total2022 2023 2024 2025 2026Expenditures 10,00010,000Construction 10,000 10,000Total Total2022 2023 2024 2025 2026Funding Sources 10,00010,000CI - Capital Improvement Fund 10,000 10,000Total Wednesday, December 8, 2021 58 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Activity Ctr Director 2022 2026 thru Department Comm Svcs - Activity Center Description Paint hallway, computer area, Raspberry room, Library, and entry ways to match lounge and office . Prep and clean up after completion. Price includes all paint, supplies, material and labor Project #21-CIP-AC051 Priority 2 Very Important Justification The paint is looking worn, needs to be freshened up and coordinate with carpet to give clean and inviting appearance. Budget Impact/Other Useful Life 5 yearsProject Name Activity Center - Painting Common Areas Category Buildings: Activity Center Type Improvement Future Total Project Cost:$18,200 Total2022 2023 2024 2025 2026Expenditures 18,20018,200Construction/Maintenance 18,200 18,200Total Total2022 2023 2024 2025 2026Funding Sources 18,20018,200CI - Capital Improvement Fund 18,200 18,200Total Wednesday, December 8, 2021 59 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2022 2026 thru Department Comm Svcs - Arts Center Description Prep work area Paint walls and soffit in theater and side vestibules of Main Theater Paint metal handrails Paint metal door frames and metal doors Apply 2 coats of paint to all surfaces Price includes paint, supplies, materials and labor If brushing and rolling does not apply over rough block, then spraying will need to take place. If spraying is needed additional charges will apply covering and prep Reupholster Fabric Sound walls in back of theater to match paint color Project #14-CIP-AR003 Priority 2 Very Important Justification The Theater has not been painted since 1997 when built. The theater seats have been recovered, the carpet has been replaced and the wall color is dated and needs a freshening up. As the highlight of the building, the theater's appearance is of utmost importance. Budget Impact/Other Did not complete in 2015, moving project forward Useful Life 15 yearsProject Name Arts Center - Paint Theatre Category Buildings: Arts Center Type Improvement Future Total Project Cost:$24,086 Total2022 2023 2024 2025 2026Expenditures 24,08624,086Construction/Maintenance 24,086 24,086Total Total2022 2023 2024 2025 2026Funding Sources 24,08624,086AC - Arts Center Fund 24,086 24,086Total Wednesday, December 8, 2021 60 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Asst City Manager 2022 2026 thru Department Comm Svcs - Arts Center Description This project was originally slated for 2019, but tabled for further planning and city guideline revisions This is a multi-phase project: Phase 1: Replace existing name signage with larger and refreshed outdoor signage for front and side of building Phase 2: Create a sculptural sign in front of the Center to clearly identify the building as Hopkins Center for the Arts located at the corner of 11th & Mainstreet Phase 3: Add accent lighting to the front of the building. Project #19-CIP-AR002 Priority 2 Very Important Justification Currently the signage for Hopkins Center for the Arts above the front entrance is obstructed by trees, making Stages Theatre Co the most visible. Current signage at the top of the building on Mainstreet and 12th is very faded. We have added the logo sign to the front of the building, however, long-term permanent signage is very important to the identity of the Center. In honor of the Center's 25th year, it would be great to have Phase 1 completed Budget Impact/Other Useful Life 20 yearsProject Name Arts Center - Outdoor Signage/lighting Category Buildings: Arts Center Type Improvement Future Total Project Cost:$45,000 Total2022 2023 2024 2025 2026Expenditures 45,00010,000 25,000 10,000Construction 10,000 25,000 10,000 45,000Total Total2022 2023 2024 2025 2026Funding Sources 45,00010,000 25,000 10,000AC - Arts Center Fund 10,000 25,000 10,000 45,000Total Wednesday, December 8, 2021 61 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2022 2026 thru Department Comm Svcs - Arts Center Description This is a project that was slated for 2019 and not completed because we couldn't find the time in the theater. The Theater stage floor has reached its lifespan and it in need of replacement. Replace plywood over entire stage area, approximately 3000 square feet Request includes materials and labor for installation Due to the price of materials, I have doubled the original estimate of $9000 Project #19-CIP-AR003 Priority 1 Urgent Justification The flooring has reached its lifespan and is starting to give/flex which is unsafe Budget Impact/Other Useful Life 15 yearsProject Name Arts Center - Tile Flooring Category Buildings: Arts Center Type Improvement Future Total Project Cost:$18,000 Total2022 2023 2024 2025 2026Expenditures 18,00018,000Construction/Maintenance 18,000 18,000Total Total2022 2023 2024 2025 2026Funding Sources 18,00018,000AC - Arts Center Fund 18,000 18,000Total Wednesday, December 8, 2021 62 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Asst City Manager 2022 2026 thru Department Comm Svcs - Arts Center Description Retrofitting Center exterior HCA and Stages staff entrances with keycard access. The estimate for the work to equip HCA back entrance, Stages back entrance, and Green Room street