2025-2029 Capital Improvement PlanAmended on February 18, 2025 CAPITAL IMPROVEMENT PLAN 2025-2029 DATE: November 12, 2024 TO: Honorable Mayor and Members of the City Council FROM: Mike Mornson, City Manager SUBJECT: 2025-2029 CAPITAL IMPROVEMENT PLAN With this letter I respectfully submit the 2025-2029 Capital Improvement Plan. This five- year planning document represents the combined efforts of city staff, advisory commissions, residents and the City Council. The Capital Improvement Plan is a five-year forecast of project needs in the City of Hopkins. It is intended to alert the Council and residents to the major capital needs on the horizon. The first year of the plan becomes an adopted capital budget and relates almost completely to the operating budget that is approved on a yearly basis. The remaining four year represents an estimate of project needs and funding capabilities of the city. This plan does not include proposed equipment purchases. A document relating specifically to equipment replacement needs has been developed into a separate document. The Capital Improvement Plan is intended to serve as a planning tool and is therefore structured to present a meaningful, long-range perspective of the city’s capital programming needs. At the same time, sufficient projected detail is provided to enable those who review the information to make informed decisions on the programming of projects over the next several years. Please use the information provided to formulate plans, projects and questions. The Capital Improvement Plan can serve the community best by provoking thoughts and actions. This document was developed by the Finance Department with assistance of all city departments. I want to especially thank all those involved in the development of the Capital Improvement Plan and especially Chuck Autio, Public Works Director, Eric Klingbeil, City Engineer, Kersten Elverum, Planning and Economic Development Director, Casey Casella, Assistant City Manager and Nick Bishop, Finance Director for their hard work and dedication. 2 Page City Manager's Message 2 Table of Contents 3 Introduction Introduction and Purpose 4 Program Descriptions Utilities Program 5 Transportation Program 6 Parks, Forestry, and Pavilion Program 8 General Public Buildings Program 9 Economic Development 11 Sources of Funding Sources of Funding 12 Funding Source Abreviations 15 Cash Flow Statements Park Capital Improvement Fund 16 Capital Improvement Fund 17 Permanent Improvement Revolving Fund (PIR)18 Five-Year Project Summaries Department Summary 19 Projects by Department 20 Funding Source Summary 22 Projects by Funding Source 23 Project Descriptions & Narratives City Wide 27 City Hall 28 Activity Center 31 Arts Center 35 Depot 44 Fire Station 45 Pavilion 48 907 Mainstreet (Hopkins Historical Society)53 Public Works Building 54 Parks 56 Streets 66 Utilities 78 CAPITAL IMPROVEMENT PLAN 2025-2029 TABLE OF CONTENTS 3 INTRODUCTION AND PURPOSE The Capital Improvement Plan is a flexible plan based upon long-range physical planning and financial projections, which schedules the major public improvements that may be incurred by the City over the next five years. Flexibility of the Capital Improvement Plan is established through annual review, and revision if necessary. The annual review assures that the program will become a continuing part of the budgetary process and that it will be consistent with changing demands as well as changing patterns in cost and financial resources. Funds are appropriated only for the first year of the program, which is then included in the annual budget. The Capital Improvement Plan serves as a tool for implementing certain aspects of the City's comprehensive plan; therefore, the program describes the overall objectives of City development, the relationship between projects with respect to timing and need, and the City's fiscal capabilities. The Capital Improvement Plan can help assure: 1. A systematic approach to planning and initiating capital projects affording the opportunity to plan the location, timing, and financing of needed public improvements; 2. The development of a realistic program of capital spending within the City's projected fiscal capability to finance such projects, avoiding sharp change in the tax levy or bonded indebtedness; 3. The coordination of public and private improvement projects permitting adequate time for design and engineering to eliminate duplication of effort and expense; 4. The expenditure of public funds that is compatible with the City's adopted Comprehensive Plan; 5. That the public is kept informed of the proposed future projects and expenditures; 6. That private investors are aware of the City's long-range development program so that they may guide their development in a way that is compatible with the City's program; 7. Aid in achieving federal and/or state participation by providing the necessary planning and lead time necessary for a successful application in addition to meeting prerequisites needed for certain federal and state grants. 4 PROGRAM DESCRIPTIONS In order to effectively plan for and manage the projects contained in a Capital Improvement Plan, it is necessary to group similar activities into "Program Categories". The City of Hopkins' activities are divided into four program categories which are 1) Utilities, 2) Transportation, 3) Parks, Forestry and Pavilion, and 4) General Public Buildings. The City also includes an outline of proposed expenditures for unscheduled projects. Program categories are explained in the following sections. UTILITIES PROGRAM Program Description: The Utilities Program includes the municipal water, municipal sanitary sewer, storm sewer and refuse systems. Program Goal: Provide reliable, efficient, and safe utility service to all parts of the City with a minimum of adverse effects on the environment. Subprograms: Water, sanitary sewer, storm sewer, and refuse service. I. Municipal Water System Subprogram (WA) A. Subprogram Goal: The goal of the Municipal Water System subprogram is to provide water in sufficient quantities at sufficient pressure, with a high degree of reliability and safety to all parts of the City so as to satisfy the normal demands of the general public for water while at the same time providing sufficient reserves in case of fire emergency or power outages. B. Objectives: 1. Water quality shall meet the purity standards of the Minnesota Department of Health. 2. Any hydrant on the system shall, under maximum condition, deliver no less than 500 gallons per minute with a residual pressure of 20 pounds per square inch. 3. The system shall be looped to provide maximum reliability. 4. The supply and storage system shall be designed and maintained to have maximum reliability. 5 II. Municipal Sanitary Sewer Subprogram (SA) A. Subprogram Goal: The goal of the Municipal Sanitary Sewer subprogram is to promote a healthful environment by collecting all sewage from existing and projected development in a sanitary and economic manner. B. Objectives: 1. Provide sewer lines of adequate size and grade to collect and transmit all discharge sewage. 2. Prevent sewage from overflowing into the natural environment. 3. Prevent sewage back-ups. 4. Encourage or promote connection of all generators of sewage to the Municipal system. 5. Meet the effluent and infiltration standards of the Metropolitan Waste Control Commission. III. Storm Sewer Subprogram (SS) A. Subprogram Goal: Manage and control surface and ground waters in order to protect the man-made and natural environment in a safe and efficient manner. B. Objectives: 1. Prevent flooding. 2. Prevent damage to property due to erosion. 3. Meet water quality standards established by the controlling regulatory law or authority. TRANSPORTATION PROGRAM Program Description: This program includes streets, walkways, traffic signs and signals, vehicular parking facilities, and street lighting. Program Goal: Provide for the safe and efficient movement of people and goods throughout the city. Subprograms: Streets, Walkways/Sidewalks, Signs/Signals, Parking Facilities, and Street Lights. 6 I. Streets Subprogram (ST) A. Subprogram Goal: The goal of the Streets subprogram is to provide safe, convenient, economic public streets to best facilitate the movement of vehicular traffic. B. Objectives: 1. Streets should be constructed with permanent surfaces, concrete curb and gutter, and with ancillary storm drainage, to standards established by the City. 2. Streets should be of a size and load capacity consistent with their functional classifications. 3. Timely major repair to preserve the basic capital investment in streets. II. Walkways/Sidewalks Subprogram (WS) A. Subprogram Goal: To provide a safe and convenient pedestrian system with incidental recreational benefits. III. Signs/Signals Subprogram (SI) A. Subprogram Goal: The goal of the Signs/Signals subprogram is to provide an efficient and orderly system of street and traffic signing so as to promote safe, convenient travel throughout the City. B. Objectives: 1. Signs and signals should be installed in conformity with the Minnesota Manual on Uniform Traffic Control Devices. 2. Periodic surveys and studies should be made to document the effectiveness of City signing patterns. IV. Parking Facilities Subprogram (PA) A. Subprogram Goal: To provide such supporting facilities as will promote maximum use of public parking spaces by employers, employees, customers, and visitors. B. Objectives: 1. Provide parking facilities for present and anticipated needs of the City of Hopkins. 7 V.Street Lights Subprogram (SL) A.Subprogram Goal: To provide a system of street lighting within the City that will promote safe and convenient vehicular and pedestrian travel on City Streets. B.Objectives: 1. To provide lighting at each street intersection within the City. 2. To provide mid-block street lighting in conformance with the City's street lighting policy, in order to provide equitable, cost efficient lighting. 3. To continually update the system so as to provide energy and cost efficient lighting. PARKS, FORESTRY AND PAVILION PROGRAM Program Description: This program includes community parks, neighborhood parks, open spaces, recreational structures and facilities. Program Goal: The goal of the Park and Recreation Program is to provide facilities for safe, stimulating, and comprehensive leisure time activities of Hopkins citizens. Subprograms: Neighborhood Facilities, Community Facilities I.Neighborhood Facilities Subprogram (NF) A.Subprogram Goals: To acquire ownership or use rights of park sites located to provide convenient walking access to all Hopkins citizens and to develop such sites to provide optimum recreational serviceability consistent with the preservation and enhancement of pleasing aesthetic qualities. B.Objectives: 1. Acquire property or use rights on those neighborhoods that do not have convenient walking access to neighborhood park facilities. 2. Develop neighborhood park facilities to meet the needs of various user groups. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Preserve and enhance the aesthetic qualities of neighborhood parks. 8 II. Community Facilities Subprogram (CF) A. Subprogram Goals: The goal of the Community Facilities subprogram is to develop, or acquire ownership or use rights of sites which serve the entire City and to provide facilities that serve community-wide needs. B. Objectives: 1. Acquire sites that have valuable and unique natural characteristics to preserve irreplaceable community resources. 2. Preserve by acquisition, gift, or other arrangement properties that have valuable historic-cultural qualities. 3. Preserve and maintain existing structures and facilities in order to retain current service and safety levels. 4. Construct or acquire structures and facilities necessary to meet the changing needs of the community. GENERAL PUBLIC BUILDINGS PROGRAM Program Description: The General Public Buildings Program includes all municipal buildings except those provided for in the Utility and Park Facilities Program. Program Goal: Provide buildings that are adequate and convenient for the efficient accommodation of City functions. Subprograms: Administrative Offices, Maintenance Facilities, Fire Facilities, Community Center. I. Administrative Offices Subprogram (AO) A. Subprogram Goal: The goal of the Administrative Offices subprogram is to provide facilities for the efficient and safe conduct of legislative and administrative functions of the City. B. Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of the City services. 9 II.Maintenance Facilities Subprogram (MF) A.Subprogram Goal: The goal of the Maintenance Facilities subprogram is to provide facilities for the efficient and safe conduct of City maintenance functions. B.Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repair. 