2025-2029 Equipment Replacement PlanAmended on March 4, 2025 EQUIPMENT REPLACEMENT PLAN 2025-2029 DATE: November 12, 2024 TO: Honorable Mayor and Members of the City Council FROM: Mike Mornson, City Manager SUBJECT: 2025-2029 EQUIPMENT REPLACEMENT PLAN With this letter, I respectfully submit the 2025-2029 Equipment Replacement Plan. This five-year planning document represents the combined efforts of city staff and the City Council. The Equipment Replacement Plan is a five-year forecast of equipment replacement needs in the City of Hopkins. It is intended to alert the Council and residents of equipment replacement needs that are needed to maintain the efficiency of city services and the safety of city staff. The first year of the plan becomes the adopted budget, however the equipment is again re-evaluated before final approval is given for the purchase. The remaining four years represents estimated replacement needs and the related funding. The Equipment Replacement Plan does not include proposed capital projects. A document relating specifically to capital project needs has been developed into a separate document. The Equipment Replacement Plan is intended to serve as a planning tool and is therefore structured to present a meaningful, long-range perspective of the city’s equipment needs over the next five years. At the same time sufficient details on individual pieces of equipment scheduled for replacement is provided to enable those who review the information to make informed decisions of the city’s equipment needs over the next several years. Please use the information provided to assist in the understanding of the city’s equipment needs as they relate to the delivery of service to the residents of Hopkins. This document was developed by the Finance Department with the assistance of all city departments. I wish to especially thank all those involved in the development of the Equipment Replacement Plan, and especially Chuck Autio, Public Works Director, Brent Johnson, Police Chief, Dale Specken, Fire Chief, Casey Casella, Assistant City Manager, and Nick Bishop, Finance Director for their hard work and dedication. 2 Page City Manager's Message 2 Table of Contents 3 Cash Flow Statement Equipment Replacement Fund 4 Five-Year Project Summaries Department Summary 5 Projects by Department 6 Funding Source Summary 9 Projects by Funding Source 10 Equipment Requests Individual Equipment Request Details Activity Center 12 Arts Center 13 Information Technology 19 City Clerk 34 Inspections 35 Fire 36 Pavilion 47 Police 51 Public Works 62 Refuse 79 Water/Sewer 80 EQUIPMENT REPLACEMENT PLAN 2025-2029 TABLE OF CONTENTS 3 2025 2026 2027 2028 2029 Beginning Fund Balance 1,431,321 808,827 873,036 921,509 635,496 Revenues & Other Financing Sources Tax Levy 220,000 200,000 200,000 200,000 200,000 Equipment Charges 797,688 845,549 896,282 950,059 1,007,063 Sale of Equipment 35,000 35,000 35,000 35,000 35,000 Interest Earnings 14,313 8,088 8,730 9,215 6,355 Equipment Certificates - - 3,200,000 - - Total Revenue & Other Financing Sources 1,067,001 1,088,637 4,340,012 1,194,274 1,248,418 Expenditures & Other Financing Uses Current Expenditures 35,000 35,000 35,000 35,000 35,000 Capital Projects Community Services - Activity Center - 6,700 - - - Community Services - Information Technology 499,324 509,688 260,707 237,841 342,248 Community Services - Inspections 16,231 - - 14,300 - Fire Vehicles & Equipment 870,300 45,000 3,253,300 18,500 36,900 Police Vehicles & Equipment 268,640 251,640 390,390 365,337 397,331 Public Works: Building/Equipment Services - 40,000 14,143 - 8,300 Public Works: Parks/Forestry 469,609 45,600 Public Works: Streets/Traffic - 136,400 338,000 339,700 47,509 Total Expenditures and Other Financing Sources 1,689,495 1,024,428 4,291,540 1,480,287 912,888 Increase (Decrease) in Fund Balance (622,494) 64,209 48,472 (286,013) 335,530 Projected Ending Fund Balance 808,827 873,036 921,509 635,496 971,026 Equipment Replacement Fund - Projected Cash Flows 4 2025 through 2029 Equipment Replacement Plan Hopkins, MN ERPDepartment Summary Department 2025 2026 2027 2028 2029 Total Comm Svcs - Activity Center 6,700 6,700 Comm Svcs - Arts Center 19,300 10,000 16,000 45,300 Comm Svcs - IT 499,324 509,688 260,707 237,841 342,248 1,849,808 Community Services 16,231 14,300 30,531 Fire 870,300 45,000 3,253,300 18,500 36,900 4,224,000 Pavilion 10,000 16,000 173,900 199,900 Police 268,640 251,640 390,390 365,337 397,331 1,673,338 Public Works: Bldg/Equip Serv 40,000 14,143 8,300 62,443 Public Works: Parks/Forestry 469,609 45,600 515,209 Public Works: Streets/Traffic 136,400 338,000 339,700 47,509 861,609 Refuse 350,000 350,000 Sewer 87,000 87,000 Water 160,000 160,000 GRAND TOTAL 2,014,495 1,271,728 4,440,440 1,461,287 877,888 10,065,838 Produced Using Plan-It CIP Software 5 2025 through 2029 Equipment Replacement Plan Hopkins, MN ERPProjects By Department Department Project #2025 2026 2027 2028 2029 Total Comm Svcs - Activity Center Activity Center - Floor Scrubber 01-ERP-0035 6,700 6,700 Comm Svcs - Activity Center Total 0 6,700 0 0 0 6,700 Comm Svcs - Arts Center Art Center Floor Scrubber 01-ERP-1109 10,800 10,800 Art Center Jaycee Studio Audio Visual 01-ERP-1105 16,000 16,000 Art Center Lobby Public Announcement Equipment 01-ERP-1114 10,000 10,000 Art Center Theater Presentation Microphones 01-ERP-1108 8,500 8,500 Comm Svcs - Arts Center Total 0 19,300 10,000 16,000 0 45,300 Comm Svcs - IT Backup Server 01-ERP-0015 78,808 86,115 164,923 CH - Network Server 01-ERP-0003 27,849 28,684 29,545 30,431 31,344 147,853 Computers 01-ERP-0006 38,686 39,847 41,042 42,273 43,541 205,389 Core Network Switch 01-ERP-0012 45,000 45,000 Distribution Network Switches 01-ERP-0014 75,000 75,000 IT - Laptops for Mobile Computer Lab 01-ERP-0021 10,927 11,941 22,868 IT - Office 365 01-ERP-0017 71,680 73,180 74,680 76,180 77,680 373,400 IT - Patching Automation Software 01-ERP-0020 40,000 40,000 40,000 11,255 11,593 142,848 IT - Sandbox Security Appliance 01-ERP-0024 45,000 45,000 IT - Windows 10 Enterprise Upgrade 01-ERP-0022 43,260 44,558 45,895 47,271 48,690 229,674 Network Infrastructure Upgrade - Fiber 01-ERP-0009 70,000 70,000 PD - Network Server 01-ERP-0211 27,849 28,684 29,545 30,431 31,344 147,853 Permitting and Licensing Software Upgrade 796DQPWR 120,000 120,000 Video Servers 60,000 60,000 Comm Svcs - IT Total 499,324 509,688 260,707 237,841 342,248 1,849,808 Community Services Document Management Scanner (2)01-ERP-0008 14,300 14,300 Electronic Inspections Processing 01-ERP-0052 16,231 16,231 Community Services Total 16,231 0 0 14,300 0 30,531 Fire Emergency Preparedness Sirens 01-ERP-0113 45,000 45,000 Extrication Tool (1)01-ERP-0109 36,900 36,900 Fire - Lucus Device 01-ERP-0127 18,500 18,500 Fire Pumper (Engine 3)01-ERP-0101 1,500,000 1,500,000 Fire Radios - Portable and Mobile Devices 01-ERP-0125 445,000 445,000 Floor Scrubber 01-ERP-0114 25,500 25,500 Ladder #7 01-ERP-0100 1,700,000 1,700,000 Self Contained Breathing Apparatus (SCBA) (45)01-ERP-0108 400,000 400,000 Thermal Imaging Camera (2)01-ERP-0112 18,600 20,000 38,600 Workout Equipment - Dumb Bells 01-ERP-0122 6,700 6,700 Workout Equipment - Treadmill 01-ERP-0116 7,800 7,800 Fire Total 870,300 45,000 3,253,300 18,500 36,900 4,224,000 Produced Using Plan-It CIP Software 6 Pavilion Pavilion - Electric Ice Edger 01-ERP-1001 8,900 8,900 Pavilion - Floor Scrubber 01-ERP-1003 16,000 16,000 Pavilion Ice Resurfacer 01-ERP-1000 165,000 165,000 Pavilion - Scissor Lift 01-ERP-1004 10,000 10,000 Pavilion Total 10,000 16,000 173,900 0 0 199,900 Police Marked Patrol Vehicles (7)01-ERP-0200 145,000 150,000 150,000 155,000 140,000 740,000 Police Equipment 01-ERP-0227 12,500 13,750 15,125 41,375 PSO / Parking Enforcement Vehicle 01-ERP-0202 75,000 75,000 PSO - Utility 4x4 01-ERP-0203 95,000 95,000 Sergeant's Vehicle 01-ERP-0201 72,500 72,206 144,706 Squad Car Camera Systems 01-ERP-0212 26,640 26,640 26,640 26,640 30,000 136,560 Squad Computers 01-ERP-0220 140,000 140,000 Tactical Ballistic Vests / Helmets - SWAT 01-ERP-0214 12,000 88,697 100,697 Taser Replacement 01-ERP-0217 200,000 200,000 Police Total 268,640 251,640 390,390 365,337 397,331 1,673,338 Public Works: Bldg/Equip Serv Hot Water High Pressure Vehicle Washer 01-ERP-0711 8,300 8,300 PW - Truck Scan Kit 01-ERP-0714 14,143 14,143 Supervisor Vehicle OH7I84S6 40,000 40,000 Public Works: Bldg/Equip Serv Total 0 40,000 14,143 0 8,300 62,443 Public Works: Parks/Forestry 4x4 3/4Ton Trucks (2)01-ERP-0801 108,000 108,000 Forestry Boom/Chipper Box Truck 01-ERP-0818 240,000 240,000 Large Turf Mower 01-ERP-0810 121,609 121,609 Skid Loader 01-ERP-0815 45,600 45,600 Public Works: Parks/Forestry Total 0 0 0 469,609 45,600 515,209 Public Works: Streets/Traffic 1 Ton Traffic Boom Truck 01-ERP-0304 136,400 136,400 4X4 3/4 Ton Truck with Plow 01-ERP-0301 70,000 70,000 Asphalt Hot Mix Heating Box - Trailer 01-ERP-0318 31,509 31,509 Front End Loaders (2)01-ERP-0308 268,000 268,000 Regenerative Air Sweeper 01-ERP-0319 210,000 210,000 Riding Floor Sweeper 01-ERP-0324 40,000 40,000 Skid Loader (2)01-ERP-0309 59,700 59,700 Striper 01-ERP-0313 16,000 16,000 Trailer 01-ERP-0323 30,000 30,000 Public Works: Streets/Traffic Total 0 136,400 338,000 339,700 47,509 861,609 Refuse Refuse Truck (RAP-R) (2)01-ERP-0900 350,000 350,000 Refuse Total 350,000 0 0 0 0 350,000 Sewer 3/4 Ton Utility Truck 01-ERP-0551 87,000 87,000 Sewer Total 0 87,000 0 0 0 87,000 Department Project #2025 2026 2027 2028 2029 Total Produced Using Plan-It CIP Software 7 Water 3/4 Ton Truck 01-ERP-0500 80,000 80,000 3/4 Ton Utility Truck 01-ERP-0501 80,000 80,000 Water Total 0 160,000 0 0 0 160,000 GRAND TOTAL 2,014,495 1,271,728 4,440,440 1,461,287 877,888 10,065,838 Department Project #2025 2026 2027 2028 2029 Total Produced Using Plan-It CIP Software 8 2025 through 2029 Equipment Replacement Plan Hopkins, MN ERPFunding Source Summary Source 2025 2026 2027 2028 2029 Total AC - Arts Center Fund 19,300 10,000 16,000 45,300 Equipment Replacement Fund 1,654,495 989,428 4,256,540 1,445,287 877,888 9,223,638 PA - Pavilion Fund 10,000 16,000 173,900 199,900 RF - Refuse Fund 350,000 350,000 SF - Sanitary Sewer Fund 87,000 87,000 WF - Water Fund 160,000 160,000 GRAND TOTAL 2,014,495 1,271,728 4,440,440 1,461,287 877,888 10,065,838 Produced Using Plan-It CIP Software 9 2025 through 2029 Equipment Replacement Plan Hopkins, MN ERPProjects By Funding Source Summary Source Project #2025 2026 2027 2028 2029 Total AC - Arts Center Fund Art Center Floor Scrubber 01-ERP-1109 10,800 10,800 Art Center Jaycee Studio Audio Visual 01-ERP-1105 16,000 16,000 Art Center Lobby Public Announcement Equipment 01-ERP-1114 10,000 10,000 Art Center Theater Presentation Microphones 01-ERP-1108 8,500 8,500 AC - Arts Center Fund Total 0 19,300 10,000 16,000 0 45,300 Equipment Replacement Fund 1 Ton Traffic Boom Truck 01-ERP-0304 136,400 136,400 4x4 3/4Ton Trucks (2)01-ERP-0801 108,000 108,000 4X4 3/4 Ton Truck with Plow 01-ERP-0301 70,000 70,000 Activity Center - Floor Scrubber 01-ERP-0035 6,700 6,700 Asphalt Hot Mix Heating Box - Trailer 01-ERP-0318 31,509 31,509 Backup Server 01-ERP-0015 78,808 86,115 164,923 CH - Network Server 01-ERP-0003 27,849 28,684 29,545 30,431 31,344 147,853 Computers 01-ERP-0006 38,686 39,847 41,042 42,273 43,541 205,389 Core Network Switch 01-ERP-0012 45,000 45,000 Distribution Network Switches 01-ERP-0014 75,000 75,000 Document Management Scanner (2)01-ERP-0008 14,300 14,300 Electronic Inspections Processing 01-ERP-0052 16,231 16,231 Emergency Preparedness Sirens 01-ERP-0113 45,000 45,000 Extrication Tool (1)01-ERP-0109 36,900 36,900 Fire - Lucus Device 01-ERP-0127 18,500 18,500 Fire Pumper (Engine 3)01-ERP-0101 1,500,000 1,500,000 Fire Radios - Portable