entrance is $18,000 (2019.) Retrofitting interior doors over a series of 2-3 years and software upgrades is estimated at $20,000 each year (2020 - 2022) Project #19-CIP-AR005 Priority 2 Very Important Justification Installing keycard access would allow better control of who is allowed to enter the building as well as the ability to track who is in the building. Stages Theatre Company has many staff members, and many who are contracted, working as needed on a project. The contracted employees are given keys when needed, however, from a building management standpoint, it is difficult to track and make sure that people don't have access to the building that shouldn't. Long-term the goal is to key all interior office and room doors with the same system, primarily to be able to keep key situation under better control and to allow for a safe lock-down procedure if ever needed. Budget Impact/Other Useful LifeProject Name Arts Center - Key Card Exterior & Interior Access Category Buildings: Arts Center Type Improvement Future Total Project Cost:$78,000 Total2022 2023 2024 2025 2026Expenditures 20,00020,000Construction/Maintenance 20,000 20,000Total Total2022 2023 2024 2025 2026Funding Sources 20,00020,000AC - Arts Center Fund 20,000 20,000Total Wednesday, December 8, 2021 63 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2022 2026 thru Department Comm Svcs - Arts Center Description Replacing fire panel. Project #19-CIP-AR006 Priority 2 Very Important Justification Current system is outdated and obselete. Additional cost has occurred when needed to repair due to age. Budget Impact/Other Moved from 2020 to 2022 Useful LifeProject Name Arts Center - Fire Panel Category Buildings: Arts Center Type Improvement Future Total Project Cost:$30,000 Total2022 2023 2024 2025 2026Expenditures 30,00030,000Construction 30,000 30,000Total Total2022 2023 2024 2025 2026Funding Sources 30,00030,000AC - Arts Center Fund 30,000 30,000Total Wednesday, December 8, 2021 64 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2022 2026 thru Department Comm Svcs - Arts Center Description Replacement of Roof Project #19-CIP-AR007 Priority 2 Very Important Justification Facility originally built in 1997. Budget Impact/Other Useful LifeProject Name Arts Center - Roof Replacement Category Buildings: Arts Center Type Improvement Future Total Project Cost:$150,000 Total2022 2023 2024 2025 2026Expenditures 150,000150,000Construction 150,000 150,000Total Total2022 2023 2024 2025 2026Funding Sources 150,000150,000AC - Arts Center Fund 150,000 150,000Total Wednesday, December 8, 2021 65 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2022 2026 thru Department Comm Svcs - Arts Center Description Demo existing carpet and grind existing adhesive Install Carpet tile in Green Room and walk off carpet in hallway Install millwork base and transitions Project #21-CIP-AR002 Priority 2 Very Important Justification The current flooring in the Green Room and hallway is showing wear. The west hallway is heavily used for load-in for concerts and other events. Installing Walk off carpet in the west hallway would help to reduce salt and dirt from being spread into the lobby, on stage and into the Green Room. The carpeting tiles in the Green Room would match the carpeting in the rest of the building and because it is tiles can be replaced easily if there were stains or damage. Budget Impact/Other Useful Life 10 yearsProject Name Arts Center - Green Room & West Hallway Carpeting Category Buildings: Arts Center Type Improvement Future Total Project Cost:$16,010 Total2022 2023 2024 2025 2026Expenditures 16,01016,010Construction/Maintenance 16,010 16,010Total Total2022 2023 2024 2025 2026Funding Sources 16,01016,010AC - Arts Center Fund 16,010 16,010Total Wednesday, December 8, 2021 66 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2022 2026 thru Department Comm Svcs - Arts Center Description Remove and dispose of existing vinyl tile, grind existing adhesive Prep Polish Concrete to match gallery Millwork base 6" Mandalay to match in rest of building Install millwork base and transitions Project #21-CIP-AR003 Priority 1 Urgent Justification The current flooring in the JC Studio is original to the building, and is showing wear lines that cannot be repaired through cleaning and waxing. The current appearance is a deterent to future rental of the space. Removing the tile and finishing the concert has long term wear. The floor needs to be very durable because Stages Theatre Co builds sets in the space when using it as a Black Box Theater. Finished concrete is more durable than vinyl tile and mirrors the look of the Gallery space. It may need periodic buffing in order to maintain its appearance, which can be included in the Arts Center budget when needed. Budget Impact/Other Useful Life 10 yearsProject Name Arts Center - Replace JC Studio Flooring Category Buildings: Arts Center Type Improvement Future Total Project Cost:$18,095 Total2022 2023 2024 2025 2026Expenditures 18,09518,095Construction/Maintenance 18,095 18,095Total Total2022 2023 2024 2025 2026Funding Sources 18,09518,095AC - Arts Center Fund 18,095 18,095Total Wednesday, December 8, 2021 67 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2022 2026 thru Department Fire Description Replace 35 ton Air Handling Unit Project #08-CIP-B121 Priority n/a Justification Budget Impact/Other Useful LifeProject Name