2025-2029 Equipment Replacement PlanAmended on March 4, 2025
EQUIPMENT REPLACEMENT PLAN
2025-2029
DATE: November 12, 2024
TO: Honorable Mayor and Members of the City Council
FROM: Mike Mornson, City Manager
SUBJECT: 2025-2029 EQUIPMENT REPLACEMENT PLAN
With this letter, I respectfully submit the 2025-2029 Equipment Replacement Plan. This
five-year planning document represents the combined efforts of city staff and the City
Council.
The Equipment Replacement Plan is a five-year forecast of equipment replacement needs
in the City of Hopkins. It is intended to alert the Council and residents of equipment
replacement needs that are needed to maintain the efficiency of city services and the
safety of city staff. The first year of the plan becomes the adopted budget, however the
equipment is again re-evaluated before final approval is given for the purchase. The
remaining four years represents estimated replacement needs and the related funding.
The Equipment Replacement Plan does not include proposed capital projects. A
document relating specifically to capital project needs has been developed into a separate
document.
The Equipment Replacement Plan is intended to serve as a planning tool and is therefore
structured to present a meaningful, long-range perspective of the city’s equipment needs
over the next five years. At the same time sufficient details on individual pieces of
equipment scheduled for replacement is provided to enable those who review the
information to make informed decisions of the city’s equipment needs over the next several
years.
Please use the information provided to assist in the understanding of the city’s equipment
needs as they relate to the delivery of service to the residents of Hopkins.
This document was developed by the Finance Department with the assistance of all city
departments. I wish to especially thank all those involved in the development of the
Equipment Replacement Plan, and especially Chuck Autio, Public Works Director, Brent
Johnson, Police Chief, Dale Specken, Fire Chief, Casey Casella, Assistant City Manager,
and Nick Bishop, Finance Director for their hard work and dedication.
2
Page
City Manager's Message 2
Table of Contents 3
Cash Flow Statement
Equipment Replacement Fund 4
Five-Year Project Summaries
Department Summary 5
Projects by Department 6
Funding Source Summary 9
Projects by Funding Source 10
Equipment Requests
Individual Equipment Request Details
Activity Center 12
Arts Center 13
Information Technology 19
City Clerk 34
Inspections 35
Fire 36
Pavilion 47
Police 51
Public Works 62
Refuse 79
Water/Sewer 80
EQUIPMENT REPLACEMENT PLAN
2025-2029
TABLE OF CONTENTS
3
2025 2026 2027 2028 2029
Beginning Fund Balance 1,431,321 808,827 873,036 921,509 635,496
Revenues & Other Financing Sources
Tax Levy 220,000 200,000 200,000 200,000 200,000
Equipment Charges 797,688 845,549 896,282 950,059 1,007,063
Sale of Equipment 35,000 35,000 35,000 35,000 35,000
Interest Earnings 14,313 8,088 8,730 9,215 6,355
Equipment Certificates - - 3,200,000 - -
Total Revenue & Other Financing Sources 1,067,001 1,088,637 4,340,012 1,194,274 1,248,418
Expenditures & Other Financing Uses
Current Expenditures 35,000 35,000 35,000 35,000 35,000
Capital Projects
Community Services - Activity Center - 6,700 - - -
Community Services - Information Technology 499,324 509,688 260,707 237,841 342,248
Community Services - Inspections 16,231 - - 14,300 -
Fire Vehicles & Equipment 870,300 45,000 3,253,300 18,500 36,900
Police Vehicles & Equipment 268,640 251,640 390,390 365,337 397,331
Public Works: Building/Equipment Services - 40,000 14,143 - 8,300
Public Works: Parks/Forestry 469,609 45,600
Public Works: Streets/Traffic - 136,400 338,000 339,700 47,509
Total Expenditures and Other Financing Sources 1,689,495 1,024,428 4,291,540 1,480,287 912,888
Increase (Decrease) in Fund Balance (622,494) 64,209 48,472 (286,013) 335,530
Projected Ending Fund Balance 808,827 873,036 921,509 635,496 971,026
Equipment Replacement Fund - Projected Cash Flows
4
2025 through 2029
Equipment Replacement Plan
Hopkins, MN ERPDepartment Summary
Department 2025 2026 2027 2028 2029 Total
Comm Svcs - Activity Center 6,700 6,700
Comm Svcs - Arts Center 19,300 10,000 16,000 45,300
Comm Svcs - IT 499,324 509,688 260,707 237,841 342,248 1,849,808
Community Services 16,231 14,300 30,531
Fire 870,300 45,000 3,253,300 18,500 36,900 4,224,000
Pavilion 10,000 16,000 173,900 199,900
Police 268,640 251,640 390,390 365,337 397,331 1,673,338
Public Works: Bldg/Equip Serv 40,000 14,143 8,300 62,443
Public Works: Parks/Forestry 469,609 45,600 515,209
Public Works: Streets/Traffic 136,400 338,000 339,700 47,509 861,609
Refuse 350,000 350,000
Sewer 87,000 87,000
Water 160,000 160,000
GRAND TOTAL 2,014,495 1,271,728 4,440,440 1,461,287 877,888 10,065,838
Produced Using Plan-It CIP Software
5
2025 through 2029
Equipment Replacement Plan
Hopkins, MN ERPProjects By Department
Department Project #2025 2026 2027 2028 2029 Total
Comm Svcs - Activity Center
Activity Center - Floor Scrubber 01-ERP-0035 6,700 6,700
Comm Svcs - Activity Center Total 0 6,700 0 0 0 6,700
Comm Svcs - Arts Center
Art Center Floor Scrubber 01-ERP-1109 10,800 10,800
Art Center Jaycee Studio Audio Visual 01-ERP-1105 16,000 16,000
Art Center Lobby Public Announcement
Equipment 01-ERP-1114 10,000 10,000
Art Center Theater Presentation Microphones 01-ERP-1108 8,500 8,500
Comm Svcs - Arts Center Total 0 19,300 10,000 16,000 0 45,300
Comm Svcs - IT
Backup Server 01-ERP-0015 78,808 86,115 164,923
CH - Network Server 01-ERP-0003 27,849 28,684 29,545 30,431 31,344 147,853
Computers 01-ERP-0006 38,686 39,847 41,042 42,273 43,541 205,389
Core Network Switch 01-ERP-0012 45,000 45,000
Distribution Network Switches 01-ERP-0014 75,000 75,000
IT - Laptops for Mobile Computer Lab 01-ERP-0021 10,927 11,941 22,868
IT - Office 365 01-ERP-0017 71,680 73,180 74,680 76,180 77,680 373,400
IT - Patching Automation Software 01-ERP-0020 40,000 40,000 40,000 11,255 11,593 142,848
IT - Sandbox Security Appliance 01-ERP-0024 45,000 45,000
IT - Windows 10 Enterprise Upgrade 01-ERP-0022 43,260 44,558 45,895 47,271 48,690 229,674
Network Infrastructure Upgrade - Fiber 01-ERP-0009 70,000 70,000
PD - Network Server 01-ERP-0211 27,849 28,684 29,545 30,431 31,344 147,853
Permitting and Licensing Software Upgrade 796DQPWR 120,000 120,000
Video Servers 60,000 60,000
Comm Svcs - IT Total 499,324 509,688 260,707 237,841 342,248 1,849,808
Community Services
Document Management Scanner (2)01-ERP-0008 14,300 14,300
Electronic Inspections Processing 01-ERP-0052 16,231 16,231
Community Services Total 16,231 0 0 14,300 0 30,531
Fire
Emergency Preparedness Sirens 01-ERP-0113 45,000 45,000
Extrication Tool (1)01-ERP-0109 36,900 36,900
Fire - Lucus Device 01-ERP-0127 18,500 18,500
Fire Pumper (Engine 3)01-ERP-0101 1,500,000 1,500,000
Fire Radios - Portable and Mobile Devices 01-ERP-0125 445,000 445,000
Floor Scrubber 01-ERP-0114 25,500 25,500
Ladder #7 01-ERP-0100 1,700,000 1,700,000
Self Contained Breathing Apparatus (SCBA) (45)01-ERP-0108 400,000 400,000
Thermal Imaging Camera (2)01-ERP-0112 18,600 20,000 38,600
Workout Equipment - Dumb Bells 01-ERP-0122 6,700 6,700
Workout Equipment - Treadmill 01-ERP-0116 7,800 7,800
Fire Total 870,300 45,000 3,253,300 18,500 36,900 4,224,000
Produced Using Plan-It CIP Software
6
Pavilion
Pavilion - Electric Ice Edger 01-ERP-1001 8,900 8,900
Pavilion - Floor Scrubber 01-ERP-1003 16,000 16,000
Pavilion Ice Resurfacer 01-ERP-1000 165,000 165,000
Pavilion - Scissor Lift 01-ERP-1004 10,000 10,000
Pavilion Total 10,000 16,000 173,900 0 0 199,900
Police
Marked Patrol Vehicles (7)01-ERP-0200 145,000 150,000 150,000 155,000 140,000 740,000
Police Equipment 01-ERP-0227 12,500 13,750 15,125 41,375
PSO / Parking Enforcement Vehicle 01-ERP-0202 75,000 75,000
PSO - Utility 4x4 01-ERP-0203 95,000 95,000
Sergeant's Vehicle 01-ERP-0201 72,500 72,206 144,706
Squad Car Camera Systems 01-ERP-0212 26,640 26,640 26,640 26,640 30,000 136,560
Squad Computers 01-ERP-0220 140,000 140,000
Tactical Ballistic Vests / Helmets - SWAT 01-ERP-0214 12,000 88,697 100,697
Taser Replacement 01-ERP-0217 200,000 200,000
Police Total 268,640 251,640 390,390 365,337 397,331 1,673,338
Public Works: Bldg/Equip Serv
Hot Water High Pressure Vehicle Washer 01-ERP-0711 8,300 8,300
PW - Truck Scan Kit 01-ERP-0714 14,143 14,143
Supervisor Vehicle OH7I84S6 40,000 40,000
Public Works: Bldg/Equip Serv Total 0 40,000 14,143 0 8,300 62,443
Public Works: Parks/Forestry
4x4 3/4Ton Trucks (2)01-ERP-0801 108,000 108,000
Forestry Boom/Chipper Box Truck 01-ERP-0818 240,000 240,000
Large Turf Mower 01-ERP-0810 121,609 121,609
Skid Loader 01-ERP-0815 45,600 45,600
Public Works: Parks/Forestry Total 0 0 0 469,609 45,600 515,209
Public Works: Streets/Traffic
1 Ton Traffic Boom Truck 01-ERP-0304 136,400 136,400
4X4 3/4 Ton Truck with Plow 01-ERP-0301 70,000 70,000
Asphalt Hot Mix Heating Box - Trailer 01-ERP-0318 31,509 31,509
Front End Loaders (2)01-ERP-0308 268,000 268,000
Regenerative Air Sweeper 01-ERP-0319 210,000 210,000
Riding Floor Sweeper 01-ERP-0324 40,000 40,000
Skid Loader (2)01-ERP-0309 59,700 59,700
Striper 01-ERP-0313 16,000 16,000
Trailer 01-ERP-0323 30,000 30,000
Public Works: Streets/Traffic Total 0 136,400 338,000 339,700 47,509 861,609
Refuse
Refuse Truck (RAP-R) (2)01-ERP-0900 350,000 350,000
Refuse Total 350,000 0 0 0 0 350,000
Sewer
3/4 Ton Utility Truck 01-ERP-0551 87,000 87,000
Sewer Total 0 87,000 0 0 0 87,000
Department Project #2025 2026 2027 2028 2029 Total
Produced Using Plan-It CIP Software
7
Water
3/4 Ton Truck 01-ERP-0500 80,000 80,000
3/4 Ton Utility Truck 01-ERP-0501 80,000 80,000
