Loading...
Conditional Use Application 29 Van Buren Ave SPlanning & Development City of Hopkin's P&Z Report 2025-09 To: Planning and Zoning Commission Members From: Sam Gallagher, Associate Planner Date: October 28, 2025 Subject: Conditional Use Permit Application for Short -Term Rental for 29 Van Buren Ave S REQUEST Anthony Yanchuk, submitted an application for a conditional use permit to allow short- term rental of their property located at 29 Van Buren Ave S. The request is to allow the short-term rental of both of the 2 units in the duplex. The site is currently guided for Traditional Urban land use by the 2040 Comprehensive Plan and zoned N3-B, Small Lot Traditional Neighborhood. Short-term rental uses are a conditional use in the N3-B Zone. RECOMMENDATION Staff recommends, following a public hearing, the Planning & Zoning Commission adopt the following motion: Move to adopt Planning & Zoning Commission Resolution 2025- 08. recommending the City Council approve the Conditional Use Permit a lication for 29 Van Buren Avenue South to be used for short-term rental. subject to conditions. ANALYSIS Concept Overview Address: 29 Van Buren Avenue South Applicant/Owner: Anthony Yanchuk, Property Owner BASE ZONE: BUILDING TYPES ALLOWED: BUILDING TYPE SELECTED: �irr4F_v443 BUILDING SIZE: N3-B Traditional House Traditional House 0.14 ac (5,982 sfj One 2-story Duplex EXISTING USE: PROPOSED USE: IS USE PERMITTED/ CONDITIONAL?: DENSITY: COMPREHENSIVE PLAN DESIGNATION Household Living, 2 unit Short Term Rental, 2 unit Permitted 14 units/ac Traditional Urban (5- 12 units/ac) W U. € ~ w Z s" z O ° �a z a W `e z U) € Q r J =O €3 ; �l § w p § z HUN a � o� #g mMi Z 9 F SA _ ffil Z =M12� �a PHE OF ° § •� = z 9e M. ao .-°sg wwz }a F FumoN anNanv Fus E E .... . ......... . . Lq _° j '2y NN V Y LL 1 �v a z W D Lu Z = N LO x ,6 z �g o zW = a_ _ =Q U U �g W W W Of cn LO Q 0 z a W a a U U) 0 z t Background The property at 29 Van Buren Avenue South contains a duplex constructed in 1912 per County records. Both units in the duplex contain two bedrooms and one bathroom. The property also contains four off-street parking spaces located off the alley. The property was purchased by the applicants in August of 2025 and is currently used as a homestead for the applicant in one unit and vacant in the second unit. The applicant has applied for a conditional use permit to allow for both units on the property to be used for short-term rental. Zoning and Land Use Review The 2040 Comprehensive Plan — Cultivate Hopkins guides the future land use of this property as Traditional Urban. Traditional Urban land use is characterized by moderate density residential dwellings which are predominantly single family dwellings but include a mix of duplexes and attached units. The property is zoned as N3-B, Small Lot Traditional Neighborhood. This zone is primarily intended to accommodate detached houses, semi-detached houses, two -unit houses, and attached houses in a traditional neighborhood context featuring smaller lots. The Development Code identifies use of the property for short-term rental as allowable subject to the supplemental use regulations that are detailed on the following pages and upon approval of a conditional use permit. Public Hearing and Notice The procedures of the Development Code related to review of conditional use permits are detailed in Article 13 of the Development Code. These procedures require that a public hearing be held by the Planning & Zoning Commission and that notice of the public hearing be published in the City's official newspaper at least 10 days before the day of the public hearing. Additionally, the conditional use permit procedures require that mailed notice be provided to all owners and occupants of property within 500 feet of the subject property. Notice of the public hearing was published and mailed according to these procedures. The City has received no public comments to date. Conditional Use Permit Review and Approval Criteria A conditional use permit may be approved only if it is determined that the proposed conditional use meets all of the following criteria: 1) The proposed conditional use is consistent with the Comprehensive Plan and the purposes of the Development Code Finding: Staff finds that the proposed use is consistent with the Comprehensive Plan and the purposes of the Development Code. Use of the property as a short- term rental will not significantly alter the property's relationship to or impact on the surrounding neighborhood. The built form of the property will not change and is consistent with the character of the Traditional Urban land use. 2) The proposed conditional use complies with all applicable provisions of the Development Code 29 Van Buren Avenue South I Page 2 Finding: Staff finds that with the proposed conditions detailed in the attached resolution, the proposed conditional use complies with the applicable provisions of the Development Code. Staff review of the applicable supplemental use regulations are detailed on the following pages of this report. 3) The proposed conditional use will not be injurious to the neighborhood or otherwise detrimental to the public welfare. Finding: Staff finds that the proposed conditional use will not be injurious to the neighborhood or otherwise detrimental to the public welfare. Use of the property as a short-term rental will not significantly alter the property's relationship to or impact on the surrounding neighborhood. Alternatives 1. Recommend approval of the conditional use permit application. By recommending approval, the City Council would consider the recommendation of approval in making its decision to approve or deny the application. 2. Recommend denial of the conditional use permit application. By recommending denial, the City Council would consider the recommendation of denial in making its decision to approve or deny the application. Should the Planning & Zoning Commission consider this option, it must also identify specific findings that support this alternative. 3. Continue for further information. If the Planning & Zoning Commission indicates that further information is needed the item should be continued. NEXT STEPS The City Council will review the Conditional Use request at the November 18, 2025, meeting. 29 Van Buren Avenue South I Page 3 ZONING REVIEW: 29 VAN BUREN AVENUE SOUTH CONDITIONAL USE PERMIT FOR SHORT-TERM RENTAL Zoning Application 2025-09 Review Date: 6—ctober 28, 2025 Address: 28 Van Buren Avenue S Applicant/Owner: Anthony Yanchuk, Property Owner PROJECT ❑ECRIPTION: Application for a conditional use permit to use existing duplex for short-term rental. BASE ZONE: w- a EXISTING USE: Household Living, 2 unit Detached House, BUILDING TYPES Semi -Detached PROPOSED USE: Household Living, 2 unit ALLOWED: House, Two -Unit House BUILDING TYPE SELECTED: Two -Unit House PERMITTED/CONDITIONAL: Conditional .-A SITE AREA 0.14 ac (5,982 sf) BUILDING SIZE: One 2 Story Duplex LARGE PUD REQUIRED? No Meets or exceeds regulation N/A Regulation does not apply ZONING MAP DENSITY: 14 units/ac COMPREHENSIVE PLAN Traditional Urban (5-12 DESIGNATION: units/ac) DEADLINE FOR ACTION November 29, 2025 w Review Key Does not meet regulation 7 More Information Needed Met per conditions PUD PUD Deviation LOCATION MAP Owl 29 Van Buren Avenue South I Page 4 ARTICLE 5 PRINCIPAL USES Section of Code Regulation 102-5800) SUPPLEMENTAL USE REGULATION Cond. 102-5800)(1) LICENSING AND PERMITTING Cond, 102-5800)(2) MAXIMUM OCCUPANCY ✓ 102-5806)(3) ACCESSORY DWELLING UNITS Cond. 102-5800)(4) STRUCTURE AND SITE ALTERATIONS Cond 102-5800)(5) REGISTER OF RENTAL GUESTS REVIEW NOTES Short-term rentals must comply with all applicable licensing and permit requirements of the City and Hennepin County. Proposed condition requires that City licensing requirements be met prior to the use commencing. The City is not aware of any County licenses that need to be obtained. No more than 6 adults and their dependent children may occupy rooms within a short-term rental. Proposed condition prohibits more than 6 adults and their dependent children occupying the short-term rental at one time.. Short-term rentals are not permitted on lots occupied. by accessory dwelling units. No accessory dwelling unit is present on the property. External structural alterations or site improvements that change the residential character of the lot upon which a short-term rental is located are prohibited. Examples of such prohibited alterations include the construction of a parking lot, the addition of commercial -like exterior lighting, and signage. No external structural alterations that change they residential,charaeter are proposed. A register of short-term rental guests must be maintained and made available to the City upon request. Proposed condition requires a register of short- term rental guests to be maintained and made available to the City upon request. thort-term rentals may not be used for special events to be attended by individuals who are not Cond. 102-5800)(6) SPECIAL EVENTS registered guests of the short-term rental unit. Proposed condition prohibits use of the short- term rentals for special events attended by individuals who,are not registered guests. 29 Van Buren Avenue South I Page 5 CITY OF HOPKINS HENNEPIN COUNTY, MINNESOTA PLANNING & ZONING COMMISSION RESOLUTION 2026-08 RESOLUTION RECOMMENDING THE CITY COUNCIL APPROVE THE CONDITIONAL USE PERMIT APPLICATION FOR 29 VAN BUREN AVENUE SOUTH TO BE USED FOR SHORT-TERM RENTAL, SUBJECT TO CONDITIONS WHEREAS, the applicant, Anthony Yanchuk, has submitted an application for a conditional use permit to allow short-term rental of their property located at 29 Van Buren Avenue South; and WHEREAS, the subject property is legally described as Lot 27, Block 20, West Minneapolis, Hennepin County, Minnesota; and WHEREAS, the procedural history of the application is as follow: 1. That the above application was initiated by the applicant on September 24, 2025 2. That the Hopkins Planning and Zoning Commission, pursuant to published and mailed notice, held a public hearing on the application and reviewed such application on October 28, 2025; all persons present were given an opportunity to be heard; and 3. That written comments and analysis of City staff were considered; and WHEREAS, staff recommended approval of the above stated application based on the findings outlined in the staff report dated October 28, 2025 NOW THEREFORE BE IT RESOLVED, that the Planning & Zoning Commission of the City of Hopkins hereby recommends the City Council approve the Conditional Use Permit application from Anthony Yanchuk to use the property at 29 Van Buren Avenue South for Short -Term Rental, subject to the conditions listed below. 1. All applicable licensing and permit requirements of the City must be met before the use commences. 2. No more than 6 adults and their dependent children may occupy each unit of the short-term rental at one time. 3. A register of short-term rental guests must be maintained and made available to the City upon request. 4. Use of the short-term rental for special events attended by individuals who are not registered guests is prohibited. 