Fire Station: Replace 25 Ton AHU Category Buildings: Fire Facilities Type Improvement Future Total Project Cost:$82,000 Total2022 2023 2024 2025 2026Expenditures 82,00082,000Construction/Maintenance 82,000 82,000Total Total2022 2023 2024 2025 2026Funding Sources 82,00082,000CI - Capital Improvement Fund 82,000 82,000Total Wednesday, December 8, 2021 68 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2022 2026 thru Department Fire Description Replace boilers Project #08-CIP-FD123 Priority n/a Justification Budget Impact/Other Move from 2021 to 2022. Useful Life 20 yearsProject Name Fire Station - Replace Boilers Category Buildings: Fire Facilities Type Improvement Future Total Project Cost:$45,000 Total2022 2023 2024 2025 2026Expenditures 45,00045,000Construction/Maintenance 45,000 45,000Total Total2022 2023 2024 2025 2026Funding Sources 45,00045,000CI - Capital Improvement Fund 45,000 45,000Total Wednesday, December 8, 2021 69 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Pavilion Manager 2022 2026 thru Department Pavilion Description Purchase of a turf system for the Pavilion's arena turf programs. Project #19-CIP-PV330 Priority 2 Very Important Justification The current system was purchased in 1998 and has exceeded its useful life. It's seams have begun to fray, the velcro is worn, and areas torn have been patched. Budget Impact/Other Possible resale of current turf system estimated between $25,000 to $30,000 Useful Life 15 yearsProject Name Pavilion - Indoor Turf System Replacement Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$95,000 Total2022 2023 2024 2025 2026Expenditures 95,00095,000Construction/Maintenance 95,000 95,000Total Total2022 2023 2024 2025 2026Funding Sources 95,00095,000PA - Pavilion Fund 95,000 95,000Total Wednesday, December 8, 2021 70 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Pavilion Manager 2022 2026 thru Department Pavilion Description Replace the (60) T8 High Bay Lighting Fixtures used to light the arena with more energy efficient LED High Bay Fixtures. Project #19-CIP-PV331 Priority 2 Very Important Justification LED lighting is more energy effcient and needs less maintenance. Several times a year we are replacing T8 bulbs and ballasts that burn out. LED bulbs last longer and will require less energy and have a much longer life cycle. Budget Impact/Other Useful Life 15-20 yearsProject Name Pavilion - Arena Lighting Replacement Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$18,000 Total2022 2023 2024 2025 2026Expenditures 18,00018,000Construction/Maintenance 18,000 18,000Total Total2022 2023 2024 2025 2026Funding Sources 18,00018,000PA - Pavilion Fund 18,000 18,000Total Wednesday, December 8, 2021 71 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Pavilion Manager 2022 2026 thru Department Pavilion Description Replace and upgrade the current sound system and install audio/visual capabilities in the Warming House and other areas. Run new speaker, audio, and fiber optic cabling to the arena, warming house, and other areas. Replace sound system racks, components, and microphones. Replace and add speakers in the arena and install speakers in the lobby, warming house, and near the outdoor skating areas. Purchase a portable audio visual system the can be set up in serval locations in the arena and warming house and link into the main system. Project #19-CIP-PV332 Priority 2 Very Important Justification The current system has not beeen upgraded since 2002 and does not currently allow for areas to operate independently. This upgrade would allow for inside arena announcing, lobby music, and outside rink music simultaneously. Budget Impact/Other The Hopkins Youth Hockey Association has agreed to contribute $10,000 to this project. Useful Life 15 yearsProject Name Pavilion - Pav/Cent Park Sound System Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$70,000 Total2022 2023 2024 2025 2026Expenditures 70,00070,000Construction/Maintenance 70,000 70,000Total Total2022 2023 2024 2025 2026Funding Sources 60,00060,000PA - Pavilion Fund 10,00010,000PF - Private Sector Funds 70,000 70,000Total Wednesday, December 8, 2021 72 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Pavilion Manager 2022 2026 thru Department Pavilion Description Replace the mezzanine vinyl tile with rubber flooring. Project #20-CIP-PV333 Priority 3 Important Justification Current flooring has cracks, gouges, and severe wear areas. Rubber floor is easier maintain and is more durable and versitle than vinyl tile. Budget Impact/Other Useful Life 20 yearsProject Name Pavilion - Mezzanine Flooring Replacement Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$90,000 Total2022 2023 2024 2025 2026Expenditures 90,00090,000Construction/Maintenance 90,000 90,000Total Total2022 2023 2024 2025 2026Funding Sources 90,00090,000PA - Pavilion Fund 90,000 90,000Total Wednesday, December 8, 2021 73 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Pavilion Manager 2022 2026 thru Department Pavilion Description Replace the arena exit doors, frames, hinges, and closers. Project #20-CIP-PV334 Priority 3 Important Justification The frames and hardware are original, installed during the construction of the facility. Frames are rusting and hardware is failing. Budget Impact/Other Useful Life 15-20 yearsProject Name Pavilion - Arena Exit Door Replacement Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$105,000 