2023-2027 Capital Improvement PlanCAPITAL IMPROVEMENT PLAN 2023-2027 DATE: September 6, 2022 TO: Honorable Mayor and Members of the City Council FROM: Mike Mornson, City Manager SUBJECT: 2023-2027 CAPITAL IMPROVEMENT PLAN With this letter I respectfully submit the 2023-2027 Capital Improvement Plan. This five- year planning document represents the combined efforts of city staff, advisory commissions, residents and the City Council. The Capital Improvement Plan is a five-year forecast of project needs in the City of Hopkins. It is intended to alert the Council and residents to the major capital needs on the horizon. The first year of the plan becomes an adopted capital budget and relates almost completely to the operating budget that is approved on a yearly basis. The remaining four year represents an estimate of project needs and funding capabilities of the city. This plan does not include proposed equipment purchases. A document relating specifically to equipment replacement needs has been developed into a separate document. The Capital Improvement Plan is intended to serve as a planning tool and is therefore structured to present a meaningful, long-range perspective of the city’s capital programming needs. At the same time, sufficient projected detail is provided to enable those who review the information to make informed decisions on the programming of projects over the next several years. Please use the information provided to formulate plans, projects and questions. The Capital Improvement Plan can serve the community best by provoking thoughts and actions. This document was developed by the Finance Department with assistance of all city departments. I want to especially thank all those involved in the development of the Capital Improvement Plan and especially Nate Stanley, Public Works Director, Eric Klingbeil, City Engineer, Kersten Elverum, Planning and Economic Development Director, Ari Lenz, Assistant City Manager and Nick Bishop, Finance Director for their hard work and dedication. 1 2 Page City Manager's Message 1 Table of Contents 3 Introduction Introduction and Purpose 6 Program Descriptions Utilities Program 7 Transportation Program 8 Parks, Forestry, and Pavilion Program 10 General Public Buildings Program 11 Economic Development 13 Sources of Funding Sources of Funding 16 Funding Source Abreviations 19 Summary of Impacts on Major Funding Sources 22 Cash Flow Statements Park Capital Improvement Fund 26 Capital Improvement Fund 27 Permanent Improvement Revolving Fund (PIR)28 Municipal State Aid Fund 29 Water Utility Fund 30 Sewer Utility Fund 31 Storm Sewer Utiltiy Fund 32 Pavilion - Ice Arena Fund 33 Five-Year Project Summaries Projects by Year 36 Department Summary 38 Projects by Department 39 Funding Source Summary 41 Projects by Funding Source 42 Project Descriptions & Narratives General Public Buildings 47 Parks & Recreation 65 Streets 75 Utilities 85 CAPITAL IMPROVEMENT PLAN 2023-2027 TABLE OF CONTENTS 3 4 Introduction 5 INTRODUCTION AND PURPOSE The Capital Improvement Plan is a flexible plan based upon long-range physical planning and financial projections, which schedules the major public improvements that may be incurred by the City over the next five years. Flexibility of the Capital Improvement Plan is established through annual review, and revision if necessary. The annual review assures that the program will become a continuing part of the budgetary process and that it will be consistent with changing demands as well as changing patterns in cost and financial resources. Funds are appropriated only for the first year of the program, which is then included in the annual budget. The Capital Improvement Plan serves as a tool for implementing certain aspects of the City's comprehensive plan; therefore, the program describes the overall objectives of City development, the relationship between projects with respect to timing and need, and the City's fiscal capabilities. The Capital Improvement Plan can help assure: 1. A systematic approach to planning and initiating capital projects affording the opportunity to plan the location, timing, and financing of needed public improvements; 2. The development of a realistic program of capital spending within the City's projected fiscal capability to finance such projects, avoiding sharp change in the tax levy or bonded indebtedness; 3. The coordination of public and private improvement projects permitting adequate time for design and engineering to eliminate duplication of effort and expense; 4. The expenditure of public funds that is compatible with the City's adopted Comprehensive Plan; 5. That the public is kept informed of the proposed future projects and expenditures; 6. That private investors are aware of the City's long-range development program so that they may guide their development in a way that is compatible with the City's program; 7. Aid in achieving federal and/or state participation by providing the necessary planning and lead time necessary for a successful application in addition to meeting prerequisites needed for certain federal and state grants. 6 PROGRAM DESCRIPTIONS In order to effectively plan for and manage the projects contained in a Capital Improvement Plan, it is necessary to group similar activities into "Program Categories". The City of Hopkins' activities are divided into four program categories which are 1) Utilities, 2) Transportation, 3) Parks, Forestry and Pavilion, and 4) General Public Buildings. The City also includes an outline of proposed expenditures for unscheduled projects. Program categories are explained in the following sections. UTILITIES PROGRAM Program Description: The Utilities Program includes the municipal water, municipal sanitary sewer, storm sewer and refuse systems. Program Goal: Provide reliable, efficient, and safe utility service to all parts of the City with a minimum of adverse effects on the environment. Subprograms: Water, sanitary sewer, storm sewer, and refuse service. I. Municipal Water System Subprogram (WA) A. Subprogram Goal: The goal of the Municipal Water System subprogram is to provide water in sufficient quantities at sufficient pressure, with a high degree of reliability and safety to all parts of the City so as to satisfy the normal demands of the general public for water while at the same time providing sufficient reserves in case of fire emergency or power outages. B. Objectives: 1. Water quality shall meet the purity standards of the Minnesota Department of Health. 2. Any hydrant on the system shall, under maximum condition, deliver no less than 500 gallons per minute with a residual pressure of 20 pounds per square inch. 3. The system shall be looped to provide maximum reliability. 4. The supply and storage system shall be designed and maintained to have maximum reliability. 7 II. Municipal Sanitary Sewer Subprogram (SA) A. Subprogram Goal: The goal of the Municipal Sanitary Sewer subprogram is to promote a healthful environment by collecting all sewage from existing and projected development in a sanitary and economic manner. B. Objectives: 1. Provide sewer lines of adequate size and grade to collect and transmit all discharge sewage. 2. Prevent sewage from overflowing into the natural environment. 3. Prevent sewage back-ups. 4. Encourage or promote connection of all generators of sewage to the Municipal system. 5. Meet the effluent and infiltration standards of the Metropolitan Waste Control Commission. III. Storm Sewer Subprogram (SS) A. Subprogram Goal: Manage and control surface and ground waters in order to protect the man-made and natural environment in a safe and efficient manner. B. Objectives: 1. Prevent flooding. 2. Prevent damage to property due to erosion. 3. Meet water quality standards established by the controlling regulatory law or authority. TRANSPORTATION PROGRAM Program Description: This program includes streets, walkways, traffic signs and signals, vehicular parking facilities, and street lighting. Program Goal: Provide for the safe and efficient movement of people and goods throughout the city. Subprograms: Streets, Walkways/Sidewalks, Signs/Signals, Parking Facilities, and Street Lights. 8 I. Streets Subprogram (ST) A. Subprogram Goal: The goal of the Streets subprogram is to provide safe, convenient, economic public streets to best facilitate the movement of vehicular traffic. B. Objectives: 1. Streets should be constructed with permanent surfaces, concrete curb and gutter, and with ancillary storm drainage, to standards established by the City. 2. Streets should be of a size and load capacity consistent with their functional classifications. 3. Timely major repair to preserve the basic capital investment in streets. II. Walkways/Sidewalks Subprogram (WS) A. Subprogram Goal: To provide a safe and convenient pedestrian system with incidental recreational benefits. III. Signs/Signals Subprogram (SI) A. Subprogram Goal: The goal of the Signs/Signals subprogram is to provide an efficient and orderly system of street and traffic signing so as to promote safe, convenient travel throughout the City. B. Objectives: 1. Signs and signals should be installed in conformity with the Minnesota Manual on Uniform Traffic Control Devices. 2. Periodic surveys and studies should be made to document the effectiveness of City signing patterns. IV. Parking Facilities Subprogram (PA) A. Subprogram Goal: To provide such supporting facilities as will promote maximum use of public parking spaces by employers, employees, customers, and visitors. B. Objectives: 1. Provide parking facilities for present and anticipated needs of the City of Hopkins. 9 V. Street Lights Subprogram (SL) A. Subprogram Goal: To provide a system of street lighting within the City that will promote safe and convenient vehicular and pedestrian travel on City Streets. B. Objectives: 1. To provide lighting at each street intersection within the City. 2. To provide mid-block street lighting in conformance with the City's street lighting policy, in order to provide equitable, cost efficient lighting. 3. To continually update the system so as to provide energy and cost efficient lighting. PARKS, FORESTRY AND PAVILION PROGRAM Program Description: This program includes community parks, neighborhood parks, open spaces, recreational structures and facilities. Program Goal: The goal of the Park and Recreation Program is to provide facilities for safe, stimulating, and comprehensive leisure time activities of Hopkins citizens. Subprograms: Neighborhood Facilities, Community Facilities I. Neighborhood Facilities Subprogram (NF) A. Subprogram Goals: To acquire ownership or use rights of park sites located to provide convenient walking access to all Hopkins citizens and to develop such sites to provide optimum recreational serviceability consistent with the preservation and enhancement of pleasing aesthetic qualities. B. Objectives: 1. Acquire property or use rights on those neighborhoods that do not have convenient walking access to neighborhood park facilities. 2. Develop neighborhood park facilities to meet the needs of various user groups. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Preserve and enhance the aesthetic qualities of neighborhood parks. 