5. A Resolution approving the conditional use permit must be recorded against the property with the Hennepin County Recorder's Office and receipt of said recording must be provided to the City before the use commences. Adopted this 28th day of October, 2025. Whitney Terrill, Chair To the City of Hopkins: I am writing to respectfully request approval of a Conditional Use Permit for short-term rental of my duplex located at 29 Van Buren Ave S. As the homeowner and resident of Hopkins I will ensure that if approved my future short-term rental will be managed in a way that supports neighborhood integrity, safety, and local quality of life, while providing an exceptional experience for vetted guests that will come to experience our community. Property Description The home is a charming 4-bedroom duplex matching the neighborhood character with four on -site parking spots, raised back -deck, as well as a well -maintained fenced yard. Located less than a block from Excelsior Blvd, it's a short drive to businesses where guests can enjoy food, shopping, events, and our lovely parks. 29 Van Buren Ave S is a property well -suited to short term rental with its separate entries and accommodations. To ensure that short-term rental of the property contributes to the neighborhood, several measures will be implemented: Owner Occupancy and Oversight I live in the property as my primary residence and I will always keep a close eye on all activities at the property to ensure that guests are respectful, that the home remains well -maintained, free of hazards, and that the surrounding neighborhood character is preserved. Quiet hours will be enforced in alignment with city standards. Enforcement will be enabled through several tools, including but not limited to camera monitoring, noise meters, physical check -ins, and close contact with neighbors, among other measures. In the event of a conflict or issue, I commit to prioritizing the interests of my community and will resolve with guests accordingly. Additionally, the property will be insured for short term rental appropriately. While I may rent out my unit in the future, there will be no gaps in coverage of the property's operations or integrity, leveraging my co -host and the monitoring tools I've described. In the future I may also choose to live in the upper unit and short-term renting the lower unit. Occupancy and Guest Register I will limit occupancy to no more than six (6) guests at any given time, in full compliance with city requirements. A detailed register of guests will be maintained for all stays, and I will provide this register to the City of Hopkins or its delegates at any time upon request, at the earliest possible convenience. Additionally there are no accessory dwelling units on site and none will be built. Events and Activities will not allow or host any special events, parties, or gatherings on the property. The use of the short-term rental will be limited strictly to lodging accommodations for registered guests. My presence on -site as an owner occupant and diligent oversight will ensure this fact. Parking and Neighborhood Impact The property has an abundance of parking available on site, with four (4) dedicated parking spots inclusive of the garage. Upon approval these spots will be clearly marked with appropriate signage. This ensures that guests will not need to park on the street or encroach on neighboring properties, specifically when parking via Harrison (alley road). I will also implement clear house rules, including aforementioned quiet hours and strict limits on outdoor noise, to ensure that guests do not disturb neighbors as well as conduct guides. Furthermore, I will properly vet guests via established profiles and public internet sources, harnessing my background and judgement as a corporate security specialist, equipping me to ensure safe quiet enjoyment of the space. Clear violation of house rules will result in immediate termination of stay agreements. Property Integrity No major alterations will be done to the property as part of its use as a short-term rental. The home will continue to be maintained as a residential dwelling that reflects and supports the character of the neighborhood. Any significant renovations will be properly permitted and documented through the city in compliance with established ordinances. Good Faith Compliance I have passed my rental license inspection with an "A" grade, reflecting my commitment to safety and compliance. The property is equipped with smoke detectors, CO detectors, safety signage, lighted walkways, and fire extinguishers which have been noted by our city inspectors. On a rolling basis I will stay abreast of any city rules, news, or guidelines surrounding property use and residential best practices. I commit to supporting the Conditional Use Permitting process with any information needed to understand usage and/or satisfy concerns that may arise, in whichever format is best including in -person consultation. Thank you for your time and consideration. Respectfully submitted, Anthony Yanchuk 29 Van Buren South, Hopkins, 55343 September 24, 2025 Ave lom ,J M M M 0 Z u o, a q N Ln p m Ln EN CC C a 1 2 c o � V Y 41 i c J $ � r cry C y $ 03 m c m � CO) � � o a� 5 V yY O 6 d tg 0 $ L V y, gy g E y %'i CITY OF HOPKINS P&.Z Report 2025-11 To: Planning and Zoning Commission Members From: Nick Bishop, Finance Director Date: October 28, 2025 Subject: Approve 2026-2030 Capital Improvement Plan RECOMMENDED ACTION Finance Department MOTION TO approve Planning & Zoning Resolution 2025-11 finding that the 2026-2030 Capital Improvement Plan is consistent with the Comprehensive Plan and recommending City Council approval based on that finding. OVERVIEW The Capital Improvement Plan (CIP) is a five-year forecast of projected needs based on long-range physical planning and financial projections. The first year of the plan becomes an adopted capital budget. The remaining four years are an estimate of project needs and funding. The CIP maintains flexibility through annual review and revision if necessary. Each year the City Council approves the CIP. The Planning Commission is required by State Statute to review all proposed capital improvements within the City for consistency with the Comprehensive Plan The attached CIP includes projects related to City buildings, street improvements, park improvements and utility infrastructure. SUPPORTING INFORMATION • 2026-2030 Capital Improvement Plan Summary & Detail Pages • Planning & Zoning Resolution 2025-11 2026 through 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Department Summary Public Works: Streets/Traffic I Public Works: Parks Public Works. Utilities 7.6% Public Works: Bldg/Equip Sery 22% City Hall Administration L6% Comm Svcs -Arts Center 1.3% Fire 0.9% Pavilion 0.4% Recreation I0.3% Comm Svcs - Activity Center 01% DepDt/ACE Program 01% Department City Hall Administration Comm Svcs - Activity Center Comm Svcs - Arts Center Depot/ACE Program Fire Pavilion Public Works: Bldg/Equip Sery Public Works: Parks Public Works: Streets/Traffic Public Works: Utilities Recreation 57.3% 2&5% 0 5M 10M 15M 20M 25M 30M 35M 40M 45M 50M 55M GRAND TOTAL 2026 2027 2028 2029 2030 Total 230,000 222,000 850,000 1,302,000 15,000 40,000 25,000 19,000 99,000 42,000 938,000 105,000 1,085,000 32,500 32,500 65,000 550,000 159,000 709,000 75,000 206,500 18,000 299,500 90,000 1,705,000 1,795,000 5,795,000 13,240,000 4,500,000 250,000 23,785,000 10,028,500 9,496,000 8,071,500 11,092,900 9,122,900 47,811,800 874,000 5,105,000 132,500 120,000 6,231,500 180,000 10,000 10,000 10,000 210,000 17=000 29,930,000 15,399,000 11'99,900 9,391.900 83,392,800 Produced Using Plan -It CIP Software 2026 through 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Projects By Department Department Project # 2026 2027 2028 2029 2030 Total City Ball Administration Council Chambers HVAC Unit 09-CIP-CH032 22,000 22,000 City Hall AC Rooftop Units 09-CIP-CH035 60,000 60,000 City Hall/Police Station - Roof 23-CIP-CH038 140,000 850,000 990,000 Replacement City Hall/PD Boilers 90,000 90,000 Replace PD 40ton Rooftop HVAC 140,000 140,000 City Hall Administration Total 230,000 222,000 850,000 0 0 1,302,000 Comm Svcs - Activity Center ._.....-_...._..._......__.._.._....__u............. Activity Center Tables 14-CIP-AR033 19,000 19,000 Activity Center - Gender Neutral 24-CIP-AC057 40,000 40,000 Bathroom Activity Center - Gymnasium Floor 24-CIP-AC058 25,000 25,000 Activity Center - Camera/Surveillance 15,000 15,000 System Comm Svcs - Activity Center Total 15,000 40,000 25,000 0 19,000 99,000 Comm Svcs - Arts Center Arts Center - Paint Theatre 14-CIP-AR003 28,000 28,000 Arts Center- Theater Curtains 17-CIP-AR004 80,000 80,000 Arts Center - OutdoorSignage/lighting 19-QPAR002 25,000 25,000 50,000 Arts Center - Access/Lockdown System 19-CIP-AR005 30,000 30,000 60,000 Arts Center - Roof Replacement 19-CIP AR007 750,000 750,000 Arts Center- Restroom Remodel 24-CIPAR009 105,000 105,000 Arts Center - Theater Microphones 12,000 12,000 Comm Svcs - Arts Center Total 42,000 938,000 105,000 0 0 1,085,000 Depot/ACE Program Depot - Exterior Door Replacement 32,500 32,500 65,000 Depot/ACE Program Total 32,500 32,500 0 0 0 65,000 Fire Fire Station - Replace Make-up Air Units 08-CIP-B122 14,000 14.000 Fire Station - Replace overhead doors 08-CIP-B124 145,000 145,000 Fire - Replace Roof 08-CIP-B125 550,000 550,000 Fire Total 0 550,000 0 159,000 0 709,000 Produced Using Plan -It CIP Software Department Project # 2026 2027 2028 2029 2030 Total Pavilion Pavilion Team Room HVAC Unit 16-CIP-PV329 Pavilion - Arena Exit Door Replacement 20-CIP-PV334 75,000 17,500 Pavilion - Roof Replacement 23-CIP-PV336 100,000 Pavilion - Bleacher Heating Replacement 23-CIP-PV337 75,000 Pavilion -Warming House Window 23-CIP-PV339 14,000 Blinds Pavilion Total 75.000 206,500 Public Works: Bldg/Equip Sery Public Works - Replace Roofing 08-CIP-BO22 Public Works - Replace Overhead Doors 08-CIP-BO23 907 Mainstreet (HHS) Windows & 21-CIP-8101 Front/Back Door Public Works: Bldg/Er;ujp Sery Total 18,000 18,000 92,500 100,000 75,000 14,000 0 18,000 0 299,500 1,600,000 1,600,000 90,000 90,000 105,000 105,000 0 90,000 1,705,000 0 0 1,795,000 Public Works: Parks _.._-.-...._____-_..