Total2022 2023 2024 2025 2026Expenditures 105,000105,000Construction/Maintenance 105,000 105,000Total Total2022 2023 2024 2025 2026Funding Sources 105,000105,000PA - Pavilion Fund 105,000 105,000Total Wednesday, December 8, 2021 74 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2022 2026 thru Department Police Description Project #08-CIP-PD215 Priority n/a Justification Budget Impact/Other Useful Life 20 yearsProject Name City Hall Police Station Rooftop Category Buildings: Police Department Type Improvement Future Total Project Cost:$240,000 Total2022 2023 2024 2025 2026Expenditures 240,000240,000Construction/Maintenance 240,000 240,000Total Total2022 2023 2024 2025 2026Funding Sources 240,000240,000CI - Capital Improvement Fund 240,000 240,000Total Wednesday, December 8, 2021 75 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2022 2026 thru Department Public Works: Bldg/Equip Ser Description Replace overhead doors Project #08-CIP-B023 Priority n/a Justification Budget Impact/Other Inspected in 2019, will move from 2020 to 2022. Useful LifeProject Name Public Works - Replace Overhead Doors Category Buildings: Public Works Type Improvement Future Total Project Cost:$90,000 Total2022 2023 2024 2025 2026Expenditures 90,00090,000Construction/Maintenance 90,000 90,000Total Total2022 2023 2024 2025 2026Funding Sources 18,00018,000CI - Capital Improvement Fund 18,00018,000RF - Refuse Fund 18,00018,000SF - Sanitary Sewer Fund 18,00018,000SU - Storm Sewer Fund 18,00018,000WF - Water Fund 90,000 90,000Total Wednesday, December 8, 2021 76 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2022 2026 thru Department Public Works: Bldg/Equip Ser Description The current windows are well past their useful life. 8 Windows and two doors are due for replacement. Project #21-CIP-B101 Priority 5 Future Consideration Justification The need to get this facility into the CIP for future planning. Installing new windows and doors will be more energy efficent for the building. Today's estimated cost is $55,000. Budget Impact/Other Useful Life 20 yearsProject Name 907 Mainstreet (HHS) Windows & Front/Back Door Category Equipment Type Improvement Future Total Project Cost:$55,000 Total2022 2023 2024 2025 2026Expenditures 55,00055,000Construction/Maintenance 55,000 55,000Total Total2022 2023 2024 2025 2026Funding Sources 55,00055,000CI - Capital Improvement Fund 55,000 55,000Total Wednesday, December 8, 2021 77 78 Parks and Recreation 79 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2022 2026 thru Department Public Works: Parks Description Oakes Park - Reconstruct tennis courts pavement - $130,000 Cottageville Park - Rehab basketball court $60,000 Project #13-CIP-P044 Priority n/a Justification Tennis courts are badly cracked, no longer repairable. Basketball court pavement deteriorated, needs upgraded hoops and goal standards. Budget Impact/Other Useful LifeProject Name Improve Courts at Oakes Park and Cottageville Park Category Parks/Fores/Pav.: Comm. Facil. Type Improvement Future Total Project Cost:$210,000 Total2022 2023 2024 2025 2026Expenditures 190,000190,000Construction/Maintenance 190,000 190,000Total Total2022 2023 2024 2025 2026Funding Sources 190,000190,000PDF- Park Dedication Fund 190,000 190,000Total Wednesday, December 8, 2021 80 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2022 2026 thru Department Public Works: Parks Description Replace roofing & fascia boards, clean and stain wood columns, glu-lam beams and tongue/groove roof deck boards, replace concrete floor slab and turf restoration for both Central Park picnic shelters Project #20-CIP-P071 Priority n/a Justification The picnic shelter are 30+ years old, look drab, concrete floor slabs are heaved and cracked. Rehab will restore the appearance and function of these picnic shelters. Budget Impact/Other Useful Life 15 yearsProject Name Central Park Picnic Shelters Rehab Category Parks/Forestry Type Improvement Future Total Project Cost:$60,000 Total2022 2023 2024 2025 2026Expenditures 60,00060,000Construction/Maintenance 60,000 60,000Total Total2022 2023 2024 2025 2026Funding Sources 60,00060,000PDF- Park Dedication Fund 60,000 60,000Total Wednesday, December 8, 2021 81 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2022 2026 thru Department Public Works: Parks Description Replace existing play equipment with a new play set, including demolition, new safety surfacing to provide complete access for children of all abilities. Project #20-CIP-P072 Priority n/a Justification The existing play equipment is 30 years old and needs replacement. Budget Impact/Other Useful LifeProject Name Central Park East Play Equipment Replacement Category Parks/Forestry Type Improvement Future Total Project Cost:$100,000 Total2022 2023 2024 2025 2026Expenditures 100,000100,000Construction/Maintenance 100,000 100,000Total Total2022 2023 2024 2025 2026Funding Sources 100,000100,000PDF- Park Dedication Fund 100,000 100,000Total Wednesday, December 8, 2021 82 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2022 2026 thru Department Public Works: Parks Description Remove and replace existing asphalt pavement and apply new color coatings system. Project #21-CIP-P073 Priority n/a Justification The court is deteriorated beyond crack sealing or top coat repairs. Needs new asphalt pavement and color coatings. Budget Impact/Other Useful LifeProject Name Repair