Water Total 0 160,000 0 0 0 160,000
GRAND TOTAL 2,014,495 1,271,728 4,440,440 1,461,287 877,888 10,065,838
Department Project #2025 2026 2027 2028 2029 Total
Produced Using Plan-It CIP Software
8
2025 through 2029
Equipment Replacement Plan
Hopkins, MN ERPFunding Source Summary
Source 2025 2026 2027 2028 2029 Total
AC - Arts Center Fund 19,300 10,000 16,000 45,300
Equipment Replacement Fund 1,654,495 989,428 4,256,540 1,445,287 877,888 9,223,638
PA - Pavilion Fund 10,000 16,000 173,900 199,900
RF - Refuse Fund 350,000 350,000
SF - Sanitary Sewer Fund 87,000 87,000
WF - Water Fund 160,000 160,000
GRAND TOTAL 2,014,495 1,271,728 4,440,440 1,461,287 877,888 10,065,838
Produced Using Plan-It CIP Software
9
2025 through 2029
Equipment Replacement Plan
Hopkins, MN ERPProjects By Funding Source Summary
Source Project #2025 2026 2027 2028 2029 Total
AC - Arts Center Fund
Art Center Floor Scrubber 01-ERP-1109 10,800 10,800
Art Center Jaycee Studio Audio Visual 01-ERP-1105 16,000 16,000
Art Center Lobby Public Announcement
Equipment 01-ERP-1114 10,000 10,000
Art Center Theater Presentation
Microphones 01-ERP-1108 8,500 8,500
AC - Arts Center Fund Total 0 19,300 10,000 16,000 0 45,300
Equipment Replacement Fund
1 Ton Traffic Boom Truck 01-ERP-0304 136,400 136,400
4x4 3/4Ton Trucks (2)01-ERP-0801 108,000 108,000
4X4 3/4 Ton Truck with Plow 01-ERP-0301 70,000 70,000
Activity Center - Floor Scrubber 01-ERP-0035 6,700 6,700
Asphalt Hot Mix Heating Box - Trailer 01-ERP-0318 31,509 31,509
Backup Server 01-ERP-0015 78,808 86,115 164,923
CH - Network Server 01-ERP-0003 27,849 28,684 29,545 30,431 31,344 147,853
Computers 01-ERP-0006 38,686 39,847 41,042 42,273 43,541 205,389
Core Network Switch 01-ERP-0012 45,000 45,000
Distribution Network Switches 01-ERP-0014 75,000 75,000
Document Management Scanner (2)01-ERP-0008 14,300 14,300
Electronic Inspections Processing 01-ERP-0052 16,231 16,231
Emergency Preparedness Sirens 01-ERP-0113 45,000 45,000
Extrication Tool (1)01-ERP-0109 36,900 36,900
Fire - Lucus Device 01-ERP-0127 18,500 18,500
Fire Pumper (Engine 3)01-ERP-0101 1,500,000 1,500,000
Fire Radios - Portable and Mobile
Devices 01-ERP-0125 445,000 445,000
Floor Scrubber 01-ERP-0114 25,500 25,500
Forestry Boom/Chipper Box Truck 01-ERP-0818 240,000 240,000
Front End Loaders (2)01-ERP-0308 268,000 268,000
Hot Water High Pressure Vehicle Washer 01-ERP-0711 8,300 8,300
IT - Laptops for Mobile Computer Lab 01-ERP-0021 10,927 11,941 22,868
IT - Office 365 01-ERP-0017 71,680 73,180 74,680 76,180 77,680 373,400
IT - Patching Automation Software 01-ERP-0020 40,000 40,000 40,000 11,255 11,593 142,848
IT - Sandbox Security Appliance 01-ERP-0024 45,000 45,000
IT - Windows 10 Enterprise Upgrade 01-ERP-0022 43,260 44,558 45,895 47,271 48,690 229,674
Ladder #7 01-ERP-0100 1,700,000 1,700,000
Large Turf Mower 01-ERP-0810 121,609 121,609
Marked Patrol Vehicles (7)01-ERP-0200 145,000 150,000 150,000 155,000 140,000 740,000
Network Infrastructure Upgrade - Fiber 01-ERP-0009 70,000 70,000
PD - Network Server 01-ERP-0211 27,849 28,684 29,545 30,431 31,344 147,853
Permitting and Licensing Software
Upgrade 796DQPWR 120,000 120,000
Police Equipment 01-ERP-0227 12,500 13,750 15,125 41,375
PSO / Parking Enforcement Vehicle 01-ERP-0202 75,000 75,000
PSO - Utility 4x4 01-ERP-0203 95,000 95,000
PW - Truck Scan Kit 01-ERP-0714 14,143 14,143
Produced Using Plan-It CIP Software
10
Regenerative Air Sweeper 01-ERP-0319 210,000 210,000
Riding Floor Sweeper 01-ERP-0324 40,000 40,000
Self Contained Breathing Apparatus
(SCBA) (45)01-ERP-0108 400,000 400,000
Sergeant's Vehicle 01-ERP-0201 72,500 72,206 144,706
Skid Loader 01-ERP-0815 45,600 45,600
Skid Loader (2)01-ERP-0309 59,700 59,700
Squad Car Camera Systems 01-ERP-0212 26,640 26,640 26,640 26,640 30,000 136,560
Squad Computers 01-ERP-0220 140,000 140,000
Striper 01-ERP-0313 16,000 16,000
Supervisor Vehicle OH7I84S6 40,000 40,000
Tactical Ballistic Vests / Helmets - SWAT 01-ERP-0214 12,000 88,697 100,697
Taser Replacement 01-ERP-0217 200,000 200,000
Thermal Imaging Camera (2)01-ERP-0112 18,600 20,000 38,600
Trailer 01-ERP-0323 30,000 30,000
Video Servers 60,000 60,000
Workout Equipment - Dumb Bells 01-ERP-0122 6,700 6,700
Workout Equipment - Treadmill 01-ERP-0116 7,800 7,800
Equipment Replacement Fund Total 1,654,495 989,428 4,256,540 1,445,287 877,888 9,223,638
PA - Pavilion Fund
Pavilion - Electric Ice Edger 01-ERP-1001 8,900 8,900
Pavilion - Floor Scrubber 01-ERP-1003 16,000 16,000
Pavilion Ice Resurfacer 01-ERP-1000 165,000 165,000
Pavilion - Scissor Lift 01-ERP-1004 10,000 10,000
PA - Pavilion Fund Total 10,000 16,000 173,900 0 0 199,900
RF - Refuse Fund
Refuse Truck (RAP-R) (2)01-ERP-0900 350,000 350,000
RF - Refuse Fund Total 350,000 0 0 0 0 350,000
SF - Sanitary Sewer Fund
3/4 Ton Utility Truck 01-ERP-0551 87,000 87,000
SF - Sanitary Sewer Fund Total 0 87,000 0 0 0 87,000
WF - Water Fund
3/4 Ton Truck 01-ERP-0500 80,000 80,000
3/4 Ton Utility Truck 01-ERP-0501 80,000 80,000
WF - Water Fund Total 0 160,000 0 0 0 160,000
GRAND TOTAL 2,014,495 1,271,728 4,440,440 1,461,287 877,888 10,065,838
Source Project #2025 2026 2027 2028 2029 Total
Produced Using Plan-It CIP Software
11
Activity
Center
-
Floor
Scrubber
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0035
Project Name Activity Center - Floor Scrubber
Total Project Cost $20,700 Department Comm Svcs - Activity Center
Type Equipment Category Equipment
Status Active Useful Life 10 years
Description
Floor scrubbed is used to clean tiled floors at the Activity Center
Justification/Sustainability
Floor scrubber has been used to the extent of it's useful life.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
5,000 Equipment 0 6,700 0 0 0 6,700 9,000
Total 0 6,700 0 0 0 6,700
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
5,000 Equipment Replacement Fund 0 6,700 0 0 0 6,700 9,000
Total 0 6,700 0 0 0 6,700
Budget Impact
New item for 2016
Produced Using Plan-It CIP Software
12
Art
Center
Floor
Scrubber
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-1109
Project Name Art Center Floor Scrubber
Total Project Cost $33,316 Department Comm Svcs - Arts Center
Type Equipment Category Equipment
Status Active Useful Life 10 years
Description
26-inch auto scrubber
Justification/Sustainability
Current scrubber has reached its lifetime and no longer spins fast enough to be effective.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
8,000 Equipment 0 10,800 0 0 0 10,800 14,516
Total 0 10,800 0 0 0 10,800
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
8,000 AC - Arts Center Fund 0 10,800 0 0 0 10,800 14,516
Total 0 10,800 0 0 0 10,800
Budget Impact
Variance from 20 year plan - New item Estimate salvage/resale value on replaced item: $-0-
Produced Using Plan-It CIP Software
13
Art
Center
Jaycee
Studio
Audio
Visual
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-1105
Project Name Art Center Jaycee Studio Audio Visual
Total Project Cost $64,015 Department Comm Svcs - Arts Center
Type Equipment Category Equipment
Status Active Useful Life 7 years
Description
Install a projector in a ceiling mount. Wire speakers into the ceiling. Wire input for computer on front wall. Add two microphones. Mount supporting hardware in rack that fits
into closet. Originally scheduled for the Community Room this project was moved to the Jaycee Studio as they found a greater need for this equipment in that room.
Justification/Sustainability
An increasing number of users of this room require media support. Current means of providing this include the use of an oversized A/V cart, cords stretch across the floor
and a large speaker on a stick. We can streamline the appearance and functionality by making these appropriate changes. These changes also address safety concerns.
They will help attract safety concerns. They will help attract and retain rental customers as well as appropriately support our own activities.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
11,000 Equipment 0 0 0 16,000 0 16,000 37,015
Total 0 0 0 16,000 0 16,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
11,000 AC - Arts Center Fund 0 0 0 16,000 0 16,000 37,015
Total 0 0 0 16,000 0 16,000
Budget Impact
Move this item from 2014 to 2015.
Produced Using Plan-It CIP Software
14
Art
Center
Kitchen
Catering
Equipment
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-1102
Project Name Art Center Kitchen Catering Equipment
Total Project Cost $22,223 Department Comm Svcs - Arts Center
Type Equipment Category Equipment
Status Completed Useful Life 12 years
Description
Under counter freezer and refrigerator in catering kitchen.
Justification/Sustainability
These units are used for storing food for HCA events and for rental clients.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
5,000 Equipment 0 7,100 0 0 0 7,100 10,123
Total 0 7,100 0 0 0 7,100
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
5,000 AC - Arts Center Fund 0 7,100 0 0 0 7,100 10,123
Total 0 7,100 0 0 0 7,100
Budget Impact
Variance from 20 year plan - New item. Current pricing $2049 refrigerator, $2207 freezer plus delivery. Estimate salvage/resale value on replaced item: $-0-
Produced Using Plan-It CIP Software
15
Art
Center
Lobby
Public
Announcement
Equipment
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-1114
Project Name Art Center Lobby Public Announcement Equipment
Total Project Cost $23,064 Department Comm Svcs - Arts Center
Type Equipment Category Equipment
Status Active Useful Life 10 years
Description
Wireless PA System for Lobby Equipment and labor: $5000 Public Announcement system that would allow for announcements throughout the lobby for events and
emergencies.