__-_._.._.._._... Shady Oak Beach - Play Equipment 13-CIP-PO67 Repair Valley Park Volleyball Court 21-CIP-PO73 80,000 Repair Burnes Park Tennis Courts 21-CIP-PO74 130,000 Repair Play Courts- Elmo & Park Valley 21-CIP-PO75 90,000 Central Park Renovation 23-CIP-PO76 5,500,000 8,500,000 Downtown Park Stage - Electric 24-CIP-PO78 25,000 Valley Park Basketball Court 24-CIP-PO79 60,000 Maetzold Field Lighting 24-CIP-POBO 150,000 Oakes & Valley Parks Recreation & 24-CIP-PO81 4,500,000 4,500,000 Resilience Hubs Public Works: Parks Total 5,795.000 13,240,000 4,500,000 Public Works: Streets/Traffic Residential Street Improvements and Utilities County Road 3 Pedestrian & Bicycle Access Improvements Street Rehabilitation Improvements Street Sign Management Central Business District Lighting Upgrades City Street Lighting Upgrades Minnetonka Mills/5th St N Intersection Improvement Trail Segment - Bellgrove Mainstreet Banner Pole Installation Excelsrior Blvd. Fencing 17th Ave Reconstruction 250,000 250,000 80,000 130,000 90,000 14,000,000 25,000 60,000 150,000 9,000,000 0 250,000 23.785,000 01-CIP-S101 8,877,000 7,298,000 7,662,900 7,662,900 31,500,800 01-CIP-S104 2,300,000 2,300,000 13-CIP-SO40 27,500 30,000 32,500 35,000 120,000 245,000 16-CIP-5041 500,000 550,000 575,000 600,000 625,000 2,850,000 16-CIP-SO42 24,000 26,000 26,000 76,000 20-CIP-SO01 40,000 40,000 20-CIP-SO02 200,000 90,000 225,000 535,000 1,050,000 20-CIP-SOOS 600,000 600,000 20-CIP-SO06 100,000 100,000 23-CIP-SO07 120,000 130,000 250,000 23-CIP-SO08 50,000 50,000 50,000 50,000 200,000 24-CIP-SO10 8,600,000 8,600,000 Public Works: Streets/Traffic Total 10,028,500 9,496,000 9,071,500 11,092,900 9,122,900 47,811,800 Produced Using Plan -It CIP Software Department Project # 2026 2027 2028 2029 2030 Total Public Works: Utilities Storm Drainage System Maintenance - 01-CIP-U002 29,000 30,000 32,500 35,000 126,500 Alley Repairs Sewer Lining 18-CIP-U016 75,000 75,000 80,000 85,000 315,000 Trunk Utility Rehabilitation 19-CIP-U017 5,000,000 5,000,000 Water Treatment Plant - Roof 23-CIP-U018 270,000 20,000 290,000 Replacement Phase 3 SCADA Fiber 500,000 500,000 Public Works: Utilities Total 874,000 5,105,000 132,500 120,000 0 6,231,500 Recreation Shady Oak Beach Improvements 16-CIP-R003 180,000 10,000 10,000 10,000 210,000 Recreation Total 180,000 10,000 10,000 10,000 0 210,000 GRANDTOTAL 17,272000 29,930,000 15,399 000 11,399,900 9,491,900 83,39Z800 Produced Using Plan -It CIP Software PI - PIR/General Obligation Bands GA- Grant -In -Aid WF - Water Fund SF - Sanitary Sewer Fund PDF- Park Dedication Fund SU - Storm Sewer Fund MS - Municipal State Aid Streets SA - Special Assessment CI - Capital Improvement Fund GU - Other Governmental Units CR - Current Revenues -Tax Levy AC - Arts Center Fund PA - Pavilion Fund RF - Refuse Fund Equipment Replacement Fund Source AC - Arts Center Fund CI - Capital Improvement Fund CR - Current Revenues - Tax Levy Equipment Replacement Fund GA - Grant -In -Aid GU - Other Governmental Units MS- Municipal State Aid Streets PA - Pavilion Fund PDF- Park Dedication Fund PI - PIR/General Obligation Bonds RF - Refuse Fund SA - Special Assessment SF - Sanitary Sewer Fund SU - Storm Sewer Fund W F - Water Fund 2026 through 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Funding Source Summary 30.5% 0 2.5M 5M 7.5M 10M 12.5M 15M 17.5M 20M 22.5M 25M 27... 2026 2027 2028 2029 2030 Total 30,000 188,000 105,000 323,000 262,500 1,612,500 1,780,000 159,000 19,000 3,833,000 290,000 140,000 395,000 715,000 1.540,000 A 27,000 27,000 3,500,000 5,750,000 2,250,000 11,500,000 120,600 6,700 6,700 1,606,700 1,740.700 3,790,000 700,000 4,490,000 75,000 206,500 18,000 299,500 354,400 4,293,300 2,253,300 3,300 250,000 7,154,300 4,454,500 5,636,000 4,913,500 5,229,000 5,239,000 25,472,000 a 18,000 50,000 68,000 1,124,000 780,000 650,000 682,500 682500 3,919,000 1,877,000 693,000 1,980,000 ~822,500 1,817,500 1,732,500 8,100,000 3,171,000 548,000 602,000 567,000 5,710,500 2,276,000 6,118,000 448,000 186,900 186,900 9,215,800 GRAND TOTAL 177T4000 29,930,000 15,399,OW 11,399,900 9139119W 34:i94= Produced Using Plan -It CIP Software 2026 through 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Projects By Fondling Source Source Project # 2026 2027 2028 2029 2030 Total AC -Arts Center Fund Arts Center - Paint Theatre 14-CIP-AR003 28,000 28,000 Arts Center -Theater Curtains 17-CIP-AR004 80,000 80,000 Arts Center - Outdoor Signage/lighting 19-CIP-AR002 25,000 25,000 50,000 Arts Center -Access/Lockdown System 19-CIP-AR005 30,000 30,000 60,000 Arts Center- Restroom Remodel 24-CIP-AR009 105,000 105,000 AC - Arts Center Fund Total 30,000 188,000 105,000 0 0 323,000 Cl - Capital Improvement Fund Public Works - Replace Roofing 08-CIP-BO22 800,000 800,000 Public Works - Replace Overhead Doors 08-CIP-BO23 18,000 18,000 Fire Station -Replace Make-up Air Units 08-CIP-B122 14,000 14,000 Fire Station - Replace overhead doors 08-CIP-BI24 145,000 145,000 Fire - Replace Roof 08-CIP-B125 550,000 550,000 Council Chambers HVAC Unit 09-CIP-CH032 22,000 22,000 City Hall AC Rooftop Units 09-CIP-CH035 60,000 60,000 Activity Center Tables 14-CIP-AR033 19,000 19,000 Arts Center - Roof Replacement 19-CIP AR007 750,000 750,000 907 Mainstreet (HHS) Windows & 21-CIP-B101 105,000 105,000 Front/Back Door City Hall/Police Station - Roof 23-CIP-CH038 140,000 850,000 990,000 Replacement Activity Center - Gender Neutral 24-CIP-AC057 40,000 40,000 Bathroom Activity Center -Gymnasium Floor 24-CIPAC058 25,000 25,000 Depot - Exterior Door Replacement 32,500 32,500 65,000 Replace PD 40ton Rooftop HVAC 140,000 140,000 City Hall/PD Boilers 90,000 90,000 Cl -Capital Improvement Fund Total 262,500 1,612,500 1,780,000 159,000 19,000 3,833,000 CR - Current Revenues - Tax Levy Central Business District Lighting 20-CIP-S001 40,000 40,000 Upgrades City Street Lighting Upgrades 20-CIP-SO02 200,000 90,000 225,000 535,000 1,050,000 Mainstreet Banner Pole Installation 23-CIP-SO07 120,000 130,000 250,000 Excelsrior Blvd. Fencing 23-CIP-S008 50,000 50,000 50,000 50,000 200,000 CR - Current Revenues -Tax Lever Total 0 290,000 140,000 395,000 715,000 1,540,000 Produced Using Plan -It CIP Software Source Project# 2026 2027 2028 2029 2030 Total Equipment Replacement Fund Activity Center - Camera/Surveillance 15,000 15,000 System Arts Center - Theater Microphones 12,000 12,000 Equipment Replacement Fund Total 27,000 0 0 0 0 27,000 GA - Grant -In -Aid Central Park Renovation 23-CIP-PO76 3,500,000 3,500,000 7,000,000 Oakes & Valley Parks Recreation & 24 CIP-P081 2,250,000 2,250,000 4,500,000 Resilience Hubs GA - Grant -In -Aid Total 3,500,000 5,750,000 2,250,000 0 0 11,500,000 GU - Other Governmental Units County Road 3 01-CIP-S104 1,600,000 1,600,000 Shady Oak Beach Improvements 16-CIP-RO03 120,600 6,700 6,700 6,700 140,700 GU - Other Governmental Units Total 120,600 6,700 6,700 1,606,700 0 1,740,700 MS - Municipal State Aid Streets County Road 3 01-CIP-S104 17th Ave Reconstruction 24-CIP-SOIO MS - Municipal State Aid Streets Total 700,000 700,000 3,790,000 3,790,000 0 3,790,000 0 700,000 0 4,490,000 PA - Pavilion Fund Pavilion Team Room HVAC Unit 16-CIP-PV329 Pavilion - Arena Exit Door Replacement 20-CIP-PV334 75,000 17,500 Pavilion - Roof Replacement 23-CIP-PV336 100,000 Pavilion - Bleacher Heating Replacement 23-CIP-PV337 75,000 Pavilion - Warming House Window 23-GP-PV339 14,000 Blinds PA - Pavilion Fund Total 75,000 206,500 18,000 18,000 92,500 100,000 75,000 14,000 0 18,000 0 299,500 PDF- Park Dedication Fund Shady Oak Beach - Play Equipment 13-CIP-PO67 250,000 250,000 Shady Oak Beach Improvements 16-CIP-RO03 59,400 3,300 3,300 3,300 69,300 Repair Valley Park Volleyball Court 21-CIP-PO73 80,000 80,000 Repair Burnes Park Tennis Courts 21-CIP-PO74 130,000 130,000 Repair Play Courts- Elmo & Park Valley 21-CIP-PO75 90,000 90,000 Central Park Renovation 23-CIP-PO76 1,800,000 1,800,000 Downtown Park Stage - Electric 24-CIP-PO78 25,000 25,000 Valley Park Basketball Court 24-CIP-PO79 60,000 60,000 Maetzold Field Lighting 24-CIP-PO80 150,000 150,000 Oakes & Valley Parks Recreation & 24-CIP-PO81 2,250,000 2,250,000 4,500,000 Resilience Hubs PDF- Park Dedication Fund Total 354,400 4,293,300 2,253,300 3,300 250,000 7,154,300 Produced Using Plan -It CIP Software Source Project # 2026 2027 2028 2029 2030 Total PI - PIR/General Obligation Bonds Residential Street Improvements and 01-CIP-S101 3,313,000 4,280,000 4,494,000 4,494,000 16,581,000 Utilities Pedestrian & Bicycle Access Improvements Street Rehabilitation Improvements Street Sign Management Minnetonka Mills/Sth St N Intersection Improvement Trail Segment - Bellgrove Central vPark Renovation 17th Ave Reconstruction 13-CIP-SO40 27,500 30,000 32,500 35,000 120,000 245,000 16-CIP-SO41 500,000 550,000 575,000 600,000 625,000 2,850,000 16-CIP-SO42 24,000 26,000 26,000 76,000 20-CIP-SOOS 590,000 590,000 20-CIP-SO06 100,000 100,000 23-CIP-PO76 3,200,000 3,200,000 24-CIP-SO10 1,830,000 1,830,000 PI - PIR/General Obligation Bonds Total 4,454,500 5,636,000 4,913,500 5,229,000 5,239,000 25,472,000 RF - Refuse Fund Public Works - Replace Roofing 08-CIP-BO22 50,000 50,000 Public Works - Replace Overhead Doors 08-CIP-BO23 18,000 18,000 RF - Refuse Fund Total 0 18,000 50,000 0 0 68,000 SA - Special Assessment Residential Street Improvements and 01-CIP-S701 1,124,000 650,000 682,500 682,500 3,139,000 Utilities 17th Ave Reconstruction 24-OP-SO10 780,000 790,000 SA - Special Assessment Total 1,124,000 780,000 650,000 682,500 682,500 3,919,000 SF - Sanitary Sewer Fund Residential Street Improvements and 01-CIP-S101 1,552,000 1,650,000 1,732,500 1,732,500 6,667,000 Utilities Public Works - Replace Roofing 08-CIP-BO22 250,000 250,000 Public Works- Replace Overhead Doors 08-CIP-BO23 18,000 18,000 Sewer Lining 18-OP-UO16 75,000 75,000 80,000 85,000 315,000 17th Ave Reconstruction 24-CIP-SO10 600,000 600,000 Phase 3 SCADA Fiber 250,000 250,000 SF - Sanitary Sewer Fund Total 1,877,000 693,000 1,980,000 1,817,500 1,732,500 8,100,000 SU - Storm Sewer Fund Residential Street Improvements and 01-CIP-510T 1,132,000 Utilities Storm Drainage System Maintenance - 01-CIP-U002 29,000 Alley Repairs Public Works - Replace Roofing 08-CIP-BO22 Public Works - Replace Overhead Doors 08-CIP-BO23 Minnetonka Mills/5th St N Intersection 20-CIP-5005 10,000 Improvement Central Park Renovation 23-CIP-PO76 2,000,000 17th Ave Reconstruction 24-CIP-SO10 540,000 567,000 567,000 2,806,000 30,000 32,500 35,000 126,500 250,000 250,000 18,000 18,000 10,000 2,000,000 500,000 500,000 SU - Storm Sewer Fund Total 3,171,000 548,000 822,500 602,000 567,000 5,710,500 Produced Using Plan -It CIP Software Source Project # 2026 2027 2028 2029 2030 Total WF -Water Fund Residential Street Improvements and Utilities 01-CIP-S101 1,756,000 178,000 186,900 186,900 2,307,800 Public Works - Replace Roofing 08-CIP-BO22 250,000 250,000 Public Works - Replace Overhead Doors 08-CIP-BO23 18,000 18,000 Trunk Utility Rehabilitation 19-CIP-UO17 5,000,000 5,000,000 Water Treatment Plant - Roof 23-CIP-U018 270,000 20,000 290,000 Replacement 17th Ave Reconstruction 24-CIP-S010 1,100,000 1,100,000 Phase 3 SCADA Fiber 250,000 250,000 WF - Water Fund Total 2,276,000 6,118,600 448,000 186,906 186,900 9,215,800 GRAND TOTAL 17=000 2%930,000 15,399,000 11,399,900 9,391,900 83,392,800 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 01-CIP-5101 Project Name Residential Street Improvements and Utilities Total Project Cost $99,039,800 Contact Public Works Director Department Public Works: Streets/Traffic Type Improvement Category Trans: Streets Status Active Useful Life 30years GLACCOUNT 501-49400-6160 Description Locations to be determined consistent with the street reconstruction program. Program includes reconstruction of deteriorated water main, sanitary sewer and storm sewer in conjunction with street improvement projects. Utility improvements are consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. 