Valley Park Basketball Court Category PW - Parks Type Improvement Future Total Project Cost:$70,000 Total2022 2023 2024 2025 2026Expenditures 70,00070,000Construction/Maintenance 70,000 70,000Total Total2022 2023 2024 2025 2026Funding Sources 70,00070,000PDF- Park Dedication Fund 70,000 70,000Total Wednesday, December 8, 2021 83 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2022 2026 thru Department Public Works: Parks Description Remove and replace existing asphalt pavement and apply new color coatings system. Project #21-CIP-P074 Priority n/a Justification The court is deteriorated beyond crack sealing or top coat repairs. Needs new asphalt pavement and color coatings. Budget Impact/Other Useful LifeProject Name Repair Burnes Park Tennis Courts Category PW - Parks Type Improvement Future Total Project Cost:$130,000 Total2022 2023 2024 2025 2026Expenditures 130,000130,000Construction/Maintenance 130,000 130,000Total Total2022 2023 2024 2025 2026Funding Sources 130,000130,000PDF- Park Dedication Fund 130,000 130,000Total Wednesday, December 8, 2021 84 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2022 2026 thru Department Public Works: Parks Description Remove and replace existing asphalt pavement. Project #21-CIP-P075 Priority n/a Justification The court is deteriorated beyond crack sealing or top coat repairs. Needs new asphalt pavement. Budget Impact/Other Useful LifeProject Name Repair Play Courts-Interlachen, Elmo & Park Valley Category PW - Parks Type Unassigned Future Total Project Cost:$120,000 Total2022 2023 2024 2025 2026Expenditures 120,000120,000Construction/Maintenance 120,000 120,000Total Total2022 2023 2024 2025 2026Funding Sources 120,000120,000PDF- Park Dedication Fund 120,000 120,000Total Wednesday, December 8, 2021 85 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2022 2026 thru Department Recreation Description The joint recreation agreement in place between the cities of Hopkins and Minnetonka provides for the sharing of operational and maintenance expenses for Shady Oak Beach. These expenses are split 33% city of Hopkins and 67% city of Minnetonka. Shady Oak Beach is operated from June - August annually; however the park is available for use year round. 2021: Dock maintenance ($10,000) 2022: Miscellaneous building components, i.e. installation of energy efficient lighting in restrooms/gate area, patio tables and chairs ($15,000); inflatables replacement ($10,000) 2023: Miscellaneous building maintenance ($10,000) 2024: Inflatable replacement ($10,000) 2025: Miscellaneous building maintenance ($10,000) Project #16-CIP-R003 Priority 3 Important Justification Since last undergoing a renovation in 1998, Shady Oak Beach contiues to be a primary park destination for residents of Hopkins and Minnetonka. Scheduled items are intended to keep the park in excellent appearence, establish a gateway to the park, and to provide park users with a quality recreational experience. 2020: Water play inflatable amenities 2021: Dock maintenance and replacement of picnic shelter 2022: Miscellaneous building components 2023: Miscellaneous building maintenance 2024: Miscellaneous building components Budget Impact/Other Useful Life 10-20 yearsProject Name Shady Oak Beach Improvements Category PW - Parks Type Improvement Future Total Project Cost:$360,000 Total2022 2023 2024 2025 2026Expenditures 65,00025,000 10,000 10,000 10,000 10,000Construction/Maintenance 25,000 10,000 10,000 10,000 10,000 65,000Total Total2022 2023 2024 2025 2026Funding Sources 43,60016,800 6,700 6,700 6,700 6,700GU - Other Governmental 21,4008,200 3,300 3,300 3,300 3,300PDF- Park Dedication Fund 25,000 10,000 10,000 10,000 10,000 65,000Total Wednesday, December 8, 2021 86 Streets, Traffic & Transportation 87 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2022 2026 thru Department Public Works: Streets/Traffic Description Locations to be determined consistent with the street reconstruction program. Program includes reconstruction of deteriorated water main, sanitary sewer and storm sewer in conjunction with street improvement projects. Utility improvements are consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. 2022: 6th Ave South/7th Ave South 2023: West Central Avenues 2024-2026: Central Avenues Reconstruction Project #01-CIP-S101 Priority n/a Justification In most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be installed new. In most cases, water main and sanitary sewer need to be rehabilitated in conjunction with street reconstruction. The costs assume the city funding 100% of major storm sewer, water main, and sanitary sewer improvements. Budget Impact/Other Public Hearing - year prior to planned construction Plans and specifications - year prior to planned construction Bid - year of planned construction Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections. Consistent with the City Council adopted Roadway Improvement Policy, Street Ratings, Pavement Management Program, Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. Useful Life UnassignedProject Name Residential Street Improvements and Utilities Category Trans: Streets Type Improvement Future Total Project Cost:$73,903,000 Total2022 2023 2024 2025 2026Expenditures 31,529,0002,375,000 6,493,000 7,542,000 7,552,000 7,567,000Construction/Maintenance 2,375,000 6,493,000 7,542,000 7,552,000 7,567,000 31,529,000Total Total2022 2023 2024 2025 2026Funding