2. Upgrade facilities as necessary to provide for the efficient, safe, and effective provision of City services. III.Fire Facilities Subprogram (FF) A.Subprogram Goal: To provide a fire station, or stations, for storage of Fire Department equipment and for the training and meetings of volunteer fire fighters to provide prompt and efficient protection to life and property. B.Objectives: 1. Provide a maximum four-minute daytime and three-minute nighttime response to all points within the City. 2. Meet objective 1 through the use of volunteers. IV.Community Center Subprogram (CC) A.Subprogram Goal: To provide a community facility, or facilities, which meet the social, recreational, and cultural needs of all citizens, particularly senior citizens. B.Objectives: 1. Maintain current facilities in a state of good repair so as to maximize cost effectiveness and avoid costly repairs. 2. Construct or acquire structures and facilities necessary to meet the changing needs of the City. 3. Upgrade facilities as necessary to provide for efficient, safe, and effective provision of City services. 10 ECONOMIC DEVELOPMENT PROGRAM Program Description: This program includes redevelopment projects that have been identified through adopted plans and goals of the City of Hopkins. Program Goal: To facilitate the redevelopment of key sites in order to achieve the state objectives of the project. Objectives: 1. Elimination of blight or blighting conditions 2. Creation of jobs 3. Increase property value(s) 4. Catalyst of additional redevelopment 5. Environmental clean-up 6. Increase transit-oriented development around LRT stations 11 SOURCES OF FUNDING In order to fund the anticipated Capital Improvements, the City must draw upon a variety of sources. Many of these sources have a specific or "dedicated" purpose (i.e., the water utility fund will finance water main installation but not a street overlay). Therefore, it is important to identify the uses and limitations of the various revenue sources. CURRENT REVENUES - GENERAL FUND (CR) This represents funding from current year revenue collections in the General Fund that support operations and capital outlay expenditures. Revenue sources include property tax levies, state aid payments, and various permit and license fees. This source of funding is generally used only for operations and small capital purchases. GENERAL FUND RESERVES (GR) Reserves of the general fund are the funds remaining after subtracting cash flow and emergency amounts from the City's cash balance, sometimes referred to as "fund balance". The use of General Fund Reserves is not recommended for Capital Improvements without significant staff and Council review. COMMUNICATION (formerly Cable TV) FUND (CT) This funding source consists of franchise fees received from the local Cable TV company, in excess of the amounts earmarked for the access programming and commission budgets. Expenditures are limited to cable-related facilities, or must have a cable related purpose. ECONOMIC DEVELOPMENT FUND (ED) This funding source was established by the Housing and Redevelopment Authority (HRA) and the City of Hopkins, to provide funding for the purpose of promoting development and redevelopment within the City. The Economic Development fund is a revolving fund administered by the HRA, intended to provide an ongoing funding source used to reduce or extend the long term debt involved with development and redevelopment activities. The HRA reviews all proposed uses of this fund on an individual basis. GRANT-IN-AID (GA) This is aid received from either the Federal or State government. In many cases, grants are made on matching basis, which means the City shares a portion of the costs of the project being funded. 12 MUNICIPAL STATE AID STREETS (MS) This funding source represents funds received from the State of Minnesota to support construction and maintenance of State Aid classified municipal streets. State law defines the types and limits of State Aid Streets expenditures. PERMANENT IMPROVEMENT REVOLVING/GENERAL OBLIGATION BONDS (PI) Improvements with a life of several years may be financed from the proceeds of a General Obligation Bond Issue. Law limits the total debt that can be incurred under this method of financing. With some exception, General Obligation Bonds are generally subject to a referendum process. Examples of projects, which may not require a referendum, are those financed through the use of special assessments where at least 20 percent of the project cost is assessed to the benefiting property owners. The remaining portion not assessed can be financed through general obligation bonds repaid by a tax levy. PRIVATE SECTOR FUNDING (PF) This funding source consists primarily of payments made by developers for the purchase of land, the installation of water, sewer, or streets or other related expenditures. It can also refer to donations made to the City by individuals or groups. OTHER GOVERNMENTAL UNITS (GU) These are funds received from Hennepin County, adjacent communities, etc. for projects that also benefit a jurisdiction other than the City of Hopkins. REVENUE BONDS (RB) These are bonds issued for improvements made for specific revenue producing facility or operation. The debt incurred is repaid from the revenue generated by the facility. If the revenue generated is insufficient, then the difference becomes an annual obligation of the taxpayers and becomes an additional tax levy. These are generally not subject to referendum. REAL ESTATE SALES FUND (RE) This funding source consists primarily of funds built up from the sale of City owned property. To date, the fund has been used for building improvements. Because the sale of both general City property and park/recreation property are accumulated into this fund, earmarking a portion for recreational purposes may be justified. 13 SPECIAL ASSESSMENT (SA) A number of projects may be realistically financed using Special Assessment to pay the ultimate cost. Almost any project can potentially be financed using the assessment process. In each case it is necessary to make a determination that the assessed property will benefit by the amount of the assessment. The cost of street reconstruction is shared by the property owner and the City. Special assessments to individual properties are capped per city policy. Concurrent improvement costs to the utility systems are assumed by the respective utility funds. TAX INCREMENT FINANCING (TF) This funding source results from the tax value of new development that is "incrementally" greater than the existing tax value. Typically, bonds are sold based on the assumption that the higher tax receipts will retire the bonds. However, the use of TIF funds through a "pay as you go" method has become more common. This type of funding can be used for public improvements within a redevelopment district to support the goals of redevelopment, specifically the elimination of blighted conditions. Approval of the Hopkins HRA should be anticipated prior to the commitment of these funds. State law strictly regulates the use of these funds. WATER FUNDS (WF) Water funds consist of revenue generated from the sale of water. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. SANITARY SEWER FUNDS (SF) Sanitary sewer funds consist of revenue generated from charges made for sewage disposal. The cost of operations plus system (capital) improvements determines the ultimate charge levied for the service provided. STORM SEWER UTILITY REVENUES (SU) Storm sewer funds consist of revenue generated by charging storm water drainage fee to parcels of land for the availability and use of municipal storm sewer facilities. Expenditures from this funding source are related to drainage facilities. PAVILION FUND (PA) Pavilion Funds consist of revenues generated from rental fees collected from users of the Pavilion. These funds are utilized to pay for operating, and capital expenditures. 14 Funding Sources Communication (formerly Cable TV) Fund CT Current Revenues – General Fund CR General Fund Reserves GR Economic Development Fund ED Grant-In-Aid GA Housing and Redevelopment Authority HRA Municipal State-Aid Streets MS Other Government Units GU Park Dedication Fund PDF Pavilion Fund PA Permanent Improvement Revolving/General Obligation Bonds PI Private Sector Funds PF Real Estate Sales Fund RE Revenue Bonds RB Sanitary Sewer Fund SF Special Assessment SA Storm Sewer Fund SU Tax Increment Financing TF Water Fund WF 15 2025 2026 2027 2028 2029 Projected Beginning Fund Balance Restricted for Park Dedication Costs 376,100 376,100 2,076,100 2,076,100 2,076,100 Committed for Park Improvements & Maintenance 385,688 386,706 316,034 292,734 509,434 Total Projected Begining Fund Balance 761,788 762,806 2,392,134 2,368,834 2,585,534 Revenues & Other Financing Sources Franchise Fees 355,000 355,000 355,000 355,000 355,000 Grants and Other Government Contributions - 3,000,000 2,250,000 2,250,000 - Park Dedication Fees - 1,700,000 - - - Interest Earnings 7,618 7,628 - - - Bond Proceeds - 3,000,000 2,250,000 2,250,000 - Total Revenue & Other Financing Sources 362,618 8,062,628 4,855,000 4,855,000 355,000 Expenditures & Other Financing Uses Current Expenditures 15,000 15,000 15,000 15,000 15,000 Capital Projects Shady Oak Beach Improvements 6,600 3,300 3,300 3,300 3,300 Central Park Tennis Courts 220,000 - - - - Central Park Renovation - 6,000,000 - - - Repair Valley Park Volleyball Court - 80,000 - - - Repair Burnes Park Tennis Court - 130,000 - - - Downtown Park Stage - Electric - 25,000 - - - Valley Park Basketball Court - 60,000 - - - Oakes & Valley Parks Recreation & Resilience Hubs - -4,500,000 4,500,000 - Maetzold Field Lighting - -150,000 - - Repair Play Courts - Elmo & Park Valley - -90,000 - - Debt Service Transfers Cottageville Park Bonds 120,000 120,000 120,000 120,000 120,000 Total Expenditures and Other Financing Sources 361,600 6,433,300 4,878,300 4,638,300 138,300 Increase (Decrease) in Fund Balance 1,018 1,629,328 (23,300) 216,700 216,700 Projected Ending Fund Balance Restricted for Park Dedication Costs 376,100 2,076,100 2,076,100 2,076,100 2,076,100 Committed for Park Improvements & Maintenance 386,706 316,034 292,734 509,434 726,134 Total Projected Ending Fund Balance 762,806 2,392,134 2,368,834 2,585,534 2,802,234 Park Improvement Fund - Projected Cash Flows 16 2025 2026 2027 2028 2029 Beginning Fund Balance 269,759 66,895 96,064 270,525 419,730 Revenues & Other Financing Sources Tax Levy 445,000 250,000 250,000 250,000 250,000 Franchise Fees 361,500 361,500 361,500 361,500 361,500 Interest Earnings 2,698 669 961 2,705 4,197 Bond Proceeds (roof replacement)- - 1,300,000 1,650,000 - Total Revenue & Other Financing Sources 809,198 612,169 1,912,461 2,264,205 615,697 Expenditures & Other Financing Uses Capital Projects Activity Center - Tuckpointing & Brick Repair 120,000 - - - - Activity Center - Roof Replacement & Flashing 250,000 - - - - Depot - Remodel and Upgrade 32,062 - - - - City Wide - Door Access Controls 225,000 - - - - Parking Ramp - Security Cameras 25,000 - - - - Activity Center - Gender Neutral Bathroom - 40,000 - - - Activity Center - Gynmasium Floor - 25,000 - - - City Hall - Council Chamber HVAC Unit - 18,000 - - - City Hall/Police Station - Roof Replacement - 140,000 - - - Arts Center - Roof Replacement - - 750,000 - - City Hall - AC Rooftop Units - - 60,000 - - Fire Station - Roof Replacement - - 550,000 - - Public Works - Replace Overhead Doors - - 18,000 - - 907 Mainstreet - Windows & Doors - - - 105,000 - City Hall - Roof Replacement - - - 850,000 - Public Works - Roof Replacement - - - 800,000 - Fire Station - Replace Make-Up Air Units - - - - 14,000 Fire Station - Replace Overhead Doors - - - - 145,000 Debt Service Transfers - City Hall 360,000 360,000 360,000 360,000 360,000 Total Expenditures and Other Financing Sources 1,012,062 583,000 1,738,000 2,115,000 519,000 Increase (Decrease) in Fund Balance (202,864) 29,169 174,461 149,205 96,697 Projected Ending Fund Balance 66,895 96,064 270,525 419,730 516,427 Capital Improvement Fund - Projected Cash Flows 17 2025 2026 2027 2028 2029 Beginning Fund Balance 269,759 258,457 292,542 295,467 314,922 Revenues & Other Financing Sources Tax Levy 50,000 420,000 260,000 275,000 585,000 Grants and Other Government Contributions - - 3,790,000 2,300,000 Special Assessments (Prepaid)120,000 120,000 156,000 130,000 136,500 Interest Earnings 2,698 2,585 2,925 2,955 3,149 Bond Proceeds 4,900,000 4,900,000 3,650,000 5,450,000 5,700,000 Total Revenue & Other Financing Sources 5,072,698 5,442,585 7,858,925 5,857,955 8,724,649 Expenditures & Other Financing Uses Capital Projects Residential Street Improvements 4,437,000 4,437,000 - 4,930,000 5,176,500 17th Avenue Reconstruction - - 6,400,000 - - Minnetonka Mills/5th Intersetion Improvement - - 590,000 - - County Road 3 - - - - 2,300,000 Pedestrian & Bicycle Access Improvements 100,000 27,500 30,000 32,500 35,000 Street Rehabilitation (Mill & Overlay)475,000 500,000 550,000 575,000 600,000 Street Sign