2025-2026: Central Avenues Reconstruction 2028: South Avenues (14th, 15th, 16th and 17th) 2029-2030: Belgrove Justification/Sustainabi I ity In most cases where street reconstruction takes place, storm sewer facilities either need upgrading or need to be installed new. In most cases, water main and sanitary sewer need to be rehabilitated in conjunction with street reconstruction. The costs assume the city funding 100% of major storm sewer, water main, and sanitary sewer improvements. Prior Expenditures 67,539,000 Construction/Maintenance Prior Funding Sources 67,539,000 PI - PIR/General Obligation Bonds SF - Sanitary Sewer Fund SA - Special Assessment SU - Storm Sewer Fund WF - Water Fund 2026 2027 2028 2029 2030 Total 8,877,000 0 7,298,000 7,662,900 7,662,900 31,500,800 Total 8,877,000 0 7,298,000 7,662,900 7,662,900 31,500,800 2026 2027 2028 2029 2030 Total 3,313,000 0 4,280,000 4,494,000 4,494,000 16,581,000 1,552,000 0 1,650,000 1,732,500 1,732,500 6,667,000 1,124,000 0 650,000 682,500 682,500 3,139,000 1,132,000 0 540,000 567,000 567,000 2,806,000 1,756,000 0 178,000 186,900 186,900 2,307,800 Total 8,877,000 0 7,298,000 7,662,900 7,662,900 31,500,800 Budget Impact Public Hearing -year prior to planned construction Plans and specifications - year prior to planned construction Bid - year of planned construction Consistent with the Storm Water Management Plan, Water and Sewer Utility Master Plan, and television inspections. Consistent with the City Council adopted Roadway Improvement Polity, Street Ratings, Pavement Management Program, Storm Water Management Plan, Water and Sewer Utility Master Plan, and televised inspections. Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 01-CIP-S104 Project Name County Road 3 Total Project Cost $2,300,000 Department Public Works: Streets/Traffic Type Improvement Category Trans: Streets Status Active Useful Life None Description County Road 3 from Shady Oak Road to Meadowbrook Road. Lighting, landscaping, street, etc. improvements along Excelsior Boulevard from the east to west city limits. GO Bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue Project has been delayed pending countyfunding for remaining 4th segement. Justification/Sustainability Deficiencies in terms of roadway condition, traffic/pedestrian movement, safety and aesthetics appear in remaining segment of County Road 3. Segment 4 from Blake Road to Meadowbrook Road; upgrade roadway, implement beautification program. Expenditures 2026 2027 2028 2029 2030 Total Construction/Maintenance 0 0 0 2,300,000 0 2,300,000 Total 0 0 0 2,300,000 0 2,300,000 Funding Sources 2026 2027 2028 2029 2030 Total GU - Other Governmental Units 0 0 0 1,600,000 0 1,600,000 MS - Municipal State Aid Streets 0 0 0 700,000 0 700,000 Total 0 0 0 2,300,000 0 2,300,000 Budget Impact GO bond payments to be financed by a combination of existing TIF revenue, Municipal State Aid road funds, additional TIF revenue created by economic development, grant funds, and, as a last resort, general city revenue. Segment 4: Planning and acquisition - Not in County Funding Plan, when funded city will complete our portion. Consistent with Hennepin County CIP and City Council action. Produced Using Plan -it CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 01-CIP-0002 Project Name Storm Drainage System Maintenance - Alley Repairs Total Project Cost $490,500 Department Type Improvement Category Status Active Useful Life GLACCOUNT 740-48610-6160 Description Annual concrete repairs and patching of existing alleys. J ustificatio n/Sustaina bi I ity Annual alley pavement concrete slab repairs are needed. Public Works: Utilities Utilities: Municipal Sanitary Sewer None Prior Expenditures 2026 2027 2028 2029 2030 Total 364,000 Construction/Maintenance 29,000 30,000 32,500 35,000 0 126,500 Total 29,000 30,000 32,500 35,000 0 126,500 Prior Funding Sources 2026 2027 2028 2029 2030 Total 364,000 SU - Storm Sewer Fund 29,000 30,000 32,500 35,000 0 126,500 Total 29,000 30,000 32,500 35,000 0 126.500 Budget Impact Consistent with the Storm Water Management Plan. Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 08-CIP-BO22 Project Name Public Works - Replace Roofing Total Project Cost $1,600,000 Department Public Works: Bldg/Equip Sery Category Buildings: Public Works GL ACCOUNT SEE FINANCE FOR BREAKDOWN Description Replace Roofing, Vehicle Storage and Office area Expenditures Construction/Maintenance Tota I Funding Sources Cl - Capital Improvement Fund WF- Water Fund SU - Storm Sewer Fund SF - Sanitary Sewer Fund RF - Refuse Fund Tota I 2026 2027 0 0 0 0 2026 2027 0 0 0 0 0 0 0 0 0 0 0 0 Contact Facilities Director Type Improvement Status Active 2028 1,600,000 2029 0 2030 0 Total 1,600,000 1,600,000 0 0 1,600,000 2028 2029 2030 Total 800,000 0 0 800,000 250,000 0 0 250,000 250,000 0 0 250,000 250,000 0 0 250,000 50,000 0 0 50,000 1,600,000 0 0 1,600,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project# 08-CIP-BO23 Project Name Public Works - Replace Overhead Doors Total Project Cost $90,000 Department Public Works: Bldg/Equip Sery Type Improvement Category Buildings: Public Works Status Active GL ACCOUNT SEE FINANCE FOR BREAKDOWN Description Replace overhead doors Expenditures 2026 2027 2028 2029 2030 Total Construction/Maintenance 0 90,000 0 0 0 90,000 Total 0 90,000 0 0 0 90,000 Funding Sources 2026 2027 2028 2029 2030 Total SF- Sanitary Sewer Fund 0 18,000 0 0 0 18,000 SU - Storm Sewer Fund 0 18,000 0 0 0 18,000 WF - Water Fund 0 18,000 0 0 0 18,000 Cl - Capital Improvement Fund 0 18,000 0 0 0 18,000 RF - Refuse Fund 0 18,000 0 0 0 18,000 Total 0 90,000 0 0 0 90,000 Budget Impact Inspected in 2019, will move from 2020 to 2022. Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 08-CIP-13122 Project Name Fire Station - Replace Make-up Air Units Total Project Cost $14,000 Department Fire Type Improvement Category Buildings: Fire Facilities Status Active GLACCOUNT 305-40250-6160 Description Replace make-up air units 4-15-2014 -- per Norb Kerber each unit is $6,500 each and there are two of them. Requested budget is $14,000. Expenditures 2026 2027 2028 2029 Construction/Maintenance 0 0 0 14,000 Total 0 0 0 14,000 Funding Sources CI - Capital Improvement Fund 2026 2027 0 0 Total 0 0 2030 Total 0 14,000 0 14,000 2028 2029 2030 Total 0 14,000 0 14,000 0 14,000 0 14,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 08-CIP-6124 Project Name Fire Station - Replace overhead doors Total Project Cost $145,000 Department Fire Type Improvement Category Buildings: Fire Facilities Status Active GLACCOUNT 305-40250-6160 Description Replace overhead doors Expenditures 2026 2027 2028 2029 2030 Total Construction/Maintenance 0 0 0 145,000 0 145,000 Total 0 0 0 145.000 0 145,000 Funding Sources 2026 2027 2028 2029 2030 Total Cl - Capital Improvement Fund 0 0 0 145,000 0 145,000 Total 0 0 0 145,000 0 145,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project# 08-CIP-13125 Project Name Fire - Replace Roof Total Project Cost $550,000 Type Improvement Status Active Description Replace roof Expenditures Construction/Maintenance Funding Sources Cl - Capital Improvement Fund Department Fire Category Buildings: Fire Facilities GLACCOUNT 305-40250-6160 2026 2027 2028 2029 2030 Total 0 550,000 0 0 0 550,000 Total 0 550,000 0 0 0 550,000 2026 2027 2028 2029 2030 Total 0 550,000 0 0 0 550,000 Total 0 550,000 0 0 0 550,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project# 09-CIP-CH032 Project Name Council Chambers HVAC Unit Total Project Cost $22,000 Department City Hall Administration Category Bldg: City Hall Useful Life 20 years Description Replace Rooftop HVAC units for Council Chambers Justification/Sustainability The RTU was installed in 2004 and the heat exchanger is beginning to fail. Expenditures Construction/Maintenance Total Contact Facilities Director Type Improvement Status- Active GLACCOUNT 305-40262-6160 2026 2027 2028 2029 2030 Total 0 22,000 0 0 0 22,000 0 22,000 0 0 0 22,000 Funding Sources 2026 Cl - Capital Improvement Fund 0 Total 0 2027 2028 2029 2030 Total 22,000 0 0 0 22,000 22,000 0 0 0 22,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 09-CIP-CH035 Project Name City Hall AC Rooftop Units Total Project Cost $60,000 Contact Facilities Director Department City Hall Administration Type Improvement Category Bldg: City Hall Status Active Useful Life 20years GLACCOUNT 305-40261-6160 Description Rooftop units for City Hall upper and lower level. One 10 ton and one 17 ton. Justification/Sustai na bi I ity Existing Units were installed in 2007 Expenditures Construction/Maintenance Funding Sources Cl - Capital Improvement Fund 2026 2027 2028 2029 2030 Total 0 60,000 0 0 0 60,000 Total 0 60,000 0 0 0 60,000 2026 2027 2028 2029 2030 Total 0 60,000 0 0 0 60,000 Total 0 60,000 0 0 0 60,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 13-CIP-PO67 Project Name Shady Oak Beach - Play Equipment Total Project Cost $250,000 Type Improvement Status Active Description Play Equipment Expenditures Construction/Maintenance Funding Sources PDF- Park Dedication Fund Department Public Works: Parks Category Parks/Fores/Pay.: Comm. Facil. 2026 2027 2028 2029 2030 Total 0 0 0 0 250,000 250,000 Total 0 0 0 0 250,000 250,000 2026 2027 2028 2029 2030 Total 0 0 0 0 250,000 250,000 Total 0 0 0 0 250,000 250,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 13-CIP-SO40 Project Name Pedestrian & Bicycle Access Improvements Total Project Cost $620,000 Department Type Improvement Category Status. Active Useful Life GLACCOUNT 501-49400-6160 Public Works: Streets/Traffic Trans: Streets 20 years Description Painting bike lanes, constructing trails and sidewalks, safety improvements and other general pedestrian and bicycle improvements to the system. 