Justification/Sustainability
We currently have no way of making announcements in the lobby without having a speaker and microphone set up. It would be helpful to be able to make general
announcements for events or in case of an emergency. General announcements other than during a scheduled event.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
5,000 Equipment 0 0 10,000 0 0 10,000 8,064
Total 0 0 10,000 0 0 10,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
5,000 AC - Arts Center Fund 0 0 10,000 0 0 10,000 8,064
Total 0 0 10,000 0 0 10,000
Produced Using Plan-It CIP Software
16
Art
Center
Theater
Presentation
Microphones
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-1108
Project Name Art Center Theater Presentation Microphones
Total Project Cost $43,979 Department Comm Svcs - Arts Center
Type Equipment Category Buildings: Arts Center
Status Active Useful Life 6 years
Description
Replace theater lapel (3) and hand held (3) microphones with supporting transmitters, receivers, splitter kit and rack mount kit.
Justification/Sustainability
Current microphones are of insufficient quality to work well in a space as large as the theater resulting in technical glitches during presentations. These are necessary for
Center functions, City functions and rental events in the theater.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
13,100 Equipment 0 8,500 0 0 0 8,500 22,379
Total 0 8,500 0 0 0 8,500
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
13,100 AC - Arts Center Fund 0 8,500 0 0 0 8,500 22,379
Total 0 8,500 0 0 0 8,500
Budget Impact
Variance from 20-year plan: New item.
Produced Using Plan-It CIP Software
17
Art
Center
Theater
Projector
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-1104
Project Name Art Center Theater Projector
Total Project Cost $75,000 Department Comm Svcs - Arts Center
Type Equipment Category Equipment
Status Pending Useful Life 5 years
Description
Current projector is 3000 lumen -- 6500 lumen is required for theater usage including in partial light situations and to achieve the clarity needed for detailed images. Such a
projector costs about $7,200 (including mounting and rigging hardware, cables and installation labor). The projector also needs to be part of a professional system that
permits it to be operated from the theater tech booth or from on-stage -- the current projector is only operable from a hand-held remote requiring the operator to dash into the
audience of the theater. This total cost of $15,200 includes all the wiring and hardware needed to support a projector well into the future. The projector itself is estimated to
have a 5-year useful life. (The existing projector will be moved to one of the meeting rooms).
Justification/Sustainability
The justification of this expense is two-fold: First, in order to attract and retain arts and corporate renters we need to be able to provide the technical support required for their
events. Income from such rentals (including Pen Pals and Digital Rivers) is becoming increasingly vital to the financial health of the Center. If we are not capable of
competing with similar size venues, we will lose this income. Secondly, as a professional arts presenter we need to have the technical capabilities to run our own programs in
a professional manner. Year 2018: $17,100 Year 2023 $19,800 Year 2028 $22,900
Prior Expenditures 2025 2026 2027 2028 2029 Total
52,100 Equipment 0 0 0 22,900 0 22,900
Total 0 0 0 22,900 0 22,900
Prior Funding Sources 2025 2026 2027 2028 2029 Total
52,100 AC - Arts Center Fund 0 0 0 22,900 0 22,900
Total 0 0 0 22,900 0 22,900
Budget Impact
Investing $15, 000 to retain major renters such as Pen Pals and Digital Rivers is worthwhile. Pen Pals alone brings in about $20.000/year in income. Digital Rivers just under
$9,000.
Produced Using Plan-It CIP Software
18
Backup
Server
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0015
Project Name Backup Server
Total Project Cost $801,110 Department Comm Svcs - IT
Type Equipment Category Equipment
Status Active Useful Life 3 years
Description
Group of Dell servers to run Dell Rapid Recovery software to backup city computers and servers, along with Windows and VMWare licsensing required to run the servers.
Justification/Sustainability
Backup servers are essential to keep the electronic data for the city safe. We have overgrown our current system and are not able to backup everything that needs to be
backed up in a timely manor. Additinally restores on the curent system take hours to days. If we needed to restore a critical server from backup, we would be looking at an
unacceptable amount of downtime.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
204,120 Equipment 0 78,808 0 0 86,115 164,923 432,067
Total 0 78,808 0 0 86,115 164,923
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
204,120 Equipment Replacement Fund 0 78,808 0 0 86,115 164,923 432,067
Total 0 78,808 0 0 86,115 164,923
Produced Using Plan-It CIP Software
19
CH
-
Network
Server
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0003
Project Name CH - Network Server
Total Project Cost $1,113,900 Department Comm Svcs - IT
Type Equipment Category Equipment
Status Active Useful Life 1 year
Description
The network server is the hub of the network. New computers are faster and more reliable.
Justification/Sustainability
Networking allows user to share information that is stored in a single location, the network server. This is more efficient because the information does not have to be stored
on many different computers. It also makes for better accuracy because as the information changes or is updated, every user is working with the same data.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
315,287 Equipment 27,849 28,684 29,545 30,431 31,344 147,853 650,760
Total 27,849 28,684 29,545 30,431 31,344 147,853
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
315,287 Equipment Replacement Fund 27,849 28,684 29,545 30,431 31,344 147,853 650,760
Total 27,849 28,684 29,545 30,431 31,344 147,853
Budget Impact
Changes reflect anticipated need for increased storage.
Produced Using Plan-It CIP Software
20
Computers
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0006
Project Name Computers
Total Project Cost $1,852,679 Department Comm Svcs - IT
Type Equipment Category Equipment
Status Active Useful Life 3 years
Description
Personal computer purchases and upgrades for the entire City staff. Coordinating personal computer purchases from individual departments to one fund.
Justification/Sustainability
Tools enabling staff to perform job responsibilities efficiently and effectively.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
743,328 Equipment 38,686 39,847 41,042 42,273 43,541 205,389 903,962
Total 38,686 39,847 41,042 42,273 43,541 205,389
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
743,328 Equipment Replacement Fund 38,686 39,847 41,042 42,273 43,541 205,389 903,962
Total 38,686 39,847 41,042 42,273 43,541 205,389
Budget Impact
Increase in expenditure a result of supporting more computers than when the original allotment was put in place.
Produced Using Plan-It CIP Software
21
Core
Network
Switch
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0012
Project Name Core Network Switch
Total Project Cost $158,878 Department Comm Svcs - IT
Type Equipment Category Equipment
Status Active Useful Life 6 years
Description
Provides layer 3 IP presence for the network, core switching connectivity, backbone on which all network communication is built and facilitates fiber optic network connection
to fire department. 2 - Cisco 3560E-24PD managed switch - $3,000 each 2 - Cisco X2-10GB-LR fiber optic transceiver - $1200 each cost listed is for equipment only and does
not include tax, shipping and other related costs
Justification/Sustainability
Current two switches are obsolete, end of life and no longer supported by manufacturer. Past lost of service resulted in significant network outage that was immediately
noticed by many employees.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
27,000 Equipment 45,000 0 0 0 0 45,000 86,878
Total 45,000 0 0 0 0 45,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
27,000 Equipment Replacement Fund 45,000 0 0 0 0 45,000 86,878
Total 45,000 0 0 0 0 45,000
Budget Impact
Variance from 20 year plan - Not currently in ERP but critical to network communication infrastructure. This is outside the budget for city hall server network budget as the
Lisa service is scheduled for replacement due to end of life, out of PCI compliance and obsolete. 2015 - change amount from $12,000 to $17,000 - more expensive than
originally thought based on 2015 replacement. Estimate salvage/resale value on replace item: - $-0-
Produced Using Plan-It CIP Software
22
Distribution
Network
Switches
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0014
Project Name Distribution Network Switches
Total Project Cost $356,486 Department Comm Svcs - IT
Type Equipment Category Equipment
Status Active Useful Life 5 years
Description
We have 25 distribution network switches in our enterprise environment along with fiber optic transceivers and direct attach sfp cables to connect them. Distribution switches
connect to the core switches and bring the data to the actual endpoints such as desktops, servers, telephones, and copiers.
Justification/Sustainability
Replacement of these switches with current technology is vital to the function of the network as well as the safety of the data being passed through the switch.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
50,000 Equipment 75,000 0 0 0 0 75,000 231,486
Total 75,000 0 0 0 0 75,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
50,000 Equipment Replacement Fund 75,000 0 0 0 0 75,000 231,486
Total 75,000 0 0 0 0 75,000
Budget Impact
2016 - New item in ERP
Produced Using Plan-It CIP Software
23
Financial
Software
-
Various
Depts.
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0005
Project Name Financial Software - Various Depts.
Total Project Cost $1,593,000 Department Comm Svcs - IT
Type Equipment Category Equipment
Status Pending Useful Life 7 years
Description
Finance software upgrade. Software currently used by Finance, City Clerk, Inspections and Public Works. This includes software for all finance applications including general
ledger, payroll, accounts payable, accounts receivable, fixed assets, utility billing; Business Licenses, Building Permits, GIS Mapping, Purchasing, etc.
Justification/Sustainability
Current software vendor is unable to keep up with technology and internet security standards. Staff is often frustrated with how the software works and are often unable to get
reports they need from the system.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
415,000 Equipment 315,000 0 0 0 0 315,000 863,000
Total 315,000 0 0 0 0 315,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
415,000 Equipment Replacement Fund 315,000 0 0 0 0 315,000 863,000
Total 315,000 0 0 0 0 315,000
Budget Impact
Variance from 20 year plan - replacement needed in 2014 Estimate salvage/resale value on replaced item: $-0-
Produced Using Plan-It CIP Software
24
IT
-
Laptops
for
Mobile
Computer
Lab
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0021
Project Name IT - Laptops for Mobile Computer Lab
Total Project Cost $102,777 Department Comm Svcs - IT
Type Operating Budget Item Category Equipment
Status Active Useful Life 3 years
Description
Laptops for emergency management and training city employees.
Justification/Sustainability
The city has a need for a mobile computer lab to assist with both emergency management preparedness and with employee training opportunities. The process improvement
commmittee has identified a need to setup an internal training program for employees on existing software as well as future software initiatives. This ERP item would
purchase 10 - 15 low cost laptops to be utilized for giving employees hands on training with Office, Springbrook, Laserfiche, and other future software.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
20,000 Equipment 0 10,927 0 0 11,941 22,868 59,909
Total 0 10,927 0 0 11,941 22,868
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
20,000 Equipment Replacement Fund 0 10,927 0 0 11,941 22,868 59,909
Total 0 10,927 0 0 11,941 22,868
Produced Using Plan-It CIP Software
25
IT
-
Office
365
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0017
Project Name IT - Office 365
Total Project Cost $2,545,690 Department Comm Svcs - IT
Type Equipment Category Equipment
Status Active Useful Life 1 year
Description
Transition from the legacy model of Microsoft Office to Office 365. This project would transition 25 percent of our users and devices per year.