Management 22,000 24,000 26,000 26,000 - Street Lighting Upgrades - 200,000 90,000 225,000 535,000 Central Business District Lighting Upgrades - 40,000 - - - Mainstreet Banner Pole Installation - 130,000 120,000 - - Excelsior Fencing 50,000 50,000 50,000 50,000 50,000 Total Expenditures and Other Financing Sources 5,084,000 5,408,500 7,856,000 5,838,500 8,696,500 Increase (Decrease) in Fund Balance (11,302) 34,085 2,925 19,455 28,149 Projected Ending Fund Balance 258,457 292,542 295,467 314,922 343,071 Permanent Improvement Revolving - Projected Cash Flows 18 2025 through 2029 Capital Improvement Plan Hopkins, MN CIPDepartment Summary Department 2025 2026 2027 2028 2029 Total Administration 225,000 225,000 City Hall Administration 158,000 60,000 850,000 1,068,000 Comm Svcs - Activity Center 380,000 65,000 445,000 Comm Svcs - Arts Center 116,000 135,000 833,000 105,000 1,189,000 Depot/ACE Program 45,262 45,262 Fire 550,000 159,000 709,000 Pavilion 92,500 189,000 92,500 9,500 383,500 Public Works: Bldg/Equip Serv 90,000 1,705,000 1,795,000 Public Works: Parks 220,000 6,295,000 4,740,000 4,500,000 15,755,000 Public Works: Streets/Traffic 9,549,000 9,848,500 10,066,000 8,206,500 11,182,900 48,852,900 Public Works: Utilities 933,000 374,000 5,105,000 132,500 120,000 6,664,500 Recreation 20,000 10,000 10,000 10,000 10,000 60,000 GRAND TOTAL 11,580,762 17,074,500 21,546,500 15,509,000 11,481,400 77,192,162 Produced Using Plan-It CIP Software 19 2025 through 2029 Capital Improvement Plan Hopkins, MN CIPProjects By Department Department Project #2025 2026 2027 2028 2029 Total Administration City Wide Door Access Controls 24-CIP-AD001 225,000 225,000 Administration Total 225,000 0 0 0 0 225,000 City Hall Administration City Hall AC Rooftop Units 09-CIP-CH035 60,000 60,000 City Hall/Police Station - Roof Replacement 23-CIP-CH038 140,000 850,000 990,000 Council Chambers HVAC Unit 09-CIP-CH032 18,000 18,000 City Hall Administration Total 0 158,000 60,000 850,000 0 1,068,000 Comm Svcs - Activity Center Activity Center - Gender Neutral Bathroom 24-CIP-AC057 10,000 40,000 50,000 Activity Center - Gymnasium Floor 24-CIP-AC058 25,000 25,000 Activity Center - Roof Replacement & Flashing 23-CIP-AC053 250,000 250,000 Activity Center - Tuckpointing & Repair of Brick 22-CIP-AC052 120,000 120,000 Comm Svcs - Activity Center Total 380,000 65,000 0 0 0 445,000 Comm Svcs - Arts Center Arts Center - Access/Lockdown System 19-CIP-AR005 50,000 30,000 30,000 110,000 Arts Center JC Studio Sound System & Projection 24-CIP-AR006 31,000 31,000 Arts Center - Main Theater Lighting Upgrades 24-CIP-AR007 20,000 20,000 Arts Center - Main Theater Stage Floor Replacement 24-CIP-AR008 15,000 15,000 Arts Center - Outdoor Signage/lighting 19-CIP-AR002 25,000 25,000 50,000 Arts Center - Paint Theatre 14-CIP-AR003 28,000 28,000 Arts Center - Restroom Remodel 24-CIP-AR009 105,000 105,000 Arts Center - Roof Replacement 19-CIP-AR007 750,000 750,000 Arts Center - Theater Curtains 17-CIP-AR004 80,000 80,000 Comm Svcs - Arts Center Total 116,000 135,000 833,000 105,000 0 1,189,000 Depot/ACE Program Depot Remodel and Upgrade Project 24-CIP-DP001 45,262 45,262 Depot/ACE Program Total 45,262 0 0 0 0 45,262 Fire Fire - Replace Roof 08-CIP-B125 550,000 550,000 Fire Station - Replace Make-up Air Units 08-CIP-B122 14,000 14,000 Fire Station - Replace overhead doors 08-CIP-B124 145,000 145,000 Fire Total 0 0 550,000 0 159,000 709,000 Produced Using Plan-It CIP Software 20 Pavilion Pavilion - Arena Exit Door Replacement 20-CIP-PV334 92,500 75,000 17,500 185,000 Pavilion - Bleacher Heating Replacement 23-CIP-PV337 75,000 75,000 Pavilion - Roof Replacement 23-CIP-PV336 100,000 100,000 Pavilion Team Room HVAC Unit 16-CIP-PV329 9,500 9,500 Pavilion - Warming House Window Blinds 23-CIP-PV339 14,000 14,000 Pavilion Total 92,500 189,000 92,500 0 9,500 383,500 Public Works: Bldg/Equip Serv 907 Mainstreet (HHS) Windows & Front/Back Door 21-CIP-B101 105,000 105,000 Public Works - Replace Overhead Doors 08-CIP-B023 90,000 90,000 Public Works - Replace Roofing 08-CIP-B022 1,600,000 1,600,000 Public Works: Bldg/Equip Serv Total 0 0 90,000 1,705,000 0 1,795,000 Public Works: Parks Central Park Renovation 23-CIP-P076 6,000,000 6,000,000 Central Park Tennis Courts 24-CIP-P077 220,000 220,000 Downtown Park Stage - Electric 24-CIP-P078 25,000 25,000 Maetzold Field Lighting 24-CIP-P080 150,000 150,000 Oakes & Valley Parks Recreation & Resilience Hubs 24-CIP-P081 4,500,000 4,500,000 9,000,000 Repair Burnes Park Tennis Courts 21-CIP-P074 130,000 130,000 Repair Play Courts- Elmo & Park Valley 21-CIP-P075 90,000 90,000 Repair Valley Park Volleyball Court 21-CIP-P073 80,000 80,000 Valley Park Basketball Court 24-CIP-P079 60,000 60,000 Public Works: Parks Total 220,000 6,295,000 4,740,000 4,500,000 0 15,755,000 Public Works: Streets/Traffic 17th Ave Reconstruction 24-CIP-S010 8,600,000 8,600,000 Central Business District Lighting Upgrades 20-CIP-S001 40,000 40,000 City Street Lighting Upgrades 20-CIP-S002 200,000 90,000 225,000 535,000 1,050,000 County Road 3 01-CIP-S104 2,300,000 2,300,000 Excelsrior Blvd. Fencing 23-CIP-S008 50,000 50,000 50,000 50,000 50,000 250,000 Mainstreet Banner Pole Installation 23-CIP-S007 130,000 120,000 250,000 Minnetonka Mills/5th St N Intersection Improvement 20-CIP-S005 600,000 600,000 Parking Ramp Cameras 24-CIP-S009 25,000 25,000 Pedestrian & Bicycle Access Improvements 13-CIP-S040 100,000 27,500 30,000 32,500 35,000 225,000 Residential Street Improvements and Utilities 01-CIP-S101 8,877,000 8,877,000 7,298,000 7,662,900 32,714,900 Street Rehabilitation Improvements 16-CIP-S041 475,000 500,000 550,000 575,000 600,000 2,700,000 Street Sign Management 16-CIP-S042 22,000 24,000 26,000 26,000 98,000 Public Works: Streets/Traffic Total 9,549,000 9,848,500 10,066,000 8,206,500 11,182,900 48,852,900 Public Works: Utilities SCADA Fiber Project 23-CIP-U022 400,000 400,000 Sewer Lining 18-CIP-U016 65,000 75,000 75,000 80,000 85,000 380,000 Storm Drainage System Maintenance - Alley Repairs 01-CIP-U002 28,000 29,000 30,000 32,500 35,000 154,500 Trunk Utility Rehabilitation 19-CIP-U017 5,000,000 5,000,000 Water Treatment Plant - Roof Replacement 23-CIP-U018 270,000 20,000 290,000 Well #6 Emergency Generator 24-CIP-U023 350,000 350,000 Yard Waste Storage Building 24-CIP-U024 90,000 90,000 Public Works: Utilities Total 933,000 374,000 5,105,000 132,500 120,000 6,664,500 Department Project #2025 2026 2027 2028 2029 Total Produced Using Plan-It CIP Software 21 2025 through 2029 Capital Improvement Plan Hopkins, MN CIPFunding Source Summary Source 2025 2026 2027 2028 2029 Total AC - Arts Center Fund 116,000 135,000 83,000 105,000 439,000 CI - Capital Improvement Fund 652,062 223,000 1,378,000 1,755,000 159,000 4,167,062 CR - Current Revenues - Tax Levy 50,000 420,000 260,000 275,000 585,000 1,590,000 GA - Grant-In-Aid 2,000,000 2,250,000 2,250,000 6,500,000 GU - Other Governmental Units 26,600 1,006,700 6,700 6,700 1,606,700 2,653,400 MS - Municipal State Aid Streets 3,790,000 700,000 4,490,000 OP - Operating Budget 10,000 10,000 PA - Pavilion Fund 92,500 189,000 92,500 9,500 383,500 PDF- Park Dedication Fund 226,600 3,298,300 2,493,300 2,253,300 3,300 8,274,800 PI - PIR/General Obligation Bonds 3,910,000 3,864,500 3,026,000 4,913,500 5,129,000 20,843,000 RF - Refuse Fund 90,000 18,000 50,000 158,000 SA - Special Assessment 1,124,000 1,124,000 780,000 650,000 682,500 4,360,500 SF - Sanitary Sewer Fund 1,817,000 1,627,000 693,000 1,980,000 1,817,500 7,934,500 SU - Storm Sewer Fund 1,160,000 1,161,000 558,000 822,500 602,000 4,303,500 WF - Water Fund 2,306,000 2,026,000 6,118,000 448,000 186,900 11,084,900 GRAND TOTAL 11,580,762 17,074,500 21,546,500 15,509,000 11,481,400 77,192,162 Produced Using Plan-It CIP Software 22 2025 through 2029 Capital Improvement Plan Hopkins, MN CIPProjects By Funding Source Summary Source Project #2025 2026 2027 2028 2029 Total AC - Arts Center Fund Arts Center - Access/Lockdown System 19-CIP-AR005 50,000 30,000 30,000 110,000 Arts Center JC Studio Sound System & Projection 24-CIP-AR006 31,000 31,000 Arts Center - Main Theater Lighting Upgrades 24-CIP-AR007 20,000 20,000 Arts Center - Main Theater Stage Floor Replacement 24-CIP-AR008 15,000 15,000 Arts Center - Outdoor Signage/lighting 19-CIP-AR002 25,000 25,000 50,000 Arts Center - Paint Theatre 14-CIP-AR003 28,000 28,000 Arts Center - Restroom Remodel 24-CIP-AR009 105,000 105,000 Arts Center - Theater Curtains 17-CIP-AR004 80,000 80,000 AC - Arts Center Fund Total 116,000 135,000 83,000 105,000 0 439,000 CI - Capital Improvement Fund 907 Mainstreet (HHS) Windows & Front/Back Door 21-CIP-B101 105,000 105,000 Activity Center - Gender Neutral Bathroom 24-CIP-AC057 40,000 40,000 Activity Center - Gymnasium Floor 24-CIP-AC058 25,000 25,000 Activity Center - Roof Replacement & Flashing 23-CIP-AC053 250,000 250,000 Activity Center - Tuckpointing & Repair of Brick 22-CIP-AC052 120,000 120,000 Arts Center - Roof Replacement 19-CIP-AR007 750,000 750,000 City Hall AC Rooftop Units 09-CIP-CH035 60,000 60,000 City Hall/Police Station - Roof Replacement 23-CIP-CH038 140,000 850,000 990,000 City Wide Door Access Controls 24-CIP-AD001 225,000 225,000 Council Chambers HVAC Unit 09-CIP-CH032 18,000 18,000 Depot Remodel and Upgrade Project 24-CIP-DP001 32,062 32,062 Fire - Replace Roof 08-CIP-B125 550,000 550,000 Fire Station - Replace Make-up Air Units 08-CIP-B122 14,000 14,000 Fire Station - Replace overhead doors 08-CIP-B124 145,000 145,000 Parking Ramp Cameras 24-CIP-S009 25,000 25,000 Public Works - Replace Overhead Doors 08-CIP-B023 18,000 18,000 Public Works - Replace Roofing 08-CIP-B022 800,000 800,000 CI - Capital Improvement Fund Total 652,062 223,000 1,378,000 1,755,000 159,000 4,167,062 CR - Current Revenues - Tax Levy Central Business District Lighting Upgrades 20-CIP-S001 40,000 40,000 City Street Lighting Upgrades 20-CIP-S002 200,000 90,000 225,000 535,000 1,050,000 Excelsrior Blvd. Fencing 23-CIP-S008 50,000 50,000 50,000 50,000 50,000 250,000 Mainstreet Banner Pole Installation 23-CIP-S007 130,000 120,000 250,000 CR - Current Revenues - Tax Levy Total 50,000 420,000 260,000 275,000 585,000 1,590,000 Produced Using Plan-It CIP Software 23 GA - Grant-In-Aid Central Park Renovation 23-CIP-P076 2,000,000 2,000,000 Oakes & Valley Parks Recreation & Resilience Hubs 24-CIP-P081 2,250,000 2,250,000 4,500,000 GA - Grant-In-Aid Total 0 2,000,000 2,250,000 2,250,000 0 6,500,000 GU - Other Governmental Units Central Park Renovation 23-CIP-P076 1,000,000 1,000,000 County Road 3 01-CIP-S104 1,600,000 1,600,000 Depot Remodel and Upgrade Project 24-CIP-DP001 13,200 13,200 Shady Oak Beach Improvements 16-CIP-R003 13,400 6,700 6,700 6,700 6,700 40,200 GU - Other Governmental Units Total 26,600 1,006,700 6,700 6,700 1,606,700 2,653,400 MS - Municipal State Aid Streets 17th Ave Reconstruction 24-CIP-S010 3,790,000 3,790,000 County Road 3 01-CIP-S104 700,000 700,000 MS - Municipal State Aid Streets Total 0 0 3,790,000 0 700,000 4,490,000 OP - Operating Budget Activity Center - Gender Neutral Bathroom 24-CIP-AC057 10,000 10,000 OP - Operating Budget Total 10,000 0 0 0 0 10,000 PA - Pavilion Fund Pavilion - Arena Exit Door Replacement 20-CIP-PV334 92,500 75,000 17,500 185,000 Pavilion - Bleacher Heating Replacement 23-CIP-PV337 75,000 75,000 Pavilion - Roof Replacement 23-CIP-PV336 100,000 100,000 Pavilion Team Room HVAC Unit 16-CIP-PV329 9,500 9,500 Pavilion - Warming House Window Blinds 23-CIP-PV339 14,000 14,000 PA - Pavilion Fund Total 92,500 189,000 92,500 0 9,500 383,500 PDF- Park Dedication Fund Central Park Renovation 23-CIP-P076 3,000,000 3,000,000 Central Park Tennis Courts 24-CIP-P077 220,000 220,000 Downtown Park Stage - Electric 24-CIP-P078 25,000 25,000 Maetzold Field Lighting 24-CIP-P080 150,000 150,000 Oakes & Valley Parks Recreation & Resilience Hubs 24-CIP-P081 2,250,000 2,250,000 4,500,000 Repair Burnes Park Tennis Courts 21-CIP-P074 130,000 130,000 Repair Play Courts- Elmo & Park Valley 21-CIP-P075 90,000 90,000 Repair Valley Park Volleyball Court 21-CIP-P073 80,000 80,000 Shady Oak Beach Improvements 16-CIP-R003 6,600 3,300 3,300 3,300 3,300 19,800 Valley Park Basketball Court 24-CIP-P079 60,000 60,000 PDF- Park Dedication Fund Total 226,600 3,298,300 2,493,300 2,253,300 3,300 8,274,800 Source Project #2025 2026 2027 2028 2029 Total Produced Using Plan-It CIP Software 24 PI - PIR/General Obligation Bonds 17th Ave Reconstruction 24-CIP-S010 1,830,000 1,830,000 Minnetonka Mills/5th St N Intersection Improvement 20-CIP-S005 590,000 590,000 Pedestrian & Bicycle Access Improvements 13-CIP-S040 100,000 27,500 30,000 32,500 35,000 225,000 Residential Street Improvements and Utilities 01-CIP-S101 3,313,000 3,313,000 4,280,000 4,494,000 15,400,000 Street Rehabilitation Improvements 16-CIP-S041 475,000 500,000 550,000 575,000 600,000 2,700,000 Street Sign Management 16-CIP-S042 22,000 24,000 26,000 26,000 98,000 PI - PIR/General Obligation Bonds Total 