2025: Upgrade of the 11th Ave South pedestrian crossings in the Wesbrooke Area to pedestrian activated RRFB. 2030: 2nd Street NE updated pedestrian facilities Justification/Sustainability Council adopted plan to increase pedestrian and bicycle access and safety, these improvements begin to implement that plan. The existing overhead flashers provide very little benefit. Pedestrian activated rectangular rapid flushing beacons (RRFB) have shown to provide very high compliance for motorists and increases pedestrian safety and comfort. Prior Expenditures 2026 2027 2028 2029 2030 Total 375,000 Construction/Maintenance 27,500 30,000 32,500 35,000 120,000 245,000 Total 27,500 30,000 32,500 35,000 120,000 245,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 375,000 PI - PIR/General Obligation Bonds 27,500 30,000 32,500 35,000 120,000 245,000 Total 27,500 30,000 32,500 35,000 120,000 245,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project# 14-CIP-AR003 Project Name Arts Center - Paint Theatre Total Project Cost $52,086 Department Comm Svcs - Arts Center Type Improvement Category Buildings: Arts Center Status Active Useful Life 15years GLACCOUNT 2504BS30-7300 Description Prep work area Paint walls and soffit in theater and side vestibules of Main Theater Paint metal handrails Paint metal door frames and metal doors Apply 2 coats of paint to all surfaces Price includes paint, supplies, materials and labor If brushing and rolling does not apply over rough block, then spraying will need to take place. If spraying is needed additional charges will apply covering and prep Reupholster Fabric Sound walls in back of theater to match paint color Justification/Sustainability The Theater has not been painted since 1997 when built. The theater seats have been recovered, the carpet has been replaced and the wall color is dated and needs a freshening up. As the highlight of the building, the theater's appearance is of utmost importance. Prior Expenditures 2026 2027 2028 2029 2030 Total 24,086 Construction/Maintenance 0 28,000 0 0 0 28,000 Total 0 28,000 0 0 0 28,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 24,086 AC - Arts Center Fund 0 28,000 0 0 0 28,000 Total 0 28,000 0 0 0 28,000 Budget Impact Did not complete in 2015, moving project forward Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project# 14-CIP-AR033 Project Name Activity Center Tables Total Project Cost $31,200 Department Comm Svcs - Activity Center Type Improvement Category Equipment Status Active- Useful Life 15years Description 23 tables - 6' x 24 mobile, multiple use, folding tables @$475 each J ustificatio n/Susta i na bility This type of table will add depth to the type of activities we can accommodate at the Activity Center. It will help cut staff time taken to setting up and resetting up rooms for varying types of activities that occur. For instance, we set up the Raspberry Room for a class very differently than we do for an anniversary reception. Prior Expenditures 2026 2027 2028 2029 2030 Total 12,200 Equipment 0 0 0 0 19,000 19,000 Total 0 0 0 0 19.000 19.000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 12,200 CI - Capital Improvement Fund 0 0 0 0 19,000 19,000 Total 0 0 0 0 19,000 19,000 Budget Impact Variance from 20 year plan - New item Estimate salvage/resale value on replaced items: $ Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 16-CIP-PV329 Project Name Pavilion Team Room HVAC Unit Total Project Cost $18,000 Type Improvement Status Active GLACCOUNT 747-48775-7200 Department Pavilion Category Bldgs: Pavillion Useful Life 15 years Description Purchase and installation of(l) rooftop HVAC unit that supply's heating and cooling to the Pavilions Main Level (Office, Bathrooms, Warming Room, Lobby, and Concessions). Justification/Susta i nabi I ity The current unit was installed in 2007 and is at the end of its useful life. Expenditures Construction/Maintenance Funding Sources PA- Pavilion Fund Budget Impact Variance from 20 year plan - New item 2026 2027 2028 2029 2030 Total 0 0 0 18,000 0 18,000 Total 0 0 0 18,000 0 18,000 2026 2027 2028 2029 2030 Total 0 0 0 18,000 0 18,000 Total 0 0 0 18,000 0 18,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 16-CIP-RO03 Project Name Shady Oak Beach Improvements Total Project Cost $655,000 Department Recreation Type Improvement Category PW- Parks Status Active Useful Life 10 years Description The joint recreation agreement in place between the cities of Hopkins and Minnetonka provides for the sharing of operational and maintenance expenses for Shady Oak Beach. These expenses are split 33% city of Hopkins and 67% city of Minnetonka. Shady Oak Beach is operated from June -Augusta nnually, however the park is available for use year round. 2021: Dock maintenance ($10,000) 2022: Miscellaneous building components, i.e. installation of energy efficient lighting in restrooms/gate area, patio tables and chairs ($15,000); inflatables replacement ($10,000) 2023: Miscellaneous building maintenance ($10,000) 2024: Inflatable replacement ($10,000) 2025: Miscellaneous building maintenance ($10,000) Justification/Sustaina bility Shady Oak Beach is jointly operated by the cities of Hopkins and Minnetonka. The facility is open from June -August each summer with the revenues generated from season pass sales and daily admissions. -The facility was most recently renovated in 1998. An addiitional renovation on the lifeguard shack was completed in 2021.2023: Miscellaneous building/grounds maintenance; miscellaneous building equipment/components, i.e, concession equipment, patio tables and chairs 2024: Inflatable replacement ($10,000); parking lot mill and overlay ($80,000) 2025: Miscellaneous building maintenance 2026: Miscellaneous building maintenance 2027: Miscellaneous building maintenance Prior Expenditures 2026 2027 2028 2029 2030 Total 445,000 Construction/Maintenance 180,000 10,000 10,000 10,000 0 210,000 Total 180,000 10,000 10,000 10,000 0 210,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 445,000 GU - Other Governmental Units 120,600 6,700 6,700 6,700 0 140,700 PDF- Park Dedication Fund 59,400 3,300 3,300 3,300 0 69,300 Total 180,000 10,000 10,000 10,000 0 210,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 16-CIP-SO41 Project Name Street Rehabilitation Improvements Total Project Cost $6,895,000 Department Public Works: Streets/Traffic Type Improvement Category Trans: Streets Status Active GLACCOLINT 501-49400-6160 Description Location to be determined based on Pavement Management Program. Program includes mill and overlay of deteriorated pavements to extend the useful life of the street. Streets for this method of rehabilitation have usually been rehabilitated or reconstructed within the last 20 years. 2025: Central Avenues 2026 Central Avenues 2027: 11 th Ave South 2028: 12th, 13th, 15th and 16th Ave South 2029: St. Louis/Jackson Avenue 2030: Robbinwood Lane Area Justification/Sustainability Properly timed mill and overlay projects can significantly extend the life of a street and delay the need for reconstruction. Mill and overlay projects also require less disturbance and are shorter in duration than reconstruction, which results in less impact of the traveling public. Prior Expenditures 2026 2027 2028 2029 2030 Total 4,045,000 Construction/Maintenance 500,000 550,000 575,000 600,000 625,000 2,850,000 Total 500,000 550,000 575,000 600,000 625,000 2,850,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 4,045,000 PI - PIR/General Obligation Bonds 500,000 550,000 575,000 600,000 625,000 2,850,000 Total 500,000 550,000 575,000 600,000 625,000 2,850,000 Budget Impact Increased 2023 amount by $70,000 from original 2023-2027 CIP. Amendment considered by City Council on May 16, 2023. Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 16-CIP-SO42 Project Name Street Sign Management Total Project Cost $278,000 Department Public Works: Streets/Traffic Type Improvement Category Trans: Streets Status Active GLACCOUNT 501-49400-6160 Description Replacement of aged regulatoryand warning signs that have lost minimum retroreflectivity and replacement of posts, when needed. Justification/Sustai nability The city is required to have a sign management program which includes a sign replacement strategy to ensure regulatory and warning signs provide adequate retroreflectivity. Sign replacement cycle is 8 years. Estimated costs assume sign replacements by contract. Parking signs will be replaced as needed due to age, fading, etc. Sign inventory data base will be updated to reflect install date/sign age. Prior Expenditures 2026 2027 2028 2029 2030 Total 202,000 Construction/Maintenance 24,000 26,000 26,000 0 0 76,000 Total 24,000 26,000 26,000 0 0 76,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 202,000 PI - PIR/General Obligation Bonds 24,000 26,000 26,000 0 0 76,000 Total 24,000 26,000 26,000 0 0 76,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project# 17-CIP-AR004 Project Name Arts Center -Theater Curtains Total Project Cost $80,000 Contact Arts Center Director Department Comm Svcs - Arts Center Type Improvement Category Buildings: Arts Center Status Active . Useful Life 15 years GL ACCOUNT 250-48530-7500 Description Replace main Theater front curtains. J ustification/Sustainability Due to age of theater curtains, I am suggesting replacement. They have become frayed at the bottom. Estimated cost based on online research. Expenditures Construction/Maintenance Funding Sources AC - Arts Center Fund 2026 2027 2028 2029 2030 Total 0 0 80,000 0 0 80,000 Total 0 0 80,000 0 0 80,000 2026 2027 2028 2029 2030 Total 0 0 80,000 0 0 80,000 Total 0 0 80,000 0 0 80,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 18-CIP-UO16 Project Name Sewer Lining Total Project Cost $747,500 Department Public Works: Utilities Type Improvement Category Utilities: Municipal Sanitary Sewer Status Active GL ACCOUNT 707-48460-6160 Description This will help us line our sanitary sewers to eliminate infiltration root intrusion and avoid expensive repairs and sewer backups. Justification/Sustai nabi lity We have an old collection system that needs immediate attention. Continuously cleaning the sewer does not stop roots or infiltration from going into the pipes, we need a more permanent fix. The majority of our sanitary sewer pipe is made out of clay pipe and has reached its life expectancy. Prior Expenditures 2026 2027 2028 2029 2030 Total 432,500 Construction/Maintenance 75,000 75,000 80,000 85,000 0 315,000 Total 75,000 75,000 80,000 85,000 0 315,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 432,500 SF - Sanitary Sewer Fund 75,000 75,000 80,000 85,000 0 315,000 Total 75,000 75,000 80,000 85,000 0 315,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project# 19-CIP-AR002 Project Name Arts Center - Outdoor Signage/lighting Total Project Cost $100,000 Department Comm Svcs - Arts Center Type Improvement Category Buildings: Arts Center Status Active Useful Life 20 years GL ACCOUNT 250-48530-7900 Description This project was originally slated for 2019, but tabled for further planning and city guideline revisions This is a multi -phase project: Phase 1: Replace existing name signage with imporved and refreshed outdoor signage on front of building Phase 2: Create signage/marquee/sculptural piece in front of Center that clearly identifies the building as Hopkins Center for the Arts Phase 3: Continue impage improvements Justification/Sustainability Currently the signage for Hopkins Center for the Arts is obstructed by trees and in need of updates. Stages Theatre signage is more visible causing confusion regarding the building. This project is estimated to exceed $100,000. Part of the funding for this project will be raised through donations with assistance from the Friends and City leadership. Prior Expenditures 2026 2027 2028 2029 2030 Total 50,000 Construction 0 25,000 25,000 0 0 50,000 Total 0 25.000 25.000 0 0 50.000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 50,000 AC -Arts Center Fund 0 25,000 25,000 0 0 50,000 Total 0 25,000 25,000 0 0 50,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 19-CIP-AR005 Project Name Arts Center - Access/Lockdown System Total Project Cost $210,500 Department Comm Svcs - Arts Center Type Improvement Category Buildings: Arts Center Status Active GLACCOUNT 25048530-7200 Description Access Control System with Lockdown Capacity including equipment and installation. Phase 1: $43,500 Phase 2: $32,000 Phase 3: $27,000 Phase 1 & 2 completed in 2024/2025. Install locking and security mechanisms that will allow for panic button locking system in an emergency lockdown situation throughout the building. System will be integrated with security camera system. Justification/Sustainability Installing keycard access would allow better control of who is allowed to enter the building as well as the ability to track who is in the building. Stages Theatre Company has many staff members, and many who are contracted, working as needed on a project. The contracted employees are given keys when needed, however, from a building management standpoint, it is difficult to track and make sure that people don't have access to the building that shouldn't. Long-term the goal is to key all interior office and room doors with the same system, primarily to be able to keep key situation under better control and to allow for a safe lock -down procedure if ever needed. Prior Expenditures 2026 2027 2028 2029 2030 Total 150,500 Construction/Maintenance 30,000 30,000 0 0 0 60,000 Total 30,000 30,000 0 0 0 60,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 150,500 AC - Arts Center Fund 30,000 30,000 0 0 0 60,000 Total 30,000 30,000 0 0 0 60,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project# 19-CIP-AR007 Project Name Arts Center - Roof Replacement Total Project Cost $750,000 Contact Facilities Director Department Comm Svcs - Arts Center Type Improvement Category Buildings: Arts Center Status Active GL ACCOUNT 305-40270-6160 Description Replacement of Roof Justification/Sustainability Facility originally built in 1997. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 750,000 0 0 0 750,000 Total 0 750,000 0 0 0 750,000 Funding Sources 2026 2027 2028 2029 2030 Total Cl - Capital Improvement Fund 0 750,000 0 0 0 750,000 Total 0 750,000 0 0 0 750,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 19-CIP-UO17 Project Name Trunk Utility Rehabilitation Total Project Cost $8,955,000 Department Public Works: Utilities Type Improvement Category Utilities: Municipal Water System Status Active GLACCOUNT 703-48280-6160 Description Program includes rehabilitation of trunk water mains and sanitary sewer around the city. Staff has conducted some non-destructive condition assessment testing of various trunk lines around the city. The testing determines a level of deterioration based on a calculated reduction of thickness of the pipe wall. Review of how critical the line is, break records, pipe age, and soil conditions are also considered in determining projects. 2027: Replacement of trunk utility mains as informed by non-destructive testing at various locations. Justification/Sustainability Trunk water mains are large diameter, high capacity lines that are critical to supply water to and from the water treatment plant, water towers, and distribution lines around the city and cannot easily be taken out of service. Trunk sanitary sewer mains are larger diameter mains that collect smaller mains and convey sanitary sewage to pumping stations. Public Works staff has been managing the trunk main system as a standalone asset, as these mains cannot always be included for rehabilitation with street reconstruction projects. Much of the city's trunk system was constructed over 50 years ago and is approachingthe end of it's service life. Prior Expenditures 2026 2027 2028 2029 2030 Total 3,955,000 Construction/Maintenance 0 5,000,000 0 0 0 5,000,000 Total 0 5,000,000 0 0 0 5,000,000 Prior Funding5ources 2026 2027 2028 2029 2030 Total 3,955,000 WF - Water Fund 0 5,000,000 0 0 0 5,000,000 Total 0 5,000,000 0 0 0 5,000,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 20-CIP-PV334 Project Name Pavilion - Arena Exit Door Replacement Total Project Cost $185,000 Type Improvement Status Active GL ACCOUNT 747-48775-7200 Description Replace the arena exit doors, frames, hinges, and closers. Department Pavilion Category Bldgs: Pavillion Useful Life 15 years Justification/Sustainability The frames and hardware are original, installed during the construction of the facility. Frames are rusting and hardware is failing. Prior Expenditures 2026 2027 2028 2029 2030 Total 92,500 Construction/Maintenance 75,000 17,500 0 0 0 92,500 Total 75,000 17,500 0 0 0 92,500 Prior Funding Sources 2026 2027 2028 2029 2030 Total 92,500 PA- Pavilion Fund 75,000 17,500 0 0 0 92,500 Total 75,000 17,500 0 0 0 92,500 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 20-CIP-S001 Project Name Central Business District Lighting Upgrades Total Project Cost $140,000 Department Public Works: Streets/Traffic Type Improvement Category Trans: Street Lights Status Active Description Upgrade existing lighting in the Central Business District to newer LED fixtures, replace light poles and electrical service feed cabinets, as needed. 2023: Mainstreet East of 5th Ave - 20 fixtures 10th, 11th and 12th Ave N & S of Mainstreet - 52 fixtures Parking Lots 500 and 600 -15 fixtures 2024: 7th, 8th and 9th Ave N & S of Mainstreet- 28 fixtures Parking Lots 700 and 750 - 8 fixtures Justificatio n/Sustaina bility There is a need to continue the upgrade of lighting in the Central Business District. The Mainstreet lights were all upgraded to LED fixtures in 2015. An upgrade to LED fixtures will provide energy savings, maintenance savings and create a more uniform lighting appearance throughout the downtown area. Prior Expenditures 2026 2027 2028 2029 2030 Total 100,000 Construction 0 40,000 0 0 0 40,000 Total 0 40.000 0 0 0 40.000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 100,000 CR - Current Revenues -Tax Levy 0 40,000 0 0 0 40,000 Total 0 40,000 0 0 0 40,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 20-CIP-SO02 Project Name City Street Lighting Upgrades Total Project Cost $1,350,000 Department Type Improvement Category Status Active Description Public Works: Streets/Traffic Trans: Street Lights Street lighting upgrades are needed to replace deteriorated poles, electrical feedpoints and old, energy inefficient fixtures. 2026: Hobby Acres neighborhood streets, replace 17th poles and fixtures to match Xcel Energy upgraded poles/lights and three electrical feedpoints. 2027: Westbrooke Way street lighting, upgrade 22 lights, poles and wiring via new Xcel Energy agreement to replace expired 30-year agreement 2028:11th Ave S, south of 7th St S, replace 18 poles and fixtures and one electrical feedpoint. 2029: Upgrade/Replace 8 Power Feed Points and Excelsior West of 11th to Shady Oak (Xcel Lease) Justification/Sustainability A replacement plan is needed as these lighting and electrical feed systems are reaching the end of their useful life, with out -dated electrical cabinets, poles and bases and old, energy inefficient light fixtures. Prior Expenditures 2026 2027 2028 2029 2030 Total 300,000 Construction 0 Total 0 200,000 200,000 90,000 90,000 225,000 225,000 535,000 535,000 1,050,000 1,050,000 Prior Funding Sources 2026 300,000 CR - Current Revenues - Tax Levy 0 Tota 1 0 2027 2028 2029 2030 Total 200,000 90,000 225,000 535,000 1,050,000 200,000 90,000 225,000 535,000 1,050.000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 20-CIP-S005 Project Name Minnetonka Mills/5th St N Intersection Improvement Total Project Cost $600,000 Department Public Works: Streets/Traffic Type Improvement Category Trans: Sign/Signals Status Active GLACCOUNT 501-49400-6160 Description Remove outdated signal and update intersection for all modes of travel.The work will also include upgrading the pedestrian ramps and crossings to meet ADA standards. 2026: Removal and replacement of signal and ADA upgrades Justification/Sustainabi lity The existing signal is old and reaching the end of it's service life. Pedestrian crossing and ADA improvements should be completed as there are increased levels pedestrian traffic through the intersection since the improvements to Burnes Park. Expenditures Construction/Maintenance 2026 2027 2028 2029 2030 Total 600,000 0 0 0 0 600,000 Total 600,000 0 0 0 0 600,000 Funding Sources 2026 2027 2028 2029 2030 PI - PIR/General Obligation Bonds 590,000 0 0 0 0 SU - Storm Sewer Fund 10,000 0 0 0 0 Total 600,000 0 0 0 0 Total 590,000 10,000 600,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 20-CIP-SO06 Project Name Trail Segment- Bellgrove Total Project Cost $100,000 Contact Public Works Director Department Public Works: Streets/Traffic Type Improvement Category Trans: Walkways/Sidewalks Status Active Description Trail in Bellgrove Neighborhood Expenditures Construction/Maintenance Funding Sources PI - PIR/General Obligation Bonds 2026 2027 2028 0 0 0 Total 0 0 0 2026 2027 2028 0 0 0 Total 0 0 0 2029 2030 Total 100,000 0 100,000 100,000 0 100,000 2029 2030 Total 100,000 0 100,000 100,000 0 100,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project# 21-CIP-B101 Project Name 907 Mainstreet (HHS) Windows & Front/Back Door Total Project Cost $105,000 Department Type Improvement Category Status Active Useful Life GLACCOUNT 501-49400-6160 Public Works: Bldg/Equip Sery Economic Development 20 years Description The current windows are well past their useful life. 8 Windows and two doors are due for replacement. Justification/Sustainability The need to get this facility into the CIP for future planning. Installing new windows and doors will be more energy efficent for the building. Today's estimated cost is $55,000. Expenditures Construction/Maintenance Funding Sources cl - Capital Improvement Fund 2026 2027 2028 2029 2030 Total 0 0 105,000 0 0 105,000 Total 0 0 105,000 0 0 105,000 2026 2027 2028 2029 2030 Total 0 0 105,000 0 0 105,000 Total 0 0 105,000 0 0 105,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 21-CIP-PO73 Project Name Repair Valley Park Volleyball Court Total Project Cost $80,000 Type Improvement Status Active . Description Department Public Works: Parks Category PW - Parks GLACCOUNT 300-49110-6160 Install new curbing, posts and lighting. Regrade base and add new sand. Justification/Sustai na bi I ity Current curbing is wood and is rotting, posts are also wood that is detoriating Expenditures 2026 2027 2028 2029 Construction/Maintenance 80,000 0 0 0 Total 80,000 0 0 0 Funding Sources PDF- Park Dedication Fund 2026 2027 2028 80,000 0 0 Total 80,000 0 0 2030 Total 0 80,000 0 80,000 2029 2030 Total 0 0 80,000 0 0 80,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 21-CIP-PO74 Project Name Repair Burnes Park Tennis Courts Total Project Cost $130,000 Department Public Works: Parks Type Improvement Category PW - Parks Status Active GL ACCOUNT 300-49110-6160 Description Remove and replace existing asphalt pavement and apply new color coatings system. Justification/Susta i nabi I ity The court is deteriorated beyond crack sealing or top coat repairs. Needs new asphalt pavement and color coatings. Expenditures 2026 2027 2028 2029 2030 Total Construction/Maintenance 130,000 0 0 0 0 130,000 Total 130,000 0 0 0 0 130,000 Funding Sources 2026 2027 2028 2029 2030 Total PDF- Park Dedication Fund 130,000 0 0 0 0 130,000 Total 130,000 0 0 0 0 130,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 21-CIP-PO75 Project Name Repair Play Courts- Elmo & Park Valley Total Project Cost $90,000 Department Public Works: Parks Type Unassigned Category PW - Parks Status Active GL ACCOUNT 300-49110-6160 Description Remove and replace