Justification/Sustainability
As we become a more mobile workforce embracing new mobile and remote technology we need to move away from the traditonal office that can only be installed on a
Windows computer and transition to the version of Office that can be used in the cloud and as a mobile app. Unfortunately, as is becoming common with most enterprise
softwre, you can no longer just purchase it out right, you must rent it from the software author. The cost for Office 365 will now be a yearly ongoing cost. Office 365 is
common at other cities, corporations, and educational environments.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
199,320 Equipment 71,680 73,180 74,680 76,180 77,680 373,400 1,972,970
Total 71,680 73,180 74,680 76,180 77,680 373,400
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
199,320 Equipment Replacement Fund 71,680 73,180 74,680 76,180 77,680 373,400 1,972,970
Total 71,680 73,180 74,680 76,180 77,680 373,400
Produced Using Plan-It CIP Software
26
IT
-
Patching
Automation
Software
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0020
Project Name IT - Patching Automation Software
Total Project Cost $458,333 Department Comm Svcs - IT
Type Equipment Category Equipment
Status Active Useful Life 1 year
Description
Software to automate the delivery of critical and maintenance patches to our enterprise endpoints and yearly maintenance of the software going forward.
Justification/Sustainability
Microsoft software has to be patched the second Tuesday of every month. Adobe software has to be patched every time a critical vulnerability is discovered, which can be
twice in a week in a bad week. Other applications have to be patched as new releases are produced from vendors. Currently our staff must touch every endpoint for the
majority of the software installs. We are using up an inordinate amount of staff time to patch all of our endpoints only to have to restart the cycle 3 weeks later. Automation of
this process would free up staff time to work on other projects and problems for the city. Approx. two full weeks of 1FTE per month or 960 hours per year saved.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
129,000 Equipment 40,000 40,000 40,000 11,255 11,593 142,848 186,485
Total 40,000 40,000 40,000 11,255 11,593 142,848
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
129,000 Equipment Replacement Fund 40,000 40,000 40,000 11,255 11,593 142,848 186,485
Total 40,000 40,000 40,000 11,255 11,593 142,848
Produced Using Plan-It CIP Software
27
IT
-
Sandbox
Security
Appliance
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0024
Project Name IT - Sandbox Security Appliance
Total Project Cost $272,000 Department Comm Svcs - IT
Type Equipment Category Equipment
Status Active Useful Life 5 years
Description
The sandbox is a security appliance that integrates into the overall security fabric of the city providing an automated method of detecting malware.
Justification/Sustainability
The city relies on our sandbox as a place to investigate questionable files that user received to determine if they are safe to open. The sandbox performs automated analysis
that would normally take a significatn amount of manual time invested to determine if an item is dangerous. This allows the IT department to perform investigations in
minutes instead of hours. The existing sandbox has proved extremly useful over the last 5 years and needs to be replaced because it is no longer supported by the ventor
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
45,000 Equipment 0 45,000 0 0 0 45,000 182,000
Total 0 45,000 0 0 0 45,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
45,000 Equipment Replacement Fund 0 45,000 0 0 0 45,000 182,000
Total 0 45,000 0 0 0 45,000
Produced Using Plan-It CIP Software
28
IT
-
Windows
10
Enterprise
Upgrade
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0022
Project Name IT - Windows 10 Enterprise Upgrade
Total Project Cost $1,201,909 Department Comm Svcs - IT
Type Equipment Category Unassigned
Status Active Useful Life 1 year
Description
Upgrade Windows 10 Pro software to Windows 10 Enterprise. Required to renew every 3 years. This plan would bring the PD into compliance in 2020 then upgrade 60 city
computers a year until all city computers are upgraded. Each batch of 60 computers needs to be renewed every 3 years. It is estimated that it will take 3 years to fully
upgrade the city to Windows 10 Enterprise.
Justification/Sustainability
The BCA has mandated that we move to Enterprise edition for our Windows computers in the PD. Microsoft is changing the way they deliver Windows. It is becoming like
Office, where you will no longer own Windows outright, you will have to rent it from them. We have to switch to Enterprise in the PD for compliance reasons, but it is strongly
suggested that we plan on switching to Enterprise for all city computers as well. There may come a time where we are forced to switch to Enterprise edition for the city. It
would be ideal to plan ahead and budget money for a gradual upgrade for the city so it doesn't come as a surprise.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
189,000 Equipment 43,260 44,558 45,895 47,271 48,690 229,674 783,235
Total 43,260 44,558 45,895 47,271 48,690 229,674
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
189,000 Equipment Replacement Fund 43,260 44,558 45,895 47,271 48,690 229,674 783,235
Total 43,260 44,558 45,895 47,271 48,690 229,674
Produced Using Plan-It CIP Software
29
Network
Infrastructure
Upgrade
-
Fiber
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0009
Project Name Network Infrastructure Upgrade - Fiber
Total Project Cost $145,000 Department Comm Svcs - IT
Type Equipment Category Equipment
Status Active Useful Life 15 years
Description
Install fiber and related equipment to maintain and add reduncancy
Justification/Sustainability
Improve capacity, coverage and reliability.
Prior Expenditures 2025 2026 2027 2028 2029 Total
75,000 Equipment 70,000 0 0 0 0 70,000
Total 70,000 0 0 0 0 70,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total
75,000 Equipment Replacement Fund 70,000 0 0 0 0 70,000
Total 70,000 0 0 0 0 70,000
Budget Impact
Variance from 20 year plan - new item to replace substandard network wiring. Estimate salvage/resale value on replaced item: $
Produced Using Plan-It CIP Software
30
PD
-
Network
Server
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0211
Project Name PD - Network Server
Total Project Cost $1,118,901 Department Comm Svcs - IT
Type Equipment Category Equipment
Status Active Useful Life 1 year
Description
Computer servers store information and system programs for Police Department.
Justification/Sustainability
Annual replacement cycle allows development of system storage program. Use of newer servers for heavy use programs while older servers used for data storage
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
320,288 Equipment 27,849 28,684 29,545 30,431 31,344 147,853 650,760
Total 27,849 28,684 29,545 30,431 31,344 147,853
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
320,288 Equipment Replacement Fund 27,849 28,684 29,545 30,431 31,344 147,853 650,760
Total 27,849 28,684 29,545 30,431 31,344 147,853
Produced Using Plan-It CIP Software
31
Permitting
and
Licensing
Software
Upgrade
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #796DQPWR
Project Name Permitting and Licensing Software Upgrade
Total Project Cost $120,000 Contact Asst City Manager
Department Comm Svcs - IT Type Equipment
Category Equipment Status Active
Useful Life 8 years
Description
New Permitting and Licensing Software. Software currently used by Inspections, Fire, City Clerk, Public Works, and Planning & Development. The City would acquire
software that manages and processes the City's permits and licenses including: permits for building, plumbing, electrical, mechanical, water/sewer, street closure, right-of-
way/utility excavation, fire-related/alarm systems, water meters, and planning and zoning requests; licenses including business, contractors, and rental housing; and code
enforcement.
New permitting and licensing software would add transparency, enhance work flows, and an improved customer portal for residents and customers. A new permitting
platform would allow integration with the City's electronic plan review software. Staff would also look for vendors capable of providing both Finance and Permitting/Licensing
platforms for potential cost and efficiency savings.
Justification/Sustainability
The current permitting software is outdated and lacks customer service and efficiency components that our peer communities offer. Our customers regularly request
additional online service capabilities. Staff is frustrated with the software's operability and lack of customization. IT staff has concerns about the maintenance needs of the
software and security issues it presents.
Expenditures 2025 2026 2027 2028 2029 Total
Equipment 0 120,000 0 0 0 120,000
Total 0 120,000 0 0 0 120,000
Funding Sources 2025 2026 2027 2028 2029 Total
Equipment Replacement Fund 0 120,000 0 0 0 120,000
Total 0 120,000 0 0 0 120,000
Budget Impact
Software is anticipated to have an annual subscription fee estimated at $40,000.
Produced Using Plan-It CIP Software
32
Video
Servers
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #None
Project Name Video Servers
Total Project Cost $60,000 Contact IT Director
Department Comm Svcs - IT Type Equipment
Category Trans: Parking Facilities Status Active
Useful Life 3 years
Description
Purchase two video servers to support the existing video cameras in the parking ramp. The ownership of the video cameras was transferred from Hennepin County to the
City of Hopkins. The video servers are needed to make them functional.
Justification/Sustainability
Video cameras help prevent and deter crime in the parking ramp.
Expenditures 2025 2026 2027 2028 2029 Total
Equipment 60,000 0 0 0 0 60,000
Total 60,000 0 0 0 0 60,000
Funding Sources 2025 2026 2027 2028 2029 Total
Equipment Replacement Fund 60,000 0 0 0 0 60,000
Total 60,000 0 0 0 0 60,000
Produced Using Plan-It CIP Software
33
Document
Management
Scanner
(2)
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0008
Project Name Document Management Scanner (2)
Total Project Cost $101,873 Department Community Services
Type Equipment Category Equipment
Status Active Useful Life 4 years
Description
Large document (11” x17”) scanner for document management and retention as well as general administrative use. Purchased two scanners in 2012 at a cost of $10,315 - 1
at scanner station, 1 in City Clerk's office Current equipment: Canon DR 7550C
Justification/Sustainability
Scanners are needed for converting paper copies to electronic data to reduce storage space.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
33,300 Equipment 0 0 0 14,300 0 14,300 54,273
Total 0 0 0 14,300 0 14,300
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
33,300 Equipment Replacement Fund 0 0 0 14,300 0 14,300 54,273
Total 0 0 0 14,300 0 14,300
Budget Impact
Variance from 20 year plan - Two scanners purchased in 2012 and will be replaced every four years. Estimate salvage/resale value on replaced item: $500-$1,000
Produced Using Plan-It CIP Software
34
Electronic
Inspections
Processing
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0052
Project Name Electronic Inspections Processing
Total Project Cost $96,150 Department Community Services
Type Equipment Category Equipment
Status Active Useful Life 5 years
Description
Included in this request are equipment needed to move to an electronic plan review and inspections process. Revu -Bluebeam electronic plan review software - 2020 -
$1,100 (useful life 8-10 years) Ipads - 2020 - $5,400 (useful life 5-6 years) Rental Inspection software - 2020 - $7,500 (useful life 7-10 years)
Justification/Sustainability
As more and more contractors and architects ask to submit plan electronically, Blubeam software will enable inspectors to perform electronic plan reviews which will make
the plan review process more efficient and enhance customer service. As the inspection and construction industry becomes more paperless, iPads will enable inspectors to
use mobile technology to keep up with the requests of engineers, architect, contractors, landlords and residents. Ipads are a key piece that will enable staff to view electronic
plans in the field. Going paperless will eventually eliminate our need for paper plan scanning and sorting which is very time consuming and costs $1,500 - $2,000 per year.
The software company currently used by Rental Inspectors has recently gone out of business and support for the software is going to be on a very limited basis after 2020.
Because rental inspections effect such a large part of the city and the department, I believe getting a new software in place before the existing software stops functioning is
essential to the rental inspection program.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
14,000 Equipment 16,231 0 0 0 0 16,231 65,919
Total 16,231 0 0 0 0 16,231
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
14,000 Equipment Replacement Fund 16,231 0 0 0 0 16,231 65,919
Total 16,231 0 0 0 0 16,231
Produced Using Plan-It CIP Software
35
Emergency
Preparedness
Sirens
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0113
Project Name Emergency Preparedness Sirens
Total Project Cost $72,000 Department Fire
Type Equipment Category Equipment
Status Active Useful Life 20 years
Description
Emergency warning system for City of Hopkins.