3,910,000 3,864,500 3,026,000 4,913,500 5,129,000 20,843,000 RF - Refuse Fund Public Works - Replace Overhead Doors 08-CIP-B023 18,000 18,000 Public Works - Replace Roofing 08-CIP-B022 50,000 50,000 Yard Waste Storage Building 24-CIP-U024 90,000 90,000 RF - Refuse Fund Total 90,000 0 18,000 50,000 0 158,000 SA - Special Assessment 17th Ave Reconstruction 24-CIP-S010 780,000 780,000 Residential Street Improvements and Utilities 01-CIP-S101 1,124,000 1,124,000 650,000 682,500 3,580,500 SA - Special Assessment Total 1,124,000 1,124,000 780,000 650,000 682,500 4,360,500 SF - Sanitary Sewer Fund 17th Ave Reconstruction 24-CIP-S010 600,000 600,000 Public Works - Replace Overhead Doors 08-CIP-B023 18,000 18,000 Public Works - Replace Roofing 08-CIP-B022 250,000 250,000 Residential Street Improvements and Utilities 01-CIP-S101 1,552,000 1,552,000 1,650,000 1,732,500 6,486,500 SCADA Fiber Project 23-CIP-U022 200,000 200,000 Sewer Lining 18-CIP-U016 65,000 75,000 75,000 80,000 85,000 380,000 SF - Sanitary Sewer Fund Total 1,817,000 1,627,000 693,000 1,980,000 1,817,500 7,934,500 SU - Storm Sewer Fund 17th Ave Reconstruction 24-CIP-S010 500,000 500,000 Minnetonka Mills/5th St N Intersection Improvement 20-CIP-S005 10,000 10,000 Public Works - Replace Overhead Doors 08-CIP-B023 18,000 18,000 Public Works - Replace Roofing 08-CIP-B022 250,000 250,000 Residential Street Improvements and Utilities 01-CIP-S101 1,132,000 1,132,000 540,000 567,000 3,371,000 Storm Drainage System Maintenance - Alley Repairs 01-CIP-U002 28,000 29,000 30,000 32,500 35,000 154,500 SU - Storm Sewer Fund Total 1,160,000 1,161,000 558,000 822,500 602,000 4,303,500 Source Project #2025 2026 2027 2028 2029 Total Produced Using Plan-It CIP Software 25 WF - Water Fund 17th Ave Reconstruction 24-CIP-S010 1,100,000 1,100,000 Public Works - Replace Overhead Doors 08-CIP-B023 18,000 18,000 Public Works - Replace Roofing 08-CIP-B022 250,000 250,000 Residential Street Improvements and Utilities 01-CIP-S101 1,756,000 1,756,000 178,000 186,900 3,876,900 SCADA Fiber Project 23-CIP-U022 200,000 200,000 Trunk Utility Rehabilitation 19-CIP-U017 5,000,000 5,000,000 Water Treatment Plant - Roof Replacement 23-CIP-U018 270,000 20,000 290,000 Well #6 Emergency Generator 24-CIP-U023 350,000 350,000 WF - Water Fund Total 2,306,000 2,026,000 6,118,000 448,000 186,900 11,084,900 GRAND TOTAL 11,580,762 17,074,500 21,546,500 15,509,000 11,481,400 77,192,162 Source Project #2025 2026 2027 2028 2029 Total Produced Using Plan-It CIP Software 26 City Wide Door Access Controls 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-AD001 Project Name City Wide Door Access Controls Total Project Cost $225,000 Contact Police Chief Department Administration Type Improvement Category Buildings - Multiple Status Active Useful Life 10 years Description Door access control system controls entry to every City owned facility, including critical infrastructure sites, with electronic locking systems. Door access control migration to modern integrated system - $175,000 Contracted labor costs and miscellaneous hardware needs - $50,000 Total estimated cost - $225,000 Justification/Sustainability The Police Department houses the main equipment for the door access control system. The system was last updated in 2005, and technology advancements have resulted in the existing system be vulnerable to unauthorized access. Such unauthorized access has the potential to be catastrophic to public health and leave critical infrastructure at risk. Modern door access control secures publicly owned facilities, and provides necessary protection for critical infrastructure such as the City water supply. Modern door access control can integrate into the current public safety camera system allowing for enhanced security and remove video monitoring. Expenditures 2025 2026 2027 2028 2029 Total Construction 225,000 0 0 0 0 225,000 Total 225,000 0 0 0 0 225,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 225,000 0 0 0 0 225,000 Total 225,000 0 0 0 0 225,000 Produced Using Plan-It CIP Software 27 City Hall AC Rooftop Units 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #09-CIP-CH035 Project Name City Hall AC Rooftop Units Total Project Cost $60,000 Department City Hall Administration Type Improvement Category Bldg: City Hall Status Active Useful Life 20 years Description Rooftop units for City Hall upper and lower level. One 10 ton and one 17 ton. Justification/Sustainability Existing Units were installed in 2007. Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 0 60,000 0 0 60,000 Total 0 0 60,000 0 0 60,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 0 0 60,000 0 0 60,000 Total 0 0 60,000 0 0 60,000 Produced Using Plan-It CIP Software 28 City Hall/Police Station - Roof Replacement 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #23-CIP-CH038 Project Name City Hall/Police Station - Roof Replacement Total Project Cost $990,000 Department City Hall Administration Type Improvement Category Bldg: City Hall Status Active Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 140,000 0 850,000 0 990,000 Total 0 140,000 0 850,000 0 990,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 0 140,000 0 850,000 0 990,000 Total 0 140,000 0 850,000 0 990,000 Produced Using Plan-It CIP Software 29 Council Chambers HVAC Unit 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #09-CIP-CH032 Project Name Council Chambers HVAC Unit Total Project Cost $18,000 Department City Hall Administration Type Improvement Category Bldg: City Hall Status Active Useful Life 20 years Description 10 Ton Heating and Air Conditioning Unit for City Hall Council Chambers Justification/Sustainability Unit was replaced in 2004, needs to be put on schedule. Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 18,000 0 0 0 18,000 Total 0 18,000 0 0 0 18,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 0 18,000 0 0 0 18,000 Total 0 18,000 0 0 0 18,000 Produced Using Plan-It CIP Software 30 Activity Center - Gender Neutral Bathroom 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-AC057 Project Name Activity Center - Gender Neutral Bathroom Total Project Cost $50,000 Contact Activity Ctr Director Department Comm Svcs - Activity Center Type Improvement Category Buildings: Activity Center Status Active Useful Life 20 years Description Phase 1: Consult with Architect to convert second floor restrooms to gender neutral Phase 2: Add gender neutral restrooms if plans permit and upgrade current restrooms to be handicap accessible by adding push-button door opening hardware to current men's and women's restrooms Estimating cost at $40,000. Will not have actual costs until architectural consultation. Justification/Sustainability In order to make our facilities accessible and welcoming to all, we would like to add a gender neutral restroom at the Activity Center. At the same time, we would also like to add handicap accessible push buttons to open existing men's and women's restroom doors. Give the age of the clientele, this is often requested. Expenditures 2025 2026 2027 2028 2029 Total Construction 0 40,000 0 0 0 40,000 Planning/Design 10,000 0 0 0 0 10,000 Total 10,000 40,000 0 0 0 50,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 0 40,000 0 0 0 40,000 OP - Operating Budget 10,000 0 0 0 0 10,000 Total 10,000 40,000 0 0 0 50,000 Produced Using Plan-It CIP Software 31 Activity Center - Gymnasium Floor 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-AC058 Project Name Activity Center - Gymnasium Floor Total Project Cost $25,000 Contact Activity Ctr Director Department Comm Svcs - Activity Center Type Improvement Category Buildings: Activity Center Status Active Useful Life 20 years Description Refinish and repair gymnasium floor Justification/Sustainability The gymnasium floor will need to be refinished in the near future to maintain its quality. Pickle ball players have complained that there are several 'dead' spots in the floor that will also need to be addressed in order for it to be viable for Pickle Ball rentals and events. Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 25,000 0 0 0 25,000 Total 0 25,000 0 0 0 25,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 0 25,000 0 0 0 25,000 Total 0 25,000 0 0 0 25,000 Produced Using Plan-It CIP Software 32 Activity Center - Roof Replacement & Flashing 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #23-CIP-AC053 Project Name Activity Center - Roof Replacement & Flashing Total Project Cost $250,000 Department Comm Svcs - Activity Center Type Improvement Category Buildings: Activity Center Status Active Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 250,000 0 0 0 0 250,000 Total 250,000 0 0 0 0 250,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 250,000 0 0 0 0 250,000 Total 250,000 0 0 0 0 250,000 Produced Using Plan-It CIP Software 33 Activity Center - Tuckpointing & Repair of Brick 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #22-CIP-AC052 Project Name Activity Center - Tuckpointing & Repair of Brick Total Project Cost $120,000 Department Comm Svcs - Activity Center Type Improvement Category Buildings: Activity Center Status Active Useful Life 20 years Description Replace and repair mortar joints, replace damaged bricks and repair sagging window lintels. Justification/Sustainability Brick exterior has major and minor cracking and loose mortar joints. Thre are damaged or cracked bricks that need to be removed and replaced. Two window lintels are bowing and need replacement. Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 120,000 0 0 0 0 120,000 Total 120,000 0 0 0 0 120,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 120,000 0 0 0 0 120,000 Total 120,000 0 0 0 0 120,000 Produced Using Plan-It CIP Software 34 Arts Center - Access/Lockdown System 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #19-CIP-AR005 Project Name Arts Center - Access/Lockdown System Total Project Cost $210,500 Department Comm Svcs - Arts Center Type Improvement Category Buildings: Arts Center Status Active Description Access Control System with Lockdown Capacity including equipment and installation. Phase 1: $43,500 Phase 2: $32,000 Phase 3: $27,000 Phase 1 & 2 completed in 2024/2025. Install locking and security mechanisms that will allow for panic button locking system in an emergency lockdown situation throughout the building. System will be integrated with security camera system. Justification/Sustainability Installing keycard access would allow better control of who is allowed to enter the building as well as the ability to track who is in the building. Stages Theatre Company has many staff members, and many who are contracted, working as needed on a project. The contracted employees are given keys when needed, however, from a building management standpoint, it is difficult to track and make sure that people don't have access to the building that shouldn't. Long-term the goal is to key all interior office and room doors with the same system, primarily to be able to keep key situation under better control and to allow for a safe lock-down procedure if ever needed. Prior Expenditures 2025 2026 2027 2028 2029 Total 100,500 Construction/Maintenance 50,000 30,000 30,000 0 0 110,000 Total 50,000 30,000 30,000 0 0 110,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 100,500 AC - Arts Center Fund 50,000 30,000 30,000 0 0 110,000 Total 50,000 30,000 30,000 0 0 110,000 Produced Using Plan-It CIP Software 35 Arts Center JC Studio Sound System & Projection 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-AR006 Project Name Arts Center JC Studio Sound System & Projection Total Project Cost $31,000 Contact Arts Center Director Department Comm Svcs - Arts Center Type Equipment Category Buildings: Arts Center Status Active Useful Life 7 years Description Upgrade sound system in the JC Studio $9,000: mixer, rack, laptop input, wireless mic antennas $7,000: main speakers $3,300: subwoofers $4,000: labor $2,000: electrician $5,000: projection screen (estimate) Justification/Sustainability The sound sytem in the JC Studio is old and owned by Stages Theatre Co. Only one of the speakers is currently working. Running sound for HCA involves multiple cables and wire hook-ups which often degrade the sound. If a renter wishes to have sound at a small concert or event, Stages is now charging $60/hour for tech service which often deter customers from renting. This upgrade will be easier for staff to operate and create better sound quality. Expenditures 2025 2026 2027 2028 2029 Total Equipment 31,000 0 0 0 0 31,000 Total 31,000 0 0 0 0 31,000 Funding Sources 2025 2026 2027 2028 2029 Total AC - Arts Center Fund 31,000 0 0 0 0 31,000 Total 31,000 0 0 0 0 31,000 Produced Using Plan-It CIP Software 36 Arts Center - Main Theater Lighting Upgrades 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-AR007 Project Name Arts Center - Main Theater Lighting Upgrades Total Project Cost $20,000 Contact Arts Center Director