Sources 11,510,000650,000 2,170,000 2,885,000 2,895,000 2,910,000PI - PIR/General Obligation Bonds 4,568,000500,000 1,050,000 1,006,000 1,006,000 1,006,000SA - Special Assessment 6,444,000500,000 1,363,000 1,527,000 1,527,000 1,527,000SF - Sanitary Sewer Fund 2,505,000225,000 480,000 600,000 600,000 600,000SU - Storm Sewer Fund 6,502,000500,000 1,430,000 1,524,000 1,524,000 1,524,000WF - Water Fund 2,375,000 6,493,000 7,542,000 7,552,000 7,567,000 31,529,000Total Wednesday, December 8, 2021 88 Smetana Dr9th Ave NMilwaukeeSt3rd St S Oxford St 6 t h S t  S SaintLouis St6 t h  Av e   S Division St WestPark Rd7th Ave S11th Ave SM ilw a u k e e S t5thAve S21st Ave N20thAve S5th Ave N7th St S D r i l l a n e C i r 12thAve NTexas AveWashington Ave NFarmdaleRd W Feltl CtParkLaneVanBuren Ave NOakridge RdBlakeRd NBlake Rd NDrillaneRd Madison Circle S Blake Rd NH e rm a n C tFarmdaleRd E 6th St S Highway 7 Frontage Rd S a in t  Lo u is  S t10th Ave N8th St S 1st St S Ashley Rd2 n d S t  S Feltl Court Van BurenAve N7th St S 2nd St S MinnetonkaMills Rd 5th St N Wilshire Walk SweetBriar LnS h a d y s i d e C i r JacksonAve NInterlachenRdGethsemane Rd14thAve SValley Way2 n d S t  N Edgemoor Dr6th Ave NMadi sonAve N2nd St NE Loring Rd Homedale RdMill RdTyler Ave NOak Park LnCam pbel l  Dr17th Ave N11th Ave NWayside Rd E 5th St S Sunnyside Ln 1st St S 2nd St N 2nd St N Goodrich St Boyce St 3rd ST S Preston Ln 3rd St N 4th St N 1st St S 3rd ST S 3rd St S 2nd St S 5th St S 6th St S 2nd St N Mainstreet 3rd St N 1st St N M a d is o n C irc le  N Park LnDrillane Rd S Minnetonka Mills Rd MapleHill RdMurphy AveH ighway 7 Frontage Rd 21st Ave NWa y s i d e R d  W 16th Ave N15th Ave N14th Ave NAlthea Ln13th Ave N7th Ave NBridle Ln RobinwoodLn15thAve S17thAve N12th Ave NS a i nt Al ba ns  Rd  E BlakeRd SWebster Pl MonroeAve N12th Ave S9th Ave SDrillane Rd D r illa n e R d  N 18thAve S18th Ave N13thAve S8th Ave N11thAve S19thAve SHiawatha Ave Cambridge St OakwoodRdHawthorne RdVan Buren Ave SInterlachen RdWes t   S ai ntAlbans  RdHarrison Ave S16th Ave N19th Ave N17th Ave SWashington Ave S4th St N 5th Ave SPowell Rd12thAve S6th Ave SWest ParkValley Dr8th Ave S7th Ave S20th Ave NHol l yhockL nHollyRd10thAve SBlake Rd S13th Ave S15thAve S16thAve SMonroe Ave SPar kTer r aceMeadowbrook RdRidgewoodDrWe s t b r o o k e  Wa y10thAve SBurnesDrJacksonAve S8th Ave SF le tc h e r  P lCot tage Downs Lake St NE 5th Ave SAlthea Ln6th Ave SManitoba Rd Oakglen DrHermanTerR o b i n wo o d  L n 9th Ave SSweetBriar LnEast ParkValley Dr2nd Ave SEl m o P ark S ervice  R d 2nd Ave S2022 Mill and Overlay 2022 Reconstruct 2023 Mill and Overlay 2023 Reconstruct 2024 Mill and Overlay 2024 - 2026 Construction 2025 Mill and Overlay 2026 Mill and Overlay 2023 Parking Lot Mill and Overlay 2022 - 2026 Capital Improvement Projects Revised 7/2/2021 89 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2022 2026 thru Department Public Works: Streets/Traffic Description County Road 3 from Shady Oak Road to Meadowbrook Road. Lighting, landscaping, street, etc. improvements along Excelsior Boulevard from the east to west city limits. GO Bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue Project has been delayed pending county funding for remaining 4th segement. Project #01-CIP-S104 Priority n/a Justification Deficiencies in terms of roadway condition, traffic/pedestrian movement, safety and aesthetics appear in remaining segment of County Road 3. Segment 4 from Blake Road to Meadowbrook Road; upgrade roadway, implement beautification program. Budget Impact/Other GO bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue. Segment 4: Planning and acquisition - Not in County Funding Plan, when funded city will complete our portion. Consistent with Hennepin County CIP and City Council action. Useful Life UnassignedProject Name County Road 3 Category Trans: Streets Type Improvement Future Total Project Cost:$2,300,000 Total2022 2023 2024 2025 2026Expenditures 2,300,0002,300,000Construction/Maintenance 2,300,000 2,300,000Total Total2022 2023 2024 2025 2026Funding Sources 1,600,0001,600,000GU - Other Governmental 700,000700,000MS - Municipal State Aid Streets 2,300,000 2,300,000Total Wednesday, December 8, 2021 90 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2022 2026 thru Department Public Works: Streets/Traffic Description Painting bike lanes, constructing trails and sidewalks, safety improvements and other general pedestrian and bicycle improvements to the system. 2025: Upgrade of the 11th Ave South pedestrian crossings in the Wesbrooke Area to pedestrian activated RRFB. Project #13-CIP-S040 Priority n/a Justification Council adopted plan to increase pedestrian and bicycle access and safety, these improvements begin to implement that plan. The existing overhead flushers provide very little benefit. Pedestrian activated rectangular rapid flushing beacons (RRFB) have shown to provide very high compliance for motorists and increases pedestrian safety and comfort. Budget Impact/Other Useful Life 20 yearsProject Name Pedestrian & Bicycle Access Improvements Category Trans: Streets Type Improvement Future Total Project Cost:$400,000 Total2022 2023 2024 2025 2026Expenditures 200,00025,000 25,000 25,000 100,000 25,000Construction/Maintenance 25,000 25,000 25,000 100,000 25,000 200,000Total Total2022 2023 2024 2025 2026Funding Sources 200,00025,000 25,000 25,000 100,000 25,000PI - PIR/General Obligation Bonds 25,000 25,000 25,000 100,000 25,000 200,000Total Wednesday, December 8, 2021 91 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2022 2026 thru Department Public Works: Streets/Traffic Description Location to be determined based on Pavement Management Program. Program includes mill and overlay of deteriorated pavements to extend the useful life of the street. Streets for this method of rehabilitation have usually been rehabilitated or reconstructed within the last 20 years. 