Prior Expenditures 2025 2026 2027 2028 2029 Total
27,000 Equipment 0 45,000 0 0 0 45,000
Total 0 45,000 0 0 0 45,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total
27,000 Equipment Replacement Fund 0 45,000 0 0 0 45,000
Total 0 45,000 0 0 0 45,000
Budget Impact
Variance from 20 year plan - None Estimate salvage/resale value on replaced item: $-0-
Produced Using Plan-It CIP Software
36
Extrication
Tool
(1)
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0109
Project Name Extrication Tool (1)
Total Project Cost $240,800 Department Fire
Type Equipment Category Equipment
Status Active Useful Life 10 years
Description
Hydraulic rescue and extrication tool with spreader, cutters and hydraulic ram.
Justification/Sustainability
All vehicle and industrial rescue situations which will require patient disentanglement or entrapment. This tool will be added to the purchase of the quick attack pumper. The
tool will be scaled down to a smaller tool, possibly reducing cost.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
109,600 Equipment 0 0 0 0 36,900 36,900 94,300
Total 0 0 0 0 36,900 36,900
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
109,600 Equipment Replacement Fund 0 0 0 0 36,900 36,900 94,300
Total 0 0 0 0 36,900 36,900
Budget Impact
Estimate salvage/resale value on replaced item: $1,000 Purchased: 2007
Produced Using Plan-It CIP Software
37
Fire
-
Lucus
Device
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0127
Project Name Fire - Lucus Device
Total Project Cost $98,686 Department Fire
Type Equipment Category Equipment
Status Active Useful Life 5 years
Description
Lucus device is used to assist CPR during full arrest. The current device was purchased in 2016 and with changed in technology, it is recommended to update every 5 years.
Justification/Sustainability
To continue to serve citizens of Hopkins during medical incidents.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
18,000 Equipment 0 0 0 18,500 0 18,500 62,186
Total 0 0 0 18,500 0 18,500
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
18,000 Equipment Replacement Fund 0 0 0 18,500 0 18,500 62,186
Total 0 0 0 18,500 0 18,500
Budget Impact
Reoccurs every 5 years.
Produced Using Plan-It CIP Software
38
Fire
Pumper
(Engine
3)
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0101
Project Name Fire Pumper (Engine 3)
Total Project Cost $3,250,000 Department Fire
Type Equipment Category Vehicles
Status Active Useful Life 25 years
Description
1500 GPM fire pumper, fully equipped to respond to all fire situations in the city. Responds to mutual aid calls in other cities. This truck wil be pushed back to 2027 and will
also be on a 10 year rotation. Current vehicle: 2006 Peterbilt Fire Pumper 357 (#103)
Justification/Sustainability
Current unit is a first out pumper. This apparatus construction will require 25 year specifications for life of the apparatus.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
400,000 Equipment 0 0 1,500,000 0 0 1,500,000 1,350,000
Total 0 0 1,500,000 0 0 1,500,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
400,000 Equipment Replacement Fund 0 0 1,500,000 0 0 1,500,000 1,350,000
Total 0 0 1,500,000 0 0 1,500,000
Budget Impact
Variance from 20 year plan - None Estimate salvage/resale value on replaced item: $2,500
Produced Using Plan-It CIP Software
39
Fire
Radios
-
Portable
and
Mobile
Devices
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0125
Project Name Fire Radios - Portable and Mobile Devices
Total Project Cost $2,394,328 Department Fire
Type Equipment Category Equipment
Status Active Useful Life 5 years
Description
Portable and mobile radios used by the police departments to allow the department to communicate on one frequency. Fire has 50 portable and 13 mobile radios along with
50 pagers. Cost in ERP includes portable radios (30), portable radio's encrypted (20), mobile radio's (13), pagers (50), chargers single (60), charger base (3) plus other
needed equipment. Details of all items are on file with Fire and Finance Depts.
Justification/Sustainability
Provides radios so that the police, fire and public works can communicate on a common radio frequency during an emergency and multiple county interoperability.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
294,075 Equipment 445,000 0 0 0 0 445,000 1,655,253
Total 445,000 0 0 0 0 445,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
294,075 Equipment Replacement Fund 445,000 0 0 0 0 445,000 1,655,253
Total 445,000 0 0 0 0 445,000
Budget Impact
In 2016 the Fire radios were separated from Police for better accountability. Project was adjusted for current pricing. 2025 - 356,500 FD 2025 - 29,500 PW
Produced Using Plan-It CIP Software
40
Floor
Scrubber
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0114
Project Name Floor Scrubber
Total Project Cost $68,741 Department Fire
Type Equipment Category Equipment
Status Active Useful Life 12 years
Description
Floor scrubber to keep apparatus floors clean. Current equipment: 2004 Tennant 5400
Justification/Sustainability
Scrubber is used to keep apparatus floors clean so that floor will last longer.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
14,300 Equipment 0 0 25,500 0 0 25,500 28,941
Total 0 0 25,500 0 0 25,500
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
14,300 Equipment Replacement Fund 0 0 25,500 0 0 25,500 28,941
Total 0 0 25,500 0 0 25,500
Budget Impact
Variance from 20 year plan - Eliminate sweeper and add scrubber as scrubber is used more. Move from 2016 to 2015 Estimate salvage/resale value on replaced item: $0
Produced Using Plan-It CIP Software
41
Ladder
#7
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0100
Project Name Ladder #7
Total Project Cost $1,700,000 Department Fire
Type Equipment Category Vehicles
Status Active Useful Life 10 years
Description
Fire engine: full size response truck Current vehicle:
Justification/Sustainability
This is a replacement engine for response to emergency response in the City. We will be reducing the fleet by one truck in making this one unit (ladder/pumper) which would
reduce the life of a vehicle from 25 years to 10 years. We are finding that the life a vehicle is no longer 20 years.
Expenditures 2025 2026 2027 2028 2029 Total
Equipment 0 0 1,700,000 0 0 1,700,000
Total 0 0 1,700,000 0 0 1,700,000
Funding Sources 2025 2026 2027 2028 2029 Total
Equipment Replacement Fund 0 0 1,700,000 0 0 1,700,000
Total 0 0 1,700,000 0 0 1,700,000
Budget Impact
Variance from 20 year plan - was scheduled for replacement in 2019 and has been moved up to 2017. Change useful life from 25 to 10 years. Updated value to reflect more
accurate replacement cost. Estimate salvage/resale value on replaced item: $
Produced Using Plan-It CIP Software
42
Self
Contained
Breathing
Apparatus
(SCBA)
(45)
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0108
Project Name Self Contained Breathing Apparatus (SCBA) (45)
Total Project Cost $902,000 Department Fire
Type Equipment Category Equipment
Status Active Useful Life 10 years
Description
Breathing apparatus for interior firefighting for firefighters.
Justification/Sustainability
The breathing apparatus was taken out of the ERP in 2006 because we thought we were getting a grant. Grant was not successful. The SCBA's (45) need to be replaced
because they are at the end of their life and cannot be hydro tested any longer.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
166,000 Equipment 400,000 0 0 0 0 400,000 336,000
Total 400,000 0 0 0 0 400,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
166,000 Equipment Replacement Fund 400,000 0 0 0 0 400,000 336,000
Total 400,000 0 0 0 0 400,000
Budget Impact
Variance from 20 year plan - Move back to 2025. Purchased SCBA's in 2015 with grant funds. Estimate salvage/resale value on replaced item: $
Produced Using Plan-It CIP Software
43
Thermal
Imaging
Camera
(2)
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0112
Project Name Thermal Imaging Camera (2)
Total Project Cost $149,905 Department Fire
Type Equipment Category Equipment
Status Active Useful Life 10 years
Description
Used by our fire companies to locate victims trapped in a smoke filled building. It helps us determine where fire and heat may be hidden allowing for faster extinguishment.
Note: purchased 2013 & 2017
Justification/Sustainability
Current camera is ten years old and has been through many hot fires and needs to be replaced. Current camera was purchased with donation money.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
39,400 Equipment 18,600 0 20,000 0 0 38,600 71,905
Total 18,600 0 20,000 0 0 38,600
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
39,400 Equipment Replacement Fund 18,600 0 20,000 0 0 38,600 71,905
Total 18,600 0 20,000 0 0 38,600
Budget Impact
Variance from 20 year plan - department owns 2 cameras. Reoccuring expenditure. Estimate salvage/resale value on replaced item: $-0-
Produced Using Plan-It CIP Software
44
Workout
Equipment
-
Dumb
Bells
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0122
Project Name Workout Equipment - Dumb Bells
Total Project Cost $20,704 Department Fire
Type Equipment Category Equipment
Status Active Useful Life 10 years
Description
Workout equipment used in Fire Department workout room.
Justification/Sustainability
Current dumb bells are 15 plus years old. The current dumb bells are older and some of the weights contained lead based plaint. This purchase would update our dumb bells
to the current type fitness bells.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
5,000 Equipment 6,700 0 0 0 0 6,700 9,004
Total 6,700 0 0 0 0 6,700
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
5,000 Equipment Replacement Fund 6,700 0 0 0 0 6,700 9,004
Total 6,700 0 0 0 0 6,700
Budget Impact
Variance from 20 year plan - Move back from 2014 to 2017. Estimate salvage/resale value on replaced item: $
Produced Using Plan-It CIP Software
45
Workout
Equipment
-
Treadmill
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0116
Project Name Workout Equipment - Treadmill
Total Project Cost $42,704 Department Fire
Type Equipment Category Equipment
Status Active Useful Life 6 years
Description
Workout equipment used in Fire Department workout room. One elliptical machine replaced on a 6 year cycle, one every 3 years.
Justification/Sustainability
This equipment is available to all City employees for health and wellness.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
14,500 Equipment 0 0 7,800 0 0 7,800 20,404
Total 0 0 7,800 0 0 7,800
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
14,500 Equipment Replacement Fund 0 0 7,800 0 0 7,800 20,404
Total 0 0 7,800 0 0 7,800
Budget Impact
Variance from 20 year plan - had two elliptical machines in the ERP. One was replaced along with the Stairmaster with a summit trainer. The remaining elliptical is
scheduled for replacement in 2015. Estimate salvage/resale value on replaced item: $
Produced Using Plan-It CIP Software
46
Pavilion
-
Electric
Ice
Edger
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-1001
Project Name Pavilion - Electric Ice Edger
Total Project Cost $25,861 Department Pavilion
Type Equipment Category Equipment
Status Active Useful Life 10 years
Description
Electric ice edger used for ice maintenance of the Pavilion's ice sheet. An edger is used to shave the ice next to the boards to remove ice buildup that the ice resurfacer
cannot reach. 2014 cost = $6,281.25 Asset ID #5174
Justification/Sustainability
Replace the current battery fueled ice edger with a new model of battery ice edger. Scheduled to replace at the end of useful life should occur in 2026, the model was
purchased in 2014.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
5,000 Equipment 0 0 8,900 0 0 8,900 11,961
Total 0 0 8,900 0 0 8,900
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
5,000 PA - Pavilion Fund 0 0 8,900 0 0 8,900 11,961
Total 0 0 8,900 0 0 8,900
Budget Impact
Variance from 20 year plan - New item. Estimate salvage/resale value on replaced item: $
Produced Using Plan-It CIP Software
47
Pavilion
-
Floor
Scrubber
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-1003
Project Name Pavilion - Floor Scrubber
Total Project Cost $52,567 Department Pavilion
Type Equipment Category Equipment
Status Active Useful Life 10 years
Description
26 to 28 battery operated walk behind floor scrubber. Floor scrubber is used to clean the arenas concrete floor and tiled surfaces throughout the building. 2014 cost =
$8,651.94 Asset ID #5172
Justification/Sustainability
Replace the existing floor scrubber with new model. Current floor scrubber was purchased in 2014 and is scheduled to be replaced in 2024.