Department Comm Svcs - Arts Center Type Improvement Category Buildings: Arts Center Status Active Useful Life 15 years Description Upgrade theater lighting system to make it LED compatible $20,000 estimate Justification/Sustainability The lighting system in the theater is original to the building. We have made a transition to LED bulbs throughout the Art Center In order for the lights to dim properly with LED bulbs we have had to have several indandescent bulbs intermixed. It is becoming impossible to find the incandescent bulbs that we need in order for this to work. An upgrade/retrofit needs to be made to the system to allow us to use all LED bulbs. Expenditures 2025 2026 2027 2028 2029 Total Equipment 20,000 0 0 0 0 20,000 Total 20,000 0 0 0 0 20,000 Funding Sources 2025 2026 2027 2028 2029 Total AC - Arts Center Fund 20,000 0 0 0 0 20,000 Total 20,000 0 0 0 0 20,000 Produced Using Plan-It CIP Software 37 Arts Center - Main Theater Stage Floor Replacement 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-AR008 Project Name Arts Center - Main Theater Stage Floor Replacement Total Project Cost $15,000 Contact Arts Center Director Department Comm Svcs - Arts Center Type Improvement Category Buildings: Arts Center Status Active Useful Life 20 years Description Replace flooring on State $15,000 Estimate Justification/Sustainability The stage flooring is original to the building and starting to show major wear. Due to its age, it is starting to lift on the edges which may cause hazards for tripping. Expenditures 2025 2026 2027 2028 2029 Total Construction 15,000 0 0 0 0 15,000 Total 15,000 0 0 0 0 15,000 Funding Sources 2025 2026 2027 2028 2029 Total AC - Arts Center Fund 15,000 0 0 0 0 15,000 Total 15,000 0 0 0 0 15,000 Produced Using Plan-It CIP Software 38 Arts Center - Outdoor Signage/lighting 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #19-CIP-AR002 Project Name Arts Center - Outdoor Signage/lighting Total Project Cost $100,000 Department Comm Svcs - Arts Center Type Improvement Category Buildings: Arts Center Status Active Useful Life 20 years Description This project was originally slated for 2019, but tabled for further planning and city guideline revisions This is a multi-phase project: Phase 1: Replace existing name signage with imporved and refreshed outdoor signage on front of building Phase 2: Create signage/marquee/sculptural piece in front of Center that clearly identifies the building as Hopkins Center for the Arts Phase 3: Continue impage improvements Justification/Sustainability Currently the signage for Hopkins Center for the Arts is obstructed by trees and in need of updates. Stages Theatre signage is more visible causing confusion regarding the building. This project is estimated to exceed $100,000. Part of the funding for this project will be raised through donations with assistance from the Friends and City leadership. Prior Expenditures 2025 2026 2027 2028 2029 Total 50,000 Construction 0 0 25,000 25,000 0 50,000 Total 0 0 25,000 25,000 0 50,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 50,000 AC - Arts Center Fund 0 0 25,000 25,000 0 50,000 Total 0 0 25,000 25,000 0 50,000 Produced Using Plan-It CIP Software 39 Arts Center - Paint Theatre 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #14-CIP-AR003 Project Name Arts Center - Paint Theatre Total Project Cost $52,086 Department Comm Svcs - Arts Center Type Improvement Category Buildings: Arts Center Status Active Useful Life 15 years Description Prep work area Paint walls and soffit in theater and side vestibules of Main Theater Paint metal handrails Paint metal door frames and metal doors Apply 2 coats of paint to all surfaces Price includes paint, supplies, materials and labor If brushing and rolling does not apply over rough block, then spraying will need to take place. If spraying is needed additional charges will apply covering and prep Reupholster Fabric Sound walls in back of theater to match paint color Justification/Sustainability The Theater has not been painted since 1997 when built. The theater seats have been recovered, the carpet has been replaced and the wall color is dated and needs a freshening up. As the highlight of the building, the theater's appearance is of utmost importance. Prior Expenditures 2025 2026 2027 2028 2029 Total 24,086 Construction/Maintenance 0 0 28,000 0 0 28,000 Total 0 0 28,000 0 0 28,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 24,086 AC - Arts Center Fund 0 0 28,000 0 0 28,000 Total 0 0 28,000 0 0 28,000 Budget Impact Did not complete in 2015, moving project forward Produced Using Plan-It CIP Software 40 Arts Center - Restroom Remodel 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-AR009 Project Name Arts Center - Restroom Remodel Total Project Cost $105,000 Contact Arts Center Director Department Comm Svcs - Arts Center Type Improvement Category Buildings: Arts Center Status Active Useful Life 20 years Description Phase 1: Consult with architect to converst secon floor restrooms to gender neutral restrooms Phase 2: Convert second floor restrooms to gender neutral and possibly one family restroom if plans permit. Upgrade main floor restrooms with new stall partitions, toilet paper dispensers, motion activated faucets and upgraded tile floors Estimated cost at $105,000. Architectural consultation in 2025 will help determine actual cost. Justification/Sustainability We receive requests for gender neutral restrooms. When requested, we have to shut down one of the public restrooms for individual use. The second floor restroom seems to be the most economical way of doing this. Due to the complexity of this project it is important to have an architect's expertise on the design. The first floor restroom floor, stall and equipment is original to the building. We have continued to have the tile floors refurbished but they are looking old and outdated. The toilet paper dispensers are slowly breaking down from age, and we often have the water left running in the restrooms by all of the children that use the building. Because of the toilet paper dispenser and floor replacements, we may have to replace the partitions as well. Expenditures 2025 2026 2027 2028 2029 Total Construction 0 80,000 0 0 0 80,000 Planning/Design 0 25,000 0 0 0 25,000 Total 0 105,000 0 0 0 105,000 Funding Sources 2025 2026 2027 2028 2029 Total AC - Arts Center Fund 0 105,000 0 0 0 105,000 Total 0 105,000 0 0 0 105,000 Produced Using Plan-It CIP Software 41 Arts Center - Roof Replacement 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #19-CIP-AR007 Project Name Arts Center - Roof Replacement Total Project Cost $750,000 Department Comm Svcs - Arts Center Type Improvement Category Buildings: Arts Center Status Active Description Replacement of Roof Justification/Sustainability Facility originally built in 1997. Expenditures 2025 2026 2027 2028 2029 Total Construction 0 0 750,000 0 0 750,000 Total 0 0 750,000 0 0 750,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 0 0 750,000 0 0 750,000 Total 0 0 750,000 0 0 750,000 Produced Using Plan-It CIP Software 42 Arts Center - Theater Curtains 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #17-CIP-AR004 Project Name Arts Center - Theater Curtains Total Project Cost $80,000 Department Comm Svcs - Arts Center Type Improvement Category Buildings: Arts Center Status Active Useful Life 15 years Description Replace main Theater front curtains Justification/Sustainability Due to age of theater curtains, I am suggesting replacement. They have become frayed at the bottom. Estimated cost based on online research. Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 0 0 80,000 0 80,000 Total 0 0 0 80,000 0 80,000 Funding Sources 2025 2026 2027 2028 2029 Total AC - Arts Center Fund 0 0 0 80,000 0 80,000 Total 0 0 0 80,000 0 80,000 Produced Using Plan-It CIP Software 43 Depot Remodel and Upgrade Project 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-DP001 Project Name Depot Remodel and Upgrade Project Total Project Cost $102,062 Contact Arts Center Director Department Depot/ACE Program Type Improvement Category Bldg: Depot Status Active Useful Life 15 years Description The Depot building is a renovated train Depot that has been operated as a coffee house and music venue. This remodel project would revitalize the building used by the Youth Advisory Board for programming and events, trailhead access, rental space, music events and movie nights. Phase 1: 2024 Phase 2: 2025 Equipment ($4,000) New Tables & Chairs ($7,040) Window Treatments & Furniture ($10,000) Entry Door Replacement ($29,222) Signage ($5,000) Landscaping ($5,000) Painting ($9,000) Outdoor Furniture ($4,000) Entry Door Replacement ($22,000) Remodel Freight Room ($4,500) Remodel Kitchen Area ($2,300) Justification/Sustainability For 25 years, Hopkins, Minnetonka, Hopkins School District and Three Rivers Park District have operated a Youth Advisory Board and coffee shop at the Depot building. Even with financial contributions from all entities the coffee house operation have not been financially stable due to a number of factors including HIghway 169 construction, METRO Green Line Extension Construction and the COVID-19 Pandemic. The building is still routinely used for Advisory Events, students in the community in addition to bikers who desire access to the building as a trailhead. The project described above would allow for the space to be utilized for expanded Art Center programming, additional rental spaces, regular hours for Youth Advisory Board Programming and provide limited trailhead access. Prior Expenditures 2025 2026 2027 2028 2029 Total 56,800 Construction 34,222 0 0 0 0 34,222 Equipment 11,040 0 0 0 0 11,040 Total 45,262 0 0 0 0 45,262 Prior Funding Sources 2025 2026 2027 2028 2029 Total 56,800 CI - Capital Improvement Fund 32,062 0 0 0 0 32,062 GU - Other Governmental Units 13,200 0 0 0 0 13,200 Total 45,262 0 0 0 0 45,262 Produced Using Plan-It CIP Software 44 Fire - Replace Roof 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #08-CIP-B125 Project Name Fire - Replace Roof Total Project Cost $550,000 Department Fire Type Improvement Category Buildings: Fire Facilities Status Active Description Replace roof Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 0 550,000 0 0 550,000 Total 0 0 550,000 0 0 550,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 0 0 550,000 0 0 550,000 Total 0 0 550,000 0 0 550,000 Produced Using Plan-It CIP Software 45 Fire Station - Replace Make- up Air Units 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #08-CIP-B122 Project Name Fire Station - Replace Make-up Air Units Total Project Cost $14,000 Department Fire Type Improvement Category Buildings: Fire Facilities Status Active Description Replace make-up air units 4-15-2014 -- per Norb Kerber each unit is $6,500 each and there are two of them. Requested budget is $14,000. Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 0 0 0 14,000 14,000 Total 0 0 0 0 14,000 14,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 0 0 0 0 14,000 14,000 Total 0 0 0 0 14,000 14,000 Produced Using Plan-It CIP Software 46 Fire Station - Replace overhead doors 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #08-CIP-B124 Project Name Fire Station - Replace overhead doors Total Project Cost $145,000 Department Fire Type Improvement Category Buildings: Fire Facilities Status Active Description Replace overhead doors Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 0 0 0 145,000 145,000 Total 0 0 0 0 145,000 145,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 0 0 0 0 145,000 145,000 Total 0 0 0 0 145,000 145,000 Produced Using Plan-It CIP Software 47 Pavilion - Arena Exit Door Replacement 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #20-CIP-PV334 Project Name Pavilion - Arena Exit Door Replacement Total Project Cost $185,000 Department Pavilion Type Improvement Category Bldgs: Pavillion Status Active Useful Life 15 years Description Replace the arena exit doors, frames, hinges, and closers. Justification/Sustainability The frames and hardware are original, installed during the construction of the facility. Frames are rusting and hardware is failing. Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 92,500 75,000 17,500 0 0 185,000 Total 92,500 75,000 17,500 0 0 185,000 Funding Sources 2025 2026 2027 2028 2029 Total PA - Pavilion Fund 92,500 75,000 17,500 0 0 185,000 Total 92,500 75,000 17,500 0 0 185,000 Produced Using Plan-It CIP Software 48 Pavilion - Bleacher Heating Replacement 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #23-CIP-PV337 Project Name Pavilion - Bleacher Heating Replacement Total Project Cost $75,000 Department Pavilion Type Improvement Category Bldgs: Pavillion Status Active Useful Life 10 years Description Replace existing radiant heating system above the bleachers in the arena. Justification/Sustainability Current system is at the end of useful life and major components will need replacing. Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 0 75,000 0 0 75,000 Total 0 0 75,000 0 0 75,000 Funding Sources 2025 2026 2027 2028 2029 Total PA - Pavilion Fund 0 0 75,000 0 0 75,000 Total 0 0 75,000 0 0 75,000 Produced Using Plan-It CIP Software 49 Pavilion - Roof Replacement 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #23-CIP-PV336 Project Name Pavilion - Roof Replacement Total Project Cost $100,000 Department Pavilion Type Unassigned Category Bldgs: Pavillion Status Active Description Replace South Team Room Addition Roof Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 100,000 0 0 0 100,000 Total 0 100,000 0 0 0 100,000 Funding Sources 2025 2026 2027 2028 2029 Total PA - Pavilion Fund 0 100,000 0 0 0 100,000 Total 0 100,000 0 0 0 100,000 Produced Using Plan-It CIP Software 50 Pavilion Team Room HVAC Unit 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #16-CIP-PV329 Project Name Pavilion Team Room HVAC Unit Total Project Cost $9,500 Department Pavilion Type Improvement Category Bldgs: Pavillion Status Active Useful Life 15 years Description Purchase and installation of (1) rooftop HVAC unit that supply's heating and cooling to the Pavilions Main Level (Office, Bathrooms, Warming Room, Lobby, and Concessions). Justification/Sustainability The current unit was installed in 2007 and is at the end of its useful life. Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 0 0 0 9,500 9,500 Total 0 0 0 0 9,500 9,500 Funding Sources 2025 2026 2027 2028 2029 Total PA - Pavilion Fund 0 0 0 0 9,500 9,500 Total 0 0 0 0 9,500 9,500 Budget Impact Variance from 20 year plan - New item Produced Using Plan-It CIP Software 51 Pavilion - Warming House Window Blinds 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #23-CIP-PV339 Project Name Pavilion - Warming House Window Blinds Total Project Cost $14,000 Department Pavilion Type Improvement Category Bldgs: Pavillion Status Active Description Add window blinds to windows in the warming house Expenditures 2025 2026 2027 2028 2029 Total Construction 0 14,000 0 0 0 14,000 Total 0 14,000 0 0 0 14,000 Funding Sources 2025 2026 2027 2028 2029 Total PA - Pavilion Fund 0 14,000 0 0 0 14,000 Total 0 14,000 0 0 0 14,000 Produced Using Plan-It CIP Software 52 907 Mainstreet (HHS) Windows & Front/Back Door 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #21-CIP-B101 Project Name 907 Mainstreet (HHS) Windows & Front/Back Door Total Project Cost $105,000 Department Public Works: Bldg/Equip Serv Type Improvement Category Economic Development Status Active Useful Life 20 years Description The current windows are well past their useful life. 8 Windows and two doors are due for replacement. Justification/Sustainability The need to get this facility into the CIP for future planning. Installing new windows and doors will be more energy efficent for the building. Today's estimated cost is $55,000. Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 0 0 105,000 0 105,000 Total 0 0 0 105,000 0 105,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 0 0 0 105,000 0 105,000 Total 0 0 0 105,000 0 105,000 Produced Using Plan-It CIP Software 53 Public Works - Replace Overhead Doors 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #08-CIP-B023 Project Name Public Works - Replace Overhead Doors Total Project Cost $90,000 Department Public Works: Bldg/Equip Serv Type Improvement Category Buildings: Public Works Status Active Description Replace overhead doors Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 0 90,000 0 0 90,000 Total 0 0 90,000 0 0 90,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 0 0 18,000 0 0 18,000 RF - Refuse Fund 0 0 18,000 0 0 18,000 SF - Sanitary Sewer Fund 0 0 18,000 0 0 18,000 SU - Storm Sewer Fund 0 0 18,000 0 0 18,000 WF - Water Fund 0 0 18,000 0 0 18,000 Total 0 0 90,000 0 0 90,000 Budget Impact Inspected in 2019, will move from 2020 to 2022. Produced Using Plan-It CIP Software 54 Public Works - Replace Roofing 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #08-CIP-B022 Project Name Public Works - Replace Roofing Total Project Cost $1,600,000 Department Public Works: Bldg/Equip Serv Type Improvement Category Buildings: Public Works Status Active Description Replace Roofing, Vehicle Storage and Office area Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 0 0 1,600,000 0 1,600,000 Total 0 0 0 1,600,000 0 1,600,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 0 0 0 800,000 0 800,000 SF - Sanitary Sewer Fund 0 0 0 250,000 0 250,000 SU - Storm Sewer Fund 0 0 0 250,000 0 250,000 WF - Water Fund 0 0 0 250,000 0 250,000 RF - Refuse Fund 0 0 0 50,000 0 50,000 Total 0 0 0 1,600,000 0 1,600,000 Produced Using Plan-It CIP Software 55 Central Park Renovation 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #23-CIP-P076 Project Name Central Park Renovation Total Project Cost $6,150,000 Contact Management Analyst Department Public Works: Parks Type Improvement Category PW - Parks Status Active Useful Life 25 years Description Amending 23-CIP-P076 to include costs for improvements associated with master plan. Includes removal of kickball backstop and existing playground, addition of new playground, volleyball, basketball and other amenities. Justification/Sustainability Items in park have exceeded their useful life. Central park ranks as number 2 in the prioritization score for improvements in the Park System Master Plan. Prior Expenditures 2025 2026 2027 2028 2029 Total 150,000 Construction 0 6,000,000 0 0 0 6,000,000 Total 0 6,000,000 0 0 0 6,000,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 150,000 PDF- Park Dedication Fund 0 3,000,000 0 0 0 3,000,000 GA - Grant-In-Aid 0 2,000,000 0 0 0 2,000,000 GU - Other Governmental Units 0 1,000,000 0 0 0 1,000,000 Total 0 6,000,000 0 0 0 6,000,000 Produced Using Plan-It CIP Software 56 Central Park Tennis Courts 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-P077 Project Name Central Park Tennis Courts Total Project Cost $220,000 Contact Public Works Director Department Public Works: Parks Type Improvement Category PW - Parks Status Active Useful Life 15 years Description Remove existing court and repave and color coat. May need soil correction. Justification/Sustainability Courts have been repaired several times. Repair is no longer an option. Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 220,000 0 0 0 0 220,000 Total 220,000 0 0 0 0 220,000 Funding Sources 2025 2026 2027 2028 2029 Total PDF- Park Dedication Fund 220,000 0 0 0 0 220,000 Total 220,000 0 0 0 0 220,000 Produced Using Plan-It CIP Software 57 Downtown Park Stage - Electric 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-P078 Project Name Downtown Park Stage - Electric Total Project Cost $25,000 Contact Public Works Director Department Public Works: Parks Type Improvement Category PW - Parks Status Active Useful Life 15 years Description Add 50 amp outlets to stage area for bands to be able to use more equipment Justification/Sustainability All outlets on stage are 20 amp and not sufficient to handle today's equipment Expenditures 2025 2026 2027 2028 2029 Total Construction 0 25,000 0 0 0 25,000 Total 0 25,000 0 0 0 25,000 Funding Sources 2025 2026 2027 2028 2029 Total PDF- Park Dedication Fund 0 25,000 0 0 0 25,000 Total 0 25,000 0 0 0 25,000 Produced Using Plan-It CIP Software 58 Maetzold Field Lighting 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-P080 Project Name Maetzold Field Lighting Total Project Cost $150,000 Contact Public Works Director Department Public Works: Parks Type Improvement Category PW - Parks Status Active Useful Life 15 years Description Switch all lighting to Musco controls. Lighting will be able to be controlled through an app. It will have a fail safe if lights are left on. Justification/Sustainability Currently lights are being turned of and off by breakers and key switches. We are not able to control if they are left on. Expenditures 2025 2026 2027 2028 2029 Total Construction 0 0 150,000 0 0 150,000 Total 0 0 150,000 0 0 150,000 Funding Sources 2025 2026 2027 2028 2029 Total PDF- Park Dedication Fund 0 0 150,000 0 0 150,000 Total 0 0 150,000 0 0 150,000 Produced Using Plan-It CIP Software 59 Oakes & Valley Parks Recreation & Resilience Hubs 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-P081 Project Name Oakes & Valley Parks Recreation & Resilience Hubs Total Project Cost $9,000,000 Contact Management Analyst Department Public Works: Parks Type Improvement Category PW - Parks Status Active Useful Life 50 years Description Construction of two (2) new buildings which will serve community needs for recreation, resilience, and other civic uses such as voting and EMS operations. Justification/Sustainability Buildings in these parks no longer meet community needs. The City has a gap in provision of public buildings which directly overlaps with areas of poverty and where population is most diverse. Buildings will meet a wide array of community needs. Oakes and Valley Parks rank number por3 and 5 in the equity portion of the Park System Master Plan. Expenditures 2025 2026 2027 2028 2029 Total Construction 0 0 4,500,000 4,500,000 0 9,000,000 Total 0 0 4,500,000 4,500,000 0 9,000,000 Funding Sources 2025 2026 2027 2028 2029 Total GA - Grant-In-Aid 0 0 2,250,000 2,250,000 0 4,500,000 PDF- Park Dedication Fund 0 0 2,250,000 2,250,000 0 4,500,000 Total 0 0 4,500,000 4,500,000 0 9,000,000 Produced Using Plan-It CIP Software 60 Repair Burnes Park Tennis Courts 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #21-CIP-P074 Project Name Repair Burnes Park Tennis Courts Total Project Cost $130,000 Department Public Works: Parks Type Improvement Category PW - Parks Status Active Description Remove and replace existing asphalt pavement and apply new color coatings system. Justification/Sustainability The court is deteriorated beyond crack sealing or top coat repairs. Needs new asphalt pavement and color coatings. Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 130,000 0 0 0 130,000 Total 0 130,000 0 0 0 130,000 Funding Sources 2025 2026 2027 2028 2029 Total PDF- Park Dedication Fund 0 130,000 0 0 0 130,000 Total 0 130,000 0 0 0 130,000 Produced Using Plan-It CIP Software 61 Repair Play Courts- Elmo & Park Valley 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #21-CIP-P075 Project Name Repair Play Courts- Elmo & Park Valley Total Project Cost $90,000 Department Public Works: Parks Type Unassigned Category PW - Parks Status Active Description Remove and replace existing asphalt pavement. Justification/Sustainability The court is deteriorated beyond crack sealing or top coat repairs. Needs new asphalt pavement. Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 0 90,000 0 0 90,000 Total 0 0 90,000 0 0 90,000 Funding Sources 2025 2026 2027 2028 2029 Total PDF- Park Dedication Fund 0 0 90,000 0 0 90,000 Total 0 0 90,000 0 0 90,000 Produced Using Plan-It CIP Software 62 Repair Valley Park Volleyball Court 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #21-CIP-P073 Project Name Repair Valley Park Volleyball Court Total Project Cost $80,000 Department Public Works: Parks Type Improvement Category PW - Parks Status Active Description Install new curbing, posts and lighting. Regrade base and add new sand. Justification/Sustainability Current curbing is wood and is rotting, posts are also wood that is detoriating Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 80,000 0 0 0 80,000 Total 0 80,000 0 0 0 80,000 Funding Sources 2025 2026 2027 2028 2029 Total PDF- Park Dedication Fund 0 80,000 0 0 0 80,000 Total 0 80,000 0 0 0 80,000 Produced Using Plan-It CIP Software 63 Valley Park Basketball Court 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-P079 Project Name Valley Park Basketball Court Total Project Cost $60,000 Contact Public Works Director Department Public Works: Parks Type Improvement Category PW - Parks Status Active Useful Life 15 years Description Remove existing court and repave and color coat. Basketball hoops and posts can be reused. Justification/Sustainability Court has substantial cracks and chunks of the color coating have come up Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 60,000 0 0 0 60,000 Total 0 60,000 0 0 0 60,000 Funding Sources 2025 2026 2027 2028 2029 Total PDF- Park Dedication Fund 0 60,000 0 0 0 60,000 Total 0 60,000 0 0 0 60,000 Produced Using Plan-It CIP Software 64 Shady Oak Beach Improvements 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #16-CIP-R003 Project Name Shady Oak Beach Improvements Total Project Cost $485,000 Department Recreation Type Improvement Category PW - Parks Status Active Useful Life 10 years Description The joint recreation agreement in place between the cities of Hopkins and Minnetonka provides for the sharing of operational and maintenance expenses for Shady Oak Beach. These expenses are split 33% city of Hopkins and 67% city of Minnetonka. Shady Oak Beach is operated from June - August annually; however the park is available for use year round. 