10 II. Community Facilities Subprogram (CF) A. Subprogram Goals: The goal of the Community Facilities subprogram is to develop, or acquire ownership or use rights of sites which serve the entire City and to provide facilities that serve community-wide needs. B. Objectives: 1. Acquire sites that have valuable and unique natural characteristics to preserve irreplaceable community resources. 2. Preserve by acquisition, gift, or other arrangement properties that have valuable historic-cultural qualities. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Construct or acquire structures and facilities necessary to meet the changing needs of the community. GENERAL PUBLIC BUILDINGS PROGRAM Program Description: The General Public Buildings Program includes all municipal buildings except those provided for in the Utility and Park Facilities Program. Program Goal: Provide buildings that are adequate and convenient for the efficient accommodation of City functions. Subprograms: Administrative Offices, Maintenance Facilities, Fire Facilities, Community Center. I. Administrative Offices Subprogram (AO) A. Subprogram Goal: The goal of the Administrative Offices subprogram is to provide facilities for the efficient and safe conduct of legislative and administrative functions of the City. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of the City services. 11 II. Maintenance Facilities Subprogram (MF) A. Subprogram Goal: The goal of the Maintenance Facilities subprogram is to provide facilities for the efficient and safe conduct of City maintenance functions. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of City services. III. Fire Facilities Subprogram (FF) A. Subprogram Goal: To provide a fire station, or stations, for storage of Fire Department equipment and for the training and meetings of volunteer fire fighters to provide prompt and efficient protection to life and property. B. Objectives: 1. Provide a maximum four-minute daytime and three-minute nighttime response to all points within the City. 2. Meet objective 1 through the use of volunteers. IV. Community Center Subprogram (CC) A. Subprogram Goal: To provide a community facility, or facilities, which meet the social, recreational, and cultural needs of all citizens, particularly senior citizens. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repairs. 2. Construct or acquire structures and facilities necessary to meet the changing needs of the City. 3. Upgrade facilities as necessary to provide for efficient, safe, and effective provision of City services. 12 ECONOMIC DEVELOPMENT PROGRAM Program Description: This program includes redevelopment projects that have been identified through adopted plans and goals of the City of Hopkins. Program Goal: To facilitate the redevelopment of key sites in order to achieve the state objectives of the project. Objectives: 1. Elimination of blight or blighting conditions 2. Creation of jobs 3. Increase property value(s) 4. Catalyst of additional redevelopment 5. Environmental clean-up 6. Increase transit-oriented development around LRT stations 13 14 Sources of Funding 15 SOURCES OF FUNDING In order to fund the anticipated Capital Improvements, the City must draw upon a variety of sources. Many of these sources have a specific or "dedicated" purpose (i.e., the water utility fund will finance water main installation but not a street overlay). Therefore, it is important to identify the uses and limitations of the various revenue sources. CURRENT REVENUES - GENERAL FUND (CR) This represents funding from current year revenue collections in the General Fund that support operations and capital outlay expenditures. Revenue sources include property tax levies, state aid payments, and various permit and license fees. This source of funding is generally used only for operations and small capital purchases. GENERAL FUND RESERVES (GR) Reserves of the general fund are the funds remaining after subtracting cash flow and emergency amounts from the City's cash balance, sometimes referred to as "fund balance". The use of General Fund Reserves is not recommended for Capital Improvements without significant staff and Council review. COMMUNICATION (formerly Cable TV) FUND (CT) This funding source consists of franchise fees received from the local Cable TV company, in excess of the amounts earmarked for the access programming and commission budgets. Expenditures are limited to cable-related facilities, or must have a cable related purpose. ECONOMIC DEVELOPMENT FUND (ED) This funding source was established by the Housing and Redevelopment Authority (HRA) and the City of Hopkins, to provide funding for the purpose of promoting development and redevelopment within the City. The Economic Development fund is a revolving fund administered by the HRA, intended to provide an ongoing funding source used to reduce or extend the long term debt involved with development and redevelopment activities. The HRA reviews all proposed uses of this fund on an individual basis. GRANT-IN-AID (GA) This is aid received from either the Federal or State government. In many cases, grants are made on matching basis, which means the City shares a portion of the costs of the project being funded. 16 MUNICIPAL STATE AID STREETS (MS) This funding source represents funds received from the State of Minnesota to support construction and maintenance of State Aid classified municipal streets. State law defines the types and limits of State Aid Streets expenditures. PERMANENT IMPROVEMENT REVOLVING/GENERAL OBLIGATION BONDS (PI) Improvements with a life of several years may be financed from the proceeds of a General Obligation Bond Issue. Law limits the total debt that can be incurred under this method of financing. With some exception, General Obligation Bonds are generally subject to a referendum process. Examples of projects, which may not require a referendum, are those financed through the use of special assessments where at least 20 percent of the project cost is assessed to the benefiting property owners. The remaining portion not assessed can be financed through general obligation bonds repaid by a tax levy. PRIVATE SECTOR FUNDING (PF) This funding source consists primarily of payments made by developers for the purchase of land, the installation of water, sewer, or streets or other related expenditures. It can also refer to donations made to the City by individuals or groups. OTHER GOVERNMENTAL UNITS (GU) These are funds received from Hennepin County, adjacent communities, etc. for projects that also benefit a jurisdiction other than the City of Hopkins. REVENUE BONDS (RB) These are bonds issued for improvements made for specific revenue producing facility or operation. The debt incurred is repaid from the revenue generated by the facility. If the revenue generated is insufficient, then the difference becomes an annual obligation of the taxpayers and becomes an additional tax levy. These are generally not subject to referendum. REAL ESTATE SALES FUND (RE) This funding source consists primarily of funds built up from the sale of City owned property. To date, the fund has been used for building improvements. Because the sale of both general City property and park/recreation property are accumulated into this fund, earmarking a portion for recreational purposes may be justified. 17 SPECIAL ASSESSMENT (SA) A number of projects may be realistically financed using Special Assessment to pay the ultimate cost. Almost any project can potentially be financed using the assessment process. In each case it is necessary to make a determination that the assessed property will benefit by the amount of the assessment. The cost of street reconstruction is shared by the property owner and the City. Special assessments to individual properties are capped per city policy. Concurrent improvement costs to the utility systems are assumed by the respective utility funds. TAX INCREMENT FINANCING (TF) This funding source results from the tax value of new development that is "incrementally" greater than the existing tax value. Typically, bonds are sold based on the assumption that the higher tax receipts will retire the bonds. However, the use of TIF funds through a "pay as you go" method has become more common. This type of funding can be used for public improvements within a redevelopment district to support the goals of redevelopment, specifically the elimination of blighted conditions. Approval of the Hopkins HRA should be anticipated prior to the commitment of these funds. State law strictly regulates the use of these funds. WATER FUNDS (WF) Water funds consist of revenue generated from the sale of water. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. SANITARY SEWER FUNDS (SF) Sanitary sewer funds consist of revenue generated from charges made for sewage disposal. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. STORM SEWER UTILITY REVENUES (SU) Storm sewer funds consist of revenue generated by charging storm water drainage fee to parcels of land for the availability and use of municipal storm sewer facilities. Expenditures from this funding source are related to drainage facilities. PAVILION FUND (PA) Pavilion Funds consist of revenues generated from rental fees collected from users of the Pavilion. These funds are utilized to pay for operating, and capital expenditures. 18 Funding Sources Communication (formerly Cable TV) Fund CT Current Revenues – General Fund CR General Fund Reserves GR Economic Development Fund ED Grant-In-Aid GA Housing and Redevelopment Authority HRA Municipal State-Aid Streets MS Other Government Units GU Park Dedication Fund PDF Pavilion Fund PA Permanent Improvement Revolving/General Obligation Bonds PI Private Sector Funds PF Real Estate Sales Fund RE Revenue Bonds RB Sanitary Sewer Fund SF Special Assessment SA Storm Sewer Fund SU Tax Increment Financing TF Water Fund WF 19 20 Summary of Impacts on Major Funding Sources 21 SUMMARY OF PROJECT IMPACTS ON MAJOR FUNDING SOURCES CURRENT REVENUES/GENERAL FUND RESERVES Expenditures for 2023 are budgeted at an increase of 6.27% over the 2022 budget. The 2023 budget has no levy limits and the City will receive approximately $925,000 in LGA. The tax levy is the major source of revenues (82%) for the General Fund and therefore presents a challenge when levy limits are in place. Unassigned fund balance in the General Fund totals $7,989,399 at the end of 2021 and is projected to remain at that level for 2022 or increase slightly. The State Auditor’s Office recommends no less than five month of operating expenditures in reserves. For 2022 five months of expenditures would total $6,739,008 or 41.7%. At January 1, 2022 the unassigned fund balance was at 49.4% of budgeted expenditures. PERMANENT IMPROVEMENT REVOLVING FUND, (P.I.R.) - G.O. DEBT Funding from bonds is used to reimburse the P.I.R. fund for public improvement projects, which have been previously expended. The debt is funded by special assessment collections and city tax levies over a ten to fifteen year period. Bonds totaling $2,085,000 were sold in 2022 to fund the 2022 street improvement project. The next bond sale is scheduled for 2023 and will be for the 2023 street improvement project. These bonds are expected to total approximately $3,975,000. The P.I.R. fund has completed substantial projects over the last five years. The pace is expected to slow slightly with $3,980,000 of projects scheduled in 2023 and a one year pause is street reconstruction in 2024. The street reconstruction program will resume in 2025. Projects scheduled for 2023, 2025, 2026, and 2027 will require bonding. Projects scheduled for 2023 include the West Central Avenues street reconstruction project, pedestrian and bicycle access improvements, along with street overlay, street sign management programs and street lighting upgrades. The funding is provided for these projects by special assessments, PIR/Bonding and general fund transfers. MUNICIPAL STATE AID FUND Funding for municipal state aid road projects comes from state MSA funding and is drawn down as projects are done. State funding is not sufficient for current planned projects as the City has been aggressive in doing MSA projects. In the queue for reimbursement is a request for is the Shady Oak project. In late 2014 we received an advance on the Shady Oak project which essentially cleared up our receivable backlog for Excelsior Blvd and Minnetonka Mills Road. This leaves Shady Oak Road as the only project in the funding queue. Currently one MSA projects are scheduled, street improvements on County Road 3 from Shady Oak Road to Meadowbrook Road in 2027. 