Expenditures 2025 2026 2027 2028 2029 Total Future
Equipment 0 16,000 0 0 0 16,000 36,567
Total 0 16,000 0 0 0 16,000
Funding Sources 2025 2026 2027 2028 2029 Total Future
PA - Pavilion Fund 0 16,000 0 0 0 16,000 36,567
Total 0 16,000 0 0 0 16,000
Budget Impact
Variance from 20 year plan - New item Estimate salvage/resale value on replaced item: $
Produced Using Plan-It CIP Software
48
Pavilion
Ice
Resurfacer
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-1000
Project Name Pavilion Ice Resurfacer
Total Project Cost $640,251 Department Pavilion
Type Equipment Category Equipment
Status Active Useful Life 12 years
Description
Ice resurfacer used by the Pavilion for ice sheet maintenance. Current equipment: Zamboni Ice Resurfacer 2014 cost = $116,205.93 Asset ID #5176
Justification/Sustainability
Replace existing electric (battery) ice resurfacer. The current electric ice resurfacer was purchased in 2014 and has a useful life of 12 years and is scheduled for replacement
in 2026.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
240,000 Equipment 0 0 165,000 0 0 165,000 235,251
Total 0 0 165,000 0 0 165,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
240,000 PA - Pavilion Fund 0 0 165,000 0 0 165,000 235,251
Total 0 0 165,000 0 0 165,000
Budget Impact
Variance from 20 year plan - Decrease cost due to 2014 purchase price. Move back one year. Estimate salvage/resale value on replaced item: $30,000
Produced Using Plan-It CIP Software
49
Pavilion
-
Scissor
Lift
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-1004
Project Name Pavilion - Scissor Lift
Total Project Cost $35,240 Department Pavilion
Type Equipment Category Equipment
Status Active Useful Life 15 years
Description
25 foot scissor lift used to perform maintenance duties in the arena. 2014 cost = $10,430.35 Asset ID #5173
Justification/Sustainability
The current model was purchased in 2014 and is scheduled for replacement in 2029. The scissor lift allows staff the ability to perform maintenance on arena lighting fixtures
and other maintenance around the arena ceiling.
Expenditures 2025 2026 2027 2028 2029 Total Future
Equipment 10,000 0 0 0 0 10,000 25,240
Total 10,000 0 0 0 0 10,000
Funding Sources 2025 2026 2027 2028 2029 Total Future
PA - Pavilion Fund 10,000 0 0 0 0 10,000 25,240
Total 10,000 0 0 0 0 10,000
Budget Impact
Variance from 20 year plan - New item Estimate salvage/resale value on replaced item: $
Produced Using Plan-It CIP Software
50
Body
Worn
Cameras
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0222
Project Name Body Worn Cameras
Total Project Cost $899,500 Department Police
Type Equipment Category Equipment
Status Pending Useful Life 5 years
Description
Body worn cameras (BWC) are cameras worn on the person of a police officer to capture the actions of individuals and the situations encountered by police officers. The
BWCs offer video data and evidence that cannot be captured by traditional squad car video systems. The State of Minnesota recently passed legislation regarding the use of
BWCs and the video data associated with their use. The use of BWCs by police officers is an emergeing documentation tool in law enforcement, and considered directly
associated with transparency and positive community relations.
Justification/Sustainability
There are a number of costs associated with the implementation of a BWC program. The State of Minnesota set forth specific data privacy and retention guidelines in the
legislation that must be followed. The legislation mandates the performance of duties that are not currently performed by members of the Police Department staff and may
require the hiring of additional staff to perform the mandated duties. Initial inquiries into BWC platforms indicate the best practice will be the acquistion of one BWC per officer
in contact with the public as a core function of their job duties, which for the Police Department would result in the purchase of 30 BWCs. BWC manufacturers require license
fees per device and ongoing warranty and maintenace fees. Computer software to manage the video data has additional associated costs, not including staff salary /
compensation to perform needed duties.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
160,000 Equipment 0 0 165,000 0 0 165,000 574,500
Total 0 0 165,000 0 0 165,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
160,000 Equipment Replacement Fund 0 0 165,000 0 0 165,000 574,500
Total 0 0 165,000 0 0 165,000
Produced Using Plan-It CIP Software
51
Building
Video
Server
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0218
Project Name Building Video Server
Total Project Cost $165,907 Department Police
Type Equipment Category Equipment
Status Pending Useful Life 3 years
Description
Building Video Server hardware and associated software is used to store video recorded by the cameras in and around the police department including interview rooms as
well as booking. We record approximately 6 TB of video every 2-3 weeks. Large amounts of storage are required for 30 days of archival storage on the server itself.
Justification/Sustainability
Maintenance agreement with software vendor needs to be renewed every three years. Computer hardware should be refreshed around the same time to minimize drive
failure and take advantage of new storage technology.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
59,000 Equipment 0 25,000 0 0 0 25,000 81,907
Total 0 25,000 0 0 0 25,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
59,000 Equipment Replacement Fund 0 25,000 0 0 0 25,000 81,907
Total 0 25,000 0 0 0 25,000
Budget Impact
Variance from 20 year plan - Change in replacement schedule and estimated cost. Current equipment was purchased with DTF funding. Beginning in 2020 it will be funded
with ERP funds. Estimate salvage/resale value on replaced item: $-0-
Produced Using Plan-It CIP Software
52
Marked
Patrol
Vehicles
(7)
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0200
Project Name Marked Patrol Vehicles (7)
Total Project Cost $4,793,000 Department Police
Type Equipment Category Vehicles
Status Active Useful Life 3 years
Description
Marked patrol vehicles used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties. Fleet consists of 8 marked patrol vehicles
Justification/Sustainability
Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for routine and emergency
operations. Vehicles contain secure seating for prisoner transport.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
1,931,600 Vehicles 145,000 150,000 150,000 155,000 140,000 740,000 2,121,400
Total 145,000 150,000 150,000 155,000 140,000 740,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
1,931,600 Equipment Replacement Fund 145,000 150,000 150,000 155,000 140,000 740,000 2,121,400
Total 145,000 150,000 150,000 155,000 140,000 740,000
Produced Using Plan-It CIP Software
53
Police
Equipment
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0227
Project Name Police Equipment
Total Project Cost $121,425 Department Police
Type Equipment Category Equipment
Status Active Useful Life 2 years
Description
The police department needs to maintain law and order during times of civil unrest. We need to allow for the peaceful demonstrations and first amendment rights of our
community members, while ensuring that we have the ability to keep everyone safe and property from being damaged. This requires specialized equipment for each of our
officer.
Justification/Sustainability
Community safety is our priority and specialized equipment is necessary to perform this core function. This includes full face shielts, soft body armor (turltle gear), gas masks
and less lethal munitions, which are necessary to keep officer and the community members safe. The general fund supported numerous acquisitions and purchases in 2021,
however this was only a temporary solution.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
25,000 Equipment 12,500 0 13,750 0 15,125 41,375 55,050
Total 12,500 0 13,750 0 15,125 41,375
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
25,000 Equipment Replacement Fund 12,500 0 13,750 0 15,125 41,375 55,050
Total 12,500 0 13,750 0 15,125 41,375
Produced Using Plan-It CIP Software
54
PSO
/
Parking
Enforcement
Vehicle
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0202
Project Name PSO / Parking Enforcement Vehicle
Total Project Cost $427,572 Department Police
Type Equipment Category Vehicles
Status Active Useful Life 5 years
Description
Marked patrol vehicle used by Parking Enforcement Officer to respond to calls for service, enforce parking laws, and perfom duties as assigned. Current Vehicle: 2021 Ford
Utility (#211) VIN# 1FM5K8AB3MGB53656
Justification/Sustainability
Use by parking enforcement officers in the course of their duties enforcing parking regulations in the downtown area. Set up and marking of police vehicles must conform to
Minnesota law and POST standards. Vehicles contain secure data and radio equipment for routine and emergency operations. Vehicles contain secure seating for prisoner
transport.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
108,900 Vehicles 0 75,000 0 0 0 75,000 243,672
Total 0 75,000 0 0 0 75,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
108,900 Equipment Replacement Fund 0 75,000 0 0 0 75,000 243,672
Total 0 75,000 0 0 0 75,000
Budget Impact
2016 - Change in replacement schedule due to full time use of vehicle and change of position responsibilities. Next replacement scheduled for 2021 from 2026
Produced Using Plan-It CIP Software
55
PSO
-
Utility
4x4
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0203
Project Name PSO - Utility 4x4
Total Project Cost $816,989 Department Police
Type Equipment Category Vehicles
Status Active Useful Life 4 years
Description
Four wheel drive marked patrol vehicle used by PSOs to respond to calls for service, handle animal complaints, and perform other duties associated with department
operations. Current vehicle: 2021 Ford F150 (#212)
Justification/Sustainability
Vehicle is normally used by public service officers for a wide variety of uses such as transporting animals, prisoners and equipment. The 4 wheel drive vehicle is also used at
times as a patrol vehicle, particularly in the winter in extreme snow conditions.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
255,100 Vehicles 0 0 0 95,000 0 95,000 466,889
Total 0 0 0 95,000 0 95,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
255,100 Equipment Replacement Fund 0 0 0 95,000 0 95,000 466,889
Total 0 0 0 95,000 0 95,000
Budget Impact
2023 Variance from 20 year plan - Originally this vehicles was scheduled to be replaced in 2022. Ford cancelled the order, and we missed the next order window. Need to
replace in 2024 and reset ERP schedule.
Produced Using Plan-It CIP Software
56
Sergeant's
Vehicle
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0201
Project Name Sergeant's Vehicle
Total Project Cost $604,988 Department Police
Type Equipment Category Vehicles
Status Active Useful Life 4 years
Description
Marked patrol vehicle used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties. 4 year rotation. Current vehicle: 2021 Ford Utility
(#201) VIN #1FM5K8AB6MGB53652
Justification/Sustainability
Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for routine and emergency
operations. Vehicles contain secure seating for prisoner transport.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
184,600 Vehicles 72,500 0 0 0 72,206 144,706 275,682
Total 72,500 0 0 0 72,206 144,706
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
184,600 Equipment Replacement Fund 72,500 0 0 0 72,206 144,706 275,682
Total 72,500 0 0 0 72,206 144,706
Produced Using Plan-It CIP Software
57
Squad
Car
Camera
Systems
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0212
Project Name Squad Car Camera Systems
Total Project Cost $443,700 Department Police
Type Equipment Category Equipment
Status Active Useful Life 5 years
Description
Squad car camera systems are used to document events inside and outside of the patrol vehicles. The cameras utilize a forward facing camera and a prisoner transport area
camaera. Body cameras capture interactions between the officers and the public for transparency.