existing asphalt pavement. Justification/Sustainability The court is deteriorated beyond crack sealing or top coat repairs. Needs new asphalt pavement. Expenditures 2026 2027 2028 2029 2030 Total Construction/Maintenance 0 90,000 0 0 0 90,000 Total 0 90,000 0 0 0 90,000 Funding Sources 2026 2027 2028 2029 2030 Total PDF- Park Dedication Fund 0 90,000 0 0 0 90,000 Total 0 90,000 0 0 0 90,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project# 23-CIP-CH038 Project Name City Hall/Police Station - Roof Replacement Total Project Cost $990,000 Department City Hall Administration Category Bldg: City Hall GLACCOUNT 305-40261-6160 Expenditures 2026 Construction/Maintenance 0 Total 0 Funding Sources 2026 Cl - Capital Improvement Fund 0 V Total 0 Contact Facilities Director Type Improvement Status Active 2027 2028 2029 2030 Total 140,000 850,000 0 0 990,000 140,000 850,000 0 0 990,000 2027 2028 2029 2030 Total 140,000 850,000 0 0 990,000 140,000 850,000 0 0 990,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 23-CIP-PO76 Project Name Central Park Renovation Total Project Cost $14,150,000 Contact Management Analyst Department Public Works: Parks Type Improvement Category PW - Parks Status Active Useful Life 25years GLACCOUNT 300-49110-6160 Description Amending 23-CIP-PO76 to include costs for improvements associated with master plan. Includes removal of kickball backstop and existing playground, addition of new playground, volleyball, basketball and other amenities. Justification/Sustainability Items in park have exceeded their useful life. Central park ranks as number 2 in the prioritization score for improvements in the Park System Master Plan. Prior Expenditures 2026 2027 2028 2029 2030 150,000 Construction 5,500,000 8,500,000 0 0 0 Total 5,500,000 8,500,000 0 0 0 Prior Funding Sources 2026 2027 2028 2029 2030 150,000 GA - Grant -In -Aid 3,500,000 3,500,000 0 0 0 PI - PIR/General Obligation Bonds ' 0 3,200,000 0 0 0 SU - Storm Sewer Fund 2,000,000 0 0 0 0 PDF- Park Dedication Fund 0 1,800,000 0 0 0 Total 5,500,000 8,500,000 0 0 0 Total 14,000,000 14,000,000 Total 7,000,000 3,200,000 2,000,000 1,800,000 14,000,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 23-CIP-PV336 Project Name Pavilion - Roof Replacement Total Project Cost $100,000 Department Pavilion Category Bldgs: Pavillion GL ACCOUNT 747-4877S-7200 Description Replace South Team Room Addition Roof Expenditures Construction/Maintenance Funding Sources PA- Pavilion Fund Contact Facilities Director Type Unassigned Status Active 2026 2027 2028 2029 2030 Total 0 100,000 0 0 0 100,000 Total 0 100,000 0 0 0 100,000 2026 2027 2028 2029 2030 Total 0 100,000 0 0 0 100,000 Total 0 100,000 0 0 0 100,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project# 23-CIP-PV337 Project Name Pavilion - Bleacher Heating Replacement Total Project Cost $75,000 Contact Department Pavilion Type Category Bldgs: Pavillion Status Useful Life 10years GLACCOUNT Description Replace existing radiant heating system above the bleachers in the arena. Justification/Sustai nability Current system is at the end of useful life and major components will need replacing. Expenditures 2026 Construction/Maintenance 0 Total 0 Finance Director Improvement Active 747-48775-7900 2027 2028 2029 2030 Total 75,000 0 0 0 75,000 75,000 0 0 0 75,000 Funding Sources 2026 2027 2028 2029 2030 Total PA- Pavilion Fund 0 75,000 0 0 0 75,000 Total 0 75,000 0 0 0 75,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 23-CIP-PV339 Project Name Pavilion - Warming House Window Blinds Total Project Cost $14,000 Type Improvement Status Active Description Add window blinds to windows in the warming house Expenditures Construction Total Funding Sources PA- Pavilion Fund Total Department Pavilion Category Bldgs: Pavillion GLACCOUNT 747-48775-7500 2026 2027 2028 2029 2030 Total 0 14,000 0 0 0 14,000 0 14,000 0 0 0 14,000 2026 2027 2028 2029 2030 Total 0 14,000 0 0 0 14,000 0 14,000 0 0 0 14,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project# 23-CIP-SO07 Project Name Mainstreet Banner Pole Installation Total Project Cost $250,000 Department Public Works: Streets/Traffic Type Unassigned Category Trans: Sign/Signals Status Active Description Installation of freestanding banner mount poles for large Mainstreet banners Justification/Sustainability The existing Mainstreet banners are mounted to provate buildings through an agreement between the City and the property owners. The banners have caused significant damage to building brickwork in recent years, requireing extensive and expensive repairs that the City is responsible for. One property owner has expressed that they will not renew the banner attachment agreement when it expires. Freestanding banner mounts would eliminate the need to have the banners mounted to private businesses. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 0 0 120,000 130,000 250,000 Total 0 0 0 120,000 130,000 250,000 Funding Sources 2026 2027 2028 2029 2030 Total CR - Current Revenues - Tax Levy 0 0 0 120,000 130,000 250,000 Total 0 0 0 120,000 130,000 250,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 23-CIP-S008 Project Name Excelsrior Blvd. Fencing Total Project Cost $250,000 Department Public Works: Streets/Traffic Type Unassigned Category Trans: Streets Status Active Description Wooden fencing on Excelsior Blvd: South side of South Presidents, South side of 5th St S and 9th Ave S, and North side of Excelsior Blvd. 17th Ave N Justification/Sustainability Posts and panels have been failing for a few years. We need to start replacing so we are not constantly replacing the broken boards Prior Expenditures 2026 2027 2028 2029 2030 Total 50,000 Construction/Maintenance 0 50,000 50,000 50,000 50,000 200,000 Total 0 50,000 50,000 50,000 50,000 200,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 50,000 CR - Current Revenues - Tax Levy 0 50,000 50,000 50,000 50,000 200,000 Total 0 50,000 50,000 50,000 50,000 200,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 23-CIP-UO18 Project Name Water Treatment Plant Roof Replacement Total Project Cost $290,000 Department Public Works: Utilities Type Improvement Category Utilities: Municipal Water System Status Active GLACCOUNT 703-48280-6160 Expenditures 2026 2027 2028 2029 2030 Construction/Maintenance 270,000 0 20,000 0 0 Total 270,000 0 20,000 0 0 Funding Sources WF- Water Fund 2026 2027 270,000 0 Total 270,000 0 Total 290,000 290,000 2028 2029 2030 Total 20,000 0 0 290,000 20,000 0 0 290,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 24-CIP-AC057 Project Name Activity Center- Gender Neutral Bathroom Total Project Cost $50,000 Contact Department Comm Svcs - Activity Center Type Category Buildings: Activity Center Status Useful Life 20years GLACCOUNT Activity Ctr Director Improvement Active OPERATING BUDGET 2025 - 305-40257-6160 Description Phase 1: Consult with Architect to convert second floor restrooms to gender neutral Phase 2: Add gender neutral restrooms if plans permit and upgrade current restrooms to be handicap accessible by adding push-button door opening hardware to current men's and women's restrooms Estimating cost at $40,000. Will not have actual costs until architectural consultation. Justification/Sustainability In order to make our facilities accessible and welcoming to all, we would like to add a gender neutral restroom at the Activity Center. At the same time, we would also like to add handicap accessible push buttons to open existing men's and women's restroom doors. Give the age of the clientele, this is often requested. Prior Expenditures 2026 2027 2028 2029 2030 Total 10,000 Construction 0 40,000 0 0 0 40,000 Total 0 40,000 0 0 0 40,000 Prior Funding Sources 2026 2027 2028 2029 2030 Total 10,000 Cl - Capital Improvement Fund 0 40,000 0 0 0 40,000 Total 0 40,000 0 0 0 40,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 24-CIP-AC058 Project Name Activity Center - Gymnasium Floor Total Project Cost $25,000 Contact Activity Ctr Director Department Comm Svcs - Activity Center Type Improvement Category Buildings: Activity Center Status Active Useful Life 20 years GL ACCOUNT 305-40257-6160 Description Refinish and repair gymnasium floor Justification/SustainabiIity The gymnasium floor will need to be refinished in the near future to maintain its quality. Pickle ball players have complained that there are several 'dead' spots in the floor that will also need to be addressed in order for it to be viable for Pickle Ball rentals and events. Expenditures Construction/Maintenance Funding Sources Cl - Capital Improvement Fund 2026 2027 2028 2029 2030 Total 0 0 25,000 0 0 25,000 Total 0 0 25,000 0 0 25,000 2026 2027 2028 2029 2030 Total 0 0 25,000 0 0 25,000 Total 0 0 25,000 0 0 25,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 24-CIP-AR009 Project Name Arts Center- Restroom Remodel Total Project Cost $105,000 Contact Arts Center Director Department CommSvcs- ArtsCenter Type Improvement Category Buildings: Arts Center Status Active Useful Life 20 years GL ACCOUNT 250-48530-7200 Description Phase 1: Consult with architect to convert second floor restrooms to gender neutral restrooms Phase 2: Convert second floor restrooms to gender neutral and possibly one family restroom if plans permit. Upgrade main floor restrooms with new stall partitions, toilet paper dispensers, motion activated faucets, handicap accessible doors and upgraded tile floors Estimated cost at $110,000. Architectural consultation in 2025 will help determine actual cost. Justification/Sustai nabil ity We receive requests for gender neutral restrooms. When requested, we have to shut down one of the public restrooms for individual use. The second floor restroom seems to be the most economical way of doing this. Due to the complexity of this project it is important to have an architect's expertise on the design The first floor restroom floor, stall and equipment is original to the building. We have continued to have the tile floors refurbished but they are looking old and outdated. The toilet paper dispensers are slowly breaking down from age, and we often have the water left running in the restrooms by all of the children that use the building. Because of the toilet paper dispenser and floor replacements, we may have to replace the partitions as well. Expenditures Construction Planning/Design Funding Sources AC -Arts Center Fund 2026 2027 2028 2029 2030 Total 0 90,000 0 0 0 90,000 0 15,000 0 0 0 15,000 Total 0 105,000 0 0 0 105,000 2026 2027 2028 2029 2030 Total 0 105,000 0 0 0 105,000 Total 0 105,000 0 0 0 105,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 24-CIP-PO78 Project Name Downtown Park Stage - Electric Total Project Cost $25,000 Contact Department Public Works: Parks Type Category PW - Parks Status Useful Life 15 years GL ACCOUNT Description Add 50 amp outlets to stage area for bands to be able to use more equipment Justification/Sustai nability All outlets on stage are 20 amp and not sufficient to handle today's equipment Public Works Director Improvement Active 300-49110-6160 Expenditures 2026 2027 2028 2029 2030 Total Construction 25,000 0 0 0 0 25,000 Total 25,000 0 0 0 0 