22 CAPITAL IMPROVEMENT FUND The Capital Improvement Fund received only tax levy support from 2005 through 2018. Gas and electric franchise fees were increased beginning in 2019, to support the capital improvement fund. The franchise fees are expected to generate $361,500 annually for the fund. The fund will receive $427,650 of transfers from the general fund in 2023. There are no projects scheduled in 2023. PARK IMPROVEMENT FUND The source of funding for this fund is development fees charged to developers for park development, in addition to franchise fees from gas and electric services. The franchise fees are expected to supply approximately $305,000 to the fund for much needed park projects. The City is seeing an increased interest in development with $1,638,000 of dedication fees projected to be received in 2023. Projects scheduled for 2023 are for Shady Oak Beach Improvements. WATER FUND Increasing consumption charges and bond proceeds in 2023 provide the funding needed for projects scheduled for 2023. Bonds will need to be sold each year thereafter in which there are water projects associated with the residential street improvement program. Projects planned for 2023 total $1,430,000 and include water main improvements done in conjunction the with the West Central Avenues street reconstruction project. SANITARY SEWER FUND Increasing consumption charges and bond proceeds in 2023 provide the funding needed for projects scheduled for 2023. Bonds will need to be sold each year thereafter in which there are sanitary sewer projects associated with the residential street improvement program. Projects planned for 2023 total $1,418,000 and include sewer line improvements done in conjunction the with the West Central Avenues street reconstruction project. STORM SEWER FUND Bonds will be sold in 2023 for the 2023 storm water management project. These bonds issues along with current revenues should provide the needed funding for scheduled projects. Bonds will need to be sold each year thereafter in which there are storm sewer projects associated with the residential street improvement program. Projects planned for 2023 total $506,000 and include storm sewer improvements done in conjunction the with the West Central Avenues street reconstruction project. The most recent rate increase pursuant to the 2007 Utility Master Plan was done in 2009. This rate increase is expected to support the storm sewer system well into the future and currently no additional rates increases are proposed. 23 PAVILION FUND This facility completed a significant upgrade project in 2018, with a total project cost of approximately $5,700,000. The new expanded facility has a new refrigeration system and was expanded to better meet the needs of the community. The project received contributions from the Park Improvement Fund along with outside organizations. A bond was issued for the remaining costs of approximately $3,200,000. The fund will continue to receive tax levy support in 2023 to pay ongoing debt service costs. The fund will also receive general fund transfers of $120,000 in 2023 to replace the indoor turf system. 24 Cash Flow Statements 25 City of Hopkins Park Capital Improvements Fund (301) PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2022 2023 2024 2025 2026 2027 Working Capital Begin Year 473,109 846,777 2,618,245 2,341,163 2,397,975 2,468,655 Revenues Franchise Fees 305,000 305,000 305,000 305,000 305,000 305,000 Dedication Fees 348,000 1,638,000 - - - - Interest earnings 4,731 8,468 2,618 23,412 23,980 24,687 Hennepin County Grants - - - - - - Donations - - - - - - Transfer In - - - - - - Bond Proceeds - - - - - - Total Revenues 657,731 1,951,468 307,618 328,412 328,980 329,687 Expenditures Current 145,589 15,000 15,000 15,000 15,000 15,000 Capital Projects 8,200 5,000 449,700 136,600 123,300 183,300 Bond Payment Contribution (2015)10,000 10,000 10,000 10,000 10,000 10,000 Bond Payment Contribution (2016)100,000 100,000 110,000 110,000 110,000 110,000 Bond Payment Contribution (2017)20,274 50,000 - - - - Total Expenditures 284,063 180,000 584,700 271,600 258,300 318,300 Working Capital Ending Balance 846,777 2,618,245 2,341,163 2,397,975 2,468,655 2,480,042 (Unrestricted Net Position) 26 City of Hopkins Capital Improvements Fund (305) PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2022 2023 2024 2025 2026 2027 Working Capital Begin Year 152,405 99,029 529,169 99,029 60,628 159,189 Revenues from charges Tax Levy 50,000 - - 200,000 200,000 200,000 Federal Grants - - - - - - Interest earnings 1,524 990 5,360 99 61 159 Franchise Fees 361,500 361,500 361,500 361,500 361,500 361,500 Transfer In - 427,650 - - - - Total Revenues 413,024 790,140 366,860 561,599 561,561 561,659 Expenditures Current - - - - - - Capital Projects 106,400 - 437,000 240,000 103,000 50,000 City Hall Debt Service 360,000 360,000 360,000 360,000 360,000 360,000 Total Expenditures 466,400 360,000 797,000 600,000 463,000 410,000 Working Capital Ending Balance 99,029 529,169 99,029 60,628 159,189 310,848 (Unrestricted Net Position) 27 City of Hopkins Permanent Improving Revolving Fund (501) PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2022 2023 2024 2025 2026 2027 Working Capital Begin Year 406,106 410,167 909,269 418,412 402,796 426,024 Revenues Tax Levy 110,000 - 240,000 110,000 245,000 80,000 Special Assessments (Prepaid)100,000 210,000 - 201,200 201,200 201,200 Reimbursements - - - - - - Investments 4,061 4,102 4,143 4,184 4,028 4,260 Bond Proceeds 1,945,000 3,975,000 - 4,400,000 4,400,000 5,000,000 Transfer In - 290,000 - Total Revenues 2,159,061 4,479,102 244,143 4,715,384 4,850,228 5,285,460 Expenditures Current - - - - - - Residential Street Improvements 1,150,000 3,220,000 - 4,046,000 4,057,000 4,072,000 Central Business District Lighting Upgrades - 100,000 40,000 - - - City Street Lighting Upgrades 110,000 190,000 200,000 90,000 225,000 60,000 Trail Segement - Bellgrove - - - - - - Pedestrian & Bicycle Access Improvements 25,000 25,000 25,000 100,000 25,000 25,000 Blake Road Corridor Improvements - - - - - - Street Overlay Improvements 400,000 425,000 450,000 475,000 500,000 550,000 Street Sign Management 20,000 20,000 20,000 20,000 20,000 20,000 Trunk Water Main Rehabilitation 450,000 - - - - - Minnetonka Mills Signal Replacement - - - - 590,000 Transfer Out - - - - - - Total Expenditures 2,155,000 3,980,000 735,000 4,731,000 4,827,000 5,317,000 Working Capital Ending Balance 410,167 909,269 418,412 402,796 426,024 394,484 (Unrestricted Net Position) 28 City of Hopkins Municipal State Aid Fund (302) PROJECTED BUDGET BUDGET BUDGET BUDGET 2022 2023 2024 2025 2026 Working Capital Begin Year 950,219 1,009,429 1,715,357 2,449,220 2,449,220 Revenues State MSA Funds, projects 55,094 695,834 716,709 738,210 760,356 Interest Earnings 9,502 10,094 17,154 24,492 24,492 Total Revenues 64,596 705,928 733,863 Expenditures CIP State Aid Projects 5,386 - - - - Total Expenditures 5,386 - - - - Working Capital Ending Balance 1,009,429 1,715,357 2,449,220 2,449,220 2,449,220 (Unrestricted Net Position) 29 Water Fund (703) - Working Capital Projection PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2022 2023 2024 2025 2026 2027 Working Capital Begin Year 14,079 1,042,846 791,731 403,958 170,148 267,544 Revenues Operating Revenues 2,336,580 2,368,000 2,581,120 2,813,421 3,066,629 3,342,625 Other 100,844 145,000 147,900 150,858 153,875 156,953 Federal Grants Bond Proceeds - Capital 4,156,286 1,450,000 - 1,550,000 1,650,000 6,600,000 Bond Proceeds - Refunding - - - - - - Total Revenues 6,593,710 3,963,000 2,729,020 4,514,279 4,870,504 10,099,578 Expenditures Operating Expenditures 1,736,089 1,833,742 1,888,754 1,945,417 2,003,779 2,063,893 Interest/Fiscal Agent Expense 330,865 207,832 271,348 241,531 216,737 193,021 Capital Outlay 3,095,963 1,430,000 - 1,585,000 1,603,000 6,585,000 Bond Payments 242,600 485,450 699,600 719,050 692,500 720,950 Transfer Out - Bond Payments 159,426 257,091 257,091 257,091 257,091 257,091 Total Expenses 5,564,943 4,214,115 3,116,793 4,748,089 4,773,107 9,819,955 Working Capital Ending Balance 1,042,846 791,731 403,958 170,148 267,544 547,167 (Unrestricted Net Position) 30 City of Hopkins Sewer Fund (707) - Working Capital Projection PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2022 2023 2024 2025 2026 2027 Working Capital Begin Year 1,909,131 1,269,271 1,096,876 944,837 870,176 908,303 Revenues Operating Revenues 3,151,283 3,245,821 3,343,196 3,443,492 3,546,797 3,653,201 Other 19,548 15,000 15,300 15,606 15,918 16,236 Interest - 20,000 10,969 9,448 8,702 9,083 Bond Proceeds - Capital 274,040 1,400,000 - 1,650,000 1,700,000 1,700,000 Total Revenues 3,444,871 4,680,821 3,369,465 5,118,546 5,271,417 5,378,520 Expenditures Operating Expenditures 2,645,605 2,665,138 2,745,092 2,827,445 2,912,268 2,999,636 Interest/Fiscal Agent Expense 106,095 202,372 128,076 109,047 95,215 82,961 Capital Outlay 984,562 1,418,000 60,000 1,653,000 1,681,000 1,663,000 Bond Payments 216,637 377,540 398,170 413,550 354,640 369,970 Transfer Out - Bond Payments 131,832 190,166 190,166 190,166 190,166 190,166 Total Expenses 4,084,731 4,853,216 3,521,504 5,193,208 5,233,289 5,305,733 Working Capital Ending Balance 1,269,271 1,096,876 944,837 870,176 908,303 981,091 (Unrestricted Net Position) 31 City of Hopkins Storm Sewer (740) Fund - Working Capital Projection PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2022 2023 2024 2025 2026 2027 Working Capital Begin Year 2,724,492 2,611,371 2,629,669 2,758,073 2,909,809 3,037,433 Revenues Operating Revenues 799,340 779,332 779,332 779,332 779,332 779,332 Other 6,874 6,000 6,000 6,000 6,000 Interest - 25,000 26,297 27,581 29,098 30,374 Bond Proceeds - Capital 