and Mobile Devices 01-ERP-0125 445,000 445,000 Floor Scrubber 01-ERP-0114 25,500 25,500 Forestry Boom/Chipper Box Truck 01-ERP-0818 240,000 240,000 Front End Loaders (2)01-ERP-0308 268,000 268,000 Hot Water High Pressure Vehicle Washer 01-ERP-0711 8,300 8,300 IT - Laptops for Mobile Computer Lab 01-ERP-0021 10,927 11,941 22,868 IT - Office 365 01-ERP-0017 71,680 73,180 74,680 76,180 77,680 373,400 IT - Patching Automation Software 01-ERP-0020 40,000 40,000 40,000 11,255 11,593 142,848 IT - Sandbox Security Appliance 01-ERP-0024 45,000 45,000 IT - Windows 10 Enterprise Upgrade 01-ERP-0022 43,260 44,558 45,895 47,271 48,690 229,674 Ladder #7 01-ERP-0100 1,700,000 1,700,000 Large Turf Mower 01-ERP-0810 121,609 121,609 Marked Patrol Vehicles (7)01-ERP-0200 145,000 150,000 150,000 155,000 140,000 740,000 Network Infrastructure Upgrade - Fiber 01-ERP-0009 70,000 70,000 PD - Network Server 01-ERP-0211 27,849 28,684 29,545 30,431 31,344 147,853 Permitting and Licensing Software Upgrade 796DQPWR 120,000 120,000 Police Equipment 01-ERP-0227 12,500 13,750 15,125 41,375 PSO / Parking Enforcement Vehicle 01-ERP-0202 75,000 75,000 PSO - Utility 4x4 01-ERP-0203 95,000 95,000 PW - Truck Scan Kit 01-ERP-0714 14,143 14,143 Produced Using Plan-It CIP Software 10 Regenerative Air Sweeper 01-ERP-0319 210,000 210,000 Riding Floor Sweeper 01-ERP-0324 40,000 40,000 Self Contained Breathing Apparatus (SCBA) (45)01-ERP-0108 400,000 400,000 Sergeant's Vehicle 01-ERP-0201 72,500 72,206 144,706 Skid Loader 01-ERP-0815 45,600 45,600 Skid Loader (2)01-ERP-0309 59,700 59,700 Squad Car Camera Systems 01-ERP-0212 26,640 26,640 26,640 26,640 30,000 136,560 Squad Computers 01-ERP-0220 140,000 140,000 Striper 01-ERP-0313 16,000 16,000 Supervisor Vehicle OH7I84S6 40,000 40,000 Tactical Ballistic Vests / Helmets - SWAT 01-ERP-0214 12,000 88,697 100,697 Taser Replacement 01-ERP-0217 200,000 200,000 Thermal Imaging Camera (2)01-ERP-0112 18,600 20,000 38,600 Trailer 01-ERP-0323 30,000 30,000 Video Servers 60,000 60,000 Workout Equipment - Dumb Bells 01-ERP-0122 6,700 6,700 Workout Equipment - Treadmill 01-ERP-0116 7,800 7,800 Equipment Replacement Fund Total 1,654,495 989,428 4,256,540 1,445,287 877,888 9,223,638 PA - Pavilion Fund Pavilion - Electric Ice Edger 01-ERP-1001 8,900 8,900 Pavilion - Floor Scrubber 01-ERP-1003 16,000 16,000 Pavilion Ice Resurfacer 01-ERP-1000 165,000 165,000 Pavilion - Scissor Lift 01-ERP-1004 10,000 10,000 PA - Pavilion Fund Total 10,000 16,000 173,900 0 0 199,900 RF - Refuse Fund Refuse Truck (RAP-R) (2)01-ERP-0900 350,000 350,000 RF - Refuse Fund Total 350,000 0 0 0 0 350,000 SF - Sanitary Sewer Fund 3/4 Ton Utility Truck 01-ERP-0551 87,000 87,000 SF - Sanitary Sewer Fund Total 0 87,000 0 0 0 87,000 WF - Water Fund 3/4 Ton Truck 01-ERP-0500 80,000 80,000 3/4 Ton Utility Truck 01-ERP-0501 80,000 80,000 WF - Water Fund Total 0 160,000 0 0 0 160,000 GRAND TOTAL 2,014,495 1,271,728 4,440,440 1,461,287 877,888 10,065,838 Source Project #2025 2026 2027 2028 2029 Total Produced Using Plan-It CIP Software 11 Activity Center - Floor Scrubber 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0035 Project Name Activity Center - Floor Scrubber Total Project Cost $20,700 Department Comm Svcs - Activity Center Type Equipment Category Equipment Status Active Useful Life 10 years Description Floor scrubbed is used to clean tiled floors at the Activity Center Justification/Sustainability Floor scrubber has been used to the extent of it's useful life. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 5,000 Equipment 0 6,700 0 0 0 6,700 9,000 Total 0 6,700 0 0 0 6,700 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 5,000 Equipment Replacement Fund 0 6,700 0 0 0 6,700 9,000 Total 0 6,700 0 0 0 6,700 Budget Impact New item for 2016 Produced Using Plan-It CIP Software 12 Art Center Floor Scrubber 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-1109 Project Name Art Center Floor Scrubber Total Project Cost $33,316 Department Comm Svcs - Arts Center Type Equipment Category Equipment Status Active Useful Life 10 years Description 26-inch auto scrubber Justification/Sustainability Current scrubber has reached its lifetime and no longer spins fast enough to be effective. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 8,000 Equipment 0 10,800 0 0 0 10,800 14,516 Total 0 10,800 0 0 0 10,800 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 8,000 AC - Arts Center Fund 0 10,800 0 0 0 10,800 14,516 Total 0 10,800 0 0 0 10,800 Budget Impact Variance from 20 year plan - New item Estimate salvage/resale value on replaced item: $-0- Produced Using Plan-It CIP Software 13 Art Center Jaycee Studio Audio Visual 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-1105 Project Name Art Center Jaycee Studio Audio Visual Total Project Cost $64,015 Department Comm Svcs - Arts Center Type Equipment Category Equipment Status Active Useful Life 7 years Description Install a projector in a ceiling mount. Wire speakers into the ceiling. Wire input for computer on front wall. Add two microphones. Mount supporting hardware in rack that fits into closet. Originally scheduled for the Community Room this project was moved to the Jaycee Studio as they found a greater need for this equipment in that room. Justification/Sustainability An increasing number of users of this room require media support. Current means of providing this include the use of an oversized A/V cart, cords stretch across the floor and a large speaker on a stick. We can streamline the appearance and functionality by making these appropriate changes. These changes also address safety concerns. They will help attract safety concerns. They will help attract and retain rental customers as well as appropriately support our own activities. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 11,000 Equipment 0 0 0 16,000 0 16,000 37,015 Total 0 0 0 16,000 0 16,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 11,000 AC - Arts Center Fund 0 0 0 16,000 0 16,000 37,015 Total 0 0 0 16,000 0 16,000 Budget Impact Move this item from 2014 to 2015. Produced Using Plan-It CIP Software 14 Art Center Kitchen Catering Equipment 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-1102 Project Name Art Center Kitchen Catering Equipment Total Project Cost $22,223 Department Comm Svcs - Arts Center Type Equipment Category Equipment Status Completed Useful Life 12 years Description Under counter freezer and refrigerator in catering kitchen. Justification/Sustainability These units are used for storing food for HCA events and for rental clients. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 5,000 Equipment 0 7,100 0 0 0 7,100 10,123 Total 0 7,100 0 0 0 7,100 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 5,000 AC - Arts Center Fund 0 7,100 0 0 0 7,100 10,123 Total 0 7,100 0 0 0 7,100 Budget Impact Variance from 20 year plan - New item. Current pricing $2049 refrigerator, $2207 freezer plus delivery. Estimate salvage/resale value on replaced item: $-0- Produced Using Plan-It CIP Software 15 Art Center Lobby Public Announcement Equipment 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-1114 Project Name Art Center Lobby Public Announcement Equipment Total Project Cost $23,064 Department Comm Svcs - Arts Center Type Equipment Category Equipment Status Active Useful Life 10 years Description Wireless PA System for Lobby Equipment and labor: $5000 Public Announcement system that would allow for announcements throughout the lobby for events and emergencies. Justification/Sustainability We currently have no way of making announcements in the lobby without having a speaker and microphone set up. It would be helpful to be able to make general announcements for events or in case of an emergency. General announcements other than during a scheduled event. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 5,000 Equipment 0 0 10,000 0 0 10,000 8,064 Total 0 0 10,000 0 0 10,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 5,000 AC - Arts Center Fund 0 0 10,000 0 0 10,000 8,064 Total 0 0 10,000 0 0 10,000 Produced Using Plan-It CIP Software 16 Art Center Theater Presentation Microphones 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-1108 Project Name Art Center Theater Presentation Microphones Total Project Cost $43,979 Department Comm Svcs - Arts Center Type Equipment Category Buildings: Arts Center Status Active Useful Life 6 years Description Replace theater lapel (3) and hand held (3) microphones with supporting transmitters, receivers, splitter kit and rack mount kit. Justification/Sustainability Current microphones are of insufficient quality to work well in a space as large as the theater resulting in technical glitches during presentations. These are necessary for Center functions, City functions and rental events in the theater. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 13,100 Equipment 0 8,500 0 0 0 8,500 22,379 Total 0 8,500 0 0 0 8,500 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 13,100 AC - Arts Center Fund 0 8,500 0 0 0 8,500 22,379 Total 0 8,500 0 0 0 8,500 Budget Impact Variance from 20-year plan: New item. Produced Using Plan-It CIP Software 17 Art Center Theater Projector 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-1104 Project Name Art Center Theater Projector Total Project Cost $75,000 Department Comm Svcs - Arts Center Type Equipment Category Equipment Status Pending Useful Life 5 years Description Current projector is 3000 lumen -- 6500 lumen is required for theater usage including in partial light situations and to achieve the clarity needed for detailed images. Such a projector costs about $7,200 (including mounting and rigging hardware, cables and installation labor). The projector also needs to be part of a professional system that permits it to be operated from the theater tech booth or from on-stage -- the current projector is only operable from a hand-held remote requiring the operator to dash into the audience of the theater. This total cost of $15,200 includes all the wiring and hardware needed to support a projector well into the future. The projector itself is estimated to have a 5-year useful life. (The existing projector will be moved to one of the meeting rooms). Justification/Sustainability The justification of this expense is two-fold: First, in order to attract and retain arts and corporate renters we need to be able to provide the technical support required for their events. Income from such rentals (including Pen Pals and Digital Rivers) is becoming increasingly vital to the financial health of the Center. If we are not capable of competing with similar size venues, we will lose this income. Secondly, as a professional arts presenter we need to have the technical capabilities to run our own programs in a professional manner. Year 2018: $17,100 Year 2023 $19,800 Year 2028 $22,900 Prior Expenditures 2025 2026 2027 2028 2029 Total 52,100 Equipment 0 0 0 22,900 0 22,900 Total 0 0 0 22,900 0 22,900 Prior Funding Sources 2025 2026 2027 2028 2029 Total 52,100 AC - Arts Center Fund 0 0 0 22,900 0 22,900 Total 0 0 0 22,900 0 22,900 Budget Impact Investing $15, 000 to retain major renters such as Pen Pals and Digital Rivers is worthwhile. Pen Pals alone brings in about $20.000/year in income. Digital Rivers just under $9,000. Produced Using Plan-It CIP Software 18 Backup Server 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0015 Project Name Backup Server Total Project Cost $801,110 Department Comm Svcs - IT Type Equipment Category Equipment Status Active Useful Life 3 years Description Group of Dell servers to run Dell Rapid Recovery software to backup city computers and servers, along with Windows and VMWare licsensing required to run the servers. Justification/Sustainability Backup servers are essential to keep the electronic data for the city safe. We have overgrown our current system and are not able to backup everything that needs to be backed up in a timely manor. Additinally restores on the curent system take hours to days. If we needed to restore a critical server from backup, we would be looking at an unacceptable amount of downtime. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 204,120 Equipment 0 78,808 0 0 86,115 164,923 432,067 Total 0 78,808 0 0 86,115 164,923 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 204,120 Equipment Replacement Fund 0 78,808 0 0 86,115 164,923 432,067 Total 0 78,808 0 0 86,115 164,923 Produced Using Plan-It CIP Software 19 CH - Network Server 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0003 Project Name CH - Network Server Total Project Cost $1,113,900 Department Comm Svcs - IT Type Equipment Category Equipment Status Active Useful Life 1 year Description The network server is the hub of the network. New computers are faster and more reliable. Justification/Sustainability Networking allows user to share information that is stored in a single location, the network server. This is more efficient because the information does not have to be stored on many different computers. It also makes for better accuracy because as the information changes or is updated, every user is working with the same data. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 315,287 Equipment 27,849 28,684 29,545 30,431 31,344 147,853 650,760 Total 27,849 28,684 29,545 30,431 31,344 147,853 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 315,287 Equipment Replacement Fund 27,849 28,684 29,545 30,431 31,344 147,853 650,760 Total 27,849 28,684 29,545 30,431 31,344 147,853 Budget Impact Changes reflect anticipated need for increased storage. Produced Using Plan-It CIP Software 20 Computers 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0006 Project Name Computers Total Project Cost $1,852,679 Department Comm Svcs - IT Type Equipment Category Equipment Status Active Useful Life 3 years Description Personal computer purchases and upgrades for the entire City staff. Coordinating personal computer purchases from individual departments to one fund. Justification/Sustainability Tools enabling staff to perform job responsibilities efficiently and effectively. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 743,328 Equipment 38,686 39,847 41,042 42,273 43,541 205,389 903,962 Total 38,686 39,847 41,042 42,273 43,541 205,389 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 743,328 Equipment Replacement Fund 38,686 39,847 41,042 42,273 43,541 205,389 903,962 Total 38,686 39,847 41,042 42,273 43,541 205,389 Budget Impact Increase in expenditure a result of supporting more computers than when the original allotment was put in place. Produced Using Plan-It CIP Software 21 Core Network Switch 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0012 Project Name Core Network Switch Total Project Cost $158,878 Department Comm Svcs - IT Type Equipment Category Equipment Status Active Useful Life 6 years Description Provides layer 3 IP presence for the network, core switching connectivity, backbone on which all network communication is built and facilitates fiber optic network connection to fire department. 2 - Cisco 3560E-24PD managed switch - $3,000 each 2 - Cisco X2-10GB-LR fiber optic transceiver - $1200 each cost listed is for equipment only and does not include tax, shipping and other related costs Justification/Sustainability Current two switches are obsolete, end of life and no longer supported by manufacturer. Past lost of service resulted in significant network outage that was immediately noticed by many employees. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 27,000 Equipment 45,000 0 0 0 0 45,000 86,878 Total 45,000 0 0 0 0 45,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 27,000 Equipment Replacement Fund 45,000 0 0 0 0 45,000 86,878 Total 45,000 0 0 0 0 45,000 Budget Impact Variance from 20 year plan - Not currently in ERP but critical to network communication infrastructure. This is outside the budget for city hall server network budget as the Lisa service is scheduled for replacement due to end of life, out of PCI compliance and obsolete. 2015 - change amount from $12,000 to $17,000 - more expensive than originally thought based on 2015 replacement. Estimate salvage/resale value on replace item: - $-0- Produced Using Plan-It CIP Software 22 Distribution Network Switches 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0014 Project Name Distribution Network Switches Total Project Cost $356,486 Department Comm Svcs - IT Type Equipment Category Equipment Status Active Useful Life 5 years Description We have 25 distribution network switches in our enterprise environment along with fiber optic transceivers and direct attach sfp cables to connect them. Distribution switches connect to the core switches and bring the data to the actual endpoints such as desktops, servers, telephones, and copiers. Justification/Sustainability Replacement of these switches with current technology is vital to the function of the network as well as the safety of the data being passed through the switch. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 50,000 Equipment 75,000 0 0 0 0 75,000 231,486 Total 75,000 0 0 0 0 75,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 50,000 Equipment Replacement Fund 75,000 0 0 0 0 75,000 231,486 Total 75,000 0 0 0 0 75,000 Budget Impact 2016 - New item in ERP Produced Using Plan-It CIP Software 23 Financial Software - Various Depts. 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0005 Project Name Financial Software - Various Depts. Total Project Cost $1,593,000 Department Comm Svcs - IT Type Equipment Category Equipment Status Pending Useful Life 7 years Description Finance software upgrade. Software currently used by Finance, City Clerk, Inspections and Public Works. This includes software for all finance applications including general ledger, payroll, accounts payable, accounts receivable, fixed assets, utility billing; Business Licenses, Building Permits, GIS Mapping, Purchasing, etc. Justification/Sustainability Current software vendor is unable to keep up with technology and internet security standards. Staff is often frustrated with how the software works and are often unable to get reports they need from the system. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 415,000 Equipment 315,000 0 0 0 0 315,000 863,000 Total 315,000 0 0 0 0 315,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 415,000 Equipment Replacement Fund 315,000 0 0 0 0 315,000 863,000 Total 315,000 0 0 0 0 315,000 Budget Impact Variance from 20 year plan - replacement needed in 2014 Estimate salvage/resale value on replaced item: $-0- Produced Using Plan-It CIP Software 24 IT - Laptops for Mobile Computer Lab 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0021 Project Name IT - Laptops for Mobile Computer Lab Total Project Cost $102,777 Department Comm Svcs - IT Type Operating Budget Item Category Equipment Status Active Useful Life 3 years Description Laptops for emergency management and training city employees. Justification/Sustainability The city has a need for a mobile computer lab to assist with both emergency management preparedness and with employee training opportunities. The process improvement commmittee has identified a need to setup an internal training program for employees on existing software as well as future software initiatives. This ERP item would purchase 10 - 15 low cost laptops to be utilized for giving employees hands on training with Office, Springbrook, Laserfiche, and other future software. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 20,000 Equipment 0 10,927 0 0 11,941 22,868 59,909 Total 0 10,927 0 0 11,941 22,868 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 20,000 Equipment Replacement Fund 0 10,927 0 0 11,941 22,868 59,909 Total 0 10,927 0 0 11,941 22,868 Produced Using Plan-It CIP Software 25 IT - Office 365 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0017 Project Name IT - Office 365 Total Project Cost $2,545,690 Department Comm Svcs - IT Type Equipment Category Equipment Status Active Useful Life 1 year Description Transition from the legacy model of Microsoft Office to Office 365. This project would transition 25 percent of our users and devices per year. Justification/Sustainability As we become a more mobile workforce embracing new mobile and remote technology we need to move away from the traditonal office that can only be installed on a Windows computer and transition to the version of Office that can be used in the cloud and as a mobile app. Unfortunately, as is becoming common with most enterprise softwre, you can no longer just purchase it out right, you must rent it from the software author. The cost for Office 365 will now be a yearly ongoing cost. Office 365 is common at other cities, corporations, and educational environments. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 199,320 Equipment 71,680 73,180 74,680 76,180 77,680 373,400 1,972,970 Total 71,680 73,180 74,680 76,180 77,680 373,400 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 199,320 Equipment Replacement Fund 71,680 73,180 74,680 76,180 77,680 373,400 1,972,970 Total 71,680 73,180 74,680 76,180 77,680 373,400 Produced Using Plan-It CIP Software 26 IT - Patching Automation Software 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0020 Project Name IT - Patching Automation Software Total Project Cost $458,333 Department Comm Svcs - IT Type Equipment Category Equipment Status Active Useful Life 1 year Description Software to automate the delivery of critical and maintenance patches to our enterprise endpoints and yearly maintenance of the software going forward. Justification/Sustainability Microsoft software has to be patched the second Tuesday of every month. Adobe software has to be patched every time a critical vulnerability is discovered, which can be twice in a week in a bad week. Other applications have to be patched as new releases are produced from vendors. Currently our staff must touch every endpoint for the majority of the software installs. We are using up an inordinate amount of staff time to patch all of our endpoints only to have to restart the cycle 3 weeks later. Automation of this process would free up staff time to work on other projects and problems for the city. Approx. two full weeks of 1FTE per month or 960 hours per year saved. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 129,000 Equipment 40,000 40,000 40,000 11,255 11,593 142,848 186,485 Total 40,000 40,000 40,000 11,255 11,593 142,848 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 129,000 Equipment Replacement Fund 40,000 40,000 40,000 11,255 11,593 142,848 186,485 Total 40,000 40,000 40,000 11,255 11,593 142,848 Produced Using Plan-It CIP Software 27 IT - Sandbox Security Appliance 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0024 Project Name IT - Sandbox Security Appliance Total Project Cost $272,000 Department Comm Svcs - IT Type Equipment Category Equipment Status Active Useful Life 5 years Description The sandbox is a security appliance that integrates into the overall security fabric of the city providing an automated method of detecting malware. Justification/Sustainability The city relies on our sandbox as a place to investigate questionable files that user received to determine if they are safe to open. The sandbox performs automated analysis that would normally take a significatn amount of manual time invested to determine if an item is dangerous. This allows the IT department to perform investigations in minutes instead of hours. The existing sandbox has proved extremly useful over the last 5 years and needs to be replaced because it is no longer supported by the ventor Prior Expenditures 2025 2026 2027 2028 2029 Total Future 45,000 Equipment 0 45,000 0 0 0 45,000 182,000 Total 0 45,000 0 0 0 45,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 45,000 Equipment Replacement Fund 0 45,000 0 0 0 45,000 182,000 Total 0 45,000 0 0 0 45,000 Produced Using Plan-It CIP Software 28 IT - Windows 10 Enterprise Upgrade 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0022 Project Name IT - Windows 10 Enterprise Upgrade Total Project Cost $1,201,909 Department Comm Svcs - IT Type Equipment Category Unassigned Status Active Useful Life 1 year Description Upgrade Windows 10 Pro software to Windows 10 Enterprise. Required to renew every 3 years. This plan would bring the PD into compliance in 2020 then upgrade 60 city computers a year until all city computers are upgraded. Each batch of 60 computers needs to be renewed every 3 years. It is estimated that it will take 3 years to fully upgrade the city to Windows 10 Enterprise. Justification/Sustainability The BCA has mandated that we move to Enterprise edition for our Windows computers in the PD. Microsoft is changing the way they deliver Windows. It is becoming like Office, where you will no longer own Windows outright, you will have to rent it from them. We have to switch to Enterprise in the PD for compliance reasons, but it is strongly suggested that we plan on switching to Enterprise for all city computers as well. There may come a time where we are forced to switch to Enterprise edition for the city. It would be ideal to plan ahead and budget money for a gradual upgrade for the city so it doesn't come as a surprise. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 189,000 Equipment 43,260 44,558 45,895 47,271 48,690 229,674 783,235 Total 43,260 44,558 45,895 47,271 48,690 229,674 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 189,000 Equipment Replacement Fund 43,260 44,558 45,895 47,271 48,690 229,674 783,235 Total 43,260 44,558 45,895 47,271 48,690 229,674 Produced Using Plan-It CIP Software 29 Network Infrastructure Upgrade - Fiber 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0009 Project Name Network Infrastructure Upgrade - Fiber Total Project Cost $145,000 Department Comm Svcs - IT Type Equipment Category Equipment Status Active Useful Life 15 years Description Install fiber and related equipment to maintain and add reduncancy Justification/Sustainability Improve capacity, coverage and reliability. Prior Expenditures 2025 2026 2027 2028 2029 Total 75,000 Equipment 70,000 0 0 0 0 70,000 Total 70,000 0 0 0 0 70,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 75,000 Equipment Replacement Fund 70,000 0 0 0 0 70,000 Total 70,000 0 0 0 0 70,000 Budget Impact Variance from 20 year plan - new item to replace substandard network wiring. Estimate salvage/resale value on replaced item: $ Produced Using Plan-It CIP Software 30 PD - Network Server 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0211 Project Name PD - Network Server Total Project Cost $1,118,901 Department Comm Svcs - IT Type Equipment Category Equipment Status Active Useful Life 1 year Description Computer servers store information and system programs for Police Department. Justification/Sustainability Annual replacement cycle allows development of system storage program. Use of newer servers for heavy use programs while older servers used for data storage Prior Expenditures 2025 2026 2027 2028 2029 Total Future 320,288 Equipment 27,849 28,684 29,545 30,431 31,344 147,853 650,760 Total 27,849 28,684 29,545 30,431 31,344 147,853 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 320,288 Equipment Replacement Fund 27,849 28,684 29,545 30,431 31,344 147,853 650,760 Total 27,849 28,684 29,545 30,431 31,344 147,853 Produced Using Plan-It CIP Software 31 Permitting and Licensing Software Upgrade 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #796DQPWR Project Name Permitting and Licensing Software Upgrade Total Project Cost $120,000 Contact Asst City Manager Department Comm Svcs - IT Type Equipment Category Equipment Status Active Useful Life 8 years Description New Permitting and Licensing Software. Software currently used by Inspections, Fire, City Clerk, Public Works, and Planning & Development. The City would acquire software that manages and processes the City's permits and licenses including: permits for building, plumbing, electrical, mechanical, water/sewer, street closure, right-of- way/utility excavation, fire-related/alarm systems, water meters, and planning and zoning requests; licenses including business, contractors, and rental housing; and code enforcement. New permitting and licensing software would add transparency, enhance work flows, and an improved customer portal for residents and customers. A new permitting platform would allow integration with the City's electronic plan review software. Staff would also look for vendors capable of providing both Finance and Permitting/Licensing platforms for potential cost and efficiency savings. Justification/Sustainability The current permitting software is outdated and lacks customer service and efficiency components that our peer communities offer. Our customers regularly request additional online service capabilities. Staff is frustrated with the software's operability and lack of customization. IT staff has concerns about the maintenance needs of the software and security issues it presents. Expenditures 2025 2026 2027 2028 2029 Total Equipment 0 120,000 0 0 0 120,000 Total 0 120,000 0 0 0 120,000 Funding Sources 2025 2026 2027 2028 2029 Total Equipment Replacement Fund 0 120,000 0 0 0 120,000 Total 0 120,000 0 0 0 120,000 Budget Impact Software is anticipated to have an annual subscription fee estimated at $40,000. Produced Using Plan-It CIP Software 32 Video Servers 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #None Project Name Video Servers Total Project Cost $60,000 Contact IT Director Department Comm Svcs - IT Type Equipment Category Trans: Parking Facilities Status Active Useful Life 3 years Description Purchase two video servers to support the existing video cameras in the parking ramp. The ownership of the video cameras was transferred from Hennepin County to the City of Hopkins. The video servers are needed to make them functional. Justification/Sustainability Video cameras help prevent and deter crime in the parking ramp. Expenditures 2025 2026 2027 2028 2029 Total Equipment 60,000 0 0 0 0 60,000 Total 60,000 0 0 0 0 60,000 Funding Sources 2025 2026 2027 2028 2029 Total Equipment Replacement Fund 60,000 0 0 0 0 60,000 Total 60,000 0 0 0 0 60,000 Produced Using Plan-It CIP Software 33 Document Management Scanner (2) 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0008 Project Name Document Management Scanner (2) Total Project Cost $101,873 Department Community Services Type Equipment Category Equipment Status Active Useful Life 4 years Description Large document (11” x17”) scanner for document management and retention as well as general administrative use. Purchased two scanners in 2012 at a cost of $10,315 - 1 at scanner station, 1 in City Clerk's office Current equipment: Canon DR 7550C Justification/Sustainability Scanners are needed for converting paper copies to electronic data to reduce storage space. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 33,300 Equipment 0 0 0 14,300 0 14,300 54,273 Total 0 0 0 14,300 0 14,300 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 33,300 Equipment Replacement Fund 0 0 0 14,300 0 14,300 54,273 Total 0 0 0 14,300 0 14,300 Budget Impact Variance from 20 year plan - Two scanners purchased in 2012 and will be replaced every four years. Estimate salvage/resale value on replaced item: $500-$1,000 Produced Using Plan-It CIP Software 34 Electronic Inspections Processing 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0052 Project Name Electronic Inspections Processing Total Project Cost $96,150 Department Community Services Type Equipment Category Equipment Status Active Useful Life 5 years Description Included in this request are equipment needed to move to an electronic plan review and inspections process. Revu -Bluebeam electronic plan review software - 2020 - $1,100 (useful life 8-10 years) Ipads - 2020 - $5,400 (useful life 5-6 years) Rental Inspection software - 2020 - $7,500 (useful life 7-10 years) Justification/Sustainability As more and more contractors and architects ask to submit plan electronically, Blubeam software will enable inspectors to perform electronic plan reviews which will make the plan review process more efficient and enhance customer service. As the inspection and construction industry becomes more paperless, iPads will enable inspectors to use mobile technology to keep up with the requests of engineers, architect, contractors, landlords and residents. Ipads are a key piece that will enable staff to view electronic plans in the field. Going paperless will eventually eliminate our need for paper plan scanning and sorting which is very time consuming and costs $1,500 - $2,000 per year. The software company currently used by Rental Inspectors has recently gone out of business and support for the software is going to be on a very limited basis after 2020. Because rental inspections effect such a large part of the city and the department, I believe getting a new software in place before the existing software stops functioning is essential to the rental inspection program. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 14,000 Equipment 16,231 0 0 0 0 16,231 65,919 Total 16,231 0 0 0 0 16,231 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 14,000 Equipment Replacement Fund 16,231 0 0 0 0 16,231 65,919 Total 16,231 0 0 0 0 16,231 Produced Using Plan-It CIP Software 35 Emergency Preparedness Sirens 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0113 Project Name Emergency Preparedness Sirens Total Project Cost $72,000 Department Fire Type Equipment Category Equipment Status Active Useful Life 20 years Description Emergency warning system for City of Hopkins. Prior Expenditures 2025 2026 2027 2028 2029 Total 27,000 Equipment 0 45,000 0 0 0 45,000 Total 0 45,000 0 0 0 45,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 27,000 Equipment Replacement Fund 0 45,000 0 0 0 45,000 Total 0 45,000 0 0 0 45,000 Budget Impact Variance from 20 year plan - None Estimate salvage/resale value on replaced item: $-0- Produced Using Plan-It CIP Software 36 Extrication Tool (1) 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0109 Project Name Extrication Tool (1) Total Project Cost $240,800 Department Fire Type Equipment Category Equipment Status Active Useful Life 10 years Description Hydraulic rescue and extrication tool with spreader, cutters and hydraulic ram. Justification/Sustainability All vehicle and industrial rescue situations which will require patient disentanglement or entrapment. This tool will be added to the purchase of the quick attack pumper. The tool will be scaled down to a smaller tool, possibly reducing cost. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 109,600 Equipment 0 0 0 0 36,900 36,900 94,300 Total 0 0 0 0 36,900 36,900 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 109,600 Equipment Replacement Fund 0 0 0 0 36,900 36,900 94,300 Total 0 0 0 0 36,900 36,900 Budget Impact Estimate salvage/resale value on replaced item: $1,000 Purchased: 2007 Produced Using Plan-It CIP Software 37 Fire - Lucus Device 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0127 Project Name Fire - Lucus Device Total Project Cost $98,686 Department Fire Type Equipment Category Equipment Status Active Useful Life 5 years Description Lucus device is used to assist CPR during full arrest. The current device was purchased in 2016 and with changed in technology, it is recommended to update every 5 years. Justification/Sustainability To continue to serve citizens of Hopkins during medical incidents. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 18,000 Equipment 0 0 0 18,500 0 18,500 62,186 Total 0 0 0 18,500 0 18,500 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 18,000 Equipment Replacement Fund 0 0 0 18,500 0 18,500 62,186 Total 0 0 0 18,500 0 18,500 Budget Impact Reoccurs every 5 years. Produced Using Plan-It CIP Software 38 Fire Pumper (Engine 3) 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0101 Project Name Fire Pumper (Engine 3) Total Project Cost $3,250,000 Department Fire Type Equipment Category Vehicles Status Active Useful Life 25 years Description 1500 GPM fire pumper, fully equipped to respond to all fire situations in the city. Responds to mutual aid calls in other cities. This truck wil be pushed back to 2027 and will also be on a 10 year rotation. Current vehicle: 2006 Peterbilt Fire Pumper 357 (#103) Justification/Sustainability Current unit is a first out pumper. This apparatus construction will require 25 year specifications for life of the apparatus. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 400,000 Equipment 0 0 1,500,000 0 0 1,500,000 1,350,000 Total 0 0 1,500,000 0 0 1,500,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 400,000 Equipment Replacement Fund 0 0 1,500,000 0 0 1,500,000 1,350,000 Total 0 0 1,500,000 0 0 1,500,000 Budget Impact Variance from 20 year plan - None Estimate salvage/resale value on replaced item: $2,500 Produced Using Plan-It CIP Software 39 Fire Radios - Portable and Mobile Devices 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0125 Project Name Fire Radios - Portable and Mobile Devices Total Project Cost $2,394,328 Department Fire Type Equipment Category Equipment Status Active Useful Life 5 years Description Portable and mobile radios used by the police departments to allow the department to communicate on one frequency. Fire has 50 portable and 13 mobile radios along with 50 pagers. Cost in ERP includes portable radios (30), portable radio's encrypted (20), mobile radio's (13), pagers (50), chargers single (60), charger base (3) plus other needed equipment. Details of all items are on file with Fire and Finance Depts. Justification/Sustainability Provides radios so that the police, fire and public works can communicate on a common radio frequency during an emergency and multiple county interoperability. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 294,075 Equipment 445,000 0 0 0 0 445,000 1,655,253 Total 445,000 0 0 0 0 445,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 294,075 Equipment Replacement Fund 445,000 0 0 0 0 445,000 1,655,253 Total 445,000 0 0 0 0 445,000 Budget Impact In 2016 the Fire radios were separated from Police for better accountability. Project was adjusted for current pricing. 2025 - 356,500 FD 2025 - 29,500 PW Produced Using Plan-It CIP Software 40 Floor Scrubber 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0114 Project Name Floor Scrubber Total Project Cost $68,741 Department Fire Type Equipment Category Equipment Status Active Useful Life 12 years Description Floor scrubber to keep apparatus floors clean. Current equipment: 2004 Tennant 5400 Justification/Sustainability Scrubber is used to keep apparatus floors clean so that floor will last longer. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 14,300 Equipment 0 0 25,500 0 0 25,500 28,941 Total 0 0 25,500 0 0 25,500 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 14,300 Equipment Replacement Fund 0 0 25,500 0 0 25,500 28,941 Total 0 0 25,500 0 0 25,500 Budget Impact Variance from 20 year plan - Eliminate sweeper and add scrubber as scrubber is used more. Move from 2016 to 2015 Estimate salvage/resale value on replaced item: $0 Produced Using Plan-It CIP Software 41 Ladder #7 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0100 Project Name Ladder #7 Total Project Cost $1,700,000 Department Fire Type Equipment Category Vehicles Status Active Useful Life 10 years Description Fire engine: full size response truck Current vehicle: Justification/Sustainability This is a replacement engine for response to emergency response in the City. We will be reducing the fleet by one truck in making this one unit (ladder/pumper) which would reduce the life of a vehicle from 25 years to 10 years. We are finding that the life a vehicle is no longer 20 years. Expenditures 2025 2026 2027 2028 2029 Total Equipment 0 0 1,700,000 0 0 1,700,000 Total 0 0 1,700,000 0 0 1,700,000 Funding Sources 2025 2026 2027 2028 2029 Total Equipment Replacement Fund 0 0 1,700,000 0 0 1,700,000 Total 0 0 1,700,000 0 0 1,700,000 Budget Impact Variance from 20 year plan - was scheduled for replacement in 2019 and has been moved up to 2017. Change useful life from 25 to 10 years. Updated value to reflect more accurate replacement cost. Estimate salvage/resale value on replaced item: $ Produced Using Plan-It CIP Software 42 Self Contained Breathing Apparatus (SCBA) (45) 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0108 Project Name Self Contained Breathing Apparatus (SCBA) (45) Total Project Cost $902,000 Department Fire Type Equipment Category Equipment Status Active Useful Life 10 years Description Breathing apparatus for interior firefighting for firefighters. Justification/Sustainability The breathing apparatus was taken out of the ERP in 2006 because we thought we were getting a grant. Grant was not successful. The SCBA's (45) need to be replaced because they are at the end of their life and cannot be hydro tested any longer. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 166,000 Equipment 400,000 0 0 0 0 400,000 336,000 Total 400,000 0 0 0 0 400,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 166,000 Equipment Replacement Fund 400,000 0 0 0 0 400,000 336,000 Total 400,000 0 0 0 0 400,000 Budget Impact Variance from 20 year plan - Move back to 2025. Purchased SCBA's in 2015 with grant funds. Estimate salvage/resale value on replaced item: $ Produced Using Plan-It CIP Software 43 Thermal Imaging Camera (2) 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0112 Project Name Thermal Imaging Camera (2) Total Project Cost $149,905 Department Fire Type Equipment Category Equipment Status Active Useful Life 10 years Description Used by our fire companies to locate victims trapped in a smoke filled building. It helps us determine where fire and heat may be hidden allowing for faster extinguishment. Note: purchased 2013 & 2017 Justification/Sustainability Current camera is ten years old and has been through many hot fires and needs to be replaced. Current camera was purchased with donation money. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 39,400 Equipment 18,600 0 20,000 0 0 38,600 71,905 Total 18,600 0 20,000 0 0 38,600 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 39,400 Equipment Replacement Fund 18,600 0 20,000 0 0 38,600 71,905 Total 18,600 0 20,000 0 0 38,600 Budget Impact Variance from 20 year plan - department owns 2 cameras. Reoccuring expenditure. Estimate salvage/resale value on replaced item: $-0- Produced Using Plan-It CIP Software 44 Workout Equipment - Dumb Bells 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0122 Project Name Workout Equipment - Dumb Bells Total Project Cost $20,704 Department Fire Type Equipment Category Equipment Status Active Useful Life 10 years Description Workout equipment used in Fire Department workout room. Justification/Sustainability Current dumb bells are 15 plus years old. The current dumb bells are older and some of the weights contained lead based plaint. This purchase would update our dumb bells to the current type fitness bells. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 5,000 Equipment 6,700 0 0 0 0 6,700 9,004 Total 6,700 0 0 0 0 6,700 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 5,000 Equipment Replacement Fund 6,700 0 0 0 0 6,700 9,004 Total 6,700 0 0 0 0 6,700 Budget Impact Variance from 20 year plan - Move back from 2014 to 2017. Estimate salvage/resale value on replaced item: $ Produced Using Plan-It CIP Software 45 Workout Equipment - Treadmill 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0116 Project Name Workout Equipment - Treadmill Total Project Cost $42,704 Department Fire Type Equipment Category Equipment Status Active Useful Life 6 years Description Workout equipment used in Fire Department workout room. One elliptical machine replaced on a 6 year cycle, one every 3 years. Justification/Sustainability This equipment is available to all City employees for health and wellness. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 14,500 Equipment 0 0 7,800 0 0 7,800 20,404 Total 0 0 7,800 0 0 7,800 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 14,500 Equipment Replacement Fund 0 0 7,800 0 0 7,800 20,404 Total 0 0 7,800 0 0 7,800 Budget Impact Variance from 20 year plan - had two elliptical machines in the ERP. One was replaced along with the Stairmaster with a summit trainer. The remaining elliptical is scheduled for replacement in 2015. Estimate salvage/resale value on replaced item: $ Produced Using Plan-It CIP Software 46 Pavilion - Electric Ice Edger 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-1001 Project Name Pavilion - Electric Ice Edger Total Project Cost $25,861 Department Pavilion Type Equipment Category Equipment Status Active Useful Life 10 years Description Electric ice edger used for ice maintenance of the Pavilion's ice sheet. An edger is used to shave the ice next to the boards to remove ice buildup that the ice resurfacer cannot reach. 2014 cost = $6,281.25 Asset ID #5174 Justification/Sustainability Replace the current battery fueled ice edger with a new model of battery ice edger. Scheduled to replace at the end of useful life should occur in 2026, the model was purchased in 2014. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 5,000 Equipment 0 0 8,900 0 0 8,900 11,961 Total 0 0 8,900 0 0 8,900 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 5,000 PA - Pavilion Fund 0 0 8,900 0 0 8,900 11,961 Total 0 0 8,900 0 0 8,900 Budget Impact Variance from 20 year plan - New item. Estimate salvage/resale value on replaced item: $ Produced Using Plan-It CIP Software 47 Pavilion - Floor Scrubber 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-1003 Project Name Pavilion - Floor Scrubber Total Project Cost $52,567 Department Pavilion Type Equipment Category Equipment Status Active Useful Life 10 years Description 26 to 28 battery operated walk behind floor scrubber. Floor scrubber is used to clean the arenas concrete floor and tiled surfaces throughout the building. 2014 cost = $8,651.94 Asset ID #5172 Justification/Sustainability Replace the existing floor scrubber with new model. Current floor scrubber was purchased in 2014 and is scheduled to be replaced in 2024. Expenditures 2025 2026 2027 2028 2029 Total Future Equipment 0 16,000 0 0 0 16,000 36,567 Total 0 16,000 0 0 0 16,000 Funding Sources 2025 2026 2027 2028 2029 Total Future PA - Pavilion Fund 0 16,000 0 0 0 16,000 36,567 Total 0 16,000 0 0 0 16,000 Budget Impact Variance from 20 year plan - New item Estimate salvage/resale value on replaced item: $ Produced Using Plan-It CIP Software 48 Pavilion Ice Resurfacer 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-1000 Project Name Pavilion Ice Resurfacer Total Project Cost $640,251 Department Pavilion Type Equipment Category Equipment Status Active Useful Life 12 years Description Ice resurfacer used by the Pavilion for ice sheet maintenance. Current equipment: Zamboni Ice Resurfacer 2014 cost = $116,205.93 Asset ID #5176 Justification/Sustainability Replace existing electric (battery) ice resurfacer. The current electric ice resurfacer was purchased in 2014 and has a useful life of 12 years and is scheduled for replacement in 2026. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 240,000 Equipment 0 0 165,000 0 0 165,000 235,251 Total 0 0 165,000 0 0 165,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 240,000 PA - Pavilion Fund 0 0 165,000 0 0 165,000 235,251 Total 0 0 165,000 0 0 165,000 Budget Impact Variance from 20 year plan - Decrease cost due to 2014 purchase price. Move back one year. Estimate salvage/resale value on replaced item: $30,000 Produced Using Plan-It CIP Software 49 Pavilion - Scissor Lift 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-1004 Project Name Pavilion - Scissor Lift Total Project Cost $35,240 Department Pavilion Type Equipment Category Equipment Status Active Useful Life 15 years Description 25 foot scissor lift used to perform maintenance duties in the arena. 2014 cost = $10,430.35 Asset ID #5173 Justification/Sustainability The current model was purchased in 2014 and is scheduled for replacement in 2029. The scissor lift allows staff the ability to perform maintenance on arena lighting fixtures and other maintenance around the arena ceiling. Expenditures 2025 2026 2027 2028 2029 Total Future Equipment 10,000 0 0 0 0 10,000 25,240 Total 10,000 0 0 0 0 10,000 Funding Sources 2025 2026 2027 2028 2029 Total Future PA - Pavilion Fund 10,000 0 0 0 0 10,000 25,240 Total 10,000 0 0 0 0 10,000 Budget Impact Variance from 20 year plan - New item Estimate salvage/resale value on replaced item: $ Produced Using Plan-It CIP Software 50 Body Worn Cameras 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0222 Project Name Body Worn Cameras Total Project Cost $899,500 Department Police Type Equipment Category Equipment Status Pending Useful Life 5 years Description Body worn cameras (BWC) are cameras worn on the person of a police officer to capture the actions of individuals and the situations encountered by police officers. The BWCs offer video data and evidence that cannot be captured by traditional squad car video systems. The State of Minnesota recently passed legislation regarding the use of BWCs and the video data associated with their use. The use of BWCs by police officers is an emergeing documentation tool in law enforcement, and considered directly associated with transparency and positive community relations. Justification/Sustainability There are a number of costs associated with the implementation of a BWC program. The State of Minnesota set forth specific data privacy and retention guidelines in the legislation that must be followed. The legislation mandates the performance of duties that are not currently performed by members of the Police Department staff and may require the hiring of additional staff to perform the mandated duties. Initial inquiries into BWC platforms indicate the best practice will be the acquistion of one BWC per officer in contact with the public as a core function of their job duties, which for the Police Department would result in the purchase of 30 BWCs. BWC manufacturers require license fees per device and ongoing warranty and maintenace fees. Computer software to manage the video data has additional associated costs, not including staff salary / compensation to perform needed duties. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 160,000 Equipment 0 0 165,000 0 0 165,000 574,500 Total 0 0 165,000 0 0 165,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 160,000 Equipment Replacement Fund 0 0 165,000 0 0 165,000 574,500 Total 0 0 165,000 0 0 165,000 Produced Using Plan-It CIP Software 51 Building Video Server 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0218 Project Name Building Video Server Total Project Cost $165,907 Department Police Type Equipment Category Equipment Status Pending Useful Life 3 years Description Building Video Server hardware and associated software is used to store video recorded by the cameras in and around the police department including interview rooms as well as booking. We record approximately 6 TB of video every 2-3 weeks. Large amounts of storage are required for 30 days of archival storage on the server itself. Justification/Sustainability Maintenance agreement with software vendor needs to be renewed every three years. Computer hardware should be refreshed around the same time to minimize drive failure and take advantage of new storage technology. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 59,000 Equipment 0 25,000 0 0 0 25,000 81,907 Total 0 25,000 0 0 0 25,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 59,000 Equipment Replacement Fund 0 25,000 0 0 0 25,000 81,907 Total 0 25,000 0 0 0 25,000 Budget Impact Variance from 20 year plan - Change in replacement schedule and estimated cost. Current equipment was purchased with DTF funding. Beginning in 2020 it will be funded with ERP funds. Estimate salvage/resale value on replaced item: $-0- Produced Using Plan-It CIP Software 52 Marked Patrol Vehicles (7) 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0200 Project Name Marked Patrol Vehicles (7) Total Project Cost $4,793,000 Department Police Type Equipment Category Vehicles Status Active Useful Life 3 years Description Marked patrol vehicles used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties. Fleet consists of 8 marked patrol vehicles Justification/Sustainability Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for routine and emergency operations. Vehicles contain secure seating for prisoner transport. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 1,931,600 Vehicles 145,000 150,000 150,000 155,000 140,000 740,000 2,121,400 Total 145,000 150,000 150,000 155,000 140,000 740,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 1,931,600 Equipment Replacement Fund 145,000 150,000 150,000 155,000 140,000 740,000 2,121,400 Total 145,000 150,000 150,000 155,000 140,000 740,000 Produced Using Plan-It CIP Software 53 Police Equipment 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0227 Project Name Police Equipment Total Project Cost $121,425 Department Police Type Equipment Category Equipment Status Active Useful Life 2 years Description The police department needs to maintain law and order during times of civil unrest. We need to allow for the peaceful demonstrations and first amendment rights of our community members, while ensuring that we have the ability to keep everyone safe and property from being damaged. This requires specialized equipment for each of our officer. Justification/Sustainability Community safety is our priority and specialized equipment is necessary to perform this core function. This includes full face shielts, soft body armor (turltle gear), gas masks and less lethal munitions, which are necessary to keep officer and the community members safe. The general fund supported numerous acquisitions and purchases in 2021, however this was only a temporary solution. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 25,000 Equipment 12,500 0 13,750 0 15,125 41,375 55,050 Total 12,500 0 13,750 0 15,125 41,375 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 25,000 Equipment Replacement Fund 12,500 0 13,750 0 15,125 41,375 55,050 Total 12,500 0 13,750 0 15,125 41,375 Produced Using Plan-It CIP Software 54 PSO / Parking Enforcement Vehicle 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0202 Project Name PSO / Parking Enforcement Vehicle Total Project Cost $427,572 Department Police Type Equipment Category Vehicles Status Active Useful Life 5 years Description Marked patrol vehicle used by Parking Enforcement Officer to respond to calls for service, enforce parking laws, and perfom duties as assigned. Current Vehicle: 2021 Ford Utility (#211) VIN# 1FM5K8AB3MGB53656 Justification/Sustainability Use by parking enforcement officers in the course of their duties enforcing parking regulations in the downtown area. Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for routine and emergency operations. Vehicles contain secure seating for prisoner transport. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 108,900 Vehicles 0 75,000 0 0 0 75,000 243,672 Total 0 75,000 0 0 0 75,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 108,900 Equipment Replacement Fund 0 75,000 0 0 0 75,000 243,672 Total 0 75,000 0 0 0 75,000 Budget Impact 2016 - Change in replacement schedule due to full time use of vehicle and change of position responsibilities. Next replacement scheduled for 2021 from 2026 Produced Using Plan-It CIP Software 55 PSO - Utility 4x4 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0203 Project Name PSO - Utility 4x4 Total Project Cost $816,989 Department Police Type Equipment Category Vehicles Status Active Useful Life 4 years Description Four wheel drive marked patrol vehicle used by PSOs to respond to calls for service, handle animal complaints, and perform other duties associated with department operations. Current vehicle: 2021 Ford F150 (#212) Justification/Sustainability Vehicle is normally used by public service officers for a wide variety of uses such as transporting animals, prisoners and equipment. The 4 wheel drive vehicle is also used at times as a patrol vehicle, particularly in the winter in extreme snow conditions. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 255,100 Vehicles 0 0 0 95,000 0 95,000 466,889 Total 0 0 0 95,000 0 95,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 255,100 Equipment Replacement Fund 0 0 0 95,000 0 95,000 466,889 Total 0 0 0 95,000 0 95,000 Budget Impact 2023 Variance from 20 year plan - Originally this vehicles was scheduled to be replaced in 2022. Ford cancelled the order, and we missed the next order window. Need to replace in 2024 and reset ERP schedule. Produced Using Plan-It CIP Software 56 Sergeant's Vehicle 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0201 Project Name Sergeant's Vehicle Total Project Cost $604,988 Department Police Type Equipment Category Vehicles Status Active Useful Life 4 years Description Marked patrol vehicle used by patrol officers to respond to calls, enforce traffic laws and perform general patrol duties. 4 year rotation. Current vehicle: 2021 Ford Utility (#201) VIN #1FM5K8AB6MGB53652 Justification/Sustainability Set up and marking of police vehicles must conform to Minnesota law and POST standards. Vehicles contain secure data and radio equipment for routine and emergency operations. Vehicles contain secure seating for prisoner transport. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 184,600 Vehicles 72,500 0 0 0 72,206 144,706 275,682 Total 72,500 0 0 0 72,206 144,706 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 184,600 Equipment Replacement Fund 72,500 0 0 0 72,206 144,706 275,682 Total 72,500 0 0 0 72,206 144,706 Produced Using Plan-It CIP Software 57 Squad Car Camera Systems 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0212 Project Name Squad Car Camera Systems Total Project Cost $443,700 Department Police Type Equipment Category Equipment Status Active Useful Life 5 years Description Squad car camera systems are used to document events inside and outside of the patrol vehicles. The cameras utilize a forward facing camera and a prisoner transport area camaera. Body cameras capture interactions between the officers and the public for transparency. Justification/Sustainability The police vehicle cameras are a necessary component of the patrol vehicles. Evidentiary information is collected from the cameras and often used in court. Cameras also provide a snapshot of an officers interaction with the public so we are able to maintain transparency and public trust with our operations. Prior Expenditures 2025 2026 2027 2028 2029 Total 307,140 Equipment 26,640 26,640 26,640 26,640 30,000 136,560 Total 26,640 26,640 26,640 26,640 30,000 136,560 Prior Funding Sources 2025 2026 2027 2028 2029 Total 307,140 Equipment Replacement Fund 26,640 26,640 26,640 26,640 30,000 136,560 Total 26,640 26,640 26,640 26,640 30,000 136,560 Budget Impact Integrated camera system - 12 squad car cameras Squad cameras 11,100 each over 5 years. The industry has changed its service model for cloud storage of video data. Body worn cameras moved to Video as a Service (VAAS) and incorporated into the general fund. Produced Using Plan-It CIP Software 58 Squad Computers 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0220 Project Name Squad Computers Total Project Cost $601,242 Department Police Type Equipment Category Equipment Status Active Useful Life 5 years Description Mobile Data Computers are used in the squad cars to receive calls for service from dispatch, query information from criminal justice databases, and facilitate communication between squad cars. Replacement in 2029 for 17 computers. Justification/Sustainability Mobile Data Computers have a limited life expectancy. The computers facilitate the basic response to emergency calls for service to which police officers respond. Vital information is forwarded to officers via the mobile data computers. Officers complete investigative reports, issue traffic related warnings and citations, and process arrest incidents from the mobile data computers. As technology evolves the officers must be able to access information using up to date computers that can process the large amount of data and applications. Mobile data computers are currently used to host the squad car video camera system and have the potential to be integrated with a possible body worn camera. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 155,000 Equipment 0 0 0 0 140,000 140,000 306,242 Total 0 0 0 0 140,000 140,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 155,000 Equipment Replacement Fund 0 0 0 0 140,000 140,000 306,242 Total 0 0 0 0 140,000 140,000 Budget Impact Change in replacement year to accurately reflect life expectancy in relation to when the computers were purchased. Produced Using Plan-It CIP Software 59 Tactical Ballistic Vests / Helmets - SWAT 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0214 Project Name Tactical Ballistic Vests / Helmets - SWAT Total Project Cost $640,274 Department Police Type Equipment Category Equipment Status Active Useful Life 5 years Description 12 Tactical Ballistical Vests worn by members of the Hopkins Police Department SWAT (Special Weapons and Tactics) team. These vests offer a higher level of protection for officers involved in high risk situations; this protection offers a higher level of ballistic protection compared to regular duty vests. SWAT team members also require ballistic helmets on the same rotational cycle. Equipment breakdown: 12 vests @ $4,215 = $50,580. 12 ballistic helmets @ $642 = $7,716. 2 New protective shields @ $2,864 = $5,729. 12 Radio headsets @ $1,042 = $12,500. Justification/Sustainability Variance - Change in vendor equipment pricing and SWAT team staffing levels. Current price is reflective of a twelve person (fully staffed) SWAT team with current vendor pricing. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 179,360 Equipment 12,000 0 0 88,697 0 100,697 360,217 Total 12,000 0 0 88,697 0 100,697 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 179,360 Equipment Replacement Fund 12,000 0 0 88,697 0 100,697 360,217 Total 12,000 0 0 88,697 0 100,697 Budget Impact 5 year replacement schedule Two additional SWAT Officers in 2025, $6,000 to outfit each Officer Produced Using Plan-It CIP Software 60 Taser Replacement 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0217 Project Name Taser Replacement Total Project Cost $881,864 Department Police Type Equipment Category Equipment Status Active Useful Life 5 years Description Tasers can prevent officers and the public from injuries.Taser technology continues to develop and are worn/ carried 24/7. Tasers have a useful life expectancy of approximately 5 years. Justification/Sustainability Tasers are a crtical tool for Law Enforcement for control purposes during use of force encounters. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 193,600 Equipment 0 0 200,000 0 0 200,000 488,264 Total 0 0 200,000 0 0 200,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 193,600 Equipment Replacement Fund 0 0 200,000 0 0 200,000 488,264 Total 0 0 200,000 0 0 200,000 Produced Using Plan-It CIP Software 61 Hot Water High Pressure Vehicle Washer 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0711 Project Name Hot Water High Pressure Vehicle Washer Total Project Cost $25,600 Department Public Works: Bldg/Equip Serv Type Equipment Category Equipment Status Active Useful Life 12 years Description Hot water, high pressure vehicle washer. Justification/Sustainability Existing washer is 12 years old; is in poor condition and needs to be replaced. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 5,800 Equipment 0 0 0 0 8,300 8,300 11,500 Total 0 0 0 0 8,300 8,300 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 5,800 Equipment Replacement Fund 0 0 0 0 8,300 8,300 11,500 Total 0 0 0 0 8,300 8,300 Budget Impact Variance from 20 year plan - new item. Estimate salvage resale value on replaced item: $ Produced Using Plan-It CIP Software 62 PW - Truck Scan Kit 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0714 Project Name PW - Truck Scan Kit Total Project Cost $43,152 Department Public Works: Bldg/Equip Serv Type Equipment Category Vehicles Status Active Useful Life 10 years Description Scan kit to assist in diagnosing repairs needed on the fleets larger trucks. Justification/Sustainability Having the scan tool will provide the in-house mechanics to pull the codes off the trucks and make the repairs. We will not have to send the truck to an outside source for diagnosis. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 10,000 Equipment 0 0 14,143 0 0 14,143 19,009 Total 0 0 14,143 0 0 14,143 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 10,000 Equipment Replacement Fund 0 0 14,143 0 0 14,143 19,009 Total 0 0 14,143 0 0 14,143 Produced Using Plan-It CIP Software 63 Supervisor Vehicle 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #OH7I84S6 Project Name Supervisor Vehicle Total Project Cost $40,000 Contact Public Works Director Department Public Works: Bldg/Equip Serv Type Equipment Category Equipment Status Active Useful Life 6 years Description Replace current pick-up with SUV for supervisor. Justification/Sustainability Replace Truck 301, a 2012 Ford F-150 that is rusting out and starting to show more need for maintenance. Expenditures 2025 2026 2027 2028 2029 Total Equipment 0 40,000 0 0 0 40,000 Total 0 40,000 0 0 0 40,000 Funding Sources 2025 2026 2027 2028 2029 Total Equipment Replacement Fund 0 40,000 0 0 0 40,000 Total 0 40,000 0 0 0 40,000 Produced Using Plan-It CIP Software 64 4x4 3/4Ton Trucks (2) 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0801 Project Name 4x4 3/4Ton Trucks (2) Total Project Cost $623,918 Department Public Works: Parks/Forestry Type Equipment Category Vehicles Status Active Useful Life 8 years Description Trucks used by Parks Division of Public Works. Current vehicles: 2012 Ford F350 4X4 (#801) & 2012 Ford F350 4X4 (#802) Justification/Sustainability Snow plowing, hauling, transportation. Units are heavily used. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 205,800 Vehicles 0 0 0 108,000 0 108,000 310,118 Total 0 0 0 108,000 0 108,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 205,800 Equipment Replacement Fund 0 0 0 108,000 0 108,000 310,118 Total 0 0 0 108,000 0 108,000 Budget Impact Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $ Produced Using Plan-It CIP Software 65 Forestry Boom/Chipper Box Truck 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0818 Project Name Forestry Boom/Chipper Box Truck Total Project Cost $240,000 Department Public Works: Parks/Forestry Type Equipment Category Equipment Status Active Description Forestry boom truck, used to trim/remove trees. Has chipper box on back to haul chipped wood. Is also used to replace lights too high for traffic boom. Current equipment: 812 2010 Freightliner Justification/Sustainability Is used every day during summer months and as needed during winter. It is reaching the end of its lifecycle. Expenditures 2025 2026 2027 2028 2029 Total Equipment 0 0 0 240,000 0 240,000 Total 0 0 0 240,000 0 240,000 Funding Sources 2025 2026 2027 2028 2029 Total Equipment Replacement Fund 0 0 0 240,000 0 240,000 Total 0 0 0 240,000 0 240,000 Produced Using Plan-It CIP Software 66 Large Turf Mower 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0810 Project Name Large Turf Mower Total Project Cost $486,659 Department Public Works: Parks/Forestry Type Equipment Category Equipment Status Active Useful Life 8 years Description Large turf mower (11' cutting width) used by Parks Division of Public Works. Current equipment: 2010 Toro Groundmaster (#825) Justification/Sustainability Required to efficiently mow large parks. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 211,000 Equipment 0 0 0 121,609 0 121,609 154,050 Total 0 0 0 121,609 0 121,609 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 211,000 Equipment Replacement Fund 0 0 0 121,609 0 121,609 154,050 Total 0 0 0 121,609 0 121,609 Budget Impact Variance from 20 year plan - move from 2011 to 2010 due to poor condition of existing mower. Estimated useful life reduced from 10 to 8 years. Estimate salvage/resale value on replaced item: $3,500 Produced Using Plan-It CIP Software 67 Skid Loader 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0815 Project Name Skid Loader Total Project Cost $142,614 Department Public Works: Parks/Forestry Type Equipment Category Equipment Status Active Useful Life 12 years Description Current equipment: 2004 Bobcat 463 (#833) Prior Expenditures 2025 2026 2027 2028 2029 Total Future 32,000 Equipment 0 0 0 0 45,600 45,600 65,014 Total 0 0 0 0 45,600 45,600 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 32,000 Equipment Replacement Fund 0 0 0 0 45,600 45,600 65,014 Total 0 0 0 0 45,600 45,600 Budget Impact Variance from 20 year plan - new item in 2004. Estimate salvage/resale value on replaced item: $ Produced Using Plan-It CIP Software 68 1 Ton Traffic Boom Truck 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0304 Project Name 1 Ton Traffic Boom Truck Total Project Cost $413,400 Department Public Works: Streets/Traffic Type Equipment Category Vehicles Status Active Useful Life 12 years Description Boom truck used in Street and Traffic Divisions of Public Works. Current vehicle: 2012 Ford F450 (#309) Justification/Sustainability Vehicle used by Traffic Department for signal and light pole maintenance. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 82,500 Vehicles 0 136,400 0 0 0 136,400 194,500 Total 0 136,400 0 0 0 136,400 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 82,500 Equipment Replacement Fund 0 136,400 0 0 0 136,400 194,500 Total 0 136,400 0 0 0 136,400 Budget Impact Variance from 20 year plan - Increase amount to reflect actual. Estimate salvage/resale value on replaced item: $8,000 Useful life moved from 17 years to 12 years. Produced Using Plan-It CIP Software 69 4X4 3/4 Ton Truck with Plow 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0301 Project Name 4X4 3/4 Ton Truck with Plow Total Project Cost $235,019 Department Public Works: Streets/Traffic Type Equipment Category Vehicles Status Active Useful Life 10 years Description 3/4 ton pickup used by Street Division of Public Works for heavy loads and pulling trailers. Current vehicle: 2018 Ford F350 (#302) 2027 Request is truck ($45,000) and plow ($25,000). Justification/Sustainability Light hauling, pulling trailers, transportation to and from job sites. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 54,400 Vehicles 0 0 70,000 0 0 70,000 110,619 Total 0 0 70,000 0 0 70,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 54,400 Equipment Replacement Fund 0 0 70,000 0 0 70,000 110,619 Total 0 0 70,000 0 0 70,000 Budget Impact Estimate salvage/resale value on replaced item: $1,500 Produced Using Plan-It CIP Software 70 Asphalt Hot Mix Heating Box - Trailer 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0318 Project Name Asphalt Hot Mix Heating Box - Trailer Total Project Cost $104,309 Department Public Works: Streets/Traffic Type Equipment Category Equipment Status Active Useful Life 12 years Description A trailer that hauls up to 2.5 tons of hot asphalt and heats the mix to keep it workable. Justification/Sustainability Current asphalt hot mix heating box insert sits in the back of a truck and is too small, 1 ton capacity. Sits too high to be handled easily. The trailer will hold more mix, reducing the trips to the asphalt plant, and will work better ergonomically. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 30,500 Equipment 0 0 0 0 31,509 31,509 42,300 Total 0 0 0 0 31,509 31,509 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 30,500 Equipment Replacement Fund 0 0 0 0 31,509 31,509 42,300 Total 0 0 0 0 31,509 31,509 Budget Impact Variance from 20 year plan - New item. 2016 - Upgrading from mounted unit to trailer Estimate salvage/resale value on replaced item: $-0-. Produced Using Plan-It CIP Software 71 Front End Loaders (2) 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0308 Project Name Front End Loaders (2) Total Project Cost $998,500 Department Public Works: Streets/Traffic Type Equipment Category Equipment Status Active Useful Life 15 years Description Current equipment: 2005 Caterpillar 938G (#322) Prior Expenditures 2025 2026 2027 2028 2029 Total Future 312,000 Equipment 0 0 268,000 0 0 268,000 418,500 Total 0 0 268,000 0 0 268,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 312,000 Equipment Replacement Fund 0 0 268,000 0 0 268,000 418,500 Total 0 0 268,000 0 0 268,000 Budget Impact Variance from 20 year plan - None Estimate salvage/resale value on replaced item: $ Produced Using Plan-It CIP Software 72 Grader 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0310 Project Name Grader Total Project Cost $167,300 Department Public Works: Streets/Traffic Type Equipment Category Equipment Status Completed Useful Life 20 years Description Grader with wing used by Streets Division of Public Works. Current equipment: 1989 Caterpillar 140-G (#326) Justification/Sustainability Snow plowing, grading, asphalt work. Expenditures 2025 2026 2027 2028 2029 Total Equipment 167,300 0 0 0 0 167,300 Total 167,300 0 0 0 0 167,300 Funding Sources 2025 2026 2027 2028 2029 Total Equipment Replacement Fund 167,300 0 0 0 0 167,300 Total 167,300 0 0 0 0 167,300 Budget Impact Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $18,000 Produced Using Plan-It CIP Software 73 Regenerative Air Sweeper 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0319 Project Name Regenerative Air Sweeper Total Project Cost $395,000 Department Public Works: Streets/Traffic Type Equipment Category Equipment Status Active Useful Life 15 years Description The City currently utilizes an Elgin Pelican Mechanical Sweeper (01-ERP-311). This type of sweeper is for heavy spring sweeps and is labor intensive due to the need for a water truck and dump truck to assist during its use. The proposed sweeper is a vacuum type sweeper that regenerates its air to vacuum up dirt and debris. The vacuum is effective in its ability to pick up even the smallest of dirt without the use of pre-wetting . It is also a truck type unit so it can be used by one operator to drive to a dump site to empty the sweepings without the need of a separate dump truck. Justification/Sustainability The existing sweeper that was due for replacement in 2013 for $156,400 will be moved out to 2021 and scheduled every twenty years. The new machine will also be a 20 year machine and budgeted at $185,000. The reduced usage by having two machines will allow us to keep both for a longer time and allow us more flexibility on different types of sweeping and reduce the labor needed to perform this duty. Prior Expenditures 2025 2026 2027 2028 2029 Total 185,000 Equipment 0 0 0 210,000 0 210,000 Total 0 0 0 210,000 0 210,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 185,000 Equipment Replacement Fund 0 0 0 210,000 0 210,000 Total 0 0 0 210,000 0 210,000 Budget Impact Variance from 20 year plan - New item. Estimate salvage/resale value one replaced item: $ Produced Using Plan-It CIP Software 74 Riding Floor Sweeper 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0324 Project Name Riding Floor Sweeper Total Project Cost $40,000 Department Public Works: Streets/Traffic Type Equipment Category Equipment Status Active Useful Life 20 years Description Floor sweeper for PW parking garage and Public Parking ramp Current equipment: 351 2004 Tennant Sweeper Justification/Sustainability Current sweeper is past its useful life. Current sweeper is not big enough to handle either space. City rents a sweeper to clean ramp. Expenditures 2025 2026 2027 2028 2029 Total Equipment 0 0 0 40,000 0 40,000 Total 0 0 0 40,000 0 40,000 Funding Sources 2025 2026 2027 2028 2029 Total Equipment Replacement Fund 0 0 0 40,000 0 40,000 Total 0 0 0 40,000 0 40,000 Produced Using Plan-It CIP Software 75 Skid Loader (2) 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0309 Project Name Skid Loader (2) Total Project Cost $258,900 Department Public Works: Streets/Traffic Type Equipment Category Equipment Status Active Useful Life 10 years Description Loading trucks, landscape work, snow removal, material handling. Current equipment: 2011 Bobcat S650 Skid-Steer Loader (#325) Prior Expenditures 2025 2026 2027 2028 2029 Total Future 127,900 Equipment 0 0 0 59,700 0 59,700 71,300 Total 0 0 0 59,700 0 59,700 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 127,900 Equipment Replacement Fund 0 0 0 59,700 0 59,700 71,300 Total 0 0 0 59,700 0 59,700 Budget Impact Estimate salvage/resale value on replaced item: $ Produced Using Plan-It CIP Software 76 Striper 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0313 Project Name Striper Total Project Cost $27,200 Department Public Works: Streets/Traffic Type Equipment Category Equipment Status Active Useful Life 12 years Description Line striper. Current equipment: 1993 Line Striper A1990 (#352) Prior Expenditures 2025 2026 2027 2028 2029 Total 11,200 Equipment 0 0 0 0 16,000 16,000 Total 0 0 0 0 16,000 16,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total 11,200 Equipment Replacement Fund 0 0 0 0 16,000 16,000 Total 0 0 0 0 16,000 16,000 Budget Impact Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $ Produced Using Plan-It CIP Software 77 Trailer 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0323 Project Name Trailer Total Project Cost $30,000 Department Public Works: Streets/Traffic Type Equipment Category Equipment Status Active Useful Life 20 years Description Streets trailer used for paver and light poles Current equipment 350 1993 T3 Trailer Justification/Sustainability This trailer is well past its lifecycle. PW request a new trailer able to haul PDI blocks for road closures. Expenditures 2025 2026 2027 2028 2029 Total Equipment 0 0 0 30,000 0 30,000 Total 0 0 0 30,000 0 30,000 Funding Sources 2025 2026 2027 2028 2029 Total Equipment Replacement Fund 0 0 0 30,000 0 30,000 Total 0 0 0 30,000 0 30,000 Produced Using Plan-It CIP Software 78 Refuse Truck (RAP- R) (2) 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0900 Project Name Refuse Truck (RAP-R) (2) Total Project Cost $2,025,500 Department Refuse Type Equipment Category Vehicles Status Active Useful Life 8 years Description Refuse truck used by Refuse Utility Division of Public Works. Current vehicle: 2011 Freightliner Rapid Rail (#900) Justification/Sustainability Residential waste pick up. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 824,200 Vehicles 350,000 0 0 0 0 350,000 851,300 Total 350,000 0 0 0 0 350,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 824,200 RF - Refuse Fund 350,000 0 0 0 0 350,000 851,300 Total 350,000 0 0 0 0 350,000 Budget Impact Variance from 20 year plan - increase cost to reflect actual Estimate salvage/resale value on replaced item: $18,000 Produced Using Plan-It CIP Software 79 3/4 Ton Utility Truck 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0551 Project Name 3/4 Ton Utility Truck Total Project Cost $232,346 Department Sewer Type Equipment Category Vehicles Status Active Useful Life 10 years Description 3/4 ton utility truck used by the Water/Sewer Division of Public Works. Current vehicle: 2007 Chevrolet Pickup (#505) 2026 request would add a crane, utility box and snow plow. Justification/Sustainability Transportation to and from job sites, box carries tools used by personnel for job site repairs and light hauling. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 84,600 Vehicles 0 87,000 0 0 0 87,000 60,746 Total 0 87,000 0 0 0 87,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 84,600 SF - Sanitary Sewer Fund 0 87,000 0 0 0 87,000 60,746 Total 0 87,000 0 0 0 87,000 Budget Impact Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $2,500 Produced Using Plan-It CIP Software 80 3/4 Ton Truck 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0500 Project Name 3/4 Ton Truck Total Project Cost $180,881 Department Water Type Equipment Category Vehicles Status Active Useful Life 10 years Description Trucks used by Water Department. 2016 - Changed from 1/2 ton truck to 3/4 ton truck Current vehicle: 2007 Chevrolet Pickup Justification/Sustainability Truck is due for replacement. Price includes service body and crane. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 52,500 Vehicles 0 80,000 0 0 0 80,000 48,381 Total 0 80,000 0 0 0 80,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 52,500 WF - Water Fund 0 80,000 0 0 0 80,000 48,381 Total 0 80,000 0 0 0 80,000 Budget Impact Variance from 20 year plan - none Estimate salvage/resale value on replaced item: $ Produced Using Plan-It CIP Software 81 3/4 Ton Utility Truck 2025 thru 2029 Equipment Replacement Plan Hopkins, MN ERP Project #01-ERP-0501 Project Name 3/4 Ton Utility Truck Total Project Cost $178,029 Department Water Type Equipment Category Vehicles Status Active Useful Life 10 years Description 3/4 ton utility truck used by the Water Division of Public Works. Current vehicle: 2006 Chevrolet Pickup 2026 request includes service body and crane. Justification/Sustainability Transportation to and from job sites, box carries tools used by personnel for job site repairs and light hauling. Prior Expenditures 2025 2026 2027 2028 2029 Total Future 35,000 Vehicles 0 80,000 0 0 0 80,000 63,029 Total 0 80,000 0 0 0 80,000 Prior Funding Sources 2025 2026 2027 2028 2029 Total Future 35,000 WF - Water Fund 0 80,000 0 0 0 80,000 63,029 Total 0 80,000 0 0 0 80,000 Budget Impact Variance from 20 year plan - moved up from 2017 to 2016 Estimate salvage/resale value on replaced item: $2,500 Produced Using Plan-It CIP Software 82