Justification/Sustainability
The police vehicle cameras are a necessary component of the patrol vehicles. Evidentiary information is collected from the cameras and often used in court. Cameras also
provide a snapshot of an officers interaction with the public so we are able to maintain transparency and public trust with our operations.
Prior Expenditures 2025 2026 2027 2028 2029 Total
307,140 Equipment 26,640 26,640 26,640 26,640 30,000 136,560
Total 26,640 26,640 26,640 26,640 30,000 136,560
Prior Funding Sources 2025 2026 2027 2028 2029 Total
307,140 Equipment Replacement Fund 26,640 26,640 26,640 26,640 30,000 136,560
Total 26,640 26,640 26,640 26,640 30,000 136,560
Budget Impact
Integrated camera system - 12 squad car cameras Squad cameras 11,100 each over 5 years. The industry has changed its service model for cloud storage of video data.
Body worn cameras moved to Video as a Service (VAAS) and incorporated into the general fund.
Produced Using Plan-It CIP Software
58
Squad
Computers
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0220
Project Name Squad Computers
Total Project Cost $601,242 Department Police
Type Equipment Category Equipment
Status Active Useful Life 5 years
Description
Mobile Data Computers are used in the squad cars to receive calls for service from dispatch, query information from criminal justice databases, and facilitate communication
between squad cars. Replacement in 2029 for 17 computers.
Justification/Sustainability
Mobile Data Computers have a limited life expectancy. The computers facilitate the basic response to emergency calls for service to which police officers respond. Vital
information is forwarded to officers via the mobile data computers. Officers complete investigative reports, issue traffic related warnings and citations, and process arrest
incidents from the mobile data computers. As technology evolves the officers must be able to access information using up to date computers that can process the large
amount of data and applications. Mobile data computers are currently used to host the squad car video camera system and have the potential to be integrated with a possible
body worn camera.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
155,000 Equipment 0 0 0 0 140,000 140,000 306,242
Total 0 0 0 0 140,000 140,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
155,000 Equipment Replacement Fund 0 0 0 0 140,000 140,000 306,242
Total 0 0 0 0 140,000 140,000
Budget Impact
Change in replacement year to accurately reflect life expectancy in relation to when the computers were purchased.
Produced Using Plan-It CIP Software
59
Tactical
Ballistic
Vests
/
Helmets
-
SWAT
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0214
Project Name Tactical Ballistic Vests / Helmets - SWAT
Total Project Cost $640,274 Department Police
Type Equipment Category Equipment
Status Active Useful Life 5 years
Description
12 Tactical Ballistical Vests worn by members of the Hopkins Police Department SWAT (Special Weapons and Tactics) team. These vests offer a higher level of protection
for officers involved in high risk situations; this protection offers a higher level of ballistic protection compared to regular duty vests. SWAT team members also require
ballistic helmets on the same rotational cycle. Equipment breakdown: 12 vests @ $4,215 = $50,580. 12 ballistic helmets @ $642 = $7,716. 2 New protective shields @
$2,864 = $5,729. 12 Radio headsets @ $1,042 = $12,500.
Justification/Sustainability
Variance - Change in vendor equipment pricing and SWAT team staffing levels. Current price is reflective of a twelve person (fully staffed) SWAT team with current vendor
pricing.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
179,360 Equipment 12,000 0 0 88,697 0 100,697 360,217
Total 12,000 0 0 88,697 0 100,697
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
179,360 Equipment Replacement Fund 12,000 0 0 88,697 0 100,697 360,217
Total 12,000 0 0 88,697 0 100,697
Budget Impact
5 year replacement schedule
Two additional SWAT Officers in 2025, $6,000 to outfit each Officer
Produced Using Plan-It CIP Software
60
Taser
Replacement
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0217
Project Name Taser Replacement
Total Project Cost $881,864 Department Police
Type Equipment Category Equipment
Status Active Useful Life 5 years
Description
Tasers can prevent officers and the public from injuries.Taser technology continues to develop and are worn/ carried 24/7. Tasers have a useful life expectancy of
approximately 5 years.
Justification/Sustainability
Tasers are a crtical tool for Law Enforcement for control purposes during use of force encounters.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
193,600 Equipment 0 0 200,000 0 0 200,000 488,264
Total 0 0 200,000 0 0 200,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
193,600 Equipment Replacement Fund 0 0 200,000 0 0 200,000 488,264
Total 0 0 200,000 0 0 200,000
Produced Using Plan-It CIP Software
61
Hot
Water
High
Pressure
Vehicle
Washer
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0711
Project Name Hot Water High Pressure Vehicle Washer
Total Project Cost $25,600 Department Public Works: Bldg/Equip Serv
Type Equipment Category Equipment
Status Active Useful Life 12 years
Description
Hot water, high pressure vehicle washer.
Justification/Sustainability
Existing washer is 12 years old; is in poor condition and needs to be replaced.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
5,800 Equipment 0 0 0 0 8,300 8,300 11,500
Total 0 0 0 0 8,300 8,300
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
5,800 Equipment Replacement Fund 0 0 0 0 8,300 8,300 11,500
Total 0 0 0 0 8,300 8,300
Budget Impact
Variance from 20 year plan - new item. Estimate salvage resale value on replaced item: $
Produced Using Plan-It CIP Software
62
PW
-
Truck
Scan
Kit
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0714
Project Name PW - Truck Scan Kit
Total Project Cost $43,152 Department Public Works: Bldg/Equip Serv
Type Equipment Category Vehicles
Status Active Useful Life 10 years
Description
Scan kit to assist in diagnosing repairs needed on the fleets larger trucks.
Justification/Sustainability
Having the scan tool will provide the in-house mechanics to pull the codes off the trucks and make the repairs. We will not have to send the truck to an outside source for
diagnosis.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
10,000 Equipment 0 0 14,143 0 0 14,143 19,009
Total 0 0 14,143 0 0 14,143
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
10,000 Equipment Replacement Fund 0 0 14,143 0 0 14,143 19,009
Total 0 0 14,143 0 0 14,143
Produced Using Plan-It CIP Software
63
Supervisor
Vehicle
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #OH7I84S6
Project Name Supervisor Vehicle
Total Project Cost $40,000 Contact Public Works Director
Department Public Works: Bldg/Equip Serv Type Equipment
Category Equipment Status Active
Useful Life 6 years
Description
Replace current pick-up with SUV for supervisor.
Justification/Sustainability
Replace Truck 301, a 2012 Ford F-150 that is rusting out and starting to show more need for maintenance.
Expenditures 2025 2026 2027 2028 2029 Total
Equipment 0 40,000 0 0 0 40,000
Total 0 40,000 0 0 0 40,000
Funding Sources 2025 2026 2027 2028 2029 Total
Equipment Replacement Fund 0 40,000 0 0 0 40,000
Total 0 40,000 0 0 0 40,000
Produced Using Plan-It CIP Software
64
4x4
3/4Ton
Trucks
(2)
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0801
Project Name 4x4 3/4Ton Trucks (2)
Total Project Cost $623,918 Department Public Works: Parks/Forestry
Type Equipment Category Vehicles
Status Active Useful Life 8 years
Description
Trucks used by Parks Division of Public Works. Current vehicles: 2012 Ford F350 4X4 (#801) & 2012 Ford F350 4X4 (#802)
Justification/Sustainability
Snow plowing, hauling, transportation. Units are heavily used.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
205,800 Vehicles 0 0 0 108,000 0 108,000 310,118
Total 0 0 0 108,000 0 108,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
205,800 Equipment Replacement Fund 0 0 0 108,000 0 108,000 310,118
Total 0 0 0 108,000 0 108,000
Budget Impact
Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $
Produced Using Plan-It CIP Software
65
Forestry
Boom/Chipper
Box
Truck
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0818
Project Name Forestry Boom/Chipper Box Truck
Total Project Cost $240,000 Department Public Works: Parks/Forestry
Type Equipment Category Equipment
Status Active
Description
Forestry boom truck, used to trim/remove trees. Has chipper box on back to haul chipped wood. Is also used to replace lights too high for traffic boom. Current equipment:
812 2010 Freightliner
Justification/Sustainability
Is used every day during summer months and as needed during winter. It is reaching the end of its lifecycle.
Expenditures 2025 2026 2027 2028 2029 Total
Equipment 0 0 0 240,000 0 240,000
Total 0 0 0 240,000 0 240,000
Funding Sources 2025 2026 2027 2028 2029 Total
Equipment Replacement Fund 0 0 0 240,000 0 240,000
Total 0 0 0 240,000 0 240,000
Produced Using Plan-It CIP Software
66
Large
Turf
Mower
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0810
Project Name Large Turf Mower
Total Project Cost $486,659 Department Public Works: Parks/Forestry
Type Equipment Category Equipment
Status Active Useful Life 8 years
Description
Large turf mower (11' cutting width) used by Parks Division of Public Works. Current equipment: 2010 Toro Groundmaster (#825)
Justification/Sustainability
Required to efficiently mow large parks.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
211,000 Equipment 0 0 0 121,609 0 121,609 154,050
Total 0 0 0 121,609 0 121,609
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
211,000 Equipment Replacement Fund 0 0 0 121,609 0 121,609 154,050
Total 0 0 0 121,609 0 121,609
Budget Impact
Variance from 20 year plan - move from 2011 to 2010 due to poor condition of existing mower. Estimated useful life reduced from 10 to 8 years. Estimate salvage/resale
value on replaced item: $3,500
Produced Using Plan-It CIP Software
67
Skid
Loader
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0815
Project Name Skid Loader
Total Project Cost $142,614 Department Public Works: Parks/Forestry
Type Equipment Category Equipment
Status Active Useful Life 12 years
Description
Current equipment: 2004 Bobcat 463 (#833)
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
32,000 Equipment 0 0 0 0 45,600 45,600 65,014
Total 0 0 0 0 45,600 45,600
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
32,000 Equipment Replacement Fund 0 0 0 0 45,600 45,600 65,014
Total 0 0 0 0 45,600 45,600
Budget Impact
Variance from 20 year plan - new item in 2004. Estimate salvage/resale value on replaced item: $
Produced Using Plan-It CIP Software
68
1
Ton
Traffic
Boom
Truck
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0304
Project Name 1 Ton Traffic Boom Truck
Total Project Cost $413,400 Department Public Works: Streets/Traffic
Type Equipment Category Vehicles
Status Active Useful Life 12 years
Description
Boom truck used in Street and Traffic Divisions of Public Works. Current vehicle: 2012 Ford F450 (#309)
Justification/Sustainability
Vehicle used by Traffic Department for signal and light pole maintenance.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
82,500 Vehicles 0 136,400 0 0 0 136,400 194,500
Total 0 136,400 0 0 0 136,400
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
82,500 Equipment Replacement Fund 0 136,400 0 0 0 136,400 194,500
Total 0 136,400 0 0 0 136,400
Budget Impact
Variance from 20 year plan - Increase amount to reflect actual. Estimate salvage/resale value on replaced item: $8,000 Useful life moved from 17 years to 12 years.