2021: Dock maintenance ($10,000) 2022: Miscellaneous building components, i.e. installation of energy efficient lighting in restrooms/gate area, patio tables and chairs ($15,000); inflatables replacement ($10,000) 2023: Miscellaneous building maintenance ($10,000) 2024: Inflatable replacement ($10,000) 2025: Miscellaneous building maintenance ($10,000) Justification/Sustainability Shady Oak Beach is jointly operated by the cities of Hopkins and Minnetonka. The facility is open from June - August each summer with the revenues generated from season pass sales and daily admissions. The facility was most recently renovated in 1998. An addiitional renovation on the lifeguard shack was completed in 2021. 2023: Miscellaneous building/grounds maintenance; miscellaneous building equipment/components, i.e. concession equipment, patio tables and chairs 2024: Inflatable replacement ($10,000); parking lot mill and overlay ($80,000) 2025: Miscellaneous building maintenance 2026: Miscellaneous building maintenance 2027: Miscellaneous building maintenance Prior Expenditures 2025 2026 2027 2028 2029 Total 425,000 Construction/Maintenance 20,000 10,000 10,000 10,000 10,000 60,000 Total 20,000 10,000 10,000 10,000 10,000 60,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 425,000 GU - Other Governmental Units 13,400 6,700 6,700 6,700 6,700 40,200 PDF- Park Dedication Fund 6,600 3,300 3,300 3,300 3,300 19,800 Total 20,000 10,000 10,000 10,000 10,000 60,000 Produced Using Plan-It CIP Software 65 17th Ave Reconstruction 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-S010 Project Name 17th Ave Reconstruction Total Project Cost $8,600,000 Contact Public Works Director Department Public Works: Streets/Traffic Type Improvement Category Trans: Streets Status Active Useful Life 30 years Description Reconstruction of 17th Avenue, including watermain, sanitary sewer, addition of off-street pedestrian/bicycle facilities, and pavement surface. Improvement is consistent with the Storm Water Management Plan, Complete Street Policy, and Bike and Pedestrian Plan. Justification/Sustainability The pavement surface is nearing the end of its usable life. The utilities in the corridor are near the end of their service life as well. Reconstruction will also allow the installation of off-street pedestrian and bicycles improvements. Public engagement has shown a desire for an improved road surface and improved bicycle and pedestrian facilities in the corridor. The cost assumes city funding 100% of major storm sewer, sanitary sewer and watermain improvements. Applications for outside funding have been submitted, and additional sources of outside funding will continue to be pursued. Expenditures 2025 2026 2027 2028 2029 Total Construction 0 0 8,600,000 0 0 8,600,000 Total 0 0 8,600,000 0 0 8,600,000 Funding Sources 2025 2026 2027 2028 2029 Total MS - Municipal State Aid Streets 0 0 3,790,000 0 0 3,790,000 PI - PIR/General Obligation Bonds 0 0 1,830,000 0 0 1,830,000 WF - Water Fund 0 0 1,100,000 0 0 1,100,000 SA - Special Assessment 0 0 780,000 0 0 780,000 SF - Sanitary Sewer Fund 0 0 600,000 0 0 600,000 SU - Storm Sewer Fund 0 0 500,000 0 0 500,000 Total 0 0 8,600,000 0 0 8,600,000 Produced Using Plan-It CIP Software 66 Central Business District Lighting Upgrades 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #20-CIP-S001 Project Name Central Business District Lighting Upgrades Total Project Cost $140,000 Department Public Works: Streets/Traffic Type Improvement Category Trans: Street Lights Status Active Description Upgrade existing lighting in the Central Business District to newer LED fixtures, replace light poles and electrical service feed cabinets, as needed. 2023: Mainstreet East of 5th Ave - 20 fixtures 10th, 11th and 12th Ave N & S of Mainstreet - 52 fixtures Parking Lots 500 and 600 - 15 fixtures 2024: 7th, 8th and 9th Ave N & S of Mainstreet - 28 fixtures Parking Lots 700 and 750 - 8 fixtures Justification/Sustainability There is a need to continue the upgrade of lighting in the Central Business District. The Mainstreet lights were all upgraded to LED fixtures in 2015. An upgrade to LED fixtures will provide energy savings, maintenance savings and create a more uniform lighting appearance throughout the downtown area. Prior Expenditures 2025 2026 2027 2028 2029 Total 100,000 Construction 0 40,000 0 0 0 40,000 Total 0 40,000 0 0 0 40,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 100,000 CR - Current Revenues - Tax Levy 0 40,000 0 0 0 40,000 Total 0 40,000 0 0 0 40,000 Produced Using Plan-It CIP Software 67 City Street Lighting Upgrades 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #20-CIP-S002 Project Name City Street Lighting Upgrades Total Project Cost $1,350,000 Department Public Works: Streets/Traffic Type Improvement Category Trans: Street Lights Status Active Description Street lighting upgrades are needed to replace deteriorated poles, electrical feedpoints and old, energy inefficient fixtures. 2026: Hobby Acres neighborhood streets, replace 17th poles and fixtures to match Xcel Energy upgraded poles/lights and three electrical feedpoints. 2027: Westbrooke Way street lighting, upgrade 22 lights, poles and wiring via new Xcel Energy agreement to replace expired 30-year agreement 2028: 11th Ave S, south of 7th St S, replace 18 poles and fixtures and one electrical feedpoint. 2029: Upgrade/Replace 8 Power Feed Points and Excelsior West of 11th to Shady Oak (Xcel Lease) Justification/Sustainability A replacement plan is needed as these lighting and electrical feed systems are reaching the end of their useful life, with out-dated electrical cabinets, poles and bases and old, energy inefficient light fixtures. Prior Expenditures 2025 2026 2027 2028 2029 Total 300,000 Construction 0 200,000 90,000 225,000 535,000 1,050,000 Total 0 200,000 90,000 225,000 535,000 1,050,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 300,000 CR - Current Revenues - Tax Levy 0 200,000 90,000 225,000 535,000 1,050,000 Total 0 200,000 90,000 225,000 535,000 1,050,000 Produced Using Plan-It CIP Software 68 County Road 3 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #01-CIP-S104 Project Name County Road 3 Total Project Cost $2,300,000 Department Public Works: Streets/Traffic Type Improvement Category Trans: Streets Status Active Useful Life None Description County Road 3 from Shady Oak Road to Meadowbrook Road. Lighting, landscaping, street, etc. improvements along Excelsior Boulevard from the east to west city limits. GO Bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue Project has been delayed pending county funding for remaining 4th segement. Justification/Sustainability Deficiencies in terms of roadway condition, traffic/pedestrian movement, safety and aesthetics appear in remaining segment of County Road 3. Segment 4 from Blake Road to Meadowbrook Road; upgrade roadway, implement beautification program. Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 0 0 0 2,300,000 2,300,000 Total 0 0 0 0 2,300,000 2,300,000 Funding Sources 2025 2026 2027 2028 2029 Total GU - Other Governmental Units 0 0 0 0 1,600,000 1,600,000 MS - Municipal State Aid Streets 0 0 0 0 700,000 700,000 Total 0 0 0 0 2,300,000 2,300,000 Budget Impact GO bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue. Segment 4: Planning and acquisition - Not in County Funding Plan, when funded city will complete our portion. Consistent with Hennepin County CIP and City Council action. Produced Using Plan-It CIP Software 69 Excelsrior Blvd. Fencing 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #23-CIP-S008 Project Name Excelsrior Blvd. Fencing Total Project Cost $250,000 Department Public Works: Streets/Traffic Type Unassigned Category Trans: Streets Status Active Description Wooden fencing on Excelsior Blvd: South side of South Presidents, South side of 5th St S and 9th Ave S, and North side of Excelsior Blvd. 17th Ave N Justification/Sustainability Posts and panels have been failing for a few years. We need to start replacing so we are not constantly replacing the broken boards Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 50,000 50,000 50,000 50,000 50,000 250,000 Total 50,000 50,000 50,000 50,000 50,000 250,000 Funding Sources 2025 2026 2027 2028 2029 Total CR - Current Revenues - Tax Levy 50,000 50,000 50,000 50,000 50,000 250,000 Total 50,000 50,000 50,000 50,000 50,000 250,000 Produced Using Plan-It CIP Software 70 Mainstreet Banner Pole Installation 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #23-CIP-S007 Project Name Mainstreet Banner Pole Installation Total Project Cost $250,000 Department Public Works: Streets/Traffic Type Unassigned Category Trans: Sign/Signals Status Active Description Installation of freestanding banner mount poles for large Mainstreet banners Justification/Sustainability The existing Mainstreet banners are mounted to provate buildings through an agreement between the City and the property owners. The banners have caused significant damage to building brickwork in recent years, requireing extensive and expensive repairs that the City is responsible for. One property owner has expressed that they will not renew the banner attachment agreement when it expires. Freestanding banner mounts would eliminate the need to have the banners mounted to private businesses. Expenditures 2025 2026 2027 2028 2029 Total Construction 0 130,000 120,000 0 0 250,000 Total 0 130,000 120,000 0 0 250,000 Funding Sources 2025 2026 2027 2028 2029 Total CR - Current Revenues - Tax Levy 0 130,000 120,000 0 0 250,000 Total 0 130,000 120,000 0 0 250,000 Produced Using Plan-It CIP Software 71 Minnetonka Mills/5th St N Intersection Improvement 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #20-CIP-S005 Project Name Minnetonka Mills/5th St N Intersection Improvement Total Project Cost $600,000 Department Public Works: Streets/Traffic Type Improvement Category Trans: Sign/Signals Status Active Description Remove outdated signal and update intersection for all modes of travel.The work will also include upgrading the pedestrian ramps and crossings to meet ADA standards. 2027: Removal and replacement of signal and ADA upgrades Justification/Sustainability The existing signal is old and reaching the end of it's service life. Pedestrian crossing and ADA improvements should be completed as there are increased levels pedestrian traffic through the intersection since the improvements to Burnes Park. Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 0 600,000 0 0 600,000 Total 0 0 600,000 0 0 600,000 Funding Sources 2025 2026 2027 2028 2029 Total PI - PIR/General Obligation Bonds 0 0 590,000 0 0 590,000 SU - Storm Sewer Fund 0 0 10,000 0 0 10,000 Total 0 0 600,000 0 0 600,000 Produced Using Plan-It CIP Software 72 Parking Ramp Cameras 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-S009 Project Name Parking Ramp Cameras Total Project Cost $25,000 Contact Facilities Director Department Public Works: Streets/Traffic Type Improvement Category Trans: Parking Facilities Status Active Useful Life 10 years Description Hennepin County has agreed to transfer ownership of existing cameras to the City of Hopkins. Funding requested is to integrate the cameras with City of Hopkins current system. Justification/Sustainability The project provides cost savings through the use of an existing asset from Hennepin County. Cameras can be used to deter and also investigate any vandalism or crime in the parking ramp. Expenditures 2025 2026 2027 2028 2029 Total Equipment 25,000 0 0 0 0 25,000 Total 25,000 0 0 0 0 25,000 Funding Sources 2025 2026 2027 2028 2029 Total CI - Capital Improvement Fund 25,000 0 0 0 0 25,000 Total 25,000 0 0 0 0 25,000 Produced Using Plan-It CIP Software 73 Pedestrian & Bicycle Access Improvements 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #13-CIP-S040 Project Name Pedestrian & Bicycle Access Improvements Total Project Cost $500,000 Department Public Works: Streets/Traffic Type Improvement Category Trans: Streets Status Active Useful Life 20 years Description Painting bike lanes, constructing trails and sidewalks, safety improvements and other general pedestrian and bicycle improvements to the system. 