25,000 Funding Sources PDF- Park Dedication Fund 2026 2027 2028 2029 2030 Total 25,000 0 0 Total 25,000 0 0 0 0 25,000 0 0 25,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project# 24-CIP-PO79 Project Name Valley Park Basketball Court Total Project Cost $60,000 Contact Public Works Director Department Public Works: Parks Type Improvement Category PW - Parks Status Active Useful Life 15years GLACCOUNT 300-49110-6160 Description Remove existing court and repave and color coat. Basketball hoops and posts can be reused. Justification/Sustai na bility Court has substantial cracks and chunks of the color coating have come up Expenditures 2026 2027 2028 2029 2030 Total Construction/Maintenance 60,000 0 0 0 0 60,000 Total 60,000 0 0 0 0 60,000 Funding Sources 2026 2027 2028 2029 2030 Total PDF- Park Dedication Fund 60,000 0 0 0 0 60,000 Total 60,000 0 0 0 0 60,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 24-CIP-PO80 Project Name Maetzold Field Lighting Total Project Cost $150,000 Department Public Works: Parks Category PW - Parks Useful Life 15 years Contact Public Works Director Type Improvement Status Active GL ACCOUNT 300-49110-6160 Description Switch all lighting to Musco controls. Lighting will be able to be controlled through an app. It will have a fail safe if lights are left on. J ustifi cati o n/S u sta i na bi I ity Currently lights are being turned of and off by breakers and key switches. We are not able to control if they are left on. Expenditures Construction Funding Sources PDF- Park Dedication Fund 2026 2027 2028 2029 2030 Total 0 150,000 0 0 0 150,000 Total 0 150,000 0 0 0 150,000 2026 2027 2028 2029 2030 Total 0 150,000 0 0 0 150,000 Total 0 150,000 0 0 _ 0 150,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project# 24-CIP-PO81 Project Name Oakes & Valley Parks Recreation & Resilience Hubs Total Project Lost $9,000,000 Department Public Works: Parks Category PW - Parks Useful Life 50years Description Contact Management Analyst Type Improvement Status Active . GLACCOUNT 300-49110-6160 Construction of two (2) new buildings which will serve community needs for recreation, resilience, and other civic uses such as voting and EMS operations. Justification/Sustaina bi I ity Buildings in these parks no longer meet community needs. The City has a gap in provision of public buildings which directly overlaps with areas of poverty and where population is most diverse. Buildings will meet a wide array of community needs. Oakes and Valley Parks rank number por3 and 5 in the equity portion of the Park System Master Plan. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 4,500,000 4,500,000 0 0 9,000,000 Total 0 4,500,000 4,500,000 0 0 9,000,000 Funding Sources 2026 2027 2028 2029 2030 Total GA- Grant -In -Aid 0 2,250,000 2,250,000 0 0 4,500,000 PDF- Park Dedication Fund 0 2,250,000 2,250,000 0 0 4,500,000 Total 0 4,500,000 4,500,000 0 0 9,000,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # 24-CIP-SO10 Project Name 17th Ave Reconstruction Total Project Cost $8,600,000 Department Public Works: Streets/Traffic Category Trans: Streets Useful Life 30years Description Contact Public Works Director Type Improvement Status Active GLACCOUNT 501-49400-6160 Reconstruction of 17th Avenue, including watermain, sanitary sewer, addition of off-street pedestrian/bicycle facilities, and pavement surface. Improvement is consistent with the Storm Water Management Plan, Complete Street Policy, and Bike and Pedestrian Plan. Justification/Sustainability The pavement surface is nearing the end of its usable life. The utilities in the corridor are near the end of their service life as well. Reconstruction will also allow the installation of off-street pedestrian and bicvcles improvements_ Public engagement has shown a desire for an improved road surface and improved bicycle and pedestrian facilities in the corridor. The cost assumes city funding 100% of major storm sewer, sanitary sewer and watermain improvements. Applications for outside funding have been submitted, and additional sources of outside funding will continue to be pursued. Expenditures 2026 2027 2028 2029 2030 Total Construction 0 8,600,000 0 0 0 8,600,000 Total 0 8,600,000 0 0 0 8.600,000 Funding Sources 2026 2027 2028 2029 2030 Total MS - Municipal State Aid Streets 0 3,790,000 0 0 0 3.790,000 PI - PIR/General Obligation Bonds 0 1,830,000 0 0 0 1,830,000 WF- Water Fund 0 1,100,000 0 0 0 1,100,000 SA - Special Assessment 0 780,000 0 0 0 780,000 SF- Sanitary Sewer Fund 0 600,000 0 0 0 600,000 SU - Storm Sewer Fund 0 500,000 0 0 0 500,000 Total 0 8,600,000 0 0 0 8,600,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # None Project Name Phase 3 SCADA Fiber Total Project Cost $500,000 Contact Public Works Director Department Public Works: Utilities Type Improvement Category Utilities: Municipal Sanitary Sewer Status Active Useful Life 20 years Description Phase three of switching current monitoring and controls equipment from radio communication to fiber communication. Justificatio n/Sustai nabi I ity Our current system of monitoring and controlling the sanitary sewer system can be vulnerable to hackers. Radio signals can intercepted by unauthorized individuals using radio scanners or other devices. Our critical infrastructure will be safer with fiber. Expenditures Construction/Maintenance Funding Sources SF - Sanitary Sewer Fund WF - Water Fund 2026 2027 2028 2029 2030 Total 500,000 0 0 0 0 500,000 Total 500,000 0 0 0 0 500,000 2026 2027 2028 2029 2030 Total 250,000 0 0 0 0 250,000 250,000 0 0 0 0 250,000 Total 500,000 0 0 0 0 500,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project# None Project Name Replace PD 40ton Rooftop HVAC Total Project Cost $140,000 Department City Hall Administration Category Bldg: City Hall Useful Life 20 years Contact Facilities Director Type Unassigned Status Active Description Replace 40ton Rooftop HVAC responsible for heating and cooling in the Police Department Justification/Sustainability Current unit has a outdated and unsupported control board, if that board were to fail there is no repair, replacement, or upgrade that can be done. Expenditures Construction/Maintenance Funding Sources Cl - Capital Improvement Fund 2026 2027 2028 2029 2030 Total 140,000 0 0 0 0 140,000 Total 140,000 0 0 0 0 140,000 2026 2027 2028 2029 2030 Total 140,000 0 0 0 0 140,000 Total 140,000 0 0 0 0 140,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # None Project Name City Hall/PD Boilers Total Project Cost $90,000 Contact Facilities Director Department City Hall Administration Type Unassigned Category Bldg: City Hall Status Active Useful Life 15 years Description Boiler Replacement City Hall/PD Boilers. Justification/Sustainability Current boilers were installed in 2009 and exchangers are in need of replacement, due to the age of the boilers its recommended to replace the boilers Expenditures Construction/Maintenance Funding Sources Cl - Caoital Improvement Fund 2026 2027 2028 2029 2030 Total 90,000 0 0 0 0 90,000 Total 90,000 0 0 0 0 90,000 2026 2027 2028 2029 2030 Total 90,000 0 0 0 0 90,000 Total 90,000 0 0 0 0 90,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # None Project Name Activity Center - Camera/Surveillance System Total Project Cost $15,000 Contact Activity Ctr Director Department Comm Svcs - Activity Center Type Equipment Category Buildings: Activity Center Status Active Useful Life 5 years Description The interior cameras and software system at the Activity Center are outdated and no longer interface with the office monitor. Due to this, the cameras are only visible through Beth's computer leaving Building Supervisor without the ability to see activity in the building. This upgrade would replace outdated interior cameras and integrate the system into the same system used by the Arts Center and Police Department. • Replace 4 interior cameras • Integration into City system Justification/SustainabiIity Due to the lack of access and operation of the current system, the Building staff lacks security and safety of monitoring activities and who may be entering the building. Expenditures 2026 2027 2028 2029 2030 Total Equipment 15,000 0 0 0 0 15,000 Total 15,000 0 0 0 0 15,000 Funding Sources 2026 2027 2028 2029 2030 Total Equipment Replacement Fund 15,000 0 0 0 0 15,000 Total 15,000 0 0 0 0 15,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT Hopkins, MN CIP Project # None Project Name Arts Center- Theater Microphones Total Project Cost $12,000 Contact Arts Center Director Department Comm Svcs - Arts Center Type Equipment Category Buildings: Arts Center Status Active Useful Life 5 years Description Upgrade microphones used in main theater. In order to ensure best sound quality, it is advised to upgrade to new microphones periodically. The current microphones are over 5 years old. justification/Sustai nability In order to provide the best sound quality for concerts and to renters it is advised to replace microphones periodically. Expenditures 2026 2027 2028 2029 2030 Total Equipment 12,000 0 0 0 0 12,000 Total 12,000 0 0 0 0 12,000 Funding Sources 2026 2027 2028 2029 2030 Total Equipment Replacement Fund 12,000 0 0 0 0 12,000 Total 12,000 0 0 0 0 12,000 Produced Using Plan -It CIP Software 2026 thru 2030 CAPITAL IMPROVEMENT PLAN - FIRST DRAFT .Hopkins, MN CIP Project # None Project Name Depot - Exterior Door Replacement Total Project Cost $65,000 Contact Facilities Director Department Depot/ACE Program Type Improvement Category . Bldg: Depot Status Active Useful Life 20 years Description Replace Depot exterior doors, jambs, flashing, and trim of Main Entrance, South Main room entrance, West Main room Deck Entrance, and North Main Room Deck Entrance. Justificatio n/Sustai na bility The doors are old and not energy efficient,and do not seem very secure. Replacement doors should last 20 25 years. Project could be divided into phases over two years. Priority given to main entrance. Total cost of project: $65,000. Expenditures Unassigned Construction/Maintenance Funding Sources Cl - Capital Improvement Fund 2026 0 32,500 Total 32,500 2026 32,500 Total 32,500 2027 32,500 0 32,500 2027 32,500 32,500 2028 2029 2030 Total 0 0 0 32,500 0 0 0 32,500 0 0 0 65,000 2028 2029 2030 Total 0 0 0 65,000 0 0 0 65.000 Produced Using Plan -It CIP Software CITY OF HOPKINS HENNEPIN COUNTY, MINNESOTA PLANNING & ZONING RESOLUTION 2025-11 A RESOLUTION FINDING THAT THE 2026-2030 CAPITAL IMPROVEMENT PLAN IS CONSISTENT WITH THE COMPREHENSIVE PLAN WHEREAS, the Planning & Zoning Commission reviewed the Comprehensive Plan regarding the proposed capital improvements in the 2026-2030 Capital Improvement Plan at their regular meeting on October 28, 2025; and WHEREAS, the Planning & Zoning Commission has found that the proposed capital improvements are consistent with the City's Comprehensive Plan, NOW THEREFORE BE IT RESOLVED, the Planning & Zoning Commission of the City of Hopkins hereby find that the 2026-2030 Capital Improvement Plan is consistent with the Comprehensive Plan and recommending City Council approval based on that finding. Adopted this 28th day of October 2025. By: - - - Whitney Terrill, Chair