Produced Using Plan-It CIP Software
69
4X4
3/4
Ton
Truck
with
Plow
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0301
Project Name 4X4 3/4 Ton Truck with Plow
Total Project Cost $235,019 Department Public Works: Streets/Traffic
Type Equipment Category Vehicles
Status Active Useful Life 10 years
Description
3/4 ton pickup used by Street Division of Public Works for heavy loads and pulling trailers. Current vehicle: 2018 Ford F350 (#302)
2027 Request is truck ($45,000) and plow ($25,000).
Justification/Sustainability
Light hauling, pulling trailers, transportation to and from job sites.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
54,400 Vehicles 0 0 70,000 0 0 70,000 110,619
Total 0 0 70,000 0 0 70,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
54,400 Equipment Replacement Fund 0 0 70,000 0 0 70,000 110,619
Total 0 0 70,000 0 0 70,000
Budget Impact
Estimate salvage/resale value on replaced item: $1,500
Produced Using Plan-It CIP Software
70
Asphalt
Hot
Mix
Heating
Box
-
Trailer
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0318
Project Name Asphalt Hot Mix Heating Box - Trailer
Total Project Cost $104,309 Department Public Works: Streets/Traffic
Type Equipment Category Equipment
Status Active Useful Life 12 years
Description
A trailer that hauls up to 2.5 tons of hot asphalt and heats the mix to keep it workable.
Justification/Sustainability
Current asphalt hot mix heating box insert sits in the back of a truck and is too small, 1 ton capacity. Sits too high to be handled easily. The trailer will hold more mix, reducing
the trips to the asphalt plant, and will work better ergonomically.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
30,500 Equipment 0 0 0 0 31,509 31,509 42,300
Total 0 0 0 0 31,509 31,509
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
30,500 Equipment Replacement Fund 0 0 0 0 31,509 31,509 42,300
Total 0 0 0 0 31,509 31,509
Budget Impact
Variance from 20 year plan - New item. 2016 - Upgrading from mounted unit to trailer Estimate salvage/resale value on replaced item: $-0-.
Produced Using Plan-It CIP Software
71
Front
End
Loaders
(2)
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0308
Project Name Front End Loaders (2)
Total Project Cost $998,500 Department Public Works: Streets/Traffic
Type Equipment Category Equipment
Status Active Useful Life 15 years
Description
Current equipment: 2005 Caterpillar 938G (#322)
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
312,000 Equipment 0 0 268,000 0 0 268,000 418,500
Total 0 0 268,000 0 0 268,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
312,000 Equipment Replacement Fund 0 0 268,000 0 0 268,000 418,500
Total 0 0 268,000 0 0 268,000
Budget Impact
Variance from 20 year plan - None Estimate salvage/resale value on replaced item: $
Produced Using Plan-It CIP Software
72
Grader
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0310
Project Name Grader
Total Project Cost $167,300 Department Public Works: Streets/Traffic
Type Equipment Category Equipment
Status Completed Useful Life 20 years
Description
Grader with wing used by Streets Division of Public Works. Current equipment: 1989 Caterpillar 140-G (#326)
Justification/Sustainability
Snow plowing, grading, asphalt work.
Expenditures 2025 2026 2027 2028 2029 Total
Equipment 167,300 0 0 0 0 167,300
Total 167,300 0 0 0 0 167,300
Funding Sources 2025 2026 2027 2028 2029 Total
Equipment Replacement Fund 167,300 0 0 0 0 167,300
Total 167,300 0 0 0 0 167,300
Budget Impact
Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $18,000
Produced Using Plan-It CIP Software
73
Regenerative
Air
Sweeper
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0319
Project Name Regenerative Air Sweeper
Total Project Cost $395,000 Department Public Works: Streets/Traffic
Type Equipment Category Equipment
Status Active Useful Life 15 years
Description
The City currently utilizes an Elgin Pelican Mechanical Sweeper (01-ERP-311). This type of sweeper is for heavy spring sweeps and is labor intensive due to the need for a
water truck and dump truck to assist during its use. The proposed sweeper is a vacuum type sweeper that regenerates its air to vacuum up dirt and debris. The vacuum is
effective in its ability to pick up even the smallest of dirt without the use of pre-wetting . It is also a truck type unit so it can be used by one operator to drive to a dump site to
empty the sweepings without the need of a separate dump truck.
Justification/Sustainability
The existing sweeper that was due for replacement in 2013 for $156,400 will be moved out to 2021 and scheduled every twenty years. The new machine will also be a 20
year machine and budgeted at $185,000. The reduced usage by having two machines will allow us to keep both for a longer time and allow us more flexibility on different
types of sweeping and reduce the labor needed to perform this duty.
Prior Expenditures 2025 2026 2027 2028 2029 Total
185,000 Equipment 0 0 0 210,000 0 210,000
Total 0 0 0 210,000 0 210,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total
185,000 Equipment Replacement Fund 0 0 0 210,000 0 210,000
Total 0 0 0 210,000 0 210,000
Budget Impact
Variance from 20 year plan - New item. Estimate salvage/resale value one replaced item: $
Produced Using Plan-It CIP Software
74
Riding
Floor
Sweeper
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0324
Project Name Riding Floor Sweeper
Total Project Cost $40,000 Department Public Works: Streets/Traffic
Type Equipment Category Equipment
Status Active Useful Life 20 years
Description
Floor sweeper for PW parking garage and Public Parking ramp Current equipment: 351 2004 Tennant Sweeper
Justification/Sustainability
Current sweeper is past its useful life. Current sweeper is not big enough to handle either space. City rents a sweeper to clean ramp.
Expenditures 2025 2026 2027 2028 2029 Total
Equipment 0 0 0 40,000 0 40,000
Total 0 0 0 40,000 0 40,000
Funding Sources 2025 2026 2027 2028 2029 Total
Equipment Replacement Fund 0 0 0 40,000 0 40,000
Total 0 0 0 40,000 0 40,000
Produced Using Plan-It CIP Software
75
Skid
Loader
(2)
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0309
Project Name Skid Loader (2)
Total Project Cost $258,900 Department Public Works: Streets/Traffic
Type Equipment Category Equipment
Status Active Useful Life 10 years
Description
Loading trucks, landscape work, snow removal, material handling. Current equipment: 2011 Bobcat S650 Skid-Steer Loader (#325)
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
127,900 Equipment 0 0 0 59,700 0 59,700 71,300
Total 0 0 0 59,700 0 59,700
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
127,900 Equipment Replacement Fund 0 0 0 59,700 0 59,700 71,300
Total 0 0 0 59,700 0 59,700
Budget Impact
Estimate salvage/resale value on replaced item: $
Produced Using Plan-It CIP Software
76
Striper
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0313
Project Name Striper
Total Project Cost $27,200 Department Public Works: Streets/Traffic
Type Equipment Category Equipment
Status Active Useful Life 12 years
Description
Line striper. Current equipment: 1993 Line Striper A1990 (#352)
Prior Expenditures 2025 2026 2027 2028 2029 Total
11,200 Equipment 0 0 0 0 16,000 16,000
Total 0 0 0 0 16,000 16,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total
11,200 Equipment Replacement Fund 0 0 0 0 16,000 16,000
Total 0 0 0 0 16,000 16,000
Budget Impact
Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $
Produced Using Plan-It CIP Software
77
Trailer
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0323
Project Name Trailer
Total Project Cost $30,000 Department Public Works: Streets/Traffic
Type Equipment Category Equipment
Status Active Useful Life 20 years
Description
Streets trailer used for paver and light poles Current equipment 350 1993 T3 Trailer
Justification/Sustainability
This trailer is well past its lifecycle. PW request a new trailer able to haul PDI blocks for road closures.
Expenditures 2025 2026 2027 2028 2029 Total
Equipment 0 0 0 30,000 0 30,000
Total 0 0 0 30,000 0 30,000
Funding Sources 2025 2026 2027 2028 2029 Total
Equipment Replacement Fund 0 0 0 30,000 0 30,000
Total 0 0 0 30,000 0 30,000
Produced Using Plan-It CIP Software
78
Refuse
Truck
(RAP-
R)
(2)
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0900
Project Name Refuse Truck (RAP-R) (2)
Total Project Cost $2,025,500 Department Refuse
Type Equipment Category Vehicles
Status Active Useful Life 8 years
Description
Refuse truck used by Refuse Utility Division of Public Works. Current vehicle: 2011 Freightliner Rapid Rail (#900)
Justification/Sustainability
Residential waste pick up.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
824,200 Vehicles 350,000 0 0 0 0 350,000 851,300
Total 350,000 0 0 0 0 350,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
824,200 RF - Refuse Fund 350,000 0 0 0 0 350,000 851,300
Total 350,000 0 0 0 0 350,000
Budget Impact
Variance from 20 year plan - increase cost to reflect actual Estimate salvage/resale value on replaced item: $18,000
Produced Using Plan-It CIP Software
79
3/4
Ton
Utility
Truck
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0551
Project Name 3/4 Ton Utility Truck
Total Project Cost $232,346 Department Sewer
Type Equipment Category Vehicles
Status Active Useful Life 10 years
Description
3/4 ton utility truck used by the Water/Sewer Division of Public Works. Current vehicle: 2007 Chevrolet Pickup (#505)
2026 request would add a crane, utility box and snow plow.
Justification/Sustainability
Transportation to and from job sites, box carries tools used by personnel for job site repairs and light hauling.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
84,600 Vehicles 0 87,000 0 0 0 87,000 60,746
Total 0 87,000 0 0 0 87,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
84,600 SF - Sanitary Sewer Fund 0 87,000 0 0 0 87,000 60,746
Total 0 87,000 0 0 0 87,000
Budget Impact
Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $2,500
Produced Using Plan-It CIP Software
80
3/4
Ton
Truck
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0500
Project Name 3/4 Ton Truck
Total Project Cost $180,881 Department Water
Type Equipment Category Vehicles
Status Active Useful Life 10 years
Description
Trucks used by Water Department. 2016 - Changed from 1/2 ton truck to 3/4 ton truck Current vehicle: 2007 Chevrolet Pickup
Justification/Sustainability
Truck is due for replacement. Price includes service body and crane.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
52,500 Vehicles 0 80,000 0 0 0 80,000 48,381
Total 0 80,000 0 0 0 80,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
52,500 WF - Water Fund 0 80,000 0 0 0 80,000 48,381
Total 0 80,000 0 0 0 80,000
Budget Impact
Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $
Produced Using Plan-It CIP Software
81
3/4
Ton
Utility
Truck
2025 thru 2029
Equipment Replacement Plan
Hopkins, MN ERP
Project #01-ERP-0501
Project Name 3/4 Ton Utility Truck
Total Project Cost $178,029 Department Water
Type Equipment Category Vehicles
Status Active Useful Life 10 years
Description
3/4 ton utility truck used by the Water Division of Public Works. Current vehicle: 2006 Chevrolet Pickup
2026 request includes service body and crane.
Justification/Sustainability
Transportation to and from job sites, box carries tools used by personnel for job site repairs and light hauling.
Prior Expenditures 2025 2026 2027 2028 2029 Total Future
35,000 Vehicles 0 80,000 0 0 0 80,000 63,029
Total 0 80,000 0 0 0 80,000
Prior Funding Sources 2025 2026 2027 2028 2029 Total Future
35,000 WF - Water Fund 0 80,000 0 0 0 80,000 63,029
Total 0 80,000 0 0 0 80,000
Budget Impact
Variance from 20 year plan - moved up from 2017 to 2016 Estimate salvage/resale value on replaced item: $2,500
Produced Using Plan-It CIP Software
82