2025: Upgrade of the 11th Ave South pedestrian crossings in the Wesbrooke Area to pedestrian activated RRFB. Justification/Sustainability Council adopted plan to increase pedestrian and bicycle access and safety, these improvements begin to implement that plan. The existing overhead flushers provide very little benefit. Pedestrian activated rectangular rapid flushing beacons (RRFB) have shown to provide very high compliance for motorists and increases pedestrian safety and comfort. Prior Expenditures 2025 2026 2027 2028 2029 Total 275,000 Construction/Maintenance 100,000 27,500 30,000 32,500 35,000 225,000 Total 100,000 27,500 30,000 32,500 35,000 225,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 275,000 PI - PIR/General Obligation Bonds 100,000 27,500 30,000 32,500 35,000 225,000 Total 100,000 27,500 30,000 32,500 35,000 225,000 Produced Using Plan-It CIP Software 74 Residential Street Improvements and Utilities 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #01-CIP-S101 Project Name Residential Street Improvements and Utilities Total Project Cost $91,376,900 Department Public Works: Streets/Traffic Type Improvement Category Trans: Streets Status Active Useful Life None Description Locations to be determined consistent with the street reconstruction program. Program includes reconstruction of deteriorated water main, sanitary sewer and storm sewer in conjunction with street improvement projects. Utility improvements are consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. 2025-2026: Central Avenues Reconstruction 2028: South Avenues (14th, 15th, 16th and 17th) 2029-2030: Belgrove Justification/Sustainability In most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be installed new. In most cases, water main and sanitary sewer need to be rehabilitated in conjunction with street reconstruction. The costs assume the city funding 100% of major storm sewer, water main, and sanitary sewer improvements. Prior Expenditures 2025 2026 2027 2028 2029 Total 58,662,000 Construction/Maintenance 8,877,000 8,877,000 0 7,298,000 7,662,900 32,714,900 Total 8,877,000 8,877,000 0 7,298,000 7,662,900 32,714,900 Prior Funding Sources 2025 2026 2027 2028 2029 Total 58,662,000 PI - PIR/General Obligation Bonds 3,313,000 3,313,000 0 4,280,000 4,494,000 15,400,000 SF - Sanitary Sewer Fund 1,552,000 1,552,000 0 1,650,000 1,732,500 6,486,500 WF - Water Fund 1,756,000 1,756,000 0 178,000 186,900 3,876,900 SA - Special Assessment 1,124,000 1,124,000 0 650,000 682,500 3,580,500 SU - Storm Sewer Fund 1,132,000 1,132,000 0 540,000 567,000 3,371,000 Total 8,877,000 8,877,000 0 7,298,000 7,662,900 32,714,900 Budget Impact Public Hearing - year prior to planned construction Plans and specifications - year prior to planned construction Bid - year of planned construction Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections. Consistent with the City Council adopted Roadway Improvement Policy, Street Ratings, Pavement Management Program, Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. Produced Using Plan-It CIP Software 75 Street Rehabilitation Improvements 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #16-CIP-S041 Project Name Street Rehabilitation Improvements Total Project Cost $6,270,000 Department Public Works: Streets/Traffic Type Improvement Category Trans: Streets Status Active Description Location to be determined based on Pavement Management Program. Program includes mill and overlay of deteriorated pavements to extend the useful life of the street. Streets for this method of rehabilitation have usually been rehabilitated or reconstructed within the last 20 years. 2025: Central Avenues 2026 Central Avenues 2027: 11th Ave South 2028: 12th, 13th, 15th and 16th Ave South 2029: St. Louis/Jackson Avenue Justification/Sustainability Properly timed mill and overlay projects can significantly extend the life of a street and delay the need for reconstruction. Mill and overlay projects also require less disturbance and are shorter in duration than reconstruction, which results in less impact of the traveling public. Prior Expenditures 2025 2026 2027 2028 2029 Total 3,570,000 Construction/Maintenance 475,000 500,000 550,000 575,000 600,000 2,700,000 Total 475,000 500,000 550,000 575,000 600,000 2,700,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 3,570,000 PI - PIR/General Obligation Bonds 475,000 500,000 550,000 575,000 600,000 2,700,000 Total 475,000 500,000 550,000 575,000 600,000 2,700,000 Budget Impact Increased 2023 amount by $70,000 from original 2023-2027 CIP. Amendment considered by City Council on May 16, 2023. Produced Using Plan-It CIP Software 76 Street Sign Management 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #16-CIP-S042 Project Name Street Sign Management Total Project Cost $278,000 Department Public Works: Streets/Traffic Type Improvement Category Trans: Streets Status Active Description Replacement of aged regulatory and warning signs that have lost minimum retroreflectivity and replacement of posts, when needed. Justification/Sustainability The city is required to have a sign management program which includes a sign replacement strategy to ensure regulatory and warning signs provide adequate retroreflectivity. Sign replacement cycle is 8 years. Estimated costs assume sign replacements by contract. Parking signs will be replaced as needed due to age, fading, etc. Sign inventory data base will be updated to reflect install date/sign age. Prior Expenditures 2025 2026 2027 2028 2029 Total 180,000 Construction/Maintenance 22,000 24,000 26,000 26,000 0 98,000 Total 22,000 24,000 26,000 26,000 0 98,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 180,000 PI - PIR/General Obligation Bonds 22,000 24,000 26,000 26,000 0 98,000 Total 22,000 24,000 26,000 26,000 0 98,000 Produced Using Plan-It CIP Software 77 SCADA Fiber Project 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #23-CIP-U022 Project Name SCADA Fiber Project Total Project Cost $750,000 Department Public Works: Utilities Type Improvement Category Utilities: Municipal Water System Status Active Description Switch current monitoring and controls equipment from radio communication to fiber communication. Justification/Sustainability Our current system of monitoring and controls can be vulnerable to hackers. Radio signals can be intercepted by unauthorized individuals using radio scanners or other devices. Our critical infrastructure will be safer with fiber. Prior Expenditures 2025 2026 2027 2028 2029 Total 350,000 Construction/Maintenance 400,000 0 0 0 0 400,000 Total 400,000 0 0 0 0 400,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 350,000 SF - Sanitary Sewer Fund 200,000 0 0 0 0 200,000 WF - Water Fund 200,000 0 0 0 0 200,000 Total 400,000 0 0 0 0 400,000 Produced Using Plan-It CIP Software 78 Sewer Lining 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #18-CIP-U016 Project Name Sewer Lining Total Project Cost $747,500 Department Public Works: Utilities Type Improvement Category Utilities: Municipal Sanitary Sewer Status Active Description This will help us line our sanitary sewers to eliminate infiltration root intrusion and avoid expensive repairs and sewer backups. Justification/Sustainability We have an old collection system that needs immediate attention. Continuously cleaning the sewer does not stop roots or infiltration from going into the pipes, we need a more permanent fix. The majority of our sanitary sewer pipe is made out of clay pipe and has reached its life expectancy. Prior Expenditures 2025 2026 2027 2028 2029 Total 367,500 Construction/Maintenance 65,000 75,000 75,000 80,000 85,000 380,000 Total 65,000 75,000 75,000 80,000 85,000 380,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 367,500 SF - Sanitary Sewer Fund 65,000 75,000 75,000 80,000 85,000 380,000 Total 65,000 75,000 75,000 80,000 85,000 380,000 Produced Using Plan-It CIP Software 79 Storm Drainage System Maintenance - Alley Repairs 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #01-CIP-U002 Project Name Storm Drainage System Maintenance - Alley Repairs Total Project Cost $490,500 Department Public Works: Utilities Type Improvement Category Utilities: Municipal Sanitary Sewer Status Active Useful Life None Description Annual concrete repairs and patching of existing alleys. Justification/Sustainability Annual alley pavement concrete slab repairs are needed. Prior Expenditures 2025 2026 2027 2028 2029 Total 336,000 Construction/Maintenance 28,000 29,000 30,000 32,500 35,000 154,500 Total 28,000 29,000 30,000 32,500 35,000 154,500 Prior Funding Sources 2025 2026 2027 2028 2029 Total 336,000 SU - Storm Sewer Fund 28,000 29,000 30,000 32,500 35,000 154,500 Total 28,000 29,000 30,000 32,500 35,000 154,500 Budget Impact Consistent with the Storm Water Management Plan. Produced Using Plan-It CIP Software 80 Trunk Utility Rehabilitation 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #19-CIP-U017 Project Name Trunk Utility Rehabilitation Total Project Cost $8,955,000 Department Public Works: Utilities Type Improvement Category Utilities: Municipal Water System Status Active Description Program includes rehabilitation of trunk water mains and sanitary sewer around the city. Staff has conducted some non-destructive condition assessment testing of various trunk lines around the city. The testing determines a level of deterioration based on a calculated reduction of thickness of the pipe wall. Review of how critical the line is, break records, pipe age, and soil conditions are also considered in determining projects. 2027: Replacement of trunk utility mains as informed by non-destructive testing at various locations. Justification/Sustainability Trunk water mains are large diameter, high capacity lines that are critical to supply water to and from the water treatment plant, water towers, and distribution lines around the city and cannot easily be taken out of service. Trunk sanitary sewer mains are larger diameter mains that collect smaller mains and convey sanitary sewage to pumping stations. Public Works staff has been managing the trunk main system as a standalone asset, as these mains cannot always be included for rehabilitation with street reconstruction projects. Much of the city's trunk system was constructed over 50 years ago and is approaching the end of it's service life. Prior Expenditures 2025 2026 2027 2028 2029 Total 3,955,000 Construction/Maintenance 0 0 5,000,000 0 0 5,000,000 Total 0 0 5,000,000 0 0 5,000,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 3,955,000 WF - Water Fund 0 0 5,000,000 0 0 5,000,000 Total 0 0 5,000,000 0 0 5,000,000 Produced Using Plan-It CIP Software 81 Water Treatment Plant - Roof Replacement 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #23-CIP-U018 Project Name Water Treatment Plant - Roof Replacement Total Project Cost $290,000 Department Public Works: Utilities Type Improvement Category Utilities: Municipal Water System Status Active Expenditures 2025 2026 2027 2028 2029 Total Construction/Maintenance 0 270,000 0 20,000 0 290,000 Total 0 270,000 0 20,000 0 290,000 Funding Sources 2025 2026 2027 2028 2029 Total WF - Water Fund 0 270,000 0 20,000 0 290,000 Total 0 270,000 0 20,000 0 290,000 Produced Using Plan-It CIP Software 82 Well #6 Emergency Generator 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-U023 Project Name Well #6 Emergency Generator Total Project Cost $350,000 Contact Public Works Director Department Public Works: Utilities Type Improvement Category Utilities: Municipal Water System Status Active Useful Life 25 years Description Installation of an emergency power generator to well #6. Justification/Sustainability The city currently has three deep wells that provide drinking water to Hopkins. Only one well has an emergency generator for operations during power outages or unforeseen events. One well cannot meet the demand to keep our system running and provide clean drinking water if the remaining two wells are out of service due to not having power. If this type of emergency were to happen, the city needs to rely on the cities of Minnetonka, St. Louis Park and Edina to help provide water to Hopkins. This is not an ideal solution because any of those city's can say no to providing water due to their own circumstances. It also opens up the possibility of allowing contaminates into our system from other systems. By having the ability to stay self sufficient, it will protect our critical infrastructure and allow us to continue providing safe drinking water without interruption during a long term power outage or other unforeseen circumstance to the residents and businesses of Hopkins. Expenditures 2025 2026 2027 2028 2029 Total Construction 350,000 0 0 0 0 350,000 Total 350,000 0 0 0 0 350,000 Funding Sources 2025 2026 2027 2028 2029 Total WF - Water Fund 350,000 0 0 0 0 350,000 Total 350,000 0 0 0 0 350,000 Produced Using Plan-It CIP Software 83 Yard Waste Storage Building 2025 thru 2029 Capital Improvement Plan Hopkins, MN CIP Project #24-CIP-U024 Project Name Yard Waste Storage Building Total Project Cost $90,000 Contact Public Works Director Department Public Works: Utilities Type Improvement Category Utilities: Refuse Status Active Useful Life 25 years Description Storage building for seasonal equipment and trailers. Justification/Sustainability Currently, the main shop is congested with seasonal equipment and trailers sit outside in the elements Expenditures 2025 2026 2027 2028 2029 Total Construction 90,000 0 0 0 0 90,000 Total 90,000 0 0 0 0 90,000 Funding Sources 2025 2026 2027 2028 2029 Total RF - Refuse Fund 90,000 0 0 0 0 90,000 Total 90,000 0 0 0 0 90,000 Produced Using Plan-It CIP Software 84