128,400 500,000 - 650,000 650,000 650000 Total Revenues 934,614 1,310,332 811,629 1,462,913 1,464,430 1,459,706 Expenditures Operating Expenditures 158,638 148,363 152,814 157,398 162,120 166,984 Interest/Fiscal Agent Expense 67,809 148,824 84,344 72,541 63,990 55,609 Capital Outlay - Construction 546,584 506,000 27,000 652,000 671,000 664,000 Bond Payments 119,200 312,010 242,230 252,400 262,860 274,080 Transfer Out - Bond Payments 155,504 176,837 176,837 176,837 176,837 176,837 Total Expenses 1,047,735 1,292,034 683,225 1,311,176 1,336,807 1,337,510 Working Capital Ending Balance 2,611,371 2,629,669 2,758,073 2,909,809 3,037,433 3,159,629 (Unrestricted Net Position) 32 City of Hopkins Pavilion Fund (747) - Working Capital Projection PROJECTED BUDGET BUDGET BUDGET BUDGET BUDGET 2022 2023 2024 2025 2026 2027 Working Capital Begin Year (250,377) 26,135 46,960 67,138 86,771 105,962 Revenues Property Taxes 409,544 340,000 340,000 340,000 340,000 340,000 Federal Grants 250,000 - Operating Revenues 475,672 471,500 485,645 500,214 515,220 530,677 Other 26,757 7,500 7,500 7,500 7,500 7,500 Transfer In - 120,000 143,000 90,000 - - Total Revenues 1,161,973 939,000 976,145 937,714 862,720 878,177 Expenditures Operating Expenditures 530,026 523,900 539,617 555,806 572,480 589,654 Interest/Fiscal Agent Expense 79,435 79,275 73,350 67,275 61,050 54,675 Capital Outlay - Construction 66,000 120,000 143,000 90,000 - - Bond Payments 210,000 195,000 200,000 205,000 210,000 215,000 Total Expenses 885,461 918,175 955,967 918,081 843,530 859,329 Working Capital Ending Balance 26,135 46,960 67,138 86,771 105,962 124,810 (Unrestricted Net Position) 33 34 Five Year Project Summaries 35 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP PROJECTS BY YEAR 2023 2027thru Project Name Department Project #Priority Project Cost 2023 19-CIP-AR002Arts Center - Outdoor Signage/lighting 2 25,000Comm Svcs - Arts Center 19-CIP-AR005Arts Center - Key Card Exterior & Interior Access 2 10,000Comm Svcs - Arts Center 19-CIP-PV330Pavilion - Indoor Turf System Replacement 2 120,000Pavilion 01-CIP-S101Residential Street Improvements and Utilities n/a 6,493,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 425,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S001Central Business District Lighting Upgrades n/a 100,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 190,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 26,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 55,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 15,000Recreation 7,504,000Total for 2023 2024 08-CIP-AC024Activity Center - Raspberry Room Roof Replacement n/a 80,000Comm Svcs - Activity Center 09-CIP-AC031Activity Center - Lower Roof Replacement n/a 80,000Comm Svcs - Activity Center 22-CIP-AC052Activity Center - Tuckpointing & Repair of Brick 2 120,000Comm Svcs - Activity Center 19-CIP-AR002Arts Center - Outdoor Signage/lighting 2 10,000Comm Svcs - Arts Center 19-CIP-AR005Arts Center - Key Card Exterior & Interior Access 2 10,000Comm Svcs - Arts Center 19-CIP-AR007Arts Center - Roof Replacement 2 150,000Comm Svcs - Arts Center 08-CIP-B121Fire Station: Replace 25 Ton AHU n/a 82,000Fire 20-CIP-PV334Pavilion - Arena Exit Door Replacement 3 105,000Pavilion 22-CIP-PV335Pavilion - Water Heater Replacement n/a 38,000Pavilion 13-CIP-P044Improve Courts at Oakes Park and Cottageville Park n/a 190,000Public Works: Parks 20-CIP-P071Central Park Picnic Shelters Rehab n/a 60,000Public Works: Parks 20-CIP-P072Central Park East Play Equipment Replacement n/a 100,000Public Works: Parks 21-CIP-P073Repair Valley Park Basketball Court n/a 70,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 0Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 450,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S001Central Business District Lighting Upgrades n/a 40,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 200,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 27,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 60,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 90,000Recreation 2,007,000Total for 2024 2025 19-CIP-AR005Arts Center - Key Card Exterior & Interior Access 2 10,000Comm Svcs - Arts Center 20-CIP-PV333Pavilion - Mezzanine Flooring Replacement 3 90,000Pavilion 08-CIP-PD215City Hall Police Station Rooftop n/a 240,000Police Thursday, August 4, 2022 36 Project Name Department Project #Priority Project Cost 21-CIP-P074Repair Burnes Park Tennis Courts n/a 130,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 7,843,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 100,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 475,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 90,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 28,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 65,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 20,000Recreation 9,111,000Total for 2025 2026 09-CIP-CH032Council Chambers HVAC Unit n/a 15,000City Hall Administration 19-CIP-AR005Arts Center - Key Card Exterior & Interior Access 2 10,000Comm Svcs - Arts Center 08-CIP-B023Public Works - Replace Overhead Doors n/a 90,000Public Works: Bldg/Equip Serv 22-CIP-B102Undercarriage Wash System 3 70,000Public Works: Bldg/Equip Serv 21-CIP-P075Repair Play Courts-Interlachen, Elmo & Park Valley n/a 120,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 7,854,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 500,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 225,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 29,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 75,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 10,000Recreation 9,043,000Total for 2026 2027 09-CIP-CH035City Hall AC Rooftop Units n/a 50,000City Hall Administration 14-CIP-AR003Arts Center - Paint Theatre 2 28,000Comm Svcs - Arts Center 19-CIP-AR005Arts Center - Key Card Exterior & Interior Access 2 10,000Comm Svcs - Arts Center 13-CIP-P049Burnes Park - Tennis Courts Reconstruction n/a 180,000Public Works: Parks 01-CIP-S101Residential Street Improvements and Utilities n/a 7,869,000Public Works: Streets/Traffic 01-CIP-S104County Road 3 n/a 2,300,000Public Works: Streets/Traffic 13-CIP-S040Pedestrian & Bicycle Access Improvements n/a 25,000Public Works: Streets/Traffic 16-CIP-S041Street Rehabilitation Improvements n/a 550,000Public Works: Streets/Traffic 16-CIP-S042Street Sign Management n/a 20,000Public Works: Streets/Traffic 20-CIP-S002City Street Lighting Upgrades n/a 60,000Public Works: Streets/Traffic 20-CIP-S005Minnetonka Mills/5th St N Signal Replacement 5 600,000Public Works: Streets/Traffic 01-CIP-U002Storm Drainage System Maintenance - Alley Repairs n/a 30,000Public Works: Utilities 18-CIP-U016Sewer Lining 2 75,000Public Works: Utilities 19-CIP-U017Trunk Water Main Rehabilitation 2 5,000,000Public Works: Utilities 16-CIP-R003Shady Oak Beach Improvements 3 10,000Recreation 16,807,000Total for 2027 GRAND TOTAL 44,472,000 Thursday, August 4, 2022 37 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP DEPARTMENT SUMMARY 2023 2027thru Total20232024202520262027Department City Hall Administration 65,00015,000 50,000 Comm Svcs - Activity Center 280,000280,000 Comm Svcs - Arts Center 263,00035,000 170,000 10,000 10,000 38,000 Fire 82,00082,000 Pavilion 353,000120,000 143,000 90,000 Police 240,000240,000 Public Works: Bldg/Equip Serv 160,000160,000 Public Works: Parks 850,000420,000 130,000 120,000 180,000 Public Works: Streets/Traffic 36,564,0007,253,000 735,000 8,528,000 8,624,000 11,424,000 Public Works: Utilities 5,470,00081,000 87,000 93,000 104,000 5,105,000 Recreation 145,00015,000 90,000 20,000 10,000 10,000 7,504,000 2,007,000 9,111,000 9,043,000 16,807,000 44,472,000TOTAL Thursday, August 4, 202238 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP PROJECTS BY DEPARTMENT 2023 2027thru Total20232024202520262027DepartmentProject #Priority City Hall Administration 09-CIP-CH035 50,00050,000City Hall AC Rooftop Units n/a 09-CIP-CH032 15,00015,000Council Chambers HVAC Unit n/a 65,00015,000 50,000City Hall Administration Total Comm Svcs - Activity Center 08-CIP-AC024 80,00080,000Activity Center - Raspberry Room Roof Replacement n/a 09-CIP-AC031 80,00080,000Activity Center - Lower Roof Replacement n/a 22-CIP-AC052 120,000120,000Activity Center - Tuckpointing & Repair of Brick 2 280,000280,000Comm Svcs - Activity Center Total Comm Svcs - Arts Center 19-CIP-AR007 150,000150,000Arts Center - Roof Replacement 2 14-CIP-AR003 28,00028,000Arts Center - Paint Theatre 2 19-CIP-AR002 35,00025,000 10,000Arts Center - Outdoor Signage/lighting 2 19-CIP-AR005 50,00010,000 10,000 10,000 10,000 10,000Arts Center - Key Card Exterior & Interior Access 2 263,00035,000 170,000 10,000 10,000 38,000Comm Svcs - Arts Center Total Fire 08-CIP-B121 82,00082,000Fire Station: Replace 25 Ton AHU n/a 82,00082,000Fire Total Pavilion 20-CIP-PV333 90,00090,000Pavilion - Mezzanine Flooring Replacement 3 20-CIP-PV334 105,000105,000Pavilion - Arena Exit Door Replacement 3 22-CIP-PV335 38,00038,000Pavilion - Water Heater Replacement n/a 19-CIP-PV330 120,000120,000Pavilion - Indoor Turf System Replacement 2 353,000120,000 143,000 90,000Pavilion Total Police 08-CIP-PD215 240,000240,000City Hall Police Station Rooftop n/a 240,000240,000Police Total Public Works: Bldg/Equip Serv 08-CIP-B023 90,00090,000Public Works - Replace Overhead Doors n/a 22-CIP-B102 70,00070,000Undercarriage Wash System 3 160,000160,000Public Works: Bldg/Equip Serv Total Public Works: Parks 13-CIP-P049 180,000180,000Burnes Park - Tennis Courts Reconstruction n/a Thursday, August 4, 202239 Total20232024202520262027DepartmentProject #Priority 20-CIP-P071 60,00060,000Central Park Picnic Shelters Rehab n/a 20-CIP-P072 100,000100,000Central Park East Play Equipment Replacement n/a 21-CIP-P073 70,00070,000Repair Valley Park Basketball Court n/a 21-CIP-P074 130,000130,000Repair Burnes Park Tennis Courts n/a 21-CIP-P075 120,000120,000Repair Play Courts-Interlachen, Elmo & Park Valley n/a 13-CIP-P044 190,000190,000Improve Courts at Oakes Park and Cottageville Park n/a 850,000420,000 130,000 120,000 180,000Public Works: Parks Total Public Works: Streets/Traffic 13-CIP-S040 200,00025,000 25,000 100,000 25,000 25,000Pedestrian & Bicycle Access Improvements n/a 20-CIP-S005 600,000600,000Minnetonka Mills/5th St N Signal Replacement 5 20-CIP-S002 765,000190,000 200,000 90,000 225,000 60,000City Street Lighting Upgrades n/a 20-CIP-S001 140,000100,000 40,000Central Business District Lighting Upgrades n/a 16-CIP-S041 2,400,000425,000 450,000 475,000 500,000 550,000Street Rehabilitation Improvements n/a 01-CIP-S104 2,300,0002,300,000County Road 3 n/a 01-CIP-S101 30,059,0006,493,000 0 7,843,000 7,854,000 7,869,000Residential Street Improvements and Utilities n/a 16-CIP-S042 100,00020,000 20,000 20,000 20,000 20,000Street Sign Management n/a 36,564,0007,253,000 735,000 8,528,000 8,624,000 11,424,000Public Works: Streets/Traffic Total Public Works: Utilities 01-CIP-U002 140,00026,000 27,000 28,000 29,000 30,000Storm Drainage System Maintenance - Alley Repairs n/a 18-CIP-U016 330,00055,000 60,000 65,000 75,000 75,000Sewer Lining 2 19-CIP-U017 5,000,0005,000,000Trunk