2022: 2nd Ave S 2023: 1st St. N, Lot 700 2024: 1st St S, South Central Business District Avenues 2025: Robbinwood Ln. Hwy 7 Service Drive, 5th St N 2026: Wasjomgtpm Ave N, Jackson Ave N, St Louis St Project #16-CIP-S041 Priority n/a Justification Properly timed mill and overlay projects can significantly extend the life of a street and delay the need for reconstruction. Mill and overlay projects also require less disturbance and are shorter in duration than reconstruction, which results in less impact of the traveling public. Budget Impact/Other Annual pavement rehabilitation category. Useful LifeProject Name Street Rehabilitation Improvements Category Trans: Streets Type Improvement Future Total Project Cost:$4,475,000 Total2022 2023 2024 2025 2026Expenditures 2,250,000400,000 425,000 450,000 475,000 500,000Construction/Maintenance 400,000 425,000 450,000 475,000 500,000 2,250,000Total Total2022 2023 2024 2025 2026Funding Sources 2,250,000400,000 425,000 450,000 475,000 500,000PI - PIR/General Obligation Bonds 400,000 425,000 450,000 475,000 500,000 2,250,000Total Wednesday, December 8, 2021 92 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2022 2026 thru Department Public Works: Streets/Traffic Description Replacement of aged regulatory and warning signs that have lost minimum retroreflectivity and replacement of posts, when needed. Project #16-CIP-S042 Priority n/a Justification The city is required to have a sign management program which includes a sign replacement strategy to ensure regulatory and warning signs provide adequate retroreflectivity. Sign replacement cycle is 8 years. Estimated costs assume sign replacements by contract. Parking signs will be replaced as needed due to age, fading, etc. Sign inventory data base will be updated to reflect install date/sign age. Budget Impact/Other Useful LifeProject Name Street Sign Management Category Trans: Streets Type Improvement Future Total Project Cost:$220,000 Total2022 2023 2024 2025 2026Expenditures 100,00020,000 20,000 20,000 20,000 20,000Construction/Maintenance 20,000 20,000 20,000 20,000 20,000 100,000Total Total2022 2023 2024 2025 2026Funding Sources 100,00020,000 20,000 20,000 20,000 20,000PI - PIR/General Obligation Bonds 20,000 20,000 20,000 20,000 20,000 100,000Total Wednesday, December 8, 2021 93 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2022 2026 thru Department Public Works: Streets/Traffic Description Upgrade existing lighting in the Central Business District to newer LED fixtures, replace light poles and electrical service feed cabinets, as needed. 2023: Mainstreet East of 5th Ave - 20 fixtures 10th, 11th and 12th Ave N & S of Mainstreet - 52 fixtures Parking Lots 500 and 600 - 15 fixtures 2024: 7th, 8th and 9th Ave N & S of Mainstreet - 28 fixtures Parking Lots 700 and 750 - 8 fixtures Project #20-CIP-S001 Priority n/a Justification There is a need to continue the upgrade of lighting in the Central Business District. The Mainstreet lights were all upgraded to LED fixtures in 2015. An upgrade to LED fixtures will provide energy savings, maintenance savings and create a more uniform lighting appearance throughout the downtown area. Budget Impact/Other Useful LifeProject Name Central Business District Lighting Upgrades Category Trans: Street Lights Type Improvement Future Total Project Cost:$140,000 Total2022 2023 2024 2025 2026Expenditures 140,000100,000 40,000Construction 100,000 40,000 140,000Total Total2022 2023 2024 2025 2026Funding Sources 140,000100,000 40,000PI - PIR/General Obligation Bonds 100,000 40,000 140,000Total Wednesday, December 8, 2021 94 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2022 2026 thru Department Public Works: Streets/Traffic Description Street lighting upgrades are needed to replace deteriorated poles, electrical feedpoints and old, energy inefficent fixtures. 2022: Feltl Court street lighting: replace 10 lights, poles and electrical feedpoint. 2023: 11th Ave S, south of 7th St S, replace 18 poles and fixtures and one electrical feedpoint. 2024: Hobby Acres neighborhood streets, replace 17th poles and fixtures to match Xcel Energy upgraded poles/lights and three electrical feedpoints. 