Water Main Rehabilitation 2 5,470,00081,000 87,000 93,000 104,000 5,105,000Public Works: Utilities Total Recreation 16-CIP-R003 145,00015,000 90,000 20,000 10,000 10,000Shady Oak Beach Improvements 3 145,00015,000 90,000 20,000 10,000 10,000Recreation Total GRAND TOTAL 44,472,0007,504,000 2,007,000 9,111,000 9,043,000 16,807,000 Thursday, August 4, 202240 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP FUNDING SOURCE SUMMARY 2023 thru 2027 TotalSource20232024202520262027 AC - Arts Center Fund 188,00035,000 95,000 10,000 10,000 38,000 CI - Capital Improvement Fund 830,000437,000 240,000 103,000 50,000 GU - Other Governmental Units 1,697,10010,000 60,300 13,400 6,700 1,606,700 MS - Municipal State Aid Streets 700,000700,000 PA - Pavilion Fund 353,000120,000 143,000 90,000 PDF- Park Dedication Fund 897,9005,000 449,700 136,600 123,300 183,300 PI - PIR/General Obligation Bonds 15,402,0002,930,000 735,000 3,685,000 3,781,000 4,271,000 RF - Refuse Fund 18,00018,000 SA - Special Assessment 4,188,0001,050,000 0 1,046,000 1,046,000 1,046,000 SF - Sanitary Sewer Fund 6,475,0001,418,000 60,000 1,653,000 1,681,000 1,663,000 SU - Storm Sewer Fund 2,520,000506,000 27,000 652,000 671,000 664,000 WF - Water Fund 11,203,0001,430,000 0 1,585,000 1,603,000 6,585,000 7,504,000 2,007,000 9,111,000 9,043,000 16,807,000 44,472,000GRAND TOTAL Thursday, August 4, 2022 41 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP PROJECTS BY FUNDING SOURCE 2023 2027thru TotalSourceProject #Priority 2023 2024 2025 2026 2027 AC - Arts Center Fund 14-CIP-AR003 28,00028,000Arts Center - Paint Theatre 2 19-CIP-AR002 35,00025,000 10,000Arts Center - Outdoor Signage/lighting 2 19-CIP-AR005 50,00010,000 10,000 10,000 10,000 10,000Arts Center - Key Card Exterior & Interior Access 2 19-CIP-AR007 75,00075,000Arts Center - Roof Replacement 2 188,00035,000 95,000 10,000 10,000 38,000AC - Arts Center Fund Total CI - Capital Improvement Fund 08-CIP-AC024 80,00080,000Activity Center - Raspberry Room Roof Replacement n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 08-CIP-B121 82,00082,000Fire Station: Replace 25 Ton AHU n/a 08-CIP-PD215 240,000240,000City Hall Police Station Rooftop n/a 09-CIP-AC031 80,00080,000Activity Center - Lower Roof Replacement n/a 09-CIP-CH032 15,00015,000Council Chambers HVAC Unit n/a 09-CIP-CH035 50,00050,000City Hall AC Rooftop Units n/a 19-CIP-AR007 75,00075,000Arts Center - Roof Replacement 2 22-CIP-AC052 120,000120,000Activity Center - Tuckpointing & Repair of Brick 2 22-CIP-B102 70,00070,000Undercarriage Wash System 3 830,000437,000 240,000 103,000 50,000CI - Capital Improvement Fund Total GU - Other Governmental Units 01-CIP-S104 1,600,0001,600,000County Road 3 n/a 16-CIP-R003 97,10010,000 60,300 13,400 6,700 6,700Shady Oak Beach Improvements 3 1,697,10010,000 60,300 13,400 6,700 1,606,700GU - Other Governmental Units Total MS - Municipal State Aid Streets 01-CIP-S104 700,000700,000County Road 3 n/a 700,000700,000MS - Municipal State Aid Streets Total PA - Pavilion Fund 19-CIP-PV330 120,000120,000Pavilion - Indoor Turf System Replacement 2 20-CIP-PV333 90,00090,000Pavilion - Mezzanine Flooring Replacement 3 20-CIP-PV334 105,000105,000Pavilion - Arena Exit Door Replacement 3 22-CIP-PV335 38,00038,000Pavilion - Water Heater Replacement n/a 353,000120,000 143,000 90,000PA - Pavilion Fund Total PDF- Park Dedication Fund 13-CIP-P044 190,000190,000Improve Courts at Oakes Park and Cottageville Park n/a Thursday, August 4, 2022 42 TotalSourceProject #Priority 2023 2024 2025 2026 2027 13-CIP-P049 180,000180,000Burnes Park - Tennis Courts Reconstruction n/a 16-CIP-R003 47,9005,000 29,700 6,600 3,300 3,300Shady Oak Beach Improvements 3 20-CIP-P071 60,00060,000Central Park Picnic Shelters Rehab n/a 20-CIP-P072 100,000100,000Central Park East Play Equipment Replacement n/a 21-CIP-P073 70,00070,000Repair Valley Park Basketball Court n/a 21-CIP-P074 130,000130,000Repair Burnes Park Tennis Courts n/a 21-CIP-P075 120,000120,000Repair Play Courts-Interlachen, Elmo & Park Valley n/a 897,9005,000 449,700 136,600 123,300 183,300PDF- Park Dedication Fund Total PI - PIR/General Obligation Bonds 01-CIP-S101 11,207,0002,170,000 0 3,000,000 3,011,000 3,026,000Residential Street Improvements and Utilities n/a 13-CIP-S040 200,00025,000 25,000 100,000 25,000 25,000Pedestrian & Bicycle Access Improvements n/a 16-CIP-S041 2,400,000425,000 450,000 475,000 500,000 550,000Street Rehabilitation Improvements n/a 16-CIP-S042 100,00020,000 20,000 20,000 20,000 20,000Street Sign Management n/a 20-CIP-S001 140,000100,000 40,000Central Business District Lighting Upgrades n/a 20-CIP-S002 765,000190,000 200,000 90,000 225,000 60,000City Street Lighting Upgrades n/a 20-CIP-S005 590,000590,000Minnetonka Mills/5th St N Signal Replacement 5 15,402,0002,930,000 735,000 3,685,000 3,781,000 4,271,000PI - PIR/General Obligation Bonds Total RF - Refuse Fund 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 18,00018,000RF - Refuse Fund Total SA - Special Assessment 01-CIP-S101 4,188,0001,050,000 0 1,046,000 1,046,000 1,046,000Residential Street Improvements and Utilities n/a 4,188,0001,050,000 0 1,046,000 1,046,000 1,046,000SA - Special Assessment Total SF - Sanitary Sewer Fund 01-CIP-S101 6,127,0001,363,000 0 1,588,000 1,588,000 1,588,000Residential Street Improvements and Utilities n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 18-CIP-U016 330,00055,000 60,000 65,000 75,000 75,000Sewer Lining 2 6,475,0001,418,000 60,000 1,653,000 1,681,000 1,663,000SF - Sanitary Sewer Fund Total SU - Storm Sewer Fund 01-CIP-S101 2,352,000480,000 0 624,000 624,000 624,000Residential Street Improvements and Utilities n/a 01-CIP-U002 140,00026,000 27,000 28,000 29,000 30,000Storm Drainage System Maintenance - Alley Repairs n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 20-CIP-S005 10,00010,000Minnetonka Mills/5th St N Signal Replacement 5 2,520,000506,000 27,000 652,000 671,000 664,000SU - Storm Sewer Fund Total WF - Water Fund 01-CIP-S101 6,185,0001,430,000 0 1,585,000 1,585,000 1,585,000Residential Street Improvements and Utilities n/a 08-CIP-B023 18,00018,000Public Works - Replace Overhead Doors n/a 19-CIP-U017 5,000,0005,000,000Trunk Water Main Rehabilitation 2 11,203,0001,430,000 0 1,585,000 1,603,000 6,585,000WF - Water Fund Total Thursday, August 4, 2022 43 TotalSourceProject #Priority 2023 2024 2025 2026 2027 44,472,0007,504,000 2,007,000 9,111,000 9,043,000 16,807,000GRAND TOTAL Thursday, August 4, 2022 44 Project Descriptions And Narratives 45 46 General Public Buildings 47 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2023 2027 thru Department City Hall Administration Description 10 Ton Heating and Air Conditioning Unit for City Hall Council Chambers Project #09-CIP-CH032 Priority n/a Justification Unit was replaced in 2004, needs to be put on schedule. Budget Impact/Other Useful Life 20 yearsProject Name Council Chambers HVAC Unit Category Bldg: City Hall Type Improvement Future Total Project Cost:$15,000 Total2023 2024 2025 2026 2027Expenditures 15,00015,000Construction/Maintenance 15,000 15,000Total Total2023 2024 2025 2026 2027Funding Sources 15,00015,000CI - Capital Improvement Fund 15,000 15,000Total Thursday, August 4, 2022 48 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2023 2027 thru Department City Hall Administration Description Rooftop units for City Hall upper and lower level. One 10 ton and one 17 ton. Project #09-CIP-CH035 Priority n/a Justification Existing Units were installed in 2007. Budget Impact/Other Useful Life 20 yearsProject Name City Hall AC Rooftop Units Category Bldg: City Hall Type Improvement Future Total Project Cost:$50,000 Total2023 2024 2025 2026 2027Expenditures 50,00050,000Construction/Maintenance 50,000 50,000Total Total2023 2024 2025 2026 2027Funding Sources 50,00050,000CI - Capital Improvement Fund 50,000 50,000Total Thursday, August 4, 2022 49 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2023 2027 thru Department Comm Svcs - Activity Center Description Built up asphalt roofing system covering Raspberry Rooms, Craft Room and Hallways at the Activity Center Project #08-CIP-AC024 Priority n/a Justification Existing roof was replaced in 1992. Following inspection in 2018, move out to 2023. Budget Impact/Other Inspection, repair and upkeep of roofing systems prevent deterioration of interior building structure and damage to interior components of building. Variance from 20 year plan: Moved from 2018 to 2023 and all roof components will be done with one contract for better bids. Useful Life 25 yearsProject Name Activity Center - Raspberry Room Roof Replacement Category Buildings: Activity Center Type Improvement Future Total Project Cost:$80,000 Total2023 2024 2025 2026 2027Expenditures 80,00080,000Construction/Maintenance 80,000 80,000Total Total2023 2024 2025 2026 2027Funding Sources 80,00080,000CI - Capital Improvement Fund 80,000 80,000Total Thursday, August 4, 2022 50 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2023 2027 thru Department Comm Svcs - Activity Center Description Built up Roof on Activity Center Raspberry Rooms and Hallway. Project #09-CIP-AC031 Priority n/a Justification Existing roof was installed in 1992. Budget Impact/Other Variance from 20 year plan: Moved from 2018 to 2023 and all roof components will be done with one contract for better bids. Useful Life 25 yearsProject Name Activity Center - Lower Roof Replacement Category Buildings: Activity Center Type Improvement Future Total Project Cost:$80,000 Total2023 2024 2025 2026 2027Expenditures 80,00080,000Construction/Maintenance 80,000 80,000Total Total2023 2024 2025 2026 2027Funding Sources 80,00080,000CI - Capital Improvement Fund 80,000 80,000Total Thursday, August 4, 2022 51 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2023 2027 thru Department Comm Svcs - Activity Center Description Replace and repair mortar joints, replace damaged bricks and repair sagging window lintels. Project #22-CIP-AC052 Priority 2 Very Important Justification Brick exterior has major and minor cracking and loose mortar joints. Thre are damaged or cracked bricks that need to be removed and replaced. Two window lintels are bowing and need replacement. Budget Impact/Other Useful Life 20 yearsProject Name Activity Center - Tuckpointing & Repair of Brick Category Buildings: Activity Center Type Improvement Future Total Project Cost:$120,000 Total2023 2024 2025 2026 2027Expenditures 120,000120,000Construction/Maintenance 120,000 120,000Total Total2023 2024 2025 2026 2027Funding Sources 120,000120,000CI - Capital Improvement Fund 120,000 120,000Total Thursday, August 4, 2022 52 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2023 2027 thru Department Comm Svcs - Arts Center Description Prep work area Paint walls and soffit in theater and side vestibules of Main Theater Paint metal handrails Paint metal door frames and metal doors Apply 2 coats of paint to all surfaces Price includes paint, supplies, materials and labor If brushing and rolling does not apply over rough block, then spraying will need to take place. If spraying is needed additional charges will apply covering and prep Reupholster Fabric Sound walls in back of theater to match paint color Project #14-CIP-AR003 Priority 2 Very Important Justification The Theater has not been painted since 1997 when built. The theater seats have been recovered, the carpet has been replaced and the wall color is dated and needs a freshening up. As the highlight of the building, the theater's appearance is of utmost importance. Budget Impact/Other Did not complete in 2015, moving project forward Useful Life 15 yearsProject Name Arts Center - Paint Theatre Category Buildings: Arts Center Type Improvement Future Total Project Cost:$52,086 Total2023 2024 2025 2026 2027Expenditures 28,00028,000Construction/Maintenance 28,000 28,000Total Total2023 2024 2025 2026 2027Funding Sources 28,00028,000AC - Arts Center Fund 28,000 28,000Total Thursday, August 4, 2022 53 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2023 2027 thru Department Comm Svcs - Arts Center Description This project was originally slated for 2019, but tabled for further planning and city guideline revisions This is a multi-phase project: Phase 1: Replace existing name signage with larger and refreshed outdoor signage for front and side of building Phase 2: Create a sculptural sign in front of the Center to clearly identify the building as Hopkins Center for the Arts located at the corner of 11th & Mainstreet Phase 3: Add accent lighting to the front of the building. Project #19-CIP-AR002 Priority 2 Very Important Justification Currently the signage for Hopkins Center for the Arts above the front entrance is obstructed by trees, making Stages Theatre Co the most visible. Current signage at the top of the building on Mainstreet and 12th is very faded. We have added the logo sign to the front of the building, however, long-term permanent signage is very important to the identity of the Center. In honor of the Center's 25th year, it would be great to have Phase 1 completed Budget Impact/Other Useful Life 20 yearsProject Name Arts Center - Outdoor Signage/lighting Category Buildings: Arts Center Type Improvement Future Total Project Cost:$45,000 Total2023 2024 2025 2026 2027Expenditures 35,00025,000 10,000Construction 25,000 10,000 35,000Total Total2023 2024 2025 2026 2027Funding Sources 35,00025,000 10,000AC - Arts Center Fund 25,000 10,000 35,000Total Thursday, August 4, 2022 54 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2023 2027 thru Department Comm Svcs - Arts Center Description Retrofitting Center exterior HCA and Stages staff entrances with keycard access. The estimate for the work to equip HCA back entrance, Stages back entrance, and Green Room street entrance is $18,000 (2019.) Retrofitting interior doors over a series of 2-3 years and software upgrades is estimated at $20,000 each year (2020 - 2022) Project #19-CIP-AR005 Priority 2 Very Important Justification Installing keycard access would allow better control of who is allowed to enter the building as well as the ability to track who is in the building. Stages Theatre Company has many staff members, and many who are contracted, working as needed on a project. The contracted employees are given keys when needed, however, from a building management standpoint, it is difficult to track and make sure that people don't have access to the building that shouldn't. Long-term the goal is to key all interior office and room doors with the same system, primarily to be able to keep key situation under better control and to allow for a safe lock-down procedure if ever needed. Budget Impact/Other Useful LifeProject Name Arts Center - Key Card Exterior & Interior Access Category Buildings: Arts Center Type Improvement Future Total Project Cost:$128,000 Total2023 2024 2025 2026 2027Expenditures 50,00010,000 10,000 10,000 10,000 10,000Construction/Maintenance 10,000 10,000 10,000 10,000 10,000 50,000Total Total2023 2024 2025 2026 2027Funding Sources 50,00010,000 10,000 10,000 10,000 10,000AC - Arts Center Fund 10,000 10,000 10,000 10,000 10,000 50,000Total Thursday, August 4, 2022 55 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Arts Center Director 2023 2027 thru Department Comm Svcs - Arts Center Description Replacement of Roof Project #19-CIP-AR007 Priority 2 Very Important Justification Facility originally built in 1997. Budget Impact/Other Useful LifeProject Name Arts Center - Roof Replacement Category Buildings: Arts Center Type Improvement Future Total Project Cost:$1,000,000 Total2023 2024 2025 2026 2027Expenditures 150,000150,000Construction 150,000 150,000Total Total2023 2024 2025 2026 2027Funding Sources 75,00075,000AC - Arts Center Fund 75,00075,000CI - Capital Improvement Fund 150,000 150,000Total Thursday, August 4, 2022 56 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2023 2027 thru Department Fire Description Replace 35 ton Air Handling Unit Project #08-CIP-B121 Priority n/a Justification Budget Impact/Other Useful LifeProject Name Fire Station: Replace 25 Ton AHU Category Buildings: Fire Facilities Type Improvement Future Total Project Cost:$82,000 Total2023 2024 2025 2026 2027Expenditures 82,00082,000Construction/Maintenance 82,000 82,000Total Total2023 2024 2025 2026 2027Funding Sources 82,00082,000CI - Capital Improvement Fund 82,000 82,000Total Thursday, August 4, 2022 57 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Pavilion Manager 2023 2027 thru Department Pavilion Description Purchase of a turf system for the Pavilion's arena turf programs. Project #19-CIP-PV330 Priority 2 Very Important Justification The current system was purchased in 1998 and has exceeded its useful life. It's seams have begun to fray, the velcro is worn, and areas torn have been patched. Budget Impact/Other Possible resale of current turf system estimated between $25,000 to $30,000 Useful Life 15 yearsProject Name Pavilion - Indoor Turf System Replacement Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$120,000 Total2023 2024 2025 2026 2027Expenditures 120,000120,000Construction/Maintenance 120,000 120,000Total Total2023 2024 2025 2026 2027Funding Sources 120,000120,000PA - Pavilion Fund 120,000 120,000Total Thursday, August 4, 2022 58 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Pavilion Manager 2023 2027 thru Department Pavilion Description Replace the mezzanine vinyl tile with rubber flooring. Project #20-CIP-PV333 Priority 3 Important Justification Current flooring has cracks, gouges, and severe wear areas. Rubber floor is easier maintain and is more durable and versitle than vinyl tile. Budget Impact/Other Useful Life 20 yearsProject Name Pavilion - Mezzanine Flooring Replacement Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$90,000 Total2023 2024 2025 2026 2027Expenditures 90,00090,000Construction/Maintenance 90,000 90,000Total Total2023 2024 2025 2026 2027Funding Sources 90,00090,000PA - Pavilion Fund 90,000 90,000Total Thursday, August 4, 2022 59 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Pavilion Manager 2023 2027 thru Department Pavilion Description Replace the arena exit doors, frames, hinges, and closers. Project #20-CIP-PV334 Priority 3 Important Justification The frames and hardware are original, installed during the construction of the facility. Frames are rusting and hardware is failing. Budget Impact/Other Useful Life 15-20 yearsProject Name Pavilion - Arena Exit Door Replacement Category Bldgs: Pavillion Type Improvement Future Total Project Cost:$105,000 Total2023 2024 2025 2026 2027Expenditures 105,000105,000Construction/Maintenance 105,000 105,000Total Total2023 2024 2025 2026 2027Funding Sources 105,000105,000PA - Pavilion Fund 105,000 105,000Total Thursday, August 4, 2022 60 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact 2023 2027 thru Department Pavilion Description Replace the three 100 gallon water heaters that are used to supply hot water to the bathrooms and hot water used for ice resurfacing. Project #22-CIP-PV335 Priority n/a Justification The water heaters are at the end of useful life and in need of replacing. Budget Impact/Other Useful LifeProject Name Pavilion - Water Heater Replacement Category Unassigned Type Unassigned Future Total Project Cost:$38,000 Total2023 2024 2025 2026 2027Expenditures 38,00038,000Construction/Maintenance 38,000 38,000Total Total2023 2024 2025 2026 2027Funding Sources 38,00038,000PA - Pavilion Fund 38,000 38,000Total Thursday, August 4, 2022 61 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2023 2027 thru Department Police Description Project #08-CIP-PD215 Priority n/a Justification Budget Impact/Other Useful Life 20 yearsProject Name City Hall Police Station Rooftop Category Buildings: Police Department Type Improvement Future Total Project Cost:$240,000 Total2023 2024 2025 2026 2027Expenditures 240,000240,000Construction/Maintenance 240,000 240,000Total Total2023 2024 2025 2026 2027Funding Sources 240,000240,000CI - Capital Improvement Fund 240,000 240,000Total Thursday, August 4, 2022 62 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2023 2027 thru Department Public Works: Bldg/Equip Ser Description Replace overhead doors Project #08-CIP-B023 Priority n/a Justification Budget Impact/Other Inspected in 2019, will move from 2020 to 2022. Useful LifeProject Name Public Works - Replace Overhead Doors Category Buildings: Public Works Type Improvement Future Total Project Cost:$90,000 Total2023 2024 2025 2026 2027Expenditures 90,00090,000Construction/Maintenance 90,000 90,000Total Total2023 2024 2025 2026 2027Funding Sources 18,00018,000CI - Capital Improvement Fund 18,00018,000RF - Refuse Fund 18,00018,000SF - Sanitary Sewer Fund 18,00018,000SU - Storm Sewer Fund 18,00018,000WF - Water Fund 90,000 90,000Total Thursday, August 4, 2022 63 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Facilities Director 2023 2027 thru Department Public Works: Bldg/Equip Ser Description Purchase and install a drive over undercarriage wash system for the equipment wash bay. Project #22-CIP-B102 Priority 3 Important Justification Currently the was bay does not have an efficient process to rinse sale and direct from underneath vehicles and equipment. An undercarriage pressure washing system is a fast and effective way to rinse the salt, snow and ice that collects when plowing and will aide in the prevention of rust and prolong the useful life of equipment and lower maintenance costs. Budget Impact/Other Useful Life 20 yearsProject Name Undercarriage Wash System Category Buildings: Public Works Type Improvement Future Total Project Cost:$70,000 Total2023 2024 2025 2026 2027Expenditures 70,00070,000Construction/Maintenance 70,000 70,000Total Total2023 2024 2025 2026 2027Funding Sources 70,00070,000CI - Capital Improvement Fund 70,000 70,000Total Thursday, August 4, 2022 64 Parks and Recreation 65 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Management Analyst 2023 2027 thru Department Public Works: Parks Description Oakes Park - Reconstruct tennis courts pavement - $130,000 Cottageville Park - Rehab basketball court $60,000 Project #13-CIP-P044 Priority n/a Justification Tennis courts are badly cracked, no longer repairable. Basketball court pavement deteriorated, needs upgraded hoops and goal standards. Budget Impact/Other Useful LifeProject Name Improve Courts at Oakes Park and