2025: Westbrooke Way street lighting, upgrade 22 lights, poles and wiring via new Xcel Energy agreement to replace expired 30-year agreement 2026: Excelsior Boulevard street lighting, upgrade lighting to LED fixtures via Xcel Energy upgrade program. Project #20-CIP-S002 Priority n/a Justification A replacement plan is needed as these lighting and electrical feed systems are reaching the end of their useful life, with out-dated electrical cabinets, poles and bases and old, energy inefficent light fixtures. Budget Impact/Other Useful LifeProject Name City Street Lighting Upgrades Category Trans: Street Lights Type Improvement Future Total Project Cost:$815,000 Total2022 2023 2024 2025 2026Expenditures 815,000110,000 190,000 200,000 90,000 225,000Construction 110,000 190,000 200,000 90,000 225,000 815,000Total Total2022 2023 2024 2025 2026Funding Sources 815,000110,000 190,000 200,000 90,000 225,000PI - PIR/General Obligation Bonds 110,000 190,000 200,000 90,000 225,000 815,000Total Wednesday, December 8, 2021 95 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact PW Director 2022 2026 thru Department Public Works: Streets/Traffic Description Replacement and upgrading of traffic signal infrastructure including poles, mast arms, cabinets and controls, signal heads, pedestrian heads, and pushbuttons.The work will also include upgrading the pedestrian ramps and crossings to meet ADA standards. 2026: Removal and replacement of signal and ADA upgrades Project #20-CIP-S005 Priority 5 Future Consideration Justification The existing signal is old and reaching the end of it's service life. Pedestrian crossing and ADA improvements should be completed as there are increased levels of both pedestrian and vehicular traffic through the intersection since the development of the Excelsior Crossings office park and improvements to Burnes Park. Budget Impact/Other Useful LifeProject Name Minnetonka Mills/5th St N Signal Replacement Category Trans: Sign/Signals Type Improvement Future Total Project Cost:$600,000 Total2022 2023 2024 2025 2026Expenditures 600,000600,000Construction/Maintenance 600,000 600,000Total Total2022 2023 2024 2025 2026Funding Sources 590,000590,000PI - PIR/General Obligation Bonds 10,00010,000SU - Storm Sewer Fund 600,000 600,000Total Wednesday, December 8, 2021 96 Utilities 97 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2022 2026 thru Department Public Works: Utilities Description Annual concrete repairs and patching of existing alleys. Project #01-CIP-U002 Priority n/a Justification Annual alley pavement concrete slab repairs are needed. Budget Impact/Other Consistent with the Storm Water Management Plan. Useful Life UnassignedProject Name Storm Drainage System Maintenance - Alley Repairs Category Utilities: Municipal Sanitary Se Type Improvement Future Total Project Cost:$393,000 Total2022 2023 2024 2025 2026Expenditures 135,00025,000 26,000 27,000 28,000 29,000Construction/Maintenance 25,000 26,000 27,000 28,000 29,000 135,000Total Total2022 2023 2024 2025 2026Funding Sources 135,00025,000 26,000 27,000 28,000 29,000SU - Storm Sewer Fund 25,000 26,000 27,000 28,000 29,000 135,000Total Wednesday, December 8, 2021 98 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2022 2026 thru Department Public Works: Utilities Description This will help us line our sanitary sewers to eliminate infiltration root intrusion and avoid expensive repairs and sewer backups. Project #18-CIP-U016 Priority 2 Very Important Justification We have an old collection system that needs immediate attention. Continuously cleaning the sewer does not stop roots or infiltration from going into the pipes, we need a more permanent fix. The majority of our sanitary sewer pipe is made out of clay pipe and has reached its life expectancy. Budget Impact/Other Useful LifeProject Name Sewer Lining Category Utilities: Municipal Sanitary Se Type Improvement Future Total Project Cost:$507,500 Total2022 2023 2024 2025 2026Expenditures 307,50052,500 55,000 60,000 65,000 75,000Construction/Maintenance 52,500 55,000 60,000 65,000 75,000 307,500Total Total2022 2023 2024 2025 2026Funding Sources 307,50052,500 55,000 60,000 65,000 75,000SF - Sanitary Sewer Fund 52,500 55,000 60,000 65,000 75,000 307,500Total Wednesday, December 8, 2021 99 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2022 2026 thru Department Public Works: Utilities Description Program includes rehabilitatation of trunk water mains around the city. Staff has conducted some non-destructive condition assessment testing of various trunk lines around the city. The testing determines a level of deterioration based on a calculated reduction of thickness of the pipe wall. Review of how critical the line is, break records, pipe age, and soil conditions are also considered in determining projects. 2022: Replacement of trunk main along North TH 7 Service Drive from Oakridge Road to west of Hopkins Crossroad and trunk main from Water Treatment Plant to North Service Drive. Project #19-CIP-U017 Priority 2 Very Important Justification Trunk water mains are large diameter, high capacity lines that are critical to supply water to and from the water treatment plant, water towers, and distribution lines around the city and cannot easily be taken out of service. Public Works staff has been managing the trunk main system as a standalone asset, as these mains cannot always be included for rehabilitation with street reconstruction projects. Much of the city's trunk system was constructed over 50 years ago and is approaching the end of it's service life. Budget Impact/Other Useful LifeProject Name Trunk Water Main Rehabilitation Category Utilities: Municipal Water Syst Type Improvement Future Total Project Cost:$3,955,000 Total2022 2023 2024 2025 2026Expenditures 3,955,0003,955,000Construction/Maintenance 3,955,000 3,955,000Total Total2022 2023 2024 2025 2026Funding Sources 450,000450,000PI - PIR/General Obligation Bonds 395,000395,000SF - Sanitary Sewer Fund 160,000160,000SU - Storm Sewer Fund 2,950,0002,950,000WF - Water Fund 3,955,000 3,955,000Total Wednesday, December 8, 2021 100