Cottageville Park Category Parks/Fores/Pav.: Comm. Facil. Type Improvement Future Total Project Cost:$210,000 Total2023 2024 2025 2026 2027Expenditures 190,000190,000Construction/Maintenance 190,000 190,000Total Total2023 2024 2025 2026 2027Funding Sources 190,000190,000PDF- Park Dedication Fund 190,000 190,000Total Thursday, August 4, 2022 66 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Management Analyst 2023 2027 thru Department Public Works: Parks Description Reconstruction Tennis Courts - 2 courts Project #13-CIP-P049 Priority n/a Justification Budget Impact/Other Useful LifeProject Name Burnes Park - Tennis Courts Reconstruction Category Parks/Fores/Pav.: Comm. Facil. Type Improvement Future Total Project Cost:$180,000 Total2023 2024 2025 2026 2027Expenditures 180,000180,000Construction/Maintenance 180,000 180,000Total Total2023 2024 2025 2026 2027Funding Sources 180,000180,000PDF- Park Dedication Fund 180,000 180,000Total Thursday, August 4, 2022 67 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Management Analyst 2023 2027 thru Department Public Works: Parks Description Replace roofing & fascia boards, clean and stain wood columns, glu-lam beams and tongue/groove roof deck boards, replace concrete floor slab and turf restoration for both Central Park picnic shelters Project #20-CIP-P071 Priority n/a Justification The picnic shelter are 30+ years old, look drab, concrete floor slabs are heaved and cracked. Rehab will restore the appearance and function of these picnic shelters. Budget Impact/Other Useful Life 15 yearsProject Name Central Park Picnic Shelters Rehab Category Parks/Forestry Type Improvement Future Total Project Cost:$60,000 Total2023 2024 2025 2026 2027Expenditures 60,00060,000Construction/Maintenance 60,000 60,000Total Total2023 2024 2025 2026 2027Funding Sources 60,00060,000PDF- Park Dedication Fund 60,000 60,000Total Thursday, August 4, 2022 68 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Management Analyst 2023 2027 thru Department Public Works: Parks Description Replace existing play equipment with a new play set, including demolition, new safety surfacing to provide complete access for children of all abilities. Project #20-CIP-P072 Priority n/a Justification The existing play equipment is 30 years old and needs replacement. Budget Impact/Other Useful LifeProject Name Central Park East Play Equipment Replacement Category Parks/Forestry Type Improvement Future Total Project Cost:$100,000 Total2023 2024 2025 2026 2027Expenditures 100,000100,000Construction/Maintenance 100,000 100,000Total Total2023 2024 2025 2026 2027Funding Sources 100,000100,000PDF- Park Dedication Fund 100,000 100,000Total Thursday, August 4, 2022 69 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Management Analyst 2023 2027 thru Department Public Works: Parks Description Remove and replace existing asphalt pavement and apply new color coatings system. Project #21-CIP-P073 Priority n/a Justification The court is deteriorated beyond crack sealing or top coat repairs. Needs new asphalt pavement and color coatings. Budget Impact/Other Useful LifeProject Name Repair Valley Park Basketball Court Category PW - Parks Type Improvement Future Total Project Cost:$70,000 Total2023 2024 2025 2026 2027Expenditures 70,00070,000Construction/Maintenance 70,000 70,000Total Total2023 2024 2025 2026 2027Funding Sources 70,00070,000PDF- Park Dedication Fund 70,000 70,000Total Thursday, August 4, 2022 70 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Management Analyst 2023 2027 thru Department Public Works: Parks Description Remove and replace existing asphalt pavement and apply new color coatings system. Project #21-CIP-P074 Priority n/a Justification The court is deteriorated beyond crack sealing or top coat repairs. Needs new asphalt pavement and color coatings. Budget Impact/Other Useful LifeProject Name Repair Burnes Park Tennis Courts Category PW - Parks Type Improvement Future Total Project Cost:$130,000 Total2023 2024 2025 2026 2027Expenditures 130,000130,000Construction/Maintenance 130,000 130,000Total Total2023 2024 2025 2026 2027Funding Sources 130,000130,000PDF- Park Dedication Fund 130,000 130,000Total Thursday, August 4, 2022 71 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Management Analyst 2023 2027 thru Department Public Works: Parks Description Remove and replace existing asphalt pavement. Project #21-CIP-P075 Priority n/a Justification The court is deteriorated beyond crack sealing or top coat repairs. Needs new asphalt pavement. Budget Impact/Other Useful LifeProject Name Repair Play Courts-Interlachen, Elmo & Park Valley Category PW - Parks Type Unassigned Future Total Project Cost:$120,000 Total2023 2024 2025 2026 2027Expenditures 120,000120,000Construction/Maintenance 120,000 120,000Total Total2023 2024 2025 2026 2027Funding Sources 120,000120,000PDF- Park Dedication Fund 120,000 120,000Total Thursday, August 4, 2022 72 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Management Analyst 2023 2027 thru Department Recreation Description The joint recreation agreement in place between the cities of Hopkins and Minnetonka provides for the sharing of operational and maintenance expenses for Shady Oak Beach. These expenses are split 33% city of Hopkins and 67% city of Minnetonka. Shady Oak Beach is operated from June - August annually; however the park is available for use year round. 2021: Dock maintenance ($10,000) 2022: Miscellaneous building components, i.e. installation of energy efficient lighting in restrooms/gate area, patio tables and chairs ($15,000); inflatables replacement ($10,000) 2023: Miscellaneous building maintenance ($10,000) 2024: Inflatable replacement ($10,000) 2025: Miscellaneous building maintenance ($10,000) Project #16-CIP-R003 Priority 3 Important Justification Shady Oak Beach is jointly operated by the cities of Hopkins and Minnetonka. The facility is open from June - August each summer with the revenues generated from season pass sales and daily admissions. The facility was most recently renovated in 1998. An addiitional renovation on the lifeguard shack was completed in 2021. 2023: Miscellaneous building/grounds maintenance; miscellaneous building equipment/components, i.e. concession equipment, patio tables and chairs 2024: Inflatable replacement ($10,000); parking lot mill and overlay ($80,000) 2025: Miscellaneous building maintenance 2026: Miscellaneous building maintenance 2027: Miscellaneous building maintenance Budget Impact/Other Useful Life 10-20 yearsProject Name Shady Oak Beach Improvements Category PW - Parks Type Improvement Future Total Project Cost:$465,000 Total2023 2024 2025 2026 2027Expenditures 145,00015,000 90,000 20,000 10,000 10,000Construction/Maintenance 15,000 90,000 20,000 10,000 10,000 145,000Total Total2023 2024 2025 2026 2027Funding Sources 97,10010,000 60,300 13,400 6,700 6,700GU - Other Governmental Units 47,9005,000 29,700 6,600 3,300 3,300PDF- Park Dedication Fund 15,000 90,000 20,000 10,000 10,000 145,000Total Thursday, August 4, 2022 73 74 Streets, Traffic & Transportation 75 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2023 2027 thru Department Public Works: Streets/Traffic Description Locations to be determined consistent with the street reconstruction program. Program includes reconstruction of deteriorated water main, sanitary sewer and storm sewer in conjunction with street improvement projects. Utility improvements are consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. 2023: West Central Avenues 2025-2027: Central Avenues Reconstruction 2028: South Avenues (14th, 15th, 16th and 17th) --- projected Project #01-CIP-S101 Priority n/a Justification In most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be installed new. In most cases, water main and sanitary sewer need to be rehabilitated in conjunction with street reconstruction. The costs assume the city funding 100% of major storm sewer, water main, and sanitary sewer improvements. Budget Impact/Other Public Hearing - year prior to planned construction Plans and specifications - year prior to planned construction Bid - year of planned construction Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections. Consistent with the City Council adopted Roadway Improvement Policy, Street Ratings, Pavement Management Program, Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. Useful Life UnassignedProject Name Residential Street Improvements and Utilities Category Trans: Streets Type Improvement Future Total Project Cost:$74,808,000 Total2023 2024 2025 2026 2027Expenditures 30,059,0006,493,000 0 7,843,000 7,854,000 7,869,000Construction/Maintenance 6,493,000 0 7,843,000 7,854,000 7,869,000 30,059,000Total Total2023 2024 2025 2026 2027Funding Sources 11,207,0002,170,000 0 3,000,000 3,011,000 3,026,000PI - PIR/General Obligation Bonds 4,188,0001,050,000 0 1,046,000 1,046,000 1,046,000SA - Special Assessment 6,127,0001,363,000 0 1,588,000 1,588,000 1,588,000SF - Sanitary Sewer Fund 2,352,000480,000 0 624,000 624,000 624,000SU - Storm Sewer Fund 6,185,0001,430,000 0 1,585,000 1,585,000 1,585,000WF - Water Fund 6,493,000 0 7,843,000 7,854,000 7,869,000 30,059,000Total Thursday, August 4, 2022 76 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2023 2027 thru Department Public Works: Streets/Traffic Description County Road 3 from Shady Oak Road to Meadowbrook Road. Lighting, landscaping, street, etc. improvements along Excelsior Boulevard from the east to west city limits. GO Bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue Project has been delayed pending county funding for remaining 4th segement. Project #01-CIP-S104 Priority n/a Justification Deficiencies in terms of roadway condition, traffic/pedestrian movement, safety and aesthetics appear in remaining segment of County Road 3. Segment 4 from Blake Road to Meadowbrook Road; upgrade roadway, implement beautification program. Budget Impact/Other GO bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue. Segment 4: Planning and acquisition - Not in County Funding Plan, when funded city will complete our portion. Consistent with Hennepin County CIP and City Council action. Useful Life UnassignedProject Name County Road 3 Category Trans: Streets Type Improvement Future Total Project Cost:$2,300,000 Total2023 2024 2025 2026 2027Expenditures 2,300,0002,300,000Construction/Maintenance 2,300,000 2,300,000Total Total2023 2024 2025 2026 2027Funding Sources 1,600,0001,600,000GU - Other Governmental Units 700,000700,000MS - Municipal State Aid Streets 2,300,000 2,300,000Total Thursday, August 4, 2022 77 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2023 2027 thru Department Public Works: Streets/Traffic Description Painting bike lanes, constructing trails and sidewalks, safety improvements and other general pedestrian and bicycle improvements to the system. 2025: Upgrade of the 11th Ave South pedestrian crossings in the Wesbrooke Area to pedestrian activated RRFB. Project #13-CIP-S040 Priority n/a Justification Council adopted plan to increase pedestrian and bicycle access and safety, these improvements begin to implement that plan. The existing overhead flushers provide very little benefit. Pedestrian activated rectangular rapid flushing beacons (RRFB) have shown to provide very high compliance for motorists and increases pedestrian safety and comfort. Budget Impact/Other Useful Life 20 yearsProject Name Pedestrian & Bicycle Access Improvements Category Trans: Streets Type Improvement Future Total Project Cost:$425,000 Total2023 2024 2025 2026 2027Expenditures 200,00025,000 25,000 100,000 25,000 25,000Construction/Maintenance 25,000 25,000 100,000 25,000 25,000 200,000Total Total2023 2024 2025 2026 2027Funding Sources 200,00025,000 25,000 100,000 25,000 25,000PI - PIR/General Obligation Bonds 25,000 25,000 100,000 25,000 25,000 200,000Total Thursday, August 4, 2022 78 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2023 2027 thru Department Public Works: Streets/Traffic Description Location to be determined based on Pavement Management Program. Program includes mill and overlay of deteriorated pavements to extend the useful life of the street. Streets for this method of rehabilitation have usually been rehabilitated or reconstructed within the last 20 years. 2023: 11th Ave S, Lot 700 2024: 1st St S, South Central Business District Avenues 2025: Robbinwood Ln. Hwy 7 Service Drive, 5th St N 2026: Washington Ave N, Jackson Ave N, St Louis St 2027: 12th, 13th, 15th, 16th Ave S Project #16-CIP-S041 Priority n/a Justification Properly timed mill and overlay projects can significantly extend the life of a street and delay the need for reconstruction. Mill and overlay projects also require less disturbance and are shorter in duration than reconstruction, which results in less impact of the traveling public. Budget Impact/Other Annual pavement rehabilitation category. Useful LifeProject Name Street Rehabilitation Improvements Category Trans: Streets Type Improvement Future Total Project Cost:$5,025,000 Total2023 2024 2025 2026 2027Expenditures 2,400,000425,000 450,000 475,000 500,000 550,000Construction/Maintenance 425,000 450,000 475,000 500,000 550,000 2,400,000Total Total2023 2024 2025 2026 2027Funding Sources 2,400,000425,000 450,000 475,000 500,000 550,000PI - PIR/General Obligation Bonds 425,000 450,000 475,000 500,000 550,000 2,400,000Total Thursday, August 4, 2022 79 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2023 2027 thru Department Public Works: Streets/Traffic Description Replacement of aged regulatory and warning signs that have lost minimum retroreflectivity and replacement of posts, when needed. Project #16-CIP-S042 Priority n/a Justification The city is required to have a sign management program which includes a sign replacement strategy to ensure regulatory and warning signs provide adequate retroreflectivity. Sign replacement cycle is 8 years. Estimated costs assume sign replacements by contract. Parking signs will be replaced as needed due to age, fading, etc. Sign inventory data base will be updated to reflect install date/sign age. Budget Impact/Other Useful LifeProject Name Street Sign Management Category Trans: Streets Type Improvement Future Total Project Cost:$240,000 Total2023 2024 2025 2026 2027Expenditures 100,00020,000 20,000 20,000 20,000 20,000Construction/Maintenance 20,000 20,000 20,000 20,000 20,000 100,000Total Total2023 2024 2025 2026 2027Funding Sources 100,00020,000 20,000 20,000 20,000 20,000PI - PIR/General Obligation Bonds 20,000 20,000 20,000 20,000 20,000 100,000Total Thursday, August 4, 2022 80 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2023 2027 thru Department Public Works: Streets/Traffic Description Upgrade existing lighting in the Central Business District to newer LED fixtures, replace light poles and electrical service feed cabinets, as needed. 2023: Mainstreet East of 5th Ave - 20 fixtures 10th, 11th and 12th Ave N & S of Mainstreet - 52 fixtures Parking Lots 500 and 600 - 15 fixtures 2024: 7th, 8th and 9th Ave N & S of Mainstreet - 28 fixtures Parking Lots 700 and 750 - 8 fixtures Project #20-CIP-S001 Priority n/a Justification There is a need to continue the upgrade of lighting in the Central Business District. The Mainstreet lights were all upgraded to LED fixtures in 2015. An upgrade to LED fixtures will provide energy savings, maintenance savings and create a more uniform lighting appearance throughout the downtown area. Budget Impact/Other Useful LifeProject Name Central Business District Lighting Upgrades Category Trans: Street Lights Type Improvement Future Total Project Cost:$140,000 Total2023 2024 2025 2026 2027Expenditures 140,000100,000 40,000Construction 100,000 40,000 140,000Total Total2023 2024 2025 2026 2027Funding Sources 140,000100,000 40,000PI - PIR/General Obligation Bonds 100,000 40,000 140,000Total Thursday, August 4, 2022 81 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2023 2027 thru Department Public Works: Streets/Traffic Description Street lighting upgrades are needed to replace deteriorated poles, electrical feedpoints and old, energy inefficent fixtures. 2022: Feltl Court street lighting: replace 10 lights, poles and electrical feedpoint. 2023: 11th Ave S, south of 7th St S, replace 18 poles and fixtures and one electrical feedpoint. 2024: Hobby Acres neighborhood streets, replace 17th poles and fixtures to match Xcel Energy upgraded poles/lights and three electrical feedpoints. 2025: Westbrooke Way street lighting, upgrade 22 lights, poles and wiring via new Xcel Energy agreement to replace expired 30-year agreement 2026: Excelsior Boulevard street lighting, upgrade lighting to LED fixtures via Xcel Energy upgrade program. 2027: Upgrade/Replace 8 Power Feed Points Project #20-CIP-S002 Priority n/a Justification A replacement plan is needed as these lighting and electrical feed systems are reaching the end of their useful life, with out-dated electrical cabinets, poles and bases and old, energy inefficent light fixtures. Budget Impact/Other Useful LifeProject Name City Street Lighting Upgrades Category Trans: Street Lights Type Improvement Future Total Project Cost:$875,000 Total2023 2024 2025 2026 2027Expenditures 765,000190,000 200,000 90,000 225,000 60,000Construction 190,000 200,000 90,000 225,000 60,000 765,000Total Total2023 2024 2025 2026 2027Funding Sources 765,000190,000 200,000 90,000 225,000 60,000PI - PIR/General Obligation Bonds 190,000 200,000 90,000 225,000 60,000 765,000Total Thursday, August 4, 2022 82 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2023 2027 thru Department Public Works: Streets/Traffic Description Replacement and upgrading of traffic signal infrastructure including poles, mast arms, cabinets and controls, signal heads, pedestrian heads, and pushbuttons.The work will also include upgrading the pedestrian ramps and crossings to meet ADA standards. 2027: Removal and replacement of signal and ADA upgrades Project #20-CIP-S005 Priority 5 Future Consideration Justification The existing signal is old and reaching the end of it's service life. Pedestrian crossing and ADA improvements should be completed as there are increased levels of both pedestrian and vehicular traffic through the intersection since the development of the Excelsior Crossings office park and improvements to Burnes Park. Budget Impact/Other Useful LifeProject Name Minnetonka Mills/5th St N Signal Replacement Category Trans: Sign/Signals Type Improvement Future Total Project Cost:$600,000 Total2023 2024 2025 2026 2027Expenditures 600,000600,000Construction/Maintenance 600,000 600,000Total Total2023 2024 2025 2026 2027Funding Sources 590,000590,000PI - PIR/General Obligation Bonds 10,00010,000SU - Storm Sewer Fund 600,000 600,000Total Thursday, August 4, 2022 83 84 Utilities 85 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2023 2027 thru Department Public Works: Utilities Description Annual concrete repairs and patching of existing alleys. Project #01-CIP-U002 Priority n/a Justification Annual alley pavement concrete slab repairs are needed. Budget Impact/Other Consistent with the Storm Water Management Plan. Useful Life UnassignedProject Name Storm Drainage System Maintenance - Alley Repairs Category Utilities: Municipal Sanitary Se Type Improvement Future Total Project Cost:$423,000 Total2023 2024 2025 2026 2027Expenditures 140,00026,000 27,000 28,000 29,000 30,000Construction/Maintenance 26,000 27,000 28,000 29,000 30,000 140,000Total Total2023 2024 2025 2026 2027Funding Sources 140,00026,000 27,000 28,000 29,000 30,000SU - Storm Sewer Fund 26,000 27,000 28,000 29,000 30,000 140,000Total Thursday, August 4, 2022 86 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2023 2027 thru Department Public Works: Utilities Description This will help us line our sanitary sewers to eliminate infiltration root intrusion and avoid expensive repairs and sewer backups. Project #18-CIP-U016 Priority 2 Very Important Justification We have an old collection system that needs immediate attention. Continuously cleaning the sewer does not stop roots or infiltration from going into the pipes, we need a more permanent fix. The majority of our sanitary sewer pipe is made out of clay pipe and has reached its life expectancy. Budget Impact/Other Useful LifeProject Name Sewer Lining Category Utilities: Municipal Sanitary Se Type Improvement Future Total Project Cost:$582,500 Total2023 2024 2025 2026 2027Expenditures 330,00055,000 60,000 65,000 75,000 75,000Construction/Maintenance 55,000 60,000 65,000 75,000 75,000 330,000Total Total2023 2024 2025 2026 2027Funding Sources 330,00055,000 60,000 65,000 75,000 75,000SF - Sanitary Sewer Fund 55,000 60,000 65,000 75,000 75,000 330,000Total Thursday, August 4, 2022 87 CAPITAL IMPROVEMENT PLAN City of Hopkins, MN - CIP Contact Public Works Director 2023 2027 thru Department Public Works: Utilities Description Program includes rehabilitatation of trunk water mains around the city. Staff has conducted some non-destructive condition assessment testing of various trunk lines around the city. The testing determines a level of deterioration based on a calculated reduction of thickness of the pipe wall. Review of how critical the line is, break records, pipe age, and soil conditions are also considered in determining projects. 2027: Replacement of trunk main as informed by non-destructive testing at various locations. Project #19-CIP-U017 Priority 2 Very Important Justification Trunk water mains are large diameter, high capacity lines that are critical to supply water to and from the water treatment plant, water towers, and distribution lines around the city and cannot easily be taken out of service. Public Works staff has been managing the trunk main system as a standalone asset, as these mains cannot always be included for rehabilitation with street reconstruction projects. Much of the city's trunk system was constructed over 50 years ago and is approaching the end of it's service life. Budget Impact/Other Useful LifeProject Name Trunk Water Main Rehabilitation Category Utilities: Municipal Water Syst Type Improvement Future Total Project Cost:$8,955,000 Total2023 2024 2025 2026 2027Expenditures 5,000,0005,000,000Construction/Maintenance 5,000,000 5,000,000Total Total2023 2024 2025 2026 2027Funding Sources 5,000,0005,000,000WF - Water Fund 5,000,000 5,000,000Total Thursday, August 4, 2022 88